A wire and cable production molding and processing equipment

By introducing drying, crushing and cutting components into the cable production equipment, the problems of poor drying of the pellets and long heating time are solved, and more efficient external protective layer forming processing of cables is achieved, improving product quality and production efficiency.

CN118711900BActive Publication Date: 2024-11-05SHENYANG LIAOXIAN WIRE & CABLE CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411181425.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-05
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

In existing cable production equipment, due to the poor dryness of the pellets, there is too much water vapor during heating, resulting in bubbles, affecting product quality, and the heating time is long, affecting working efficiency.

Method used

A wire and cable production and forming processing equipment is designed, including drying components, crushing components and cutting components. The uniform drying and crushing of pellets is achieved through vibration tanks, reducing heating time, ensuring that pellets are preheated and crushed before heating, and avoiding Bubble formation and material plugging.

Benefits of technology

It effectively avoids bubble problems caused by water vapor generated by wet pellets, shortens heating time, improves work efficiency, and ensures improvement of product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118711900B_ABST
    Figure CN118711900B_ABST
Patent Text Reader

Abstract

The present invention discloses a wire and cable production and molding processing equipment, including: a main machine; a driving component for providing power; a drying component for drying granular materials; a crushing component for crushing granular materials; a feeding component for adding granular materials; an inner screw is installed for rotation inside the main machine, an extrusion head is installed at the left end of the main machine, and a plurality of heat sinks are installed on the main machine. Through the arrangement of the driving component and the drying component, after the granular materials enter the vibration trough, the vibration trough is vibrated and conveyed so that the granular materials can be evenly distributed on the surface of the vibration trough and slowly move toward the target position. The plurality of impellers rotate to blow the hot air emitted by the plurality of heat sinks on the main machine onto the moving granular materials, so that the granular materials come into contact with the hot air, and the effect of dehumidification is achieved. The granular materials are dried in the process of passing through the vibration trough, and a certain preheating effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of cable production equipment, and in particular to a wire and cable production molding and processing equipment. Background Art

[0002] Wires and cables are wire products used to transmit electrical (magnetic) energy, information and realize electromagnetic energy conversion. Wires and cables in a broad sense can be referred to as cables, and cables in a narrow sense refer to insulated cables, which are mainly composed of one or more insulating cores, and their respective coatings, total protective layers and outer sheaths. When processing the outer protective layer of the cable, the plastic or rubber material needs to be heated and covered on the cable conductor through the host to form a protective layer.

[0003] However, the prior art has the following problems:

[0004] Since some pellets are cut underwater, the dryness of some pellets is poor and the pellets are relatively moist. The moist pellets will emit more water vapor during the heating process, which may cause more bubbles to be generated in the melt, resulting in pores in the outer protective layer of the cable during the extrusion process, affecting the product quality.

[0005] The prior art takes a long time to heat and melt the pellets, which affects the overall work efficiency. Summary of the invention

[0006] The purpose of the present invention is to provide a wire and cable production molding and processing equipment to solve the above-mentioned problems and overcome the defects of the prior art, as described in detail below.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] The present invention provides a wire and cable production and molding processing equipment, comprising:

[0009] Host;

[0010] A drive assembly for providing power;

[0011] A drying component for drying the pellets;

[0012] A crushing component, used for crushing granular materials;

[0013] Feeding assembly, used for feeding granular materials;

[0014] An inner screw is rotatably installed inside the main engine, an extrusion head is installed on the left end of the main engine, a plurality of heat sinks are installed on the main engine, and the plurality of heat sinks are located on the left half of the top surface of the main engine. The driving assembly is arranged on the main engine, the drying assembly is arranged on the main engine, the crushing assembly is arranged on the main engine, and the unloading assembly is arranged on the main engine. The driving assembly is located on the right side of the main engine, the drying assembly, the crushing assembly and the unloading assembly are all located above the main engine, the unloading assembly is located on the right side of the drying assembly, and the crushing assembly is located above the unloading assembly. The driving assembly includes a driving box, and a No. 1 gear is connected to the output end of the driving box, a No. 2 gear is installed on the inner screw, a worm is rotatably installed on the main engine, and the worm is located behind the unloading assembly. A No. 3 gear is connected to the end of the worm close to the driving box, and the No. 3 gear and the No. 2 gear are both meshed with the No. 1 gear.

[0015] The drying component includes a bucket No. 1, which is installed on the main machine through a bracket. The bucket No. 1 is located above the main machine near the left side. A mounting frame is installed on the main machine, and a vibration groove is installed on the mounting frame through multiple springs. A rotating shaft is rotatably installed on the main machine, and a worm gear is connected to the rotating shaft, which is meshed with a worm. Two special-shaped blocks are installed on the rotating shaft, and two protrusions are installed on the vibration groove. A cam is connected to the end of the rotating shaft away from the worm gear. A slide frame is slidably installed on the main machine, and a sliding frame is slidably installed on the main machine. The bottom of the mounting frame is slidably connected to a friction frame, and a plurality of impellers are rotatably installed on the mounting frame.

