An adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution
The adaptive intelligent monitoring system improved through the collaboration of software and hardware, using deep learning algorithms and ground-penetrating radar technology, solves the problem of monitoring and early warning of shale gas flowback fluid leakage pollution, and achieves highly accurate and efficient pollution monitoring and Risk warning.
Patent Information
- Application Number
- CN202411197259.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-29
Smart Images

Figure CN118690147B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of environmental pollution monitoring, and in particular to an adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution. Background Art
[0002] At present, the polluted media and the types of pollutants contained in each stage of shale gas development (well site construction, drilling, fracturing gas testing, gas production, gathering and transportation, etc.) are very complex. According to relevant research literature, the return time and volume of fracturing flowback fluid (including fracturing fluid and formation water) are different in different blocks and different engineering stages. The return time ranges from a few hours to several months, and the return volume is less than 30% in some cases, but most of them account for about 70% of the injected fracturing fluid. Shale gas flowback fluid contains a large number of additives, hydrocarbons, heavy metals, salts, radioactivity and other chemical substances, with high salt, high mineralization, high color, toxic and harmful substances, poor biodegradability and difficult to treat. Therefore, when using hydraulic fracturing to produce shale oil and gas, more water is consumed and the output of shale gas flowback fluid is also large. If some untreated flowback fluid leaks into the surrounding soil and rock formations during the exploitation of shale gas using hydraulic fracturing technology, it will cause serious pollution to the soil and rock formations, seriously threatening the safety of the ecological environment. Therefore, large-scale, efficient, and non-destructive monitoring of the shallow surface of the shale gas operating area has become one of the key technologies for timely detection and resolution of shale gas flowback fluid environmental pollution. Only by timely discovering whether the shale gas flowback fluid is leaking (abnormal operating conditions) and the actual scope of the leakage can we effectively prevent and specifically deal with shale gas flowback fluid leakage pollution incidents and ensure the safety of the ecological environment.
[0003] In the prior art, in order to address the environmental pollution and soil structure damage caused by the large amount of backflow fluid discharged to the surface during the fracturing and exploitation of shale gas, a document with publication number CN112798312A discloses a device for monitoring soil pollution caused by accidental leakage of fracturing backflow fluid. The device is mainly composed of a fracturing backflow fluid geological model, a pressure gauge, a pressure pump, a fluid meter, a ground penetrating radar and a replenishment fluid pool. This invention can simulate leakage accidents of flowback fluid under different pressures, different fluid metering, and different leakage depths, and can monitor the time-space distribution range of accidental leakage of fracturing flowback fluid through ground penetrating radar; however, this patent is only a technical means to obtain experimental data on soil pollution caused by accidental leakage of fracturing flowback fluid, and does not indicate how to apply the obtained experimental monitoring parameters to the on-site environmental treatment and solution of flowback fluid pollution, nor does it explain how to apply this technology specifically and monitor and deal with whether soil pollution accidents occur in the flowback fluid after fracturing construction during actual shale gas production; at the same time, the experimental device provided by this technology has a complex structure, cannot be moved, can only monitor fixed locations, and cannot make adaptive judgments based on different shale gas working scenes, fracturing flowback fluid, soil, rock and permeability development in the fracturing production area, etc. The data obtained through ground penetrating radar has many problems in the process of interpretation, such as complex algorithms and difficulty in noise reduction, which leads to difficulties in matching appropriate working conditions, matching the optimal algorithm, predicting the further development of pollution, large actual calculation amount, and low accuracy of the monitoring results during the monitoring process. Summary of the invention
[0004] The purpose of the present invention is to provide an adaptive intelligent monitoring method and system for shale gas return fluid leakage pollution in view of the above-mentioned deficiencies. Through the coordinated improvement of software and hardware, the hardware module is modularized, simplified and portable, and the deep learning algorithm model is introduced into the software module. Model training is carried out for different fracturing return fluids under various abnormal working conditions, soil, rock and permeability development conditions in different mining operation areas, so that various main monitoring elements are incorporated into the adaptive intelligent monitoring and analysis model. The deep learning algorithm model automatically matches the closest working condition, selects the optimal algorithm, and automatically predicts the pollution development according to the various monitoring elements perceived (or input), and quickly gives high-accuracy evaluation results and performs diffusion prediction and risk warning, thereby solving various technical problems in the prior art.
[0005] The technical solution provided by the present invention is as follows:
[0006] An adaptive intelligent monitoring method for shale gas flowback fluid leakage pollution comprises the following steps:
[0007] S1. Setting up an adaptive intelligent monitoring system
[0008] An adaptive intelligent monitoring system for shale gas flowback fluid leakage pollution is provided, which is composed of a cloud server, a management terminal and at least one mobile field monitoring hardware and software unit;
[0009] Among them, the on-site monitoring software and hardware unit is used to collect real-time monitoring data related to shale gas flowback fluid leakage pollution generated at the monitored construction site;
[0010] The cloud server is equipped with a field monitoring control unit and an AI monitoring and analysis unit;
[0011] The field monitoring control unit is used to control the operation of the field monitoring software and hardware unit, receive the real-time monitoring data uploaded by the field monitoring software and hardware unit, and perform data preprocessing;
[0012] The AI monitoring and analysis unit has a built-in AI model based on deep learning and a leakage pollution accident diffusion prediction and early warning model, which is used to analyze and process the data preprocessed by the on-site monitoring control unit, and output the monitoring results according to the safety threshold preset by the leakage pollution accident diffusion prediction and early warning model;
[0013] The management terminal is used to input data and instructions to the cloud server or display the monitoring results output by the cloud server;
[0014] S2. Collect real-time monitoring data of shale gas flowback leakage pollution
[0015] Deploy the mobile field monitoring hardware and software units to the pre-set shale gas flowback fluid leakage pollution site experimental model;
[0016] Through the on-site experimental model of shale gas flowback fluid leakage pollution, shale gas flowback fluid leakage pollution accidents under various working conditions (including normal working conditions and abnormal working conditions) are simulated respectively. The on-site monitoring software and hardware unit collects the real-time monitoring data of the continuous changes caused by the shale gas flowback fluid leakage pollution and uploads it to the on-site monitoring control unit;
[0017] S3. Train to obtain an adaptive intelligent monitoring and analysis AI model
[0018] Build an AI model based on deep learning, use the real-time monitoring data related to shale gas flowback leakage pollution to train the AI model, and obtain an adaptive intelligent monitoring and analysis AI model after multiple trainings;
[0019] S4. Construct a prediction and early warning model for the spread of leakage pollution accidents
[0020] Based on the effective medium model formula 1, a leakage pollution accident diffusion prediction and early warning model is constructed. Under the condition of uniform medium of relative dielectric constant model, the upper and lower limits of effective dielectric constant of multiphase mixed medium are determined:
[0021] Formula 1
[0022] In formula 1:
[0023] ε is the dielectric constant. The average dielectric constant of sand and mud soils ranges from 7 to 9, and the average dielectric constant of flowback fluid is 18.
[0024] ε 1 is the relative dielectric constant of the background medium; ε 2 is the relative dielectric constant of the added medium; f 1 is the volume proportion of the background medium in the mixed medium, f 2 is the volume ratio of the added medium in the mixed medium;
[0025] The safety threshold of formula 1 is pre-set, including two safety thresholds of leakage range and depth;
[0026] Deploy the constructed leakage pollution accident spread prediction and early warning model into the AI monitoring and analysis unit;
[0027] S5. Implement adaptive intelligent monitoring on the construction sites to be monitored
[0028] The trained adaptive intelligent monitoring and analysis AI model is deployed to the AI monitoring and analysis unit of the cloud server, and the field monitoring software and hardware unit is deployed to the actual operation site to be monitored, and the monitoring area is delineated; after the adaptive intelligent monitoring system is started, the field monitoring software and hardware unit collects the real-time monitoring data related to the leakage pollution of shale gas return fluid at the site and uploads it to the cloud server. After the adaptive intelligent monitoring and analysis AI model is calculated, the real-time monitoring data is output to the leakage pollution accident diffusion prediction and early warning model. The leakage pollution accident diffusion prediction and early warning model calculates and compares the preset safety threshold and then outputs the monitoring result: it keeps silent operation when it does not exceed the preset safety threshold, and sends an alarm signal when the real-time monitoring data exceeds the preset safety threshold to determine whether a leakage pollution accident has occurred; if a leakage accident has occurred, the subsequent diffusion area and speed of the leakage pollution are further predicted;
[0029] S6. Iteration and update of adaptive intelligent monitoring and analysis AI model
[0030] Regularly import new real-time monitoring data to train AI models, update and iterate the adaptive intelligent monitoring and analysis AI models, evaluate, verify and optimize the performance of the adaptive intelligent monitoring and analysis AI models, improve the accuracy and reliability of the adaptive intelligent monitoring and analysis AI models, so as to adapt to new working conditions and meet the real-time monitoring needs under changing working conditions.
[0031] An adaptive intelligent monitoring system for shale gas flowback fluid leakage pollution, used to implement the aforementioned adaptive intelligent monitoring method, comprising a cloud server, a management terminal and at least one mobile field monitoring hardware and software unit interconnected and communicating via a network;
[0032] Among them, the on-site monitoring software and hardware unit is used to collect real-time monitoring data related to shale gas flowback fluid leakage pollution generated at the monitored construction site;
[0033] The cloud server is equipped with a field monitoring control unit and an AI monitoring and analysis unit;
[0034] The field monitoring control unit is used to control the operation of the field monitoring software and hardware unit, receive the real-time monitoring data uploaded by the field monitoring software and hardware unit, and perform data preprocessing;
[0035] Each mobile and deployable on-site monitoring hardware and software unit includes the following interconnected components: front-end computer, multiple sets of sensors, detection radar, and monitoring lines;
[0036] The AI monitoring and analysis unit is equipped with a deep learning-based AI model and a leakage pollution accident diffusion prediction and early warning model, which is used to analyze and process the data preprocessed by the on-site monitoring control unit, and output the monitoring results according to the preset leakage pollution accident risk early warning safety threshold;
[0037] The management terminal is used to input data and instructions to the cloud server or display the monitoring results output by the cloud server.
