Through big data technology, the safety status of construction equipment and personnel is monitored and evaluated in real time, and the problems of low efficiency and insufficient accuracy of traditional safety assessment methods are solved, and efficient safety management and resource optimization at the construction site are achieved.

CN118691089BActive Publication Date: 2024-11-22BEIJING KANGCHENG MUNICIPAL ENG CO
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411155557.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-22
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

The traditional road construction safety assessment method relies on manual inspection, is inefficient and susceptible to human factors, resulting in insufficient accuracy of the assessment results and the inability to effectively predict and prevent safety accidents.

Method used

Using the road construction safety assessment method based on big data, by collecting equipment operation and maintenance information and personnel behavior data at the construction site, conducting real-time monitoring and safety factor analysis, dividing dangerous areas and conducting risk assessments, and giving corresponding grade marks to the equipment and areas. Realize real-time security management.

Benefits of technology

It improves the safety and efficiency of the construction site, reduces the probability of accidents, optimizes resource allocation, extends equipment life, reduces maintenance costs, and realizes digital management and transparent safety supervision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118691089B_ABST
    Figure CN118691089B_ABST
Patent Text Reader

Abstract

The present invention discloses a road construction safety assessment method and system based on big data, including a collection unit, a processing unit, an assessment unit and a display unit, and the present invention relates to the field of safety assessment technology. The road construction safety assessment method and system based on big data, whether for construction equipment or construction personnel, the present invention provides a set of systematic analysis and assessment frameworks, specifically through the four steps of information collection, information processing, safety assessment and data display, the method can achieve real-time monitoring and predictive maintenance of the safety status of the construction site, through detailed analysis of construction equipment and personnel in dangerous areas, potential safety problems can be discovered in time, thereby reducing the probability of accidents, ensuring the overall safety of the construction site, providing a scientific, systematic and comprehensive safety assessment tool for the construction site, helping to improve construction efficiency, reduce costs, and ensure the safety of the construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of safety assessment, and in particular to a road construction safety assessment method and system based on big data. Background Art

[0002] During road construction, equipment safety and personnel safety management are crucial. Any small negligence may lead to safety accidents, causing serious personal injury and property losses. However, traditional safety assessment methods often rely on manual inspection and experience judgment, which is not only inefficient, but also may affect the accuracy of assessment results due to human factors.

[0003] With the development of big data technology, its application in various fields has shown great potential, including in the field of equipment and personnel safety management. By collecting and analyzing a large amount of information about equipment operation and maintenance, personnel behavior data, etc., it is possible to more accurately assess the safety status of equipment and personnel, predict possible safety problems, and take measures in advance to avoid accidents.

[0004] Therefore, a road construction safety assessment method based on big data has emerged. This method can realize real-time monitoring and assessment of construction equipment and personnel, timely discover potential safety problems, improve construction efficiency, reduce delays caused by equipment failure or personnel safety accidents, and ensure the safety of the construction site. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a road construction safety assessment method and system based on big data, which solves the problems raised in the background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a road construction safety assessment method and system based on big data, comprising:

[0007] The collection unit is used to obtain the operation and maintenance information of each construction equipment at the target construction site; it is also used to divide the target construction site into several dangerous areas, and obtain monitoring information of the dangerous areas at multiple selected time periods during the construction cycle;

[0008] Operation and maintenance information includes the number of times each construction component of the construction equipment has been repaired, the length of the maintenance interval, and the length of time the repaired construction components have been used; monitoring information includes the number of times construction personnel have stayed in hazardous areas, and the length of time a construction personnel has stayed in hazardous areas at a time;

[0009] A processing unit is used to analyze the safety factor of each construction equipment based on the operation and maintenance information, and is also used to analyze the safety factor of the safety management of the dangerous area based on the monitoring information, and obtain the status evaluation value of each construction equipment and the danger determination value of each dangerous area according to the analysis results;

[0010] An evaluation unit is used to adapt the status evaluation value of each construction equipment to the corresponding multiple dangerous equipment level intervals in the corresponding preset status evaluation table, and is also used to adapt the danger determination value of each dangerous area to the corresponding multiple risk level intervals in the corresponding preset danger evaluation table, and according to the adaptation result, add a corresponding dangerous equipment level mark to each construction equipment, and add a corresponding risk level mark to the dangerous area;

[0011] Among them, the dangerous equipment level interval contains the corresponding preset dangerous equipment level marks, and the risk level interval contains the corresponding preset risk level marks.

