A variable diameter boring tool handle
By designing a variable diameter boring handle, the tool handle diameter adjustment is achieved using carbon fiber material and knob mechanism, the problem of increasing the weight of the tool handle in large-bore processing is solved, the processing efficiency and accuracy are improved, and the resistance reduction and vibration reduction is reduced through airflow The system reduces vibration and has a cleaning function.
Patent Information
- Application Number
- CN202411174778.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-26
AI Technical Summary
During the process of large-bore precision boring, the increase in the size of the tool holder leads to an increase in weight, exceeding the load-bearing capacity of the spindle motor, affecting the machining stability and efficiency, and frequent replacement of the tool holder increases operational complexity and adjustment difficulty.
Design a variable diameter boring tool handle, which adopts a columnar structure of carbon fiber material, including a knob mechanism, locking mechanism and airflow resistance reduction and vibration reduction system. The tool handle diameter adjustment is achieved through the coordination of gears and racks, reducing tool change and prevent thermal deformation and debris accumulation through the coolant delivery system.
It realizes that the tool holder can adapt to different pore processing without replacement, improves production efficiency, ensures processing accuracy, reduces vibration amplitude, and has cleaning and cooling functions to prevent debris from silting.
Smart Images

Figure CN118682157B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of machine tools, and in particular relates to a diameter-variable, washable, airflow drag-reducing and vibration-reducing large-aperture boring tool handle. Background Art
[0002] Boring tools are mainly used for rough machining, semi-precision machining, and finishing of existing holes. With the development of new energy vehicles, the demand for large-diameter precision boring is growing. However, for large-diameter precision boring, as the diameter increases, the corresponding toolholder size will also increase, which leads to a significant increase in the weight of the toolholder. Excessive weight may exceed the bearing capacity of the spindle motor and affect the stability and efficiency of the machining process. When machining different hole diameters, the toolholder needs to be replaced frequently, which not only increases the complexity of the operation, but also makes it more difficult to achieve high-precision adjustment. Summary of the invention
[0003] In order to solve the technical problem of frequently replacing the tool handle when processing different hole diameters, the present invention designs a variable diameter boring tool handle, and the specific scheme is as follows:
[0004] A variable diameter boring tool handle comprises a tool holder, a tool rod, a housing, a boring tool assembly, a knob mechanism, a locking mechanism, and an air flow resistance reduction and vibration reduction system.
[0005] The knife bar is a columnar structure, the knife seat is arranged at one end of the guide bar in the length direction, and the shell is arranged at the other end of the guide bar in the length direction, and the knife bar and the shell are made of carbon fiber;
[0006] The shell is a columnar structure, and a receiving space is provided inside the shell. The boring tool assembly is arranged in the receiving space of the shell;
[0007] The boring tool assembly includes a gear, a rack, and a boring tool. The gear is meshed with the rack. The end of the rack is provided with a groove. The boring tool is arranged in the groove at the end of the rack. The housing is provided with an opening for the end of the rack to extend out.
[0008] The knob mechanism includes a knob and a connecting rod. The knob is located on the top cover and at the upper end of the connecting rod. The connecting rod passes through the housing and is connected to the gear of the boring tool. A dial is provided on the top of the housing. A mark is provided on the knob. The connecting rod is controlled by the knob to drive the gear of the boring tool to rotate and adjust the extension length of the rack.
[0009] The locking mechanism includes a locking bolt, and the housing is provided with a threaded hole for the locking bolt to pass through. The locking bolt is screwed into the threaded hole on the housing, and its lower end is located in the accommodation space in the housing. When the knob mechanism adjusts the extended length of the rack, the bolt is tightened so that its lower end contacts the rack and presses against the rack to fix the position of the rack;
[0010] The airflow drag reduction and vibration reduction system comprises a gas delivery hose, the gas outlet of the gas delivery hose is located in the accommodating space of the shell, and the gas outlet of the gas delivery hose faces the rack.
[0011] As a supplement to the technical solution of the present invention, the boring tool assembly is provided with two groups of racks and boring tools, and each group of racks is provided with a group of boring tools; the two groups of racks are centrally symmetrically arranged with the axis of the gear, so that when the gear rotates synchronously to drive the two groups of racks to extend, the two groups of boring tools extend with the racks.
[0012] As a supplement to the technical solution of the present invention, the housing includes a top cover, a middle shell, and a bottom cover, wherein the top cover is arranged above the middle shell, the bottom cover is arranged below the middle shell, and the dial is arranged on the top cover; there are two groups of accommodating spaces for accommodating the boring tool assembly, namely a first accommodating space and a second accommodating space, wherein the first accommodating space is located between the top cover and the middle shell, and the second accommodating space is located between the bottom cover and the middle shell;
[0013] The boring tool assembly is provided with two groups, namely a first boring tool assembly and a second boring tool assembly. The first boring tool assembly is arranged in the first accommodating space, and the second boring tool assembly is arranged in the second accommodating space.
