Access section unlocking method and device

By determining whether the section to be unlocked is the last physical section during the unlocking of the route section, and verifying the switch position of the foreign route, the problem of low unlocking accuracy in the prior art is solved and the safety is improved.

CN118701137BActive Publication Date: 2024-12-06BEIJING URBAN CONSTR INTELLIGENT CONTROL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411201198.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

In the prior art, the accuracy of unlocking of the projectile section is low, which may lead to safety accidents, especially when the section to be unlocked is the last physical section of the projectile and the next section belongs to the outside part of the projectile section. Easy to unlock errors.

Method used

When the unlocking section meets the unlocking conditions, determine whether it is the last physical section of the current route, and determine whether to unlock the switch position of the external route at the beginning of the terminal signal of the current route, and determine whether to unlock the unlocking section to avoid error unlocking.

Benefits of technology

It improves the unlocking accuracy of the road entry section, reduces safety risks, and prevents train rear-end collisions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118701137B_ABST
    Figure CN118701137B_ABST
Patent Text Reader

Abstract

The embodiments of this specification provide a route section unlocking method and device, wherein the route section unlocking method includes: when the section to be unlocked meets the unlocking conditions, determining whether the section to be unlocked is the last physical section of the current route; if it is the last physical section, determining the terminal signal of the current route, and determining at least one external route starting from the terminal signal; when the starting physical section of each external route includes a turnout, determining whether to unlock the section to be unlocked according to the current turnout position of the starting physical section of each external route. After determining that the section to be unlocked meets the unlocking conditions, the turnout position of the external route of the current route is further verified to avoid erroneous unlocking of the section to be unlocked, optimizing the section unlocking scheme based on the unlocking conditions, preventing train rear-end collision caused by erroneous route unlocking, improving the unlocking accuracy of the route section, and reducing safety risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present specification relate to the field of rail transit technology, and in particular to a method and device for unlocking an approach section. Background Art

[0002] In order to ensure driving safety, technical methods are used to establish a relationship of both interconnection and mutual restriction between the route, turnout and signal machine according to certain procedures and conditions. This is called interlocking. The interlocking system is an important part of the railway signal system. The core of interlocking is route control, and the core of route control is the locking and unlocking of the route section. In interlocking technology, the train must travel in the locked route section, and after the train passes normally, the locked route section needs to be unlocked so that other trains can enter the route section again. The train's occupation status of the route section is one of the important conditions for unlocking the route.

[0003] In the prior art, the unlocking of route sections mainly adopts the three-point inspection principle, which checks the physical sections in the current route, and unlocks the section to be unlocked when the adjacent section to the section to be unlocked has been unlocked, the occupation of the section to be unlocked has been cleared, and the next section is occupied. However, if the section to be unlocked is the last physical section of the current route, and the next section belongs to the section outside the route, the section to be unlocked may be unlocked by mistake, and the unlocking accuracy of the route section is low, which may cause safety accidents. Therefore, a more accurate solution for unlocking the route sections is urgently needed. Summary of the invention

[0004] In view of this, an embodiment of this specification provides a route section unlocking method. One or more embodiments of this specification also relate to a route section unlocking device, a computing device, a computer-readable storage medium and a computer program product to solve the technical defects existing in the prior art.

[0005] According to a first aspect of an embodiment of this specification, a method for unlocking an approach section is provided, comprising:

[0006] When the section to be unlocked meets the unlocking condition, determining whether the section to be unlocked is the last physical section of the current route;

[0007] If it is the last physical section, determine the terminal signal of the current route, and determine at least one external route starting from the terminal signal;

[0008] In the case where the starting physical section of each external route includes a turnout, whether to unlock the section to be unlocked is determined according to the current turnout position of the starting physical section of each external route.

[0009] According to a second aspect of an embodiment of this specification, there is provided an approach section unlocking device, comprising:

[0010] A first determination module is configured to determine whether the to-be-unlocked section is the last physical section of the current route when the to-be-unlocked section meets the unlocking condition;

[0011] The second determination module is configured to determine the terminal signal of the current route if it is the last physical section, and determine at least one external route starting from the terminal signal;

[0012] The first unlocking module is configured to determine whether to unlock the to-be-unlocked section according to the current turnout position of the starting physical section of each external route when the starting physical section of each external route includes a turnout.

[0013] According to a third aspect of an embodiment of this specification, a computing device is provided, including:

[0014] Memory and processor;

[0015] The memory is used to store computer executable instructions, and the processor is used to execute the computer executable instructions. When the computer executable instructions are executed by the processor, the steps of the above-mentioned route section unlocking method are implemented.

[0016] According to a fourth aspect of the embodiments of the present specification, a computer-readable storage medium is provided, which stores computer-executable instructions, and when the instructions are executed by a processor, the steps of the above-mentioned route section unlocking method are implemented.

[0017] According to a fifth aspect of the embodiments of the present specification, a computer program product is provided, comprising a computer program / instruction, which implements the steps of the above-mentioned route section unlocking method when executed by a processor.

[0018] An embodiment of the present specification provides a method for unlocking a route section. When the section to be unlocked meets the unlocking conditions, it is determined whether the section to be unlocked is the last physical section of the current route; if it is the last physical section, the terminal signal of the current route is determined, and at least one external route starting from the terminal signal is determined; when the starting physical section of each external route includes a switch, it is determined whether to unlock the section to be unlocked based on the current switch position of the starting physical section of each external route.

