Transformer charging start control method, device, equipment and storage medium
By combining predictive models and meteorological information with rated parameters to generate a charging start-up control strategy, the problem of low reliability of transformer charging start-up in existing technologies is solved, and safer charging start-up control is achieved.
Patent Information
- Application Number
- CN202411127135.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-16
AI Technical Summary
Existing transformer charging start-up control methods rely on real-time data, resulting in low reliability and potential safety hazards.
By combining predictive models and meteorological information with rated parameters, a charging start-up control strategy is generated, including deep learning models and fuzzy control rules, to optimize the transformer's charging start-up process.
This improves the reliability and safety of transformer charging start-up control and reduces the risk of damage to the transformer from voltage or current surges.
Smart Images

Figure CN118659449B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of transformers, and in particular to a charging startup control method, device, equipment and storage medium for a transformer. Background Art
[0002] With the continuous growth of global energy demand and the enhancement of environmental protection awareness, the application of new energy power generation (such as wind power and solar energy) has become more and more common worldwide. The grid connection of new energy power generation equipment is an important link in realizing the efficient utilization of new energy. It can convert wind energy, solar energy, etc. into electrical energy and transmit it to users through the power grid. However, the existing grid connection technology mainly relies on the real-time data of the target power grid and the real-time data of the environment to control the charging start of the transformer during grid connection. This charging start control method has low reliability and there are great safety hazards in the charging start process of the transformer. Summary of the invention
[0003] The present application provides a transformer charging startup control method, device, equipment and storage medium to solve the problems raised by the above background technology.
[0004] In a first aspect, the present application provides a charging start control method for a transformer, which is used for grid connection processing of a new energy power generation device, and the method comprises:
[0005] Before incorporating the new energy power generation equipment into the target power grid, the current time information is obtained, and the time information is input into a preset target power grid parameter information prediction model to obtain the power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model;
[0006] Determining whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information;
[0007] If yes, obtain the weather forecast information within the preset time period through the weather information service terminal, and determine whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information;
[0008] If so, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
[0009] In a possible implementation, the grid parameter information includes a change curve of parameter values of multiple grid parameters within the preset time period, and the determining whether to integrate the new energy power generation equipment into the target grid based on the grid parameter prediction information includes:
[0010] For each of the power grid parameters, a standard value range corresponding to the power grid parameter is obtained in a database, and a target area corresponding to the standard value range is determined in a coordinate system where a change curve of the power grid parameter is located, and when the change curve of the power grid parameter is within the target area, the power grid parameter is determined to be a reliable power grid parameter;
[0011] If all the grid parameters are reliable grid parameters, it is determined that the new energy power generation equipment will be integrated into the target grid.
[0012] In a possible implementation manner, before generating the charging start control strategy of the transformer based on the grid parameter prediction information, the meteorological prediction information and the rated parameter information, the method further includes:
[0013] The power grid parameter prediction information is encoded based on a preset encoding rule to obtain a coding sequence corresponding to the power grid parameter prediction information; wherein the coding sequence includes letters and numbers;
[0014] Arrange the numbers in the coding sequence in sequence based on the positions of the numbers in the coding sequence to obtain a digital sequence, and arrange the letters in the coding sequence in sequence based on the positions of the letters in the coding sequence to obtain a letter sequence;
[0015] Obtain a first hash value and a second hash value based on a preset hash algorithm; wherein the first hash value is a hash value corresponding to the digital sequence, the second hash value is a hash value corresponding to the letter sequence, and the first hash value and the second hash value both include 2n characters;
[0016] Put the second hash value below the first hash value to obtain an initial matrix;
[0017] The initial matrix is divided into a plurality of second-order square matrices, and based on the corresponding position of each second-order square matrix in the initial matrix, each second-order square matrix is arranged in sequence to obtain a square matrix sequence;
[0018] Multiplying each second-order square matrix in the square matrix sequence in sequence to obtain a target matrix;
[0019] Decrypting each encrypted text in the database based on the target matrix;
[0020] If there is a successfully decrypted encrypted text, determining the successfully decrypted encrypted text as the target text; wherein the target text records the initial charging start-up control strategy corresponding to the power grid parameter prediction information;
[0021] The initial charging start control strategy is modified based on the weather forecast information to obtain a charging start control strategy.
