Construction device and construction method for slope reinforcement
Through the design of the construction device for slope reinforcement, the anchor rod maintains the middle position in the installation hole, which solves the problem of unstable anchor rod installation, and solves the tilt angle deviation of the installation hole through adaptive adjustment, achieving stable installation of the anchor rod .
Patent Information
- Application Number
- CN202411170560.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-26
AI Technical Summary
During slope reinforcement construction, when the anchor rod is inserted into the installation hole or cement is injected, it is difficult to ensure that the anchor rod is in the middle of the installation hole, resulting in unstable installation.
A construction device for slope reinforcement is designed, including a base plate, pushing assembly, T-shaped sliding plate, conveying pipe, sealing plate and electric push rod. Through the coordinated work of these components, the anchor rod maintains the middle position in the installation hole. , and adjust the inclination angle of the anchor rod through the limiting plate and the bearing plate to ensure the stability of anchor rod insertion and cement injection.
Effectively avoid the problem of cement extrusion or difficulty in filling the anchor during installation, ensure the stability of the anchor in the installation hole, and solve the tilt angle deviation of the installation hole through adaptive adjustment, improving the anchor stability.
Smart Images

Figure CN118686184B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of slope reinforcement construction, and in particular to a slope reinforcement construction device and a construction method. Background Art
[0002] The prestressed anchor lattice beam in the existing slope reinforcement process has gradually become the main process of slope support. Due to its good stability and high safety and reliability, it has gradually been widely used. However, in the process of fixing the anchor in the installation hole, if the entire installation hole is filled with cement first, the anchor will squeeze the cement out of the installation hole when the anchor is inserted. If the anchor is inserted into the installation hole first, when the cement is injected, the cement is limited by the anchor and it is difficult to fill the entire installation hole. At the same time, in the above two methods, it is difficult to ensure that the anchor can be in the middle of the installation hole, which leads to unstable installation of the anchor. Summary of the invention
[0003] In order to overcome the disadvantage that if the entire installation hole is filled with cement first, the anchor rod will squeeze the cement out of the installation hole, and if the anchor rod is inserted into the installation hole first, the cement will be restricted by the anchor rod and it will be difficult to fill the entire installation hole, the present invention provides a construction device and a construction method for slope reinforcement.
[0004] The technical solution is: a construction device for slope reinforcement, including a base plate and a pushing assembly; the base plate is connected to the pushing assembly; it also includes a T-shaped sliding plate, a conveying pipe, a long plate, a round tube, a blocking round plate, an electric push rod and a T-shaped limiting plate; the pushing assembly is connected to the T-shaped sliding plate; the T-shaped sliding plate is fixedly connected to the conveying pipe; the pushing assembly is connected to the long plate, and the long plate is in contact with the T-shaped sliding plate; the pushing assembly is connected to the round tube; the round tube is fixedly connected to a blocking round plate for filling the mounting hole with cement; the blocking round plate is provided with a round plug hole, and the round plug hole is aligned with the conveying pipe; the blocking round plate is provided with a round hole, and a rubber ring is arranged in the round hole, and the diameter of the rubber ring is smaller than the diameter of the anchor rod; the pushing assembly is fixedly connected to at least one electric push rod; the telescopic parts of the two electric push rods are jointly fixedly connected to the T-shaped limiting plate.
[0005] As a further preferred scheme, the pushing assembly includes a bearing plate, a limit plate, an electric slider 1, a push plate, an electric slider 2 and a fixed plate; the bottom plate is connected to the bearing plate; the bearing plate is slidably connected to two limit plates, and the front limit plate is slidably connected to a T-shaped sliding plate 1, and both limit plates are fixed to the circular tube; the bearing plate is slidably connected to the electric slider 1; the electric slider 1 is fixedly connected to the push plate, and the push plate is fixedly connected to the long plate; the bearing plate is slidably connected to the electric slider 2; the electric slider 2 is fixedly connected to the fixed plate, and the fixed plate is fixedly connected to all the limit plates.
[0006] As a further preferred solution, the delivery pipe is provided with a truncated cone portion 1, and the circular insertion hole 1 is consistent in shape with the truncated cone portion 1.
[0007] As a further preferred solution, the round tube is provided with a second frustoconical portion; the second frustoconical portion is used to enable the round tube to be better inserted into the mounting hole.
[0008] As a further preferred scheme, it also includes a mounting seat, a rotating ball, a rotating rod, a torsion spring 1, a long rod, a spring 1, a U-shaped plate, a mounting rod and a torsion spring 2; the bottom plate is fixedly connected to the mounting seat; the mounting seat is rotatably connected to a rotating ball, and the rotating ball is fixedly connected to the supporting plate; the bottom plate is rotatably connected to two rotating rods; each rotating rod is fixedly connected to at least one torsion spring 1, and all torsion springs 1 are fixedly connected to the bottom plate; each rotating rod is slidably connected to at least one long rod; each long rod is sleeved with a spring 1, and each spring 1 is fixedly connected to the corresponding rotating rod; the supporting plate is connected to two U-shaped plates; each U-shaped plate is rotatably connected to a mounting rod, and each mounting rod is fixedly connected to the corresponding long rod; each mounting rod is sleeved with a torsion spring 2 matching the number of long rods, and each torsion spring 2 is fixedly connected to the corresponding long rod, and each torsion spring 2 is fixedly connected to the corresponding U-shaped plate.