[0012] Preferably, the stay amount is obtained by counting the number of times a single construction worker appears in the dangerous area, and the single stay duration is represented by the duration of a single construction worker appearing in the dangerous area.

[0013] Preferably, the processing unit performs safety factor analysis on each construction equipment in the following manner:

[0014] SA1. Select a construction equipment, obtain the maintenance times, maintenance interval duration, and usage time of a construction component of the construction equipment, and mark them as c, WJi and YS, i=1, 2, ... c, c represents the number of maintenance interval durations, and also represents the number of operation and maintenance times;

[0015] SA2. Discrete analysis is performed on the maintenance interval duration by discrete degree analysis to obtain the corresponding retained WJi value, and the average value is calculated, and then the average value is marked as the analysis duration parameter FS of the construction component;

[0016] SA3. Then, the available time ratio b of the construction component is calculated by the formula b= (FS-YS) / FS:

[0017] SA4. According to steps SA1 to SA3, calculate the proportion of available time of the construction equipment corresponding to other construction parts, and re-mark the proportion of available time of each construction part of the construction equipment as bj, and re-mark the number of maintenance times of each construction part of the construction equipment as cj, j=1, 2, ... e, e represents the number of each construction part of the construction equipment;

[0018] SA5. Use formula , calculate the status evaluation value T of the construction equipment;

[0019] Among them, β1 and β2 are preset proportional coefficients, λ is a preset compensation factor, and its value is 0.625;

[0020] SA6. Similarly, calculate the status evaluation value of each construction equipment.

[0021] Preferably, the discrete degree analysis method in step SA2 is as follows:

[0022] First, by the formula , calculate and obtain the discrete coefficient Z of the maintenance interval time corresponding to the construction parts;

[0023] Then the discrete coefficient Z is compared with the preset discrete threshold Z0:

[0024] If Z ≥ Z0, delete the corresponding WJi values ​​in the order of |WJi-WJp| from large to small, and calculate the discrete value Z of the remaining WJi;

[0025] Then, Z obtained by deleting the corresponding WJi value is compared with the preset discrete threshold Z0 again, and so on, until Z < Z0;

[0026] When Z<Z0, the corresponding WJi value that has not been deleted is extracted, and its average value is calculated, which is the analysis time parameter FS of the construction component.

[0027] Preferably, the processing unit performs safety factor analysis on the safety management of each hazardous area in the following manner:

[0028] SS1. Select a selected period in a dangerous area, obtain the construction duration of the selected period, and mark it as JS;

[0029] SS2, obtain the number of construction workers staying in the dangerous area during the selected period and mark it as r;

[0030] At the same time, the single stay duration corresponding to each stay in the selected period is obtained and marked as Lg, where g=1, 2, ..., r;

[0031] SS3, through , calculate the danger judgment value of the danger zone;

[0032] SS4. Calculate the risk assessment value of each risk area in this way.

[0033] Preferably, the adaptation method in the evaluation unit is as follows:

[0034] If the state evaluation value matches a corresponding dangerous equipment level interval, a corresponding dangerous equipment level mark is added to the construction equipment;

[0035] If the danger determination value matches a corresponding risk level interval, a corresponding risk level mark is added to the danger area.

[0036] Preferably, each construction equipment is preset with a corresponding equipment ID code, each dangerous area is preset with a corresponding area ID code, and both the area ID code and the equipment ID code are unique.

[0037] Preferably, it also includes:

[0038] The display unit is used to extract the corresponding preset equipment ID code from the construction equipment with the dangerous equipment level mark added, and is also used to obtain the corresponding area ID code from the dangerous area with the risk level mark added, and display the equipment ID code, area ID code and its corresponding dangerous equipment level mark and risk level mark to relevant personnel.