[0022] In a possible implementation, the initial charging start control strategy is modified based on the weather forecast information to obtain the charging start control strategy, including:
[0023] The meteorological forecast information is input into a preset meteorological classification model for detection to obtain a corresponding meteorological classification result; wherein the meteorological classification model is a pre-trained deep learning model;
[0024] Based on the meteorological classification results, a corresponding target correction strategy is determined in a database; wherein the database stores a correspondence between the meteorological classification results and the correction strategy;
[0025] The initial charging start control strategy is corrected based on the target correction strategy to obtain the charging start control strategy.
[0026] In a possible implementation, the generating the charging start control strategy of the transformer based on the grid parameter prediction information, the meteorological prediction information and the rated parameter information includes:
[0027] Generating an initial charging start-up control strategy for the transformer based on the grid parameter prediction information and the rated parameter information;
[0028] The initial charging start control strategy is modified based on the weather forecast information to obtain a charging start control strategy.
[0029] In a possible implementation, the generating the initial charging start-up control strategy of the transformer based on the grid parameter prediction information and the rated parameter information includes:
[0030] Obtaining the fuzzy control rules corresponding to the transformer in a database;
[0031] Determine the initial charging parameter information when the transformer is started based on the fuzzy control rule and the grid parameter prediction information;
[0032] The initial charging start control strategy is generated based on the initial charging parameter information, a preset charging parameter increment step control rule and the rated parameter information.
[0033] In a possible implementation, the grid parameter information includes a change curve of parameter values of multiple grid parameters within the preset time period, the fuzzy control rule includes a membership function corresponding to each of the grid parameters and a charging parameter value corresponding to each charging parameter at different fuzzy levels, and the initial charging parameter information when the transformer is started is determined based on the fuzzy control rule and the grid parameter prediction information, including:
[0034] Based on each of the change curves, determine a set of grid parameters corresponding to a specified time within the preset time period; wherein the set of grid parameters includes parameter values of each grid parameter at the specified time;
[0035] For each of the power grid parameters, fuzzy processing is performed on the parameter value corresponding to the power grid parameter in the power grid parameter set based on the membership function corresponding to the power grid parameter to obtain the fuzzy processing result corresponding to the power grid parameter; wherein the fuzzy processing result is the membership degree of each fuzzy level of the power grid parameter;
[0036] For each of the fuzzy levels, a weight coefficient corresponding to the fuzzy level is determined based on each of the fuzzy processing results; wherein the weight coefficient is the minimum degree of membership corresponding to the fuzzy level in each power grid parameter;
[0037] For each of the charging parameters, determining an initial charging parameter value corresponding to the charging parameter based on a weight coefficient corresponding to each of the fuzzy levels and a charging parameter value corresponding to the charging parameter at different fuzzy levels;
[0038] The initial charging parameter values are integrated to obtain the initial charging parameter information.
[0039] In a second aspect, the present application provides a charging start control device for a transformer, which is used for grid connection processing of a new energy power generation equipment, and the device includes:
[0040] An acquisition module is used to acquire current time information before incorporating the new energy power generation equipment into the target power grid, and input the time information into a preset target power grid parameter information prediction model to obtain power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model;
[0041] A first judgment module, used to judge whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information;
[0042] A second judgment module is used to determine whether to integrate the new energy power generation equipment into the target power grid, obtain the weather forecast information within the preset time period through the weather information service end, and judge whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information;
[0043] A generation module is used to determine when to integrate the new energy power generation equipment into the target power grid, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the power grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
[0044] In a third aspect, the present application provides a terminal device, comprising a processor, a memory, and a computer program stored in the memory and executable by the processor, wherein when the computer program is executed by the processor, the charging start-up control method of the transformer as described in any one of the above items is implemented.
[0045] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the charging start-up control method for the transformer as described in any one of the above items is implemented.