[0014] As a supplement to the technical solution of the present invention, a coolant delivery system is also included, the coolant delivery system includes a coolant delivery hose and a coolant delivery main pipeline, the coolant delivery main pipeline is arranged in the tool bar, and the coolant delivery hose is connected to the coolant delivery main pipeline;
[0015] The racks of the first boring tool assembly and the second boring tool assembly are both provided with a coolant circulation pipeline, the water inlet of the coolant circulation pipeline is connected with a coolant delivery hose, and the water outlet of the coolant circulation pipeline is located at the groove position of the end of the rack; the boring tool includes a tool holder and a blade, the blade is arranged on the tool holder, the tool holder is arranged in the groove at the end of the rack, the tool holder is provided with a coolant delivery hole connected with the water inlet of the coolant circulation pipeline, and the water outlet of the coolant delivery hole is located on one side of the blade;
[0016] The coolant delivery hose is provided with four groups, namely, a first coolant delivery hose, a second coolant delivery hose, a third coolant delivery hose, and a fourth coolant delivery hose, and the water inlets of the four groups of coolant delivery hoses are connected to the coolant delivery main pipeline; the two groups of racks of the first boring tool assembly are respectively the first rack and the second rack, and the two groups of racks of the second boring tool assembly are respectively the third rack and the fourth rack;
[0017] The first coolant delivery hose passes through the bottom cover and the middle shell, and is communicated with the coolant flow pipeline of the first rack arranged in the first accommodation space;
[0018] The second coolant delivery hose passes through the bottom cover and the middle shell, and is communicated with the coolant flow pipeline of the second rack arranged in the first accommodation space;
[0019] The third coolant delivery hose passes through the bottom cover and is connected to the coolant flow pipeline of the third rack arranged in the second accommodation space;
[0020] The fourth coolant delivery hose passes through the bottom cover and is communicated with the coolant flow pipeline of the fourth rack arranged in the second accommodating space.
[0021] As a supplement to the technical solution of the present invention, a first groove is provided at the upper end of the middle shell, and the top cover and the first groove of the middle shell are combined to form a first accommodating chamber;
[0022] The first groove includes a rack fixing part and a gear fixing part. The gear fixing part is a cylindrical groove opened at the upper end of the middle shell, and the rack fixing part is a long straight groove penetrating the gear fixing part. The rack fixing part is provided with two groups, and the two groups of rack fixing parts are centrally symmetrically arranged with respect to the axis of the gear fixing part. Both ends of the rack fixing part in the length direction penetrate the outer wall of the middle shell, so that an opening connected with the rack fixing part is formed on the outer wall of the middle shell.
[0023] The gear of the first boring tool assembly is arranged in the gear fixing portion of the first groove, and the two sets of racks of the first boring tool assembly are arranged in the two sets of rack fixing portions of the first groove respectively.
[0024] As a supplement to the technical solution of the present invention, a second groove is provided on the upper top of the bottom cover, and the bottom cover and the middle shell body together form a second accommodating space. The structure of the second groove is the same as that of the first groove, and the length direction of the rack fixing part of the first groove is perpendicular to the length direction of the rack fixing part of the second groove, so that the length direction of the rack of the first boring tool assembly is perpendicular to the length direction of the rack of the second boring tool assembly; the connecting rod of the knob mechanism passes through the shell and is connected to the gears of the first boring tool assembly and the second boring tool assembly;
[0025] There are two groups of locking bolts, namely the first locking bolt and the second locking bolt. The first locking bolt is arranged on the top cover to fix and limit the rack of the first boring tool assembly; the second locking bolt is arranged on the bottom cover to fix and limit the rack of the second boring tool assembly.
[0026] As a supplement to the technical solution of the present invention, the airflow drag reduction and vibration reduction system also includes a gas delivery main pipeline, which is arranged in the tool rod; the two sets of racks of the first boring tool assembly are respectively the first rack and the second rack, and the two sets of racks of the second boring tool assembly are respectively the third rack and the fourth rack;
[0027] The depth of the first groove is the same as the height of the first rack, the second rack, and the gear of the first boring tool assembly, and the lower surface of the top cover is a plane; the depth of the second groove is the same as the height of the third rack, the fourth rack, and the gear of the second boring tool assembly, and the lower surface of the middle housing is a plane;
[0028] The two sets of racks of the first boring tool assembly are respectively the first rack and the second rack. In the first groove, the space enclosed by the top cover, the middle shell and the first rack is the first pneumatic chamber, and the space enclosed by the top cover, the middle shell and the second rack is the second pneumatic chamber.
[0029] The two sets of racks of the second boring tool assembly are the third rack and the fourth rack. In the second groove, the space enclosed by the bottom cover, the middle shell and the third rack is the third pneumatic chamber, and the space enclosed by the bottom cover, the middle shell and the fourth rack is the fourth pneumatic chamber.
[0030] The gas delivery hoses are provided with four groups, namely a first gas delivery hose, a second gas delivery hose, a third gas delivery hose, and a fourth gas delivery hose, and the gas inlets of the four groups of gas delivery hoses are all connected to the gas delivery main pipeline;
[0031] The gas outlet of the first gas delivery hose is located in the first pneumatic chamber and faces the first rack, and the flow direction of the gas blown out of the gas outlet of the first gas delivery hose is perpendicular to the length direction of the first rack;
[0032] The gas outlet of the second gas delivery hose is located in the second pneumatic chamber and faces the second rack, and the flow direction of the gas blown out of the gas outlet of the second gas delivery hose is perpendicular to the length direction of the second rack;
[0033] The gas outlet of the third gas delivery hose is located in the third pneumatic chamber and faces the third rack, and the gas flow direction blown out of the gas outlet of the third gas delivery hose is perpendicular to the length direction of the third rack;
[0034] The gas outlet of the fourth gas delivery hose is located in the fourth pneumatic chamber and faces the fourth rack, and the flow direction of the gas blown out of the gas outlet of the fourth gas delivery hose is perpendicular to the length direction of the fourth rack.
[0035] As a supplement to the technical solution of the present invention, a wireless rotation speed sensor is also included, and the wireless rotation speed sensor is arranged inside the shell.