[0019] An embodiment of the present specification realizes that, when the section to be unlocked meets the unlocking conditions, for the last physical section, its next section belongs to the external section of the current route, and there may be a handling error, so at least one external route starting from the terminal signal of the current route is further found, and then the current switch position of the starting physical section of each external route is checked to determine whether to unlock the area to be unlocked. In this way, after judging that the section to be unlocked meets the unlocking conditions, the switch position of the external route of the current route is further verified, avoiding the wrong unlocking of the section to be unlocked, optimizing the section unlocking scheme based on the unlocking conditions, preventing the train rear-end collision caused by the wrong unlocking of the route, improving the unlocking accuracy of the route section, and reducing the safety risk. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a flow chart of a route section unlocking method provided by an embodiment of this specification;

[0021] Figure 2 It is a schematic diagram of a route section unlocking scenario provided by an embodiment of this specification;

[0022] Figure 3 It is a process flow chart of a route section unlocking method provided by an embodiment of this specification;

[0023] Figure 4 It is a structural schematic diagram of an approach section unlocking device provided by an embodiment of this specification;

[0024] Figure 5 It is a structural block diagram of a computing device provided by an embodiment of this specification. DETAILED DESCRIPTION

[0025] Many specific details are described in the following description to facilitate a full understanding of this specification. However, this specification can be implemented in many other ways than those described herein, and those skilled in the art can make similar generalizations without violating the connotation of this specification, so this specification is not limited to the specific implementation disclosed below.

[0026] The terms used in one or more embodiments of this specification are only for the purpose of describing specific embodiments, and are not intended to limit one or more embodiments of this specification. The singular forms of "a", "said" and "the" used in one or more embodiments of this specification and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used in one or more embodiments of this specification refers to and includes any or all possible combinations of one or more associated listed items.

[0027] It should be understood that although the terms first, second, etc. may be used to describe various information in one or more embodiments of this specification, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of one or more embodiments of this specification, the first may also be referred to as the second, and similarly, the second may also be referred to as the first. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".

[0028] In addition, it should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in one or more embodiments of this specification are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of the relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.

[0029] First, the terms involved in one or more embodiments of this specification are explained.

[0030] Interlocking System (CI): refers to the mutual restriction relationship established between signal machines, turnouts and routes through technical means in order to ensure the safety of railway station operation and shunting operations. The interlocking system is a key component of the subway signal system. Its main function is to control and manage the signals, turnouts, routes, etc. on the line. It uses a two-by-two safety computer platform to realize the correct interlocking restriction relationship between station equipment, select routes for trains running in its control area, and ensure the safe operation of trains. The interlocking relationship between signal machines, turnouts and routes mainly includes: if the turnout position is incorrect, the route is not cleared, and there is a car occupying the route, the signal machine protecting the route cannot open the permission signal; once the signal opens the permission signal, the route is locked, and the position of the turnout on the route is not allowed to be changed. The protection signal of the hostile route (the route that is not allowed to be established at the same time) is also locked in the closed state. When a train or train enters the route, the signal machine will automatically close immediately and cannot be automatically opened again. Obviously, interlocking exists between two objects, such as: between a switch and a signal, between opposing signals, between an approach and a signal, etc.

[0031] Approach processing: After the interlocking receives the route processing command from the upper computer, the interlocking host selects the pending route and performs a consistency check on the route selection. After the check passes, the route is locked and the permission signal is released. The train enters the route according to the permission signal.

[0032] Three-point inspection principle: the section close to the section to be unlocked has been unlocked, the current section is cleared, and the next section is occupied. When the above unlocking conditions are met, the section to be unlocked is unlocked.

[0033] Unlocking of the approach: After the train enters the locked approach, the physical sections in the approach should be able to be automatically unlocked in sections as the train moves. Each physical section (excluding the first physical section in the approach) will be automatically unlocked after a certain delay after meeting the three-point inspection principle. For the first physical section in the approach, after checking that the current section is cleared and the next section is occupied, and the start signal is normally closed due to the train entering, it will be automatically unlocked after a certain delay.

[0034] Axle counter section: The section between two axle counters.

[0035] Physical segment: A closed segment contained by adjacent axle counters. A physical segment contains at least one axle counter segment.

[0036] Flying train: The train occupies the inner section of the approach route in sequence. After occupying one section, the next section is not occupied, and the occupation of this section is idle due to an axle counting failure or a track relay problem. At this time, the interlocking will set the section to fault lock, and the section can only be unlocked by the staff through the upper computer to give the interlocking section fault unlock command.

[0037] It should be noted that in the railway signal system, in order to ensure the safe operation of the train, the train's travel path needs to be controlled by the interlocking system. The unlocking of the route section means that after ensuring the safe passage of the train, the originally locked section is unlocked, so that other trains can enter the route section again to ensure safe and efficient operation. The current approach section unlocking adopts the three-point inspection principle, which only checks the inner section of the route, specifically, the section to be unlocked is unlocked, the occupation of the section to be unlocked is cleared, and the next section is occupied, then the section to be unlocked is unlocked. However, if the section to be unlocked is the last physical section of the route, the next section belongs to the outer section of the route and contains a turnout, but the turnout position is not at the expected position of the route or four-open, at this time, if a train stops in the outer section and the train runs in the last physical section of the route, the last physical section will be unlocked by mistake, and the subsequent route may be handled incorrectly, causing the risk of rear-end collision.