[0046] The present application provides a charging start control method, device, equipment and storage medium for a transformer, wherein the method is used for the grid connection processing of a new energy power generation device, and the method includes: before the new energy power generation device is connected to the target power grid, obtaining the current time information, and inputting the time information into a preset target power grid parameter information prediction model to obtain the power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model; based on the power grid parameter prediction information, judging whether to connect the new energy power generation device to the target power grid; if so, obtaining the meteorological forecast information within the preset time period through a meteorological information service end, and judging whether to connect the new energy power generation device to the target power grid based on the meteorological forecast information; if so, obtaining the rated parameter information of the transformer corresponding to the new energy power generation device, and generating a charging start control strategy for the transformer based on the power grid parameter prediction information, the meteorological forecast information and the rated parameter information, and starting the transformer based on the charging start control strategy. The method provided in this embodiment generates a charging start-up control strategy for the transformer based on the grid parameter prediction information, the meteorological forecast information and the rated parameter information when the grid parameter prediction information and the meteorological forecast information within the preset time period are beneficial to the integration of new energy power generation equipment into the target power grid, and starts the transformer based on the charging start-up control strategy, thereby improving the reliability of the transformer charging start-up control method and the safety of the transformer during the charging start-up control process. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0048] Figure 1 A schematic flow chart of a method for controlling the charging start of a transformer provided in an embodiment of the present application;
[0049] Figure 2 A schematic block diagram of the structure of a charging start control device for a transformer provided in an embodiment of the present application;
[0050] Figure 3 A schematic block diagram of the structure of a terminal device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change based on actual conditions.
[0053] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0054] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0055] With the continuous growth of global energy demand and the enhancement of environmental protection awareness, the application of new energy power generation (such as wind energy and solar energy) has become more and more common worldwide. The grid connection of new energy power generation equipment is an important link in realizing the efficient utilization of new energy. It can convert wind energy, solar energy, etc. into electrical energy and transmit it to users through the power grid. However, when the existing grid connection technology is connected to the grid, it mainly relies on the real-time data of the target power grid and the real-time data of the environment to control the charging start of the transformer. The reliability of this charging start control method is low, and there are great safety hazards in the charging start process of the transformer. To this end, the embodiment of the present application provides a charging start control method, device, equipment and storage medium for a transformer. To solve the above problems.
[0056] In conjunction with the accompanying drawings, some embodiments of the present application are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0057] See also Figure 1 , Figure 1 The flowchart of the charging start control method of the transformer provided in the embodiment of the present application is shown in FIG. Figure 1 As shown, the transformer charging start control method provided in the embodiment of the present application includes steps S100 to S400.
[0058] Step S100: Before incorporating the new energy power generation equipment into the target power grid, obtain the current time information, and input the time information into a preset target power grid parameter information prediction model to obtain the power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model.
[0059] It should be noted that the execution entity of the embodiment of the present application may be a server, or a charging start control device of a terminal or a transformer.
[0060] The time information includes the current moment and the date corresponding to the current moment, the preset time period is obtained through experiments, and the charging start of the transformer can be completed within the preset time period. The target power grid parameter information prediction model includes an input layer, a power grid parameter information prediction layer and an output layer, the input layer is used to input the time information, the power grid parameter information prediction layer is used to predict the power grid parameter information within the preset time period based on the characteristic information, and obtain the power grid parameter prediction information, and the output layer is used to output the power grid parameter prediction information.
[0061] Step S200: determining whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information.
[0062] Specifically, the grid parameter information includes a change curve of parameter values of multiple grid parameters within the preset time period, and judging whether to integrate the new energy power generation equipment into the target grid based on the grid parameter prediction information includes the following steps:
[0063] For each of the power grid parameters, a standard value range corresponding to the power grid parameter is obtained in a database, and a target area corresponding to the standard value range is determined in a coordinate system where a change curve of the power grid parameter is located, and when the change curve of the power grid parameter is within the target area, the power grid parameter is determined to be a reliable power grid parameter; wherein the power grid parameters include voltage, current and load;
[0064] If all the grid parameters are reliable grid parameters, it is determined that the new energy power generation equipment will be integrated into the target grid.
