Ice melting and unloading method for engineering structure installation

By using the method of water freezing and heating to melt during civil engineering construction, the problem of difficulty in unloading temporary supports for extremely large loads is solved, and stable support and unloading of structures is achieved, which is easy to use and easy to control.

CN118728094AActive Publication Date: 2024-10-01SHANGHAI CONSTRUCTION GROUP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410877030.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-01
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

In civil engineering construction, it is difficult to unload temporary supports for extremely large loads, and existing technologies such as jacks and other tools are difficult to effectively achieve.

Method used

An ice melting and unloading method is adopted for the installation of engineering structures. The water in the device is frozen and then heated and melted. The water is frozen by the refrigeration device to support the structure, and then the heating device melts the ice to achieve unloading. It is easy to use and easy to control.

Benefits of technology

It achieves stable unloading of extremely large loads, is easy to use and easy to control, and is suitable for unloading structures with extremely large loads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728094A_ABST
    Figure CN118728094A_ABST
Patent Text Reader

Abstract

An unloader, a freezing device and a heating device are adopted, the unloader comprises a container for containing water and a floater, an opening is formed in the top of the container, the lower end of the floater is located on the water surface in the container, the upper end of the floater extends out of the opening in the top of the container, a water drainage pipe is arranged on the container, and the freezing device and the heating device are arranged in the container. The freezing device comprises a refrigerating device and a freezing pipe, the freezing pipe extends into the container, the refrigerating device provides cooling capacity for water in the container through the freezing pipe and converts the water in the container into ice, so that the floater floats upwards to achieve supporting, the container is arranged above the heating device, and the heating device can heat the container. The ice in the container is melted, the melted water flows out through the drainage pipe, the ice blocks sink, the floater moves downwards to achieve unloading, the structure is supported and unloaded by means of icing of the water in the device and then heating and melting of the water, use is convenient, control is easy, and ultra-large loads can be unloaded.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to an ice-melting and unloading method for installing an engineering structure. Background Art

[0002] Unloading operations are often required during civil engineering construction. For example, when a large-span steel structure is installed with the assistance of temporary supports, the temporary supports need to be removed after the steel structure is installed. At this time, the temporary supports need to be unloaded before they can be removed.

[0003] The usual method of unloading is to use tools such as jacks and sand boxes, but it is difficult to unload extremely large loads using traditional means such as jacks. Summary of the invention

[0004] The present invention aims to provide an ice melting and unloading method for engineering structure installation, which utilizes the freezing and then heating and melting of water in the device to achieve support and unloading of the structure. The method is easy to use and easy to control, and can achieve support and unloading of super-large loads.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] A method for installing ice melting and unloading in an engineering structure comprises the following steps:

[0007] Step 1, a supporting device is provided between the temporary support and the structure so that during the construction of the structure, the temporary support can support the unformed structure;

[0008] Step 2, after the structure is formed, an engineering structure is set between the temporary support and the structure to install an ice-melting unloading device, the engineering structure installing an ice-melting unloading device includes: an unloader, a freezing device and a heating device, the unloader includes a container for containing water and a float, the top of the container has an opening, the lower end of the float is located on the water surface in the container, the upper end of the float extends out of the top opening of the container, the container is provided with a drain pipe, the drain pipe is arranged at the bottom of the side wall of the container, the drain pipe is provided with a drain valve, the freezing device includes a refrigeration device and a freezing pipe, the two ends of the freezing pipe are respectively connected to the refrigeration device, the freezing pipe extends into the container, the container is arranged above the heating device, and water is poured into the container;

[0009] Step 3: The refrigeration device performs refrigeration and provides coldness to the water in the container through the freezing pipe. The water in the container freezes into ice and expands in volume, causing the float to press the structure upward. Then, the supporting device is removed, so that the structure is completely supported by the ice melting and unloading device installed in the engineering structure.

[0010] Step 4: when unloading is required, the drain valve is opened and the container is heated by a heating device, so that the bottom of the ice in the container gradually melts, the melted water flows away through the drain pipe, the ice and the float sink, and the structure gradually deforms;

[0011] Step 5: After the structure is completely separated from the float of the engineering structure-mounted ice-melting unloading device, the engineering structure-mounted ice-melting unloading device and the temporary support are removed to complete the unloading of the temporary support.

[0012] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the refrigeration device, the heating device, and the drain valve are respectively connected to the control system.

