Line layout optimization method and system for explosion-proof distribution cabinet

By generating a three-dimensional equipment layout model, optimizing line connections and simulation predictions, the optimal heat sink layout solution is determined, and the problem of insufficient heat dissipation design in the line layout of explosion-proof distribution cabinets is solved, achieving more efficient heat dissipation control and equipment safety.

CN118712925BActive Publication Date: 2024-12-06JIANGSU OURUI EXPLOSION-PROOF ELECTRIC APPLIANCE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411201156.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

The existing explosion-proof distribution cabinets failed to fully consider the heat dissipation needs when laying online, resulting in insufficient heat dissipation design.

Method used

By generating a three-dimensional equipment layout model, optimizing the line connection scheme, simulating the temperature distribution, determining the optimal heat sink layout scheme, and optimizing the layout with the line connection scheme, achieving more accurate and efficient heat dissipation control.

Benefits of technology

It effectively solves the problem of insufficient heat dissipation design, achieves more reasonable line layout, and improves heat dissipation efficiency and equipment safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118712925B_ABST
    Figure CN118712925B_ABST
Patent Text Reader

Abstract

The present invention discloses a line layout optimization method and system for explosion-proof power distribution cabinets, and relates to a field related to heat measurement. The method comprises: generating a three-dimensional equipment layout model according to collected electrical equipment information of the explosion-proof power distribution cabinet, obtaining a predetermined line connection regulation to optimize the equipment connection line, and obtaining an optimal line connection plan, reading predetermined factor characteristics to analyze historical explosion-proof power distribution cabinet line heat dissipation monitoring records, obtaining a target preset application scenario, and obtaining predicted temperature distribution information, and determining an optimal line layout plan according to an optimal heat sink layout plan combined with the optimal line connection plan, thereby solving the technical problem that the existing explosion-proof power distribution cabinet fails to fully consider the heat dissipation demand during line layout, resulting in insufficient heat dissipation design, and achieves a reasonable line layout, adopts an effective line heat dissipation layout plan, and realizes a more accurate and efficient heat dissipation control technical effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of heat measurement, and in particular to a line layout optimization method and system for explosion-proof power distribution cabinets. Background Art

[0002] With the rapid development of industrial automation, explosion-proof distribution cabinets play a vital role in flammable and explosive environments such as petroleum, chemical industry, coal mines, etc. Therefore, the optimization of the line layout of explosion-proof distribution cabinets is not only related to the normal operation of the equipment, but also directly related to the personal safety of the staff and the production efficiency of the enterprise. The rationality of its line layout directly affects the safe operation and overall performance of the equipment.

[0003] However, the existing explosion-proof distribution cabinets fail to fully consider the heat dissipation requirements when laying out the lines, resulting in a technical problem of insufficient heat dissipation design. Summary of the invention

[0004] The present application solves the technical problem that the existing explosion-proof distribution cabinets fail to fully consider the heat dissipation requirements when laying out the lines, resulting in insufficient heat dissipation design, by providing a line layout optimization method and system for explosion-proof distribution cabinets. The application achieves the technical effect of reasonable line layout, adopting effective line heat dissipation layout plans, and realizing more accurate and efficient heat dissipation control.

[0005] The present application provides a line layout optimization method for an explosion-proof power distribution cabinet, the method being applied to a line layout optimization system for an explosion-proof power distribution cabinet, comprising: generating a three-dimensional equipment layout model according to collected electrical equipment information of the explosion-proof power distribution cabinet, wherein the electrical equipment information includes a plurality of equipment with location identifiers;

[0006] Obtaining a predetermined line connection regulation, and optimizing the equipment connection lines of the three-dimensional equipment layout model with the predetermined line connection regulation as a constraint and the shortest line length as a goal, to obtain an optimal line connection solution;

[0007] Reading predetermined factor characteristics, and analyzing historical explosion-proof power distribution cabinet line heat dissipation monitoring records based on the predetermined factor characteristics to obtain a target preset application scenario;

[0008] Performing simulation prediction on the line obtained by the optimal line connection solution under the target preset application scenario to obtain predicted temperature distribution information;

[0009] An optimal heat sink layout scheme is obtained according to the predicted temperature distribution information, and an optimal line layout scheme is determined in combination with the optimal line connection scheme. The optimal line layout scheme is used for line layout of the explosion-proof power distribution cabinet.