[0065] It can be understood that when all the grid parameters are reliable grid parameters, determining to integrate the new energy power generation equipment into the target grid helps to improve the safety of transformer charging start-up control during the grid connection process.
[0066] Step S300: If yes, obtain the weather forecast information within the preset time period through the weather information service end, and determine whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information.
[0067] Among them, the meteorological information service end is the official website of the Meteorological Bureau, and the meteorological forecast information includes but is not limited to temperature forecast information, rainfall forecast information, humidity forecast information and solar radiation intensity forecast information within the preset time period. The method for judging whether to integrate the new energy power generation equipment into the target power grid based on the meteorological forecast information is to judge whether there is any abnormality in the meteorological information within the preset time period for each type of meteorological information based on the standard threshold range corresponding to the meteorological information, and when there is no abnormality in each type of meteorological information within the preset time period, determine to integrate the new energy power generation equipment into the target power grid within the preset time period.
[0068] Step S400: If yes, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
[0069] The rated parameter information includes a rated voltage and a rated current, and the generating of the charging start-up control strategy of the transformer based on the grid parameter prediction information, the meteorological prediction information and the rated parameter information includes the following steps:
[0070] Generating an initial charging start-up control strategy for the transformer based on the grid parameter prediction information and the rated parameter information;
[0071] The initial charging start control strategy is modified based on the weather forecast information to obtain a charging start control strategy.
[0072] The method for correcting the initial charging start control strategy based on the weather forecast information to obtain the charging start control strategy is described below and will not be repeated here.
[0073] The step of generating the initial charging startup control strategy of the transformer based on the grid parameter prediction information and the rated parameter information comprises the following steps:
[0074] Obtaining a fuzzy control rule corresponding to the transformer in a database; wherein the fuzzy control rule is pre-obtained through experiments based on rated parameter information of the transformer;
[0075] Determine the initial charging parameter information when the transformer is started based on the fuzzy control rule and the grid parameter prediction information;
[0076] The initial charging start-up control strategy is generated based on the initial charging parameter information, the preset charging parameter incremental step control rule and the rated parameter information. Specifically, the initial charging parameter information includes an initial charging voltage value and an initial charging current value. The charging parameter incremental step control rule includes an incremental step of the charging voltage, an incremental step of the charging current corresponding to each increase in the charging voltage, and a duration of each increase in the charging voltage. The rated parameter information includes a rated voltage and a rated current. The initial charging parameter information refers to a charging voltage control curve corresponding to the rated voltage of the transformer and a charging current control curve corresponding to the rated current of the transformer, which are increased from the initial charging voltage value to the rated current of the transformer through the charging parameter incremental step control rule.
[0077] The grid parameter information includes a change curve of parameter values of multiple grid parameters within the preset time period, the fuzzy control rule includes a membership function corresponding to each of the grid parameters and a charging parameter value corresponding to each charging parameter at different fuzzy levels, and the initial charging parameter information when the transformer is started is determined based on the fuzzy control rule and the grid parameter prediction information, including the following steps:
[0078] Based on each of the change curves, determine a grid parameter set corresponding to a specified time within the preset time period; wherein the grid parameter set includes parameter values of each grid parameter at the specified time; for example, the grid parameter set is (voltage: 150V, current: 13A, load: 2000Ω);
[0079] For each of the power grid parameters, fuzzy processing is performed on the parameter value corresponding to the power grid parameter in the power grid parameter set based on the membership function corresponding to the power grid parameter, so as to obtain the fuzzy processing result corresponding to the power grid parameter; wherein the fuzzy processing result is the membership degree of the power grid parameter at each fuzzy level, and the fuzzy level includes three types: "low", "medium" and "high", for example, the voltage is "low", which represents low voltage, the voltage is "medium", which represents medium voltage, and the voltage is "high", which represents high voltage;
