A glue filling processing device for mutual inductor

By performing heating and glue filling operations in parallel in the transformer glue filling processing device, and using a multi-stage limiting mechanism and rotary glue filling method, the inefficiency problem caused by separation of glue filling and heating and curing in transformer production is solved, and the efficiency is improved. Production efficiency and glue filling quality.

CN118663515BActive Publication Date: 2024-11-12JIANGSU SUAIER POWER EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411162162.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-12
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

The separate process of the transformer's glue filling and heating and curing leads to a decrease in production efficiency, low utilization rate of equipment, and there may be a situation where the heating and curing are completed but the glue filling is not completed, which affects the production cycle and efficiency.

Method used

A transformer glue filling processing device was designed, using infrared heating pipes to heat and cure the sealant completed by filling, and at the same time, the next set of transformers was filled during the heating and curing process, ensuring that it was carried out through a multi-stage limit mechanism. The stability and uniformity of the glue filling assembly are used to reduce the generation of impurities and bubbles by rotary glue filling.

Benefits of technology

The parallel operation of heating and glue filling is realized, the consistency and continuity of the production process is improved, the production time is shortened, the stability and quality of the glue filling and heating process is ensured, and the curing efficiency and uniformity of the sealant is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118663515B_ABST
    Figure CN118663515B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of mutual inductor production, and specifically discloses a mutual inductor glue pouring processing device, including a frame, a fixed frame and a ground rail fixedly installed on the top of the frame, an X-axis slide rail fixedly installed on the top of the fixed frame, a movable plate is installed on the top of the X-axis slide rail and the ground rail respectively through an X-axis slide table and a reinforcing rod slidably connected thereto, a cylinder is fixedly installed on the top of the movable plate through a mounting seat, and a rotating glue pouring unit, an adjustable heating unit and a limit stabilization unit are arranged between the output end of the cylinder and the frame. The sealant in the mutual inductor that has been filled with glue in the previous group is heated and cured by an infrared heating tube, and during the heating and curing process, the glue pouring operation is performed on a group of mutual inductors located below the glue pouring assembly at this time, thereby realizing the function of heating and glue pouring in parallel. This function is utilized to greatly improve the coherence and continuity between the glue pouring operation and the heating and curing operation, thereby greatly shortening the time required for the overall production process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mutual inductor production, and specifically discloses a mutual inductor glue filling processing device. Background Art

[0002] The instrument transformer, also known as the instrument transformer, is a general term for current transformers and voltage transformers. It is mainly used to convert high voltage into low voltage and high current into low current, so as to facilitate measurement, protection or control of the system. The production process of the instrument transformer mainly includes the following key steps: core manufacturing, coil manufacturing, winding and assembly, packaging and finished product testing.

[0003] The transformer glue filling process is an important part of the transformer packaging process. The sensitive electronic components and windings inside the transformer are sealed with glue to improve the insulation performance, waterproof and moisture-proof ability and mechanical strength of the transformer, and significantly improve the reliability and service life of the transformer in harsh environments.

[0004] After the mutual inductor is sealed with glue, it needs to be sent to the heating process as a whole, and the sealant is heated and cured by an infrared heating tube. At present, the glue filling and heating curing of the mutual inductor are two separate processes. That is to say, in an independent process, after a group of mutual inductors is filled with glue, it is necessary to wait until all the mutual inductors in the same batch are filled with glue, and then they are sent to the heating equipment for curing. This waiting time will increase the overall production cycle.

[0005] And due to the influence of the heating and curing speed of the glue, it may happen that the heating and curing has been completed while the glue filling is still in progress. At this time, the heating equipment needs to be shut down to wait for the glue filling operation to be completed or the waiting time of the heating equipment is extended, which will not only lead to low equipment utilization, but also further affect production efficiency. Summary of the invention

[0006] The invention provides a mutual inductor glue pouring processing device, which solves the technical problem in the prior art that the mutual inductor glue pouring and heating curing processes are performed separately, resulting in reduced production efficiency.

