Intelligent control method and device for updating central air conditioning system project

The cooling tower update and installation plan is generated through the intelligent management and control method, which solves the problems of low efficiency and low accuracy of the update installation plan in the existing technology, achieves more efficient and accurate cooling tower update, and meets the needs of industrial refrigeration.

CN118669957BActive Publication Date: 2024-10-25ZHONGTONG INFORMATION SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411157684.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-10-25
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

Existing cooling tower renewal and installation plans are inefficient, inaccurate, and not very applicable, resulting in cooling tower aging and high failure rates, making it unable to meet industrial refrigeration needs.

Method used

Using intelligent management and control methods, we obtain project design requirements, determine update elements such as noise, cooling tower configuration, and wire layout, and generate target installation sequences and sub-cases to ensure the accuracy and feasibility of the update plan.

Benefits of technology

It improves the efficiency and accuracy of formulating the cooling tower update and installation plan, reduces the failure rate, meets the needs of industrial refrigeration, and improves the success rate and efficiency of the update and installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118669957B_ABST
    Figure CN118669957B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of project update control, and discloses an intelligent control method and device for central air-conditioning system project update, the method comprising: obtaining the project design requirements of the central air-conditioning update project to determine the target to be updated; according to the project design requirements, in combination with the system composition of the central air-conditioning system, determining the preset update elements, the update elements including noise, cooling tower configuration, wire arrangement and at least one element of safety control; according to the project design requirements and the update elements, generating an update installation plan for the central air-conditioning system, the update installation plan including a first update sequence for the target to be updated and a target installation sequence for the second update sequence of the update elements; executing the update installation plan according to the target installation sequence to obtain a corresponding plan installation record. It can be seen that the implementation of the present invention can be beneficial to improving the efficiency of the formulation of the cooling tower update installation plan and the accuracy of the plan formulation, while improving the applicability of the formulated plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of project update control, and in particular to an intelligent control method and device for central air-conditioning system project update. Background Art

[0002] Refrigeration technology is a particularly critical technology in industrial production scenarios or scenarios where heat dissipation technology is required. Existing conventional equipment for realizing intelligence includes cooling towers. The main function of a cooling tower is to dissipate heat in the tower by exchanging heat with the air, thereby reducing the water temperature. In order to meet industrial production needs and maintain the normal operation of various systems, cooling towers play an indispensable role.

[0003] However, as the working life of the cooling tower increases, it is inevitable that the equipment will age. The aging of the equipment will lead to a high failure rate of the cooling tower. At the same time, the aging cooling tower will also cause the originally set noise reduction function to gradually fail, resulting in greater production noise. It can be seen that aging or even faulty cooling towers can no longer meet the refrigeration needs of industrial production. The cooling tower needs to be updated. However, the existing update and installation scheme for cooling towers is not mature enough, and relies on manual formulation of the update and installation scheme, resulting in low efficiency in the formulation of the scheme. At the same time, due to the various schemes for updating cooling towers, which are not unified and standardized, the formulated update and installation schemes are not highly applicable. It can be seen that it is particularly important to provide a corresponding solution to the technical problems of low efficiency, low accuracy and low applicability of the scheme when the existing cooling tower is updated. Summary of the invention

[0004] The present invention provides an intelligent control method and device for updating a central air-conditioning system project, which can be beneficial to improving the efficiency and accuracy of formulating a cooling tower update installation plan, while improving the applicability of the formulated plan.

[0005] In order to solve the above technical problems, the first aspect of the present invention discloses an intelligent control method for updating a central air-conditioning system project, the method comprising:

[0006] Obtaining a project design requirement corresponding to a central air conditioning update project to be processed, wherein the project design requirement includes a target to be updated corresponding to a central air conditioning system to be updated;

[0007] According to the project design requirements and in combination with the system components corresponding to the central air-conditioning system, determining the update factors required to update the central air-conditioning system, wherein the update factors include at least one of noise factors, cooling tower configuration factors, wire arrangement factors, and safety control factors;

[0008] Generate an update installation plan for the central air conditioning system according to the project design requirements and the update elements, wherein the update installation plan includes a target installation sequence, and the target installation sequence includes a first update sequence for the target to be updated and a second update sequence for the update elements;

[0009] The update installation scheme is executed according to the target installation sequence to obtain a scheme installation record corresponding to the update installation scheme.

[0010] As an optional implementation manner, in the first aspect of the present invention, the priority corresponding to the first update sequence is higher than the priority corresponding to the second update sequence;

[0011] The target to be updated includes at least one sub-target of a cooling tower, a fan control box, a cooling tower pipeline and a pipeline valve corresponding to the cooling tower; the update installation plan includes a first installation sub-plan; the first installation sub-plan includes a sub-target installation plan corresponding to each of the sub-targets;

[0012] The update installation scheme further includes a second installation sub-case, wherein the second installation sub-case includes at least one of a noise sub-case, a configuration sub-case, a wire arrangement sub-case, and a safety control sub-case corresponding to the update element;

[0013] Among them, the noise sub-case is used to perform noise calculation and noise reduction processing after the cooling tower is installed; the configuration sub-case is used to perform parameter configuration and installation configuration of the cooling tower; the wire layout sub-case is used to select power cables, jointly manage the ground wire system, and set up wiring layout; the safety control sub-case is used to perform risk assessment and safety management on the entire process of project execution.

[0014] As an optional implementation, in the first aspect of the present invention, generating an update installation plan for the central air-conditioning system according to the project design requirements and the update elements includes:

[0015] When the update factor includes the noise factor and the target to be updated includes a cooling tower, the noise details corresponding to the central air-conditioning system are determined, and the noise details are details of the noise values ​​that affect the central air-conditioning system; the noise details include the noise classification corresponding to the acoustic environment functional zone of the installation area where the central air-conditioning system is located, the noise level requirements of the target to be updated, and the noise reduction parameters of the target to be updated;

[0016] According to the noise reduction parameters combined with the set noise calculation formula, noise data corresponding to the cooling tower is calculated, and the noise data includes noise power level and sound pressure level;

[0017] Generate a noise sub-case for the central air-conditioning system according to the noise classification, the noise level requirement, and the noise data, and add the noise sub-case to the update installation plan of the central air-conditioning system;

[0018] Among them, the noise sub-case includes cooling tower installation information at the noise level, and the cooling tower installation information at the noise level is used to indicate the installation requirements of the cooling tower, so that the noise data generated by the cooling tower after installation meets the noise classification, the noise level requirements and the noise requirements corresponding to the noise data.

[0019] As an optional implementation, in the first aspect of the present invention, generating an update installation plan for the central air-conditioning system according to the project design requirements and the update elements further includes:

[0020] When the update element includes the cooling tower configuration element, determining the cooling tower specifications, thermal performance, power consumption ratio, water drift rate, and component materials corresponding to the cooling tower to be installed as configuration parameters for the cooling tower;

[0021] According to the configuration parameters, a configuration sub-case for the cooling tower is generated; and the configuration sub-case is added to the update installation plan for the central air-conditioning system; the configuration sub-case is used to determine the target cooling tower to be installed and to compare and verify the parameter configuration of the target cooling tower;

[0022] When the update element includes the wire layout element, determining the cable usage details corresponding to the central air conditioning system, the cable usage details including the cable type and the number of cables to be used; the cable usage details also include the plane layout data corresponding to the cables to be used, the wiring laying requirements, and the cable connection requirements;

[0023] A wire arrangement sub-plan for the cable to be used is generated according to the cable usage details, and the wire arrangement sub-plan is added to the update installation plan for the central air-conditioning system.