[0036] As a supplement to the technical solution of the present invention, the air flow rate of the gas delivery hose for:
[0037]
[0038] In the above formula, is the gas flow rate blown out through the gas delivery hose, is the peak value of the external force on the boring tool, k is the boring tool stiffness, m is the boring tool mass, c is the boring tool damping, is the rotation speed monitored by the wireless rotation speed sensor, t is the vibration duration of the boring tool, and v is the gas flow rate blown out through the gas delivery hose.
[0039] Beneficial effects: The present invention enables the tool handle to change the processing radius through the setting of the boring tool assembly and the knob mechanism. When processing different hole diameters, there is no need to replace the entire tool handle, and it only needs to rotate the knob mechanism, which greatly shortens the tool change time and improves production efficiency. At the same time, through the setting of the coolant delivery system, coolant can be delivered to the boring tool to prevent the boring tool from thermal deformation. At the same time, it has the function of cleaning and cooling the tool head, which can prevent debris accumulation and further ensure processing accuracy. In another aspect of the present invention, through the setting of the airflow resistance reduction and vibration reduction system, the technical effect of reducing the amplitude of the boring tool can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0041] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention.
[0042] Figure 3 It is a schematic diagram of the explosion structure of the present invention.
[0043] Figure 4 It is a schematic structural diagram of the first boring tool assembly and the second boring tool assembly of the present invention.
[0044] Figure 5 It is a schematic structural diagram of the first boring tool assembly and the second boring tool assembly of the present invention.
[0045] Figure 6 It is a schematic diagram of the assembly structure of the first boring tool assembly and the middle housing of the present invention.
[0046] Figure 7 It is a schematic diagram of the assembly structure of the second boring tool assembly and the bottom cover of the present invention.
[0047] Figure 8 It is a schematic diagram of the structure of the first groove on the middle shell of the present invention.
[0048] Fig. 9 It is a schematic diagram of the cross-sectional structure of the rack of the present invention.
[0049] Fig.10 It is a schematic diagram of the boring tool structure of the present invention.
[0050] Fig.11 It is a schematic diagram of the cross-sectional structure of the boring tool of the present invention.
[0051] Fig.12 Schematic diagram of the working relationship between the boring tool and the workpiece.
[0052] In the figure: 1. tool holder, 2. tool bar, 3. housing, 4. first boring tool assembly, 5. knob, 6. first locking bolt, 7. connecting rod, 8. gear, 9. first rack, 10. second rack, 11. third rack, 12. fourth rack, 13. boring tool, 14. second boring tool assembly, 15. top cover, 16. middle housing, 17. bottom cover, 18. rack fixing part, 19. gear fixing part, 20. second locking bolt, 21. coolant circulation pipeline, 22. tool holder, 23. blade, 24. coolant delivery hole, 25. first coolant delivery hose, 26. second coolant delivery hose, 27. third coolant delivery hose, 28. fourth coolant delivery hose, 29. first gas delivery hose, 30. second gas delivery hose, 31. third gas delivery hose, 32. fourth gas delivery hose, 33. wireless speed sensor. DETAILED DESCRIPTION
[0053] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0054] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0055] like Figures 1 to 11 As shown, a large-aperture boring tool 13 with variable diameter and washable airflow resistance reduction and vibration reduction is used for boring holes in cooperation with a machine tool. It includes a tool holder 1, a tool bar 2, a housing 3, a boring tool assembly, a knob mechanism, and a locking mechanism.
[0056] The tool holder 1 is arranged at one end of the tool rod 2 and is used for connecting with a machine tool.
[0057] The knife rod 2 is a columnar structure, the knife seat 1 is arranged at one end of the guide rod in the length direction, and the housing 3 is arranged at the other end of the guide rod in the length direction.
[0058] The housing 3 is a columnar structure with a storage space inside. The boring tool assembly is arranged in the storage space of the housing 3. The boring tool assembly includes a gear 8, a rack, and a boring tool 13. The gear 8 is meshed with the rack. The end of the rack is provided with a groove. The boring tool 13 is arranged in the groove at the end of the rack. The housing 3 is provided with an opening for the end of the rack to extend. The gear 8 rotates to extend or retract the end of the rack, and the length of the rack extending out of the housing 3 is adjusted. The diameter of the boring hole is adjusted by the cooperation of the rack and the gear 8, without replacing the tool handle. This design allows the tool handle to adapt to boring tool 13 heads of different sizes, thereby improving the versatility and flexibility of the equipment. Preferably, the rack body is made of carbon fiber, and the teeth on the rack are made of metal. The rack is made by solidifying and molding the carbon fiber and the metal into one piece.
[0059] The knob mechanism is arranged at the top of the housing 3, and the lower part of the knob mechanism passes through the housing 3 and is connected to the gear 8, and the rotation of the gear 8 is controlled by the knob mechanism. A dial is arranged at the top of the housing 3, and a mark is arranged on the knob mechanism. The mark cooperates with the dial on the housing 3 to achieve accurate adjustment of the rack extension length.
[0060] Specifically, the knob mechanism and the gear 8 are connected by a key. Rotating the knob mechanism can drive the gear 8 to rotate, thereby driving the rack to extend and retract, thereby realizing the adjustment function.
[0061] The locking mechanism includes a locking bolt. The housing 3 is provided with a threaded hole for the locking bolt to pass through. The locking bolt is screwed into the threaded hole on the housing 3, and its lower end is located in the accommodation space in the housing 3. After the extended length of the rack is adjusted, the bolt is tightened so that its lower end contacts the rack and presses against the rack to fix the position of the rack. When the knob mechanism adjusts the rack to a suitable diameter, the locking bolt is tightened to fix the rack.