[0038] The advantages and beneficial effects of the present invention include at least the following:
[0039] 1. The adaptive intelligent monitoring method and system for shale gas flowback leakage pollution provided by the present invention, through the coordinated improvement of software and hardware, modularizes, simplifies and portably designs the hardware part, introduces a deep learning algorithm into the software part, and conducts model training for fracturing flowback fluid under various abnormal working conditions, soil, rock and permeability development in different mining operation areas, so as to incorporate various main monitoring elements into the adaptive intelligent monitoring and analysis model. The model automatically matches the closest working condition, selects the optimal algorithm, automatically predicts the pollution development, and quickly gives the monitoring results according to the various monitoring elements perceived (or input). Highly accurate assessment results and risk warnings can be obtained, thereby solving the problems in the existing technology that the experimental equipment is complex in structure, cannot be moved, can only monitor fixed locations, and cannot make adaptive judgments based on different shale gas working scenarios, fracturing return fluids, soil, rocks and permeability development conditions in fracturing mining operations, etc. At the same time, it can solve many problems in the interpretation process of data obtained by ground penetrating radar, such as complex algorithms and difficulty in noise reduction, and solve technical problems such as difficulty in automatically matching appropriate working conditions, matching the optimal algorithm, predicting the further development of pollution, large actual calculation volume, and low accuracy of monitoring results.
[0040] 2. The adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution provided by the present invention is a series of monitoring, detection and prediction methods obtained by the inventor team based on existing research results and measured data, further using model simulation experiments. The main monitoring elements of this model (ground penetrating radar array) are used to monitor whether soil leakage pollution accidents occur in the flowback fluid during fracturing construction at the actual shale gas mining site, sense (rapid detection), analyze, and predict the leakage pollution that has occurred, and quickly provide evaluation results and risk warnings.
[0041] 3. The adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution provided by the present invention comprehensively utilizes models and technologies such as deep learning, radar detection, water content determination and inversion, and dielectric constant inversion. It only needs to input conventional soil parameters (water content, soil texture, infiltration time, etc.) according to the actual environmental conditions of the mining site. The system can calculate the pollution characteristics (range, depth) of the shale gas flowback fluid at the site in the soil infiltration accident, and can provide direct support for the environmental protection, environmental early warning and formulation of emergency plans for the construction site.
[0042] 4. The adaptive intelligent monitoring method and system for shale gas return fluid leakage pollution provided by the present invention adopts ground penetrating radar with the advantages of high efficiency, non-destructiveness, high resolution and other detection technologies, as well as the technical advantages of combining AI model to conduct real-time automatic monitoring of shale gas return fluid leakage, investigation of penetration range, and division of safety thresholds.
[0043] 5. The adaptive intelligent monitoring method and system for shale gas return fluid leakage pollution provided by the present invention can perform non-destructive, efficient and accurate detection of shale gas fracturing return fluid leakage areas, and define the safety warning threshold range in combination with other analysis results, which is conducive to carrying out automatic monitoring of fracturing return fluid, abnormal condition processing and ecological environment restoration work in a large area.
[0044] 6. The adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution provided by the present invention can solve the following three problems at the same time: first, to monitor whether soil pollution accidents (abnormal conditions) occur in the flowback fluid during the actual operation of shale gas fracturing construction; second, to perceive (rapidly detect), analyze, and predict the pollution situation (abnormal conditions) and quickly give evaluation results; third, it can accurately obtain whether a pollution incident occurs and predict the development data of the seepage pollution accident, automatically issue risk warnings, greatly improve the automation and intelligence of the monitoring system, and improve the reliability of the monitoring results. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 Schematic diagram of the network structure of the adaptive intelligent monitoring system according to an embodiment of the present invention;
[0046] Figure 2 It is a schematic diagram of the structural composition of a construction site experimental model of shale gas flowback fluid leakage pollution according to an embodiment of the present invention;
[0047] Figure 3 It is a schematic diagram of the structural composition of a construction site experimental model of shale gas flowback fluid leakage pollution from another perspective of an embodiment of the present invention;
[0048] Figure 4 Schematic diagram of monitoring principle of a construction site experimental model according to an embodiment of the present invention;
[0049] Figure 5 Schematic diagram of soil medium filling and layered compaction of a construction site experimental model according to an embodiment of the present invention;
[0050] Figure 6 is a schematic diagram of the appearance of the construction site experimental model after the whole is filled with a medium according to an embodiment of the present invention;
[0051] Figure 7 It is a schematic diagram of the radar detection line arrangement for the construction site experimental model test according to an embodiment of the present invention;
[0052] Figure 8 Schematic diagram of shale gas flowback fluid used in the construction site experimental model of the embodiment of the present invention;
[0053] Fig. 9 Schematic diagram of radar ground penetration monitoring operation in a construction site experimental model according to an embodiment of the present invention;
[0054] Fig.10is a schematic diagram of a radar interpretation profile of the survey line L1 in an embodiment of the present invention;
[0055] Fig.11 2 is a schematic diagram of the radar interpretation profile of the survey line L2 in an embodiment of the present invention;
[0056] Fig.12 2 is a schematic diagram of a radar interpretation profile of the survey line L3 in an embodiment of the present invention;
[0057] Fig.13 2 is a schematic diagram of a radar interpretation profile of the survey line L4 in an embodiment of the present invention;
[0058] Fig.14 2 is a schematic diagram of a radar interpretation profile of the survey line L5 in an embodiment of the present invention;
[0059] Fig.15 2 is a schematic diagram of a radar interpretation profile of the survey line L6 in an embodiment of the present invention;
[0060] Fig.16 is a schematic diagram of a radar interpretation profile of a survey line S1 in an embodiment of the present invention;
[0061] Fig.17 2 is a schematic diagram of a radar interpretation profile of the survey line S2 in an embodiment of the present invention;
[0062] Fig.18 2 is a schematic diagram of a radar interpretation profile of a survey line S3 in an embodiment of the present invention;
[0063] Fig.19 is a schematic diagram of a radar interpretation profile of survey line S4 in an embodiment of the present invention;
[0064] Fig. 20 2 is a schematic diagram of a radar interpretation profile of a survey line S5 in an embodiment of the present invention;
[0065] Fig.21 This is a schematic cross-sectional diagram of the measurement line L1 without removing the direct wave according to an embodiment of the present invention;
[0066] Fig. 22 2 is a schematic cross-sectional diagram of the measurement line L1 after removing the direct wave according to an embodiment of the present invention;
[0067] Fig.23 is a schematic diagram of power spectrum analysis in an embodiment of the present invention;
[0068] Fig.24 is a schematic diagram of frequency point segmentation in an embodiment of the present invention;
[0069] Fig.25 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the lateral line L1 according to an embodiment of the present invention;
[0070] Fig.26is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line L2 in an embodiment of the present invention;
[0071] Fig. 27 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line L3 in an embodiment of the present invention;
[0072] Fig.28 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line L4 according to an embodiment of the present invention;
[0073] Fig.29 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the lateral line L5 according to an embodiment of the present invention;
[0074] Fig.30 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the lateral line L6 according to an embodiment of the present invention;
[0075] Fig.31 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line S1 according to an embodiment of the present invention;
[0076] Fig.32 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line S2 according to an embodiment of the present invention;
[0077] Fig.33 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line S3 according to an embodiment of the present invention;
[0078] Fig.34 is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line S4 according to an embodiment of the present invention;
[0079] Fig.35 It is a schematic cross-sectional diagram of water content and relative dielectric constant after inversion of the side line S5 according to an embodiment of the present invention.
[0080] In the figure:
[0081] 1. Main body of geological experiment model; 11. Model cover; 12. Model side baffle; 2. Experimental pipeline; 21. Leakage hole; 22. Sealing clamp device; 221. Sealing clamp shell; 222. Bolt; 223. Nut; 224. Sealing rubber skin; 3. Connecting pipeline; 31. Valve a; 32. Tee; 33. Valve b; 34. Pressure gauge; 35. Pressure pump; 36. Fluid meter; 37. Recharge fluid tank; 4. Ground penetrating radar; 5. Backflow fluid leakage device; 6. Cross-section of soil profile. DETAILED DESCRIPTION
[0082] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0083] In the following embodiments, the data source of shale gas flowback fluid and its leakage (including normal working conditions and abnormal working conditions) is the time series correlation data set obtained by the site experimental model or the actual measurement at the mining site, including the measured environmental concentration (MEC) of characteristic pollutants in environmental samples (soil, surface water, groundwater, solid waste and biological samples) through experimental analysis. The analysis and testing of characteristic pollutants in different media should comply with their relevant analysis and testing standards or technical specifications (such as HJ / T166, HJ164, HJ630, HJ1067, etc.).