[0013] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a displacement limiter is arranged on the top of the container, the float includes an upper part and a lower part, the outer diameter of the upper part is smaller than the outer diameter of the lower part, and when the float moves up and down, the displacement limiter has a gap for the upper part to pass freely, and the displacement limiter can limit the free passage of the lower part. In order to avoid excessive volume expansion and damage to the structure, the maximum allowable displacement of the float is determined by calculation in advance, and the maximum allowable displacement of the float is equal to the height of the upper part minus the thickness of the displacement positioning device.

[0014] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a pressure sensor is provided on the surface of the displacement limiter that can contact the lower top surface of the float, and the pressure sensor is connected to the control system. The pressure sensor can send the pressure data it is subjected to to the control system. When the pressure data measured by the pressure sensor is greater than 0, it indicates that the lower top surface of the float has reached the displacement limiter. In step 3, when the float triggers the displacement limiter, the displacement limiter sends a trigger signal to the control system, and the control system stops the refrigeration of the freezing device and starts the heating device to partially melt the ice when necessary.

[0015] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a displacement sensor is provided on the upper side wall of the float, and the displacement sensor is connected to the control system. The displacement sensor sends the displacement data of the float to the control system in real time. The control system can control the refrigeration system or the heating device to adjust the up and down movement speed and movement amplitude of the float according to the up and down movement speed and movement amplitude of the float monitored by the displacement sensor.

[0016] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, in step 3, when the upward displacement of the float exceeds the set value, the control system stops the refrigeration of the freezing device and starts the heating device to partially melt the ice if necessary; in step 4, the control system adjusts the heating temperature of the heater according to the downward movement speed of the float monitored by the displacement sensor, controls the melting speed of the ice in the container, and realizes the control of the unloading speed.

[0017] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, in the step 2, a coagulant is added to the water to accelerate the freezing speed, and the coagulant is salt or sugar.

[0018] Preferably, in the above-mentioned method for melting ice and unloading during installation of an engineering structure, in step 2, cotton is added to the water to increase the bearing capacity of the water after it freezes.

[0019] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the container is also provided with a water inlet pipe, the water inlet pipe is provided with a water inlet valve, and the water inlet valve is connected to the control system.

[0020] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a liquid level sensor is provided in the container, and the liquid level sensor is connected to the control system.

[0021] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, it also includes a temperature sensor, and the temperature sensor is arranged in the container, and the temperature sensor is connected to the control system.

[0022] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the container is made of flexible material, and the flexible material is rubber, so as to adapt to the volume expansion and contraction of water during freezing and melting. If it is made of rigid material, it should be able to resist the pressure caused by the annular volume expansion of the internal water after freezing.

[0023] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the size of the container is designed according to the maximum load that needs to be unloaded, and multiple containers can also be used in parallel to increase the unloading capacity.

[0024] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the heating device adopts an electric heater, and the heating temperature and speed are controlled by the electric heater.

[0025] It can be seen from the technical solutions disclosed above that, compared with the prior art, the beneficial effects of the present invention are as follows:

[0026] In summary, the present invention provides an engineering structure installation ice melting and unloading method, which adopts an unloader, a freezing device and a heating device. The unloader includes a container for holding water and a float. The top of the container has an opening. The lower end of the float is located on the water surface in the container. The upper end of the float extends out of the top opening of the container. The container is provided with a drain pipe, which is arranged at the bottom of the side wall of the container. The drain pipe is provided with a drain valve. The freezing device includes a refrigeration device and a freezing pipe. The two ends of the freezing pipe are respectively connected to the refrigeration device, and the freezing pipe extends into the container. The refrigeration device provides coldness to the water in the container through the freezing pipe, converts the water in the container into ice, so that the float floats up to achieve support. The container is arranged above the heating device, and the heating device can heat the container to melt the ice in the container. The melted water flows out through the drain pipe, and the ice sinks, so that the float moves down to achieve unloading. The engineering structure installation ice melting and unloading device provided by the present invention utilizes the water in the device to freeze and then heat and melt to achieve support and unloading of the structure. It is easy to use and easy to control, and can achieve support and unloading of super-large loads. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a schematic structural diagram of an ice melting and unloading device installed on an engineering structure according to an embodiment of the present invention.

[0028] Figure 2 It is a structural schematic diagram of step 1 of an engineering structure installation ice melting and unloading method according to an embodiment of the present invention.

[0029] Figure 3 It is a structural schematic diagram of step 2 of the method for installing ice melting and unloading in an engineering structure according to an embodiment of the present invention.