[0080] For each of the fuzzy levels, a weight coefficient corresponding to the fuzzy level is determined based on each of the fuzzy processing results; wherein the weight coefficient is the minimum membership degree corresponding to the fuzzy level in each power grid parameter; for example, each of the fuzzy processing results is (voltage: μ low (150V)=0.25,μ mid (150V)=0.5,μ high(150V)=0.25), (Current: μ low (13A)=0.25, μ mid (13A)=0.25, μ high (13A)=0.5), (load: μ low (2000Ω)=0,μ mid (2000Ω)=0.25, μ high (2000Ω)=0.75), where μ low It refers to the membership degree of the power grid parameter belonging to the "low" fuzzy level, μ mid It refers to the membership degree of the power grid parameter belonging to the "medium" fuzzy level, μ high It means that the grid parameter belongs to the "high" fuzzy level, then the weight coefficient of the "low" fuzzy level is min(0.25, 0.25, 0) = 0, the weight coefficient of the "medium" fuzzy level is min(0.5, 0.25, 0.25) = 0.25, and the weight coefficient of the "high" fuzzy level is min(0.25, 0.5, 0.75) = 0.25;
[0081] For each of the charging parameters, an initial charging parameter value corresponding to the charging parameter is determined based on a weight coefficient corresponding to each of the fuzzy levels and a charging parameter value corresponding to the charging parameter at different fuzzy levels; specifically, the initial charging parameter value is determined by a weighted average method. For example, the charging parameter includes a charging current and a charging voltage, and the charging parameter value corresponding to the charging current is (I low =5A, I mid =10A, I high =15A), where I low It refers to the charging current when the grid parameters belong to the "low" fuzzy level, I mid It refers to the charging current when the grid parameters belong to the "medium" fuzzy level, I high It refers to the charging current when the grid parameters belong to the "high" fuzzy level. The initial charging current is (0×5+0.25×10+0.25×15) / (0+0.25+0.25)=12.5A. For example, the charging parameter value corresponding to the charging voltage is (U low =100V, U mid =150V, U high =200V), where U low It refers to the charging voltage when the grid parameters belong to the "low" fuzzy level, U mid It refers to the charging voltage when the grid parameters belong to the "medium" fuzzy level, U high It refers to the charging voltage when the grid parameters belong to the "high" fuzzy level. The initial charging voltage is (0.25×150+0.25×200) / (0.25+0.25)=175V;
[0082] The initial charging parameter values are integrated to obtain the initial charging parameter information; for example, the initial charging parameter information includes an initial charging current of 12.5A and an initial charging voltage of 175V.
[0083] It can be understood that the above method determines the initial charging parameter information of the transformer during the charging startup process by using the fuzzy control method, which can effectively prevent the transformer from being damaged due to voltage or current shocks at the moment when the transformer starts charging control.
[0084] The method provided in this embodiment generates a charging start-up control strategy for the transformer based on the grid parameter prediction information, the meteorological forecast information and the rated parameter information when the grid parameter prediction information and the meteorological forecast information within the preset time period are both conducive to the integration of the new energy power generation equipment into the target grid, and starts the transformer based on the charging start-up control strategy, thereby improving the reliability of the transformer charging start-up control method and the safety of the transformer during the charging start-up control process.
[0085] In some embodiments, before generating the charging start control strategy of the transformer based on the grid parameter prediction information, the meteorological prediction information and the rated parameter information, the method further includes the following steps:
[0086] The power grid parameter prediction information is encoded based on a preset encoding rule to obtain a coding sequence corresponding to the power grid parameter prediction information; wherein the coding sequence includes letters and numbers;
[0087] Arrange the numbers in the coding sequence in sequence based on the positions of the numbers in the coding sequence to obtain a digital sequence, and arrange the letters in the coding sequence in sequence based on the positions of the letters in the coding sequence to obtain a letter sequence;
[0088] Obtain a first hash value and a second hash value based on a preset hash algorithm; wherein the first hash value is a hash value corresponding to the digital sequence, the second hash value is a hash value corresponding to the letter sequence, and the first hash value and the second hash value both include 2n characters;
[0089] Put the second hash value below the first hash value to obtain an initial matrix;
[0090] The initial matrix is divided into a plurality of second-order square matrices, and based on the corresponding position of each second-order square matrix in the initial matrix, each second-order square matrix is arranged in sequence to obtain a square matrix sequence;
[0091] Multiplying each second-order square matrix in the square matrix sequence in sequence to obtain a target matrix;
[0092] Decrypting each encrypted text in the database based on the target matrix;
[0093] If there is a successfully decrypted encrypted text, determining the successfully decrypted encrypted text as the target text; wherein the target text records the initial charging start-up control strategy corresponding to the power grid parameter prediction information;
[0094] The initial charging start control strategy is modified based on the weather forecast information to obtain a charging start control strategy.