[0010] In a possible implementation, the process of obtaining the optimal line connection solution performs the following processing: analyzing the plurality of devices with location identifiers based on the grid map principle to obtain the three-dimensional device layout model;

[0011] Acquire a power location grid corresponding to a power device from among the plurality of devices having location identifiers;

[0012] Eliminate the power supply device from the plurality of devices having location identifiers to obtain a first connected device set;

[0013] Randomly obtain a first device in the first connected device set, where the first device corresponds to a first position grid;

[0014] A first candidate connection device is obtained by screening according to the calculated first distance between the first position grid and the power supply position grid;

[0015] When the connection between the first candidate connection device and the power supply device meets the predetermined line connection regulation, obtaining a first optimal connection segment, where the first optimal connection segment refers to an optimal connection solution between the first candidate connection device and the power supply device;

[0016] The optimal line connection solution is obtained based on the first optimal connection segment.

[0017] In a possible implementation, the process of obtaining the first distance performs the following processing: reading a predetermined distance function;

[0018] the first distance between the first position grid and the power supply position grid calculated based on the predetermined distance function;

[0019] generating a first ascending device list of the first connected device set based on the first distance;

[0020] Taking the first device in the first ascending device list as the first candidate connection device;

[0021] Wherein, the predetermined distance function is as follows:

[0022] ;

[0023] in, refers to the first distance between the first position grid and the power supply position grid, refers to the coordinates of the power source location grid, refers to the coordinates of the first position grid.

[0024] In a possible implementation, the following processing is performed: when the connection between the first candidate connection device and the power supply device does not comply with the predetermined line connection regulation, the second device in the first ascending device list is used as the first candidate connection device.

[0025] In a possible implementation, the process of obtaining the target preset application scenario performs the following processing: randomly extracting a first factor feature from the predetermined factor features;

[0026] Matching the first historical factor feature data corresponding to the first factor feature in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record, and forming a first data set in combination with the first historical internal temperature data in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record;

[0027] Analyzing the first data set to obtain first target factor characteristic data;

[0028] The target preset application scenario is composed based on the first target factor characteristic data.

[0029] In a possible implementation, the following processing is performed: the predetermined factor characteristics at least include the working condition of the explosion-proof power distribution cabinet, the line status, the application environment, and the line load.

[0030] In a possible implementation, the process of obtaining the optimal heat sink layout solution is to perform the following processing: Step S10: obtaining a heat sink grid set in the three-dimensional device layout model;

[0031] Step S20: arranging the heat dissipation grids in the heat dissipation grid set in descending order of temperature according to the predicted temperature distribution information to obtain a heat dissipation grid descending list;

[0032] Step S30: disposing a first heat sink at the first grid in the descending list of heat sink grids as a first heat sink layout scheme;

[0033] Step S40: calling a preset heat dissipation fitness evaluation function to perform fitness evaluation on the first heat sink layout scheme to obtain a first fitness;

[0034] Step S50: on the basis of the first heat sink layout scheme, a second heat sink is arranged at the second grid in the descending list of heat sink grids to obtain a second heat sink layout scheme, and a second fitness of the second heat sink layout scheme is calculated;

[0035] Step S60: if the second fitness is greater than the first fitness, taking the second heat sink layout scheme as the optimal heat sink layout scheme;

[0036] Step S70: Repeat steps S50 to S60 until a predetermined number of iterations is reached, and output the optimal heat sink layout solution at that time.

[0037] The present application also provides a line layout optimization system for an explosion-proof power distribution cabinet, comprising: a model generation module, the model generation module is used to generate a three-dimensional equipment layout model according to the collected power equipment information of the explosion-proof power distribution cabinet, wherein the power equipment information includes a plurality of devices with location identifiers;

[0038] A first optimization module, the first optimization module is used to obtain a predetermined line connection regulation, and optimize the device connection line of the three-dimensional device layout model with the predetermined line connection regulation as a constraint and the shortest line length as a goal, to obtain an optimal line connection solution;

[0039] A first analysis module, the first analysis module is used to read predetermined factor characteristics, and analyze historical explosion-proof power distribution cabinet line heat dissipation monitoring records based on the predetermined factor characteristics to obtain a target preset application scenario;

[0040] A simulation prediction module, the simulation prediction module is used to simulate and predict the line obtained by the optimal line connection solution under the target preset application scenario to obtain predicted temperature distribution information;

[0041] A line layout module, the line layout module is used to obtain an optimal heat sink layout plan based on the predicted temperature distribution information, and determine an optimal line layout plan in combination with the optimal line connection plan, and the optimal line layout plan is used to layout the lines of the explosion-proof distribution cabinet.

[0042] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0043] The line layout optimization method and system for explosion-proof distribution cabinets provided in the present application relate to the field of heat measurement technology, solve the technical problem that the existing explosion-proof distribution cabinets fail to fully consider the heat dissipation requirements when laying out the lines, resulting in insufficient heat dissipation design, achieve reasonable line layout, adopt effective line heat dissipation layout solutions, and achieve the technical effect of more accurate and efficient heat dissipation control. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the accompanying drawings of the embodiment of the present invention will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0045] Figure 1 A schematic diagram of a flow chart of a line layout optimization method for an explosion-proof power distribution cabinet provided in an embodiment of the present application;

[0046] Figure 2 A schematic diagram of the structure of a line layout optimization system for an explosion-proof power distribution cabinet provided in an embodiment of the present application. DETAILED DESCRIPTION

[0047] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.