[0009] As a further preferred scheme, it also includes an arc plate, a sliding block and two springs; the bearing plate is fixedly connected to the two arc plates, and the arc plates and the rotating ball are arranged concentrically; each arc plate is slidably connected to a sliding block, and each sliding block is fixedly connected to the corresponding U-shaped plate; each arc plate is fixedly connected to at least one spring two, and each spring two is fixedly connected to the corresponding sliding block.
[0010] As a further preferred scheme, it also includes T-shaped sliding board 2, air pipe and hollow board; the rear limiting plate is slidably connected with T-shaped sliding board 2, and T-shaped sliding board 2 is in contact with the long board; T-shaped sliding board 2 is fixedly connected with air pipe; the air pipe is provided with frustum part 3; the circular tube is provided with a cavity; the cavity is provided with a plurality of annularly distributed air outlet holes, and the air outlet holes are used to clean the broken soil in the groove of the inner wall of the installation hole; the cavity is connected and fixedly connected with the hollow board; the hollow board is provided with circular plug-in hole 2, the circular plug-in hole 2 is aligned with the air pipe, and the circular plug-in hole 2 is consistent in shape with the frustum part 3.
[0011] As a further preferred solution, the air outlet is arranged in an inclined state with one end close to the cavity being close to the center point of the circular tube and the end far from the cavity being far from the center point of the circular tube. This arrangement is used to enable the air outlet to better clean the broken soil in the groove on the inner wall of the installation hole.
[0012] As a further preferred solution, the air outlet is configured to be in a truncated cone shape.
[0013] A method for using a construction device for slope reinforcement comprises the following steps:
[0014] Step 1: Install the bottom plate and its connected parts horizontally on the lifting and moving device, connect the delivery pipe to the external cement delivery device, connect the air pipe to the external air pump, and then control the lifting and moving device to drive the bottom plate and its connected parts to move and rise, so that the round tube is near the hole of the installation hole and at the same height, and then control the lifting and moving device to drive the bottom plate and its connected parts to flip upwards, so that the round tube and the installation hole are at the same horizontal line;
[0015] Step 2: Control the electric slider 1 to push the anchor rod to move through the push plate. At the same time, the push plate pushes the conveying pipe to move through the long plate and the T-shaped sliding plate 1 in sequence until the T-shaped sliding plate 1 contacts the plugging circular plate, the truncated cone 1 is inserted into the circular insertion hole 1, and the left end of the anchor rod passes through the circular hole and is aligned with the left side of the plugging circular plate;
[0016] Step 3: Control the electric slider 1 to make the anchor rod and the conveying pipe continue to move. At the same time, control the electric slider 2 to push the limit plate and the parts connected thereto to move through the fixing plate, so that the anchor rod, the conveying pipe 1, the round tube and the plugging round plate will move together toward the deepest part of the installation hole, until the left end of the anchor rod and the left side of the plugging round plate are in contact with the deepest part of the installation hole;
[0017] Step 4: Control the telescopic part of the electric push rod to push the T-shaped limiting plate downward so that the left side of the T-shaped limiting plate contacts the right end of the anchor rod;
[0018] Step 5: Control the external conveying equipment to inject cement into the installation hole through the conveying pipe, and at the same time, control the electric slider 2 to drive the limit plate and its connected parts to move toward the opening of the installation hole at a speed matching the speed of cement injection through the fixing plate, until the sealing circular plate moves to the edge of the opening of the installation hole;
[0019] Step six: Control the telescopic part of the electric push rod to drive the T-shaped limit plate to return to its initial position, and then control the electric slider 2 to drive the limit plate and its connected parts to continue to move away from the hole of the mounting hole through the fixing plate until the circular hole is separated from the part of the anchor rod reserved outside the mounting hole.
[0020] The present invention has the following advantages: by allowing the cement to fill the entire mounting hole in sequence from the deepest part of the mounting hole to the hole opening of the mounting hole under the restriction of the circular tube and the sealing circular plate, and by restricting the anchor rod through the sealing circular plate, the T-shaped limiting plate and the two limit plates, the anchor rod is always in the middle of the mounting hole, thereby avoiding the problem in the prior art that if the entire mounting hole is filled with cement first, then when the anchor rod is inserted, the anchor rod will squeeze the cement out of the mounting hole; if the anchor rod is inserted into the mounting hole first, then when the cement is injected, the cement is restricted by the anchor rod and it is difficult to fill the entire mounting hole. At the same time, in the above two methods, it is difficult to ensure that the anchor rod can be in the middle of the mounting hole, which leads to the problem of unstable anchor rod installation.
[0021] The circular tube will drive the rotating ball to rotate clockwise or counterclockwise on the mounting seat as viewed from the front to the back through the limit plate and the bearing plate in turn according to the deviation of the inclination angle of the mounting hole, so that the bearing plate and the parts connected thereto can adaptively adjust the inclination angle of the anchor rod according to the inclination angle of the mounting hole, so as to avoid the situation where the anchor rod and the mounting hole are not in the same horizontal line after the lifting and moving equipment drives the base plate and the parts connected thereto to flip upward according to the inclination angle determined before drilling, which leads to the problem that the anchor rod cannot be inserted to the deepest part of the mounting hole.
[0022] By adding an arc plate, a sliding block and a spring, the load-bearing plate and the parts connected thereto can adaptively adjust the position of the anchor rod according to the deviation between the hole opening of the mounting hole and the deepest point, so as to avoid the problem that the anchor rod still cannot be inserted to the deepest point of the mounting hole when there is a deviation between the hole opening of the mounting hole and the deepest point.