[0024] As an optional implementation, in the first aspect of the present invention, generating an update installation plan for the central air-conditioning system according to the project design requirements and the update elements further includes:

[0025] When the update element includes the safety control element, determining the engineering safety matters corresponding to the installation of the central air-conditioning system, the engineering safety matters including on-site exploration safety matters and construction behavior requirements; the construction behavior requirements including at least one of construction power requirements, construction fire protection requirements, construction supervision requirements and construction communication requirements;

[0026] Based on the engineering safety matters, a safety control sub-case for the central air-conditioning system is generated, and the safety control sub-case is added to the update and installation plan for the central air-conditioning system.

[0027] As an optional embodiment, in the first aspect of the present invention, when the target to be updated includes the cooling tower, the noise reduction parameters of the target to be updated include the rated air volume and rated air pressure of the cooling tower fan;

[0028] The noise data corresponding to the cooling tower is calculated based on the noise reduction parameter in combination with the set noise calculation formula, including:

[0029] Determine the number of cooling towers, and determine the correction value corresponding to the cooling tower fan according to the number of cooling towers and the noise reduction parameter;

[0030] Input the noise reduction parameter and the correction value into a set first noise calculation formula to calculate the noise power levels corresponding to all the cooling towers;

[0031] Determine the measurement distance between a noise sensitive point in the environment where the cooling tower is installed and the cooling tower;

[0032] Input the measured distance into a set second noise calculation formula to calculate the noise attenuation value when the cooling tower corresponds to the noise sensitive point;

[0033] Calculating the absolute value of the difference between the noise power level and the noise attenuation value to obtain the sound pressure level corresponding to the noise sensitive point;

[0034] The noise power levels corresponding to all the cooling towers and the sound pressure levels corresponding to the noise sensitive points are determined as the noise data corresponding to the cooling towers.

[0035] As an optional implementation manner, in the first aspect of the present invention, the first noise calculation formula is specifically:

[0036] Lw1=19+10lgQ+25lgH+δ

[0037] Wherein, Lw1 is the noise power level corresponding to the cooling tower to be analyzed; Q is the air volume corresponding to the cooling tower fan to be analyzed; H is the wind pressure corresponding to the cooling tower fan to be analyzed; δ is the correction value;

[0038] The second noise calculation formula is specifically:

[0039] Lw2=Lp+20lgr+7.9

[0040] Wherein, Lw2 is the noise attenuation value between a certain sensitive point in the installation site of the cooling tower to be analyzed and the cooling tower to be analyzed; Lp is the on-site sound pressure level at a distance of r meters from the sound source; r is the distance between the certain sensitive point and the sound source of the cooling tower to be analyzed.

[0041] The second aspect of the present invention discloses an intelligent control device for updating a central air-conditioning system project, the device comprising:

[0042] An acquisition module, used to acquire a project design requirement corresponding to a central air conditioning update project to be processed, wherein the project design requirement includes a target to be updated corresponding to a central air conditioning system to be updated;

[0043] A determination module, configured to determine, according to the project design requirements and in combination with the system components corresponding to the central air-conditioning system, an update factor required to update the central air-conditioning system, wherein the update factor includes at least one of a noise factor, a cooling tower configuration factor, a wire arrangement factor, and a safety control factor;

[0044] A generation module, configured to generate an update installation plan for the central air-conditioning system according to the project design requirements and the update elements, wherein the update installation plan includes a target installation sequence, and the target installation sequence includes a first update sequence for the target to be updated and a second update sequence for the update elements;

[0045] The solution execution module is used to execute the update installation solution according to the target installation sequence to obtain a solution installation record corresponding to the update installation solution.

[0046] As an optional implementation, in the second aspect of the present invention, the priority corresponding to the first update sequence is higher than the priority corresponding to the second update sequence;

[0047] The target to be updated includes at least one sub-target of a cooling tower, a fan control box, a cooling tower pipeline and a pipeline valve corresponding to the cooling tower; the update installation plan includes a first installation sub-plan; the first installation sub-plan includes a sub-target installation plan corresponding to each of the sub-targets;

[0048] The update installation scheme further includes a second installation sub-case, wherein the second installation sub-case includes at least one of a noise sub-case, a configuration sub-case, a wire arrangement sub-case, and a safety control sub-case corresponding to the update element;

[0049] Among them, the noise sub-case is used to perform noise calculation and noise reduction processing after the cooling tower is installed; the configuration sub-case is used to perform parameter configuration and installation configuration of the cooling tower; the wire layout sub-case is used to select power cables, jointly manage the ground wire system, and set up wiring layout; the safety control sub-case is used to perform risk assessment and safety management on the entire process of project execution.

[0050] As an optional implementation, in the second aspect of the present invention, the generation module generates an update installation plan for the central air-conditioning system according to the project design requirements and the update elements, specifically including:

[0051] When the update factor includes the noise factor and the target to be updated includes a cooling tower, the noise details corresponding to the central air-conditioning system are determined, and the noise details are details of the noise values ​​that affect the central air-conditioning system; the noise details include the noise classification corresponding to the acoustic environment functional zone of the installation area where the central air-conditioning system is located, the noise level requirements of the target to be updated, and the noise reduction parameters of the target to be updated;

[0052] According to the noise reduction parameters combined with the set noise calculation formula, noise data corresponding to the cooling tower is calculated, and the noise data includes noise power level and sound pressure level;

[0053] Generate a noise sub-case for the central air-conditioning system according to the noise classification, the noise level requirement, and the noise data, and add the noise sub-case to the update installation plan of the central air-conditioning system;

[0054] Among them, the noise sub-case includes cooling tower installation information at the noise level, and the cooling tower installation information at the noise level is used to indicate the installation requirements of the cooling tower, so that the noise data generated by the cooling tower after installation meets the noise classification, the noise level requirements and the noise requirements corresponding to the noise data.

[0055] As an optional implementation, in the second aspect of the present invention, the generation module generates an update installation plan for the central air conditioning system according to the project design requirements and the update elements, and specifically includes:

[0056] When the update element includes the cooling tower configuration element, determining the cooling tower specifications, thermal performance, power consumption ratio, water drift rate, and component materials corresponding to the cooling tower to be installed as configuration parameters for the cooling tower;

[0057] According to the configuration parameters, a configuration sub-case for the cooling tower is generated; and the configuration sub-case is added to the update installation plan for the central air-conditioning system; the configuration sub-case is used to determine the target cooling tower to be installed and to compare and verify the parameter configuration of the target cooling tower;

[0058] When the update element includes the wire layout element, determining the cable usage details corresponding to the central air conditioning system, the cable usage details including the cable type and the number of cables to be used; the cable usage details also include the plane layout data corresponding to the cables to be used, the wiring laying requirements, and the cable connection requirements;

[0059] A wire arrangement sub-plan for the cable to be used is generated according to the cable usage details, and the wire arrangement sub-plan is added to the update installation plan for the central air-conditioning system.