[0039] A road construction safety assessment method based on big data, the method is implemented by the road construction safety assessment system based on big data, and the method comprises the following steps:

[0040] Step 1: Information Collection

[0041] At the target construction site, obtain the operation and maintenance information of each construction equipment;

[0042] Step 2: Information Processing

[0043] According to the operation and maintenance information, the safety factor of each construction equipment is analyzed, and the status evaluation value of the corresponding construction equipment is obtained;

[0044] Step 3: Safety Assessment

[0045] Adapt the status evaluation value of each construction equipment to the corresponding multiple dangerous equipment level intervals in the corresponding preset status evaluation table, and add corresponding dangerous equipment level marks to each construction equipment according to the adaptation results;

[0046] Step 4: Data display

[0047] Obtain the corresponding equipment ID code from the construction equipment to which the dangerous equipment grade mark is added, and show the equipment ID code and its corresponding dangerous equipment grade mark to the safety supervisor at the construction site.

[0048] Preferably, the method further comprises the following steps:

[0049] Step 1: Information Collection

[0050] Divide the target construction site into several dangerous areas, and obtain monitoring information of the dangerous areas at multiple selected time periods during the construction cycle;

[0051] Step 2: Information Processing

[0052] Based on the monitoring information, the safety factor analysis is conducted on the safety management of the dangerous areas, and the danger judgment value of each dangerous area is obtained;

[0053] Step 3: Safety Assessment

[0054] The hazard determination value of each hazardous area is adapted to the corresponding multiple risk level intervals in the corresponding preset hazard assessment table, and the corresponding risk level mark is added to the hazardous area according to the adaptation result;

[0055] Step 4: Data display

[0056] The corresponding area ID code is obtained from the hazardous area with the risk level mark added, and the area ID code and its corresponding risk level mark are displayed to the safety supervisor at the construction site. Beneficial Effects

[0057] The present invention provides a road construction safety assessment method and system based on big data. Compared with the prior art, it has the following beneficial effects:

[0058] The present invention provides a systematic analysis and evaluation framework for both construction equipment and construction personnel. Specifically, through the four steps of information collection, information processing, safety assessment and data display, the method can achieve real-time monitoring and predictive maintenance of the safety status of the construction site.

[0059] Improve safety: Through detailed analysis of construction equipment and personnel in dangerous areas, potential safety issues can be discovered in a timely manner, thereby reducing the probability of accidents and ensuring the overall safety of the construction site.

[0060] Data-driven decision support: Using big data analysis, the safety status of equipment and personnel can be assessed more accurately, making maintenance and safety management decisions more scientific and reasonable.

[0061] Optimize resource allocation: By evaluating equipment and personnel, maintenance and safety resources can be allocated more effectively, giving priority to equipment or areas with higher risk levels to avoid wasting resources.

[0062] Extend equipment life and reduce maintenance costs: Regular maintenance and timely repairs can extend the service life of equipment, reduce downtime caused by equipment failure, and reduce the cost of emergency repairs.

[0063] Improve construction efficiency: By ensuring the normal operation and safety of equipment and personnel, delays caused by accidents or equipment failures can be reduced and construction efficiency can be improved.

[0064] Real-time monitoring and early warning: Through continuous monitoring and evaluation of equipment and personnel, potential problems can be discovered in time and measures can be taken in advance to avoid accidents.

[0065] Digital management: Assigning a unique ID code to each device and hazardous area enables digital management of the construction site, facilitating tracking and maintenance.

[0066] Improve management transparency: Presenting safety assessment results of equipment and hazardous areas to safety supervisors can improve management transparency and ensure that all relevant personnel understand the current safety status.

[0067] Increase worker confidence: Knowing that the equipment and their work area have undergone detailed safety assessments will give workers more confidence when operating, thereby improving the quality of their work.

[0068] Comprehensive assessment and improvement: Conduct a comprehensive assessment of the safety status of the construction site and make targeted improvements based on the assessment results.