[0007] The present invention provides a mutual inductor glue pouring processing device, comprising a frame and a fixed frame fixedly installed on the top of the frame, a ground rail and a tray for placing the mutual inductor, an X-axis slide rail is fixedly installed on the top of the fixed frame, a movable plate is installed together with the top of the X-axis slide rail and the ground rail through an X-axis slide table and a reinforcing rod slidably connected thereto, a cylinder is fixedly installed on the top of the movable plate through a mounting seat, a rotary glue pouring unit, an adjustable heating unit and a limit stabilization unit are arranged between the output end of the cylinder and the frame, the adjustable heating unit comprises a foldable heating component and a rotary adjustment component, the rotary glue pouring unit comprises a glue pouring component and a driving component, the limit stabilization unit comprises a lateral limit component, a vertical limit component and a clamp, a Y-axis slide rail for driving the glue pouring component is fixedly installed on the output end of the cylinder, and a Y-axis slide table is slidably connected to the bottom of the Y-axis slide rail.

[0008] The rotary adjustment component includes an annular electric slide rail fixedly connected to the glue pouring component and an arc-shaped slider slidably connected to the annular electric slide rail, a hinged plate is hinged on the arc-shaped slider, and the foldable heating component includes two folding plates hinged to each other and an infrared heating tube fixedly installed at the bottom of the folding plates, and the frontmost folding plate is fixedly connected to the hinged plate.

[0009] Furthermore, the lateral limit assembly includes a horizontal slide groove symmetrically opened on the top of the clamp and a limit frame fixedly installed on the top of the Y-axis slide rail through a return spring and slidably connected to the outside of the cylinder output end. The front and rear ends of the bottom of the limit frame are respectively adapted to the front and rear horizontal slide grooves, and the clamp is placed on the top of the tray.

[0010] Furthermore, the vertical limit assembly includes a plurality of horizontal longitudinal slide grooves opened on the top of the fixture and a plurality of ear plates distributed in a circumference, and the fixture is provided with a plurality of positioning holes matched with the outer contour of the mutual inductor.

[0011] Furthermore, the positioning holes between two adjacent horizontal longitudinal slide grooves 1 form a row, and a plurality of horizontal longitudinal slide grooves 1 divide the positioning holes into a plurality of rows, and the positioning holes in each row are further divided into a plurality of groups, and each group includes four positioning holes distributed in a square.

[0012] Furthermore, a sliding rod 1 is fixedly installed at the bottom of the ear plate and is slidably connected to a horizontal longitudinal slide groove 1. A horizontal longitudinal slide groove 2 is provided at the top of the clamp between adjacent horizontal longitudinal slide grooves 1. A sliding rod 2 is fixedly installed at the bottom of the two folding plates and is slidably connected to the horizontal longitudinal slide groove 2. The two sliding rods 2 cooperate to form a complete round rod structure when the two folding plates are in the unfolded state.

[0013] Furthermore, the glue potting assembly includes a V-shaped frame fixedly installed at the bottom of the Y-axis slide and a mounting cover fixedly installed at the bottom of the V-shaped frame, and the annular electric slide rail and a plurality of ear plates are fixedly installed on the outside of the mounting cover.

[0014] Furthermore, two front-to-back symmetrical fixed tubes are fixedly installed on the inner wall of the top of the mounting cover, a T-shaped tube is installed between the two fixed tubes, the top of the vertical section of the T-shaped tube passes through the top of the mounting cover, and rotating tubes are rotatably installed on the left and right ends of the bottom of the two fixed tubes.

[0015] Furthermore, the driving assembly includes a driving pulley fixedly mounted on the outside of the left front rotating tube and a driven pulley fixedly mounted on the outside of the other three rotating tubes. Two front-to-back symmetrical rotating rods are rotatably mounted on the top inner wall of the mounting cover. The driving pulley, three driven pulleys and the two rotating rods are connected for transmission by the same belt.