[0048] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0049] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.

[0050] The embodiment of the present application provides a line layout optimization method for an explosion-proof power distribution cabinet, and the method is applied to a line layout optimization system for an explosion-proof power distribution cabinet, such as Figure 1 As shown, the method includes:

[0051] Step A100, generating a three-dimensional equipment layout model according to the collected electrical equipment information of the explosion-proof power distribution cabinet, wherein the electrical equipment information includes a plurality of equipment with location identifiers;

[0052] In order to better lay out the lines of explosion-proof distribution cabinets, it is first necessary to obtain the information of electrical equipment such as the model, size, power, and interface type of the explosion-proof distribution cabinet, and the electrical equipment information includes multiple devices with position identification, such as the installation location of the electrical equipment, the relative position relationship of the electrical equipment, etc. Furthermore, the three-dimensional coordinate system of the three-dimensional equipment layout model is set with the electrical equipment information of the explosion-proof distribution cabinet as the basic data, as well as basic parameters such as the coordinate system unit, and a three-dimensional modeling software is used to create a three-dimensional model including the appearance, structure, interface, and connection lines of the electrical equipment. At the same time, it is necessary to ensure that each constructed three-dimensional equipment layout model can accurately reflect the size, appearance, connection lines and other characteristics of the corresponding actual electrical equipment, so as to generate a three-dimensional equipment layout model for output, which serves as an important reference for the optimization of the line layout of the explosion-proof distribution cabinet in the later stage.

[0053] Execute step A200 to obtain a predetermined line connection rule, and optimize the device connection line of the three-dimensional device layout model with the predetermined line connection rule as a constraint and the shortest line length as a goal, to obtain an optimal line connection solution;

[0054] Obtaining a predetermined line connection regulation, and optimizing the equipment connection line of the three-dimensional equipment layout model with the predetermined line connection regulation as a constraint and the shortest line length as a goal. To ensure that the line layout and implementation meet the requirements, it is necessary to extract the predetermined line connection regulation. The predetermined line connection regulation refers to compliance with relevant standards, such as IEC standards, ATEX directives, etc. In a possible implementation, step A200 further includes step A210, analyzing the multiple devices with location identifiers based on the grid map principle to obtain the three-dimensional equipment layout model;

[0055] First, based on the three-dimensional device layout model, the three-dimensional space is divided into several grid units of the same size. Each grid unit contains specific spatial information, such as position, size, etc. The three-dimensional coordinates of the device are converted into a grid index in the grid coordinate system, and the location information of each device with a location identifier is mapped to the grid map. According to the position of the device in the grid map, the corresponding grid unit is marked as "occupied" or "free". An occupied grid indicates that there is a device at that location, while an free grid indicates that there is no device at that location. Further, step A220 is executed to obtain a power position grid corresponding to the power supply device from the multiple devices with location identifiers; step A230 is executed to eliminate the power supply device from the multiple devices with location identifiers to obtain a first connected device set; step A240 is executed to randomly obtain a first device in the first connected device set, and the first device corresponds to a first position grid;

[0056] Based on the grid units in the three-dimensional equipment layout model, multiple electrical devices with position identifiers are traversed with the power supply device as the target, the grid unit where the power supply device is located is determined, and it is recorded as the power supply position grid, and the power supply device among the multiple electrical devices with position identifiers is further eliminated, so as to obtain multiple electrical devices to be connected, which are recorded as the first connection device set, and then randomly selected from the first connection device set to obtain the first device, and the position grid corresponding to the first device is recorded as the first position grid.

[0057] Then, step A250 is performed to screen and obtain a first candidate connection device according to the calculated first distance between the first position grid and the power supply position grid; in a possible implementation, step A250 further includes step A251, reading a predetermined distance function; and step A252, calculating the first distance between the first position grid and the power supply position grid based on the predetermined distance function;

[0058] The distance between the first position grid and the power supply position grid is calculated by the following predetermined distance function:

[0059] ;

[0060] in, refers to the first distance between the first position grid and the power supply position grid, refers to the coordinates of the power source location grid, refers to the coordinates of the first position grid.

[0061] Execute step A253 to generate a first ascending device list of the first connected device set based on the first distance; sort the devices in the first connected device set according to the calculated first distance to generate an ascending device list, that is, the device closest to the specific point is ranked first in the list, and the device farthest away is ranked last.