[0060] As an optional implementation, in the second aspect of the present invention, the generation module generates an update installation plan for the central air conditioning system according to the project design requirements and the update elements, and specifically includes:

[0061] When the update element includes the safety control element, determining the engineering safety matters corresponding to the installation of the central air-conditioning system, the engineering safety matters including on-site exploration safety matters and construction behavior requirements; the construction behavior requirements including at least one of construction power requirements, construction fire protection requirements, construction supervision requirements and construction communication requirements;

[0062] Based on the engineering safety matters, a safety control sub-case for the central air-conditioning system is generated, and the safety control sub-case is added to the update and installation plan for the central air-conditioning system.

[0063] As an optional embodiment, in the second aspect of the present invention, when the target to be updated includes the cooling tower, the noise reduction parameters of the target to be updated include the rated air volume and rated air pressure of the cooling tower fan;

[0064] The generation module calculates the noise data corresponding to the cooling tower according to the noise reduction parameter in combination with the set noise calculation formula, specifically including:

[0065] Determine the number of cooling towers, and determine the correction value corresponding to the cooling tower fan according to the number of cooling towers and the noise reduction parameter;

[0066] Input the noise reduction parameter and the correction value into a set first noise calculation formula to calculate the noise power levels corresponding to all the cooling towers;

[0067] Determine the measurement distance between a noise sensitive point in the environment where the cooling tower is installed and the cooling tower;

[0068] Input the measured distance into a set second noise calculation formula to calculate the noise attenuation value when the cooling tower corresponds to the noise sensitive point;

[0069] Calculating the absolute value of the difference between the noise power level and the noise attenuation value to obtain the sound pressure level corresponding to the noise sensitive point;

[0070] The noise power levels corresponding to all the cooling towers and the sound pressure levels corresponding to the noise sensitive points are determined as the noise data corresponding to the cooling towers.

[0071] As an optional implementation manner, in the second aspect of the present invention, the first noise calculation formula is specifically:

[0072] Lw1=19+10lgQ+25lgH+δ

[0073] Wherein, Lw1 is the noise power level corresponding to the cooling tower to be analyzed; Q is the air volume corresponding to the cooling tower fan to be analyzed; H is the wind pressure corresponding to the cooling tower fan to be analyzed; δ is the correction value;

[0074] The second noise calculation formula is specifically:

[0075] Lw2=Lp+20lgr+7.9

[0076] Wherein, Lw2 is the noise attenuation value between a certain sensitive point in the installation site of the cooling tower to be analyzed and the cooling tower to be analyzed; Lp is the on-site sound pressure level at a distance of r meters from the sound source; r is the distance between the certain sensitive point and the sound source of the cooling tower to be analyzed.

[0077] The third aspect of the present invention discloses another intelligent control device for updating central air-conditioning system items, the device comprising:

[0078] A memory storing executable program code;

[0079] a processor coupled to the memory;

[0080] The processor calls the executable program code stored in the memory to execute the intelligent management and control method for updating central air-conditioning system projects disclosed in the first aspect of the present invention.

[0081] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the intelligent management and control method for updating central air-conditioning system projects disclosed in the first aspect of the present invention.

[0082] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0083] In an embodiment of the present invention, an intelligent management and control method for central air-conditioning system project updates is provided, the method comprising: obtaining a project design requirement corresponding to a central air-conditioning update project to be processed, the project design requirement being used to determine a target to be updated corresponding to the central air-conditioning system to be updated; determining update elements required for updating the central air-conditioning system according to the project design requirement and in combination with a system composition corresponding to the central air-conditioning system, the update elements comprising at least one of a noise element, a cooling tower configuration element, a wire arrangement element, and a safety management and control element; generating an update installation plan for the central air-conditioning system according to the project design requirement and the update elements, the update installation plan comprising a target installation sequence, the target installation sequence comprising a first update sequence for the target to be updated and a second update sequence for the update element; executing the update installation plan according to the target installation sequence to obtain a plan installation record corresponding to the update installation plan. It can be seen that the implementation of the present invention can automatically obtain the project design requirements of the central air-conditioning system update project, and then accurately determine the target to be updated; thereafter, it can also be combined with the system composition of the central air-conditioning system to determine the update elements required for updating the central air-conditioning system, and then combine the update elements with the project design requirements to generate a corresponding update installation plan. The method of gradually determining the target to be updated and the update elements makes the generation of the update installation plan clearer and more accurate; at the same time, the generated update installation plan also includes the target installation sequence, so that when the update and installation of the central air-conditioning system is subsequently executed, the implementation of the plan is more coordinated, which is conducive to improving the execution accuracy and success rate of the update installation plan, and to a certain extent, it is conducive to improving the execution efficiency of the update installation plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0085] Figure 1 It is a flow chart of an intelligent control method for updating a central air-conditioning system project disclosed in an embodiment of the present invention;

[0086] Figure 2 It is a flow chart of another intelligent control method for updating central air-conditioning system projects disclosed in an embodiment of the present invention;

[0087] Figure 3 It is a structural schematic diagram of an intelligent control device for updating central air-conditioning system items disclosed in an embodiment of the present invention;

[0088] Figure 4 It is a structural schematic diagram of another intelligent control device for updating central air-conditioning system projects disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0089] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0090] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.

[0091] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0092] The present invention discloses an intelligent control method and device for updating a central air-conditioning system project, which can automatically obtain the project design requirements of the central air-conditioning system update project, and then accurately determine the target to be updated; afterwards, it can also determine the update elements required for updating the central air-conditioning system in combination with the system composition of the central air-conditioning system, and then generate a corresponding update installation plan by combining the update elements with the project design requirements. The method of gradually determining the target to be updated and the update elements makes the generation of the update installation plan clearer and more accurate; at the same time, the generated update installation plan also includes the target installation sequence, so that when the update installation of the central air-conditioning system is subsequently executed, the implementation of the plan is more regulated, that is, it is conducive to improving the execution accuracy and success rate of the update installation plan, and to a certain extent, it is conducive to improving the execution efficiency of the update installation plan. The following are detailed descriptions.

[0093] Embodiment 1

[0094] See also Figure 1 , Figure 1 1 is a flow chart of an intelligent control method for updating a central air conditioning system project disclosed in an embodiment of the present invention. Figure 1 The described intelligent control method for updating central air conditioning system items can be applied to an intelligent control device for updating central air conditioning system items, and the embodiments of the present invention are not limited thereto. Figure 1 As shown, the intelligent control method for updating the central air conditioning system project may include the following operations:

[0095] 101. Obtain project design requirements corresponding to a pending central air conditioning update project, where the project design requirements include a target to be updated corresponding to the pending central air conditioning system.

[0096] In an embodiment of the present invention, the project design requirements also include project design scope and engineering division of labor; among them, the details corresponding to the project design scope are: ① demolition of cooling tower equipment and related wiring and piping to be demolished; ② configuration and installation of a new cooling tower; ③ wiring, piping and routing design between the new cooling tower, power control equipment and existing equipment; environmental noise reduction engineering design.

[0097] In an embodiment of the present invention, the project design requirements also include engineering division of labor, which includes primary division of labor and secondary division of labor. The primary division of labor corresponds to the renovation of cooling towers and their supporting projects such as noise reduction and power; the secondary division of labor corresponds to the cooperation in replacing cooling towers one by one and making relevant preparations for pipeline adjustments.

[0098] 102. According to the project design requirements and in combination with the corresponding system composition of the central air-conditioning system, determine the update factors required to update the central air-conditioning system. The update factors include at least one of the noise factor, cooling tower configuration factor, wire layout factor and safety control factor.

