Control method of pre-filming device

By detecting the weight and thickness of the powder on the conveyor belt, and vibrating and replenishing the powder according to the detection results, the problems of uniformity and consistency of the laying powder layer are solved, and better film formation quality is achieved.

CN118682966BActive Publication Date: 2024-11-12HUSONG MICRO & NANO TECH (CHANGZHOU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411163546.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-12
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

The prior art cannot guarantee uniformity and consistency of laying the powder layer when laying the powder layer, especially the film unevenness caused by the difference in the void inside the powder layer.

Method used

By arranging a sensor array on the conveyor belt, the powder weight and thickness of each area are detected, and vibration commands and powder replenishing instructions are generated based on the detection results, the vibration device and powder sprinkler are controlled to vibrate and powder replenish, ensuring the powder in each area is Body weight and thickness meet the requirements, reducing internal voids and ensuring consistency.

Benefits of technology

The uniformity and consistency of the laying powder layer is achieved, the unevenness of the film after pre-pressure film formation is avoided, and the film formation quality is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118682966B_ABST
    Figure CN118682966B_ABST
Patent Text Reader

Abstract

The present application provides a control method for a pre-filming device, comprising: a feeder, a first powder hopper whose feed port is aligned with the outlet of the feeder, a first thickness detector, a conveyor belt and a vibration device, wherein the outlet of the first powder hopper is located above the conveyor belt, a sensor array is provided in the conveyor belt, the sensor array comprises a plurality of weight sensors, each weight sensor is used to detect the weight of the powder above, a first thickness detector is located above the conveyor belt, the first thickness detector is used to detect the thickness of the powder on the conveyor belt, a controller is used to obtain the weight of the powder in each area detected by all weight sensors and the thickness of the powder detected by the first thickness detector; a vibration command is generated when the weight of the powder in the first area is less than the required weight and the thickness of the powder in the first area is greater than the required thickness, so as to ensure uniformity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of calendering technology, but is not limited to a control method for a pre-film forming device. Background Art

[0002] Powder spreading equipment is used to spread powder (powder material) evenly and accurately on the working plane.

[0003] In order to ensure the thickness, uniformity and consistency of the laid powder layer, the thickness of the powder is usually tested. However, simply testing the thickness of the powder cannot guarantee the uniformity of the laid powder. Summary of the invention

[0004] The present application provides a control method for a pre-filming device, comprising: a feeder, a first powder hopper with a feed inlet aligned with an outlet of the feeder, a first thickness detector, a conveyor belt, and a vibration device, wherein the outlet of the first powder hopper is located above the conveyor belt;

[0005] The discharge port of the first powder hopper is located above the conveyor belt; a sensor array is provided inside the conveyor belt, and the sensor array includes a plurality of weight sensors, each weight sensor is used to detect the weight of the powder in the upper area; the first thickness detector is located above the conveyor belt, and the first thickness detector is used to detect the thickness of the powder in each area on the conveyor belt;

[0006] Methods include:

[0007] Obtaining the weight of powder in each area detected by all weight sensors and the thickness of powder in each area detected by the first thickness detector;

[0008] When the weight of the powder in the first area is less than the required weight and the thickness of the powder in the first area is greater than the required thickness, a vibration instruction is generated, and the vibration instruction controls the vibration device to generate vibration in the first area;

[0009] When the weight of powder in the second area is less than the required weight and the thickness of powder in the second area is less than the required thickness, a first powder replenishment instruction for the second area is generated;

[0010] When the weight of the powder in the third area is greater than the required weight and the thickness of the powder in the third area is greater than the required thickness, a command to stop spreading the powder is generated.

[0011] In some embodiments, the method further comprises:

[0012] After the vibration device generates vibration, the powder replenishment weight is calculated according to the powder weight of the first area before vibration and the required weight, and the second powder replenishment instruction of the first area is generated according to the powder replenishment weight.

[0013] In some embodiments, the pre-filming device further includes a second powder hopper, the first powder hopper and the second powder hopper are arranged along the moving direction of the conveyor belt, and the second powder hopper is located on a side of the first powder hopper close to the moving direction of the conveyor belt, and the method further includes:

[0014] If the first area and the second area are in the same column, the second powder hopper is controlled to replenish powder in the first area and the second area at the same time according to the first powder replenishment instruction and the second powder replenishment instruction;

[0015] If the first area and the second area are not in the same row, and the first area is located in front of the second area, the second powder hopper is controlled to replenish powder in the first area according to the first powder replenishment instruction, and the second powder hopper is controlled to replenish powder in the second area according to the second powder replenishment instruction.