[0069] In conclusion, this big data-based road construction safety assessment method provides a scientific, systematic, and comprehensive safety assessment tool for construction sites, which helps to improve construction efficiency, reduce costs, and ensure the safety of construction sites. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1 is a system block diagram of the present invention;

[0071] Figure 2 The present invention is a flow chart of the method. DETAILED DESCRIPTION

[0072] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0073] As embodiment 1 of the present invention:

[0074] See also Figure 2 The present invention provides a technical solution: a road construction safety assessment method based on big data, comprising the following steps:

[0075] Step 1: Information Collection

[0076] At the target construction site, obtain the operation and maintenance information of each construction equipment;

[0077] Operation and maintenance information includes the number of repairs of each construction component of the construction equipment, the length of the maintenance interval, and the length of time the repaired construction components have been in use;

[0078] Step 2: Information Processing

[0079] Conduct safety factor analysis on each construction equipment based on operation and maintenance information;

[0080] Take a construction equipment as an example;

[0081] SA1. Obtain the number of maintenance times, maintenance interval duration, and usage duration of a construction component of the construction equipment, and mark them as c, WJi, and YS respectively;

[0082] I = 1, 2, ... c, where c represents the number of maintenance intervals, and also represents the number of operations and maintenance times;

[0083] SA2, using formula , calculate and obtain the discrete coefficient Z of the maintenance interval time corresponding to the construction parts;

[0084] Then the discrete coefficient Z is compared with the preset discrete threshold Z0:

[0085] If Z ≥ Z0, delete the corresponding WJi values ​​in the order of |WJi-WJp| from large to small, and calculate the discrete value Z of the remaining WJi;

[0086] Then, Z obtained by deleting the corresponding WJi value is compared with the preset discrete threshold Z0 again, and so on, until Z < Z0;

[0087] When Z<Z0, the corresponding WJi value that has not been deleted is extracted, and its average value is calculated, and then its average value is marked as the analysis time parameter FS of the construction component;

[0088] SA3. Then, the available time ratio b of the construction component is calculated by the formula b= (FS-YS) / FS:

[0089] SA4. According to steps SA1 to SA3, calculate the proportion of available time of the construction equipment corresponding to other construction parts, and re-mark the proportion of available time of each construction part of the construction equipment as bj, and re-mark the number of maintenance times of each construction part of the construction equipment as cj, j=1, 2, ... e, e represents the number of each construction part of the construction equipment;

[0090] SA5. Use formula , calculate the status evaluation value T of the construction equipment;

[0091] Among them, β1 and β2 are preset proportional coefficients, λ is a preset compensation factor, and its value is 0.625;

[0092] SA6. Calculate the status evaluation value of each construction equipment in the same way;

[0093] Step 3: Safety Assessment

[0094] Adapt the status evaluation value of each construction equipment to a plurality of corresponding dangerous equipment level intervals in a corresponding preset status evaluation table, wherein the dangerous equipment level interval includes a corresponding preset dangerous equipment level mark, and each construction equipment is preset with a corresponding equipment ID code, and the equipment ID code is unique;

[0095] If the state evaluation value matches a corresponding dangerous equipment level interval, a corresponding dangerous equipment level mark is added to the construction equipment;

[0096] Step 4: Data display

[0097] Obtain the corresponding equipment ID code from the construction equipment to which the dangerous equipment grade mark is added, and show the equipment ID code and its corresponding dangerous equipment grade mark to the safety supervisor at the construction site.

[0098] By conducting a detailed safety factor analysis on the construction equipment, this embodiment can timely discover potential safety problems, thereby reducing the probability of accidents and ensuring the safety of the construction site; by using big data analysis, the maintenance needs and safety status of the equipment can be more accurately evaluated, making maintenance and safety decisions more scientific and reasonable; by evaluating the construction equipment, maintenance resources can be more effectively allocated, giving priority to those equipment with higher safety risks to avoid waste of resources; regular maintenance and timely repairs can extend the service life of the equipment and reduce downtime caused by equipment failure; by ensuring the normal operation of the equipment, construction efficiency can be improved and delays caused by equipment failure can be reduced; by continuously monitoring and evaluating the equipment, potential problems can be discovered in time and measures can be taken in advance to avoid accidents; through predictive maintenance, sudden equipment failures can be avoided, thereby reducing the cost of emergency repairs: knowing that the equipment has undergone a detailed safety assessment, the staff will be more assured when operating, thereby improving the quality of work; by assigning a unique ID code to each device, digital management of the equipment can be achieved, facilitating tracking and maintenance; by displaying the evaluation results of the equipment to the safety supervisor, the transparency of management can be improved to ensure that all relevant personnel understand the safety status of the equipment.