[0084] Example 1
[0085] See attached Figures 1 to 9 The adaptive intelligent monitoring method for shale gas flowback fluid leakage pollution provided in this embodiment can automatically identify normal working conditions and abnormal working conditions, and under abnormal working conditions, can further identify leakage types and leakage stages, predict the flowback fluid leakage pollution process, etc., and provide data support for accident prevention and scientific disposal, which includes the following steps:
[0086] S1. Setting up an adaptive intelligent monitoring system
[0087] An adaptive intelligent monitoring system for shale gas flowback fluid leakage pollution is provided, which is composed of a cloud server, a management terminal and one or more mobile and deployable on-site monitoring hardware and software units;
[0088] Specifically, it may include multiple movably deployed on-site monitoring software and hardware units set up at different construction sites, or multiple movably deployed on-site monitoring software and hardware units set up at one construction site, all of which are connected to the cloud server via a network;
[0089] Among them, the on-site monitoring software and hardware unit is used to collect real-time monitoring data related to shale gas flowback fluid leakage pollution generated at the monitored construction site;
[0090] The cloud server is equipped with a field monitoring control unit and an AI monitoring and analysis unit;
[0091] The field monitoring control unit is used to control the operation of the field monitoring software and hardware unit, receive the real-time monitoring data uploaded by the field monitoring software and hardware unit, and perform data preprocessing;
[0092] The AI monitoring and analysis unit has a built-in AI model based on deep learning and a leakage pollution accident diffusion prediction and early warning model, which is used to analyze and process the data preprocessed by the on-site monitoring control unit, and output the monitoring results according to the safety threshold preset by the leakage pollution accident diffusion prediction and early warning model;
[0093] The management terminal is used to input data and instructions to the cloud server or display the monitoring results output by the cloud server;
[0094] Each mobile field monitoring hardware and software unit includes the following interconnected components: front-end computer, multiple sets of sensors, detection radar, monitoring line, network communication equipment; the network communication equipment is used to communicate with the cloud server;
[0095] The on-site monitoring control unit performs data preprocessing and feature engineering analysis on the received real-time monitoring data in time series, and outputs formatted data for deep learning and data analysis of AI models;
[0096] The feature engineering analysis is to select features related to the occurrence and degree of seepage pollution based on the characteristics of shale gas flowback leakage pollution; through feature engineering analysis, the preprocessed data is converted into representative leakage pollution features to facilitate AI model learning and analysis. Leakage pollution characteristics include chemical composition, physical properties, environmental factors, such as water quality parameters, soil physical and chemical properties, groundwater level, etc. To extract features related to the occurrence and degree of seepage pollution, principal component analysis (PCA), factor analysis and other methods can be used to reduce the dimension, extract key features and then perform feature engineering analysis.
[0097] The AI model based on deep learning is an AI algorithm set constructed with deep learning algorithm as the basic architecture according to the characteristics of shale gas return fluid leakage pollution monitoring, including multiple AI algorithm models, and the system autonomously selects one of the algorithm models according to the sensor data of the site to be detected; the optional AI algorithm set includes: machine learning algorithm, deep learning algorithm, spatiotemporal analysis algorithm, convolutional neural network, random forest, logistic regression, linear regression, integrated learning methods (such as Bagging, Boosting, etc.), generative adversarial network, etc.
[0098] S2. Collect real-time monitoring data of shale gas flowback leakage pollution
[0099] Deploy the mobile field monitoring software and hardware unit to the pre-set construction site experimental model of shale gas flowback fluid leakage pollution; conduct multiple experiments through the construction site experimental model of shale gas flowback fluid leakage pollution, respectively simulating shale gas flowback fluid leakage pollution accidents under various working conditions (each experiment simulates one working condition), and the field monitoring software and hardware unit collects the real-time monitoring data of the continuous changes caused by the shale gas flowback fluid leakage pollution, and uploads it to the field monitoring control unit;
[0100] For details on the structural composition of the site experimental model, construction simulation of changing media and other working conditions, wiring, backflow fluid used and detection methods, please refer to Figures 2 to 9 , step S2 specifically includes the following steps:
[0101] S2-1: A site experimental model for shale gas flowback leakage pollution is pre-set to simulate various different working conditions of shale gas fracturing production sites, including: the regional scene of the drilling and production site, geological landforms, geological conditions, soil characteristics, drilling fluid composition, drilling engineering parameters, underground environmental parameters, ground environmental parameters, physical and chemical properties of flowback fluid, etc.
[0102] S2-2: Deploy the mobile field monitoring hardware and software units to the pre-set shale gas flowback fluid leakage pollution site experimental model;
[0103] The construction site experimental model is a construction site experimental model for fracturing flowback fluid simulation, which is composed of a geological experimental model body 1, a pressure gauge 34, a pressure pump 35, a fluid meter 36, a valve, and a replenishment fluid tank 37 connected by a connecting pipeline 3; wherein the valves include: valve a31, valve b33;
[0104] Set the sensors, monitoring lines, and detection radars of the on-site monitoring hardware and software units into the construction site experimental model, and turn on the front-end computer and network communication equipment;
[0105] S2-3: Make the construction site experimental model change various working conditions to conduct experiments multiple times, each experiment simulates a shale gas flowback fluid leakage pollution accident under a working condition, and under various experimental conditions, the ground penetrating radar 4, monitoring line and sensor of the on-site monitoring hardware and software unit monitor the diffusion range and diffusion speed of soil pollution, and collect real-time monitoring data of continuous changes generated by various monitoring objects, including: soil structure, rock distribution, effective monitoring area, environmental parameters, physical and chemical properties of flowback fluid, leakage flow, leakage start and end time, diffusion range, diffusion speed, etc.; multiple experiments can obtain real-time monitoring data of continuous changes generated by monitoring objects under various working conditions;
[0106] S2-4: The ground penetrating radar 4 and the sensor upload and store the collected real-time monitoring data in the front-end computer. After the front-end computer verifies the data and packages it, it is uploaded to the field monitoring control unit of the cloud server by the network communication device to ensure the integrity and accuracy of the uploaded data;
[0107] S2-5: The on-site monitoring control unit preprocesses the received real-time monitoring data, including data cleaning, missing value processing, noise and duplicate data, and outlier processing, and then processes the data for normalization or standardization. Data preprocessing can ensure that the numerical range of different features is consistent and eliminate the impact of data dimension on model training. Data preprocessing can improve the quality of output data and prepare for subsequent AI model training and other modeling.
[0108] S3. Train to obtain an adaptive intelligent monitoring and analysis AI model
[0109] Construct an AI model based on deep learning, use the real-time monitoring data related to shale gas flowback leakage pollution to train the AI model, and obtain an adaptive intelligent monitoring and analysis AI model after multiple trainings; enable the AI model to automatically identify and analyze the shale gas flowback leakage pollution data at the site to be monitored, and adaptively analyze various construction conditions and working conditions to provide targeted technical basis for handling leakage pollution accidents of different types and degrees; specifically include the following steps:
[0110] S3-1: Building AI models based on deep learning
[0111] According to the different working conditions during the leakage and pollution of shale gas flowback fluid, feature engineering data with discrimination is extracted and used as the basis for selecting the algorithm. Then, based on the extracted feature engineering data and taking the deep learning algorithm as the basic framework, a set of multiple independently running AI algorithms is constructed. During the monitoring process, the adaptive intelligent monitoring system selects and matches the AI algorithm with the best analysis result according to the monitoring parameter settings as the AI model for on-site monitoring of the construction site.
[0112] S3-2: Data Division
[0113] Collect and pre-process the real-time monitoring data of shale gas flowback leakage pollution and the data calculated by the interpretation software, divide the data, and divide the pre-processed data into training set, verification set and test set as the format data for deep learning.
[0114] S3-3: AI model training
[0115] The training set data is imported into the AI model for intensive training, and the parameters of the AI model are adjusted during the training process. Through the deep learning algorithm, the AI model adaptively defines and identifies the specific working conditions and corresponding parameters that cause leakage; the model performance is evaluated during the training, and the AI algorithm set with the best analysis results is selected; after multiple trainings, an AI model with adaptive intelligent monitoring and analysis results that can automatically select the closest working conditions, the best data interpretation algorithm and the data noise reduction algorithm to obtain the best analysis results is obtained;
[0116] S3-4: AI Model Validation
[0117] Import the validation set into the AI model to perform AI model validation and hyperparameter adjustment. Verify and correct the monitoring results output by the AI model through actual measurement, and adjust the model's hyperparameters based on the performance of the validation set to obtain better generalization capabilities.
[0118] S3-5: AI Model Evaluation
[0119] Import the test set data into the AI model to evaluate the generalization ability of the AI model;
[0120] S3-6: AI model optimization
[0121] According to the verification results of the AI model, the AI model is optimized, including adjusting the AI model structure, improving the feature selection method, and adjusting the training parameters to improve the adaptive processing capability of the AI model and the calculation accuracy of the analysis results, and finally an adaptive intelligent monitoring and analysis AI model is obtained.
[0122] Under normal working conditions, the characteristics of pollutants generated by drilling projects are long-term and cumulative; under accident conditions, the characteristics of pollutants generated by drilling projects are sudden and high-load. Therefore, considering the changes in working conditions, the following means can be used to improve the adaptive processing capabilities of AI models: one method is to use online learning or incremental learning technology to enable the model to adapt to new working conditions; another method is to introduce transfer learning to migrate the model trained under one working condition to other working conditions.
[0123] S4. Construct a leakage pollution accident diffusion prediction and early warning model, including:
[0124] S4-1: Constructing a prediction and early warning model for the spread of leakage pollution accidents
[0125] Based on the effective medium model formula 1, a leakage pollution accident diffusion prediction and early warning model is constructed. Under the condition of uniform relative dielectric constant model medium, the upper and lower limits of the effective dielectric constant of the multiphase mixed medium are determined:
[0126] Formula 1
[0127] In formula 1:
[0128] ε is the dielectric constant. The average dielectric constant of sand and mud soils ranges from 7 to 9, and the average dielectric constant of flowback fluid is 18.
[0129] ε 1 is the relative dielectric constant of the background medium; ε 2 is the relative dielectric constant of the added medium; f 1 is the volume proportion of the background medium in the mixed medium, f 2 is the volume ratio of the added medium in the mixed medium;
[0130] S4-2: Preset safety threshold
[0131] According to the on-site conditions of the area to be monitored, the safety threshold of formula 1 is pre-set, including the leakage range (such as 2m 3 ) and depth (such as 2m). Other safety threshold indicators include chronic toxicity indicators and acute toxicity indicators. Among them, under normal working conditions, the threshold indicators of ecological risk assessment are mainly chronic toxicity indicators (such as NOEC); under accident conditions, the threshold indicators of ecological risk assessment are mainly acute toxicity indicators (such as LC 50 , LD 50 ) is mainly used.