[0062] Execute step A254, and select the first device in the first ascending device list as the first candidate connection device; since the list is arranged in ascending order of distance, the first device is the device closest to the specific point, and further, in the first ascending device list, the first device is selected as the first candidate connection device. Furthermore, in a possible implementation, step A254 further includes step A2541, when the connection between the first candidate connection device and the power supply device does not comply with the predetermined line connection regulations, the second device in the first ascending device list is used as the first candidate connection device.

[0063] After determining the first candidate connection device, first check whether the connection between the device and the power supply device complies with the predetermined line connection regulations. If the connection between the first candidate connection device and the power supply device does not comply with the predetermined line connection regulations, then the device cannot be selected as the connection object. At this time, it is necessary to find an alternative candidate connection device. Since the list is arranged in ascending order by distance from the specific point, the second device is the second closest device to the specific point. Therefore, based on the first ascending device list, the second device in the list is selected as the new candidate connection device. At the same time, it is determined whether the connection between the second device and the power supply device complies with the predetermined line connection regulations. Thus, an iterative judgment process is performed to ensure that the connection between it and the power supply device complies with the predetermined line connection regulations.

[0064] Execute step A260, when the connection between the first candidate connection device and the power supply device meets the predetermined line connection regulations, obtain a first optimal connection segment, where the first optimal connection segment refers to the optimal connection plan between the first candidate connection device and the power supply device; execute step A270, and obtain the optimal line connection plan based on the first optimal connection segment.

[0065] Whether the connection between the first candidate connection device and the power supply device complies with the predetermined line connection regulations is determined by taking the predetermined line connection regulations as constraints. When the connection between the first candidate connection device and the power supply device complies with the predetermined line connection regulations, the connection segment between the current first candidate connection device and the power supply device is taken as the first optimal connection segment, and the first optimal connection segment refers to the optimal connection scheme between the first candidate connection device and the power supply device.

[0066] Execute step A300, read the predetermined factor characteristics, and analyze the historical explosion-proof power distribution cabinet line heat dissipation monitoring records based on the predetermined factor characteristics to obtain the target preset application scenario;

[0067] In one possible implementation, step A300 further includes step A310, randomly extracting a first factor feature from the predetermined factor features; in one possible implementation, step A310 further includes step A311, and the predetermined factor features at least include the working condition of the explosion-proof distribution cabinet, the line status, the application environment, and the line load.

[0068] A feature is randomly selected from a predetermined factor feature set as a first factor feature. For example, a feature is selected as the first factor feature based on a random number generator or according to certain weights or priorities, and the predetermined factor features at least include features such as explosion-proof distribution cabinet working conditions, line conditions, application environment, line load, etc., and the first factor feature is analyzed. When the first factor feature is the explosion-proof distribution cabinet working condition, the current operating state of the distribution cabinet can be analyzed, such as temperature, humidity, pressure and other parameters, and the working condition with the highest heat dissipation can be obtained, so as to know the working condition parameters that may affect the stability and safety of the line connection. When the first factor feature is the line state, the line state can be a normal state or other fault state, and the line state can include line The first factor characteristic is the application environment, the temperature, humidity and other parameters in the application environment should be set to the worst condition, and then further judgment should be made. For example, if the distribution cabinet is located in a humid or corrosive environment, it is necessary to select lines and connectors with waterproof and anti-corrosion properties. When the first factor characteristic is line load, the line load is analyzed to determine the appropriate line specifications and connection methods. The line load is the maximum line load when all electrical equipment are running at maximum power. Excessive line load will cause the line to heat up and be damaged, etc., to ensure that the line can safely carry the required current.

[0069] Execute step A320, match the first historical factor feature data corresponding to the first factor feature in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record, and form a first data set in combination with the first historical internal temperature data in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record;

[0070] In the historical explosion-proof distribution cabinet line heat dissipation monitoring records, historical data matching the first factor characteristics are extracted. The matched historical data include line load records in the past period of time, application environment parameters (such as temperature, humidity, pressure, etc.) and other historical data related to the first factor characteristics. At the same time, combined with the first historical internal temperature data in the historical explosion-proof distribution cabinet line heat dissipation detection records, it means that in addition to the historical data of the first factor characteristics, the corresponding internal temperature data must be extracted from the historical monitoring records as the first historical internal temperature data. The extracted first historical internal temperature data is suitable for reflecting the heat dissipation conditions inside the explosion-proof distribution cabinet under different factor characteristics, which is crucial for analyzing the impact of the line connection scheme on the heat dissipation performance.

[0071] Furthermore, the matched first historical factor characteristic data and the extracted first historical internal temperature data are integrated to form a new data set, namely the first data set. The first data set characterizes the relationship between the first historical factor characteristic data and the first historical internal temperature data, thereby guiding the optimization of the line connection scheme.

[0072] Execute step A330 to analyze the first data set to obtain first target factor characteristic data; execute step A340 to compose the target preset application scenario based on the first target factor characteristic data.