[0023] The broken soil in the groove of the inner wall of the installation hole is blown out by gas blown out from the air outlet, and the blown broken soil falls into the storage structure formed by the circular tube and the sealing circular plate for storage, so as to remove the broken soil in the groove of the inner wall of the installation hole, so as to avoid the problem that after the existing cleaning equipment cleans the broken soil in the installation hole, a large amount of broken soil still exists in the groove of the inner wall of the installation hole, which still affects the stability of the anchor rod in the installation hole. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the three-dimensional structure disclosed by the construction device for slope reinforcement of the present invention;
[0025] Figure 2 A cross-sectional view of a bearing plate disclosed in the construction device for slope reinforcement of the present invention;
[0026] Figure 3 It is a combined cross-sectional view of a bearing plate and a limiting plate disclosed in the construction device for slope reinforcement of the present invention;
[0027] Figure 4 It is a schematic diagram of the combined structure of the conveying pipe, the round pipe, the electric push rod, the T-shaped limiting plate, the bearing plate, the limiting plate and the air pipe disclosed in the construction device for slope reinforcement of the present invention;
[0028] Figure 5 It is a schematic diagram of the internal structure of a circular tube disclosed in the construction device for slope reinforcement of the present invention;
[0029] Figure 6 The present invention is a schematic diagram of the combined structure of a rotating rod, a torsion spring 1, a long rod, a spring 1, a U-shaped plate, a mounting rod, a torsion spring 2, an arc plate, a sliding block and a spring 2 disclosed in the construction device for slope reinforcement of the present invention.
[0030] Among them: 1-bottom plate, 2-T-shaped sliding plate 1, 3-conveying pipe, 4-long plate, 5-round tube, 6-blocking round plate, 7-electric push rod, 8-T-shaped limiting plate, 111-bearing plate, 112-limiting plate, 113-electric slider 1, 114-push plate, 115-electric slider 2, 116-fixed plate, 211-mounting seat, 212-rotating ball, 213-rotating rod, 214-torsion spring 1, 215-long rod, 216-spring One, 217-U-shaped plate, 218-mounting rod, 219-torsion spring two, 221-arc plate, 222-sliding block, 223-spring two, 311-T-shaped sliding plate two, 312-trachea, 313-hollow plate, 301-cone part one, 501-cone part two, 502-cavity, 503-air outlet, 601-circular socket one, 602-circular hole, 31201-cone part three, 31301-circular socket two. DETAILED DESCRIPTION
[0031] The present invention is further described below in conjunction with specific embodiments. It should also be noted that, unless otherwise clearly specified and limited, terms such as: setting, installing, connecting, and connecting should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] Example 1
[0033] A construction device for slope reinforcement, such as Figure 1-Figure 5 As shown, it includes a base plate 1 and a pushing assembly; the base plate 1 is connected to the pushing assembly for inserting the anchor rod into the mounting hole;
[0034] It also includes a T-shaped sliding plate 2, a conveying pipe 3, a long plate 4, a round tube 5, a blocking round plate 6, an electric push rod 7 and a T-shaped limiting plate 8; the pushing component is connected to the T-shaped sliding plate 2; the T-shaped sliding plate 2 is fixedly connected to the conveying pipe 3 for conveying cement; the conveying pipe 3 is provided with a truncated table portion 301; the pushing component is connected to the long plate 4, and the long plate 4 is in contact with the T-shaped sliding plate 2; the pushing component is connected to the round tube 5, and the diameter of the round tube 5 is the same as the diameter of the mounting hole; the round tube 5 is fixedly connected to the blocking round plate 6; the blocking round plate 6 A circular socket 601 is provided, which is aligned with the delivery pipe 3 and has the same shape as the truncated cone portion 301, and this arrangement is used to allow the delivery pipe 3 to be stably inserted into the circular socket 601; a circular hole 602 is provided on the sealing circular plate 6, and a rubber ring is provided in the circular hole 602, and the diameter of the rubber ring is smaller than the diameter of the anchor rod; the pushing assembly is fixedly connected to two electric push rods 7; the telescopic parts of the two electric push rods 7 are commonly fixedly connected to a T-shaped limiting plate 8 for preventing the anchor rod from moving in the mounting hole.
[0035] The pushing assembly includes a bearing plate 111, a limiting plate 112, an electric slider 113, a push plate 114, an electric slider 2 115 and a fixing plate 116; the bottom plate 1 is connected to the bearing plate 111 for bearing the anchor rod; the bearing plate 111 is slidably connected to two limiting plates 112 distributed front and back, and the front limiting plate 112 is slidably connected to the T-shaped sliding plate 12, and the two limiting plates 112 are both fixed to the circular tube 5, and the limiting plates 112 are used to limit the anchor rod; the bearing plate 111 is slidably connected to the electric slider 113; the electric slider 113 is fixedly connected to the push plate 114 for pushing the anchor rod to be inserted into the mounting hole, and the push plate 114 is fixedly connected to the long plate 4; the bearing plate 111 is slidably connected to the electric slider 2 115; the electric slider 2 115 is fixedly connected to the fixing plate 116, and the fixing plate 116 is fixedly connected to all the limiting plates 112.
[0036] The circular tube 5 is provided with a truncated cone portion 501.