[0016] In some embodiments, the pre-filming device further includes a first scraper device, a second thickness detector, a second scraper device and a third powder hopper, and the first scraper device, the second thickness detector, the second scraper device and the third powder hopper are arranged in sequence along the forward direction of the conveyor belt; the method further includes:

[0017] Controlling the first scraper device to scrape the powder on the conveyor belt;

[0018] When the thickness of the fourth area detected by the second thickness detector is not equal to the required thickness, the height of the second scraper device is lowered to a preset value, and the second scraper device is controlled to perform a secondary powder scraping operation, and then the third powder hopper is controlled to perform a powder replenishing operation.

[0019] In some embodiments, the third powder hopper is then controlled to perform a powder replenishing operation, specifically including:

[0020] Obtain the powder weight of each area detected by all weight sensors, and calculate the total powder weight of all areas;

[0021] The powder replenishment weight is calculated according to the sum of the powder weights of all areas and the preset powder spreading weight, and the third powder spreading hopper is controlled to perform powder replenishment operation according to the powder replenishment weight.

[0022] In some embodiments, the second scraper device includes a scraper body and a driving mechanism, the scraper body and the driving mechanism are mechanically connected, and a liquid cooling pipe and a temperature sensor are provided in the scraper body; the method further includes:

[0023] Calculating the temperature and flow rate of the coolant according to the height reduction amount of the second scraper device and the temperature detected by the temperature sensor;

[0024] When the second scraper device performs the secondary powder scraping operation, the flow rate of the coolant in the liquid cooling pipeline is controlled.

[0025] In some embodiments, the pre-filming device further includes a dust recovery device, and the method further includes:

[0026] After detecting that a certain weight sensor is faulty, the dust recovery device is controlled to recover the powder material in the area where the faulty weight sensor is located;

[0027] When the faulty weight sensor is located and passes below the discharge port of the first powder spreading hopper again, the discharge port of the first powder spreading hopper is controlled to be closed and the powder spreading is stopped; after the weight sensor is located and passes below the discharge port of the first powder spreading hopper, the discharge port of the first powder spreading hopper is controlled to be opened and the powder spreading is continued;

[0028] When the weight sensor located at fault passes under the discharge port of the second powder spreading hopper again, the discharge port of the second powder spreading hopper is controlled to be closed, and the powder spreading is stopped; after the weight sensor located at fault passes under the discharge port of the second powder spreading hopper, the discharge port of the second powder spreading hopper is controlled to be opened, and the powder spreading is continued;

[0029] When the faulty weight sensor passes under the discharge port of the third powder hopper again, the discharge port of the first powder hopper is controlled to be closed and the powder spreading is stopped; after the faulty weight sensor passes under the discharge port of the third powder hopper, the discharge port of the third powder hopper is controlled to be opened and the powder spreading is continued.

[0030] In some embodiments, the method further comprises:

[0031] When the density of the failed weight sensor is greater than a preset threshold, a replacement prompt message is generated, and the external power supply device is controlled to stop supplying power to the pre-filming device.

[0032] In some embodiments, the pre-filming device further includes a heating device and a rolling device;

[0033] The heating device is located on one side of the third powder hopper close to the advancing direction of the conveyor belt, and the rolling device is located on one side of the heating device close to the advancing direction of the conveyor belt; the method further includes:

[0034] When the powder on the conveyor belt is transported into the heating device, the heating device is controlled to preheat the powder on the conveyor belt.

[0035] In some embodiments, the loading machine is provided with a first discharge port, a second discharge port and a third discharge port;

[0036] The first discharge port is aligned with the first powder spreading hopper, the second discharge port is aligned with the second powder spreading hopper, and the third discharge port is aligned with the third powder spreading hopper;

[0037] The body of the feeder is close to the first powder hopper. When the outlet openings of the first discharge port and the third discharge port are the same, the flow rate of the first discharge port is greater than the flow rate of the third discharge port.

[0038] The control method of the pre-filming device provided in the present application is such that a sensor array is arranged inside the conveyor belt, each weight sensor detects the weight of the powder in the area, a first thickness detector detects the thickness of the powder on the conveyor belt, and determines whether the laying of the powder meets the requirements based on the powder weight and powder thickness of each area. When the powder weight in the first area is less than the required weight and the powder thickness in the first area is greater than the required thickness, a vibration instruction is generated, the vibration instruction controls the first area of ​​the vibration device to vibrate, thereby reducing the internal gaps in the powder. When the powder weight in the second area is less than the required weight and the powder thickness in the second area is less than the required thickness, a first powder replenishing instruction is generated in the second area, thereby ensuring the consistency of the powder in each area. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0040] Figure 1 A schematic diagram of the structure of a pre-film forming device provided in some embodiments of the present application;

[0041] Figure 2 A schematic diagram of a portion of the structure of a conveyor belt provided in some embodiments of the present application;

[0042] Figure 3 A schematic diagram of an outlet of a second powder hopper provided in some embodiments of the present application;

[0043] Figure 4 A schematic diagram of the structure of a loading machine provided in some embodiments of the present application.