[0038] Therefore, in order to solve the above technical problems, a method and device for unlocking a route section are provided in the embodiments of the present specification. When the last physical section of the route meets the three-point check principle and is automatically unlocked, the switch position of the first physical section outside the route is further judged, and based on the switch position, it is judged whether to unlock the section to be unlocked. The section unlocking scheme based on the three-point check principle is optimized to prevent train rear-end collision caused by erroneous unlocking of the route and reduce safety risks.

[0039] In this specification, a method for unlocking a route section is provided. This specification also relates to a route section unlocking device, a computing device, a computer-readable storage medium, and a computer program product, which are described in detail one by one in the following embodiments.

[0040] See also Figure 1 , Figure 1 A flow chart of a route section unlocking method provided according to an embodiment of the present specification is shown, which specifically includes the following steps 102-106.

[0041] Step 102: When the section to be unlocked meets the unlocking condition, determine whether the section to be unlocked is the last physical section of the current route.

[0042] The current route is the route that needs to be unlocked after the train passes normally. The section to be unlocked is the physical section that needs to be unlocked in the current route. The physical section is a closed section contained by adjacent axle counters. A route includes multiple physical sections, and a physical section includes at least one axle counter section. The last physical section is the last physical section of the current route.

[0043] In addition, the unlocking condition refers to the pre-configured conditions that should be met for the automatic unlocking of the section to be unlocked. For example, the unlocking condition can be a three-point check principle, that is, the section before the section to be unlocked is occupied and cleared, the section to be unlocked is occupied and cleared, and the section next to the section to be unlocked is occupied. Of course, in actual applications, the unlocking condition can also be configured as other check principles to achieve automatic unlocking of each physical section in the route.

[0044] It should be noted that the train must travel within the locked approach section, and after the train passes normally, the locked approach section needs to be unlocked so that other trains can enter the approach section again. When the train passes through the physical sections of a route normally, the physical sections passed by the train are automatically unlocked in turn. When the current route is processed, each switch in the current route will be moved to the specified position and locked. The position of each switch in the current route is correct and does not need to be verified. For the last physical section in the current route, its adjacent next physical section does not belong to the current route, but to an external route. If the physical section of the external route includes a switch and the position of the switch is wrong, there may be a risk of rear-end collision. Therefore, for the section to be unlocked of the current route, it is possible to first determine whether the section to be unlocked meets the unlocking conditions. If the unlocking conditions are met, it is further determined whether the section to be unlocked is the last physical section of the current route. Subsequently, it is further determined whether the position of the switch of the subsequent external route is correct based on the last physical section, thereby determining whether to unlock the section to be unlocked.

[0045] In an optional implementation of this embodiment, when the segment to be unlocked meets the unlocking condition, before determining whether the segment to be unlocked is the last physical segment of the current route, the method further includes:

[0046] Acquire the unlocking state of the previous section of the section to be unlocked, the first occupied state of the section to be unlocked, and the second occupied state of the next section;

[0047] According to the unlocking state, the first occupied state and the second occupied state of the previous section, it is determined whether the section to be unlocked satisfies the unlocking condition.

[0048] It should be noted that the unlocking condition is the three-point check principle, that is, a "three-point check" is carried out on the section to be unlocked, the previous section passed has been occupied and cleared, the current section is occupied and cleared, and the next section ahead is occupied. In other words, it is necessary to verify that the train has indeed come from the previous section passed, occupied and cleared the section to be unlocked (that is, passed the current section), and entered the next section ahead. Otherwise, it will not be able to be unlocked normally.

[0049] In actual implementation, the unlocking status of the previous section of the section to be unlocked, the first occupied status of the section to be unlocked, and the second occupied status of the next section can be obtained, wherein the unlocking status of the previous section of the section to be unlocked can indicate whether the previous section is occupied and cleared, that is, whether the train enters the previous section of the section to be unlocked and drives towards the section to be unlocked; the first occupied status of the section to be unlocked indicates whether the section is occupied and cleared, that is, whether the train comes from the previous section, passes through the section to be unlocked and enters the next section; the second occupied status of the next section is used to indicate whether the next section is occupied, that is, whether the train enters the next section.

[0050] When the unlocking status of the previous section indicates that the previous section is cleared, the first occupation status indicates that the current section is cleared, and the second occupation status indicates that the next section is occupied, it means that the section to be unlocked meets the three-point check principle, that is, meets the unlocking conditions.

[0051] In the embodiments of the present specification, whether the section to be unlocked meets the unlocking conditions can be determined based on the three-point check principle, which ensures the accuracy of the unlocking judgment of the section to be unlocked to a certain extent.

[0052] In an optional implementation of this embodiment, after determining whether the section to be unlocked is the last physical section of the current route, the method further includes:

[0053] If it is not the last physical segment, unlocking the segment to be unlocked is delayed for a set period of time.

[0054] Among them, the set time is the delay time for pre-configured automatic unlocking of the route section. In order to ensure the efficiency of automatic unlocking, the set time is generally set to a smaller value, such as 3 seconds, 5 seconds, 7 seconds, etc.