[0037] The specific operation of the above-mentioned embodiment 1 is as follows: first, the bottom plate 1 and its connected parts are manually installed on the lifting and moving equipment. At this time, the bottom plate 1 and its connected parts are in a horizontal state. Then, the delivery pipe 3 is connected to the external cement delivery equipment. Then, the anchor rod is placed on the bearing plate 111 in a horizontal state. At this time, Figure 2 As shown, the anchor rod is between the two limit plates 112 and is limited by the two limit plates 112. At the same time, the anchor rod is in contact with the push plate 114, the left end of the anchor rod is flush with the left end of the conveying pipe 3, and the center point of the anchor rod is aligned with the center point of the circular hole 602. Then the lifting and moving device is controlled to drive the base plate 1 and the parts connected thereto to move and rise, so that the circular tube 5 is near the opening of the mounting hole and at the same height. Then the lifting and moving device is controlled to drive the base plate 1 and the parts connected thereto to flip upward, so that the circular tube 5 and the mounting hole are on the same horizontal line, thus completing the preparation work.
[0038] Then, the electric slider 113 is controlled to push the push plate 114, so that the push plate 114 pushes the anchor rod to move. At the same time, the push plate 114 pushes the conveying tube 3 to move through the long plate 4 and the T-shaped sliding plate 2 in turn, until the T-shaped sliding plate 2 contacts the blocking circular plate 6. At this time, the truncated cone part 301 is inserted into the circular insertion hole 601, and the left end of the anchor rod passes through the circular hole 602 and is aligned with the left side surface of the blocking circular plate 6. Then, the electric slider 113 is controlled to make the anchor rod and the conveying tube 3 continue to move. At the same time, the electric slider 2 115 is controlled to push the limiting plate 112 and the connected parts to move through the fixing plate 116, that is, the anchor rod, the conveying tube 3, the circular tube 5 and the blocking circular plate 6 will move together toward the deepest direction close to the installation hole, until the left end of the anchor rod and the left side surface of the blocking circular plate 6 are in contact with the deepest part of the installation hole. At this time, the right end of the anchor rod will be directly below the left side surface of the T-shaped limiting plate 8, thereby inserting the anchor rod into the installation hole.
[0039] Then, the electric slider 113 is controlled to drive the push plate 114 to return to the initial position, that is, the push plate 114 will no longer contact the anchor rod and the T-shaped sliding plate 2, and then the telescopic part of the electric push rod 7 is controlled to push the T-shaped limiting plate 8 to move downward, so that the left side of the T-shaped limiting plate 8 contacts the right end of the anchor rod, and then the external conveying equipment is controlled to inject cement into the installation hole through the conveying pipe 3. At the same time, the electric slider 2 115 is controlled to drive the limiting plate 112 and the connected parts to move toward the hole direction of the installation hole at a speed matching the speed of cement injection through the fixing plate 116 until the blocking circular plate 6 moves to the edge of the hole of the installation hole. In this process, since the anchor rod cannot move due to the restriction of the T-shaped limiting plate 8, the blocking circular plate 6 will slide on the anchor rod through the circular hole 602, and the blocking circular plate 6 will also push the T-shaped sliding plate 2 and the conveying pipe 3 to move synchronously, and since the diameter of the circular pipe 5 is the same as the diameter of the installation hole, as the water The mud is continuously injected into the mounting hole, and the cement will fill the entire mounting hole from the deepest part of the mounting hole to the hole opening of the mounting hole in sequence under the restriction of the circular tube 5 and the sealing circular plate 6. At the same time, since the sealing circular plate 6 slides on the anchor rod through the circular hole 602, the two ends of the anchor rod are fixed by the T-shaped limiting plate 8 and the deepest part of the mounting hole, and the two sides of the anchor rod are fixed by the limiting plates 112. In the process of injecting cement, the anchor rod will be restricted by the sealing circular plate 6, the T-shaped limiting plate 8 and the two limiting plates 112, and the anchor rod will always be in the middle of the mounting hole. This avoids the problem in the prior art that if the entire mounting hole is filled with cement first, the anchor rod will squeeze the cement out of the mounting hole when the anchor rod is inserted; if the anchor rod is inserted into the mounting hole first, the cement will be difficult to fill the entire mounting hole due to the restriction of the anchor rod when the cement is injected. At the same time, in the above two methods, it is difficult to ensure that the anchor rod can be in the middle of the mounting hole, which leads to the problem of unstable anchor rod installation.
[0040] When the blocking circular plate 6 moves to the edge of the opening of the mounting hole, the telescopic part of the control electric push rod 7 drives the T-shaped limiting plate 8 to restore the initial position, and then the control electric slider 115 drives the limit plate 112 and the connected parts to continue to move away from the opening of the mounting hole through the fixing plate 116 until the circular hole 602 is separated from the part of the anchor rod reserved outside the mounting hole.
[0041] Furthermore, when the round tube 5 is inserted into the mounting hole, the round tube 5 is guided by the second truncated cone portion 501 so that the round tube 5 can be better inserted into the mounting hole.
[0042] Example 2
[0043] On the basis of Example 1, Figure 1-Figure 2 and Figure 6 As shown, it also includes a mounting seat 211, a rotating ball 212, a rotating rod 213, a torsion spring 1 214, a long rod 215, a spring 1 216, a U-shaped plate 217, a mounting rod 218 and a torsion spring 219; the bottom plate 1 is fixedly connected to the mounting seat 211; the mounting seat 211 is rotatably connected to the rotating ball 212, and the rotating ball 212 is fixedly connected to the bearing plate 111; the bottom plate 1 is rotatably connected to two rotating rods 213 distributed on the left and right; each rotating rod 213 is fixedly connected to two torsion springs 1 214, and all torsion springs 1 214 are fixedly connected to the bottom plate 1; each rotating rod 213 is slidably connected to Two long rods 215; each long rod 215 is sleeved with a spring 1 216, and each spring 1 216 is fixedly connected to the corresponding rotating rod 213; the supporting plate 111 is connected to two U-shaped plates 217 distributed on the left and right; each U-shaped plate 217 is rotatably connected to a mounting rod 218, and each mounting rod 218 is fixedly connected to the corresponding long rod 215; each mounting rod 218 is sleeved with two torsion springs 219, and each torsion spring 219 is fixedly connected to the corresponding long rod 215, and each torsion spring 219 is fixedly connected to the corresponding U-shaped plate 217.