[0016] Furthermore, a motor seat is fixedly installed on the inner wall of the top of the mounting cover, a driving motor is fixedly installed on the front side of the motor seat, a worm is fixedly installed on the outer side of the output shaft of the driving motor, a fixed sleeve on the outer side of the rotating tube located on the left front is provided with a worm wheel meshing with the worm, and a reinforcing sleeve the same number as the rotating tubes and mounted on the outer side of the fixed tube is fixedly installed on the inner wall of the mounting cover.

[0017] Furthermore, a plurality of locking grooves are provided on the top of the tray, and a plurality of locking rods which are matched with the locking grooves one by one are fixedly installed on the bottom of the clamp. Two front-to-back symmetrical limit rods are fixedly installed on the top of the Y-axis slide rail, and the top end of the limit rod slides through the limit frame. Driving components are provided in the X-axis slide rail and the Y-axis slide rail to drive the X-axis slide and the Y-axis slide to move.

[0018] The beneficial effects of the present invention are as follows: 1. The sealant in the previous group of mutual inductors that have been filled with glue is heated and cured by an infrared heating tube. During the heating and curing process, the glue filling operation is simultaneously performed on a group of mutual inductors located below the glue filling component, thereby realizing the function of parallel operation of heating and glue filling. This function greatly improves the consistency and continuity between the glue filling operation and the heating and curing operation, thereby greatly shortening the time required for the overall production process.

[0019] 2. A multi-level limit mechanism is formed through the cooperation between the limit frame and the horizontal slide groove, the cooperation between the slide bar 1 and the horizontal longitudinal slide groove 1, and the cooperation between the slide bar 2 and the horizontal longitudinal slide groove 2. The multi-level limit mechanism works together to effectively limit the movement range of the glue pouring component in all directions, preventing the glue pouring component from shifting or shaking during the glue pouring process, resulting in glue overflow or uneven glue pouring, thereby ensuring the continuity and stability of the entire glue pouring and heating process.

[0020] 3. The sealant can be evenly distributed when poured into the transformer by rotating the tube around the transformer to extrude the glue. At the same time, this method can also reduce the possibility of impurities and bubbles generated during the glue pouring process, improve the glue pouring quality, and thus help improve the heating and curing efficiency and uniformity of the sealant. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a three-dimensional structural schematic diagram of the present invention.

[0022] Figure 2 It is a schematic diagram of the three-dimensional structure of the fixed frame, X-axis slide rail, X-axis slide table, movable plate and reinforcing rod part of the present invention.

[0023] Figure 3 It is a partial three-dimensional structural schematic diagram of the cylinder, Y-axis slide rail, return spring, limit frame and adjustable heating unit of the present invention.

[0024] Figure 4 It is a three-dimensional structural schematic diagram of the folding plate, infrared heating tube, sliding rod 2, ear plate and part of the sliding rod of the present invention.

[0025] Figure 5 It is a schematic diagram of the fixed tube, T-shaped tube, rotating tube and part of the three-dimensional structure of the present invention.

[0026] Figure 6 It is a partial three-dimensional structural schematic diagram of the annular electric slide rail, arc-shaped slide block, folding plate and infrared heating tube of the present invention.

[0027] Figure 7 It is a schematic diagram of the working process of a partial structure of the present invention from a top view.

[0028] Figure 8 It is a schematic diagram of the three-dimensional structure of the clamp and the tray part of the present invention.

[0029] In the figure: 1, frame; 2, rotating glue filling unit; 3, adjustable heating unit; 4, limiting and stabilizing unit; 5, cylinder; 6, fixing frame; 7, X-axis slide rail; 8, moving plate; 9, ground rail; 10, X-axis slide table; 11, strengthening rod; 12, reset spring; 13, Y-axis slide rail; 14, Y-axis slide table; 15, mutual inductor; 16, mounting seat; 17, limiting rod; 18, tray; 19, locking rod; 20, locking groove; 21, strengthening sleeve; 201, glue filling assembly; 202, driving assembly; 2011, C-shaped frame; 2012, mounting cover; 2013, fixed pipe; 2014, rotating pipe; 2015, T-shaped pipe; 2021, motor seat; 2022, driving motor; 2023, worm; 2024, worm gear; 2025, driving pulley; 2026, driven pulley; 2027, belt; 2028, rotating rod; 301, foldable heating assembly; 302, rotating and adjusting assembly; 3011, folding plate; 3012, infrared heating pipe; 3021, annular electric slide rail; 3022, arc-shaped slider; 3023, hinged plate; 401, horizontal limiting assembly; 402, vertical limiting assembly; 403, fixture; 4011, horizontal chute; 4012, limiting frame; 4021, first horizontal longitudinal chute; 4022, ear plate; 4023, first sliding rod; 4024, second horizontal longitudinal chute; 4025, second sliding rod. Detailed implementation manners