[0044] Reference numerals:

[0045] 110, feeder; 121, first powder hopper; 122, second powder hopper; 123, third powder hopper; 131, first thickness detector; 132, second thickness detector; 140, heating device; 150, rolling device; 160, conveyor belt; 161, weight sensor; 171, first scraper device; 172, second scraper device; 114, lower hopper; 111, first discharge port; 112, second discharge port; 113, third discharge port; X, row direction; Y, column direction.

[0046] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0047] Here, exemplary embodiments will be described in detail, and examples thereof are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present application. Instead, they are only examples of devices and methods consistent with some aspects of the present application.

[0048] Powder spreading equipment is used to spread powder (powder material) evenly and accurately on the working plane.

[0049] In order to ensure the thickness, uniformity and consistency of the laid powder layer, the thickness of the powder is usually tested. However, simply testing the thickness of the powder cannot guarantee the uniformity of the laid powder.

[0050] More specifically, during the powder laying process, the voids inside the powder layer in different areas are different. If only the thickness of the powder layer is detected, the thickness of the powder layer in each area may be consistent, but there may be more voids inside the powder in one area and fewer voids inside the powder in another area. As a result, an uneven film will appear after the laid powder layer is pre-pressed into a film.

[0051] It should be noted here that the control method of the pre-film forming device provided in the present application can be applied to the production of lithium batteries.

[0052] To solve the above problems, Figure 1 As shown, some embodiments of the present application provide a pre-filming device, which includes a loader 110, a first powder hopper 121, a first thickness detector 131, a conveyor belt 160 and a vibration device (not shown).

[0053] The feed port of the first powder hopper 121 is aligned with the outlet of the feeder 110. The feeder 110 is used to convey powder to the first powder hopper 121. The discharge port of the first powder hopper 121 is located above the conveyor belt 160. During the movement of the conveyor belt 160, the first powder hopper 121 lays powder on the conveyor belt 160. The vibration device is arranged near the transmission belt to generate vibration on the conveyor belt 160 to avoid large gaps inside the laid powder.

[0054] in, Figure 2 is a partial structural diagram of the conveyor belt 160, such as Figure 2 As shown, a sensor array is provided inside the conveyor belt 160, and the sensor array includes a plurality of weight sensors 161, each weight sensor 161 is used to detect the weight of the powder in the upper area. A first thickness detector 131 is located above the conveyor belt 160, and the first thickness detector 131 is used to detect the thickness of the powder on the conveyor belt 160.

[0055] During the transportation of the conveyor belt 160, the feeder 110 continuously delivers powder to the first powder hopper 121, and the first powder hopper 121 discharges powder from the discharge port, laying the powder on the conveyor belt 160. The weight sensor 161 inside the conveyor belt 160 is used to detect the weight of the powder in the upper area and send the powder weight to the controller. The first thickness detector 131 above the conveyor belt 160 also detects the powder thickness in each area and sends the powder thickness in each area to the controller. The conveyor belt 160 uses a servo motor with a frequency converter for speed regulation, wherein the linear speed range of the conveyor belt 160 is 0.05~0.35m / s.

[0056] The control method runs in the controller, and the control method specifically includes the following steps:

[0057] S101 , obtaining the weight of powder in each area detected by all weight sensors 161 and the thickness of powder in each area detected by the first thickness detector 131 .

[0058] S102 , when the weight of the powder in the first area is less than the required weight and the thickness of the powder in the first area is greater than the required thickness, a vibration instruction is generated, and the vibration instruction controls the vibration device to generate vibration in the first area.

[0059] The pre-filming device can receive the powder spreading requirement and generate the required weight and required thickness of each area according to the powder spreading requirement. For example, if the powder spreading requirement is to lay 2mm thick powder, the required thickness of each area is 2mm, and the required weight of each area is calculated based on the area, required thickness and powder density of each area.

[0060] The first region is a region where the powder weight is less than the required weight and the powder thickness is greater than the required thickness. It is determined whether the first region exists, and if so, a vibration instruction is generated, and the vibration instruction controls the vibration device to vibrate in the first region.

[0061] The controller determines whether the powder laying in the area meets the requirements based on the received powder weight and powder thickness. If the powder weight in a certain area is less than the required weight and the powder thickness in the area is greater than the required thickness, it means that the gaps in the powder laid in the area are relatively large, and vibration needs to be generated in the area to reduce the gaps inside the powder.

[0062] S103: When the weight of the powder in the second area is less than the required weight and the thickness of the powder in the second area is less than the required thickness, a first powder replenishing instruction is generated.

[0063] The second area is an area where the powder weight is less than the required weight and the powder thickness is less than the required thickness. It is determined whether the second area exists, and if so, a first powder replenishment instruction is generated.