[0044] It also includes an arc plate 221, a sliding block 222 and a spring 223; the supporting plate 111 is fixedly connected to two arc plates 221 distributed on the left and right, and the arc plates 221 and the rotating ball 212 are arranged concentrically; each arc plate 221 is slidably connected to a sliding block 222, and each sliding block 222 is fixedly connected to the corresponding U-shaped plate 217; each arc plate 221 is fixedly connected to two springs 223, and each spring 223 is fixedly connected to the corresponding sliding block 222.
[0045] The specific operation of the above-mentioned embodiment 2 is as follows: Considering that after the lifting and moving device drives the base plate 1 and the parts connected thereto to flip upward so that the anchor rod and the mounting hole are on the same horizontal line, although the inclination angles of all mounting holes have been determined before drilling, the drilling device usually generates vibrations during drilling, and the drilling device is installed on the slope, and the soil at the slope is not particularly firm and is prone to sinking after being vibrated, the vibration may easily cause the drilling angle of the drilling device to change, and the inclination angle of the drilled mounting hole may inevitably deviate, that is, after the lifting and moving device drives the base plate 1 and the parts connected thereto to flip upward according to the inclination angle determined before drilling, it may easily cause the anchor rod and the mounting hole to not be on the same horizontal line, thereby causing the anchor rod to be unable to be inserted to the deepest part of the mounting hole.
[0046] Therefore, in Example 1, when the anchor rod, the conveying pipe 3, the round tube 5 and the sealing circular plate 6 are moving together toward the deepest direction of the mounting hole, when the round tube 5 is inserted into the hole of the mounting hole and contacts the inner wall of the hole, if there is a deviation in the inclination angle of the mounting hole, the round tube 5 will be restricted by the mounting hole. At this time, the round tube 5 will drive the rotating ball 212 to rotate clockwise or counterclockwise on the mounting seat 211 from the front to the back through the limiting plate 112 and the bearing plate 111 according to the deviation of the inclination angle of the mounting hole, that is, the bearing plate 111 and the parts connected thereto will rotate according to the deviation of the inclination angle of the mounting hole. In case of deviation in the inclination angle of the hole, the hole is flipped upward or downward with the center of the rotating ball 212 as the axis until the circular tube 5 is no longer restricted by the mounting hole. At this time, the anchor rod and the mounting hole with a deviation in the inclination angle will be in the same horizontal line, so that the supporting plate 111 and the parts connected thereto can adaptively adjust the inclination angle of the anchor rod according to the inclination angle of the mounting hole, so as to avoid the situation where the anchor rod and the mounting hole are not in the same horizontal line after the lifting and moving equipment drives the base plate 1 and the parts connected thereto to flip upward according to the inclination angle determined before drilling, thereby causing the anchor rod to be unable to be inserted into the deepest part of the mounting hole.
[0047] It should be noted that, in the process of the supporting plate 111 and the parts connected thereto flipping upward or downward with the center of the rotating ball 212 as the axis, since the rotating rod 213 can rotate on the bottom plate 1, when the rotating rod 213 rotates, the torsion spring 1 214 is in a stressed state, and the long rod 215 can slide on the rotating rod 213. When the long rod 215 slides, if the long rod 215 slides upward on the rotating rod 213, the spring 1 216 will be stretched, and if the long rod 215 slides downward on the rotating rod 213, the spring 1 216 will be compressed. The long rod 215 can drive the mounting rod 218 to rotate on the U-shaped plate 217. When the mounting rod 218 rotates, the torsion spring 219 is in a stressed state, and the supporting plate 111 and the parts connected thereto can normally flip upward or downward with the center of the rotating ball 212 as the axis.
[0048] Considering that, in addition to the inevitable deviation in the inclination angle of the drilled mounting hole, there is also inevitably a circumferential deviation in the left-right direction or other directions between the opening and the deepest point of the drilled mounting hole. When there is a left-right deviation between the opening and the deepest point of the drilled mounting hole, the deepest point of the mounting hole will be biased to the left or right of the opening based on the view from the opening of the mounting hole to the deepest point. That is, the opening and the deepest point of the mounting hole are not on the same horizontal line. Then, when there is a deviation between the opening and the deepest point of the mounting hole, the anchor rod will still not be able to be inserted to the deepest point of the mounting hole.