[0073] Based on the first data set, the factor characteristics that have the greatest impact on the target optimization target are determined. The first target factor characteristic data refer to those factor characteristic data that show significant influence in historical data and are closely related to the current optimization needs, that is, the data of the first factor characteristics corresponding to the historically highest internal temperature. Based on the first target factor characteristic data, a target preset application scenario is constructed. The constructed preset application scenario is used to reflect the most unfavorable or most representative situation that may occur in actual application, so as to fully consider various extreme conditions in the optimization process. For example, if the first target factor characteristic is line load, the target preset application scenario may include a high-load operation scenario to simulate the heat dissipation of the distribution cabinet under maximum load, thereby outputting the target preset application scenario, which lays a solid foundation for the subsequent optimization of the line layout of the explosion-proof distribution cabinet.

[0074] Execute step A400, perform simulation prediction on the line obtained by the optimal line connection solution under the target preset application scenario to obtain predicted temperature distribution information;

[0075] According to the specific conditions of the target preset application scenario, a corresponding simulation model is established. The simulation model also includes the structure of the explosion-proof distribution cabinet, line connection scheme, heat dissipation system and other related components, while ensuring that the model can accurately reflect the physical characteristics and heat dissipation mechanism in the actual application scenario.

[0076] In the simulation model, the target preset application scenario is set based on historical data, actual measurements or expert suggestions, and parameters related to the target preset application scenario such as ambient temperature, humidity, line load, etc. are set. The optimal line connection solution obtained through optimization is imported into the simulation model, including the line direction, connection method, material selection, etc., for line simulation prediction. The simulation process will simulate the heat dissipation of the line in actual operation, including heat generation, transfer and dissipation. After the simulation prediction is completed, the predicted temperature distribution information is extracted from the simulation model. The predicted temperature distribution information can be the temperature value, temperature gradient, hot spot distribution, etc. at different positions inside the distribution cabinet, so as to serve as reference data for the later optimization of the line layout of the explosion-proof distribution cabinet.

[0077] Next, step A500 is executed to obtain the optimal heat sink layout plan based on the predicted temperature distribution information, and the optimal line layout plan is determined in combination with the optimal line connection plan, and the optimal line layout plan is used to layout the lines of the explosion-proof power distribution cabinet. In a possible implementation, step A500 further includes step A510, step S10: obtaining a heat sink grid set in the three-dimensional equipment layout model; executing step A520, step S20: arranging each heat sink grid in the heat sink grid set in descending order of temperature according to the predicted temperature distribution information to obtain a heat sink grid descending list;

[0078] In the three-dimensional equipment layout model, all heat sinks are identified and extracted. The obtained heat sinks are key components for heat dissipation and air circulation in the power distribution cabinet. The extracted heat sinks are grouped into a set. At the same time, heat sinks without equipment can be used to install heat sinks for heat dissipation. Furthermore, the temperature values ​​of various positions inside the power distribution cabinet in the predicted temperature distribution information are imported into the processing flow, and the predicted temperature distribution information is mapped to the corresponding position in the three-dimensional equipment layout model. At this time, each heat sink can be associated with a specific temperature value. According to the mapped temperature data, the heat sinks in the heat sink set are arranged in descending order of temperature, which means that the heat sink with the highest temperature is placed at the front of the list, and the second highest temperature is placed second, and so on. After the arrangement is completed, a descending list of heat sinks is obtained.

[0079] Execute step A530, step S30: set a first heat sink at the first grid in the descending list of heat sink grids as a first heat sink layout scheme; execute step A540, step S40: call a preset heat dissipation fitness evaluation function to perform fitness evaluation on the first heat sink layout scheme to obtain a first fitness;

[0080] According to the descending list of heat dissipation grids, the grid with the highest temperature is determined as the layout position of the first heat sink. The layout position of the first heat sink can be the area where the heat dissipation performance needs to be improved the most. The first heat sink is set at the determined position, and at the same time, it is ensured that the heat sink can effectively increase the heat dissipation area, improve the heat dissipation conditions, and meet the safety standards of the explosion-proof distribution cabinet. The first heat sink layout plan is obtained, and then the preset heat dissipation fitness evaluation function is called to perform fitness evaluation on the first heat sink layout plan, which means quantitatively evaluating the advantages and disadvantages of the heat sink layout plan based on the degree of temperature reduction, improvement in heat dissipation efficiency, reduction in energy consumption, etc., and evaluating the degree of improvement of heat dissipation performance by different heat sink layout plans. At the same time, the first heat sink layout plan is passed as an input parameter to the preset heat dissipation fitness evaluation function. The preset heat dissipation fitness evaluation function quantitatively evaluates the layout plan according to the preset evaluation index and algorithm, and outputs a fitness value. The fitness value is used to reflect the effect of the plan in improving heat dissipation performance. The higher the value, the better the plan.