[0099] Embodiment 2:

[0100] As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the technical solution of the present embodiment is different from that of the first embodiment only in that:

[0101] The first embodiment is used to perform road construction safety assessment through construction equipment at the target construction site, while this embodiment performs road construction safety assessment through construction personnel at the target construction site:

[0102] This embodiment includes the following steps:

[0103] Step 1: Information Collection

[0104] Divide the target construction site into several dangerous areas, and obtain monitoring information of the dangerous areas at multiple selected time periods during the construction cycle;

[0105] Monitoring information includes the amount of time construction workers spend in hazardous areas and the duration of a single stay of construction workers in hazardous areas;

[0106] Among them, the number of stays is counted based on the number of times a single construction worker appears in the danger zone;

[0107] The single stay duration is expressed as the length of time a single construction worker is in the danger zone at one time;

[0108] Step 2: Information Processing

[0109] Conduct safety factor analysis on safety management of hazardous areas based on monitoring information;

[0110] Take a hazardous area as an example;

[0111] SS1. Select a selected period, obtain the construction duration of the selected period, and mark it as JS;

[0112] SS2, obtain the number of construction workers staying in the dangerous area during the selected period and mark it as r;

[0113] At the same time, the single stay duration corresponding to each stay in the selected period is obtained and marked as Lg, where g=1, 2, ..., r;

[0114] SS3, through , calculate the danger judgment value of the danger zone;

[0115] SS4, and calculate the danger judgment value of each danger zone in the same way;

[0116] Step 3: Safety Assessment

[0117] The hazard determination value of each hazard area is adapted to a plurality of corresponding risk level intervals in a corresponding preset hazard assessment table, wherein the risk level interval includes a corresponding preset risk level mark, and each hazard area is preset with a corresponding area ID code, and the area ID code is unique;

[0118] If the danger determination value matches a corresponding risk level interval, a corresponding risk level mark is added to the danger area;

[0119] Step 4: Data display

[0120] The corresponding area ID code is obtained from the hazardous area with the risk level mark added, and the area ID code and its corresponding risk level mark are displayed to the safety supervisor at the construction site.

[0121] This embodiment uses big data analysis to more accurately evaluate the safety status of dangerous areas, making safety management decisions more scientific and reasonable. By conducting a detailed safety factor analysis on dangerous areas, potential safety problems can be discovered in time, thereby reducing the probability of accidents and ensuring the safety of the construction site; by evaluating dangerous areas, safety resources can be allocated more effectively, giving priority to areas with higher risk levels to avoid waste of resources; by ensuring the safety of dangerous areas, construction efficiency can be improved and delays caused by safety accidents can be reduced; by continuously monitoring and evaluating dangerous areas, potential problems can be discovered in time, and measures can be taken in advance to avoid accidents; by assigning a unique ID code to each dangerous area, digital management of dangerous areas can be achieved, facilitating tracking and management; by displaying the risk level of dangerous areas to safety supervisors, management transparency can be improved to ensure that all relevant personnel understand the safety status of dangerous areas.

[0122] Embodiment three:

[0123] As the third embodiment of the present invention, when the present application is specifically implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments mentioned above for implementation.