[0062] For a large-sized boring tool 13, a longer tool bar 2 and a larger diameter are more likely to vibrate, especially during high-speed cutting, resonance will occur, causing the tool to vibrate violently, affecting processing stability and accuracy. As a preferred technical solution of the present invention, the boring tool assembly includes two sets of racks, which are respectively meshed with gears 8. The rotation of gears 8 can simultaneously control the two sets of racks to extend and retract, and a boring tool 13 is provided at the end of each set of racks. By setting two sets of racks, two sets of boring tools 13 can be involved in cutting at the same time, which has higher processing efficiency; at the same time, the radial forces offset each other, making it difficult for the tool body to vibrate.
[0063] As a preferred technical solution of the present invention, the housing 3 includes a top cover 15, a bottom cover 17, and a middle shell 16. The top cover 15 is arranged above the middle shell 16, and the bottom cover 17 is arranged below the middle shell 16. The dial is arranged on the top cover 15. There are two groups of accommodation spaces for accommodating the boring tool assembly, namely a first accommodation space and a second accommodation space. The first accommodation space is located between the top cover 15 and the middle shell 16, and the second accommodation space is located between the bottom cover 17 and the middle shell 16.
[0064] The boring tool assembly is provided with two groups, namely the first boring tool assembly 4 and the second boring tool assembly 14. The first boring tool assembly 4 is arranged in the first accommodation space, and the second boring tool assembly 14 is arranged in the second accommodation space. The upper and lower boring tool groups of the first boring tool assembly and the second boring tool assembly work simultaneously, which can distribute the cutting force more evenly, reduce the load borne by a single blade, and thus improve the accuracy and straightness of the machined surface. The design of the upper and lower blade groups can improve the metal removal rate, shorten the processing time, and improve production efficiency.
[0065] As a supplement to the above technical solution, a first groove is provided at the upper end of the middle shell 16, and the first groove includes a rack fixing part 18 and a gear fixing part 19. The gear fixing part 19 is a cylindrical groove opened at the upper end of the middle shell 16, and the gear 8 is arranged in the gear fixing part 19. The rack fixing part 18 is a long straight groove that passes through the gear fixing part 19. The rack fixing part 18 is provided with two groups, and the two groups of rack fixing parts 18 are centrally symmetrically arranged with the axis of the gear fixing part 19. Both ends of the long straight groove in the length direction pass through the outer wall of the middle shell 16, so that an opening connected to the rack fixing part 18 is formed on the outer wall of the middle shell 16, and the rack passes through the opening on the outer wall of the middle shell 16, so that one end of the rack provided with the boring tool 13 is located outside the middle shell 16. The rack is arranged in the rack fixing part 18, and the middle part of the rack is provided with teeth that mesh with the gear 8.
[0066] The top cover 15 is disposed above the middle housing 16 and connected to the middle housing 16 by bolts. The first groove at the upper end of the middle housing 16 and the top cover 15 enclose a first accommodation space, and the first boring tool assembly 4 is disposed in the first accommodation space. The gear 8 of the first boring tool assembly 4 is disposed in the gear fixing portion 19 of the first groove, and the two sets of racks of the first boring tool assembly 4 are disposed in the two sets of rack fixing portions 18 of the first grooves respectively. The top cover 15 limits and fixes the rack disposed in the rack fixing portion 18 and the gear 8 disposed in the gear fixing portion 19.
[0067] As a supplement to the above technical solution, a second groove is provided on the top of the bottom cover 17, and the bottom cover 17 and the middle shell 16 are enclosed to form a second accommodation space. The boring tool assembly is provided with two groups, the first boring tool assembly 4 is arranged in the first accommodation space, and the second boring tool assembly 14 is arranged in the second accommodation space. The structure of the second groove is the same as that of the first groove, and the length direction of the rack fixing part 18 of the first groove is perpendicular to the length direction of the rack fixing part 18 of the second groove, so that the length direction of the rack of the first boring tool assembly 4 and the length direction of the rack of the second boring tool assembly 14 are arranged perpendicular to each other. The vertical arrangement of the two groups of blades of the first boring tool assembly and the second boring tool assembly helps to eliminate vibration and improve processing stability.
[0068] The knob mechanism includes a knob 5 and a connecting rod 7. The knob 5 is located on the top cover 15 and at the upper end of the connecting rod 7. The connecting rod 7 passes through the housing 3 and is connected to the gears 8 of the first boring tool assembly 4 and the second boring tool assembly 14. The knob 5 simultaneously controls the rack extension lengths of the first boring tool assembly 4 and the second boring tool assembly 14. The top cover 15 is provided with an opening, and the connecting rod 7 passes through the opening on the top cover 15 and is connected to the gears 8 of the first boring tool assembly 4 and the second boring tool assembly 14. A bearing is provided at the position of the opening of the top cover 15, and the connecting rod 7 is connected to the bearing.
[0069] As a supplement to the above technical solution, there are two groups of locking bolts, namely the first locking bolt 6 and the second locking bolt 20. The first locking bolt 6 is arranged on the top cover 15 to fix and limit the rack of the first boring tool assembly 4. The second locking bolt 20 is arranged on the bottom cover 17 to fix and limit the rack of the second boring tool assembly 14.