[0132] S4-3: Deployment of prediction and early warning models
[0133] Deploy the constructed leakage pollution accident spread prediction and early warning model into the AI monitoring and analysis unit;
[0134] S5. Implement adaptive intelligent monitoring on the construction sites to be monitored
[0135] The trained adaptive intelligent monitoring and analysis AI model is deployed to the AI monitoring and analysis unit of the cloud server, and the field monitoring software and hardware unit is deployed to the actual operation site to be monitored, and the monitoring area is delineated; after the adaptive intelligent monitoring system is started, the field monitoring software and hardware unit collects the real-time monitoring data related to the leakage pollution of shale gas return fluid at the site and uploads it to the cloud server. After the adaptive intelligent monitoring and analysis AI model is calculated, the real-time monitoring data is output to the leakage pollution accident diffusion prediction and early warning model. The leakage pollution accident diffusion prediction and early warning model calculates and compares the preset safety threshold and then outputs the monitoring result: it keeps silent operation when the preset safety threshold is not exceeded, and sends an alarm signal when the real-time monitoring data exceeds the preset safety threshold to determine whether a leakage pollution accident has occurred; if a leakage accident has occurred, the subsequent diffusion area and speed of the leakage pollution are further predicted; specifically, the following steps are included:
[0136] S5-1: Deploy the trained adaptive intelligent monitoring and analysis AI model and the constructed leakage pollution accident diffusion prediction and early warning model to the AI monitoring and analysis unit of the cloud server;
[0137] S5-2: Deploy the mobile field monitoring software and hardware units to the actual operation sites to be monitored, and to one or more sites to be monitored where shale gas flowback fluid leakage pollution is present; deploy sensors, detection radars, and monitoring lines within the designated areas to be monitored;
[0138] S5-3: Real-time monitoring data analysis
[0139] The adaptive intelligent monitoring system is activated, with various sensors collecting data and using detection radar to conduct ground exploration operations;
[0140] Under the coordination of the on-site monitoring control unit, each on-site monitoring software and hardware unit collects the measured data related to the leakage pollution of shale gas flowback fluid at the site and uploads it to the cloud server;
[0141] The adaptive intelligent monitoring and analysis AI model automatically analyzes the data collected by the sensor, interprets the detection radar profile data obtained by real-time monitoring, and automatically matches the closest working conditions;
[0142] The adaptive intelligent monitoring and analysis AI model interprets the detection radar profile data obtained from real-time monitoring, removes the direct wave, and determines the water content to obtain the real-time monitoring data collected by the detection radar. The energy proportion of the high- and low-frequency power spectrum envelopes is calculated by the following formula 2, that is, the volume water content of the medium is calculated:
[0143] Formula 2
[0144] Where: θυ represents the volumetric water content, K β Represents the regulation system, C 0 represents the frequency division point, p(f) Represents the spectrum before the frequency division point, F represents the total spectrum of the radar signal, df Represents the spectrum of the radar time domain signal after Fourier transform;
[0145] S5-4: Substitute the volume moisture content data of the medium obtained by radar sensing into the risk warning model of Formula 1, perform moisture content and relative dielectric constant inversion, and obtain leakage range and depth data;
[0146] S5-5: The adaptive intelligent monitoring and analysis AI model outputs the monitoring results after calculation and comparison of the preset safety thresholds: compare the leakage range and depth data to see if they reach the set safety thresholds. If they do, an alarm message will be issued, and the potential pollution diffusion area and speed at the leakage site will be further predicted for manual intervention. If the safety threshold is not reached, the model will remain silent.
[0147] Among them, the step S5-2 specifically comprises deploying multiple movably deployable field monitoring software and hardware units to different monitored areas of a construction site to be monitored in actual operation, and having multiple field monitoring software and hardware units monitor the same construction site to be monitored; or deploying multiple movably deployable field monitoring software and hardware units to different monitored areas of multiple construction sites to be monitored in actual operation, respectively, to synchronously monitor multiple construction sites to be monitored with shale gas return fluid leakage pollution, and applying the acquired time series data to the construction, training, evaluation, verification and optimization of the AI model.
[0148] S6. Iteration and update of adaptive intelligent monitoring and analysis AI model
[0149] Regularly import new real-time monitoring data to train AI models, update and iterate the adaptive intelligent monitoring and analysis AI models, evaluate, verify and optimize the performance of the adaptive intelligent monitoring and analysis AI models, and improve the accuracy and reliability of the adaptive intelligent monitoring and analysis AI models; regularly continue to train and improve AI models based on new data accumulation and environmental changes to adapt to new on-site conditions and meet the ever-changing real-time monitoring needs under various actual mining and production conditions.
[0150] See attached Figure 1 The adaptive intelligent monitoring system for shale gas flowback fluid leakage pollution provided in this embodiment is used to implement the aforementioned adaptive intelligent monitoring method, which includes a cloud server, a management terminal and at least one mobile field monitoring hardware and software unit interconnected and communicating through a network;
[0151] Among them, the on-site monitoring software and hardware unit is used to collect real-time monitoring data related to shale gas flowback fluid leakage pollution generated at the monitored construction site;
[0152] The cloud server is equipped with a field monitoring control unit and an AI monitoring and analysis unit;
[0153] The field monitoring control unit is used to control the operation of the field monitoring software and hardware unit, receive the real-time monitoring data uploaded by the field monitoring software and hardware unit, and perform data preprocessing;
[0154] Each mobile and deployable on-site monitoring hardware and software unit includes the following interconnected components: front-end computer, multiple sets of sensors, detection radar, and monitoring lines;
[0155] The AI monitoring and analysis unit is equipped with a deep learning-based AI model and a leakage pollution accident diffusion prediction and early warning model, which is used to analyze and process the data preprocessed by the on-site monitoring control unit, and output the monitoring results according to the preset leakage pollution accident risk early warning safety threshold;
[0156] The management terminal is used to input data and instructions to the cloud server or display the monitoring results output by the cloud server.
[0157] The adaptive intelligent monitoring system for shale gas flowback leakage pollution also includes a construction site experimental model, see attached Figures 2 to 3 The construction site experimental model is composed of a geological experimental model body 1, backflow fluid, a backflow fluid leakage device 5, a sealing clamp device 22, a connecting pipeline 3, a pressure gauge 34, a pressure pump 35, a fluid meter 36, a valve a31, a valve b33, a ground penetrating radar 4, a sensor and a replenishment fluid pool 37. The geological experimental model body 1, the replenishment fluid pool 37, the backflow fluid leakage device 5 and the sealing clamp device 22 are connected to each other through the connecting pipeline 3. The pressure gauge 34, the fluid meter 36, the valve a31, and the valve b33 are all arranged at different positions of the connecting pipeline 3; the pressure pump 35 pressurizes the backflow fluid in the replenishment fluid pool 37, and then penetrates into the medium of the geological experimental model body 1 through the backflow fluid leakage device 5, and the ground penetrating radar 4 and the sensor sense the real-time data of the leakage range, speed and depth of the backflow fluid in the medium.
[0158] The method of laying out the measurement line in the construction site experimental model is as follows: Figure 7 As shown, taking the geometric center point of the model as the reference, detection lines are arranged in the length and width directions of the model at intervals of 1 meter. Seven detection lines are arranged perpendicular to the long side of the model, namely L1-L7, and five detection lines are arranged perpendicular to the wide side of the model, namely S1-S5.
[0159] The working steps of the construction site experimental model are as follows:
[0160] (1) According to the various working conditions of the construction site to be simulated, the simulated working conditions corresponding to the construction site experimental model are designed; and according to the various working conditions, different geological elements such as soil media, rocks, sand, etc. are replaced, and climate environmental elements such as temperature and humidity are adjusted;
[0161] (2) Use sealing clamps to set the required test leakage depth on the leaking pipe device;
[0162] (3) placing the leaking pipe with the designed leakage depth at the center of the three-dimensional model frame and connecting it to the tee 32 below the center of the model;
[0163] (4) Fill the 8*6*2m three-dimensional model frame with soil medium and cover it;
[0164] (5) Using the ground penetrating radar 4 to perform global detection on the surface of the 8*6m model cover 11, collect corresponding radar data as a blank comparison;
[0165] (6) The replenishment fluid pool 37 is filled with the fracturing flowback fluid required for the experiment;
[0166] (7) Close valve a31, open valve b33, turn on pressure pump 35, use valve b33 to switch the size, observe the pointer of pressure gauge 34, and obtain the test working conditions under certain pressure (0.1Mpa, 0.2Mpa, 0.3Mpa, 0.4Mpa, 0.5Mpa);
[0167] (8) When conducting a flowback test under certain pressure conditions, observe the fluid meter 36 and use valve b33 to obtain test data on the leakage and soil contamination of the flowback under the pressure conditions;
[0168] (9) Under stable pressure conditions, use ground penetrating radar 4 to conduct real-time dynamic monitoring of the test device at a rate of 10 min / time, collect corresponding radar data and corresponding fluid measurement, and stop radar detection until the end of the test;
[0169] (10) After a single test, analyze soil contamination and conduct cleanup;
[0170] (11) According to the various working conditions of the simulated object, change the working conditions, repeat the above steps (2) to (10), conduct multiple experiments, and record and analyze the real-time monitoring data sets obtained from each experiment; simulate various working conditions at the construction site to conduct experiments, obtain a large number of real-time monitoring data sets of the soil pollution process and leakage range of the fracturing return fluid accident leakage, and import them into the database after preprocessing to provide sufficient data support for AI model construction and training.
[0171] After each single simulation experiment is completed, the data obtained from the experiment is analyzed and processed respectively.
[0172] Data analysis includes: interpreting the detection radar profile, removing the direct wave, determining the water content, and obtaining the sensor data; if the interpreted profile diagram output effect is normal, the processing result can be output, and then the profile stratification status information can be interpreted from the result. The displayed result is as follows: Figure 4 Then calculate the energy ratio of high-frequency and low-frequency power spectrum envelopes, calculate the volume moisture content of the medium and other data, and finally import these data into the leakage pollution accident diffusion prediction and early warning model, and output the corresponding real-time monitoring results after calculation.