[0016] Preferably, the vibration groove is located below the No. 1 bucket, a plurality of air holes are provided on the vibration groove, the plurality of impellers are located above a plurality of heat sinks, the vibration groove is located above the plurality of impellers, and the friction frame is in contact with the plurality of impellers.

[0017] Preferably, the two special-shaped blocks contact the two protrusions respectively when rotating, one end of the sliding frame is connected to the slide slot frame, the other end of the sliding frame is connected to the friction frame, and the cam is slidably connected to the inner wall of the slide slot frame through a roller.

[0018] Preferably, a round rod is installed on the vibration groove, a dredging rod is connected to the round rod, and the dredging rod is located inside the No. 1 bucket.

[0019] Preferably, the crushing assembly includes a No. 2 bucket, which is installed on the main machine through a bracket. The No. 2 bucket is located above the main machine near the right side. A driven shaft is rotatably installed on the inner wall of the No. 2 bucket. A conveyor belt is sleeved on the rotating shaft and the driven shaft. One end of the conveyor belt is located below the vibration groove, and the other end of the conveyor belt is located above the No. 2 bucket.

[0020] Preferably, a power shaft is rotatably installed on the inner wall of the No. 2 bucket, a No. 1 transmission belt is sleeved on the power shaft and the worm, a plurality of crushing knives are installed on the outer wall of the power shaft, a crushing cylinder is installed at the bottom of the No. 2 bucket, a plurality of holes are arranged on the crushing cylinder, and a plurality of triangular bars are arranged inside the crushing cylinder.

[0021] Preferably, an annular bevel groove is provided on the power shaft, a ball slide is slidably mounted on the inner wall of the No. 2 bucket, a plurality of shift rings are mounted on the ball slide, the inner wall of the ball slide is slidably connected to the annular bevel groove on the power shaft through balls, and the plurality of shift rings are all located inside the No. 2 bucket.

[0022] Preferably, the unloading assembly includes a No. 3 bucket, which is installed on the main machine through a bracket, the top of the No. 3 bucket is connected to the No. 2 bucket, the bottom of the No. 3 bucket is rotatably connected to a rotating cylinder, the rotating cylinder is rotatably connected to the main machine, the outer wall of the rotating cylinder is connected to a bevel gear ring, a bevel gear rod is rotatably installed on the main machine, the bevel gear rod and the power shaft are sleeved with a No. 2 transmission belt, the bevel gear rod is meshed with the bevel gear ring, the inner wall of the rotating cylinder is connected to a unloading ring, the inner wall of the unloading ring is installed with a short shaft, the top of the short shaft is connected to two scraping strips, both of the two scraping strips are in contact with the inner wall of the No. 3 bucket, four square holes are provided at the bottom of the No. 3 bucket, two square holes are provided on the unloading ring, the outer wall of the short shaft is connected to a spiral sheet, a feed port is provided at the connecting position between the main machine and the rotating cylinder, and the spiral sheet is located inside the feed port of the main machine.

[0023] Preferably, the two square holes of the unloading ring are respectively slidably connected to two sliders, and the two sliders are slidably connected to the inner wall of the rotating cylinder. Two fixing frames are installed on the outer wall of the rotating cylinder, and the fixing frames are rotatably connected to a screw rod, and the two screw rods are respectively threadedly connected to the two sliders.

[0024] The beneficial effects are:

[0025] 1. The wire and cable production and molding processing equipment, through the setting of the driving component and the drying component, makes the pellets evenly distributed on the surface of the vibration trough and slowly move toward the target position through the vibration conveying method after entering the vibration trough. The multiple impellers rotate to blow the hot air emitted by the multiple heat sinks on the main engine to the moving pellets, so that the pellets come into contact with the hot air to achieve the effect of dehumidification. The pellets are dried in the process of passing through the vibration trough and achieve a certain preheating effect, avoiding the wet pellets from generating more water vapor during the heating process, thereby affecting the melt quality; through the setting of the dredging rod, the dredging rod can continuously promote the unloading of the No. 1 bucket through vibration, avoiding the situation of material blockage in the No. 1 bucket, thereby affecting the work efficiency.

[0026] 2. The wire and cable production and forming processing equipment, through the setting of the crushing component, enables multiple crushing knives and crushing barrels to crush the granular materials through cooperation, so that the granular materials are crushed into particles of smaller size before heating, thereby accelerating the melting speed, reducing the heating time, and achieving the effect of reducing energy consumption and speeding up the work progress; through the setting of multiple dial rings, the dial rings continuously flatten the granular materials in the No. 2 bucket through reciprocating motion, avoiding the concentrated accumulation of granular materials and affecting the crushing efficiency, thereby affecting the progress of subsequent work.