[0070] In the processing of deep holes or complex geometric shapes, it is difficult for the coolant or lubricant to fully reach the cutting area, resulting in heat accumulation and increased cutting temperature, which further aggravates the thermal deformation and vibration of the tool. As a preferred technical solution of the present invention, a groove is provided at the end of the rack, and the boring tool 13 is arranged in the groove at the end of the rack. The boring tool 13 handle disclosed in the present invention also includes a coolant delivery system, and the coolant delivery system includes a coolant delivery hose, and the coolant delivery hose is arranged in the tool rod 2. A coolant circulation pipeline 21 is provided in the rack of the first boring tool assembly 4 and the second boring tool assembly 14, and the water inlet of the coolant circulation pipeline 21 is connected to the coolant delivery hose, and the water outlet of the coolant circulation pipeline 21 is located at the groove position at the end of the rack.
[0071] The boring tool 13 includes a tool holder 22 and a blade 23. The blade 23 is arranged on the tool holder 22. The tool holder 22 is arranged in a groove at the end of the rack. The tool holder 22 is provided with a coolant delivery hole 24 connected to the water inlet of the coolant circulation pipeline 21. The water outlet of the coolant delivery hole 24 is located on one side of the blade 23. By delivering coolant to the coolant delivery hose, the coolant passes through the coolant delivery hose, the coolant circulation pipeline 21, and the coolant delivery in sequence, and is discharged from the position of the water outlet of the coolant delivery hole 24 and delivered to the position of the blade 23 to cool the blade 23. Through the above arrangement, the blade 23 position can be cooled by delivering coolant to the coolant delivery hose, and at the same time, debris can be cleaned to prevent debris accumulation, thereby avoiding the technical problem of deformation of the boring tool 13 and reducing thermal deformation and vibration of the tool.
[0072] As a supplement to the above technical solution, since the tool handle disclosed in the present invention includes two boring tool assemblies, each boring tool assembly includes two racks and two boring tools 13. As a preferred technical solution of the present invention, the coolant delivery system also includes a coolant delivery main pipeline, and the coolant delivery hose is provided with four groups, the water outlets of the four groups of coolant delivery hoses are respectively connected to the coolant flow pipelines 21 of the racks in the two boring tool assemblies, and the water inlets of the four groups of coolant delivery hoses are connected to the coolant delivery main pipeline, and the coolant can be supplied to the two boring tool assemblies separately by delivering coolant to the coolant delivery main pipeline.
[0073] The two groups of racks of the first boring tool assembly 4 are respectively a first rack 9 and a second rack 10 , and the two groups of racks of the second boring tool assembly 14 are respectively a third rack 11 and a fourth rack 12 .
[0074] Specifically, the first coolant delivery hose 25 passes through the bottom cover 17 and the middle shell 16, and is connected to the coolant flow pipeline 21 of the first rack 9 disposed in the first accommodation space;
[0075] The second coolant delivery hose 26 passes through the bottom cover 17 and the middle shell 16 and is communicated with the coolant flow pipeline 21 of the second rack 10 disposed in the first accommodation space;
[0076] The third coolant delivery hose 27 passes through the bottom cover 17 and communicates with the coolant flow pipeline 21 of the third rack 11 disposed in the second accommodation space;
[0077] The fourth coolant delivery hose 28 passes through the bottom cover 17 and communicates with the coolant flow pipeline 21 of the fourth rack 12 disposed in the second accommodation space. Through the above arrangement, the coolant can be smoothly delivered to the positions of the four boring cutters 13 by only delivering the coolant to the coolant delivery main pipeline.
[0078] As a preferred technical solution of the present invention, in order to further solve the technical problem of vibration of the boring tool 13, it also includes an airflow resistance reduction and vibration reduction system, which includes a gas delivery hose, and the gas delivery hose is arranged in the tool rod 2. The depth of the first groove and the height of the first rack 9, the second rack 10, and the gear 8 of the first boring tool assembly 4 are the same, and the lower surface of the top cover 15 is a plane, so that the top cover 15 limits the rack and gear 8 of the first boring tool assembly 4. The depth of the second groove and the height of the third rack 11, the fourth rack 12, and the gear 8 of the second boring tool assembly 14 are the same, and the lower surface of the middle shell 16 is a plane, so that the middle shell 16 limits the rack and gear 8 of the second boring tool assembly 14.
[0079] The fan-shaped space enclosed by the top cover 15, the middle shell 16, and the first rack 9 is the first pneumatic chamber, and the fan-shaped space enclosed by the top cover 15, the middle shell 16, and the second rack 10 is the second pneumatic chamber.
[0080] The fan-shaped space enclosed by the bottom cover 17, the middle shell 16, and the third rack 11 is the third pneumatic chamber, and the fan-shaped space enclosed by the bottom cover 17, the middle shell 16, and the fourth rack 12 is the fourth pneumatic chamber.
[0081] The first pneumatic chamber, the second pneumatic chamber, the third pneumatic chamber, and the fourth pneumatic chamber are all used to contain and control gas. The top cover 15, the middle shell 16, and the bottom cover 17 are all circular structures, so that the first pneumatic chamber, the second pneumatic chamber, the third pneumatic chamber, and the fourth pneumatic chamber are all pneumatic chambers with arc-shaped outer edges and straight lines on the other side, and the cross-section is fan-shaped.
[0082] The outlet of the gas delivery hose is located in the pneumatic chamber, and the outlet of the gas delivery hose faces the rack. The flow direction of the gas blown out from the outlet of the gas delivery hose is perpendicular to the length direction of the rack, and the extension line of the gas flow direction should be horizontal and pass through the axis of the gear 8, so that it can better act on the rack.
[0083] There are four groups of gas delivery hoses in total, and the air outlets thereof are respectively located in four groups of pneumatic chambers, and the air outlet of each group of hoses is directly opposite to the rack.