[0173] Example 2
[0174] After the fracturing test is completed, shale gas mining units usually enter the production operation stage. During this process, shale gas wells will continuously return produced water (i.e., return fluid). This return fluid usually contains formation water and fluid injected during the hydraulic fracturing process, and may contain high concentrations of salt, organic compounds, radioactive substances and heavy metals.
[0175] See attached Figures 10 to 35 The adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution provided in this embodiment is based on the embodiment 1, and specifically performs adaptive intelligent monitoring of flowback fluid leakage pollution at a shale gas mining construction site (well site) in the production and operation stage in the southwest of a city. The difference from the embodiment 1 is that a set of mobile field monitoring software and hardware units are deployed in a shale gas mining construction site and the detection area surrounding the well site to perform real-time adaptive intelligent monitoring of shale gas flowback fluid leakage pollution. The composition and wiring method of the field monitoring software and hardware units are the same as those in the embodiment 1.
[0176] This embodiment first simulates the geological conditions such as the rock and soil structure of the site, the working conditions such as the fracturing fluid, the return fluid, and the fracturing process through the construction site experimental model, and artificially creates shale gas return fluid leakage pollution accidents (abnormal working conditions) under various natural environmental conditions, including the measured experimental data (real-time monitoring data) under natural climatic conditions such as spring, summer, autumn, winter, cloudy, rainy, snowy, and sunny. The measured experimental monitoring data collected through the experiment include: shale gas fracturing mining scenes, geological conditions, drilling fluid composition, drilling engineering parameters, environmental parameters (including: underground environmental monitoring data, ground environmental monitoring data), working conditions, return fluid properties, real-time data of the monitoring area, meteorological data, geological and geomorphological data, etc.
[0177] The known data sources of the experimental model monitoring data include the measured site experimental model, field monitoring, other simulation experiments or literature reports, etc. The environmental parameters in the experimental model monitoring data include temperature, pressure, soil type, flow rate, composition, pH value of the backflow fluid, and leakage pollution data such as pollutant concentration and leakage range; the measured site experimental model adjusts the experimental model monitoring data to obtain sub-experimental models under different environmental parameters, and compares the main measured site experimental model data to ensure the integrity and accuracy of the data.
[0178] The construction site experimental model in this embodiment needs to obtain monitoring data from a site that simulates the southwest mountains of my country; first, experimental data under various working conditions under climatic conditions such as spring, summer, autumn and winter, rainy, snowy and sunny in the southwest mountainous area are collected. In actual experiments, it is found that temperature changes have a great impact on monitoring data, so it is particularly important to collect monitoring data under different ambient temperatures. Therefore, by conducting multiple simulation experiments on the construction site experimental model for a variety of working conditions, divided into time periods, seasons, and different temperature ranges, multiple experiments and monitoring data are collected to ensure that the sample data is sufficient to meet the needs of evaluating the performance of the model and training the model to have many parameters and accident level judgments for predicting the degree of leakage pollution. During the experiment, the field monitoring hardware and software unit collects the actual monitoring data of shale gas flowback fluid leakage pollution under various working conditions, and uploads it to the field monitoring control unit; the various types of data collected on shale gas flowback fluid leakage pollution are processed into actual time series and synchronously associated data sets to meet the needs of building and training AI models.
[0179] The main purpose of data preprocessing is to remove outliers, handle missing values, convert data types, etc. When preprocessing the collected time series data, it specifically includes data cleaning, missing value processing, noise and duplicate data, outlier processing, etc. Data preprocessing also includes data normalization or standardization to ensure that the numerical range of different features is consistent and eliminate the impact of data dimension on model training; only by outputting high-quality data after data preprocessing can it provide support for subsequent AI modeling and model training.
[0180] Feature engineering analysis of the data is to select features related to the occurrence and degree of seepage pollution based on the characteristics of shale gas flowback fluid leakage pollution; through feature engineering analysis, the data after data preprocessing in step S22 is converted into representative leakage pollution features to facilitate AI model processing. Leakage pollution characteristics include chemical composition, physical properties, environmental factors, etc., such as water quality parameters, soil physical and chemical properties, and groundwater level. To extract features related to the occurrence and degree of seepage pollution, principal component analysis (PCA), factor analysis and other methods can be used to reduce the dimension, first extract key features, and then perform feature engineering analysis.
[0181] Then, an adaptive intelligent monitoring and analysis AI model is constructed, trained, verified, and optimized to process the shale gas flowback fluid leakage pollution data obtained during actual on-site monitoring, and provide processing data for leakage accident data analysis, prediction and early warning. First, the definition and identification of the adaptive intelligent monitoring and analysis AI model is carried out. Through the definition and identification of the AI model, specific working conditions that may cause leakage are identified, and the parameters and levels of leakage pollution are predicted. Then, the experimental model monitoring data obtained after preprocessing (which has been converted into a data format that can be used for deep learning) are imported into the constructed AI model respectively. Through the deep learning algorithm, the interpretation software calculation data and real-time monitoring data are trained. The AI model automatically selects the closest working conditions, the optimal data interpretation algorithm and the data noise reduction algorithm. After multiple rounds of training and screening, the pre-trained AI model with the best results is obtained as the adaptive intelligent monitoring and analysis AI model. When defining the AI model objectives and performance evaluation criteria, the factors considered include whether the specific working conditions that may cause leakage can be accurately identified based on the leakage pollution data collected in the experiment. The working conditions include the temperature of the site, the atmospheric pressure, the different soil types selected, the flow rate, composition, pH value of the experimental return fluid, etc. The leakage pollution data collected in the experiment include pollutant concentration, leakage range, leakage speed, leakage depth, etc.
[0182] In the process of building an adaptive intelligent monitoring and analysis AI model, a suitable artificial intelligence algorithm is selected to build the AI model based on the extracted operating characteristic data. First, for different operating conditions, distinguishing features are extracted and used as the basis for selecting the algorithm, and then a suitable artificial intelligence algorithm is selected to build the model; in this process, a suitable AI algorithm set can be built in advance based on the characteristics of shale gas flowback leakage pollution monitoring, with deep learning algorithm as the basic framework; the system selects the deep learning algorithm as the basic framework, and trains the selected deep learning framework model, conducts model performance evaluation during training, and selects the optimal model basic framework and AI algorithm set.
[0183] In this embodiment, the optional AI algorithm set includes: machine learning algorithm, deep learning algorithm, spatiotemporal analysis algorithm, convolutional neural network, random forest, logistic regression, linear regression, integrated learning method (such as Bagging, Boosting, etc.), generative adversarial network, etc.; in the specific model construction process, the system traverses multiple algorithms, compares their performance, and selects the optimal algorithm by itself; considering the adaptability and nonlinear processing capabilities, this embodiment uses deep learning algorithm (such as neural network) as the basic architecture; further selects a suitable deep learning architecture model, such as deep neural network (DNN), convolutional neural network (CNN), recurrent neural network (RNN), long short-term memory network (LSTM), etc., and customizes the model architecture according to specific monitoring needs, adds or reduces the number of layers, adjusts the activation function, etc.; uses the preprocessed data to train the model and optimizes the model parameters. During the training process, methods such as cross-validation (CV) can also be used to evaluate the model performance and select the optimal model basic architecture and AI algorithm set.
[0184] The steps of AI model training and verification include data segmentation, dividing the preprocessed data into training set, verification set and test set, and adjusting the parameters of the model during the training process to obtain the best performance; the training set is used for model training, the verification set is used for model verification and hyperparameter adjustment, and the test set is used for final model evaluation; then the experimental results are verified and corrected according to and through actual measurements, and the data processing method is optimized to obtain adaptive shale gas return fluid leakage pollution monitoring software and modular general monitoring hardware; third, when constructing the risk warning model (relative dielectric constant model) and computer network system, the threshold of risk warning is first set (the threshold of each site can be selected according to the actual situation, the penetration depth is generally set to 0.5~2m, and the penetration range is generally set to 1~2m 3 ); During the training process, the hyperparameters of the model are adjusted according to the performance of the validation set to obtain better generalization ability; after the training is completed, the model is verified using the test set to evaluate the generalization ability of the model.
[0185] During the AI model training process, a deep learning algorithm is used to train the model of the interpretation software calculation data and real-time monitoring data, and the closest working condition, the optimal data interpretation algorithm and the data noise reduction algorithm are automatically selected to obtain the adaptive intelligent monitoring and analysis model with the best results. The basic structure of the CNN convolution model adopted in this embodiment includes an input layer, a convolution layer, a pooling layer, a fully connected layer and an output layer. Unlike the traditional network that uses matrix multiplication, the CNN convolution model introduces a convolution operation to establish the relationship between input and output. Through sparse connections, weight sharing and translation invariance, the CNN convolution model greatly reduces the amount of data required for training, and has the advantage of requiring less total data for training.
[0186] The CNN convolution model used in this embodiment includes a combination of two convolutional layers and a pooling layer and two fully connected layers; the functions of each layer are as follows: the first and second convolutional layers: extract image features; the first and second pooling layers: reduce the size of the feature map while retaining important information; Dropout layer: prevent overfitting; Flatten layer: convert multi-dimensional data into one-dimensional data to prepare for the fully connected layer; fully connected layer: perform classification.
[0187] The steps of AI model evaluation are: use the test set to evaluate model performance, use the test set to evaluate and verify the trained model, and the evaluation indicators include conventional performance indicators (accuracy, recall, F1 score), etc., as well as other metrics such as mean square error (MSE) or root mean square error (RMSE), etc. After the AI model evaluation is passed, the preprocessed data is further used to deeply train the model, optimize the model parameters, and use cross-validation and other methods to evaluate the model performance, verify the final performance of the adaptive intelligent monitoring and analysis model, give the model's performance on unseen data, and measure the model's generalization ability.