[0099] 103. Generate an update installation plan for the central air conditioning system according to the project design requirements and update elements. The update installation plan includes a target installation sequence. The target installation sequence includes a first update sequence for the target to be updated and a second update sequence for the update elements.

[0100] 104. Execute the update installation plan according to the target installation sequence to obtain a plan installation record corresponding to the update installation plan.

[0101] In the embodiment of the present invention, the priority corresponding to the first update sequence is higher than the priority corresponding to the second update sequence.

[0102] In an embodiment of the present invention, the target to be updated includes at least one sub-target of a cooling tower, a fan control box, and cooling tower pipelines and pipeline valves corresponding to the cooling tower; the updated installation plan includes a first installation sub-plan; the first installation sub-plan includes a sub-target installation plan corresponding to each sub-target.

[0103] In an embodiment of the present invention, the update installation scheme further includes a second installation sub-case, and the second installation sub-case includes at least one of a noise sub-case, a configuration sub-case, a wire arrangement sub-case, and a safety control sub-case corresponding to the update element;

[0104] Among them, the noise sub-case is used to perform noise calculation and noise reduction processing after the cooling tower is installed; the configuration sub-case is used to perform parameter configuration and installation configuration of the cooling tower; the wire layout sub-case is used to select power cables, jointly manage the ground wire system, and set up wiring layout; the safety control sub-case is used to conduct risk assessment and safety management of the entire process of project execution.

[0105] In the embodiment of the present invention, after the update installation plan is generated, the overall installation plan will be based on the target to be updated in the project design requirements, comprehensively consider multiple update factors, and then generate a sub-target installation plan that matches each first target to be updated / sub-target; wherein the factor corresponding to the generation of each sub-target installation plan is the update factor;

[0106] That is, the above step 103 generates an update installation plan for the central air conditioning system according to the project design requirements and update elements, specifically including:

[0107] Priority sorting is performed on each target to be updated in the project design requirements to obtain a sorting result corresponding to all targets to be updated; wherein, the higher the ranking in the sorting result, the higher the execution order of the subsequent update installation of the target to be updated;

[0108] For each to-be-updated item in the sorting result, combining the historical update installation data of each to-be-updated item, generating a sub-target installation plan for each to-be-updated item, and determining all sub-target installation plans as the first installation sub-plan;

[0109] For each sub-target installation plan corresponding to the project to be updated, combining the update element and the field scene data, perform plan update and correction on the sub-target installation plan corresponding to each project to be updated, and obtain a second installation sub-case matching each update element for each project to be updated and a plan updated with each sub-target installation plan;

[0110] The historical update installation data of each to-be-updated project is the historical installation information recorded corresponding to the to-be-updated project, and the historical installation information recorded corresponding to the to-be-updated project includes at least one of the following information: project installation process, project installation precautions, personnel configuration, project process planning, and configuration requirements of project components;

[0111] The field scene data mentioned above may be scene data corresponding to the field scene in which the update and installation plan is executed. The field scene data may include the scene area, information about objects surrounding the scene (such as the distance between the installation location of the target to be updated and the surrounding walls, the distance between surrounding buildings, etc.); further, the field scene data may also include scene difference data between the field scene and the historical installation scene in the historical installation information; for example, the radiation boundary of the 50-meter radiation range of the field scene is blocked by a wall, while the historical installation scene is blocked by a wall only outside the 80-meter range.

[0112] In the embodiment of the present invention, when the actual scene data includes scene difference data, after all sub-target installation schemes are determined as the first installation sub-scheme, the method further includes:

[0113] Analyze the scene difference data to obtain all differences between the actual scene and the historical installation scene;

[0114] Performing numerical conversion on each difference item to obtain a conversion numerical value corresponding to each difference item;

[0115] According to the preset item ratio of each difference item, the item ratio corresponding to each difference item is multiplied by the conversion value of the difference item, and all the product results are summed to obtain the sum result;

[0116] The summation result is used as correction information to perform information correction on the historical installation information to obtain an information correction result corresponding to the actual scene, so as to update the actual scene data to the information correction result.

[0117] It can be seen that in this optional embodiment, a correction mechanism for the actual scene data is set up. After the scene data corresponding to the actual scene for executing the updated installation plan is collected or obtained, the scene difference data between the actual scene and the historical installation scene can be used to perform numerical conversion, multiplication calculation and sum calculation on the scene difference data, and finally the actual scene data is updated to an information correction result, thereby making full use of the actual scene data and improving the accuracy of the acquired actual scene data; at the same time, the accurate actual scene data is used for the subsequent generation of the second installation sub-case and the update of each sub-target installation plan, which is beneficial to improve the generation accuracy of the second installation sub-case and the update accuracy of each sub-target installation plan.

[0118] It can be seen that implementation Figure 1The described intelligent management and control method for the central air-conditioning system project update can automatically obtain the project design requirements of the central air-conditioning system update project, and then accurately determine the target to be updated; after that, it can also combine the system composition of the central air-conditioning system to determine the update elements required for updating the central air-conditioning system, and then combine the update elements with the project design requirements to generate a corresponding update installation plan. The method of gradually determining the target to be updated and the update elements makes the generation of the update installation plan clearer and more accurate; at the same time, the generated update installation plan also includes the target installation sequence, so that when the update and installation of the central air-conditioning system is subsequently executed, the implementation of the plan is more coordinated, which is conducive to improving the execution accuracy and success rate of the update installation plan, and to a certain extent, it is conducive to improving the execution efficiency of the update installation plan.

[0119] Embodiment 2

[0120] See also Figure 2 , Figure 2 It is a flow chart of another intelligent control method for updating central air conditioning system projects disclosed in an embodiment of the present invention. Figure 2 The described intelligent control method for updating central air conditioning system items can be applied to an intelligent control device for updating central air conditioning system items, and the embodiments of the present invention are not limited thereto. Figure 2 As shown, the intelligent control method for updating the central air conditioning system project may include the following operations:

[0121] 201. Obtain project design requirements corresponding to a pending central air conditioning update project, where the project design requirements include a target to be updated corresponding to a pending central air conditioning system.

[0122] 202. According to the project design requirements and in combination with the corresponding system composition of the central air-conditioning system, determine the update elements required to update the central air-conditioning system. The update elements include at least one of the noise elements, cooling tower configuration elements, wire layout elements and safety control elements.

[0123] 203. When the update factor includes a noise factor and the target to be updated includes a cooling tower, determine the noise details corresponding to the central air-conditioning system.

