A construction method for foundation pit support structure

The combined structure of soil-facing side guide walls and steel pipe piles solves the problems of material waste and complicated steps in traditional construction, reduces the amount of formwork and disassembly in foundation pit construction, and improves the stability and construction efficiency of foundation pits. Reduced engineering costs.

CN118704490BActive Publication Date: 2024-10-29BEIJING URBAN CONSTR GROUP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411178250.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-10-29
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

In traditional underground diaphragm wall construction, there are problems such as waste of steel bars, formwork, and concrete materials, complicated construction procedures, and increased project volume, which seriously affects the progress of the project.

Method used

The combined structure of the soil-facing side guide wall and steel pipe piles is used to replace the traditional retaining wall, reducing the construction of the retaining wall at the top of the crown beam. By setting evenly spaced steel pipe piles on the soil-facing side guide wall and placing them inside Pour cement mortar to enhance the overturning resistance and bearing capacity of the structure, and reduce the number of demolition and grading excavations of the side guide walls of the foundation pit.

Benefits of technology

It effectively reduces the amount of formwork and disassembly during foundation pit construction, shortens construction time and material costs, improves the overall stability of the foundation pit, and reduces project costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118704490B_ABST
    Figure CN118704490B_ABST
Patent Text Reader

Abstract

The present invention relates to a construction method of a foundation pit support structure, comprising the following steps: preparation before construction; guide wall construction, including tying steel bars, supporting guide wall templates, and pouring concrete in the guide wall templates to form a foundation pit side guide wall and a soil side guide wall; steel pipe pile construction, evenly arranging steel pipe piles on the soil side guide wall; underground continuous wall construction; crown beam construction, breaking the foundation pit side guide wall, retaining the soil side guide wall, digging a crown beam construction groove pit on the foundation pit side, tying crown beam steel bars, supporting crown beam templates, and pouring concrete in the crown beam templates to form a crown beam; water retaining platform construction; installation of foundation pit guardrails. The present invention reduces the number of slope excavation times and the amount of guide wall demolition work required for crown beam construction during foundation pit construction by combining the soil side guide wall with steel pipe piles, thereby reducing the number of procedures and work required to shorten the manpower, working hours and material costs required for construction, thereby reducing the overall cost of the project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a foundation pit supporting structure node. Background Art

[0002] With the rapid development of urban underground space construction, underground continuous walls are widely used due to their advantages such as high efficiency, short construction period and high economic benefits. Before the construction of underground continuous walls, guide wall construction is required to ensure the accurate lowering position of the steel cage and the quality of the trenching. The current construction process is to break the guide wall after the underground continuous wall is cast, and then carry out slope excavation, construct the crown beam and the concrete retaining structure on the top of the crown beam, and finally backfill the earth. In the traditional design of deep foundation pit support structure, the crown beam is located 1~2m below the ground surface outside the pit, so a cast-in-place concrete retaining wall is required to resist the external soil pressure. In the underground continuous wall support structure of deep and large foundation pit projects in the central area of ​​the city, underground continuous wall support water-stop curtains are mostly used. Before the construction of the underground continuous wall, the foundation pit side guide wall 11 and the soil-facing side guide wall 12 need to be constructed. Refer to Figure 2 After the construction of the foundation pit side guide wall 11 and the soil side guide wall 12 is completed, the construction of the underground continuous wall is carried out, referring to Figure 3 After the construction of the underground continuous wall, the side guide wall 11 of the foundation pit is chiseled out, and the side guide wall 12 facing the soil is chiseled out after the crown beam 2 is completed. After the crown beam 2 is completed, the soil outside the pit is excavated and sloped, and then the retaining wall 8 is cast above the crown beam 2, and finally the backfill outside the pit is formed. Backfill area 9, reference Figure 4 As shown. It can be seen that in the traditional underground continuous wall construction, it is inevitable to waste steel bars, formwork, and concrete materials. Multiple earth excavation and backfilling lead to complicated construction steps, increased engineering workload, and seriously affect the progress of the project. Summary of the invention

[0003] The present invention is intended to provide a construction method for a foundation pit support structure to solve the deficiencies in the prior art. The technical problem to be solved by the present invention is achieved through the following technical solutions.