[0030] Figure 4 It is a structural schematic diagram of step 3 of the method for installing ice melting and unloading in an engineering structure according to an embodiment of the present invention.

[0031] Figure 5 yes Figure 4 An enlarged schematic diagram of part A.

[0032] Figure 6 It is a structural schematic diagram of step 4 of the method for installing ice melting and unloading in an engineering structure according to an embodiment of the present invention.

[0033] Figure 7 yes Figure 6 An enlarged schematic diagram of part B.

[0034] Figure 8 It is a structural schematic diagram of step 5 of the method for installing ice melting and unloading for an engineering structure according to an embodiment of the present invention.

[0035] In the figure: 1-unloader, 1.1-container, 1.2-float, 1.2.1-upper part, 1.2.2-lower part, 1.3-drain valve, 1.4-water, 1.5-ice, 2-freezing device, 2.1-refrigeration device, 2.2-freezing pipe, 3-heating device, 4-displacement limiter, 5-pressure sensor, 6-displacement sensor, 7-temporary support, 8-structure, 9-supporting device, 10-control system. DETAILED DESCRIPTION

[0036] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The technical content and features of the present invention will be described in detail below by combining the enumerated embodiments with the accompanying drawings. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.

[0037] See also Figures 1 to 8 The present embodiment provides a method for installing ice melting and unloading in an engineering structure, comprising the following steps:

[0038] Step 1, a supporting device 9 is arranged between the temporary support 7 and the structure 8, so that during the construction of the structure 8, the temporary support 7 can support the unformed structure 8;

[0039] Step 2, after the structure 8 is formed, an engineering structure is set between the temporary support 7 and the structure 8 to install an ice-melting unloading device, the engineering structure installing an ice-melting unloading device includes: an unloader 1, a freezing device 2 and a heating device 3, the unloader 1 includes a container 1.1 containing water 1.4 and a float 1.2, the top of the container 1.1 has an opening, the lower end of the float 1.2 is located on the water surface in the container 1.1, the upper end of the float 1.2 extends out of the top opening of the container 1.1, the container 1.1 is provided with a drain pipe, the drain pipe is arranged at the bottom of the side wall of the container 1.1, and the drain pipe is provided with a drain valve 1.3, the freezing device 2 includes a refrigeration device 2.1 and a freezing pipe 2.2, the two ends of the freezing pipe 2.2 are respectively connected to the refrigeration device 2.1, the freezing pipe 2.2 extends into the container 1.1, the container 1.1 is arranged above the heating device 3, and water is poured into the container 1.1;

[0040] Step 3, the refrigeration device 2 performs refrigeration, and provides cold energy to the water in the container 1.1 through the freezing pipe 2.2, and the water 1.4 in the container 1.1 freezes into ice 1.5, which expands in volume, so that the float 1.2 presses the structure 8 upward, and then the supporting device 9 is removed, so that the structure 8 is completely supported by the engineering structure installation ice melting and unloading device;

[0041] Step 4, when unloading is required, the drain valve 1.3 is opened, and the heating device 3 is used to heat the container 1.1, so that the bottom of the ice in the container 1.1 gradually melts, and the melted water flows away through the drain pipe, the ice and the float 1.2 sink, and the structure 8 gradually deforms;

[0042] Step 5: After the structure 8 is completely separated from the float 1.2 of the engineering structure-mounted ice-melting unloading device, the engineering structure-mounted ice-melting unloading device and the temporary support 7 are removed, and the unloading of the temporary support 7 is completed.

[0043] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the refrigeration device 2.1, the heating device 3, and the drain valve 1.3 are respectively connected to the control system 10.

[0044] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a displacement limiter 4 is arranged on the top of the container 1.1, and the float 1.2 includes an upper part 1.2.1 and a lower part 1.2.2. The outer diameter of the upper part 1.2.1 is smaller than the outer diameter of the lower part 1.2.2. When the float 1.2 moves up and down, the displacement limiter 4 has a gap for the upper part 1.2.1 to pass freely, and the displacement limiter 4 can limit the free passage of the lower part 1.2.2. In order to avoid excessive volume expansion and damage to the structure 8, the maximum allowable displacement of the float 1.2 is determined by calculation in advance, and the maximum allowable displacement of the float 1.2 is equal to the height of the upper part 1.2.1 minus the thickness of the displacement positioning device.