[0027] 3. The wire and cable production and molding processing equipment, through the setting of the feeding component, makes the feeding ring cooperate with the No. 3 bucket, so that the granular material can fall into the main machine in a timely and quantitative manner, avoiding the uneven feeding amount affecting the melting effect of the granular material. Too much feeding may cause the melt to flow back, and too little feeding may cause uneven stirring; the setting of the scraper can prevent the granular material from adhering to the inner wall of the No. 3 bucket, thereby achieving the effect of promoting feeding; the setting of the two sliders enables the staff to adjust the passing area of ​​the two square holes on the feeding ring by turning the two screws, thereby adjusting the feeding amount, achieving the effect of adjusting the feeding amount according to different production needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0030] Figure 2 is a schematic diagram of the structure of the drive assembly of the present invention;

[0031] Figure 3 It is a schematic diagram of the structure of the drying component of the present invention;

[0032] Figure 4 The present invention Figure 3 A magnified schematic diagram of point A;

[0033] Figure 5 It is a schematic diagram of the friction frame structure of the present invention;

[0034] Figure 6 It is a schematic diagram of the structure of the dredging rod of the present invention;

[0035] Figure 7 It is a schematic diagram of the conveyor belt structure of the present invention;

[0036] Figure 8It is a schematic diagram of the structure of the crushing assembly of the present invention;

[0037] Fig. 9 It is a schematic diagram of the structure of the crushing knife of the present invention;

[0038] Fig.10 It is a schematic structural diagram of a blanking assembly of the present invention;

[0039] Fig.11 It is a schematic diagram of the rotating drum structure of the present invention;

[0040] Fig.12 It is a schematic diagram of the structure of the blanking ring of the present invention.

[0041] The reference numerals are as follows: 1. host; 2. drive assembly; 21. drive box; 22. gear No. 1; 23. gear No. 2; 24. gear No. 3; 3. drying assembly; 31. worm; 32. bucket No. 1; 33. mounting frame; 34. vibration groove; 35. rotating shaft; 36. worm gear; 37. special-shaped block; 38. protrusion; 39. cam; 310. slide frame; 311. sliding frame; 312. friction frame; 313. impeller; 314. round rod; 315. dredging rod; 4. crushing assembly; 41 , driven shaft; 42, conveyor belt; 43, bucket No. 2; 44, power shaft; 45, transmission belt No. 1; 46, crushing knife; 47, crushing cylinder; 48, ball slide; 49, pull ring; 5, unloading assembly; 51, bucket No. 3; 52, rotating cylinder; 53, transmission belt No. 2; 54, bevel gear rod; 55, bevel gear ring; 56, unloading ring; 57, short shaft; 58, scraper; 59, spiral sheet; 510, slider; 511, fixed frame; 512, screw rod; 6, inner screw; 7, extruder head; 8, heat sink. DETAILED DESCRIPTION

[0042] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.

[0043] Example 1, please refer to Figure 1 - Figure 6, a wire and cable production and molding processing equipment, including: a main machine 1; an inner screw 6 is rotatably installed inside the main machine 1, an extrusion head 7 is installed on the left end of the main machine 1, a plurality of heat sinks 8 are installed on the main machine 1, and the plurality of heat sinks 8 are located on the left half of the top surface of the main machine 1, a driving component 2 is used to provide power, the driving component 2 is arranged on the main machine 1, the driving component 2 is located on the right side of the main machine 1, the driving component 2 includes a driving box 21, the output end of the driving box 21 is connected to a first gear 22, a second gear 23 is installed on the inner screw 6, and a plurality of heat sinks 8 are installed on the main machine 1. There is a worm 31, which is located at the rear of the blanking component 5. The end of the worm 31 close to the drive box 21 is connected to the third gear 24. The third gear 24 and the second gear 23 are both meshed with the first gear 22. The first gear 22 drives the inner screw 6 to rotate through the second gear 23. The inner screw 6 heats and melts the granular material in the main machine 1 through the heating of the main machine 1, and stirs and mixes it at the same time. When the granular material is melted, the inner screw 6 conveys the melt to the extruder head 7, and the extruder head 7 squeezes the melt onto the surface of the cable. After the melt is solidified and formed, an outer protective layer of the cable is formed.