[0188] AI model optimization is to carry out targeted optimization of the AI model based on the verification results of the model, including adjusting the model structure, improving the feature selection method, adjusting the training parameters, etc.; the goal of optimization is to improve the prediction accuracy of the model; if the model performance is poor, the model structure, optimization algorithm or feature engineering can be adjusted to optimize the model; according to the evaluation results, the model architecture or hyperparameters can be adjusted.
[0189] To improve the adaptive processing capability of the AI model, online learning or incremental learning technology can be used according to the changes in abnormal working conditions at different construction sites, so that the AI model can automatically adapt to new abnormal working conditions; or the transfer learning technology can be introduced to migrate the model trained under one abnormal working condition to other similar abnormal working conditions, which can improve the adaptive ability of the AI model; in order to further optimize the AI model, during the training process, the predefined loss function can be minimized by adjusting the network weights and biases; multiple iterations can be performed until the model performance reaches a satisfactory level or no longer improves significantly, so as to improve the prediction accuracy of the model.
[0190] In this embodiment, the trained adaptive intelligent monitoring and analysis AI model, as well as related software and hardware, are deployed to the actual construction site to be monitored. The basic steps are the same as those in Example 1. The deployed parts together constitute an adaptive intelligent monitoring system, which implements real-time monitoring of the construction site and performs predictions and warnings according to preset safety thresholds.
[0191] In this embodiment, various parts of the system are supported by a variety of connection and communication methods that combine local network wired connections and Internet remote wireless connections. The on-site deployed detection hardware modules and the adaptive intelligent monitoring and analysis models work together to implement actual monitoring of the mining site and provide real-time and accurate monitoring results. The ground penetrating radar, wiring method, etc. used in this embodiment are the same as those in Example 1.
[0192] The leakage pollution accident diffusion prediction and early warning model constructed in this embodiment is based on the relative dielectric constant model and combined with the AI model to jointly construct the leakage pollution accident diffusion prediction and early warning model, and pre-set the safety threshold for triggering the early warning.
[0193] This embodiment is based on the effective medium model formula 1 to build a leakage pollution accident diffusion prediction and early warning model. Under the condition of uniform model medium, the upper and lower limits of the effective dielectric constant of the multiphase mixed medium are determined, specifically:
[0194] Formula 1
[0195] In this embodiment, referring to sand and mud soil, the average dielectric constant range is determined to be 7-9, and the average dielectric constant of the flowback fluid is 18; ε 1 is the relative dielectric constant of the background medium; ε 2 is the relative dielectric constant of the added medium; f is the volume percentage of the substance, f 1 is the volume proportion of the background medium in the mixed medium, f 2 is the volume ratio of the added medium in the mixed medium;
[0196] This embodiment sets three geoelectric models for different soil types: ① sandy soil, ② sandy muddy soil, and ③ muddy soil. The dielectric constant of the flowback fluid infiltration area is 16;
[0197] The steps of system deployment are to apply the trained AI model to the actual production site of shale gas return fluid leakage pollution for monitoring. The AI model can be deployed according to the actual needs of environmental protection, ecological safety, etc. at the construction site. For example, in the cloud server in the cloud, multiple on-site monitoring devices accessed through the entire Internet can be served synchronously.
[0198] When deploying the on-site monitoring software and hardware units, the following steps are included: first, delineate the area to be monitored on the construction site; then, in the delineated area to be monitored, deploy various sensors (including temperature, humidity, wind force, resistance, capacitance and other sensors or sensor modules), deploy measurement lines, and deploy detection radars; finally, use the detection radar to perform ground exploration operations to obtain monitoring data.
[0199] When leakage of backflow fluid occurs on the surface, when laying out the survey lines, it is necessary to follow the laws of diffusion and penetration of liquid in the soil. Under the influence of factors such as gravity, soil porosity, osmotic pressure and water saturation, an elliptical infiltration area will be formed at the leakage site over time. Therefore, multiple survey lines at different locations and sufficient depth must be laid.
[0200] When using detection radar, first create a new survey area in the management system, then establish the length and width of the survey line data based on the number of survey lines determined in the laid survey lines, and clarify the zero line position.
[0201] Compared with radar signals, the frequency of environmental noise is different from that of radar main frequency signals, and its manifestation in the time domain is more random without specific rules. In data acquisition, this embodiment suppresses environmental noise by increasing the number of superpositions, and uses background denoising, one-dimensional filtering, two-dimensional filtering, wavelet transform and other methods to remove the background noise of radar records during indoor processing, so as to obtain relatively "pure" radar records.
[0202] The specific steps for using detection radar operations are:
[0203] (1) Use detection radar, adjust the antenna main frequency, set the time window parameters and the number of sampling points;
[0204] (2) Create a new survey area in the management system, establish the length and width of the survey line data according to the number of survey lines determined in step (1), and clarify the position of the zero line;
[0205] (3) A mobile panel is laid on the ground to be detected. A one-way traction rope is set on the mobile panel as a carrier of the ground penetrating radar to provide a uniform and safe ground penetrating operation environment for the ground penetrating radar under complex ground conditions;
[0206] The steps for analyzing the collected monitoring data include:
[0207] First, the detection radar profile is interpreted, the direct wave is removed, and the water content is measured to obtain the sensing data; the volume water content of the medium is calculated by calculating the energy ratio of the high- and low-frequency power spectrum envelopes through formula 2:
[0208] Formula 2
[0209] In formula 2: θυ represents the volumetric water content, K β Represents the regulation system, C 0 represents the frequency division point, p(f) Represents the spectrum before the frequency division point, F represents the total spectrum of the radar signal, df Represents the spectrum of the radar time domain signal after Fourier transform.
[0210] In the process of analyzing the detection radar profile interpretation data, the ground penetrating radar raw data usually provides rich soil medium information. The use of raw data inversion can restore the soil moisture distribution characteristics to the greatest extent. For the strong environmental noise and undesirable channel signals contained in the raw data, this embodiment improves the data signal-to-noise ratio by performing data preprocessing such as denoising and bad channel removal on the raw data. There are two ways to process the data: one is to directly remove the interference to extract the effective signal; the other is to extract the interference signal, and then try to phase-invert the extracted interference signal and superimpose it on the original signal to achieve the purpose of denoising. If strong electromagnetic noise is found at the detection site, causing burr interference of the radar signal, affecting the interpretation and inversion of the radar data, further data processing is required.
[0211] The specific steps of interpreting the detection radar profile in this embodiment are:
[0212] (1) Enter the data analysis phase and select the corresponding tool from the analysis module tools;
[0213] (2) Select the analysis tools provided in the analysis tools: amplitude spectrum analysis, power spectrum analysis, phase spectrum analysis, two-dimensional spectrum analysis, and moving average spectrum analysis;
[0214] (3) Determine the parameters that need to be processed, perform data analysis, and then perform data processing; when processing data, you can select the corresponding tools from the processing module. These include the zero line drift removal tool, gain processing tool, one-dimensional filter tool, two-dimensional filter tool, frequency compensation tool, inter-channel balance enhancement tool, wavelet transform tool, deconvolution tool, prediction level filter tool, integral operation tool, etc. in the data processing tool;
[0215] (4) After the data processing is completed, the interpretation effect is previewed first. If the interpreted cross-sectional diagram is misplaced, missing, or other abnormal conditions occur, the data analysis and data processing phase is returned. If the output effect of the interpreted cross-sectional diagram is normal, the processing result can be output, and the cross-sectional layering information can be interpreted from the result, such as in Example 1. Figure 4 shown.
[0216] See also Fig.21 and Fig. 22, remove the direct wave: Since the backflow liquid leaked into the soil changes the water saturation and electrical parameters of the soil, the backflow liquid can be detected based on the detection principle and method of soil moisture content; radar sliding average power spectrum moisture content inversion is an algorithm that establishes a relationship model between radar signal and medium volume moisture content based on the proportion of signal power spectrum energy envelope; the direct wave has the strongest energy in the original signal and does not carry the physical property information of the medium below the surface. It will occupy a large amount of power spectrum energy in the inversion, suppress the power spectrum energy in the deep medium, and cause strong interference to the inversion of the data. Therefore, the removal of direct waves is the basis of moisture content inversion. The main steps of direct wave removal are: reading radar records, single channel data analysis, determining the direct wave time window range, channel data averaging, and direct wave data removal.
[0217] Substitute the above-obtained sensing data into equation 1 to invert the water content and relative dielectric constant to obtain the leakage range and depth data; see Fig.23 , Fig.24 , the power spectrum and amplitude spectrum of radar data with different center frequencies are calculated to obtain radar spectrum data; the moisture content is inverted by establishing a relationship model between different types of soil, backflow infiltration, moisture content, conductivity and other parameters and radar wave spectrum; the basic process of moisture content inversion is: data format conversion, data reading, power spectrum analysis, and data inversion; the volume moisture content of the model is inverted by the ground penetrating radar ARMA spectrum analysis method, which can three-dimensionally display the longitudinal and lateral changes of soil moisture content in the model, see Figure 25 to Figure 35 .
[0218] After the AI model and Formula 1 are used together, the system can automatically determine whether one of the leakage range and depth has reached the preset safety threshold. If one of them is reached, an alarm message will be issued; if neither is reached, the system will continue to operate silently.
[0219] Based on the predicted data and monitoring results of the above AI model, manufacturers or government departments can formulate targeted leakage pollution prevention and control and governance response plans.
[0220] In this embodiment, during the real-time monitoring process of the shale gas production site, the specific operation scheme of the adaptive intelligent monitoring method and system for shale gas flowback leakage pollution at the site is:
[0221] Laying out survey lines: Based on the actual topography of the production site, with the mining point as the center, the detection lines are laid out in the length and width of the area to be monitored at a spacing of 1 meter. Six survey lines are laid perpendicular to the long side of the area to be monitored, namely L1-L6, and five survey lines are laid perpendicular to the wide side of the area to be monitored, namely S1-S5;
[0222] Using detection radar operation: The instrument used for detection is the GR series ground penetrating radar system independently developed by China University of Mining and Technology (Beijing). The antenna main frequency is 300MHz. During the detection process, the time window is set to 300ns and the number of sampling points is set to 2048. A new survey area is created on the system, and the length and width of the survey line data are established according to the number of deployed survey lines to clarify the position of the zero line. Due to the unknown ground conditions, the ground penetrating radar is first placed on the mobile panel, and the technician drags the traction rope to move slowly and at a uniform speed to ensure the detection effect of the ground penetrating radar.