[0055] It should be noted that when processing the current route, each switch in the current route will be moved to the specified position and locked. The position of each switch in the current route is correct and does not need to be verified. Therefore, if the area to be unlocked is not the last physical section, there is no need to conduct further verification of the subsequent switch positions. The section to be unlocked can be automatically unlocked by delaying the set time, thereby ensuring the unlocking efficiency while ensuring the unlocking accuracy.

[0056] Step 104: If it is the last physical section, determine the terminal signal of the current route, and determine at least one external route starting from the terminal signal.

[0057] It should be noted that if the section to be unlocked is the last physical section of the current route, it means that the next physical section adjacent to the section to be unlocked belongs to an external route, and there may be an abnormal turnout position, which may lead to a rear-end collision. Therefore, if the area to be unlocked is the last physical section, the terminal signal of the current route is determined, and each route is traversed to determine at least one external route starting from the terminal signal, that is, to traverse and obtain each external route connected to the current route.

[0058] Step 106: When the starting physical section of each external route includes a turnout, determine whether to unlock the section to be unlocked according to the current turnout position of the starting physical section of each external route.

[0059] It should be noted that since the starting physical section of the external route is a physical section adjacent to the section to be unlocked of the current route, the switch position of the starting physical section will respond to the unlocking of the section to be unlocked. Therefore, it is possible to determine whether the starting physical section of each external route contains a switch, and then perform further position verification based on the current switch position of each starting physical section to determine whether to unlock the section to be unlocked.

[0060] In actual implementation, if the starting physical section does not include a turnout, there will be no error caused by the turnout position error to satisfy the three-point check principle, thereby causing the section to be unlocked to be unlocked incorrectly. Therefore, it can be determined whether the starting physical sections of each external approach route contain a turnout. If the starting physical sections of each external approach route contain a turnout, it is necessary to check the current turnout position of each starting physical section one by one to determine whether to unlock the section to be unlocked.

[0061] In an optional implementation manner of this embodiment, after determining at least one external route starting from the terminal signal, the method further includes:

[0062] When the starting physical section of any external approach does not include a turnout, the section to be unlocked is unlocked for a set delay time.

[0063] It should be noted that there may be one or two or more external approaches starting from the terminal signal of the current route. If the starting physical section of any external approach does not include a switch, the external approach can allow trains to pass normally, that is, the train that passes the section to be unlocked can normally enter the starting physical section of the external approach that does not include a switch. Therefore, if the starting physical section of any external approach does not include a switch, the section to be unlocked can be automatically unlocked by setting a delay time, thereby ensuring the efficiency and safety of route unlocking.

[0064] In an optional implementation of this embodiment, determining whether to unlock the to-be-unlocked section according to the current switch position of the starting physical section of each external approach route includes:

[0065] According to the current turnout position of the starting physical section of each foreign approach route, a turnout position check is performed on the starting physical section of each foreign approach route;

[0066] When any starting physical section satisfies the turnout position check, unlocking the section to be unlocked;

[0067] In the case that each starting physical section does not satisfy the turnout position check, the section to be unlocked is set as fault locked.

[0068] It should be noted that the switch position can change dynamically, thereby changing the direction of the train on the track. When handling the approach, the switch position will be moved to the specified position according to the running status of the train, and the switch will be locked to realize the running direction control. However, in actual operation, the switch position included in the starting physical section of the external approach may not be correct. If the starting physical section of each external approach contains a switch, it is necessary to check the current switch position of each starting physical section one by one to determine whether to unlock the section to be unlocked.

[0069] In the embodiments of the present specification, the current turnout position of the starting physical section of each external approach, that is, the actual position of the turnout, can be obtained, and the turnout position check can be performed on the starting physical section of each external approach. If any starting physical section meets the turnout position check, it means that there is a starting physical section of the external approach with a correct turnout position, which can avoid train rear-end collision. At this time, the section to be unlocked can be unlocked. If each starting physical section does not meet the turnout position check, it means that due to a fault, the turnout positions in the starting physical sections of each external approach are incorrect. At this time, the section to be unlocked can be set to fault lock, and the staff can conduct fault investigation and processing. After ensuring safety, the section to be unlocked can be manually unlocked to reduce safety risks.

[0070] In an optional implementation of this embodiment, according to the current turnout position of the starting physical section of each external approach, the turnout position check is performed on the starting physical section of each external approach, including:

[0071] Determine the axle counting section included in the target starting physical section, wherein the target starting physical section is the starting physical section of any external approach;

[0072] According to the axle counter of the axle counting section, obtaining a set turnout position configured in the axle counting section;

[0073] In the case where the current turnout position of the target starting physical section is consistent with the set turnout position, determining that the target starting physical section satisfies the turnout position check;

[0074] In the case that the current turnout position of the target starting physical section is inconsistent with the set turnout position, it is determined that the target starting physical section does not satisfy the turnout position check.

[0075] In actual implementation, any starting physical section can be selected from the starting physical sections of each external approach as the target starting physical section, and then the axle counting section contained in the target starting physical section is determined. The axle counting section is a section formed by adjacent axle counters. Each axle counter is configured with its correct turnout position, that is, the set turnout position. It is determined whether the set turnout position is consistent with the current turnout position of the target starting physical section. If they are consistent, it means that the current turnout position of the target starting physical section is correct and meets the turnout position check; if they are inconsistent, it means that the current turnout position of the target starting physical section is wrong and does not meet the turnout position check. The unlocking section cannot be unlocked, otherwise, it may cause safety accidents such as rear-end collisions. By analogy, the starting physical sections of other external approaches are used as the target starting physical sections to determine whether the turnout position check is met.