[0095] The step of modifying the initial charging start control strategy based on the weather forecast information to obtain the charging start control strategy includes the following steps:
[0096] The meteorological forecast information is input into a preset meteorological classification model for detection to obtain a corresponding meteorological classification result; wherein the meteorological classification model is a pre-trained deep learning model;
[0097] Based on the meteorological classification results, a corresponding target correction strategy is determined in a database; wherein the database stores a correspondence between the meteorological classification results and the correction strategy;
[0098] The initial charging start control strategy is corrected based on the target correction strategy to obtain the charging start control strategy.
[0099] The method provided in this embodiment directly obtains the initial charging start-up control strategy corresponding to the power grid parameter prediction information from the database by decrypting the encrypted text when the initial charging start-up control strategy corresponding to the power grid parameter prediction information exists in the database. On the one hand, it helps to reduce the computing power of the server. On the other hand, setting the initial charging start-up control strategy corresponding to the power grid parameter prediction information in the encrypted text helps to improve the security of the initial charging start-up control strategy, thereby ensuring the charging start-up control method of the transformer.
[0100] See also Figure 2 , Figure 2 The structure schematic block diagram of the transformer charging start control device 100 provided in the embodiment of the present application is used for the grid connection processing of the new energy power generation equipment, such as Figure 2 As shown, the charging start control device 100 of the transformer includes:
[0101] The acquisition module 110 is used to obtain the current time information before integrating the new energy power generation equipment into the target power grid, and input the time information into a preset target power grid parameter information prediction model to obtain the power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model.
[0102] The first judgment module 120 is used to judge whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information.
[0103] The second judgment module 130 is used to determine whether to integrate the new energy power generation equipment into the target power grid, obtain the weather forecast information within the preset time period through the weather information service terminal, and judge whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information.
[0104] The generation module 140 is used to determine when the new energy power generation equipment is to be incorporated into the target power grid, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the power grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
[0105] It should be noted that technicians in the relevant technical field can clearly understand that for the convenience and simplicity of description, the specific working process of the above-described device and each module can refer to the corresponding process in the aforementioned transformer charging start-up control method embodiment, and will not be repeated here.
[0106] The transformer charging start control device 100 provided in the above embodiment can be implemented in the form of a computer program. The computer program can be used in Figure 3 The system is run on the terminal device 200 shown.
[0107] See also Figure 3 , Figure 3 The present invention provides a schematic block diagram of the structure of a terminal device 200 according to an embodiment of the present application. The terminal device 200 includes a processor 201 and a memory 202. The processor 201 and the memory 202 are connected via a device bus 203, wherein the memory 202 may include a non-volatile storage medium and an internal memory.
[0108] The non-volatile storage medium can store a computer program. The computer program includes program instructions, and when the program instructions are executed by the processor 201, the processor 201 can execute any of the above-mentioned transformer charging startup control methods.
[0109] The processor 201 is used to provide computing and control capabilities to support the operation of the entire terminal device 200.
[0110] The internal memory provides an environment for the operation of the computer program in the non-volatile storage medium. When the computer program is executed by the processor 201, the processor 201 can execute any of the above-mentioned transformer charging start-up control methods.
[0111] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the terminal device 200 involved in the scheme of the present application. The specific terminal device 200 may include more or fewer components than shown in the figure, or combine certain components, or have a different component arrangement.