[0223] Data analysis: interpret the detection radar profile, remove the direct wave, and measure the water content to obtain the sensing data; calculate the volume water content of the medium by calculating the energy ratio of the high- and low-frequency power spectrum envelopes through formula 2;
[0224] When interpreting the detection radar profile, first, enter the data analysis link, and select the corresponding tool from the analysis module tool during data analysis. This embodiment selects two-dimensional spectrum analysis to extract the spatial distribution of radar wave signals, and filter out the influence of spatial interference waves through inverse operations. Synchronously, after data analysis, data processing is carried out, and the zero line drift removal tool, frequency compensation tool and inter-channel balance enhancement tool are mainly selected. After the data processing is completed, first preview the interpretation effect. If the interpreted profile diagram has abnormal conditions such as dislocation or missing, return to the data analysis and data processing link. If the output effect of the interpreted profile diagram is normal, the processing result can be output, and the profile stratification status information can be interpreted from the result.
[0225] Direct wave removal: The direct wave removal of each detection data is mainly carried out through inter-channel averaging. The main steps are: first read the radar record, analyze the single-channel data, determine the direct wave time window range, average the channel data, and finally remove the direct wave data. Fig.21 and Fig. 22 This is a comparison diagram of the data profile before and after the direct wave of the side line L1 is removed. Through comparison, it can be found that after the direct wave is removed, the abnormal response caused by the underground electrical parameters is more obvious, and the proportion of effective signals in the power spectrum energy has increased significantly. The key to the inversion of radar moisture content of the radar sliding average power spectrum is to use statistical regression analysis to determine the cutoff frequency of the power spectrum and construct a relationship model between soil moisture content and power spectrum; the volume moisture content of the medium is calculated by calculating the energy proportion of the high- and low-frequency power spectrum envelopes. The power spectrum, amplitude spectrum and other calculations are performed on the radar data with different center frequencies to obtain the radar spectrum data. The moisture content is inverted by establishing a relationship model between parameters such as different types of soil, backflow fluid infiltration, moisture content, conductivity and the radar wave spectrum; the power spectrum and frequency spectrum obtained in this monitoring are as follows: Fig.23 , Fig.24Substituting the obtained data into the water content calculation formula, the water content in the deeper part can be obtained more accurately. The basic process of water content inversion is: data format conversion, data reading, power spectrum analysis, and data inversion. After the water content inversion and dielectric constant inversion of the 11 side line data, the vertical and horizontal changes of the fracturing return fluid in the soil are displayed in three dimensions. The results are shown in Figure 25 to Figure 35 shown.
[0226] Substitute each sensor data into the model of formula 1, perform water content and relative dielectric constant inversion, and obtain the leakage range and depth; determine whether the leakage range and depth reach the set alarm threshold, and issue an alarm message if reached; provide leakage pollution prevention and control and governance response plans for government departments and enterprises based on the model prediction results. This embodiment comprehensively uses technical models such as radar detection, water content measurement and inversion, and dielectric constant inversion. It only needs to input conventional soil parameters (water content, soil texture, infiltration time, etc.) according to the monitoring site conditions to monitor the mining site, and obtain the pollution characteristics (leakage range, depth, etc.) of shale gas return fluid in soil infiltration accidents in real time. When abnormal working conditions occur, it can alarm in real time, and when leakage occurs, it can also predict the further development of leakage, providing data support for management and decision-making work such as ecological environment protection, environmental monitoring prediction and early warning, and emergency disposal.
[0227] The method and system provided by the above-mentioned embodiment of the present invention focus on deploying the trained adaptive intelligent monitoring and analysis AI model on site and applying it to the actual shale gas flowback leakage pollution monitoring data analysis. The system can automatically determine whether leakage has occurred, and can predict the potential diffusion pollution area and speed, pollution hazard degree and other abnormal conditions when leakage has occurred; in the actual operation process of the adaptive intelligent monitoring system, the AI model can monitor the changes in the working conditions on site in real time, and adaptively identify and process new real-time monitoring data, and the system outputs accurate leakage pollution monitoring results. Based on the data monitored or predicted by the system, production enterprises and government departments can better formulate targeted leakage pollution prevention and control and governance response plans.
[0228] In other embodiments, the detection hardware module and the AI adaptive monitoring and analysis model are applied to the monitoring areas and projects that need to be monitored, and flow monitoring or distributed fixed-point monitoring can be selected, and the corresponding monitoring results can be output in real time or at a scheduled time; the optimized model is applied to the actual shale gas return fluid leakage pollution monitoring scenario to evaluate the actual effect of the model; by continuously adjusting and optimizing the model, adaptive shale gas return fluid leakage pollution monitoring is achieved in different mining sites (and under different climatic conditions), and the overall construction and operation of the system is low in cost, high in efficiency, and can cover a large area.
[0229] In summary, the adaptive intelligent monitoring method and system for shale gas flowback fluid leakage pollution provided by the above-mentioned embodiments of the present invention, through the coordinated improvement of software and hardware, modularizes, simplifies and portable designs for the hardware part, introduces a deep learning algorithm for the software part, and conducts model training for different fracturing flowback fluids, soils, rocks and permeability development conditions in different mining operation areas, thereby incorporating various major monitoring elements into the adaptive intelligent monitoring and analysis model. The model automatically matches the closest working conditions, selects the optimal algorithm, and automatically predicts the pollution development according to the various monitoring elements perceived (or input), and quickly gives highly accurate evaluation results and conducts risk warnings, thereby solving various technical problems existing in the prior art.
[0230] It should be noted that in other embodiments of the present invention, other different schemes obtained by making specific selections within the scope of the steps, systems, thresholds, and parameters recorded in the present invention can all achieve the technical effects recorded in the present invention, so the present invention will no longer list them one by one.
[0231] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the above disclosed methods and technical contents without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. All equivalent changes made according to the components, proportions and processes of the present invention should be included in the protection scope of the present invention.
Claims
1. An adaptive intelligent monitoring method for shale gas flowback leakage pollution, characterized in that: The following steps are involved: S1. Setting up an adaptive intelligent monitoring system An adaptive intelligent monitoring system for shale gas flowback fluid leakage pollution is provided, which is composed of a cloud server, a management terminal and at least one mobile field monitoring hardware and software unit; Among them, the on-site monitoring software and hardware unit is used to collect real-time monitoring data related to shale gas flowback fluid leakage pollution generated at the monitored construction site; The cloud server is equipped with a field monitoring control unit and an AI monitoring and analysis unit; The field monitoring control unit is used to control the operation of the field monitoring software and hardware unit, receive the real-time monitoring data uploaded by the field monitoring software and hardware unit, and perform data preprocessing; The AI monitoring and analysis unit has a built-in AI model based on deep learning and a leakage pollution accident diffusion prediction and early warning model, which is used to analyze and process the data preprocessed by the on-site monitoring control unit, and output the monitoring results according to the safety threshold preset by the leakage pollution accident diffusion prediction and early warning model; The management terminal is used to input data and instructions to the cloud server or display the monitoring results output by the cloud server; S2. Collect real-time monitoring data of shale gas flowback leakage pollution Deploy the mobile field monitoring hardware and software units to the pre-set shale gas flowback fluid leakage pollution site experimental model; Through the construction site experimental model of shale gas flowback fluid leakage pollution, shale gas flowback fluid leakage pollution accidents under various working conditions are simulated respectively. The on-site monitoring software and hardware unit collects the real-time monitoring data of the continuous changes caused by the shale gas flowback fluid leakage pollution and uploads it to the on-site monitoring control unit. Specifically, the following steps are included: S2-1: Pre-set the site experimental model of shale gas flowback leakage pollution, and enable it to simulate various different working conditions of shale gas fracturing and mining sites: the regional scene of the drilling and mining site, geological landforms, geological conditions, soil characteristics, drilling fluid composition, drilling engineering parameters, underground environmental parameters, ground environmental parameters, and physical and chemical properties of the flowback fluid; S2-2: Deploy the mobile field monitoring hardware and software units to the pre-set shale gas flowback fluid leakage pollution site experimental model; The construction site experimental model is a construction site experimental model for simulating fracturing return fluid, which is composed of a geological experimental model body, a pressure gauge, a pressure pump, a fluid meter, a valve, and a replenishment fluid tank connected by connecting pipelines; Set the sensors, monitoring lines, and detection radars of the on-site monitoring hardware and software units into the construction site experimental model, and turn on the front-end computer and network communication equipment; S2-3: The construction site experimental model is changed to conduct experiments under various working conditions, simulating shale gas flowback fluid leakage pollution accidents under various working conditions. Under various experimental conditions, the ground penetrating radar, monitoring line and sensor of the on-site monitoring software and hardware unit monitor the diffusion range and diffusion speed of soil pollution, and collect real-time monitoring data of continuous changes generated by various monitoring objects, including: soil structure, rock distribution, effective monitoring area, environmental parameters, physical and chemical properties of flowback fluid, leakage flow, leakage start and end time, diffusion range, and diffusion speed; S2-4: The ground penetrating radar and sensors upload and store the collected real-time monitoring data in the front-end computer. After the front-end computer verifies the data and packages it, it is uploaded to the field monitoring control unit of the cloud server by the network communication device; S2-5: The on-site monitoring control unit pre-processes the received real-time monitoring data, including data cleaning, missing value processing, noise and duplicate data, and outlier processing, and then processes the data for normalization or standardization; S3. Train to obtain an adaptive intelligent monitoring and analysis AI model Construct an AI model based on deep learning, use the real-time monitoring data related to shale gas flowback leakage pollution to train the AI model, and obtain an adaptive intelligent