[0004] A construction method for a foundation pit support structure comprises the following steps:

[0005] Step 1: Preparation before construction;

[0006] Step 2: guide wall construction; including tying the foundation pit side steel bars and the soil side steel bars, supporting the foundation pit side guide wall template and the soil side guide wall template, and pouring concrete in the foundation pit side guide wall template and the soil side guide wall template to form the foundation pit side guide wall and the soil side guide wall;

[0007] Step 3: Steel pipe pile construction: Steel pipe piles are evenly spaced on the guide wall on the soil facing side, the upper end of the steel pipe pile exceeds the upper end surface of the guide wall on the soil facing side to extend into the water retaining platform constructed later, the lower end of the steel pipe pile is embedded to a certain depth below the ground surface, and cement mortar is poured into the steel pipe pile;

[0008] Step 4: underground continuous wall construction;

[0009] Step 5: crown beam construction: demolish the guide wall on the side of the foundation pit, retain the guide wall on the soil-facing side, dig a crown beam construction trench on the side of the foundation pit, tie the crown beam reinforcement, support the crown beam template, and pour concrete in the crown beam template to form the crown beam;

[0010] Step 6: Construction of water retaining platform: pouring water retaining platform at the upper end of the guide wall on the soil facing side;

[0011] Step seven, install the foundation pit guardrail; after the concrete of the water retaining platform reaches the target strength, install the foundation pit guardrail on the upper end of the water retaining platform.

[0012] Preferably, in step one, the pre-construction preparation includes site leveling, measuring and positioning, then excavating an underground continuous wall trench section, and trimming the underground continuous wall trench section.

[0013] Preferably, in step 2, the strength grade of the concrete poured in the foundation pit side guide wall formwork and the soil-facing side guide wall formwork is C20.

[0014] Preferably, in step 2, after the foundation pit side guide wall and the soil facing side guide wall are cast, the foundation pit side guide wall and the soil facing side guide wall are cured for a certain period of time. After the strength of the foundation pit side guide wall and the soil facing side guide wall reaches 70% of the design strength, the foundation pit side formwork and the soil facing side formwork are removed, and square wooden supports are set between the foundation pit side guide wall and the soil facing side guide wall. The number of the wooden supports is multiple and they are arranged at intervals along the extension direction of the underground continuous wall.

[0015] Preferably, the soil-facing side guide wall is in an inverted L-shape, including a horizontal portion and a vertical portion. In step three, the steel pipe piles are arranged on the horizontal portion of the soil-facing side guide wall, and the foundation pit side guide wall and the soil-facing side guide wall are mutually symmetrical structures.

[0016] Preferably, in step three, the mix grade of the cement mortar poured into the steel pipe pile is M25.

[0017] Preferably, in step five, after the strength of the underground continuous wall reaches 80% of the design strength, the side guide wall of the foundation pit is broken, and the floating slurry layer on the top of the underground continuous wall is broken. When breaking the floating slurry layer, it is broken in layers, and the thickness of each layer does not exceed 200 mm.

[0018] Preferably, in step five, when digging the crown beam construction trench, slope is provided on the foundation pit side, and the slope coefficient is 1:1.

[0019] Preferably, in step six, the side surface of the water retaining platform close to the vertical portion of the soil-facing side guide wall is 200 mm away from the inner side surface of the vertical portion of the soil-facing side guide wall, and the height of the water retaining platform is 300 mm.

[0020] Preferably, the upper end of the water retaining platform is flush with the upper end of the steel pipe pile.

[0021] In the present invention, the retaining structure formed by combining the soil-facing side guide wall with the steel pipe piles replaces the retaining structure of the traditional construction method of breaking the soil-facing side guide wall, laying the slope, and pouring the retaining wall. The soil-facing side guide wall formed by pouring concrete is equipped with guide wall steel bars, which itself has certain strength and stability; the soil-facing side guide wall is provided with steel pipe piles whose upper ends extend into the water retaining platform and whose lower ends are embedded in a certain depth below the ground surface, and cement mortar is poured in the steel pipe piles, so that the combined structure of the soil-facing side guide wall and the steel pipe piles has anti-overturning ability, stronger bearing capacity and stability, so as to better resist the soil pressure on the outside of the foundation pit above the top of the crown beam, ensure the overall stability of the foundation pit, and thus there is no need to construct a retaining wall for the second time on the top of the crown beam; at the same time, the soil-facing side guide wall can be used as a construction template on the side of the crown beam close to the soil-facing side guide wall, thereby reducing the amount of templates used and the amount of disassembly during the construction of the crown beam. The invention provides a construction method for a foundation pit support structure, which reduces the number of slope excavation times for constructing a crown beam during foundation pit construction, reduces the amount of demolition work for the guide wall, shortens the manpower, working hours and material costs required for construction by reducing the number of procedures and work, thereby reducing the overall cost of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a flowchart of the present invention;