[0081] Execute step A550, step S50: on the basis of the first heat sink layout scheme, a second heat sink is arranged at the second grid in the descending list of heat sink grids to obtain a second heat sink layout scheme, and calculate a second fitness of the second heat sink layout scheme;

[0082] According to the first heat sink layout plan, a second heat sink is set at the second grid in the descending list of heat sink grids. The selection and setting method of the second heat sink should be coordinated with the aforementioned first heat sink. The overall heat dissipation performance is improved based on factors such as the size and material of the heat sink and the compatibility with the explosion-proof distribution cabinet. Combined with the first heat sink that has been set up before, a complete second heat sink layout plan is formed. The second heat sink layout plan includes the layout positions and parameters of the first heat sink and the second heat sink, and uses the same preset heat dissipation fitness evaluation function to perform fitness evaluation on the second heat sink layout plan, and respectively determine the degree of improvement of the heat dissipation performance of the first heat sink and the second heat sink.

[0083] Execute step A560, step S60: if the second fitness is greater than the first fitness, use the second heat sink layout plan as the optimal heat sink layout plan; execute step A570, step S70: repeat steps S50 to S60 until a predetermined number of iterations is reached, and output the optimal heat sink layout plan at that time.

[0084] The first fitness is compared with the second fitness. If the second fitness is greater than the first fitness, it is considered that the heat dissipation performance of the second heat sink is better than that of the first heat sink. Therefore, the second heat sink layout scheme is used as the current optimal heat sink layout scheme. Further, steps S50 to S60 are repeated until a predetermined number of iterations is reached, and the third heat sink is continued to be set at the third grid in the descending list of heat sink grids to obtain a third heat sink layout scheme, and its fitness is calculated. Similarly, the third fitness is compared with the fitness of the current optimal heat sink layout scheme. If the third fitness is higher, the optimal heat sink layout scheme is updated.

[0085] Finally, when the predetermined number of iterations is reached, the iteration process is stopped. The predetermined number of iterations can be determined based on actual conditions and computing resources. The preset number of iterations can fully explore different heat sink layout schemes without wasting computing resources due to too many iterations. After the iteration is terminated, the optimal heat sink layout scheme at that time is output. The optimal heat sink layout scheme at this time is selected based on fitness evaluation in multiple iterations and has relatively high heat dissipation performance.

[0086] The embodiments of the present application solve the technical problem that the existing explosion-proof distribution cabinets fail to fully consider the heat dissipation requirements when laying out the lines, resulting in insufficient heat dissipation design, and achieve the technical effect of reasonably laying out the lines, taking effective line heat dissipation layout plans, and realizing more accurate and efficient heat dissipation control.

[0087] In the above, refer to Figure 1 The line layout optimization method for explosion-proof power distribution cabinet according to an embodiment of the present invention is described in detail. Figure 2 A line layout optimization system for an explosion-proof power distribution cabinet according to an embodiment of the present invention is described.

[0088] The line layout optimization system for explosion-proof power distribution cabinets according to the embodiment of the present invention is used to solve the technical problem that the existing explosion-proof power distribution cabinets fail to fully consider the heat dissipation requirements when laying out the lines, resulting in insufficient heat dissipation design, so as to achieve the technical effect of reasonable layout of the lines, adopting effective line heat dissipation layout solutions, and realizing more accurate and efficient heat dissipation control. The line layout optimization system for explosion-proof power distribution cabinets includes: a model generation module 10, a first optimization module 20, a first analysis module 30, a simulation prediction module 40, and a line layout module 50.

[0089] A model generation module 10, the model generation module 10 is used to generate a three-dimensional equipment layout model according to the collected electrical equipment information of the explosion-proof power distribution cabinet, wherein the electrical equipment information includes a plurality of devices with location identifiers;

[0090] A first optimization module 20, the first optimization module 20 is used to obtain a predetermined line connection regulation, and optimize the device connection line of the three-dimensional device layout model with the predetermined line connection regulation as a constraint and the shortest line length as a goal, to obtain an optimal line connection solution;

[0091] A first analysis module 30, which is used to read predetermined factor characteristics and analyze historical explosion-proof power distribution cabinet line heat dissipation monitoring records based on the predetermined factor characteristics to obtain a target preset application scenario;

[0092] A simulation prediction module 40, the simulation prediction module 40 is used to simulate and predict the line obtained by the optimal line connection solution under the target preset application scenario to obtain predicted temperature distribution information;

[0093] The line layout module 50 is used to obtain an optimal heat sink layout plan according to the predicted temperature distribution information, and determine an optimal line layout plan in combination with the optimal line connection plan. The optimal line layout plan is used to layout the lines of the explosion-proof power distribution cabinet.