[0076] Figure 2 is a schematic diagram of a route section unlocking scenario provided by an embodiment of this specification, such as Figure 2As shown, the current route is route S1-S3, and route S1-S3 includes two physical sections P1 and P2. Train 1 occupies physical section P2. For physical section P2 as the section to be unlocked, if train 2 has occupied physical section P3, but switch DC1 is in the reverse position, that is, train 2 occupies physical section P3 in the process of driving from X1 to the lower track, the train 2 does not drive into physical section P3 from physical section P2. If train 1 occupying physical section P2 runs away at this time, physical section P2 will meet the three-point check principle, and physical section P2 will be unlocked incorrectly. The status of route S1-S3 becomes idle, and subsequent trains can handle it. Then the subsequent trains may rear-end with train 1, causing safety risks.

[0077] In this embodiment, for the physical section P2 as the section to be unlocked, since the physical section P2 is the last physical section of the route S1-S3, the terminal signal S3 of the route S1-S3 can be found, and the external route starting from S3 is found, and there is only the S3-X1 route. The S3-X1 route only contains one physical section P3. The physical section P3 contains two axle counting sections JZ1 and JZ2. Train 2 occupies the axle counting section JZ2. For the axle counting sections JZ1 and JZ2 included in the physical section P3, the set switch position configured by the axle counter should be the positioning position, but the current switch position of the switch DC1 is the reverse position, which is inconsistent with the set switch position of the axle counter. At this time, the physical section P2 is set to fault lock, and the S1-S3 route will not be handled incorrectly, avoiding safety risks. Alternatively, assuming that the current switch position of switch DC1 is the positioning position, which is consistent with the set switch position of the axle counter, the physical section P2 can be automatically unlocked normally at this time.

[0078] Similarly, the current route is route S2-S4, which includes two physical sections P4 and P5. Train 3 occupies physical section P5. For physical section P5 as the section to be unlocked, since physical section P5 is the last physical section of route S2-S4, the terminal signal S4 of route S2-S4 can be found, and the external route starting from S4 can be found, including route S4-X1 and route S4-X2. The starting physical section of the middle route S4-X1 includes the axle counting section JZ3, and the starting physical section of the route S4-X2 includes the axle counting section JZ4. JZ3 includes turnouts DC2 and DC3, and the axle counting section JZ4 includes turnout DC2. The set turnout positions of turnouts DC3 and DC4 are determined to be positioned based on the axle counter of the axle counting section JZ3, and the set turnout position of turnout DC3 is determined to be reversed based on the axle counter of the axle counting section JZ4. If the current turnout positions of the turns included in any of the starting physical sections of the route S4-X1 and the route S4-X2 are correct, the physical section P5 can be unlocked normally; otherwise, if the turnout position checks fail, the physical section P5 is set to be fault locked.

[0079] It should be noted that after determining that the section to be unlocked meets the unlocking conditions, the switch position of the external approach of the current approach is further verified to avoid erroneous unlocking of the section to be unlocked, optimize the section unlocking scheme based on the unlocking conditions, prevent train rear-end collision caused by erroneous unlocking of the approach, improve the unlocking accuracy of the approach section, and reduce safety risks.

[0080] In an optional implementation manner of this embodiment, the method further includes:

[0081] In the case where the target route is free, determining whether there is a turnout in the target route, wherein the target route is any route currently to be processed;

[0082] If a turnout exists, the turnout is controlled to move to a specified position according to the train operation plan;

[0083] When each switch in the target route moves to a designated position, the switch position of each switch is locked, and the state of the target route is updated to the initial locking of the route.

[0084] It should be noted that for any idle target route, it can be determined whether there is a turnout in the target route. If there is a turnout, the turnout is controlled to move to the specified position according to the train operation plan, so that the subsequent train can run in the direction specified in the operation plan. When each turnout in the target route moves to the specified position, each turnout is locked to prevent the turnout position from changing, and the state of the target route is updated to the route unlocked, that is, the route can be processed normally for trains to enter.

[0085] In an optional implementation of this embodiment, after updating the state of the target route to route initial lock, the method further includes:

[0086] When the train enters the approach section of the target route, updating the state of the target route to nearly open;

[0087] When the inner and outer physical sections of the starting signal of the target route are occupied at the same time, the train entry is determined and the physical sections of the target route are unlocked in sequence.

[0088] The approach section is a section located before the target route and at a set distance from the target route.

[0089] In actual implementation, after the status of the target route is updated to the initial route lock, the train can drive to the target route. If the train enters the approach section of the target route, it means that the train is approaching the target route. At this time, the status of the target route can be updated to nearly open. When the inner and outer physical sections of the starting signal of the target route are occupied at the same time, that is, the last physical section of the outer route before the target route and the first physical section in the target route are occupied at the same time, it means that the train enters the target route and passes through the first physical section in the target route. At this time, the target route is the current route to be unlocked. It can be judged in turn whether each physical section meets the unlocking conditions, so as to automatically unlock each physical section in turn.