[0023] Figure 2 It is a schematic diagram of the assembly structure of the soil-facing side guide wall and the steel pipe piles in the present invention;

[0024] Figure 3 It is a schematic diagram of a traditional foundation pit support structure in the background technology of the present invention;

[0025] Figure 4 Another schematic diagram of a traditional foundation pit support structure in the background technology of the present invention;

[0026] Figure 5 It is another schematic diagram of a traditional foundation pit support structure in the background technology of the present invention;

[0027] The reference numerals in the attached drawings are: 11. side guide wall of foundation pit, 12. side guide wall facing soil, 2. crown beam, 3. underground continuous wall, 4. steel pipe piles, 5. water retaining platform, 6. foundation pit guardrail, 7. wooden support, 8. retaining wall, 9. backfill area. DETAILED DESCRIPTION

[0028] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0029] Reference Figure 1 and Figure 2 As shown, a construction method of a foundation pit support structure, the improvement of which is that it includes the following steps:

[0030] Step 1: Preparation before construction;

[0031] Step 2, guide wall construction; including tying the foundation pit side steel bars and the soil side steel bars, supporting the foundation pit side guide wall template and the soil side guide wall template, and pouring concrete in the foundation pit side guide wall template and the soil side guide wall template to form the foundation pit side guide wall 11 and the soil side guide wall 12;

[0032] Step three, steel pipe pile construction; steel pipe piles 4 are evenly spaced on the soil-facing guide wall 12, the upper end of the steel pipe pile 4 exceeds the upper end surface of the soil-facing guide wall 12 to extend into the water retaining platform 5 constructed later, the lower end of the steel pipe pile 4 is embedded to a certain depth below the ground surface, and cement mortar is poured in the steel pipe pile 4;

[0033] Step 4: Construction of underground continuous wall 3;

[0034] Step 5: construction of the crown beam 2; demolish the guide wall 11 on the foundation pit side, retain the guide wall 12 on the soil side, dig a crown beam construction trench on the foundation pit side, tie the crown beam reinforcement, support the crown beam template, and pour concrete in the crown beam template to form the crown beam 2;

[0035] Step 6: Construction of the water retaining platform 5: Casting the water retaining platform 5 at the upper end of the guide wall 12 on the soil facing side;

[0036] Step seven, installing the foundation pit guardrail 6; after the concrete of the water retaining platform 5 reaches the target strength, the foundation pit guardrail 6 is installed on the upper end of the water retaining platform 5.

[0037] In this embodiment, in step 2, the steel bars on the foundation pit side and the steel bars on the soil side are HRB400 steel bars with a diameter of 14mm, the steel bar spacing is 200mm, and the steel bar joints need to be staggered. In step 5, the top of the underground continuous wall 3 extends into the ground of the crown beam 2 for a certain distance, which is at least 50mm, to ensure the firm connection between the crown beam 2 and the underground continuous wall 3; after breaking the foundation pit side guide wall 11, the foundation pit side steel bars are exposed, and part of the crown beam steel bars are tied to the foundation pit side steel bars to resist the soil pressure in the horizontal direction. Since the soil side guide wall 12 is additionally provided with steel pipe piles 4, during the construction of the crown beam 2, it is not necessary to tie the crown beam steel bars to the soil side steel bars. It is only necessary to roughen, clean, and slurry the contact surface between the soil side guide wall 12 and the crown beam 2. In step 3, the length of the steel pipe pile 4, the depth of embedding below the surface and other parameters are determined based on soil conditions, bearing capacity requirements and engineering stability requirements.

[0038] The retaining structure formed by combining the soil-facing side guide wall 12 with the steel pipe piles 4 replaces the retaining structure of the traditional construction method of breaking the soil-facing side guide wall, laying the slope, and pouring the retaining wall. The soil-facing side guide wall 12 made of concrete is equipped with guide wall steel bars, which itself has certain strength and stability; the soil-facing side guide wall 12 is provided with steel pipe piles 4, the upper end of which extends into the water retaining platform 5 and the lower end is embedded in a certain depth below the ground surface, and cement mortar is poured in the steel pipe piles 4, so that the combined structure of the soil-facing side guide wall 12 and the steel pipe piles 4 has anti-overturning ability, stronger bearing capacity and stability, so as to better resist the soil pressure on the outer side of the foundation pit above the top of the crown beam 2, ensure the overall stability of the foundation pit, and thus there is no need to construct a retaining wall for the second time on the top of the crown beam 2; at the same time, the soil-facing side guide wall 12 can be used as a construction template on the side of the crown beam 2 close to the soil-facing side guide wall 12, thereby reducing the amount of templates used and the amount of disassembly during the construction of the crown beam 2.