[0094] The specific configuration of the first optimization module 20 will be described in detail below. As described above, in the process of obtaining the optimal line connection solution, the first optimization module 20 may further include: a layout model acquisition unit for analyzing the plurality of devices with location identifiers based on the grid map principle to obtain the three-dimensional device layout model; a grid acquisition unit for obtaining the power location grid corresponding to the power device in the plurality of devices with location identifiers; a device elimination unit for eliminating the power device in the plurality of devices with location identifiers to obtain a first connection device set; a first random extraction unit for randomly obtaining a first device in the first connection device set, the first device corresponding to the first location grid; a screening unit for screening a first candidate connection device according to a calculated first distance between the first location grid and the power location grid; a first solution acquisition unit for obtaining a first optimal connection segment when the connection between the first candidate connection device and the power device meets the predetermined line connection regulations, the first optimal connection segment refers to the optimal connection solution between the first candidate connection device and the power device; and a second solution acquisition unit for obtaining the optimal line connection solution based on the first optimal connection segment.

[0095] The specific configuration of the screening unit will be described in detail below. As described above, in the process of obtaining the first distance, the screening unit may further include: a function reading unit for reading a predetermined distance function; a first calculation unit for calculating the first distance between the first position grid and the power supply position grid based on the predetermined distance function; a list generation unit for generating a first ascending device list of the first connection device set based on the first distance; a device selection unit for selecting the first device in the first ascending device list as the first candidate connection device;

[0096] Wherein, the predetermined distance function is as follows:

[0097] ;

[0098] in, refers to the first distance between the first position grid and the power supply position grid, refers to the coordinates of the power source location grid, refers to the coordinates of the first position grid.

[0099] The specific configuration of the device selection unit will be described in detail below. As described above, the device selection unit may further include: a first judgment unit is used to select the second device in the first ascending device list as the first candidate connection device when the connection between the first candidate connection device and the power supply device does not meet the predetermined line connection regulations.

[0100] The specific configuration of the first analysis module 30 will be described in detail below. As described above, in the process of obtaining the target preset application scenario, the first analysis module 30 may further include: a second random extraction unit is used to randomly extract the first factor feature from the predetermined factor feature; a data matching unit is used to match the first historical factor feature data corresponding to the first factor feature in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record, and to form a first data set in combination with the first historical internal temperature data in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record; a second analysis unit is used to analyze the first data set to obtain the first target factor feature data; and a scenario setting unit is used to form the target preset application scenario based on the first target factor feature data.

[0101] The specific configuration of the second random extraction unit will be described in detail below. As described above, the second random extraction unit may further include: a factor setting unit for the predetermined factor characteristics to include at least the working condition of the explosion-proof power distribution cabinet, the line state, the application environment, and the line load.

[0102] The specific configuration of the line layout module 50 will be described in detail below. As described above, the process of obtaining the optimal heat sink layout plan, the line layout module 50 may further include: a first step unit for step S10: obtaining a heat sink grid set in the three-dimensional device layout model; a second step unit for step S20: arranging each heat sink grid in the heat sink grid set in descending order of temperature according to the predicted temperature distribution information to obtain a heat sink grid descending list; a third step unit for step S30: setting a first heat sink at the first grid in the heat sink grid descending list as the first heat sink layout plan; a fourth step unit for step S40: calling a preset heat dissipation fitness evaluation function to evaluate the first heat sink layout plan The scheme is evaluated for fitness to obtain a first fitness; the fifth step unit is used for step S50: on the basis of the first heat sink layout scheme, a second heat sink is arranged at the second grid in the descending list of the heat sink grids to obtain a second heat sink layout scheme, and the second fitness of the second heat sink layout scheme is calculated; the sixth step unit is used for step S60: if the second fitness is greater than the first fitness, the second heat sink layout scheme is used as the optimal heat sink layout scheme; the seventh step unit is used for step S70: repeat steps S50 to S60 until a predetermined number of iterations is reached, and the optimal heat sink layout scheme at that time is output.

[0103] The line layout optimization system for explosion-proof power distribution cabinets provided in the embodiments of the present invention can execute the line layout optimization method for explosion-proof power distribution cabinets provided in any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.