[0045] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a pressure sensor 5 is provided on the surface of the displacement limiter 4 that can contact the top surface of the lower part 1.2.2 of the float 1.2, and the pressure sensor 5 is connected to the control system 10. The pressure sensor 5 can send the pressure data it is subjected to to the control system 10. When the pressure data measured by the pressure sensor 5 is greater than 0, it indicates that the top surface of the lower part 1.2.2 of the float 1.2 reaches the displacement limiter 4. In step 3, when the float 1.2 triggers the displacement limiter 4, the displacement limiter 4 sends a trigger signal to the control system 10, and the control system 10 stops the refrigeration of the freezing device 2 and starts the heating device 3 to partially melt the ice when necessary.

[0046] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a displacement sensor 6 is provided on the side wall of the upper part 1.2.1 of the float 1.2, and the displacement sensor 6 is connected to the control system 10. The displacement sensor 6 sends the displacement data of the float 1.2 to the control system 10 in real time. The control system 10 can control the refrigeration system or the heating device 3 according to the up and down movement speed and movement amplitude of the float 1.2 monitored by the displacement sensor 6, and adjust the up and down movement speed and movement amplitude of the float 1.2.

[0047] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, in step 3, when the upward displacement of the float 1.2 exceeds the set value, the control system 10 stops the refrigeration of the freezing device 2, and starts the heating device 3 to partially melt the ice when necessary; in step 4, the control system 10 adjusts the heating temperature of the heater according to the downward movement speed of the float 1.2 monitored by the displacement sensor 6, controls the melting speed of the ice in the container 1.1, and realizes the control of the unloading speed.

[0048] The present embodiment provides an engineering structure installation ice melting and unloading method, which uses an unloader 1, a freezing device 2 and a heating device 3. The unloader 1 includes a container 1.1 for containing water and a float 1.2. The top of the container 1.1 has an opening. The lower end of the float 1.2 is located on the water surface in the container 1.1. The upper end of the float 1.2 extends out of the top opening of the container 1.1. The container 1.1 is provided with a drain pipe, which is arranged at the bottom of the side wall of the container 1.1. The drain pipe is provided with a drain valve 1.3. The freezing device 2 includes a refrigeration device 2.1 and a freezing pipe 2.2, the two ends of the freezing pipe 2.2 are respectively connected to the refrigeration device 2.1, the freezing pipe 2.2 extends into the container 1.1, the refrigeration device 2.1 provides coldness to the water in the container 1.1 through the freezing pipe 2.2, converts the water in the container 1.1 into ice, so that the float 1.2 floats up to achieve support, and the container 1.1 is arranged above the heating device 3, and the heating device 3 can heat the container 1.1 to melt the ice in the container 1.1, and the melted water flows out through the drain pipe, and the ice sinks, so that the float 1.2 moves down to achieve unloading. The engineering structure installation ice melting and unloading device provided by the present invention utilizes the water in the device to freeze and then heat and melt to achieve support and unloading of the structure 8, which is easy to use, easy to control, and can achieve the support and unloading of super large loads. Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, in the step 2, a coagulant is added to the water to accelerate the freezing speed, and the coagulant is salt or sugar.

[0049] Preferably, in the above-mentioned method for melting ice and unloading during installation of an engineering structure, in step 2, cotton is added to the water to increase the bearing capacity of the water after it freezes.

[0050] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the container 1.1 is also provided with a water inlet pipe, and the water inlet pipe is provided with a water inlet valve, and the water inlet valve is connected to the control system 10 to facilitate water filling into the container 1.1. Of course, the water inlet pipe may not be provided, and direct filling is also possible.

[0051] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a liquid level sensor (not shown) is provided in the container 1.1, and the liquid level sensor is connected to the control system 10. The liquid level sensor can measure the water level height and send the water level height data in the container 1.1 to the control system 10, so that the management personnel can know whether the water level in the container 1.1 is normal in time.

[0052] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, a temperature sensor is also included, and the temperature sensor (not shown) is arranged in the container 1.1, and the temperature sensor is connected to the control system 10. The temperature of the water or ice in the container 1.1 can be obtained in time through the temperature sensor.

[0053] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the container 1.1 is made of flexible material, such as rubber, to adapt to the volume expansion and contraction of water during freezing and melting. If it is made of rigid material, it should be able to resist the pressure caused by the annular volume expansion of the internal water after freezing.

[0054] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the size of the container 1.1 is designed according to the maximum load that needs to be unloaded, and multiple containers 1.1 can also be used in parallel to increase the unloading capacity.