[0039] The construction method of a foundation pit support structure provided in this embodiment reduces the number of slope excavation times for constructing the crown beam during the foundation pit construction process, reduces the amount of demolition work on the guide wall, shortens the manpower, working hours and material costs required for construction by reducing the number of processes and work, thereby reducing the overall cost of the project.

[0040] Furthermore, in step one, the pre-construction preparation includes site leveling, measuring and positioning, then excavating the underground continuous wall trench section, and trimming the underground continuous wall trench section.

[0041] Furthermore, in step 2, the strength grade of the concrete poured in the foundation pit side guide wall formwork and the soil-facing side guide wall formwork is C20.

[0042] Furthermore, the thickness of the concrete protective layer of the foundation pit side guide wall 11 and the soil-facing side guide wall 12 is 25 mm.

[0043] Furthermore, in step 2, after the pit side guide wall 11 and the soil side guide wall 12 are cast, the pit side guide wall 11 and the soil side guide wall 12 are cured for a certain period of time. After the strength of the pit side guide wall 11 and the soil side guide wall 12 reaches 70% of the design strength, the pit side formwork and the soil side formwork are removed, and square wooden supports 7 are set between the pit side guide wall 11 and the soil side guide wall 12. The number of the wooden supports 7 is multiple and they are arranged at intervals along the extension direction of the underground continuous wall 3.

[0044] In this embodiment, the provision of the wooden support 7 can prevent the lateral displacement of the foundation pit side guide wall 11 and the soil-facing side guide wall 12.

[0045] Furthermore, the spacing between the wooden supports 7 is 1500-2000 mm, and the cross-sectional size of the wooden supports 7 is 100 mm x 100 mm.

[0046] Furthermore, the soil-facing side guide wall 12 is in an inverted L-shape, including a horizontal portion and a vertical portion. In step three, the steel pipe piles 4 are arranged on the horizontal portion of the soil-facing side guide wall 12, and the foundation pit side guide wall 11 and the soil-facing side guide wall 12 are mutually symmetrical structures.

[0047] Furthermore, in step three, the mix grade of the cement mortar poured into the steel pipe pile 4 is M25.

[0048] Furthermore, in step five, after the strength of the underground continuous wall 3 reaches 80% of the design strength, the foundation pit side guide wall 11 is broken, and the floating slurry layer on the top of the underground continuous wall 3 is broken. When breaking the floating slurry layer, it is broken in layers, and the thickness of each layer does not exceed 200 mm.

[0049] In this embodiment, the floating slurry layer is broken to chisel out the waste concrete on the top of the underground continuous wall 3, thereby ensuring the strength of the top of the underground continuous wall 3 and making the bottom of the cap beam 2 and the top of the underground continuous wall 3 more firmly connected.

[0050] Furthermore, in step five, when digging the trench for crown beam construction, slope is provided on the foundation pit side, and the slope coefficient is 1:1.

[0051] Furthermore, in step six, the side surface of the water retaining platform 5 close to the vertical portion of the soil-facing side guide wall 12 is 200 mm away from the inner side surface of the vertical portion of the soil-facing side guide wall 12, and the height of the water retaining platform 5 is 300 mm.

[0052] Furthermore, the upper end of the water retaining platform 5 is flush with the upper end of the steel pipe pile 4 .

[0053] It should be noted that the above detailed descriptions are exemplary and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meaning as commonly understood by those of ordinary skill in the art to which the present application belongs.

[0054] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments described in the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should also be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0055] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.

[0056] In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or apparatus that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units that are not explicitly listed or inherent to these processes, methods, products, or apparatuses.

[0057] For ease of description, spatially relative terms, such as "above", "above", "on the upper surface of", "above", etc., may be used herein to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways, such as rotated 90 degrees or in other orientations, and the spatially relative descriptions used herein are interpreted accordingly.

[0058] In the above detailed description, reference is made to the accompanying drawings, which form a part of this document. In the accompanying drawings, similar symbols typically identify similar components unless the context indicates otherwise. The illustrated embodiments described in the detailed description, drawings, and claims are not meant to be limiting. Other embodiments may be used, and other changes may be made, without departing from the spirit or scope of the subject matter presented herein.