[0030] Now, the subject matter described herein will be discussed with reference to exemplary implementation manners. It should be understood that these implementation manners are discussed so that those skilled in the art can better understand and thus implement the subject matter described herein. The functions and arrangements of the elements discussed can be changed without departing from the scope of protection of the content of this specification. Each example can omit, substitute, or add various processes or components as needed. Additionally, the features described relative to some examples can also be combined in other examples.

[0031] Refer to Figure 1 , Figure 2 , Figure 3 , Figure 5 and Figure 8, An insulating resin pouring processing device for an instrument transformer, comprising a frame 1, a fixed frame 6 fixedly installed on the top of the frame 1, a ground rail 9, and a tray 18 for placing the instrument transformer 15. A fixed X-axis slide rail 7 is fixedly installed on the top of the fixed frame 6. An X-axis slide table 10 and a reinforcing rod 11 are respectively slidably connected to the top of the X-axis slide rail 7 and the ground rail 9. A moving plate 8 is jointly installed between the X-axis slide table 10 and the reinforcing rod 11. A cylinder 5 is fixedly installed on the top of the moving plate 8 through a mounting seat 16. Between the output end of the cylinder 5 and the frame 1, there are arranged a rotary pouring unit 2, an adjustable heating unit 3, and a limit and stabilization unit 4. The adjustable heating unit 3 includes a foldable heating assembly 301 and a rotary adjustment assembly 302. The rotary pouring unit 2 includes a pouring assembly 201 and a driving assembly 202. The limit and stabilization unit 4 includes a horizontal limit assembly 401, a vertical limit assembly 402, and a fixture 403 placed on the top of the tray 18. The output end of the cylinder 5 is fixedly installed with a Y-axis slide rail 13 for driving the pouring assembly 201. A Y-axis slide table 14 is slidably connected to the bottom of the Y-axis slide rail 13. A plurality of locking grooves 20 are formed in the top of the tray 18. A plurality of locking rods 19 adapted to the locking grooves 20 one by one are fixedly installed at the bottom of the fixture 403. Driving components are arranged in both the X-axis slide rail 7 and the Y-axis slide rail 13 to drive the X-axis slide table 10 and the Y-axis slide table 14 to move.

[0032] During specific use, in the initial state, the foldable heating assembly 301 is in a folded state. First, place the instrument transformer 15 to be poured with insulating resin on the top of the tray 18. Then, insert the locking rods 19 at the bottom of the fixture 403 into the corresponding locking grooves 20 at the top of the tray 18 to position the instrument transformer 15. Then, drive the X-axis slide table 10 through the X-axis slide rail 7 to drive the moving plate 8 to move leftward, thereby driving the pouring assembly 201 to move leftward accordingly. At the same time, drive the Y-axis slide table 14 through the Y-axis slide rail 13 to move backward, thereby realizing the adjustment of the position of the pouring assembly 201. Move the pouring assembly 201 to the left-rear pouring position (as shown in Figure 8 Figure a in the figure) and wait for pouring.

[0033] Refer to Figure 3 , Figure 4 and Figure 5 , The pouring assembly 201 includes a U-shaped frame 2011 fixedly installed at the bottom of the Y-axis slide table 14 and an installation cover 2012 fixedly installed at the bottom of the U-shaped frame 2011. Two symmetrically arranged fixed pipes 2013 are fixedly installed on the inner wall of the top of the installation cover 2012. A T-shaped pipe 2015 is jointly installed between the two fixed pipes 2013. The top end of the vertical section of the T-shaped pipe 2015 penetrates through the top of the installation cover 2012. Rotating pipes 2014 are rotatably installed at the left and right ends of the bottom of the two fixed pipes 2013.