[0044] The drying component 3 is used for drying granular materials. The drying component 3 is arranged on the main machine 1. The drying component 3 includes a No. 1 bucket 32. The No. 1 bucket 32 ​​is installed on the main machine 1 through a bracket. The No. 1 bucket 32 ​​is located above the main machine 1 near the left side. A mounting frame 33 is installed on the main machine 1. A vibration groove 34 is installed on the mounting frame 33 through multiple springs. A rotating shaft 35 is rotatably installed on the main machine 1. A worm gear 36 is connected to the rotating shaft 35. The worm gear 36 is meshed with the worm 31. Two special-shaped blocks 37 are installed on the rotating shaft 35. Two protrusions 38 are installed on the vibration groove 34. The two special-shaped blocks 37 are in contact with the two protrusions 38 respectively when rotating. The two special-shaped blocks 37 will continuously lift up the two protrusions 38 when rotating. The two protrusions 38 drive the vibration groove 34 to move upward. Due to the vibration The elastic force of multiple springs between the slot 34 and the mounting frame 33 causes the two special-shaped blocks 37 to lose their upward thrust on the vibration slot 34, and the vibration slot 34 will be reset due to the elastic force, thereby achieving the effect of continuous vibration of the vibration slot 34. Since the vibration slot 34 is inclined, when the staff adds the pellets into the No. 1 bucket 32, the pellets fall into the vibration slot 34 through the outlet of the No. 1 bucket 32, and the vibration slot 34 continuously transports the pellets to the right through vibration. When the pellets leave the vibration slot 34, they fall onto the conveyor belt 42. The vibration slot 34 transports the pellets by vibration, which can make the pellets evenly distributed on the surface of the vibration slot 34 and gradually move to the right. The end of the rotating shaft 35 away from the worm gear 36 is connected to a cam 39, and the sliding mounting on the main machine 1 A slide frame 310 is installed, and a sliding frame 311 is slidably installed on the main machine 1. One end of the sliding frame 311 is connected to the slide frame 310, and the other end of the sliding frame 311 is connected to the friction frame 312. The cam 39 is slidably connected to the inner wall of the slide frame 310 through a roller. When the rotating shaft 35 rotates, the cam 39 is driven to rotate. The cam 39 drives the slide frame 310 to reciprocate left and right through the roller. The bottom of the mounting frame 33 is slidably connected to the friction frame 312, and a plurality of impellers 313 are rotatably installed on the mounting frame 33. The friction frame 312 contacts the plurality of impellers 313. The vibration groove 34 is located below the first bucket 32. A plurality of air holes are provided on the vibration groove 34. The plurality of impellers 313 are all located above the plurality of heat sinks 8. The vibration groove 34 is located above the plurality of impellers 3 13, since there is a large friction force between the friction frame 312 and the multiple impellers 313, the friction frame 312 can drive the multiple impellers 313 to rotate when sliding back and forth left and right. Since the main machine 1 will emit a certain amount of heat during the heating process, the multiple heat sinks 8 can promote the heat dissipation. The multiple impellers 313 can form an upward airflow through rotation, and the heat emitted by the multiple heat sinks 8 is blown upward. The hot air passes through the vibration groove 34 through the multiple air holes of the vibration groove 34, so that the hot air contacts the pellets in the vibration groove 34. The hot air achieves a drying effect through contact with the pellets. A round rod 314 is installed on the vibration groove 34, and a dredging rod 315 is connected to the round rod 314. The dredging rod 315 is located inside the No. 1 bucket 32.When the vibration trough 34 vibrates, the round rod 314 drives the dredging rod 315 to vibrate. The dredging rod 315 can promote the falling of the pellets in the No. 1 bucket 32 ​​through vibration to avoid blockage. Through the setting of the driving component 2 and the drying component 3, after the pellets enter the vibration trough 34, the vibration trough 34 can be evenly distributed on the surface of the vibration trough 34 and slowly move toward the target position through vibration conveying. The multiple impellers 313 rotate to blow the hot air emitted by the multiple heat sinks 8 on the main machine 1 onto the moving pellets, so that the pellets come into contact with the hot air to achieve the effect of dehumidification. The pellets are dried in the process of passing through the vibration trough 34 and achieve a certain preheating effect, avoiding the wet pellets from generating more water vapor during the heating process, thereby affecting the melt quality; through the setting of the dredging rod 315, the dredging rod 315 can continuously promote the discharge of the No. 1 bucket 32 ​​through vibration, avoiding the blockage in the No. 1 bucket 32, thereby affecting the work efficiency.

[0045] For further information, see Figure 7 - Fig. 9The crushing assembly 4 is used to crush the granular material. The crushing assembly 4 is arranged on the main machine 1. The crushing assembly 4 includes a No. 2 bucket 43. The No. 2 bucket 43 is installed on the main machine 1 through a bracket. The No. 2 bucket 43 is located above the main machine 1 near the right side. The inner wall of the No. 2 bucket 43 is rotatably installed with a driven shaft 41. A conveyor belt 42 is sleeved on the rotating shaft 35 and the driven shaft 41. One end of the conveyor belt 42 is located below the vibration groove 34, and the other end of the conveyor belt 42 is located above the No. 2 bucket 43. The rotating shaft 35 drives the conveyor belt 42 to rotate by cooperating with the driven shaft 41. After the granular material falls from the vibration groove 34 onto the conveyor belt 42, it is transported to the No. 2 bucket 43 by the conveyor belt 42. A power shaft 44 is rotatably installed on the inner wall of the No. 2 bucket 43. A No. 1 transmission belt 45 is sleeved on the power shaft 44 and the worm 31. A plurality of crushing knives 46 are installed on the outer wall of the power shaft 44. A crushing barrel 47 is installed at the bottom of the No. 2 bucket 43. The crushing barrel A plurality of holes are arranged on 47, a plurality of triangular bars are arranged inside the crushing cylinder 47, a plurality of crushing knives 46 crush the granular materials by cooperating with the plurality of triangular bars on the crushing cylinder 47, and the crushed granular materials fall into the No. 3 bucket 51 through the plurality of holes on the crushing cylinder 47. After the granular materials are crushed, the melting speed can be accelerated, thereby improving the working efficiency. An annular inclined groove is arranged on the power shaft 44, and a ball slide 48 is slidably installed on the inner wall of the No. 2 bucket 43, and a plurality of dial rings 49 are installed on the ball slide 48. The inner wall of the ball slide 48 is slidably connected with the annular inclined groove on the power shaft 44 through balls, and the plurality of dial rings 49 are all located inside the No. 2 bucket 43. When the ball slide 48 reciprocates left and right, it drives the plurality of dial rings 49 to move synchronously, and the plurality of dial rings 49 can evenly spread the granular materials in the No. 2 bucket 43 through the reciprocating motion left and right, so as to avoid the concentrated accumulation of granular materials and affect the crushing efficiency. By setting up the crushing assembly 4, multiple crushing knives 46 and crushing barrels 47 can cooperate to crush the granular materials, so that the granular materials are crushed into particles of smaller size before heating, thereby accelerating the melting speed and reducing the heating time; by setting up multiple shifting rings 49, the shifting rings 49 can continuously flatten the granular materials in the second bucket 43 through reciprocating motion, avoiding the concentrated accumulation of granular materials and affecting the crushing efficiency.