[0064] When the powder weight in a certain area is less than the required weight and the powder thickness in the area is less than the required thickness, it means that the powder thickness laid in the area is insufficient, and powder needs to be supplemented in the area.

[0065] S104, when the weight of the powder in the third area is greater than the required weight and the thickness of the powder in the third area is greater than the required thickness, a command to stop spreading the powder is generated.

[0066] The third area is an area where the weight of the powder is greater than the required weight and the thickness of the powder is greater than the required thickness. It is determined whether the third area exists, and if so, a stop powder spreading instruction is generated.

[0067] When the powder weight in a certain area is greater than the required weight and the powder thickness in the area is greater than the required thickness, it means that the powder laid in the area meets the requirements and no additional powder is needed.

[0068] In the above technical solution, a sensor array is arranged inside the conveyor belt 160, each weight sensor 161 detects the weight of the powder in the area, and the first thickness detector 131 detects the thickness of the powder on the conveyor belt 160. The controller determines whether the laying of the powder meets the requirements based on the powder weight and powder thickness of each area. When the powder weight in a certain area is less than the required weight and the powder thickness in the area is greater than the required thickness, a vibration instruction is generated. The vibration instruction controls the vibration device to vibrate in the area to reduce the internal gaps of the powder, thereby ensuring the consistency of the powder in each area.

[0069] In some embodiments, the method further comprises:

[0070] S105, after the vibration device generates vibration, calculate the powder replenishment weight according to the powder weight in the first area before vibration and the required weight, and generate a second powder replenishment instruction according to the powder replenishment weight.

[0071] After the gaps in the first area are eliminated, powder can be added to the first area, and the difference between the weight of the powder in the first area before vibration and the required weight is calculated, and the difference is used as the powder addition weight.

[0072] Among them, the pre-filming device also includes a second powder hopper 122, the first powder hopper 121 and the second powder hopper 122 are arranged along the moving direction of the conveyor belt 160, and the second powder hopper 122 is located on the side of the first powder hopper 121 close to the forward direction of the conveyor belt 160. The first powder hopper 121 is used to lay powder on the conveyor belt 160, and the second powder hopper 122 is used to determine whether to add powder based on the judgment result of the controller. More specifically, after the first powder hopper 121 lays powder on the conveyor belt 160, the controller determines whether the powder laying in the area meets the requirements based on the received powder weight and powder thickness. If it does not meet the requirements and it is necessary to add powder, the second powder hopper 122 is controlled to add powder in the corresponding area.

[0073] Continue to refer Figure 2 , assuming that the sensor array includes m rows of weight sensors 161 and n columns of weight sensors 161, the row direction X is the moving direction of the conveyor belt 160, and the column direction Y is perpendicular to the row direction X. The outlet of the second powder hopper 122 extends along the column direction Y, and a plurality of switch mechanisms are provided on the outlet, each of which is used to control whether powder flows out of the outlet area. Figure 3 As shown, the outlet of the second powder hopper 122 is provided with 6 switch mechanisms. When the 2nd switch mechanism and the 5th switch mechanism are opened, the powder can flow out from the area where the 2nd switch mechanism and the 5th switch mechanism are located, and the conveyor belt 160 area below the 2nd switch mechanism and the 5th switch mechanism is replenished with powder.

[0074] In some embodiments, the switch mechanism includes a drive mechanism and a baffle, wherein the drive end of the drive mechanism is fixedly connected to the baffle, and the drive mechanism is used to drive the baffle mechanism to extend in the column direction Y or retract in the column direction Y. The drive mechanism can be a motor and a lead screw mechanism, and the lead screw mechanism converts the rotational motion of the motor into a linear motion in the horizontal direction.

[0075] In some embodiments, some embodiments of the present application provide a control method for a pre-filming device, after step S105, the method further includes:

[0076] S106: If the first area and the second area are areas in the same column, control the second powder hopper 122 to replenish powder in the first area and the second area at the same time according to the first powder replenishment instruction and the second powder replenishment instruction.

[0077] If the first area and the second area are in the same row of areas, the corresponding switch mechanism of the second powder hopper 122 can be controlled to open, and powder can be replenished in the first area and the second area at the same time.

[0078] S107, if the first area and the second area are not in the same column, and the first area is located in front of the second area, the second powder hopper 122 is controlled to replenish powder in the first area according to the first powder replenishment instruction, and the second powder hopper 122 is controlled to replenish powder in the second area according to the second powder replenishment instruction.

[0079] If the first area and the second area are in different columns, the corresponding switch mechanism of the second powder hopper 122 can be controlled to open, and powder is first replenished in the first area, and then the corresponding switch mechanism of the second powder hopper 122 is controlled to open to replenish powder in the second area.