[0084] Specifically, the four groups of gas delivery hoses are respectively a first gas delivery hose 29 , a second gas delivery hose 30 , a third gas delivery hose 31 , and a fourth gas delivery hose 32 .
[0085] The first gas delivery hose 29 passes through the bottom cover 17 and the middle shell 16, and the air outlet is located in the first pneumatic chamber. The air outlet faces the first rack 9, and the direction of the gas blown out from the air outlet of the first gas delivery hose 29 is perpendicular to the length direction of the first rack 9.
[0086] The second gas delivery hose 30 passes through the bottom cover 17 and the middle shell 16 , and the air outlet is located in the second pneumatic chamber. The air outlet faces the second rack 10 , and the direction of the gas blown out from the air outlet of the second gas delivery hose 30 is perpendicular to the length direction of the second rack 10 .
[0087] The third gas delivery hose 31 passes through the bottom cover 17 , and its outlet is located in the third pneumatic chamber. Its outlet faces the third rack 11 , and the direction of the gas blown out from the outlet of the third gas delivery hose 31 is perpendicular to the length direction of the third rack 11 .
[0088] The fourth gas delivery hose 32 passes through the bottom cover 17 , and its outlet is located in the fourth pneumatic chamber, and its outlet faces the fourth rack 12 . The direction of the gas blown out from the outlet of the fourth gas delivery hose 32 is perpendicular to the length direction of the fourth rack 12 .
[0089] When the boring tool 13 is working, it will vibrate after contacting the workpiece, and these vibrations will be transmitted to the rack. At this time, the airflow acting on the rack will give the rack a reverse force, and this force forms a dynamic balance with the redundant vibration, thereby reducing the vibration amplitude of the entire device. The size of the airflow needs to be determined according to the amplitude of the vibration. Too large airflow or too small airflow will affect the vibration reduction effect.
[0090] Since the rack is movable, all pneumatic chambers cannot be completely sealed, so when the boring cutter 13 is working, it is necessary to continuously provide compressed air to maintain the air flow and air pressure in the pneumatic chamber.
[0091] As a supplement to the above technical solution, it also includes a gas delivery main pipeline, and the air inlets of the four groups of gas delivery hoses are connected to the gas delivery main pipeline. By delivering gas to the gas delivery main pipeline, the airflow is diverted to the four groups of gas delivery hoses.
[0092] As a preferred technical solution of the present invention, it also includes a wireless rotation speed sensor 33, which is arranged inside the middle shell 16. The rotation speed of the boring tool 13 fed back by the sensor can be used to adjust parameters such as air flow speed in real time to achieve the best vibration reduction effect.
[0093] As a supplement to the technical solution of the present invention, the bottom cover 17 is integrally formed with the shank 2. The shank 2, the middle shell 16, the top cover 15, and the bottom cover 17 are all made of epoxy resin-based carbon fiber reinforced composite materials. The fiber laying method is [0° / 0° / ±30° / ±45° / ±60° / 90° / 90°]. The above arrangement can reduce the weight of the shank, increase the self-vibration frequency, and reduce the moment of inertia. Compared with steel parts of the same shape, carbon fiber can reduce the weight by 80%. Lightweight design is achieved through carbon fiber, which makes the spindle motor easier to drive, and can reduce the load of the machine and improve the efficiency of the machine.
[0094] The working principle of ventilation vibration reduction is as follows: the boring process is as follows Fig.12 As shown in FIG. 1 , the boring tool 13 can be approximately considered as a vibration system with a single degree of freedom. The dynamic model of the boring tool 13 can be regarded as a system with a mass of The tool stiffness The boring is performed under the support condition of , and the damping is c. Among them, the stiffness k is determined by the structural form of the boring tool 13 itself, and the damping c is determined by the structural form of the boring tool 13 and the workpiece, and both are fixed values.
[0095] The cutting load of boring tool 13 is simplified as a periodic fluctuating external force ,in, is the peak value of the external force applied to the boring tool 13; The rotation speed of the boring tool 13, i.e., the rotation speed value monitored by the wireless rotation speed sensor 33; It is the duration of the vibration of the boring tool 13, specifically, the duration of the boring of the boring tool 13.
[0096] The displacement of the boring tool 13 vibration is It can be expressed as:
[0097] (1)
[0098] In the above formula, and are respectively the main amplitude and the secondary amplitude of the boring tool 13; k is the stiffness of the boring tool 13; m is the mass of the boring tool 13; c is the damping of the boring tool 13; is the rotation speed monitored by the wireless rotation speed sensor 33; t is the vibration duration of the boring tool 13, specifically the boring duration of the boring tool 13.
[0099] In the displacement equation of the vibration of the boring tool 13 in formula (1), due to the existence of the amplification term:
[0100]
[0101] Displacement The amplitude will increase with time, and as the boring tool 13 absorbs energy from the outside, the vibration of the boring tool 13 intensifies.
[0102] In order to reduce the vibration of the boring tool 13, the present invention provides a wireless speed sensor 33 and an airflow resistance reduction and vibration reduction system. The wireless speed sensor 33 is used to measure the speed of the boring tool 13. The airflow drag reduction and vibration reduction system is used to compress the air to generate reverse airflow to eliminate the amplification term, so that formula (1) is transformed into formula (2):
[0103] (2)
[0104] Air flow rate generated by compressed air It is calculated based on the amplification term and is used to offset the amplification term to achieve the purpose of airflow vibration reduction. It can be expressed as and amplification term, time , air flow rate Related functions:
[0105] (3)
[0106] In the above formula,
[0107] In the above formula, is the gas flow rate blown out through the gas delivery hose, is the peak value of the external force on the boring tool 13, k is the stiffness of the boring tool 13, m is the mass of the boring tool 13, c is the damping of the boring tool 13, is the rotation speed monitored by the wireless rotation speed sensor 33, t is the vibration duration of the boring tool 13, specifically the boring duration of the boring tool 13, and v is the gas flow rate blown out through the gas delivery hose.