[0049] Therefore, by adding the arc plate 221, the sliding block 222 and the spring 223, when the round tube 5 is inserted into the hole of the mounting hole, if there is a deviation in the inclination angle of the mounting hole and there is also a deviation between the hole of the mounting hole and the deepest point, after the round tube 5 is restricted by the mounting hole, the round tube 5 will not only drive the rotating ball 212 to rotate clockwise or counterclockwise on the mounting seat 211 as viewed from the front to the back through the limiting plate 112 and the bearing plate 111 in turn, but also drive the rotating ball 212 to rotate on the mounting seat 211 in turn through the limiting plate 112 and the bearing plate 111 according to the deviation between the hole of the mounting hole and the deepest point. 211 is rotated clockwise or counterclockwise as a reference when viewed from top to bottom, that is, the supporting plate 111 and the parts connected thereto will rotate left or right with the center of the rotating ball 212 as the axis according to the deviation between the hole opening of the mounting hole and the deepest point. Then, when the circular tube 5 is no longer restricted by the mounting hole, the anchor rod will be on the same horizontal line as the mounting hole with a deviation between the hole opening and the deepest point. In this way, the supporting plate 111 and the parts connected thereto can adaptively adjust the position of the anchor rod according to the deviation between the hole opening of the mounting hole and the deepest point, so as to avoid the problem that the anchor rod still cannot be inserted into the deepest point of the mounting hole when there is a deviation between the hole opening of the mounting hole and the deepest point.
[0050] It should be noted that when the supporting plate 111 and the parts connected thereto rotate left or right with the center of the rotating ball 212 as the axis, since the arc plate 221 and the rotating ball 212 are arranged concentrically, and the sliding block 222 can slide on the arc plate 221, when the sliding block 222 slides, the spring 223 close to the sliding direction of the sliding block 222 will be compressed, and the spring 223 away from the sliding direction of the sliding block 222 will be stretched, so that the supporting plate 111 and the parts connected thereto can rotate left or right normally with the center of the rotating ball 212 as the axis.
[0051] Example 3
[0052] On the basis of Example 2, Figure 1-Figure 5As shown, it also includes a T-shaped sliding plate 311, an air pipe 312 and a hollow plate 313; the rear limiting plate 112 is slidably connected to the T-shaped sliding plate 311, and the T-shaped sliding plate 311 is in contact with the long plate 4; the T-shaped sliding plate 311 is fixedly connected to the air pipe 312 for conveying gas; the air pipe 312 is provided with a frustum part 31201; the circular tube 5 is provided with a cavity 502; the cavity 502 is provided with a plurality of annularly distributed air outlet holes 503; the cavity 502 is connected and fixedly connected to the hollow plate 313; the hollow plate 313 is provided with a circular socket 31301, the circular socket 31301 is aligned with the air pipe 312, and the circular socket 31301 is consistent in shape with the frustum part 31201.
[0053] The air outlet 503 is arranged in an inclined state with one end close to the cavity 502 being close to the center point of the circular tube 5 and the other end away from the cavity 502 being far from the center point of the circular tube 5 .
[0054] The air outlet hole 503 is configured to be in a truncated cone shape, and this configuration is used to increase the area of the air outlet hole 503 for cleaning the broken soil in the groove on the inner wall of the installation hole.
[0055] The specific work of the above-mentioned embodiment 3 is as follows: Considering that after the drilling equipment drills the installation hole, it is necessary to manually insert the air duct of the cleaning equipment into the deepest part of the installation hole, and then control the cleaning equipment to blow air into the installation hole, so that the wind flows from the deepest part of the installation hole to the direction of the hole opening. In this process, the wind will drive the broken soil in the installation hole to move together, and finally flow out from the hole opening and blow to the outside to remove the broken soil in the installation hole, so as to avoid the broken soil in the installation hole affecting the adhesion between the cement and the inner wall of the installation hole, thereby affecting the stability of the anchor rod in the installation hole.
[0056] However, since there are a large number of grooves on the inner wall of the installation hole drilled by the drilling equipment, the broken soil in the grooves is difficult to be blown by the wind, and since the installation hole is in an inclined state, the broken soil in the grooves is even more difficult to be blown by the wind, resulting in a large amount of broken soil still existing in the grooves on the inner wall of the installation hole. The broken soil in the grooves will also affect the adhesion between the cement and the inner wall of the installation hole, and thus will still affect the stability of the anchor rod in the installation hole.
[0057] Therefore, before the device works, the air pipe 312 needs to be connected to the external air pump. When the long board 4 pushes the delivery pipe 3 to move through the T-shaped sliding plate 1 2, the long board 4 will also push the air pipe 312 to move through the T-shaped sliding plate 2 311. When the T-shaped sliding plate 1 2 contacts the blocking circular plate 6, the T-shaped sliding plate 2 311 contacts the hollow plate 313, and the truncated cone portion 31201 is inserted into the circular insertion hole 2 31301. When the electric slider 2 115 moves the limit plate 112 and the parts connected thereto toward the opening of the installation hole, the external pump is controlled to sequentially transport air into the cavity 502 through the air pipe 312 and the hollow plate 313. Gas is sent to make the gas blow toward the inner wall of the installation hole through the air outlet 503 to blow out the broken soil in the groove of the inner wall of the installation hole. In this process, since the installation hole is in an inclined state, after the broken soil is blown out of the groove, the broken soil will move toward the deepest part of the installation hole, and then fall into the storage structure formed by the circular tube 5 and the sealing circular plate 6 for storage, and finally be brought from the installation hole to the outside by the storage structure formed by the circular tube 5 and the sealing circular plate 6, so as to remove the broken soil in the groove of the inner wall of the installation hole, so as to avoid the problem that after the existing cleaning equipment cleans the broken soil in the installation hole, there is still a large amount of broken soil in the groove of the inner wall of the installation hole, which will still affect the stability of the anchor rod in the installation hole.