[0046] Further, see Fig.10 - Fig.12, a feeding assembly 5 is used for adding granular materials, the feeding assembly 5 is arranged on the main machine 1, the drying assembly 3, the crushing assembly 4 and the feeding assembly 5 are all located above the main machine 1, the feeding assembly 5 is located on the right side of the drying assembly 3, the crushing assembly 4 is located above the feeding assembly 5, the feeding assembly 5 includes a No. 3 bucket 51, the No. 3 bucket 51 is installed on the main machine 1 through a bracket, the top of the No. 3 bucket 51 is connected to the No. 2 bucket 43, the bottom of the No. 3 bucket 51 is rotatably connected with a rotating cylinder 52, the rotating cylinder 52 is rotatably connected to the main machine 1, the outer wall of the rotating cylinder 52 is connected with a bevel gear ring 55, and a bevel gear rod 54 is rotatably installed on the main machine 1, the cone A No. 2 transmission belt 53 is sleeved on the gear rod 54 and the power shaft 44, the bevel gear rod 54 is meshed with the bevel gear ring 55, the inner wall of the rotating cylinder 52 is connected with a feed ring 56, the inner wall of the feed ring 56 is installed with a short shaft 57, the top of the short shaft 57 is connected with two scraping strips 58, the two scraping strips 58 are in contact with the inner wall of the No. 3 bucket 51, the two scraping strips 58 can prevent the pellets from adhering to the inside of the No. 3 bucket 51 by rotating, and promote the falling of the pellets, the bottom of the No. 3 bucket 51 is provided with four square holes, and the feed ring 56 is provided with two square holes, and when the feed ring 56 rotates, it drives the two square holes above it to rotate, so that the feed ring 56 When the two square holes rotate, they overlap alternately with the four square holes at the bottom of the third bucket 51. When the two square holes of the lower feeding ring 56 overlap with two of the square holes at the bottom of the third bucket 51, the pellets will fall into the feeding port of the main machine 1, thereby achieving the effect of uniform feeding. The outer wall of the short shaft 57 is connected with a spiral piece 59. The connecting position of the main machine 1 and the rotating cylinder 52 is provided with a feeding port. The spiral piece 59 is located inside the feeding port of the main machine 1. The spiral piece 59 can promote the pellets to fall into the main machine 1 through the feeding port of the main machine 1 through rotation, and can prevent the pellets in the main machine 1 from flowing back. The two square holes of the lower feeding ring 56 slide respectively. There are two sliding blocks 510 that are movably connected. Both sliding blocks 510 are slidably connected to the inner wall of the rotating cylinder 52. Two fixing frames 511 are installed on the outer wall of the rotating cylinder 52. The fixing frames 511 are rotatably connected with screw rods 512. The two screw rods 512 are respectively threadedly connected to the two sliding blocks 510. The staff can rotate the two screw rods 512 on the two fixing frames 511. When the screw rod 512 rotates, the sliding block 510 threadedly connected to the screw rod 512 can slide in the square hole of the unloading ring 56, thereby achieving the effect of adjusting the passing area of ​​the square hole, so that the staff can adjust the unloading speed according to production needs. By setting the unloading component 5, the unloading ring 56 cooperates with the No. 3 bucket 51, so that the pellets can fall into the main machine 1 in a timely and quantitative manner, avoiding uneven unloading and affecting the melting effect of the pellets; the scraper 58 can avoid the pellets from adhering to the inner wall of the No. 3 bucket 51, thereby achieving the effect of promoting unloading; the two sliders 510 are set so that the staff can adjust the passing area of ​​the two square holes on the unloading ring 56 by rotating the two screw rods 512, thereby adjusting the unloading amount.