[0124] In the embodiment of the present invention, the noise details are details of the noise values ​​that affect the central air-conditioning system; the noise details include the noise classification corresponding to the acoustic environment functional zone of the installation area where the central air-conditioning system is located, the noise level requirements of the target to be updated, and the noise reduction parameters of the target to be updated;

[0125] In the embodiment of the present invention, the classification basis of the noise classification corresponding to the acoustic environment functional zone is the Acoustic Environment Quality Standard (GB3096-2008), wherein the standard divides the acoustic environment functional zone into the following five types:

[0126] Class 0 acoustic environment functional area: refers to areas that require special quietness, such as rehabilitation and convalescent areas;

[0127] Class 1 acoustic environment functional area: refers to areas with residential housing, medical and health care, cultural education, scientific research and design, and administrative offices as their main functions, which need to be kept quiet;

[0128] Category 2 acoustic environment functional area: refers to areas with commercial finance, market trade as the main functions, or mixed residential, commercial and industrial areas, where residential quietness needs to be maintained;

[0129] Category 3 acoustic environment functional area: refers to areas with industrial production, warehousing and logistics as the main functions, where it is necessary to prevent industrial noise from having a serious impact on the surrounding environment;

[0130] Category 4 acoustic environment functional areas: refers to areas within a certain distance on both sides of traffic arteries where it is necessary to prevent traffic noise from having a serious impact on the surrounding environment, including category 4a and category 4b. Category 4a refers to areas on both sides of expressways, first-class highways, second-class highways, urban expressways, urban main roads, urban secondary roads, urban rail transit (ground section), and inland waterways; category 4b refers to areas on both sides of railway arteries.

[0131] In the embodiment of the present invention, the noise level requirement of the target to be updated refers to the decibel value of the noise generated by the operation of the target to be updated. For example, referring to the noise level requirement of type C cooling tower in (GB / T 7190.1-2008) (noise level not higher than 63dB (A)), the noise level generated by the operation of the cooling tower actually purchased can be selected as a model not higher than 60dB (A).

[0132] In the embodiment of the present invention, the noise reduction parameter of the target to be updated is the noise attenuation data corresponding to the sensitive point at a distance of r meters from the noise source (such as a cooling tower fan) when no additional noise reduction processing is performed.

[0133] 204. According to the noise reduction parameters and the set noise calculation formula, the noise data corresponding to the cooling tower is calculated, and the noise data includes the noise power level and the sound pressure level.

[0134] 205. Generate a noise sub-case for the central air-conditioning system based on noise classification, noise level requirements, and noise data, and add the noise sub-case to the update installation plan of the central air-conditioning.

[0135] In an embodiment of the present invention, the noise sub-case includes cooling tower installation information at the noise level, and the cooling tower installation information at the noise level is used to indicate the installation requirements of the cooling tower, so that the noise data generated by the installed cooling tower meets the noise classification, noise level requirements and the noise requirements corresponding to the noise data.

[0136] In the embodiment of the present invention, the update installation scheme includes a target installation sequence, and the target installation sequence includes a first update sequence for a target to be updated and a second update sequence for an update element.

[0137] 206. Execute the update installation plan according to the target installation sequence to obtain a plan installation record corresponding to the update installation plan.

[0138] In the embodiment of the present invention, for other descriptions of step 201-step 202 and step 206, please refer to other specific descriptions of step 101-step 102 and step 104 in embodiment 1, which will not be repeated in the embodiment of the present invention.

[0139] It can be seen that implementation Figure 2 The described intelligent management and control method for updating a central air-conditioning system project sets up a response mechanism for the update factor of noise when generating an update installation plan. After determining the noise details corresponding to the central air-conditioning system, the noise data of the cooling tower can be estimated in advance by combining the noise reduction parameters included in the noise details with the noise calculation formula. Subsequently, the noise classification and noise level requirements included in the noise details and the estimated noise data of the cooling tower are combined to accurately generate a noise sub-case for the central air-conditioning system, thereby improving the accuracy of the plan generation of the noise sub-case for the central air-conditioning system generated at the noise processing level.

[0140] In an optional embodiment, when the target to be updated includes a cooling tower, the noise reduction parameters of the target to be updated include the rated air volume and rated air pressure of the cooling tower fan;

[0141] Furthermore, the above step 204 calculates the noise data corresponding to the cooling tower according to the noise reduction parameter and the set noise calculation formula, specifically including:

[0142] Determine the number of cooling towers, and determine the corresponding correction value of the cooling tower fan based on the number of cooling towers and the noise reduction parameters;

[0143] The noise reduction parameters and correction values ​​are input into the set first noise calculation formula to calculate the noise power levels corresponding to all cooling towers;

[0144] Determine the measurement distance between the noise sensitive point in the environment where the cooling tower is installed and the cooling tower;

[0145] Input the measured distance into the set second noise calculation formula to calculate the noise attenuation value corresponding to the cooling tower and the noise sensitive point;

[0146] Calculate the absolute value of the difference between the noise power level and the noise attenuation value to obtain the sound pressure level corresponding to the noise sensitive point;

[0147] The noise power levels corresponding to all cooling towers and the sound pressure levels corresponding to noise sensitive points are determined as the noise data corresponding to the cooling towers.

[0148] Furthermore, the first noise calculation formula is specifically:

[0149] Lw1=19+10lgQ+25lgH+δ

[0150] Among them, Lw1 is the noise power level corresponding to the cooling tower to be analyzed; Q is the air volume corresponding to the cooling tower fan to be analyzed; H is the wind pressure corresponding to the cooling tower fan to be analyzed; δ is the correction value;

[0151] The second noise calculation formula is as follows:

[0152] Lw2=Lp+20lgr+7.9

[0153] Wherein, Lw2 is the noise attenuation value between a certain sensitive point in the installation site of the cooling tower to be analyzed and the cooling tower to be analyzed; Lp is the on-site sound pressure level at a distance of r meters from the sound source; r is the distance between the certain sensitive point and the sound source of the cooling tower to be analyzed.

[0154] In this optional embodiment, specifically, if the rated air volume Q corresponding to the fan of the cooling tower to be installed is 87000m3 / h, and the rated air pressure H is 12Pa; at the same time, the correction value δ of the cooling tower fan is determined to be -3dB; at this time, the rated air volume Q, the rated air pressure H and the correction value δ are substituted into the above-mentioned first noise calculation formula, and the noise power level Lw1 of the cooling tower can be calculated to be 93dB; wherein, the correction value δ can be obtained by querying the corresponding operating condition correction value table.

[0155] In this optional embodiment, after calculating that the noise power level Lw1 of a single cooling tower is 93dB, if the number of cooling towers is greater than 1, such as multiple cooling towers (2, 3, etc.), it can be further calculated that the noise of multiple cooling towers after superposition is 93+6=99dB.

[0156] In this optional embodiment, the calculation assumes that the installation site is a hemispherical free field. When the distance from the sound source is r (m), the relationship between the on-site sound pressure level and the sound power level of the fan is the above-mentioned second noise calculation formula; at this time, the minimum distance among the sensitive points corresponding to the cooling tower noise source is predetermined to be 20 meters, and the on-site sound pressure level of the installation site is determined to be 0. Substituting r=20 into the second noise calculation formula, it can be calculated that the noise attenuation from the noise source to the sensitive point is 20lgr+7.9=34dB. If no noise reduction treatment is performed on the cooling tower fan, the sound pressure level of the sensitive point is 99-34=65dB.

[0157] It can be seen that in this optional embodiment, specifically for the actual target to be updated (cooling tower), a detailed noise calculation scheme is designed, taking into account the rated air volume and rated air pressure of the cooling tower fan itself, and through the predetermined correction value, the accurate calculation of the noise power level of a single or multiple cooling tower fans is achieved. Furthermore, the noise attenuation information of a specific noise-sensitive point can be calculated, and finally the required sound pressure level of the cooling tower fan is determined, thereby improving the calculation accuracy of the noise power level of the single or multiple cooling tower fans and the determination accuracy of the sound pressure level of the cooling tower fans; thereby improving the accuracy of the subsequent formulation of corresponding noise reduction schemes.