[0104] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0105] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. A line layout optimization method for an explosion-proof distribution cabinet, characterized in that: include: Generate a three-dimensional equipment layout model based on the collected electrical equipment information of the explosion-proof power distribution cabinet, wherein the electrical equipment information includes a plurality of devices with location identifiers; Obtaining a predetermined line connection regulation, and optimizing the equipment connection lines of the three-dimensional equipment layout model with the predetermined line connection regulation as a constraint and the shortest line length as a goal, to obtain an optimal line connection solution; Reading predetermined factor characteristics, and analyzing historical explosion-proof power distribution cabinet line heat dissipation monitoring records based on the predetermined factor characteristics to obtain a target preset application scenario; Performing simulation prediction on the line obtained by the optimal line connection solution under the target preset application scenario to obtain predicted temperature distribution information; Obtaining an optimal heat sink layout plan according to the predicted temperature distribution information, and determining an optimal line layout plan in combination with the optimal line connection plan, wherein the optimal line layout plan is used to layout the lines of the explosion-proof power distribution cabinet; The process of obtaining the optimal line connection solution includes: Analyze the plurality of devices with location identifiers based on the grid map principle to obtain the three-dimensional device layout model; Acquire a power location grid corresponding to a power device from among the plurality of devices having location identifiers; Eliminate the power supply device from the plurality of devices having location identifiers to obtain a first connected device set; Randomly obtain a first device in the first connected device set, where the first device corresponds to a first position grid; A first candidate connection device is obtained by screening according to the calculated first distance between the first position grid and the power supply position grid; When the connection between the first candidate connection device and the power supply device meets the predetermined line connection regulation, obtaining a first optimal connection segment, where the first optimal connection segment refers to an optimal connection solution between the first candidate connection device and the power supply device; Obtaining the optimal line connection solution based on the first optimal connection segment; The process of obtaining the first distance includes: reading a predetermined distance function; the first distance between the first position grid and the power supply position grid calculated based on the predetermined distance function; generating a first ascending device list of the first connected device set based on the first distance; Taking the first device in the first ascending device list as the first candidate connection device; Wherein, the predetermined distance function is as follows: ; in, refers to the first distance between the first position grid and the power supply position grid, refers to the coordinates of the power source location grid, refers to the coordinates of the first position grid; The process of obtaining the target preset application scenario includes: randomly extracting a first factor feature from the predetermined factor features; Matching the first historical factor feature data corresponding to the first factor feature in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record, and forming a first data set in combination with the first historical internal temperature data in the historical explosion-proof power distribution cabinet line heat dissipation monitoring record; Analyzing the first data set to obtain first target factor characteristic data; Composing the target preset application scenario based on the first target factor characteristic data; The process of obtaining the optimal heat sink layout solution includes: Step S10: obtaining a heat dissipation grid set in the three-dimensional device layout model; Step S20: arranging the heat dissipation grids in the heat dissipation grid set in descending order of temperature according to the predicted temperature distribution information to obtain a heat dissipation grid descending list; Step S30: disposing a first heat sink at the first grid in the descending list of heat sink grids as a first heat sink layout scheme; Step S40: calling a preset heat dissipation fitness evaluation function to perform fitness evaluation on the first heat sink layout scheme to obtain a first fitness; Step S50: on the basis of the first heat sink layout scheme, a second heat sink is arranged at the second grid in the descending list of heat sink grids to obtain a second heat sink layout scheme, and a second fitness of the second heat sink layout scheme is calculated; Step S60: if the second fitness is greater than the first fitness, taking the second heat sink layout scheme as the optimal heat sink layout scheme; Step S70: Repeat steps S50 to S60 until a predetermined number of iterations is reached, and output the optimal heat sink layout solution at that time.

2. The line layout optimization method for explosion-proof power distribution cabinet according to claim 1 is characterized in that: Also includes: When the connection between the first candidate connection device and the power supply device does not comply with the predetermined line connection regulation, the second device in the first ascending device list is used as the first candidate connection device.

3. The line layout optimization method for explosion-proof power distribution cabinet according to claim 1 is characterized in that: The predetermined factor characteristics at least include the working condition of the explosion-proof distribution cabinet, the line status, the application environment, and the line load.

4. A line layout optimization system for explosion-proof power distribution cabinets, characterized in that: The system is used to implement the line layout optimization method for explosion-proof power distribution cabinets according to any one of claims 1 to 3, comprising: A model generation module, the model generation module is used to generate a three-dimensional equipment layout model according to the collected electrical equipment information of the explosion-proof power distribution cabinet, wherein the electrical equipment information includes a plurality of devices with location identifiers; A first optimization module, the first optimization module is used to obtain a predetermined line connection regulation, and optimize the device connection line of the three-dimensional device layout model with the predetermined line connection regulation as a constraint and the shortest line length as a goal, to obtain an optimal line connection solution; A first analysis module, the first analysis module is used to read predetermined factor characteristics, and analyze historical explosion-proof power distribution cabinet line heat dissipation monitoring records based on the predetermined factor characteristics to obtain a target preset application scenario; A simulation prediction module, the simulation prediction module is used to simulate and predict the line obtained by the optimal line connection solution under the target preset application scenario to obtain predicted temperature distribution information; A line layout module, the line layout module is used to obtain an optimal heat sink layout plan based on the predicted temperature distribution information, and determine an optimal line layout plan in combination with the optimal line connection plan, and the optimal line layout plan is used to layout the lines of the explosion-proof distribution cabinet.