[0047] With the above structure, the working principle of this case is that after the driving box 21 is started, the driving box 21 drives the No. 1 gear 22 to rotate, the No. 1 gear 22 drives the inner screw 6 to rotate through the No. 2 gear 23, the inner screw 6 heats and melts the granular material in the main machine 1 through the heating of the main machine 1, and stirs and mixes at the same time, when the granular material is melted, the inner screw 6 conveys the melt to the extrusion head 7, the extrusion head 7 squeezes the melt on the surface of the cable, and after the melt is solidified and formed, an outer protective layer of the cable is formed; the No. 1 gear 22 drives the worm 31 to rotate through the No. 3 gear 24, the worm 31 drives the rotating shaft 35 to rotate through the worm wheel 36, the rotating shaft 35 drives the two special-shaped blocks 37 to rotate, and the two special-shaped blocks 37 will continuously push up the two protrusions 38 when rotating, and the two protrusions 38 drive the vibration groove 34 upward Due to the elastic force of multiple springs between the vibration groove 34 and the mounting frame 33, after the two special-shaped blocks 37 lose the upward thrust on the vibration groove 34, the vibration groove 34 will be reset due to the elastic force, thereby achieving the effect of continuous vibration of the vibration groove 34. Since the vibration groove 34 is inclined, when the staff adds the pellets into the No. 1 bucket 32, the pellets fall into the vibration groove 34 through the outlet of the No. 1 bucket 32. The vibration groove 34 continuously transports the pellets to the right through vibration. When the pellets leave the vibration groove 34, the pellets fall onto the conveyor belt 42. The vibration groove 34 transports the pellets by vibration, which can make the pellets evenly distributed on the surface of the vibration groove 34 and gradually move to the right. When the rotating shaft 35 rotates, it drives the cam 39 to rotate, and the cam 39 passes through the roller The wheel drives the slide frame 310 to move back and forth left and right, and the slide frame 310 drives the friction frame 312 to slide back and forth left and right through the sliding frame 311. Since there is a large friction force between the friction frame 312 and the multiple impellers 313, the friction frame 312 can drive the multiple impellers 313 to rotate when sliding back and forth left and right. Since the host 1 will emit a certain amount of heat during the heating process, the multiple heat sinks 8 can promote the heat dissipation. The multiple impellers 313 can form an upward airflow through rotation, and the heat emitted by the multiple heat sinks 8 is blown upward. The hot air passes through the vibration groove 34 through the multiple air holes of the vibration groove 34, so that the hot air contacts the granular materials in the vibration groove 34, and the hot air achieves a drying effect through contact with the granular materials; the vibration groove 34 vibrates During the movement, the round rod 314 drives the dredging rod 315 to vibrate, and the dredging rod 315 can promote the falling of the pellets in the No. 1 bucket 32 ​​through vibration to avoid blockage; through the arrangement of the driving component 2 and the drying component 3, after the pellets enter the vibration groove 34, the vibration groove 34 is transported by vibration, so that the pellets can be evenly distributed on the surface of the vibration groove 34 and slowly move toward the target position. The multiple impellers 313 rotate to blow the hot air emitted by the multiple heat sinks 8 on the main machine 1 onto the moving pellets, so that the pellets come into contact with the hot air to achieve the effect of dehumidification. The pellets are dried in the process of passing through the vibration groove 34, and a certain preheating effect is achieved, so that the wet pellets are prevented from generating more water vapor during the heating process, thereby affecting the melt quality;By setting the dredging rod 315, the dredging rod 315 can continuously promote the discharge of materials from the No. 1 bucket 32 ​​through vibration, thereby avoiding the situation where materials are blocked in the No. 1 bucket 32, thereby affecting the working process. ;

[0048] The rotating shaft 35 drives the conveyor belt 42 to rotate by cooperating with the driven shaft 41. After the pellets fall from the vibration groove 34 onto the conveyor belt 42, they are transported to the No. 2 bucket 43 by the conveyor belt 42. When the worm 31 rotates, it drives the power shaft 44 to rotate through the No. 1 transmission belt 45. The power shaft 44 drives multiple crushing knives 46 to rotate, and the pellets enter the No. 2 bucket 43. The multiple crushing knives 46 cooperate with multiple triangular bars on the crushing barrel 47 to crush the pellets. The crushed pellets fall into the No. 3 bucket 51 through multiple holes on the crushing barrel 47. After the pellets are crushed, the melting speed can be accelerated, thereby improving work efficiency. When the power shaft 44 rotates, it drives the ball slide 48 to move back and forth left and right through the annular inclined groove. When the ball slide 48 moves back and forth left and right, it drives multiple shifting rings 49 to move synchronously. The multiple shifting rings 49 can evenly spread the granular materials in the No. 2 bucket 43 through the reciprocating motion left and right, so as to avoid the granular materials from accumulating and affecting the crushing efficiency; through the setting of the crushing assembly 4, the multiple crushing knives 46 and the crushing barrel 47 can cooperate to crush the granular materials, so that the granular materials are crushed into particles of smaller size before heating, thereby accelerating the melting speed, reducing the heating time, and achieving the effect of reducing energy consumption and accelerating the work progress; through the setting of multiple shifting rings 49, the shifting rings 49 can continuously flatten the granular materials in the No. 2 bucket 43 through reciprocating motion, so as to avoid the granular materials from accumulating and affecting the crushing efficiency, thereby affecting the progress of subsequent work.