[0108] By applying the air flow rate according to formula (3), it is possible to ensure that the amplification term in formula (1) is eliminated and achieve the air flow vibration reduction effect.
[0109] The calculation formula between gas flow rate Q and gas flow velocity v is:
[0110] (4)
[0111] In the above formula, is the gas flow rate blown out through the gas delivery hose, A is the cross-sectional area of the gas delivery hose, It is the gas density of the gas blown into the gas delivery hose.
[0112] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A variable diameter boring tool handle, characterized in that: It includes a tool holder (1), a tool rod (2), a housing (3), a boring tool assembly, a knob mechanism, a locking mechanism, and an air flow resistance reduction and vibration reduction system. The knife bar (2) is a columnar structure, the knife seat (1) is arranged at one end of the knife bar (2) in the length direction, and the outer shell (3) is arranged at the other end of the knife bar (2) in the length direction, and the knife bar (2) and the outer shell (3) are made of carbon fiber; The outer shell (3) is a columnar structure, and a receiving space is provided inside the outer shell; the boring tool assembly is arranged in the receiving space of the outer shell (3); The boring tool assembly comprises a gear (8), a rack, and a boring tool (13); the gear (8) is meshed with the rack, a groove is provided at the end of the rack, the boring tool (13) is arranged in the groove at the end of the rack, and an opening is provided on the housing (3) for the end of the rack to extend out; The knob mechanism comprises a knob (5) and a connecting rod (7). The knob (5) is located on the housing (3) and at the upper end of the connecting rod (7). The connecting rod (7) passes through the housing (3) and is connected to the gear (8) of the boring cutter assembly. A dial is provided on the top of the housing (3). A mark is provided on the knob (5). The connecting rod (7) is controlled by the knob (5) to drive the gear (8) of the boring cutter assembly to rotate, thereby adjusting the extension length of the rack. The locking mechanism comprises a locking bolt, the housing (3) is provided with a threaded hole for the locking bolt to pass through, the locking bolt is threadedly connected to the threaded hole on the housing (3), the lower end of the locking bolt is located in the accommodation space in the housing (3), and when the knob mechanism has adjusted the extended length of the rack, the bolt is tightened so that its lower end contacts the rack and presses against the rack, thereby fixing the position of the rack; The boring tool assembly comprises two sets of racks and boring tools (13), each set of racks being provided with a set of boring tools (13); the two sets of racks are centrally symmetrically arranged about the axis of the gear (8), so that when the gear (8) rotates synchronously to drive the two sets of racks to extend, the two sets of boring tools (13) extend along with the racks; The housing (3) comprises a top cover (15), a middle shell (16), and a bottom cover (17); the top cover (15) is arranged above the middle shell (16), the bottom cover (17) is arranged below the middle shell (16), and the dial is arranged on the top cover (15); two groups of accommodating spaces for accommodating the boring tool assembly are provided, namely a first accommodating space and a second accommodating space; the first accommodating space is located between the top cover (15) and the middle shell (16), and the second accommodating space is located between the bottom cover (17) and the middle shell (16); The boring tool assembly is provided with two groups, namely a first boring tool assembly (4) and a second boring tool assembly (14); the first boring tool assembly (4) is arranged in the first accommodation space, and the second boring tool assembly (14) is arranged in the second accommodation space; the connecting rod (7) of the knob mechanism passes through the housing (3) and is connected to the gears (8) of the first boring tool assembly (4) and the second boring tool assembly (14); It also includes a wireless rotation speed sensor (33), wherein the wireless rotation speed sensor (33) is arranged inside the housing (3); The airflow drag reduction and vibration reduction system comprises a gas delivery hose, the gas outlet of the gas delivery hose is located in the accommodation space of the housing (3), and the gas outlet of the gas delivery hose faces the rack; The air flow rate Q of the gas delivery hose is: In the above formula, Q is the gas flow rate blown out through the gas delivery hose, F is the peak value of the external force applied to the boring tool (13), k is the stiffness of the boring tool (13), m is the mass of the boring tool (13), c is the damping of the boring tool (13), ω is the rotation speed monitored by the wireless rotation speed sensor (33), t is the vibration duration of the boring tool (13), and v is the gas flow rate blown out through the gas delivery hose.