[0080] In the above technical solution, a plurality of switch mechanisms are provided for the outlet of the second powder hopper 122. If the first area and the second area are in the same column, the second powder hopper 122 is controlled to replenish powder in the first area and the second area at the same time. If the first area and the second area are not in the same column, the second powder hopper 122 is controlled to replenish powder in the first area and the second area successively, thereby improving the powder replenishment efficiency and accuracy.

[0081] In some embodiments, the pre-filming device further includes a first scraper device 171, a second thickness detector 132, a second scraper device 172 and a third powder hopper 123, the first scraper device 171, the second thickness detector 132, the second scraper device 172 and the third powder hopper 123 are located above the conveyor belt 160, and the first scraper device 171, the second thickness detector 132, the second scraper device 172 and the third powder hopper 123 are arranged in sequence along the forward direction of the conveyor belt 160, after the first powder hopper 121 lays powder on the conveyor belt 160, the second powder hopper 122 performs a powder replenishing operation according to the thickness detected by the first thickness detector 131 and the weight of the powder in each area detected by each weight sensor 161, and then the first scraper device 171 scrapes the powder on the conveyor belt flat. The second thickness detector 132 is also used to detect the thickness of the powder in each area after the first scraper device 171 scrapes the powder flat. If the thickness of the powder in each area is not equal to the required thickness, the second scraper device 172 is used for secondary scraping.

[0082] In some embodiments, some embodiments of the present application provide a control method for a pre-filming device, after step S107, the method further includes:

[0083] S108 , controlling the first scraper device 171 to scrape the powder on the conveyor belt 160 , and controlling the second thickness detector 132 to detect the thickness of the powder.

[0084] S109, when the thickness of the fourth area is not equal to the required thickness, the height of the second scraper device 172 is lowered to a preset value, and the second scraper device 172 is controlled to perform a secondary powder scraping operation, and then the third powder hopper 123 is controlled to perform a powder replenishing operation.

[0085] The fact that the thickness in a certain area is not equal to the required thickness can be understood as that the difference between the thickness in the certain area and the required thickness is less than a preset difference.

[0086] Since powders are prone to agglomeration, if powder blocks are mixed in the powder during the laying process, pits or bulges will appear on the powder layer after the first scraper device 171 performs a flattening operation, that is, the powder layer in a certain area does not meet the required thickness. This is because there are powder blocks in the laid powder layer, and then there are bulges on the powder layer. Or pits are caused by the powder blocks in the laid powder layer being scraped away by the first scraper device 171.

[0087] After determining that the above situation occurs, the second scraper device 172 is required to remove more powder layers and perform a powder replenishment operation. More specifically, the scraper downward adjustment amount is calculated according to the difference between the second thickness detector and the required thickness, and the scraper downward adjustment amount is used as a preset value. The controller lowers the height of the second scraper device 172 to the preset value, performs a secondary powder leveling operation, and then controls the third powder hopper 123 to perform a powder replenishment operation.

[0088] In other embodiments, when agglomerates appear on the laid powder layer, the agglomerated powder can be removed by a one-time powder removal method, or by a multiple-time removal method.

[0089] In some embodiments, the control method further includes the following steps: after performing the secondary powder scraping operation, obtain the powder weight of each area detected by all weight sensors 161, and calculate the total weight of the powder in all areas; calculate the powder replenishment weight according to the total weight of the powder in all areas and the required weight, and control the third powder hopper 123 to perform the powder replenishment operation according to the powder replenishment weight, and the required weight is calculated according to the powder layer thickness input by the user, the total area of ​​all areas, and the powder density. In this way, after removing the powder on the powder layer, the thickness of the powder layer can be replenished to the required amount.

[0090] In some embodiments, the second scraper device 172 includes a scraper body and a driving mechanism, the scraper body and the driving mechanism are mechanically connected, and a temperature sensor and a liquid cooling pipe are provided in the scraper body. The control method provided in some embodiments of the present application, after S109, further includes the following steps:

[0091] S110, calculating the flow rate of the coolant according to the height reduction amount of the second scraper device 172 and the temperature detected by the temperature sensor;

[0092] S111, when the second scraper device 172 performs a secondary powder scraping operation, the flow rate of the coolant in the liquid cooling pipe is controlled.

[0093] The powder layer laid on the conveyor is a composite powder layer, that is, the powder contains multiple types of powders. Some powders play a bonding role and their state will change at high temperatures, which is easy to cause agglomeration. When using a scraper to remove powder, a liquid cooling device is set in the scraper body to take away the heat caused by removing powder.

[0094] A temperature sensor is provided inside the scraper. The temperature sensor detects the temperature on the scraper and predicts the heat generated based on the temperature on the scraper and the height reduction amount of the second scraper device 172. The amount of heat that needs to be removed is determined based on the predicted heat and the required temperature value, and the liquid flow rate in the liquid cooling device is determined based on the amount of heat that needs to be removed.