[0055] Preferably, in the above-mentioned engineering structure installation ice melting and unloading method, the heating device 3 adopts an electric heater, and the heating temperature and speed are controlled by the electric heater.

[0056] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A method for melting and unloading ice in an engineering structure installation, characterized in that: The steps include: Step 1, a supporting device is provided between the temporary support and the structure so that during the construction of the structure, the temporary support can support the unformed structure; Step 2, after the structure is formed, an engineering structure is set between the temporary support and the structure to install an ice-melting unloading device, the engineering structure installing an ice-melting unloading device includes: an unloader, a freezing device and a heating device, the unloader includes a container for containing water and a float, the top of the container has an opening, the lower end of the float is located on the water surface in the container, the upper end of the float extends out of the top opening of the container, the container is provided with a drain pipe, the drain pipe is arranged at the bottom of the side wall of the container, the drain pipe is provided with a drain valve, the freezing device includes a refrigeration device and a freezing pipe, the two ends of the freezing pipe are respectively connected to the refrigeration device, the freezing pipe extends into the container, the container is arranged above the heating device, and water is poured into the container; Step 3: The refrigeration device performs refrigeration and provides coldness to the water in the container through the freezing pipe. The water in the container freezes into ice and expands in volume, causing the float to press the structure upward. Then, the supporting device is removed, so that the structure is completely supported by the ice melting and unloading device installed in the engineering structure. Step 4: when unloading is required, the drain valve is opened and the container is heated by a heating device, so that the bottom of the ice in the container gradually melts, the melted water flows away through the drain pipe, the ice and the float sink, and the structure gradually deforms; Step 5: After the structure is completely separated from the float of the engineering structure-mounted ice-melting unloading device, the engineering structure-mounted ice-melting unloading device and the temporary support are removed to complete the unloading of the temporary support.

2. The engineering structure installation ice melting and unloading device according to claim 1, characterized in that: The refrigeration device, the heating device and the drain valve are respectively connected to the control system.

3. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: A displacement limiter is arranged on the top of the container, and the float comprises an upper part and a lower part, and the outer diameter of the upper part is smaller than the outer diameter of the lower part. When the float moves up and down, the displacement limiter has a gap for the upper part to pass freely, and the displacement limiter can limit the free passage of the lower part. In order to avoid damage to the structure due to excessive volume expansion, the maximum allowable displacement of the float is determined by calculation in advance, and the maximum allowable displacement of the float is equal to the height of the upper part minus the thickness of the displacement positioning device.

4. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: A pressure sensor is provided on the surface of the displacement limiter that can contact the lower top surface of the float. The pressure sensor is connected to the control system and can send the pressure data it is subjected to to the control system. When the pressure data measured by the pressure sensor is greater than 0, it indicates that the lower top surface of the float has reached the displacement limiter. In step 3, when the float floats up and triggers the displacement limiter, the displacement limiter sends a trigger signal to the control system. The control system stops the refrigeration of the freezing device and starts the heating device to partially melt the ice when necessary.

5. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: A displacement sensor is provided on the upper side wall of the float, and the displacement sensor is connected to the control system. The displacement sensor sends the displacement data of the float to the control system in real time. The control system can control the refrigeration system or the heating device to adjust the up and down movement speed and movement amplitude of the float according to the up and down movement speed and movement amplitude of the float monitored by the displacement sensor.

6. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: In step 3, when the upward displacement of the float exceeds the set value, the control system stops the refrigeration of the freezing device and starts the heating device to partially melt the ice if necessary; in step 4, the control system adjusts the heating temperature of the heater according to the downward movement speed of the float monitored by the displacement sensor, controls the melting speed of the ice in the container, and realizes the control of the unloading speed.

7. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: In step 2, a coagulant is added to water to accelerate the freezing speed, and the coagulant is salt or sugar.

8. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: In the step 2, cotton is added to the water to increase the carrying capacity of the water after it freezes.

9. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: It also includes a temperature sensor, which is arranged in the container and connected to the control system.

10. The method for melting ice and unloading an engineering structure as claimed in claim 1, characterized in that: The container is made of a flexible material, and the flexible material is rubber.

Citation Information

Patent Citations

  • Sand box device and method for unloading steel structure bracket

    CN101906879A

  • Freezing supporting device and method for large thin-wall member

    CN109894888A

  • Sandbox for engineering unloading and application method thereof

    CN110670494A

  • Floating ice towing equipment for offshore wind turbine foundation

    CN214143795U

  • Support structure for use in water

    EP0009986A1