[0124] See also Figure 1 The present invention also provides a technical solution: a road construction safety assessment method based on big data. The system is implemented by the above-mentioned road construction safety assessment method based on big data. The system includes:

[0125] The collection unit is used to obtain the operation and maintenance information of each construction equipment at the target construction site; it is also used to divide the target construction site into several dangerous areas, and obtain monitoring information of the dangerous areas at multiple selected time periods during the construction cycle;

[0126] A processing unit is used to analyze the safety factor of each construction equipment based on the operation and maintenance information, and is also used to analyze the safety factor of the safety management of the dangerous area based on the monitoring information, and obtain the status evaluation value of each construction equipment and the danger determination value of each dangerous area according to the analysis results;

[0127] An evaluation unit is used to adapt the status evaluation value of each construction equipment to the corresponding multiple dangerous equipment level intervals in the corresponding preset status evaluation table, and is also used to adapt the danger determination value of each dangerous area to the corresponding multiple risk level intervals in the corresponding preset danger evaluation table, and according to the adaptation result, add a corresponding dangerous equipment level mark to each construction equipment, and add a corresponding risk level mark to the dangerous area;

[0128] The display unit is used to extract the corresponding preset equipment ID code from the construction equipment with the dangerous equipment level mark added, and is also used to obtain the corresponding area ID code from the dangerous area with the risk level mark added, and display the equipment ID code, area ID code and its corresponding dangerous equipment level mark and risk level mark to relevant personnel.

[0129] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0130] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0131] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The road construction safety assessment system based on big data is characterized by: include: The collection unit is used to obtain the operation and maintenance information of each construction equipment at the target construction site; it is also used to divide the target construction site into several dangerous areas, and obtain monitoring information of the dangerous areas at multiple selected time periods during the construction cycle; Operation and maintenance information includes the number of repairs of each construction component of the construction equipment, the length of the maintenance interval, and the length of time the repaired construction components have been in use; monitoring information includes the number of times construction personnel stay in dangerous areas, and the length of time a construction personnel stays in dangerous areas at a time; The processing unit is used to analyze the safety factor of each construction equipment based on the operation and maintenance information, and is also used to analyze the safety factor of the safety management of the dangerous area based on the monitoring information, and obtain the state evaluation value of each construction equipment and the danger determination value of each dangerous area according to the analysis results; The processing unit performs safety factor analysis on each construction equipment in the following manner: SA1. Select a construction equipment, obtain the maintenance times, maintenance interval duration, and usage time of a construction component of the construction equipment, and mark them as c, WJi and YS, i=1, 2, ... c, c represents the number of maintenance interval durations, and also represents the number of operation and maintenance times; SA2. Discrete analysis is performed on the maintenance interval duration by discrete degree analysis to obtain the corresponding retained WJi value, and the average value is calculated, and then the average value is marked as the analysis duration parameter FS of the construction component; The discrete degree analysis method in step SA2 is as follows: First, by the formula , calculate and obtain the discrete coefficient Z of the maintenance interval time corresponding to the construction parts; Then the discrete coefficient Z is compared with the preset discrete threshold Z0: If Z ≥ Z0, delete the corresponding WJi values ​​in the order of |WJi-WJp| from large to small, and calculate the discrete value Z of the remaining WJi; Then, Z obtained by deleting the corresponding WJi value is compared with the preset discrete threshold Z0 again, and so on, until Z < Z0; When Z<Z0, the corresponding WJi value that has not been deleted is extracted, and its average value is obtained, which is the analysis time parameter FS of the construction component; SA3. Then, the available time ratio b of the construction component is calculated by the formula b= (FS-YS) / FS: SA4. According to steps SA1 to SA3, calculate the proportion of available time of the construction equipment corresponding to other construction parts, and re-mark the proportion of available time of each construction part of the construction equipment as bj, and re-mark the number of maintenance times of each construction part of the construction equipment as cj, j=1, 2, ... e, e represents the number of each construction part of the construction equipment; SA5. Use formula , calculate the status evaluation value T of the construction equipment; Among them, β1 and β2 are preset proportional coefficients, λ is a preset compensation factor, and its value is 0.625; SA6. Calculate the status evaluation value of each construction equipment in the same way; The processing unit performs safety factor analysis on the safety management of each hazardous area as follows: SS1. Select a selected period in a dangerous area, obtain the construction duration of the selected period, and mark it as JS; SS2, obtain the number of construction workers staying in the dangerous area during the selected period and mark it as r; At the same time, the single stay duration corresponding to each stay in the selected period is obtained and marked as Lg, where g=1, 2, ..., r; SS3, through , calculate the danger judgment value of the danger zone; SS4, and calculate the danger judgment value of each danger zone in the same way; An evaluation unit is used to adapt the status evaluation value of each construction equipment to the corresponding multiple dangerous equipment level intervals in the corresponding preset status evaluation table, and is also used to adapt the danger determination value of each dangerous area to the corresponding multiple risk level intervals in the corresponding preset danger evaluation table, and according to the adaptation result, add a corresponding dangerous equipment level mark to each construction equipment, and add a corresponding risk level mark to the dangerous area; Among them, the dangerous equipment level interval contains the corresponding preset dangerous equipment level marks, and the risk level interval contains the corresponding preset risk level marks.