[0049] After the pellets pass through the crushing cylinder 47 and fall into the No. 3 bucket 51, they pass through the four square holes at the bottom of the No. 3 bucket 51 and the two square holes on the discharge ring 56 and fall into the feed port of the main machine 1, and finally fall into the interior of the main machine 1. When the power shaft 44 rotates, the No. 2 transmission belt 53 drives the bevel gear rod 54 to rotate, and the bevel gear rod 54 drives the rotating cylinder 52 to rotate through the bevel gear ring 55. The rotating cylinder 52 drives the discharge ring 56 to rotate, and the discharge ring 56 drives the short shaft 57 to rotate, and the short shaft 57 drives the two scraping strips 58 and the spiral sheet 59 to rotate. The scraper strip 58 can prevent the pellets from adhering to the inside of the No. 3 bucket 51 by rotating, and promote the falling of the pellets. The spiral piece 59 can promote the pellets to fall into the main machine 1 through the feeding port of the main machine 1 by rotating, and can prevent the pellets in the main machine 1 from flowing back. When the unloading ring 56 rotates, it drives the two square holes above it to rotate, so that the two square holes of the unloading ring 56 rotate and alternately overlap with the four square holes at the bottom of the No. 3 bucket 51. When the two square holes of the unloading ring 56 overlap with two of the square holes at the bottom of the No. 3 bucket 51, the pellets It will fall into the feed port of the main machine 1, thereby achieving the effect of uniform material discharge. The staff can rotate the two screw rods 512 on the two fixed frames 511. When the screw rod 512 rotates, the slider 510 threadedly connected to the screw rod 512 can slide in the square hole of the discharge ring 56, thereby achieving the effect of adjusting the passing area of ​​the square hole, so that the staff can adjust the material discharge speed according to production needs; through the setting of the discharge component 5, the discharge ring 56 cooperates with the No. 3 bucket 51, so that the pellets can fall into the main machine 1 in a timely and quantitative manner, avoiding uneven discharge amount and affecting the melting effect of the pellets. Too much discharge may cause reflux of the melt, and too little discharge may cause uneven stirring; the setting of the scraper 58 can avoid the pellets from adhering to the inner wall of the No. 3 bucket 51, thereby achieving the effect of promoting material discharge; the setting of the two sliders 510 enables the staff to adjust the passing area of ​​the two square holes on the discharge ring 56 by rotating the two screw rods 512, thereby adjusting the discharge amount, thereby achieving the effect of adjusting the discharge amount according to different production needs.

[0050] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A wire and cable production and molding processing equipment, characterized in that: include: Host (1); A driving assembly (2) for providing power; A drying component (3) for drying the pellets; A crushing assembly (4) for crushing granular materials; A feeding assembly (5) for feeding granular materials; An internal screw (6) is rotatably mounted inside the main machine (1), an extruder head (7) is mounted on the left end of the main machine (1), a plurality of heat sinks (8) are mounted on the main machine (1), and the plurality of heat sinks (8) are all located on the left half of the top surface of the main machine (1), the drive assembly (2) is disposed on the main machine (1), the drying assembly (3) is disposed on the main machine (1), the crushing assembly (4) is disposed on the main machine (1), and the unloading assembly (5) is disposed on the main machine (1), the drive assembly (2) is located on the right side of the main machine (1), and the drying assembly (3), the crushing assembly (4) and the unloading assembly (5) are all located on the main machine (1). The material discharging assembly (5) is located on the right side of the drying assembly (3), the crushing assembly (4) is located above the material discharging assembly (5), the driving assembly (2) comprises a driving box (21), the output end of the driving box (21) is connected to a first gear (22), the inner screw (6) is mounted with a second gear (23), a worm (31) is rotatably mounted on the main machine (1), the worm (31) is located at the rear of the material discharging assembly (5), the end of the worm (31) close to the driving box (21) is connected to a third gear (24), the third gear (24) and the second gear (23) are both meshed with the first gear (22); The drying assembly (3) comprises a first bucket (32), the first bucket (32) being mounted on the main machine (1) via a bracket, the first bucket (32) being located above the main machine (1) near the left side, a mounting frame (33) being mounted on the main machine (1), a vibration groove (34) being mounted on the mounting frame (33) via a plurality of springs, a rotating shaft (35) being rotatably mounted on the main machine (1), a worm gear (36) being connected to the rotating shaft (35), and the worm gear (36) being meshed with the worm (31). The rotating shaft (35) is provided with two special-shaped blocks (37), the vibration groove (34) is provided with two protrusions (38), one end of the rotating shaft (35) away from the worm gear (36) is connected to a cam (39), a slide frame (310) is slidably mounted on the main machine (1), a sliding frame (311) is slidably mounted on the main machine (1), a friction frame (312) is slidably connected to the bottom of the mounting frame (33), and a plurality of impellers (313) are rotatably mounted on the mounting frame (33).