[0112] It should be understood that the processor 201 may be a central processing unit (CPU), and the processor 201 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. Among them, the general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0113] In some embodiments, the processor 201 is used to run a computer program stored in the memory to implement the following steps:
[0114] Before incorporating the new energy power generation equipment into the target power grid, the current time information is obtained, and the time information is input into a preset target power grid parameter information prediction model to obtain the power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model;
[0115] Determining whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information;
[0116] If yes, obtain the weather forecast information within the preset time period through the weather information service terminal, and determine whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information;
[0117] If so, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
[0118] It should be noted that technicians in the relevant field can clearly understand that for the convenience and simplicity of description, the specific working process of the terminal device 200 described above can refer to the corresponding process of the aforementioned transformer charging start control method, and will not be repeated here.
[0119] An embodiment of the present application also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by one or more processors, the one or more processors implement the transformer charging start-up control method provided in the embodiment of the present application.
[0120] The computer-readable storage medium may be an internal storage unit of the terminal device 200 in the aforementioned embodiment, such as a hard disk or memory of the terminal device 200. The computer-readable storage medium may also be an external storage device of the terminal device 200, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped with the terminal device 200.
[0121] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present application, and these modifications or replacements should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. A transformer charging start control method, characterized in that: For the grid connection processing of new energy power generation equipment, the method comprises: Before incorporating the new energy power generation equipment into the target power grid, the current time information is obtained, and the time information is input into a preset target power grid parameter information prediction model to obtain the power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model; Determining whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information; If yes, obtain the weather forecast information within the preset time period through the weather information service terminal, and determine whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information; If so, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
2. The transformer charging start control method according to claim 1, characterized in that: The grid parameter information includes a change curve of parameter values of multiple grid parameters within the preset time period, and the determining whether to integrate the new energy power generation equipment into the target grid based on the grid parameter prediction information includes: For each of the power grid parameters, a standard value range corresponding to the power grid parameter is obtained in a database, and a target area corresponding to the standard value range is determined in a coordinate system where a change curve of the power grid parameter is located, and when the change curve of the power grid parameter is within the target area, the power grid parameter is determined to be a reliable power grid parameter; If all the grid parameters are reliable grid parameters, it is determined that the new energy power generation equipment will be integrated into the target grid.
3. The transformer charging start control method according to claim 1, characterized in that: Before generating the charging start control strategy of the transformer based on the grid parameter prediction information, the meteorological prediction information and the rated parameter information, the method further includes: The power grid parameter prediction information is encoded based on a preset encoding rule to obtain a coding sequence corresponding to the power grid parameter prediction information; wherein the coding sequence includes letters and numbers; Arrange the numbers in the coding sequence in sequence based on the positions of the numbers in the coding sequence to obtain a digital sequence, and arrange the letters in the coding sequence in sequence based on the positions of the letters in the coding sequence to obtain a letter sequence; Obtain a first hash value and a second hash value based on a preset hash algorithm; wherein the first hash value is a hash value corresponding to the digital sequence, the second hash value is a hash value corresponding to the letter sequence, and the first hash value and the second hash value both include 2n characters; Put the second hash value below the first hash value to obtain an initial matrix; The initial matrix is divided into a plurality of second-order square matrices, and based on the corresponding position of each second-order square matrix in the initial matrix, each second-order square matrix is arranged in sequence to obtain a square matrix sequence; Multiplying each second-order square matrix in the square matrix sequence in sequence to obtain a target matrix; Decrypting each encrypted text in the database based on the target matrix; If there is a successfully decrypted encrypted text, determining the successfully decrypted encrypted text as the target text; wherein the target text records the initial charging start-up control strategy corresponding to the power grid parameter prediction information; The initial charging start control strategy is modified based on the weather forecast information to obtain a charging start control strategy.