[0095] In some embodiments, the control method provided in some embodiments of the present application, after S111, the control method includes the following steps:

[0096] S112 , after detecting that a certain weight sensor 161 is faulty, controlling the dust recovery device to recover the powder material in the area where the weight sensor 161 is located.

[0097] When the weight sensor 161 passes below the discharge port of the first powder hopper 121 again, the discharge port of the first powder hopper 121 is controlled to be closed to stop spreading powder. After the weight sensor 161 passes below the discharge port of the first powder hopper 121, the discharge port of the first powder hopper 121 is controlled to be opened to continue spreading powder.

[0098] When the weight sensor 161 is positioned and the column area passes below the discharge port of the second powder hopper 122 again, the discharge port of the second powder hopper 122 is controlled to be closed and the powder spreading is stopped. After the weight sensor 161 passes below the discharge port of the second powder hopper 122, the discharge port of the second powder hopper 122 is controlled to be opened and the powder spreading is continued.

[0099] When the weight sensor 161 passes below the discharge port of the third powder hopper 123 again, the discharge port of the first powder hopper 121 is controlled to be closed to stop spreading powder. After the weight sensor 161 passes below the discharge port of the third powder hopper 123, the discharge port of the third powder hopper 123 is controlled to be opened to continue spreading powder.

[0100] When the row area where the weight sensor 161 located with the fault passes through each powder spreading hopper again, the powder spreading hopper stops spreading powder to ensure that no powder is spread on the area where a row of sensors are located.

[0101] Since the conveyor belt 160 is provided with a sensor inside, when the conveyor belt 160 runs near the pulley, the conveyor belt 160 needs to bend, which can easily reduce the life of the sensor inside the conveyor belt 160 and cause sensor failure. In addition, the conveyor belt 160 will pass through the heating device 140 and the pre-pressing device, and will be subjected to a certain temperature and pressure, which is also prone to failure.

[0102] If the powder is still spread in the area after the sensor fails, the powder in the area will be inconsistent with the powder in other areas, which will eventually affect the film forming effect. If the conveyor belt 160 is replaced immediately after a sensor fails, the use cost of the entire pre-film forming device will increase.

[0103] The control method further comprises the following steps:

[0104] After determining that the weight sensor 161 in a certain area fails, the pre-filming device is controlled to stop spreading powder in the area where the weight sensor 161 is located, but continues to spread powder in other areas. This can ensure uniform film formation and reduce the use cost of the pre-filming device.

[0105] More specifically, after a certain weight sensor 161 is detected to be faulty, the dust recovery device is controlled to recover the powder in the area where the weight sensor 161 is located, thereby ensuring that there is no powder in the faulty area.

[0106] When the weight sensor 161 is located and the column area passes below the discharge port of the first powder hopper 121 again, the discharge port of the first powder hopper 121 is controlled to be closed and the powder spreading is stopped, so that the powder will not be spread on the faulty weight sensor 161. After the weight sensor 161 is located and passes below the discharge port of the first powder hopper 121, the discharge port of the first powder hopper 121 is controlled to be opened and the powder spreading continues. That is, the powder continues to be spread in the area without fault.

[0107] When the weight sensor 161 is located and the column area passes below the discharge port of the second powder hopper 122 again, the discharge port of the second powder hopper 122 is controlled to be closed and the powder spreading is stopped. In this way, powder will not be spread on the weight sensor 161 with a fault. After the weight sensor 161 is located and passes below the discharge port of the second powder hopper 122, the discharge port of the second powder hopper 122 is controlled to be opened and the powder spreading continues, that is, the powder continues to be replenished in the area without the fault.

[0108] When the weight sensor 161 is located and the column area passes below the discharge port of the third powder hopper 123 again, the discharge port of the first powder hopper 121 is controlled to be closed and the powder spreading is stopped. In this way, powder will not be spread on the weight sensor 161 with a fault. After the weight sensor 161 is located and passes below the discharge port of the third powder hopper 123, the discharge port of the third powder hopper 123 is controlled to be opened and the powder spreading continues, that is, the powder is continuously replenished in the area without the fault.

[0109] In some embodiments, the control method further includes the following steps: when the density of the failed weight sensor 161 is greater than a preset threshold, generating a replacement prompt message, and controlling the external power supply device to stop supplying power to the pre-filming device.

[0110] If it is determined that the number of faulty weight sensors 161 is relatively large and the faulty weight sensors 161 are widely distributed, the area where powder can be laid is relatively small and the pre-filming efficiency of the pre-filming device is relatively low. In this case, it is necessary to replace the conveyor belt 160 and control the external power supply device to stop supplying power to the pre-filming device to shut down the pre-filming device.