[0090] Specifically, when each physical section is automatically unlocked in sequence, the unlocking logic of the starting physical section and the last physical section is different from that of the middle physical section. For the starting physical section, after checking that the current section is cleared and the next section is occupied, and the start signal is normally closed due to the train entering, that is, it is close to being locked normally, it will be automatically unlocked after a certain delay; for the middle physical section, the three-point inspection principle is adopted for automatic unlocking; for the last physical section, the above-mentioned step of checking the position of the turnout of at least one external approach with the terminal signal as the starting point is executed. If the inspection passes, it will be automatically unlocked, and if the inspection fails, it will be fault locked.

[0091] In the embodiment of this specification, when the section to be unlocked meets the unlocking conditions, for the last physical section, its next section belongs to the external section of the current route, and there may be a handling error, so at least one external route starting from the terminal signal of the current route is further found, and then the current switch position of the starting physical section of each external route is checked to determine whether to unlock the area to be unlocked. In this way, after judging that the section to be unlocked meets the unlocking conditions, the switch position of the external route of the current route is further verified, avoiding the wrong unlocking of the section to be unlocked, optimizing the section unlocking scheme based on the unlocking conditions, preventing the train rear-end collision caused by the wrong unlocking of the route, improving the unlocking accuracy of the route section, and reducing the safety risk.

[0092] Figure 3 FIG. 1 shows a process flow chart of a route section unlocking method provided by an embodiment of the present specification, such as Figure 3 As shown, when handling the route, first determine the idle target route, and select the target route, that is, determine whether the target route contains a turnout. If it does, control the turnout in the target route to move to the specified position according to the train operation plan; after the selection is completed, update the status of the target route to the initial lock of the route. Then, configure the starting signal of the target route to be pre-opened, and when the train approaches the target route and enters the approach section of the target route, update the status of the target route to approaching opening; when the inner and outer physical sections of the starting signal of the target route are occupied at the same time, determine that the train enters.

[0093] For the first physical section of the target route, when the starting signal is normally closed due to the entry of the train, that is, when the approach locking is normal, after checking that the current section is cleared and the next section is occupied, the first physical section is automatically unlocked after a certain delay. Successful unlocking indicates that the automatic unlocking of the target route is normal, and the other physical sections of the target route are unlocked through the following process.

[0094] Determine whether the current section to be unlocked meets the three-point check principle. If it meets the three-point check principle, determine whether the current section to be unlocked is the last physical section. If it is not the last physical section, it will be automatically unlocked after a delay of the set time; if it is the last physical section, determine the terminal signal of the target route, and determine at least one external route starting from the terminal signal; for each external route, determine whether the current turnout position of its starting physical section is consistent with the set turnout position, and perform a turnout position check on each external route; if any external route meets the turnout position check, it will be automatically unlocked after a delay of the set time; if all external routes do not meet the turnout position check, the section to be unlocked is set to be fault locked.

[0095] In the embodiment of this specification, when the section to be unlocked meets the unlocking conditions, for the last physical section, its next section belongs to the external section of the current route, and there may be a handling error, so at least one external route starting from the terminal signal of the current route is further found, and then the current switch position of the starting physical section of each external route is checked to determine whether to unlock the area to be unlocked. In this way, after judging that the section to be unlocked meets the unlocking conditions, the switch position of the external route of the current route is further verified, avoiding the wrong unlocking of the section to be unlocked, optimizing the section unlocking scheme based on the unlocking conditions, preventing the train rear-end collision caused by the wrong unlocking of the route, improving the unlocking accuracy of the route section, and reducing the safety risk.

[0096] Corresponding to the above method embodiment, this specification also provides an approach section unlocking device embodiment, Figure 4 FIG. 2 shows a schematic diagram of a structure of an access section unlocking device provided by an embodiment of this specification. Figure 4 As shown, the device comprises:

[0097] The first determination module 402 is configured to determine whether the to-be-unlocked section is the last physical section of the current route when the to-be-unlocked section meets the unlocking condition;

[0098] The second determination module 404 is configured to determine the terminal signal of the current route if it is the last physical section, and determine at least one external route starting from the terminal signal;

[0099] The first unlocking module 406 is configured to determine whether to unlock the to-be-unlocked section according to the current turnout position of the starting physical section of each external route when the starting physical section of each external route includes a turnout.

[0100] Optionally, the first unlocking module 406 is further configured to:

[0101] According to the current turnout position of the starting physical section of each foreign approach route, a turnout position check is performed on the starting physical section of each foreign approach route;

[0102] When any starting physical section satisfies the turnout position check, unlocking the section to be unlocked;

[0103] In the case that each starting physical section does not satisfy the turnout position check, the section to be unlocked is set as fault locked.

[0104] Optionally, the first unlocking module 406 is further configured to:

[0105] Determine the axle counting section included in the target starting physical section, wherein the target starting physical section is the starting physical section of any external approach;

[0106] According to the axle counter of the axle counting section, obtaining a set turnout position configured in the axle counting section;

[0107] In the case where the current turnout position of the target starting physical section is consistent with the set turnout position, determining that the target starting physical section satisfies the turnout position check;

[0108] In the case that the current turnout position of the target starting physical section is inconsistent with the set turnout position, it is determined that the target starting physical section does not satisfy the turnout position check.

[0109] Optionally, the device further includes a third determining module, configured to:

[0110] Acquire the unlocking state of the previous section of the section to be unlocked, the first occupied state of the section to be unlocked, and the second occupied state of the next section;

[0111] According to the unlocking state, the first occupied state and the second occupied state of the previous section, it is determined whether the section to be unlocked satisfies the unlocking condition.