[0034] Refer to Figure 4 and Figure 5The driving assembly 202 includes a driving pulley 2025 fixedly mounted on the outside of the left front rotating tube 2014 and a driven pulley 2026 fixedly mounted on the outside of the other three rotating tubes 2014. Two rotating rods 2028 symmetrically mounted front and back are rotatably mounted on the top inner wall of the mounting cover 2012. The driving pulley 2025, the three driven pulleys 2026 and the two rotating rods 2028 are connected by a same belt 2027.

[0035] See also Figure 4 and Figure 5 A motor seat 2021 is fixedly installed on the inner wall of the top of the mounting cover 2012, a driving motor 2022 is fixedly installed on the front side of the motor seat 2021, a worm 2023 is fixedly installed on the outer side of the output shaft of the driving motor 2022, a worm wheel 2024 meshing with the worm 2023 is fixedly sleeved on the outer side of the rotating tube 2014 located at the left front, and a reinforcing sleeve 21 whose number is the same as that of the rotating tubes 2014 and is sleeved on the outer side of the fixed tube 2013 is fixedly installed on the inner wall of the mounting cover 2012.

[0036] When in use, connect the top of the T-shaped tube 2015 to the glue source, and move the glue pouring assembly 201 to the left rear glue pouring position (such as Figure 8 After that, the driving motor 2022 is started, and the driving motor 2022 drives the worm 2023 to rotate, and the rotating worm 2023 meshes with the worm wheel 2024, thereby driving the rotating tube 2014 located in the left front to rotate slowly, and then driving the driving pulley 2025 to rotate, so that the driving pulley 2025 drives the other three rotating tubes 2014 to rotate synchronously and slowly through the belt 2027, and then the T-shaped tube 2015 introduces the sealant into the fixed tube 2013 and extrude it evenly and slowly through the rotating tube 2014 and pour it into the mutual inductor 15 for glue filling and sealing, so as to achieve the effect of extruding and pouring glue around the mutual inductor 15. By rotating the glue filling, the sealant can be evenly distributed when it is poured into the inside of the mutual inductor 15, and at the same time, the possibility of generating impurities and bubbles during the glue filling process is reduced, thereby improving the glue filling quality.

[0037] See also Figure 1 , Figure 2 , Figure 4 and Figure 7 The lateral limit assembly 401 includes a horizontal slide groove 4011 symmetrically opened on the top of the clamp 403 and a limit frame 4012 fixedly installed on the top of the Y-axis slide rail 13 through a return spring 12 and slidably connected to the outside of the output end of the cylinder 5. The front and rear ends of the bottom of the limit frame 4012 are respectively adapted to the front and rear horizontal slide grooves 4011.

[0038] See also Figure 2 and Figure 3Two front-to-back symmetrical limiting rods 17 are fixedly installed on the top of the Y-axis slide rail 13, and the top of the limiting rod 17 slides through the limiting frame 4012.

[0039] See also Figure 2 , Figure 3 and Figure 4 The vertical limiting assembly 402 includes a plurality of horizontal longitudinal slide grooves 4021 opened on the top of the clamp 403 and a plurality of ear plates 4022 distributed in a circumference. The clamp 403 is provided with a plurality of positioning holes adapted to the outer contour of the mutual inductor 15.

[0040] See also Figure 1 , Figure 2 and Figure 7 The positioning holes between two adjacent horizontal longitudinal slide grooves 4021 form a row, and a plurality of horizontal longitudinal slide grooves 4021 divide the positioning holes into a plurality of rows. The positioning holes in each row are further divided into a plurality of groups, and each group includes four positioning holes distributed in a square.