2. The variable diameter boring tool handle according to claim 1, characterized in that: It also includes a coolant delivery system, the coolant delivery system including a coolant delivery hose and a coolant delivery main pipeline, the coolant delivery main pipeline is arranged in the tool rod (2), and the coolant delivery hose is connected to the coolant delivery main pipeline; The racks of the first boring tool assembly (4) and the second boring tool assembly (14) are both provided with a coolant circulation pipeline (21), the water inlet of the coolant circulation pipeline (21) is connected to a coolant delivery hose, and the water outlet of the coolant circulation pipeline (21) is located at the groove position of the end of the rack; the boring tool (13) comprises a tool holder (22) and a blade (23), the blade (23) is arranged on the tool holder (22), the tool holder (22) is arranged in the groove at the end of the rack, the tool holder (22) is provided with a coolant delivery hole (24) connected to the water inlet of the coolant circulation pipeline (21), and the water outlet of the coolant delivery hole (24) is located on one side of the blade (23); The coolant delivery hose is provided with four groups, namely a first coolant delivery hose (25), a second coolant delivery hose (26), a third coolant delivery hose (27), and a fourth coolant delivery hose (28); the water inlets of the four groups of coolant delivery hoses are connected to the coolant delivery main pipeline; the two groups of racks of the first boring tool assembly (4) are respectively a first rack (9) and a second rack (10); the two groups of racks of the second boring tool assembly (14) are respectively a third rack (11) and a fourth rack (12); The first coolant delivery hose (25) passes through the bottom cover (17) and the middle shell (16) and is connected to the coolant flow pipeline (21) of the first rack (9) arranged in the first accommodation space; The second coolant delivery hose (26) passes through the bottom cover (17) and the middle shell (16) and is in communication with the coolant flow pipeline (21) of the second rack (10) disposed in the first accommodation space; The third coolant delivery hose (27) passes through the bottom cover (17) and is in communication with the coolant flow pipeline (21) of the third rack (11) disposed in the second accommodation space; The fourth coolant delivery hose (28) passes through the bottom cover (17) and is connected to the coolant flow pipeline (21) of the fourth rack (12) disposed in the second accommodating space.
3. The variable diameter boring tool handle according to claim 1, characterized in that: A first groove is provided at the upper end of the middle shell (16), and the top cover (15) and the first groove of the middle shell (16) together enclose a first accommodating chamber; The first groove comprises a rack fixing portion (18) and a gear fixing portion (19); the gear fixing portion (19) is a cylindrical groove opened at the upper end of the middle shell (16); the rack fixing portion (18) is a long straight groove penetrating the gear fixing portion (19); the rack fixing portion (18) is provided with two groups, and the two groups of rack fixing portions (18) are centrally symmetrically arranged around the axis of the gear fixing portion (19); both ends of the rack fixing portion (18) in the length direction penetrate the outer wall of the middle shell (16), so that an opening communicating with the rack fixing portion (18) is formed on the outer wall of the middle shell (16); The gear (8) of the first boring tool assembly (4) is arranged in the gear fixing portion (19) of the first groove, and the two sets of racks of the first boring tool assembly (4) are arranged in the two sets of rack fixing portions (18) of the first grooves respectively.
4. The variable diameter boring tool handle according to claim 3, characterized in that: A second groove is provided at the top of the bottom cover (17), and the bottom cover (17) and the middle shell (16) are combined to form a second accommodating space. The structure of the second groove is the same as that of the first groove. The length direction of the rack fixing portion (18) of the first groove is perpendicular to the length direction of the rack fixing portion (18) of the second groove, so that the length direction of the rack of the first boring tool assembly (4) and the length direction of the rack of the second boring tool assembly (14) are perpendicular to each other. The locking bolts are provided in two groups, namely a first locking bolt (6) and a second locking bolt (20). The first locking bolt (6) is arranged on the top cover (15) to fix and limit the rack of the first boring tool assembly (4); the second locking bolt (20) is arranged on the bottom cover (17) to fix and limit the rack of the second boring tool assembly (14).
5. The variable diameter boring tool handle according to claim 4, characterized in that: The airflow drag reduction and vibration reduction system further comprises a gas delivery main pipeline, which is arranged in the tool rod (2); the two sets of racks of the first boring tool assembly (4) are respectively a first rack (9) and a second rack (10), and the two sets of racks of the second boring tool assembly (14) are respectively a third rack (11) and a fourth rack (12); The depth of the first groove is the same as the height of the first rack (9), the second rack (10), and the gear (8) of the first boring tool assembly (4), and the lower surface of the top cover (15) is a plane; the depth of the second groove is the same as the height of the third rack (11), the fourth rack (12), and the gear (8) of the second boring tool assembly (14), and the lower surface of the middle housing (16) is a plane; In the first groove, a space enclosed by the top cover (15), the middle shell (16) and the first rack (9) is a first pneumatic chamber, and a space enclosed by the top cover (15), the middle shell (16) and the second rack (10) is a second pneumatic chamber; In the second groove, the space enclosed by the bottom cover (17), the middle shell (16) and the third rack (11) is a third pneumatic chamber, and the space enclosed by the bottom cover (17), the middle shell (16) and the fourth rack (12) is a fourth pneumatic chamber; The gas delivery hoses are provided in four groups, namely a first gas delivery hose (29), a second gas delivery hose (30), a third gas delivery hose (31), and a fourth gas delivery hose (32); the gas inlets of the four groups of gas delivery hoses are all connected to the gas delivery main pipeline; The gas outlet of the first gas delivery hose (29) is located in the first pneumatic chamber and faces the first rack (9), and the flow direction of the gas blown out of the gas outlet of the first gas delivery hose (29) is perpendicular to the length direction of the first rack (9); The gas outlet of the second gas delivery hose (30) is located in the second pneumatic chamber and faces the second rack (10), and the flow direction of the gas blown out of the gas outlet of the second gas delivery hose (30) is perpendicular to the length direction of the second rack (10); The gas outlet of the third gas delivery hose (31) is located in the third pneumatic chamber and faces the third rack (11), and the flow direction of the gas blown out of the gas outlet of the third gas delivery hose (31) is perpendicular to the length direction of the third rack (11); The gas outlet of the fourth gas delivery hose (32) is located in the fourth pneumatic chamber and faces the fourth rack (12), and the flow direction of the gas blown out of the gas outlet of the fourth gas delivery hose (32) is perpendicular to the length direction of the fourth rack (12).