[0111] In some embodiments, the pre-filming device further includes a heating device 140 and a rolling device 150, wherein the heating device 140 is located on one side of the third powder hopper 123 close to the advancing direction of the conveyor belt 160, and the rolling device 150 is located on one side of the heating device 140 close to the advancing direction of the conveyor belt 160. The heating device 140 is used to preheat the powder on the conveyor belt 160.

[0112] Usually, the rolling device 150 is composed of two rollers with opposite rotation directions moving relative to each other to roll the powder layer on the conveyor belt 160. After the two rollers move relative to each other, the film can be output. The rollers are supplied with heat transfer oil by the mold temperature controller, the temperature range is 55~160℃, and the roller linear speed range is 0.05~0.45m / s. Since the rolling device 150 contacts the powder for a relatively short time, it is impossible to heat the powder on the conveyor belt 160 in a short time. Therefore, a heating device 140 is added in front of the rolling device 150 to heat the powder layer on the conveyor belt 160, so that the state of part of the powder in the powder layer changes, and then enters the rolling device 150 to form a film after rolling, thereby improving the film forming quality of the pre-film forming device.

[0113] Among them, the heating temperature of the heating device 140 can be adjusted according to demand, and the temperature range is controlled at 55~160℃. For this purpose, a temperature sensor is designed in the heating device 140, and the temperature is controlled at ±1℃. The heating temperature of the heating device 140 is adjusted by turning on or off the electric heating plate in the heating device 140.

[0114] In some embodiments, Figure 4As shown, the lower hopper 114 of the loading machine 110 is provided with a first discharge port 111, a second discharge port 112 and a third discharge port 113. The first discharge port 111 is aligned with the first powder hopper 121, the second discharge port 112 is aligned with the second powder hopper 122, and the third discharge port 113 is aligned with the third powder hopper 123.

[0115] The lower hopper 114 of the feeder 110 is close to the first powder spreading hopper 121, and the outlet of the lower hopper 114 is connected to the third discharge port 113 through an inclined pipe, and the outlet of the lower hopper 114 is connected to the first discharge port 111 through a vertically arranged pipe. Since the first powder spreading hopper 121 is the main powder spreading hopper, the flow rate is relatively large, and the second powder spreading hopper 122 and the third powder spreading hopper 123 are both powder replenishing hoppers, and the flow rate is relatively small. Through such an arrangement, when the outlet openings of the first discharge port 111 and the third discharge port 113 are the same, the flow rate of the first discharge port 111 is greater than the flow rate of the third discharge port 113.

[0116] In some embodiments, the flow rate of the feed port of the loader 110 is adjusted according to the flow rate of the first outlet 111 of the lower hopper 114 of the loader 110, the flow rate of the second outlet 112 of the lower hopper 114, and the flow rate of the third outlet 113 of the lower hopper 114, so that the difference between the weight of the powder in the lower hopper 114 of the loader 110 and the preset total amount threshold is less than the preset difference threshold, thereby reducing the influence of the powder amount in the lower hopper 114 on the flow rates of the three outlets, thereby enabling the powder layer to be accurately laid on the conveyor belt 160.

[0117] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.

[0118] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A control method for a pre-filming device, characterized in that: The pre-filming device comprises: a feeder, a first powder hopper with a feed port aligned with an outlet of the feeder, a second powder hopper, a first thickness detector, a conveyor belt, a vibration device and a first scraper device; The discharge port of the first powder hopper is located above the conveyor belt; a sensor array is provided inside the conveyor belt, the sensor array includes a plurality of weight sensors, each weight sensor is used to detect the weight of the powder in the upper area; the first thickness detector is located above the conveyor belt, the first thickness detector is used to detect the thickness of the powder in each area on the conveyor belt; the first powder hopper and the second powder hopper are arranged along the moving direction of the conveyor belt, and the second powder hopper is located on the side of the first powder hopper close to the forward direction of the conveyor belt; The method comprises: Obtaining the weight of powder in each area detected by all weight sensors and the thickness of powder in each area detected by the first thickness detector; Determine an area where the powder weight is less than the required weight and the powder thickness is greater than the required thickness as a first area, and generate a vibration instruction for the first area, wherein the vibration instruction controls a vibration device to generate vibration in the first area; after the vibration device generates vibration, calculate a powder replenishment weight according to the powder weight of the first area before vibration and the required weight, and generate a second powder replenishment instruction for the first area according to the powder replenishment weight; Determine an area where the powder weight is less than the required weight and the powder thickness is less than the required thickness as a second area, and generate a first powder replenishment instruction for the second area; Determine an area where the powder weight is greater than the required weight and the powder thickness is greater than the required thickness as a third area, and generate a stop powder spreading instruction for the third area, wherein the stop powder spreading instruction is used to indicate that no powder needs to be added to the third area; According to the first powder replenishing instruction and the second powder replenishing instruction, after controlling the second powder hopper to replenish powder to the first area and the second area, controlling the first scraper device to scrape the powder on the conveyor belt.