[0041] See also Figure 3 , Figure 4 and Figure 6 The rotation adjustment component 302 includes an annular electric slide rail 3021 fixedly connected to the glue pouring component 201 and an arc-shaped slider 3022 slidably connected to the annular electric slide rail 3021, and a hinged plate 3023 is hinged on the arc-shaped slider 3022. The foldable heating component 301 includes two folding plates 3011 hinged to each other and an infrared heating tube 3012 fixedly installed at the bottom of the folding plates 3011. The frontmost folding plate 3011 is fixedly connected to the hinged plate 3023.

[0042] See also Figure 1 , Figure 2 , Figure 4 , Figure 6 and Figure 7 A sliding rod 4023 slidably connected to a horizontal longitudinal slide groove 4021 is fixedly installed at the bottom of the ear plate 4022, and a horizontal longitudinal slide groove 4024 is provided at the top of the clamp 403 between adjacent horizontal longitudinal slide grooves 4021. A sliding rod 4025 slidably connected to the horizontal longitudinal slide groove 4024 is fixedly installed at the bottom of the two folding plates 3011. The two sliding rods 4025 cooperate to form a complete round rod structure when the two folding plates 3011 are unfolded. The annular electric slide rail 3021 and the plurality of ear plates 4022 are fixedly installed on the outside of the mounting cover 2012.

[0043] When in use, when the output end of the cylinder 5 pushes the rotating glue filling unit 2 to move downward, first the limit frame 4012 will be inserted into the horizontal slide groove 4011, and then the output end of the cylinder 5 continues to push to drive the Y-axis slide rail 13 to move downward, thereby driving the mounting cover 2012 to move downward, and then driving a number of slide bars 4023 to be inserted into the corresponding horizontal longitudinal slide groove 4021 (that is, the horizontal longitudinal slide groove 4021 on both sides of each column of positioning holes). When the Y-axis slide rail 13 controls the Y-axis slide table 14 to move and drives the glue filling component 201 to move, the slide bar 1 4023 slides in the horizontal longitudinal slide groove 1 4021. At the same time, when the folding plates 3011 unfold each other and move forward, the slide bar 2 4025 slides in the horizontal longitudinal slide groove 2 4024. When the X-axis slide rail 7 controls the X-axis slide table 10 to move and drive the glue filling component 201 to move, the output end of the cylinder 5 is driven to contract and drive the glue filling component 201 to move. Move upward, so that the sliding bar 1 4023 and the sliding bar 2 4025 are respectively separated from the horizontal longitudinal slide groove 1 4021 and the horizontal longitudinal slide groove 2 4024, and then the limit frame 4012 slides in the horizontal slide groove 4011. During the whole process, the clamp 403, the horizontal limit assembly 401, the vertical limit assembly 402, the glue pouring assembly 201 and the foldable heating assembly 301 are integrated with the limit reinforcement. Through the cooperation of the limit frame 4012 and the horizontal slide groove 4011, the cooperation of the sliding bar 1 4023 and the horizontal longitudinal slide groove 1 4021, and the cooperation of the sliding bar 2 4025 and the horizontal longitudinal slide groove 2 4024, a multi-level limit mechanism is formed. The multi-level limit mechanism works together to effectively limit the movement range of the glue pouring assembly 201 in all directions, prevent the glue pouring assembly 201 from deviating or shaking during the glue pouring process, resulting in glue overflow or uneven glue pouring, thereby ensuring the continuity and stability of the entire glue pouring and heating process.

[0044] After the initial glue filling is completed, the Y-axis slide 14 is driven by the Y-axis slide rail 13 to drive the glue filling assembly 201 to move forward and move to the top of the next group of positioning holes. At this time, the hinged plate 3023 is driven by an external power supply to rotate 180° to the side away from the installation cover 2012, and at the same time, the folding plate 3011 on the side away from the hinged plate 3023 is driven to rotate 180° to the side away from the folding plate 3011 hinged thereto to unfold. The rotated and unfolded folding plate 3011 covers the top of the previous group of mutual inductors 15 that have been glued, and then the red The external heating tube 3012 heats and cures the internal sealant of the previous group of mutual inductors 15 that have been filled with glue. During the heating and curing process, the glue filling operation is also performed on a group of mutual inductors 15 located below the glue filling component 201. By designing that heating and glue filling are performed in parallel, after a single glue filling operation is completed and the next group of mutual inductors 15 are filled with glue, the previous group of mutual inductors 15 is immediately heated and cured, which greatly improves the coherence and continuity between the glue filling operation and the heating and curing operation, thereby greatly shortening the time required for the overall production process.