[0112] Optionally, the device further includes a second unlocking module configured to:

[0113] If it is not the last physical segment, unlocking the segment to be unlocked is delayed for a set period of time.

[0114] Optionally, the device further includes a third unlocking module configured to:

[0115] When the starting physical section of any external approach does not include a turnout, the section to be unlocked is unlocked for a set delay time.

[0116] Optionally, the device further comprises a control module configured to:

[0117] In the case where the target route is free, determining whether there is a turnout in the target route, wherein the target route is any route currently to be processed;

[0118] If a turnout exists, the turnout is controlled to move to a specified position according to the train operation plan;

[0119] When each switch in the target route moves to a designated position, the switch position of each switch is locked, and the state of the target route is updated to the initial locking of the route.

[0120] Optionally, the control module is further configured to:

[0121] When the train enters the approach section of the target route, updating the state of the target route to nearly open;

[0122] When the inner and outer physical sections of the starting signal of the target route are occupied at the same time, the train entry is determined and the physical sections of the target route are unlocked in sequence.

[0123] The route section unlocking device provided in the embodiment of this specification includes a first determination module, a second determination module and a first unlocking module. The last physical section is determined based on the first determination module, the external route is determined based on the second determination module, and the unlocking judgment is implemented based on the first unlocking module. In this way, after judging that the section to be unlocked meets the unlocking conditions, the switch position of the external route of the current route is further verified, avoiding the wrong unlocking of the section to be unlocked, optimizing the section unlocking scheme based on the unlocking conditions, preventing the train from rear-ending due to wrong unlocking of the route, improving the unlocking accuracy of the route section, and reducing the safety risk.

[0124] The above is a schematic scheme of a route section unlocking device of this embodiment. It should be noted that the technical scheme of the route section unlocking device and the technical scheme of the route section unlocking method described above are of the same concept, and the details not described in detail in the technical scheme of the route section unlocking device can be referred to the description of the technical scheme of the route section unlocking method described above.

[0125] Figure 5 The block diagram of a computing device according to an embodiment of the present specification is shown. The components of the computing device 500 include but are not limited to a memory 510 and a processor 520. The processor 520 is connected to the memory 510 via a bus 530, and the database 550 is used to store data.

[0126] The computing device 500 also includes an access device 540 that enables the computing device 500 to communicate via one or more networks 560. Examples of these networks include a public switched telephone network (PSTN), a local area network (LAN), a wide area network (WAN), a personal area network (PAN), or a combination of communication networks such as the Internet. The access device 540 may include one or more of any type of network interface (e.g., a network interface card (NIC)) that is wired or wireless, such as an IEEE 802.11 wireless local area network (WLAN) wireless interface, a world-wide interoperability for microwave access (Wi-MAX) interface, an Ethernet interface, a universal serial bus (USB) interface, a cellular network interface, a Bluetooth interface, and a near field communication (NFC).

[0127] In one embodiment of the present specification, the above components of the computing device 500 and Figure 5 Other components not shown in the figure may also be connected to each other, for example, via a bus. It should be understood that Figure 5 The computing device structure block diagram shown is only for the purpose of illustration, and is not intended to limit the scope of this specification. Those skilled in the art can add or replace other components as needed.

[0128] The computing device 500 may be any type of stationary or mobile computing device, including a mobile computer or mobile computing device (e.g., a tablet computer, a personal digital assistant, a laptop computer, a notebook computer, a netbook, etc.), a mobile phone (e.g., a smart phone), a wearable computing device (e.g., a smart watch, smart glasses, etc.), or other types of mobile devices, or a stationary computing device such as a desktop computer or a personal computer (PC). The computing device 500 may also be a mobile or stationary server.

[0129] The processor 520 is used to execute the following computer executable instructions, which, when executed by the processor, implement the steps of the above-mentioned route section unlocking method.

[0130] The above is a schematic scheme of a computing device of this embodiment. It should be noted that the technical scheme of the computing device and the technical scheme of the above-mentioned route section unlocking method belong to the same concept, and the details not described in detail in the technical scheme of the computing device can be referred to the description of the technical scheme of the above-mentioned route section unlocking method.

[0131] An embodiment of the present specification also provides a computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, implement the steps of the above-mentioned route section unlocking method.

[0132] The above is a schematic scheme of a computer-readable storage medium of this embodiment. It should be noted that the technical scheme of the storage medium and the technical scheme of the above-mentioned route section unlocking method belong to the same concept, and the details not described in detail in the technical scheme of the storage medium can be referred to the description of the technical scheme of the above-mentioned route section unlocking method.

[0133] An embodiment of the present specification also provides a computer program product, including a computer program / instruction, which implements the steps of the above-mentioned route section unlocking method when executed by a processor.

[0134] The above is a schematic scheme of a computer program product of this embodiment. It should be noted that the technical scheme of the computer program product and the technical scheme of the above-mentioned route section unlocking method belong to the same concept, and the details not described in detail in the technical scheme of the computer program product can be referred to the description of the technical scheme of the above-mentioned route section unlocking method.

[0135] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0136] The computer instructions include computer program codes, which may be in source code form, object code form, executable files or some intermediate forms, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium may be appropriately increased or decreased according to the requirements of patent practice. For example, in some regions, according to patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.

[0137] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the embodiments of this specification are not limited by the order of the actions described, because according to the embodiments of this specification, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the embodiments of this specification.