[0158] In another optional embodiment, the above method of generating an update installation plan for the central air conditioning system according to the project design requirements and update elements specifically includes:

[0159] When the update factor includes a cooling tower configuration factor, the cooling tower specifications, thermal performance, power consumption ratio, water drift rate, and component materials corresponding to the cooling tower to be installed are determined as configuration parameters for the cooling tower;

[0160] Generate a configuration sub-case for the cooling tower according to the configuration parameters; and add the configuration sub-case to the update installation plan for the central air-conditioning system; the configuration sub-case is used to determine the target cooling tower to be installed and to compare and verify the parameter configuration of the target cooling tower;

[0161] When the update element includes the wire layout element, the cable usage details corresponding to the central air conditioning system are determined, and the cable usage details include the cable type and the number of cables to be used; the cable usage details also include the plane layout data corresponding to the cables to be used, the wiring laying requirements, and the cable connection requirements;

[0162] Generate a wire arrangement sub-plan for the cables to be used according to the cable usage details, and add the wire arrangement sub-plan to the update installation plan for the central air conditioning system.

[0163] In this optional embodiment, the cooling tower specification can be an ultra-low noise cooling tower with a noise level of C as specified in "Glass Fiber Reinforced Plastic Cooling Tower Part 1: Small and Medium-sized Glass Fiber Reinforced Plastic Cooling Tower" (GB / T 7190.1-2008); under this specification, the circulating water flow rate of the cooling tower is 600m3 / h; the overall dimensions (not exceeding): length 7800mm*width 5500mm*height 4300mm (the height below the wind duct (excluding the wind duct height) is required to be no higher than 3400mm).

[0164] It can be seen that in this optional embodiment, a scheme generation mechanism is set up for cooling tower configuration elements and wire arrangement elements, so that schemes are generated at the parameter configuration level and the wire arrangement level of the cooling tower installation, which is conducive to improving the detail and reliability of the final generated update installation scheme; when the cooling tower is subsequently installed, the update installation is performed according to the configuration sub-case and the wire arrangement sub-case, which can improve the execution efficiency and accuracy of the overall update installation scheme.

[0165] In another optional embodiment, the above method of generating an update installation plan for the central air conditioning system according to the project design requirements and update elements specifically includes:

[0166] When the update factor includes the safety control factor, determine the engineering safety issues corresponding to the installation of the central air-conditioning system. The engineering safety issues include on-site exploration safety issues and construction behavior requirements. The construction behavior requirements include at least one of the construction power requirements, construction fire protection requirements, construction supervision requirements, and construction communication requirements.

[0167] Based on the engineering safety matters, a safety control sub-case for the central air-conditioning system is generated, and the safety control sub-case is added to the update and installation plan for the central air-conditioning system.

[0168] It can be seen that in this optional embodiment, the generation of the update installation plan also takes into account the update factor of safety control, that is, a corresponding response plan is set up at the construction safety level, which further improves the safety and stability of executing the update installation plan.

[0169] Embodiment 3

[0170] See also Figure 3 , Figure 3 It is a structural diagram of an intelligent control device for updating a central air-conditioning system project disclosed in an embodiment of the present invention. The intelligent control device for updating a central air-conditioning system project can be an intelligent control terminal, device, system or server for updating a central air-conditioning system project. The server can be a local server, a remote server, or a cloud server (also known as a cloud server). When the server is a non-cloud server, the non-cloud server can communicate with the cloud server, which is not limited in the embodiment of the present invention. Figure 3 As shown, the intelligent control device for updating the central air-conditioning system project may include an acquisition module 301, a determination module 302, a generation module 303, and a solution execution module 304, wherein:

[0171] The acquisition module 301 is used to acquire the project design requirements corresponding to the central air conditioning update project to be processed, and the project design requirements are used to determine the target to be updated corresponding to the central air conditioning system to be updated;

[0172] A determination module 302 is used to determine the update factors required to update the central air-conditioning system according to the project design requirements and in combination with the system components corresponding to the central air-conditioning system, where the update factors include at least one of a noise factor, a cooling tower configuration factor, a wire arrangement factor, and a safety control factor;

[0173] A generation module 303 is used to generate an update installation plan for the central air conditioning system according to the project design requirements and update elements, wherein the update installation plan includes a target installation sequence, and the target installation sequence includes a first update sequence for the target to be updated and a second update sequence for the update elements;

[0174] The solution execution module 304 is used to execute the update installation solution according to the target installation sequence, and obtain a solution installation record corresponding to the update installation solution.

[0175] It can be seen that implementation Figure 3 The described intelligent control device for the central air-conditioning system project update can automatically obtain the project design requirements of the central air-conditioning system update project, and then accurately determine the target to be updated; after that, it can also combine the system composition of the central air-conditioning system to determine the update elements required for updating the central air-conditioning system, and then combine the update elements with the project design requirements to generate a corresponding update installation plan. The method of gradually determining the target to be updated and the update elements makes the generation of the update installation plan clearer and more accurate; at the same time, the generated update installation plan also includes the target installation sequence, so that when the central air-conditioning system is subsequently updated and installed, the implementation of the plan is more coordinated, which is conducive to improving the execution accuracy and success rate of the update installation plan, and to a certain extent, it is conducive to improving the execution efficiency of the update installation plan.

[0176] In an optional embodiment, the priority corresponding to the first update sequence is higher than the priority corresponding to the second update sequence;

[0177] The target to be updated includes at least one sub-target of a cooling tower, a fan control box, a cooling tower pipeline and a pipeline valve corresponding to the cooling tower; the updated installation plan includes a first installation sub-plan; the first installation sub-plan includes a sub-target installation plan corresponding to each sub-target;

[0178] The update installation plan also includes a second installation sub-case, and the second installation sub-case includes at least one of a noise sub-case, a configuration sub-case, a wire arrangement sub-case, and a safety control sub-case corresponding to the update element;

[0179] Among them, the noise sub-case is used to perform noise calculation and noise reduction processing after the cooling tower is installed; the configuration sub-case is used to perform parameter configuration and installation configuration of the cooling tower; the wire layout sub-case is used to select power cables, jointly manage the ground wire system, and set up wiring layout; the safety control sub-case is used to conduct risk assessment and safety management of the entire process of project execution.

[0180] In this optional embodiment, the generation module 303 generates an update installation plan for the central air conditioning system according to the project design requirements and update elements, specifically including:

[0181] When the update factor includes the noise factor and the target to be updated includes the cooling tower, the noise details corresponding to the central air-conditioning system are determined. The noise details are details of the noise values ​​that affect the central air-conditioning system. The noise details include the noise classification corresponding to the acoustic environment functional zone of the installation area where the central air-conditioning system is located, the noise level requirements of the target to be updated, and the noise reduction parameters of the target to be updated.

[0182] According to the noise reduction parameters and the set noise calculation formula, the noise data corresponding to the cooling tower is calculated, and the noise data includes the noise power level and the sound pressure level;

[0183] Generate noise sub-cases for central air-conditioning systems based on noise classification, noise level requirements, and noise data, and add the noise sub-cases to the central air-conditioning update installation plan;

[0184] Among them, the noise sub-case includes cooling tower installation information at the noise level, and the cooling tower installation information at the noise level is used to indicate the installation requirements of the cooling tower, so that the noise data generated by the installed cooling tower meets the noise classification, noise level requirements and the noise requirements corresponding to the noise data.