[0045] When the glue filling component 201 needs to be moved from the frontmost group of mutual inductors 15 in the leftmost column to just above the frontmost group of mutual inductors 15 in the second column from left to right, the glue filling component 201 is first driven upward by contracting the output end of the cylinder 5, so that the slide bar 1 4023 and the slide bar 2 4025 are respectively separated from the horizontal longitudinal slide groove 1 4021 and the horizontal longitudinal slide groove 2 4024, and then the X-axis slide rail 7 controls the X-axis slide table 10 to drive the glue filling component 201 to move right to just above the frontmost group of mutual inductors 15 in the second column from left to right, and then the circular electric slide rail 3021 drives the arc slider 3022 to rotate counterclockwise by 90°, driving the folding plate 3011 and the infrared heating tube 3012 to rotate counterclockwise by 90° and move to the top of the frontmost group of mutual inductors 15 that have just been glued in the leftmost column for heating and curing (such as Figure 7 As shown in Figure b), when the glue-filling component 201 moves backward from the frontmost group of mutual inductors 15 in the second column from left to right to the second group of mutual inductors 15, the arc-shaped slider 3022 is driven by the annular electric slide rail 3021 to rotate 90° counterclockwise, driving the folding plate 3011 and the infrared heating tube 3012 to rotate 90° counterclockwise and move to the top of the frontmost group of mutual inductors 15 in the second column from left to right for heating and curing (as shown in Figure b). Figure 7 As shown in Figure c), the above-mentioned process of glue filling, heating curing and adjustment can be repeated.

[0046] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.

Claims

1. A device for processing mutual inductor glue filling, It is characterized in that include: A frame (1) and a fixed frame (6) fixedly mounted on the top of the frame (1), a ground rail (9) and a tray (18) for placing a mutual inductor (15); an X-axis slide rail (7) is fixedly mounted on the top of the fixed frame (6); a movable plate (8) is mounted on the top of the X-axis slide rail (7) and the ground rail (9) respectively through an X-axis slide table (10) and a reinforcing rod (11) slidably connected thereto; A cylinder (5) is fixedly mounted on the top of the movable plate (8) via a mounting seat (16); a rotary glue pouring unit (2), an adjustable heating unit (3) and a limit stabilization unit (4) are arranged between the output end of the cylinder (5) and the frame (1); The adjustable heating unit (3) comprises a foldable heating component (301) and a rotation adjustment component (302); the rotation glue pouring unit (2) comprises a glue pouring component (201) and a driving component (202); The rotation adjustment component (302) comprises an annular electric slide rail (3021) fixedly connected to the glue filling component (201) and an arc-shaped slide block (3022) slidably connected to the annular electric slide rail (3021), and a hinge plate (3023) is hingedly connected to the arc-shaped slide block (3022); The foldable heating component (301) comprises two folding plates (3011) hinged to each other and an infrared heating tube (3012) fixedly mounted on the bottom of the folding plates (3011), and the frontmost folding plate (3011) is fixedly connected to the hinge plate (3023); The limiting and stabilizing unit (4) comprises a lateral limiting component (401), a vertical limiting component (402) and a clamp (403); a Y-axis slide rail (13) for driving the glue pouring component (201) is fixedly installed at the output end of the cylinder (5); and a Y-axis slide table (14) is slidably connected to the bottom of the Y-axis slide rail (13); The glue pouring component (201) moves downward and the limiting and stabilizing unit (4) limits the moving track of the glue pouring component (201). After a single glue pouring is completed and the next glue pouring is carried out, the foldable heating component (301) performs a blanket heating and curing on the mutual inductor (15) that has been poured with glue; The lateral limit assembly (401) comprises a horizontal slide groove (4011) symmetrically arranged on the top of the clamp (403) and a limit frame (4012) fixedly mounted on the top of the Y-axis slide rail (13) through a return spring (12) and slidably connected to the outer side of the output end of the cylinder (5), the front and rear ends of the bottom of the limit frame (4012) are respectively matched with the front and rear horizontal slide grooves (4011), and the clamp (403) is placed on the top of the tray (18); The vertical limit assembly (402) comprises a plurality of horizontal longitudinal slide grooves (4021) formed on the top of the clamp (403) and a plurality of ear plates (4022) distributed in a circumference, and the clamp (403) is provided with a plurality of positioning holes adapted to the outer contour of the mutual inductor (15); The glue filling assembly (201) includes a "C"-shaped frame fixedly installed at the bottom of the Y-axis slide (14) and an installation cover (2012) fixedly installed at the bottom of the "C"-shaped frame. The annular electric slide rail (3021) and several ear plates (4022) are both fixedly installed on the outer side of the installation cover (2012).