monitoring and analysis AI model after multiple trainings. The specific steps include: S3-1: Building AI models based on deep learning According to the different working conditions during the leakage and pollution of shale gas flowback fluid, feature engineering data with discrimination is extracted and used as the basis for selecting the algorithm. Then, based on the extracted feature engineering data and taking the deep learning algorithm as the basic framework, a set of multiple independently running AI algorithms is constructed. During the monitoring process, the adaptive intelligent monitoring system selects and matches the AI algorithm with the best analysis result according to the monitoring parameter settings as the AI model for on-site monitoring of the construction site. S3-2: Data Division Collect and pre-process the real-time monitoring data of shale gas flowback leakage pollution and the data calculated by the interpretation software, divide the data, and divide the pre-processed data into training set, validation set and test set as the format data for deep learning; S3-3: AI model training The training set data is imported into the AI model for intensive training, and the parameters of the AI model are adjusted during the training process. Through the deep learning algorithm, the AI model adaptively defines and identifies the specific working conditions and corresponding parameters that cause leakage; the model performance is evaluated during the training, and the AI algorithm set with the best analysis results is selected; after multiple trainings, an AI model with adaptive intelligent monitoring and analysis results that can automatically select the closest working conditions, the best data interpretation algorithm and the data noise reduction algorithm to obtain the best analysis results is obtained; S3-4: AI Model Validation Import the validation set into the AI model to perform AI model validation and hyperparameter adjustment. Verify and correct the monitoring results output by the AI model through actual measurement, and adjust the model's hyperparameters based on the performance of the validation set to obtain better generalization capabilities. S3-5: AI Model Evaluation Import the test set data into the AI model to evaluate the generalization ability of the AI model; S3-6: AI model optimization According to the verification results of the AI model, the AI model is optimized, including adjusting the AI model structure, improving the feature selection method, and adjusting the training parameters to improve the adaptive processing capability of the AI model and the calculation accuracy of the analysis results, and finally an adaptive intelligent monitoring and analysis AI model is obtained; S4. Construct a prediction and early warning model for the spread of leakage pollution accidents The effective medium model (Equation 1) is constructed as a leakage pollution accident diffusion prediction and early warning model. Based on the effective medium model, under the condition of uniform relative dielectric constant model medium, the upper and lower limits of the effective dielectric constant of the multiphase mixed medium are determined: Formula 1 In formula 1: ε is the dielectric constant. The average dielectric constant of sand and mud soils ranges from 7 to 9, and the average dielectric constant of flowback fluid is 18. ε 1 is the relative dielectric constant of the background medium; ε 2 is the relative dielectric constant of the added medium; f 1 is the volume proportion of the background medium in the mixed medium, f 2 is the volume ratio of the added medium in the mixed medium; The safety threshold of formula 1 is preset, including at least two safety thresholds of leakage range and depth; Deploy the constructed leakage pollution accident spread prediction and early warning model into the AI monitoring and analysis unit; S5. Implement adaptive intelligent monitoring on the construction sites to be monitored The trained adaptive intelligent monitoring and analysis AI model is deployed to the AI monitoring and analysis unit of the cloud server, and the field monitoring software and hardware unit is deployed to the actual operation site to be monitored, and the monitoring area is demarcated; after the adaptive intelligent monitoring system is started, the field monitoring software and hardware unit collects the real-time monitoring data related to the leakage pollution of shale gas return fluid at the site and uploads it to the cloud server. After the adaptive intelligent monitoring and analysis AI model is calculated, the real-time monitoring data is output to the leakage pollution accident diffusion prediction and early warning model. The leakage pollution accident diffusion prediction and early warning model calculates and compares the preset safety threshold and then outputs the monitoring results: it keeps silent operation when it does not exceed the preset safety threshold, and sends an alarm signal when the real-time monitoring data exceeds the preset safety threshold to determine whether a leakage pollution accident has occurred; if a leakage accident has occurred, the subsequent diffusion area and speed of the leakage pollution are further predicted, which specifically includes the following steps: S5-1: Deploy the trained adaptive intelligent monitoring and analysis AI model and the constructed leakage pollution accident diffusion prediction and early warning model to the AI monitoring and analysis unit of the cloud server; S5-2: Deploy the mobile field monitoring software and hardware units to the actual operation sites to be monitored, and to one or more sites to be monitored where shale gas flowback fluid leakage pollution is present; deploy sensors, detection radars, and monitoring lines within the designated areas to be monitored; S5-3: Real-time monitoring data analysis The adaptive intelligent monitoring system is activated, with various sensors collecting data and using detection radar to conduct ground exploration operations; Under the coordination of the on-site monitoring control unit, each on-site monitoring software and hardware unit collects the measured data related to the leakage pollution of shale gas flowback fluid at the site and uploads it to the cloud server; The adaptive intelligent monitoring and analysis AI model automatically analyzes the data collected by the sensor, interprets the detection radar profile data obtained by real-time monitoring, and automatically matches the closest working conditions; The adaptive intelligent monitoring and analysis AI model interprets the detection radar profile data obtained from real-time monitoring, removes the direct wave, and determines the water content to obtain the real-time monitoring data collected by the detection radar. The energy proportion of the high- and low-frequency power spectrum envelopes is calculated by the following formula 2, that is, the volume water content of the medium is calculated: Formula 2 Where: θ υ represents the volumetric water content, K β Represents the regulation system, C 0 represents the frequency division point, p(f) Represents the spectrum before the frequency division point, F represents the total spectrum of the radar signal, df Represents the spectrum of the radar time domain signal after Fourier transform; S5-4: Substitute the volume moisture content data of the medium obtained by radar sensing into the risk warning model of Formula 1, perform moisture content and relative dielectric constant inversion, and obtain leakage range and depth data; S5-5: The adaptive intelligent monitoring and analysis AI model outputs the monitoring results after calculation and comparison with the preset safety threshold: compare the leakage range and depth data to see if they reach the set safety threshold. If they do, an alarm message will be issued, and the potential pollution diffusion area and speed at the leakage site will be further predicted for manual intervention. If the safety threshold is not reached, the system will remain silent. S6. Iteration and update of adaptive intelligent monitoring and analysis AI model Regularly import new real-time monitoring data to train the AI model, update and iterate the adaptive intelligent monitoring and analysis AI model, evaluate, verify and optimize the performance of the adaptive intelligent monitoring and analysis AI model, and improve the accuracy and reliability of the adaptive intelligent monitoring and analysis AI model.
2. The adaptive intelligent monitoring method for shale gas flowback fluid leakage pollution according to claim 1 is characterized in that: In step S1: The adaptive intelligent monitoring system for shale gas flowback fluid leakage pollution includes multiple mobile and deployable on-site monitoring hardware and software units set up at different construction sites, all of which are connected to the cloud server through the network; Each mobile and deployable on-site monitoring hardware and software unit includes the following interconnected components: front-end computer, multiple sets of sensors, detection radar, monitoring line, and network communication equipment; The on-site monitoring control unit performs data preprocessing and feature engineering analysis on the received real-time monitoring data in time series, and outputs formatted data for deep learning and data analysis of AI models; The deep learning-based AI model is an AI algorithm set constructed with deep learning algorithm as the basic architecture according to the characteristics of shale gas flowback fluid leakage pollution monitoring.
3. The adaptive intelligent monitoring method for shale gas flowback fluid leakage pollution according to claim 1 is characterized in that: The step S5-2 specifically includes the following steps: It is to deploy multiple mobile field monitoring software and hardware units to different monitored areas of a construction site to be monitored in actual operation, and multiple field monitoring software and hardware units monitor the same construction site to be monitored; Alternatively, multiple mobile field monitoring hardware and software units can be deployed in different monitored areas of multiple actual monitoring sites to synchronously monitor multiple shale gas flowback fluid leakage and pollution sites, and the acquired time series data can be applied to the construction, training, evaluation, verification and optimization of AI models.
4. An adaptive intelligent monitoring system for shale gas flowback leakage pollution, characterized in that: Used to implement the adaptive intelligent monitoring method according to any one of claims 1 to 3, comprising a cloud server, a management terminal and at least one mobile field monitoring hardware and software unit interconnected and communicating via a network; Among them, the on-site monitoring software and hardware unit is used to collect real-time monitoring data related to shale gas flowback fluid leakage pollution generated at the monitored construction site; The cloud server is equipped with a field monitoring control unit and an AI monitoring and analysis unit; The field monitoring control unit is used to control the operation of the field monitoring software and hardware unit, receive the real-time monitoring data uploaded by the field monitoring software and hardware unit, and perform data preprocessing; Each mobile and deployable on-site monitoring hardware and software unit includes the following interconnected components: front-end computer, multiple sets of sensors, detection radar, and monitoring lines; The AI monitoring and analysis unit is equipped with a deep learning-based AI model and a leakage pollution accident diffusion prediction and early warning model, which is used to analyze and process the data preprocessed by the on-site monitoring control unit, and output the monitoring results according to the preset leakage pollution accident risk early warning safety threshold; The management terminal is used to input data and instructions to the cloud server or display the monitoring results output by the cloud server.
5. The adaptive intelligent monitoring system for shale gas flowback leakage pollution according to claim 4 is characterized in that: It also includes a construction site experimental model, which is composed of a geological experimental model body, backflow fluid, a backflow fluid leakage device, a sealing clamp device, a connecting pipeline, a pressure gauge, a pressure pump, a fluid meter, a valve, a ground penetrating radar, a sensor and a supply fluid tank. The geological experimental model body, the supply fluid tank, the backflow fluid leakage device and the sealing clamp device are connected to each other through a connecting pipeline, and the pressure gauge, the fluid meter and the valve are all arranged at different positions of the connecting pipeline; after the pressure pump pressurizes the backflow fluid in the supply fluid tank, it penetrates into the medium of the geological experimental model body through the backflow fluid leakage device, and the ground penetrating radar and the sensor sense the real-time data of the leakage range, speed and depth of the backflow fluid in the medium.