[0185] It can be seen that in this optional embodiment, when generating an update installation plan, a response mechanism for the noise factor is set up. After determining the noise details corresponding to the central air-conditioning system, the noise reduction parameters included in the noise details are combined with the noise calculation formula to pre-estimate the noise data of the cooling tower. Subsequently, the noise classification and noise level requirements included in the noise details and the estimated noise data of the cooling tower are combined to accurately generate a noise sub-case for the central air-conditioning system, thereby improving the accuracy of the noise sub-case generation for the central air-conditioning system generated at the noise processing level.

[0186] In another optional embodiment, the generation module 303 generates an update installation plan for the central air conditioning system according to the project design requirements and update elements, and specifically includes:

[0187] When the update factor includes a cooling tower configuration factor, the cooling tower specifications, thermal performance, power consumption ratio, water drift rate, and component materials corresponding to the cooling tower to be installed are determined as configuration parameters for the cooling tower;

[0188] Generate a configuration sub-case for the cooling tower according to the configuration parameters; and add the configuration sub-case to the update installation plan for the central air-conditioning system; the configuration sub-case is used to determine the target cooling tower to be installed and to compare and verify the parameter configuration of the target cooling tower;

[0189] When the update element includes the wire layout element, the cable usage details corresponding to the central air conditioning system are determined, and the cable usage details include the cable type and the number of cables to be used; the cable usage details also include the plane layout data corresponding to the cables to be used, the wiring laying requirements, and the cable connection requirements;

[0190] Generate a wire arrangement sub-plan for the cables to be used according to the cable usage details, and add the wire arrangement sub-plan to the update installation plan for the central air conditioning system.

[0191] It can be seen that in this optional embodiment, a scheme generation mechanism is set up for cooling tower configuration elements and wire arrangement elements, so that schemes are generated at the parameter configuration level and the wire arrangement level of the cooling tower installation, which is conducive to improving the detail and reliability of the final generated update installation scheme; when the cooling tower is subsequently installed, the update installation is performed according to the configuration sub-case and the wire arrangement sub-case, which can improve the execution efficiency and accuracy of the overall update installation scheme.

[0192] In another optional embodiment, the generation module 303 generates an update installation plan for the central air conditioning system according to the project design requirements and update elements, and specifically includes:

[0193] When the update factor includes the safety control factor, determine the engineering safety issues corresponding to the installation of the central air-conditioning system. The engineering safety issues include on-site exploration safety issues and construction behavior requirements. The construction behavior requirements include at least one of the construction power requirements, construction fire protection requirements, construction supervision requirements, and construction communication requirements.

[0194] Based on the engineering safety matters, a safety control sub-case for the central air-conditioning system is generated, and the safety control sub-case is added to the update and installation plan for the central air-conditioning system.

[0195] It can be seen that in this optional embodiment, the generation of the update installation plan also takes into account the update factor of safety control, that is, a corresponding response plan is set up at the construction safety level, which further improves the safety and stability of executing the update installation plan.

[0196] In yet another optional embodiment, when the target to be updated includes a cooling tower, the noise reduction parameters of the target to be updated include the rated air volume and rated air pressure of the cooling tower fan;

[0197] The generation module 303 calculates the noise data corresponding to the cooling tower according to the noise reduction parameters and the set noise calculation formula, specifically including:

[0198] Determine the number of cooling towers, and determine the corresponding correction value of the cooling tower fan based on the number of cooling towers and the noise reduction parameters;

[0199] The noise reduction parameters and correction values ​​are input into the set first noise calculation formula to calculate the noise power levels corresponding to all cooling towers;

[0200] Determine the measurement distance between the noise sensitive point in the environment where the cooling tower is installed and the cooling tower;

[0201] Input the measured distance into the set second noise calculation formula to calculate the noise attenuation value corresponding to the cooling tower and the noise sensitive point;

[0202] Calculate the absolute value of the difference between the noise power level and the noise attenuation value to obtain the sound pressure level corresponding to the noise sensitive point;

[0203] The noise power levels corresponding to all cooling towers and the sound pressure levels corresponding to noise sensitive points are determined as the noise data corresponding to the cooling towers.

[0204] In this optional embodiment, the first noise calculation formula is specifically:

[0205] Lw1=19+10lgQ+25lgH+δ

[0206] Among them, Lw1 is the noise power level corresponding to the cooling tower to be analyzed; Q is the air volume corresponding to the cooling tower fan to be analyzed; H is the wind pressure corresponding to the cooling tower fan to be analyzed; δ is the correction value;

[0207] The second noise calculation formula is as follows:

[0208] Lw2=Lp+20lgr+7.9

[0209] Wherein, Lw2 is the noise attenuation value between a certain sensitive point in the installation site of the cooling tower to be analyzed and the cooling tower to be analyzed; Lp is the on-site sound pressure level at a distance of r meters from the sound source; r is the distance between the certain sensitive point and the sound source of the cooling tower to be analyzed.

[0210] It can be seen that in this optional embodiment, specifically for the actual target to be updated (cooling tower), a detailed noise calculation scheme is designed, taking into account the rated air volume and rated air pressure of the cooling tower fan itself, and through the predetermined correction value, the accurate calculation of the noise power level of a single or multiple cooling tower fans is achieved. Furthermore, the noise attenuation information of a specific noise-sensitive point can be calculated, and finally the required sound pressure level of the cooling tower fan is determined, thereby improving the calculation accuracy of the noise power level of the single or multiple cooling tower fans and the determination accuracy of the sound pressure level of the cooling tower fans; thereby improving the accuracy of the subsequent formulation of corresponding noise reduction schemes.

[0211] Embodiment 4

[0212] See also Figure 4 , Figure 4 Schematic diagram of another intelligent control device for updating central air-conditioning system items disclosed in an embodiment of the present invention. Figure 4 As shown, the intelligent control device updated in the central air conditioning system project may include:

[0213] A memory 401 storing executable program codes;

[0214] a processor 402 coupled to the memory 401;

[0215] The processor 402 calls the executable program code stored in the memory 401 to execute the steps in the intelligent control method for updating the central air-conditioning system project described in the first embodiment of the present invention or the second embodiment of the present invention.

[0216] Embodiment 5

[0217] An embodiment of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps in the intelligent management and control method for updating central air-conditioning system projects described in Embodiment 1 or Embodiment 2 of the present invention.

[0218] Embodiment 6

[0219] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps in the intelligent management and control method for updating a central air-conditioning system project described in Embodiment 1 or Embodiment 2.

[0220] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0221] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable programmable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0222] Finally, it should be noted that the intelligent control method and device for updating central air-conditioning system projects disclosed in the embodiment of the present invention discloses only the preferred embodiments of the present invention, which are only used to illustrate the technical scheme of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical schemes described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical schemes from the spirit and scope of the technical schemes of the various embodiments of the present invention.

Claims

1. An intelligent control method for updating central air conditioning system projects, characterized in that: The method comprises: Obtaining a project design requirement corresponding to a central air conditioning update project to be processed, wherein the project design requirement is used to determine an update target corresponding to a central air conditioning system to be updated; According to the project design requirements and in combination with the system components corresponding to the central air-conditioning system, determining the update factors required to update the central air-conditioning system, wherein the update factors include at least one of noise factors, cooling tower configuration factors, wire arrangement factors, and safety control factors; Generate an update installation plan for the central air conditioning system according to the project design requirements and the update elements, wherein the update installation plan includes a target installation sequence, and the target installation sequence includes a first update sequence for the target to be updated and a second update sequence for the update elements; The update installation scheme is executed according to the target installation sequence to obtain a scheme installation record corresponding to the update installation scheme.