2. A transformer glue filling processing device according to claim 1, characterized in that, The positioning holes between two adjacent horizontal longitudinal chutes one (4021) are in a column. Several horizontal longitudinal chutes one (4021) divide the positioning holes into several columns. The positioning holes in each column are further divided into several groups, and each group includes four positioning holes distributed in a square shape.

3. A transformer glue filling processing device according to claim 1, characterized in that, A slide bar one (4023) slidably connected to the horizontal longitudinal chute one (4021) is fixedly installed at the bottom of the ear plate (4022). A horizontal longitudinal chute two (4024) is provided at the position between adjacent horizontal longitudinal chutes one (4021) at the top of the fixture (403). Slide bars two (4025) slidably connected to the horizontal longitudinal chute two (4024) are fixedly installed at the bottoms of the two folding plates (3011). Several slide bars two (4025) cooperate to form a complete round bar when the two folding plates (3011) are in the unfolded state.

4. A transformer glue filling processing device according to claim 1, characterized in that, Two symmetrically arranged fixed pipes (2013) are fixedly installed on the inner wall of the top of the installation cover (2012). A T-shaped pipe (2015) is installed between the two fixed pipes (2013). The top of the vertical section of the T-shaped pipe (2015) penetrates through the top of the installation cover (2012). Rotating pipes (2014) are rotatably installed at the left and right ends of the bottoms of the two fixed pipes (2013).

5. A transformer glue filling processing device according to claim 4, characterized in that, The driving assembly (202) includes a driving pulley (2025) fixedly sleeved on the outer side of the rotating pipe (2014) located in the front left and driven pulleys (2026) fixedly sleeved on the outer sides of the other three rotating pipes (2014). Two symmetrically arranged rotating rods (2028) are rotatably installed on the inner wall of the top of the installation cover (2012). The driving pulley (2025), the three driven pulleys (2026) and the two rotating rods (2028) are connected by the same belt (2027).

6. A transformer glue filling processing device according to claim 4, characterized in that, A motor seat (2021) is fixedly installed on the inner wall of the top of the installation cover (2012). A driving motor (2022) is fixedly installed on the front side of the motor seat (2021). A worm (2023) is fixedly installed on the outer side of the output shaft of the driving motor (2022). A worm gear (2024) meshing with the worm (2023) is fixedly sleeved on the outer side of the rotating pipe (2014) located in the front left. Reinforcing sleeves (21) with the same number as the rotating pipes (2014) and sleeved on the fixed pipes (2013) are fixedly installed on the inner wall of the installation cover (2012).

7. A mutual inductor glue filling processing device according to claim 1, It is characterized in that A plurality of locking grooves (20) are formed on the top of the tray (18); a plurality of locking rods (19) adapted to the locking grooves (20) are fixedly mounted on the bottom of the clamp (403); two front-to-back symmetrical limiting rods (17) are fixedly mounted on the top of the Y-axis slide rail (13); the top ends of the limiting rods (17) slide through the limiting frame (4012).