[0138] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0139] The preferred embodiments of this specification disclosed above are only used to help explain this specification. The optional embodiments do not describe all the details in detail, nor do they limit the invention to only the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of the embodiments of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the embodiments of this specification, so that technicians in the relevant technical field can well understand and use this specification. This specification is only limited by the claims and their full scope and equivalents.

Claims

1. A route section unlocking method, It is characterized in that include: In the case where the section to be unlocked meets the unlocking condition, determining whether the section to be unlocked is the last physical section of the current route, wherein the unlocking condition refers to the condition that should be met for checking the section to be unlocked to be automatically unlocked, the current route is the route that needs to be unlocked after the train passes normally, and the section to be unlocked is the physical section in the current route that currently needs to be unlocked; If it is the last physical section, determine the terminal signal of the current route, and determine at least one external route starting from the terminal signal; In the case that the starting physical section of each external approach includes a turnout, a turnout position check is performed on the starting physical section of each external approach according to the current turnout position of the starting physical section of each external approach, and in the case that any starting physical section satisfies the turnout position check, the section to be unlocked is unlocked, wherein the turnout position check is that the current turnout position is consistent with the set turnout position, and the set turnout position is the correct turnout position configured by the axle counter.

2. The route section unlocking method according to claim 1, It is characterized in that After checking the turnout position of the starting physical section of each foreign route according to the current turnout position of the starting physical section of each foreign route, the method further includes: In the case that each starting physical section does not satisfy the turnout position check, the section to be unlocked is set as fault locked.

3. The route section unlocking method according to claim 1, It is characterized in that The step of checking the turnout position of the starting physical section of each foreign route according to the current turnout position of the starting physical section of each foreign route comprises: Determine the axle counting section included in the target starting physical section, wherein the target starting physical section is the starting physical section of any external approach; According to the axle counter of the axle counting section, obtaining a set turnout position configured in the axle counting section; In the case where the current turnout position of the target starting physical section is consistent with the set turnout position, determining that the target starting physical section satisfies the turnout position check; In the case that the current turnout position of the target starting physical section is inconsistent with the set turnout position, it is determined that the target starting physical section does not satisfy the turnout position check.

4. The route section unlocking method according to any one of claims 1 to 3, It is characterized in that Before determining whether the to-be-unlocked section is the last physical section of the current route when the to-be-unlocked section meets the unlocking condition, the method further includes: Acquire the unlocking state of the previous section of the section to be unlocked, the first occupied state of the section to be unlocked, and the second occupied state of the next section; According to the unlocking state, the first occupied state and the second occupied state of the previous section, it is determined whether the section to be unlocked satisfies the unlocking condition.

5. The route section unlocking method according to claim 4, It is characterized in that After determining whether the section to be unlocked is the last physical section of the current route, the method further includes: If it is not the last physical segment, unlocking the segment to be unlocked is delayed for a set period of time.

6. The route section unlocking method according to claim 4, It is characterized in that After determining at least one external route starting from the terminal signal, the method further includes: When the starting physical section of any external approach does not include a turnout, the section to be unlocked is unlocked for a set delay time.

7. The route section unlocking method according to any one of claims 1 to 3, It is characterized in that The method further comprises: In the case where the target route is free, determining whether there is a turnout in the target route, wherein the target route is any route currently to be processed; If a turnout exists, the turnout is controlled to move to a specified position according to the train operation plan; When each switch in the target route moves to a designated position, the switch position of each switch is locked, and the state of the target route is updated to the initial locking of the route.

8. The route section unlocking method according to claim 7, It is characterized in that After the state of the target route is updated to route initial lock, the method further includes: When the train enters the approach section of the target route, updating the state of the target route to nearly open; When the inner and outer physical sections of the starting signal of the target route are occupied at the same time, the train entry is determined and the physical sections of the target route are unlocked in sequence.

9. An access section unlocking device, It is characterized in that include: A first determination module is configured to determine whether the section to be unlocked is the last physical section of the current route when the section to be unlocked meets the unlocking condition, wherein the unlocking condition refers to the condition that should be met for automatically unlocking the section to be unlocked, the current route is the route that needs to be unlocked after the train passes normally, and the section to be unlocked is the physical section in the current route that currently needs to be unlocked; The second determination module is configured to determine the terminal signal of the current route if it is the last physical section, and determine at least one external route starting from the terminal signal; The first unlocking module is configured to, when the starting physical section of each external approach contains a turnout, perform a turnout position check on the starting physical section of each external approach according to the current turnout position of the starting physical section of each external approach, and unlock the section to be unlocked when any starting physical section satisfies the turnout position check, wherein the turnout position check is that the current turnout position is consistent with the set turnout position, and the set turnout position is the correct turnout position configured by the axle counter.

10. A computing device, It is characterized in that include: Memory and processor; The memory is used to store computer executable instructions, and the processor is used to execute the computer executable instructions. When the computer executable instructions are executed by the processor, the steps of the route section unlocking method described in any one of claims 1-8 are implemented.

11. A computer-readable storage medium, It is characterized in that It stores computer executable instructions, which, when executed by a processor, can implement the steps of the route section unlocking method described in any one of claims 1-8.

12. A computer program product, It is characterized in that It includes a computer program / instruction, which, when executed by a processor, implements the steps of the route section unlocking method described in any one of claims 1 to 8.