[0059] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A construction method for a foundation pit support structure, characterized in that: The following steps are included: Step 1: Preparation before construction; Step 2, guide wall construction; including tying the foundation pit side steel bars and the soil side steel bars, supporting the foundation pit side guide wall template and the soil side guide wall template, and pouring concrete in the foundation pit side guide wall template and the soil side guide wall template to form the foundation pit side guide wall (11) and the soil side guide wall (12); Step 3, steel pipe pile construction; steel pipe piles (4) are evenly spaced on the soil-facing guide wall (12); the upper ends of the steel pipe piles (4) extend beyond the upper end surface of the soil-facing guide wall (12) to extend into the water retaining platform (5) constructed later; the lower ends of the steel pipe piles (4) are embedded to a certain depth below the ground surface; and cement mortar is poured into the steel pipe piles (4); Step 4: Construction of underground continuous wall (3); Step 5, construction of the crown beam (2); demolishing the guide wall (11) on the side of the foundation pit, retaining the guide wall (12) on the side facing the soil, digging a crown beam construction trench on the side of the foundation pit, tying the crown beam reinforcement, supporting the crown beam template, and pouring concrete in the crown beam template to form the crown beam (2); Step 6: Construction of the water retaining platform (5); pouring the water retaining platform (5) at the upper end of the guide wall (12) on the soil-facing side; Step seven, installing the foundation pit guardrail (6); after the concrete of the water retaining platform (5) reaches the target strength, installing the foundation pit guardrail (6) on the upper end of the water retaining platform (5).

2. The construction method of a foundation pit support structure according to claim 1, characterized in that: Step one, pre-construction preparation includes site leveling, measurement and positioning, then excavation of underground continuous wall trench sections, and trimming of the underground continuous wall trench sections.

3. The construction method of a foundation pit support structure according to claim 1, characterized in that: In step 2, the strength grade of the concrete poured in the foundation pit side guide wall formwork and the soil-facing side guide wall formwork is C20.

4. The construction method of a foundation pit support structure according to claim 1, characterized in that: In step 2, after the foundation pit side guide wall (11) and the soil facing side guide wall (12) are cast, the foundation pit side guide wall (11) and the soil facing side guide wall (12) are cured for a certain period of time. After the strength of the foundation pit side guide wall (11) and the soil facing side guide wall (12) reaches 70% of the design strength, the foundation pit side formwork and the soil facing side formwork are removed, and square wooden supports (7) are arranged between the foundation pit side guide wall (11) and the soil facing side guide wall (12). The number of the wooden supports (7) is plural and they are arranged at intervals along the extension direction of the underground continuous wall (3).

5. The construction method of a foundation pit support structure according to claim 1, characterized in that: The soil-facing side guide wall (12) is in an inverted L-shape, comprising a horizontal portion and a vertical portion. In step three, the steel pipe piles (4) are arranged on the horizontal portion of the soil-facing side guide wall (12). The foundation pit side guide wall (11) and the soil-facing side guide wall (12) are mutually symmetrical structures.

6. The construction method of a foundation pit support structure according to claim 1, characterized in that: In step 3, the mix grade of the cement mortar poured into the steel pipe pile (4) is M25.

7. The construction method of a foundation pit support structure according to claim 1, characterized in that: In step 5, after the strength of the underground continuous wall (3) reaches 80% of the design strength, the side guide wall (11) of the foundation pit is broken, and the floating slurry layer on the top of the underground continuous wall (3) is broken. When breaking the floating slurry layer, it is broken layer by layer, and the thickness of each layer is not more than 200 mm.

8. The construction method of a foundation pit support structure according to claim 1, characterized in that: In step five, when digging the trench for crown beam construction, slope is cut on the side of the foundation pit with a slope coefficient of 1:

1.

9. The construction method of a foundation pit support structure according to claim 1, characterized in that: In step six, the side surface of the vertical portion of the water retaining platform (5) close to the soil-facing side guide wall (12) is 200 mm away from the inner side surface of the vertical portion of the soil-facing side guide wall (12), and the height of the water retaining platform (5) is 300 mm.

10. The construction method of a foundation pit support structure according to claim 1, characterized in that: The upper end of the water retaining platform (5) is flush with the upper end of the steel pipe pile (4).

Citation Information

Patent Citations

  • Superficial layer groove wall reinforcing method of feeble stratum underground continuous wall

    CN103122636A

  • Construction method for underground diaphragm wall penetrating through super-thick silt layer

    CN104612179A