2. The wire and cable production and molding processing equipment according to claim 1, characterized in that: The vibration groove (34) is located below the No. 1 bucket (32), and a plurality of air holes are provided on the vibration groove (34). The plurality of impellers (313) are all located above the plurality of heat sinks (8). The vibration groove (34) is located above the plurality of impellers (313), and the friction frame (312) is in contact with the plurality of impellers (313).

3. The wire and cable production and molding processing equipment according to claim 2 is characterized by: The two special-shaped blocks (37) respectively contact the two protrusions (38) when rotating, one end of the sliding frame (311) is connected to the slide slot frame (310), the other end of the sliding frame (311) is connected to the friction frame (312), and the cam (39) is slidably connected to the inner wall of the slide slot frame (310) via a roller.

4. The wire and cable production and molding processing equipment according to claim 3 is characterized by: A round rod (314) is installed on the vibration groove (34), and a dredging rod (315) is connected to the round rod (314), and the dredging rod (315) is located inside the No. 1 bucket (32).

5. The wire and cable production and molding processing equipment according to claim 4, characterized in that: The crushing assembly (4) includes a No. 2 bucket (43), which is installed on the main machine (1) through a bracket. The No. 2 bucket (43) is located above the main machine (1) near the right side. A driven shaft (41) is rotatably installed on the inner wall of the No. 2 bucket (43). A conveyor belt (42) is sleeved on the rotating shaft (35) and the driven shaft (41). One end of the conveyor belt (42) is located below the vibration groove (34), and the other end of the conveyor belt (42) is located above the No. 2 bucket (43).

6. The wire and cable production and molding processing equipment according to claim 5, characterized in that: A power shaft (44) is rotatably mounted on the inner wall of the No. 2 bucket (43); a No. 1 transmission belt (45) is sleeved on the power shaft (44) and the worm (31); a plurality of crushing knives (46) are mounted on the outer wall of the power shaft (44); a crushing cylinder (47) is mounted on the bottom of the No. 2 bucket (43); a plurality of holes are arranged on the crushing cylinder (47); and a plurality of triangular bars are arranged inside the crushing cylinder (47).

7. The wire and cable production and molding processing equipment according to claim 6, characterized in that: The power shaft (44) is provided with an annular bevel groove, the inner wall of the No. 2 bucket (43) is slidably mounted with a ball slide (48), a plurality of shifting rings (49) are mounted on the ball slide (48), the inner wall of the ball slide (48) is slidably connected to the annular bevel groove on the power shaft (44) via balls, and the plurality of shifting rings (49) are all located inside the No. 2 bucket (43).

8. The wire and cable production and molding processing equipment according to claim 7, characterized in that: The material discharge assembly (5) comprises a No. 3 bucket (51), the No. 3 bucket (51) being mounted on the main machine (1) via a bracket, the top of the No. 3 bucket (51) being connected to the No. 2 bucket (43), the bottom of the No. 3 bucket (51) being rotatably connected to a rotating cylinder (52), the rotating cylinder (52) being rotatably connected to the main machine (1), the outer wall of the rotating cylinder (52) being connected to a bevel gear ring (55), a bevel gear rod (54) being rotatably mounted on the main machine (1), the bevel gear rod (54) being sleeved with a No. 2 transmission belt (53) on the power shaft (44), the bevel gear rod (54) being meshed with the bevel gear ring (55) The inner wall of the rotating cylinder (52) is connected to a feeding ring (56), the inner wall of the feeding ring (56) is installed with a short shaft (57), the top of the short shaft (57) is connected to two scraping strips (58), both of which are in contact with the inner wall of the No. 3 bucket (51), the bottom of the No. 3 bucket (51) is provided with four square holes, the feeding ring (56) is provided with two square holes, the outer wall of the short shaft (57) is connected to a spiral sheet (59), and a feed port is provided at the connection position between the main machine (1) and the rotating cylinder (52), and the spiral sheet (59) is located inside the feed port of the main machine (1).

9. The wire and cable production and molding processing equipment according to claim 8, characterized in that: Two square holes of the discharge ring (56) are respectively slidably connected to two sliders (510), and the two sliders (510) are both slidably connected to the inner wall of the rotating cylinder (52). Two fixing frames (511) are installed on the outer wall of the rotating cylinder (52), and the fixing frames (511) are rotatably connected to a screw rod (512), and the two screw rods (512) are respectively threadedly connected to the two sliders (510).

Citation Information

Patent Citations

  • Cold cut prilling granulator of cable material processing

    CN204585609U

  • Cooling device for cable production and processing

    CN214377795U

  • Fluororesin pellet and manufacturing method of the same, and manufacturing method of electric wire

    JP2019025742A

  • Special degaussing cable for fixed winding for underwater vehicle

    WO2022067934A1

  • Cleaning and packaging device for plastic particles

    WO2022077630A1