2. The control method of the pre-filming device according to claim 1, characterized in that: The controlling the second powder hopper to replenish powder to the first area and the second area according to the first powder replenishment instruction and the second powder replenishment instruction specifically includes: If the first area and the second area are in the same column, the second powder hopper is controlled to replenish powder in the first area and the second area at the same time according to the first powder replenishment instruction and the second powder replenishment instruction; If the first area and the second area are not in the same column, and the first area is located in front of the second area, the second powder hopper is controlled to replenish powder in the first area according to the first powder replenishment instruction, and the second powder hopper is controlled to replenish powder in the second area according to the second powder replenishment instruction.

3. The control method of the pre-filming device according to claim 2, characterized in that: The pre-filming device further includes a second thickness detector, a second scraper device and a third powder spreading hopper, wherein the first scraper device, the second thickness detector, the second scraper device and the third powder spreading hopper are arranged in sequence along the advancing direction of the conveyor belt; after the first scraper device is controlled to flatten the powder on the conveyor belt, the method further includes: When the second thickness detector detects the fourth area, the height of the second scraper device is lowered to a preset value, and the second scraper device is controlled to perform a secondary powder scraping operation, and then the third powder hopper is controlled to perform a powder replenishing operation; wherein, the fourth area is an area where the powder thickness is not equal to the required thickness.

4. The control method of the pre-filming device according to claim 3, characterized in that: Then the third powder hopper is controlled to perform powder replenishment operation, specifically including: Obtain the powder weight of each area detected by all weight sensors, and calculate the total powder weight of all areas; The powder replenishment weight is calculated according to the sum of the powder weights of all areas and the preset powder spreading weight, and the third powder spreading hopper is controlled to perform the powder replenishment operation according to the powder replenishment weight.

5. The control method of the pre-filming device according to claim 4, characterized in that: The second scraper device comprises a scraper body and a driving mechanism, the scraper body and the driving mechanism are mechanically connected, and a liquid cooling pipe and a temperature sensor are arranged in the scraper body; the method further comprises: Calculating the temperature and flow rate of the coolant according to the height downward adjustment amount of the second scraper device and the temperature detected by the temperature sensor; When the second scraper device performs the secondary powder scraping operation, the flow rate of the coolant in the liquid cooling pipeline is controlled.

6. The control method of the pre-filming device according to claim 2, characterized in that: The pre-filming device further includes a dust recovery device, and the method further includes: After detecting that a certain weight sensor is faulty, the dust recovery device is controlled to recover the powder material in the area where the faulty weight sensor is located; When the faulty weight sensor is located and passes below the discharge port of the first powder spreading hopper again, the discharge port of the first powder spreading hopper is controlled to be closed and the powder spreading is stopped; after the weight sensor is located and passes below the discharge port of the first powder spreading hopper, the discharge port of the first powder spreading hopper is controlled to be opened and the powder spreading is continued; When the weight sensor located at fault passes under the discharge port of the second powder spreading hopper again, the discharge port of the second powder spreading hopper is controlled to be closed, and the powder spreading is stopped; after the weight sensor located at fault passes under the discharge port of the second powder spreading hopper, the discharge port of the second powder spreading hopper is controlled to be opened, and the powder spreading is continued; When the faulty weight sensor passes under the discharge port of the third powder hopper again, the discharge port of the first powder hopper is controlled to be closed and the powder spreading is stopped; after the faulty weight sensor passes under the discharge port of the third powder hopper, the discharge port of the third powder hopper is controlled to be opened and the powder spreading is continued.

7. The control method of the pre-filming device according to claim 6, characterized in that: The method further comprises: When the density of the failed weight sensor is greater than a preset threshold, a replacement prompt message is generated, and the external power supply device is controlled to stop supplying power to the pre-filming device.

8. The control method of the pre-filming device according to claim 1, characterized in that: The pre-film forming device also includes a heating device and a rolling device; The heating device is located on one side of the third powder hopper close to the advancing direction of the conveyor belt, and the rolling device is located on one side of the heating device close to the advancing direction of the conveyor belt; the method further includes: When the powder on the conveyor belt is transported into the heating device, the heating device is controlled to preheat the powder on the conveyor belt.

9. The control method of the pre-filming device according to claim 3, characterized in that: The loading machine is provided with a first discharge port, a second discharge port and a third discharge port; The first discharge port is aligned with the first powder spreading hopper, the second discharge port is aligned with the second powder spreading hopper, and the third discharge port is aligned with the third powder spreading hopper; The body of the feeder is close to the first powder hopper, and when the outlet openings of the first discharge port and the third discharge port are the same, the flow rate of the first discharge port is greater than the flow rate of the third discharge port.