2. The road construction safety assessment system based on big data according to claim 1 is characterized by: The number of stays is calculated based on the number of times a single construction worker appears in the danger zone, and the single stay duration is expressed as the length of time a single construction worker appears in the danger zone.

3. The road construction safety assessment system based on big data according to claim 1 is characterized by: The adaptation in the evaluation unit is as follows: If the state evaluation value matches a corresponding dangerous equipment level interval, a corresponding dangerous equipment level mark is added to the construction equipment; If the danger determination value matches a corresponding risk level interval, a corresponding risk level mark is added to the danger area.

4. The road construction safety assessment system based on big data according to claim 1 is characterized by: in, Each construction equipment is preset with a corresponding equipment ID code, each dangerous area is preset with a corresponding area ID code, and both the area ID code and the equipment ID code are unique.

5. The road construction safety assessment system based on big data according to claim 1 is characterized by: Also includes: The display unit is used to extract the corresponding preset equipment ID code from the construction equipment with the dangerous equipment level mark added, and is also used to obtain the corresponding area ID code from the dangerous area with the risk level mark added, and display the equipment ID code, area ID code and its corresponding dangerous equipment level mark and risk level mark to relevant personnel.

6. A road construction safety assessment method based on big data, the method being implemented by a road construction safety assessment system based on big data as claimed in any one of claims 1 to 5, characterized in that: The method comprises the following steps: The first step is to obtain the operation and maintenance information of each construction equipment at the target construction site; The second step is to analyze the safety factor of each construction equipment based on the operation and maintenance information, and obtain the status evaluation value of the corresponding construction equipment; The third step is to adapt the status evaluation value of each construction equipment to the corresponding multiple dangerous equipment level intervals in the corresponding preset status evaluation table, and add the corresponding dangerous equipment level mark to each construction equipment according to the adaptation result; Step 4: Obtain the corresponding equipment ID code from the construction equipment with the dangerous equipment level mark added, and show the equipment ID code and its corresponding dangerous equipment level mark to the safety supervisor at the construction site.

7. The road construction safety assessment method based on big data according to claim 6 is characterized by: The method further comprises the following steps: Step 1: Divide the target construction site into several dangerous areas, and obtain monitoring information of the dangerous areas at multiple selected time periods during the construction cycle; Step 2: Based on the monitoring information, analyze the safety factor of the safety management of the dangerous area and obtain the danger judgment value of each dangerous area; The third step is to adapt the risk determination value of each dangerous area to the corresponding multiple risk level intervals in the corresponding preset risk assessment table, and add corresponding risk level marks to the dangerous areas according to the adaptation results; Step 4: Obtain the corresponding area ID code from the hazardous area with the risk level mark added, and show the area ID code and its corresponding risk level mark to the safety supervisor at the construction site.

Citation Information

Patent Citations

  • Construction safety big data supervision system and safety risk dynamic evaluation method

    CN112580995A

  • Safety assessment method for road construction based on big data

    CN114493147A

  • Construction safety risk management and control system for distribution network engineering digitization

    CN116341272A

  • Safety operation and maintenance system applied to construction site

    CN117877198A

  • Safety monitoring and early warning method for building construction site

    CN117910812A