4. The transformer charging start control method according to claim 3, characterized in that: The step of modifying the initial charging start control strategy based on the weather forecast information to obtain the charging start control strategy includes: The meteorological forecast information is input into a preset meteorological classification model for detection to obtain a corresponding meteorological classification result; wherein the meteorological classification model is a pre-trained deep learning model; Based on the meteorological classification results, a corresponding target correction strategy is determined in a database; wherein the database stores a correspondence between the meteorological classification results and the correction strategy; The initial charging start control strategy is corrected based on the target correction strategy to obtain the charging start control strategy.
5. The transformer charging start control method according to claim 1, characterized in that: The generating of the charging start-up control strategy of the transformer based on the grid parameter prediction information, the meteorological prediction information and the rated parameter information comprises: Generating an initial charging start-up control strategy for the transformer based on the grid parameter prediction information and the rated parameter information; The initial charging start control strategy is modified based on the weather forecast information to obtain a charging start control strategy.
6. The transformer charging start control method according to claim 5, characterized in that: The generating of the initial charging start-up control strategy of the transformer based on the grid parameter prediction information and the rated parameter information includes: Obtaining the fuzzy control rules corresponding to the transformer in a database; Determine the initial charging parameter information when the transformer is started based on the fuzzy control rule and the grid parameter prediction information; The initial charging start control strategy is generated based on the initial charging parameter information, a preset charging parameter increment step control rule and the rated parameter information.
7. The transformer charging start control method according to claim 6, characterized in that: The grid parameter information includes a change curve of parameter values of multiple grid parameters within the preset time period, the fuzzy control rule includes a membership function corresponding to each of the grid parameters and a charging parameter value corresponding to each charging parameter at different fuzzy levels, and the initial charging parameter information when the transformer is started is determined based on the fuzzy control rule and the grid parameter prediction information, including: Based on each of the change curves, determine a set of grid parameters corresponding to a specified time within the preset time period; wherein the set of grid parameters includes parameter values of each grid parameter at the specified time; For each of the power grid parameters, fuzzy processing is performed on the parameter value corresponding to the power grid parameter in the power grid parameter set based on the membership function corresponding to the power grid parameter to obtain the fuzzy processing result corresponding to the power grid parameter; wherein the fuzzy processing result is the membership degree of each fuzzy level of the power grid parameter; For each of the fuzzy levels, a weight coefficient corresponding to the fuzzy level is determined based on each of the fuzzy processing results; wherein the weight coefficient is the minimum degree of membership corresponding to the fuzzy level in each power grid parameter; For each of the charging parameters, determining an initial charging parameter value corresponding to the charging parameter based on a weight coefficient corresponding to each of the fuzzy levels and a charging parameter value corresponding to the charging parameter at different fuzzy levels; The initial charging parameter values are integrated to obtain the initial charging parameter information.
8. A transformer charging start control device, characterized in that: Used for grid connection processing of new energy power generation equipment, the device comprises: An acquisition module is used to acquire current time information before incorporating the new energy power generation equipment into the target power grid, and input the time information into a preset target power grid parameter information prediction model to obtain power grid parameter prediction information of the target power grid within a preset time period; wherein the preset time period is a time period connected to the current moment and after the current moment, and the target power grid parameter information prediction model is a pre-trained deep learning model; A first judgment module, used to judge whether to integrate the new energy power generation equipment into the target power grid based on the power grid parameter prediction information; A second judgment module is used to determine whether to integrate the new energy power generation equipment into the target power grid, obtain the weather forecast information within the preset time period through the weather information service end, and judge whether to integrate the new energy power generation equipment into the target power grid based on the weather forecast information; A generation module is used to determine when to integrate the new energy power generation equipment into the target power grid, obtain the rated parameter information of the transformer corresponding to the new energy power generation equipment, and generate a charging start-up control strategy for the transformer based on the power grid parameter prediction information, the meteorological forecast information and the rated parameter information, and start the transformer based on the charging start-up control strategy.
9. A terminal device, characterized in that: The terminal device includes a processor, a memory, and a computer program stored in the memory and executable by the processor, wherein when the computer program is executed by the processor, the charging start-up control method for the transformer according to any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein when the computer program is executed by a processor, the charging start-up control method for a transformer according to any one of claims 1 to 7 is implemented.