[0058] A method for using a construction device for slope reinforcement comprises the following steps:
[0059] Step 1: Install the bottom plate 1 and its connected parts horizontally on the lifting and moving device, connect the delivery pipe 3 to the external cement delivery device, connect the air pipe 312 to the external air pump, and then control the lifting and moving device to drive the bottom plate 1 and its connected parts to move and rise, so that the round tube 5 is near the opening of the installation hole and at the same height, and then control the lifting and moving device to drive the bottom plate 1 and its connected parts to flip upward, so that the round tube 5 and the installation hole are at the same horizontal line;
[0060] Step 2: Control the electric slider 113 to push the anchor rod to move through the push plate 114. At the same time, the push plate 114 pushes the conveying pipe 3 to move through the long plate 4 and the T-shaped slide plate 2 in sequence until the T-shaped slide plate 2 contacts the blocking circular plate 6, the truncated cone 301 is inserted into the circular insertion hole 601, and the left end of the anchor rod passes through the circular hole 602 and is aligned with the left side of the blocking circular plate 6;
[0061] Step 3: Control the electric slider 113 to make the anchor rod and the conveying pipe 3 continue to move. At the same time, control the electric slider 2 115 to push the limit plate 112 and the parts connected thereto through the fixing plate 116 to move, so that the anchor rod, the conveying pipe 3, the round tube 5 and the plugging circular plate 6 will move together toward the deepest part of the installation hole, until the left end of the anchor rod and the left side surface of the plugging circular plate 6 are in contact with the deepest part of the installation hole;
[0062] Step 4: Control the telescopic part of the electric push rod 7 to push the T-shaped limiting plate 8 downward, so that the left side of the T-shaped limiting plate 8 contacts the right end of the anchor rod;
[0063] Step 5: Control the external conveying equipment to inject cement into the installation hole through the conveying pipe 3, and at the same time, control the electric slider 115 to drive the limit plate 112 and the connected parts to move toward the opening of the installation hole at a speed matching the speed of cement injection through the fixing plate 116, until the blocking circular plate 6 moves to the edge of the opening of the installation hole;
[0064] Step six: Control the telescopic part of the electric push rod 7 to drive the T-shaped limiting plate 8 to restore the initial position, and then control the electric slider 115 to drive the limit plate 112 and the connected parts to continue to move away from the hole of the mounting hole through the fixing plate 116 until the circular hole 602 is separated from the part of the anchor rod reserved outside the mounting hole.
[0065] Although the present invention is described in detail with reference to the above embodiments, it is obvious to those skilled in the art through this disclosure that various changes or modifications may be made to the present invention without departing from the principle and spirit of the present invention defined by the claims. Therefore, the detailed description of the embodiments of the present disclosure is only used to explain, not to limit the present invention, but the scope of protection is limited by the content of the claims.
Claims
1. A construction device for slope reinforcement, comprising a base plate (1) and a pushing assembly; the base plate (1) is connected to the pushing assembly for inserting an anchor rod into a mounting hole; characterized in that: It also comprises a T-shaped sliding plate (2), a conveying pipe (3), a long plate (4), a round tube (5), a blocking round plate (6), an electric push rod (7) and a T-shaped limiting plate (8); the pushing assembly is connected to the T-shaped sliding plate (2); the T-shaped sliding plate (2) is fixedly connected to the conveying pipe (3); the pushing assembly is connected to the long plate (4), and the long plate (4) is in contact with the T-shaped sliding plate (2); the pushing assembly is connected to the round tube (5); the round tube (5) is fixedly connected to a blocking round plate (6) for filling the mounting hole with cement; the blocking round plate (6) is provided with a round plug hole (601), and the round plug hole (601) is aligned with the conveying pipe (3); the blocking round plate (6) is provided with a round hole (602), and a rubber ring is arranged in the round hole (602), and the diameter of the rubber ring is smaller than the diameter of the anchor rod; the pushing assembly is fixedly connected to at least one electric push rod (7); the telescopic parts of the two electric push rods (7) are fixedly connected to the T-shaped limiting plate (8); The invention also comprises a mounting seat (211), a rotating ball (212), a rotating rod (213), a torsion spring 1 (214), a long rod (215), a spring 1 (216), a U-shaped plate (217), a mounting rod (218) and a torsion spring 2 (219); the bottom plate (1) is fixedly connected to the mounting seat (211); the mounting seat (211) is rotatably connected to the rotating ball (212), and the rotating ball (212) is fixedly connected to the pushing assembly; the bottom plate (1) is rotatably connected to two rotating rods (213); each rotating rod (213) is fixedly connected to at least one torsion spring 1 (214), and all torsion springs 1 (214) are fixedly connected to the bottom plate (1); each rotating rod (213) is slidably connected to at least one A long rod (215); each long rod (215) is sleeved with a spring 1 (216), and each spring 1 (216) is fixedly connected to a corresponding rotating rod (213); the pushing assembly is connected to two U-shaped plates (217); each U-shaped plate (217) is rotatably connected to a mounting rod (218), and each mounting rod (218) is fixedly connected to a corresponding long rod (215); each mounting rod (218) is sleeved with a torsion spring 2 (219) matching the number of the long rods (215), and each torsion spring 2 (219) is fixedly connected to a corresponding long rod (215), and each torsion spring 2 (219) is fixedly connected to a corresponding U-shaped plate (217).