2. The intelligent control method for central air conditioning system project update according to claim 1 is characterized in that: The priority corresponding to the first update sequence is higher than the priority corresponding to the second update sequence; The target to be updated includes at least one sub-target of a cooling tower, a fan control box, a cooling tower pipeline and a pipeline valve corresponding to the cooling tower; the update installation plan includes a first installation sub-plan; the first installation sub-plan includes a sub-target installation plan corresponding to each of the sub-targets; The update installation scheme further includes a second installation sub-case, wherein the second installation sub-case includes at least one of a noise sub-case, a configuration sub-case, a wire arrangement sub-case, and a safety control sub-case corresponding to the update element; Among them, the noise sub-case is used to perform noise calculation and noise reduction processing after the cooling tower is installed; the configuration sub-case is used to perform parameter configuration and installation configuration of the cooling tower; the wire layout sub-case is used to select power cables, jointly manage the ground wire system, and set up wiring layout; the safety control sub-case is used to perform risk assessment and safety management on the entire process of project execution.

3. The intelligent control method for central air conditioning system project update according to claim 2 is characterized in that: The step of generating an update installation plan for the central air conditioning system according to the project design requirements and the update elements includes: When the update factor includes the noise factor and the target to be updated includes a cooling tower, the noise details corresponding to the central air-conditioning system are determined, and the noise details are details of the noise values ​​that affect the central air-conditioning system; the noise details include the noise classification corresponding to the acoustic environment functional zone of the installation area where the central air-conditioning system is located, the noise level requirements of the target to be updated, and the noise reduction parameters of the target to be updated; According to the noise reduction parameters combined with the set noise calculation formula, noise data corresponding to the cooling tower is calculated, and the noise data includes noise power level and sound pressure level; Generate a noise sub-case for the central air-conditioning system according to the noise classification, the noise level requirement, and the noise data, and add the noise sub-case to the update installation plan of the central air-conditioning system; Among them, the noise sub-case includes cooling tower installation information at the noise level, and the cooling tower installation information at the noise level is used to indicate the installation requirements of the cooling tower, so that the noise data generated by the cooling tower after installation meets the noise classification, the noise level requirements and the noise requirements corresponding to the noise data.

4. The intelligent control method for updating central air-conditioning system projects according to claim 3 is characterized in that: The step of generating an update installation plan for the central air conditioning system according to the project design requirements and the update elements further includes: When the update element includes the cooling tower configuration element, determining the cooling tower specifications, thermal performance, power consumption ratio, water drift rate, and component materials corresponding to the cooling tower to be installed as configuration parameters for the cooling tower; According to the configuration parameters, a configuration sub-case for the cooling tower is generated; and the configuration sub-case is added to the update installation plan for the central air-conditioning system; the configuration sub-case is used to determine the target cooling tower to be installed and to compare and verify the parameter configuration of the target cooling tower; When the update element includes the wire layout element, determining the cable usage details corresponding to the central air conditioning system, the cable usage details including the cable type and the number of cables to be used; the cable usage details also include the plane layout data corresponding to the cables to be used, the wiring laying requirements, and the cable connection requirements; A wire arrangement sub-plan for the cable to be used is generated according to the cable usage details, and the wire arrangement sub-plan is added to the update installation plan for the central air-conditioning system.

5. The intelligent control method for updating central air-conditioning system projects according to claim 3 or 4, characterized in that: The step of generating an update installation plan for the central air conditioning system according to the project design requirements and the update elements further includes: When the update element includes the safety control element, determining the engineering safety matters corresponding to the installation of the central air-conditioning system, the engineering safety matters including on-site exploration safety matters and construction behavior requirements; the construction behavior requirements including at least one of construction power requirements, construction fire protection requirements, construction supervision requirements and construction communication requirements; Based on the engineering safety matters, a safety control sub-case for the central air-conditioning system is generated, and the safety control sub-case is added to the update and installation plan for the central air-conditioning system.

6. The intelligent control method for updating central air-conditioning system projects according to claim 3 or 4, characterized in that: When the target to be updated includes the cooling tower, the noise reduction parameters of the target to be updated include the rated air volume and rated air pressure of the fan of the cooling tower; The noise data corresponding to the cooling tower is calculated based on the noise reduction parameter in combination with the set noise calculation formula, including: Determine the number of cooling towers, and determine the correction value corresponding to the cooling tower fan according to the number of cooling towers and the noise reduction parameter; Input the noise reduction parameter and the correction value into a set first noise calculation formula to calculate the noise power levels corresponding to all the cooling towers; Determine the measurement distance between a noise sensitive point in the environment where the cooling tower is installed and the cooling tower; Input the measured distance into a set second noise calculation formula to calculate the noise attenuation value when the cooling tower corresponds to the noise sensitive point; Calculating the absolute value of the difference between the noise power level and the noise attenuation value to obtain the sound pressure level corresponding to the noise sensitive point; The noise power levels corresponding to all the cooling towers and the sound pressure levels corresponding to the noise sensitive points are determined as the noise data corresponding to the cooling towers.

7. The intelligent control method for updating central air-conditioning system items according to claim 6 is characterized in that: The first noise calculation formula is specifically: Lw1=19+10lgQ+25lgH+δ Wherein, Lw1 is the noise power level corresponding to the cooling tower to be analyzed; Q is the air volume corresponding to the cooling tower fan to be analyzed; H is the wind pressure corresponding to the cooling tower fan to be analyzed; δ is the correction value; The second noise calculation formula is specifically: Lw2=Lp+20lgr+7.9 Wherein, Lw2 is the noise attenuation value between a certain sensitive point in the installation site of the cooling tower to be analyzed and the cooling tower to be analyzed; Lp is the on-site sound pressure level at a distance of r meters from the sound source; r is the distance between the certain sensitive point and the sound source of the cooling tower to be analyzed.

8. An intelligent control device for updating central air-conditioning system projects, characterized in that: The device comprises: An acquisition module, used to acquire a project design requirement corresponding to a central air conditioning update project to be processed, wherein the project design requirement includes a target to be updated corresponding to a central air conditioning system to be updated; A determination module, configured to determine, according to the project design requirements and in combination with the system components corresponding to the central air-conditioning system, an update factor required to update the central air-conditioning system, wherein the update factor includes at least one of a noise factor, a cooling tower configuration factor, a wire arrangement factor, and a safety control factor; A generation module, configured to generate an update installation plan for the central air-conditioning system according to the project design requirements and the update elements, wherein the update installation plan includes a target installation sequence, and the target installation sequence includes a first update sequence for the target to be updated and a second update sequence for the update elements; The solution execution module is used to execute the update installation solution according to the target installation sequence to obtain a solution installation record corresponding to the update installation solution.

9. An intelligent control device for updating central air-conditioning system projects, characterized in that: The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the intelligent management and control method for updating central air-conditioning system projects as described in any one of claims 1-7.

10. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, and when the computer instructions are called, they are used to execute the intelligent management and control method for updating the central air-conditioning system project as described in any one of claims 1-7.