2. A construction device for slope reinforcement according to claim 1, characterized in that: The pushing assembly comprises a bearing plate (111), a limiting plate (112), an electric slider 1 (113), a push plate (114), an electric slider 2 (115) and a fixing plate (116); the bottom plate (1) is connected to the bearing plate (111); the bearing plate (111) is slidably connected to two limiting plates (112), and the front limiting plate (112) is slidably connected to the T-shaped sliding plate 1 (2), and both limiting plates (112) are fixedly connected to the round tube (5); the bearing plate (111) is slidably connected to the electric slider 1 (113); the electric slider 1 (113) is fixedly connected to the push plate (114), and the push plate (114) is fixedly connected to the long plate (4); the bearing plate (111) is slidably connected to the electric slider 2 (115); the electric slider 2 (115) is fixedly connected to the fixing plate (116), and the fixing plate (116) is fixedly connected to all the limiting plates (112).
3. A construction device for slope reinforcement according to claim 1, characterized in that: The delivery pipe (3) is provided with a truncated cone portion (301), and the circular insertion hole (601) is consistent in shape with the truncated cone portion (301).
4. A construction device for slope reinforcement according to claim 1, characterized in that: The circular tube (5) is provided with a second truncated cone portion (501); the second truncated cone portion (501) is used to enable the circular tube (5) to be better inserted into the mounting hole.
5. A slope reinforcement construction device according to claim 1, characterized in that: It also includes an arc-shaped plate (221), a sliding block (222) and a second spring (223); the bearing plate (111) is fixedly connected to the two arc-shaped plates (221), and the arc-shaped plates (221) and the rotating ball (212) are arranged concentrically; each arc-shaped plate (221) is slidably connected to a sliding block (222), and each sliding block (222) is fixedly connected to a corresponding U-shaped plate (217); each arc-shaped plate (221) is fixedly connected to at least one second spring (223), and each second spring (223) is fixedly connected to a corresponding sliding block (222).
6. A construction device for slope reinforcement according to claim 2, characterized in that: The invention also comprises a second T-shaped sliding plate (311), an air pipe (312) and a hollow plate (313); the rear limit plate (112) is slidably connected to the second T-shaped sliding plate (311), and the second T-shaped sliding plate (311) is in contact with the long plate (4); the second T-shaped sliding plate (311) is fixedly connected to the air pipe (312); the air pipe (312) is provided with a third frustum (31201); the circular tube (5) is provided with a cavity (502); the cavity ( The hollow plate (313) is connected to the cavity (502) and fixedly connected with the hollow plate (313); the hollow plate (313) is provided with a second circular plug hole (31301), the second circular plug hole (31301) is aligned with the air pipe (312), and the second circular plug hole (31301) is consistent in shape with the third truncated cone portion (31201).
7. A construction device for slope reinforcement according to claim 6, characterized in that: The air outlet hole (503) is arranged in an inclined state with one end close to the cavity (502) being close to the center point of the circular tube (5) and the other end away from the cavity (502) being away from the center point of the circular tube (5). This arrangement is used to enable the air outlet hole (503) to better clean the broken soil in the groove of the inner wall of the installation hole.
8. A construction device for slope reinforcement according to claim 7, characterized in that: The air outlet hole (503) is configured to be in a truncated cone shape.
9. A construction device for slope reinforcement according to claim 8, characterized in that: A method for using a construction device for slope reinforcement comprises the following steps: Step 1: horizontally install the bottom plate (1) and the parts connected thereto on a lifting and moving device, connect the delivery pipe (3) to an external cement delivery device, connect the air pipe (312) to an external air pump, and then control the lifting and moving device to drive the bottom plate (1) and the parts connected thereto to move and rise, so that the round tube (5) is near the opening of the installation hole and at the same height, and then control the lifting and moving device to drive the bottom plate (1) and the parts connected thereto to flip upwards, so that the round tube (5) and the installation hole are at the same horizontal line; Step 2: Control the electric slider 1 (113) to push the anchor rod to move through the push plate (114). At the same time, the push plate (114) pushes the conveying pipe (3) to move through the long plate (4) and the T-shaped sliding plate 1 (2) in sequence until the T-shaped sliding plate 1 (2) contacts the sealing circular plate (6), the frustum 1 (301) is inserted into the circular insertion hole 1 (601), and the left end of the anchor rod passes through the circular hole (602) and is aligned with the left side of the sealing circular plate (6); Step 3: Control the electric slider 1 (113) to make the anchor rod and the conveying pipe (3) continue to move. At the same time, control the electric slider 2 (115) to push the limit plate (112) and the parts connected thereto through the fixing plate (116) to move, so that the anchor rod, the conveying pipe (3) 1, the round tube (5) and the sealing circular plate (6) will move together towards the deepest part of the installation hole until the left end of the anchor rod and the left side surface of the sealing circular plate (6) are in contact with the deepest part of the installation hole; Step 4: Control the telescopic portion of the electric push rod (7) to push the T-shaped limiting plate (8) downward, so that the left side of the T-shaped limiting plate (8) contacts the right end of the anchor rod; Step 5: Control the external conveying device to inject cement into the installation hole through the conveying pipe (3), and at the same time, control the second electric slider (115) to drive the limit plate (112) and its connected parts to move toward the opening of the installation hole at a speed matching the speed of cement injection through the fixing plate (116) until the sealing circular plate (6) moves to the edge of the opening of the installation hole; Step 6: Control the telescopic portion of the electric push rod (7) to drive the T-shaped limiting plate (8) to return to the initial position, and then control the second electric slider (115) to drive the limiting plate (112) and the parts connected thereto to continue to move in a direction away from the opening of the mounting hole through the fixing plate (116) until the circular hole (602) is separated from the portion of the anchor rod reserved outside the mounting hole.