Installation method of large inclined flat plate embedded part
Through the perforated plug welding technology of support frames and anchor bars, the problems of heavy weight and difficult control of inclination accuracy of large-scale inclined slab embedded parts have been solved, efficient installation and precise control have been achieved, and construction convenience and material utilization have been improved.
Patent Information
- Application Number
- CN202411022927.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In metallurgical construction projects, when installing large-scale inclined slab embedded parts, there are problems such as heavy weight, large area, and difficulty in controlling the accuracy of the inclination angle.
A support frame is used to control the elevation and inclination of the embedded parts, and the anchor bars are perforated and plug welded. The steel plates are cut out in the processing plant and installed and fixed on-site through the support frame before welding the anchor bars. Levels and lasers are used to ensure accuracy.
It improves the convenience and operability of construction, achieves high-efficiency precision control of the inclined surface of embedded parts, and saves materials.
Smart Images

Figure CN118728099A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil engineering, in particular to an installation method of a large inclined flat plate embedded part. Background Art
[0002] In the current field of metallurgical construction engineering, due to the needs of production technology, it is necessary to design fully flat-plate steel plate embedded parts to protect the concrete surface of the equipment foundation. The concrete area of the equipment foundation is large, and the thickness of such embedded parts is generally 30mm~50mm. The number of embedded anchor bars is large and dense, and the size of the steel plates processed in blocks is also large and the weight of a single block is heavy. If the anchor bars are welded in advance, it is very easy to collide with the steel skeleton of the equipment foundation, making it difficult to install the embedded parts; when there is an inclination on the concrete surface, it is more difficult to control the accuracy of the embedded parts. Summary of the invention
[0003] The present invention aims to overcome the defects of the prior art and provide a method for installing a large inclined flat plate embedded part, so as to solve the problems of the large inclined flat plate embedded part being heavy, large in area and difficult to control the inclination angle precision.
[0004] In order to solve the above-mentioned technical problems, the present invention is achieved as follows: A method for installing a large inclined flat plate embedded part, characterized in that it comprises the following steps: Step 1: Embedded parts processing; Step 2: Install the support frame; Step 3: Lifting of embedded steel plates; Step 4: Welding of embedded anchor bars.
[0005] The installation method of a large inclined flat plate embedded part is characterized in that: step one specifically includes: the embedded part is made of steel plate, the steel plate is arranged according to the required paving area, and is cut into single pieces. Anchor plug welding holes are opened on the steel plate and arranged in a plum blossom shape for welding anchor bars.
[0006] The installation method of a large inclined flat plate embedded part is characterized in that: the cutting length of the anchor bar is longer than the design length, which is convenient for the subsequent welding of the anchor bar; and air vent holes with a diameter of 30 mm are arranged at intervals on the steel plate to ensure that the concrete fits the embedded part.
[0007] The installation method of a large inclined flat plate embedded part is characterized in that: step two specifically includes: after the equipment foundation cushion layer is cast and the steel cage is installed, the support frame columns are installed and fixed on the concrete cushion layer to ensure verticality. The columns are arranged in a matrix at a fixed interval, and diagonal braces are welded between each column; the support rods are arranged along the entire length of the inclination direction of the overall flat plate embedded part, and a level or total station is used before welding to determine the top and bottom elevations of the support rods, and the elevation between the top and the bottom is controlled by a laser.
[0008] The installation method of a large inclined flat plate embedded part is characterized in that: step three specifically includes: hoisting the steel plate onto the support frame according to the predetermined layout order, ensuring that the flat seam between the two steel plates is tight, and the bottom of the steel plate is against the bottom template of the equipment foundation, and at the same time, the bottom template is reinforced to prevent deformation.
[0009] The installation method of a large inclined flat plate embedded part is characterized in that: Step 4 specifically includes: the anchor bar cutting length is slightly longer than the design required length, and the required length is marked with a marker pen, and the plug welding hole is inserted from the front during welding, and the extra anchor bar is leaked outside the steel plate to facilitate fixed welding, and the plug welding hole must be welded full. After welding is completed, the excess anchor bar is cut off and polished flat, and the installation of the large inclined flat plate embedded part is completed.
[0010] The installation method of a large inclined flat plate embedded part is characterized in that: the support frame includes columns, struts, and diagonal struts; the columns are made of hot-rolled ribbed steel bars with a diameter of 25 mm or more, fixed on the foundation cushion of the slope equipment, and the columns are arranged at the intersection of the horizontal steel bars and the longitudinal steel bars of the equipment foundation steel cage, and are reinforced by binding or welding; according to the area required for laying the embedded parts, the columns can be arranged in a matrix at a spacing of 500mm-1000mm; diagonal struts are arranged between each column to ensure the stability of the support frame, and the diagonal struts are made of hot-rolled ribbed steel bars with a diameter of 25 mm or more, one end of which is fixed on the foundation cushion of the slope equipment, and the other end is welded to the top of the column; the struts are made of angle steel or channel steel, and are arranged along the inclination direction of the overall flat plate embedded part, and are firmly welded to the top of the column.
[0011] The beneficial effects of the present invention are: It can be seen from the above technical scheme that the present application provides a method for installing large inclined flat plate embedded parts, in which the elevation and inclination of the embedded parts are controlled by setting a support frame, the embedded part anchor bars are welded by perforation plug welding, the steel plates are cut and holes are opened in the processing plant, and the steel plates are installed and fixed on site by support frames, and then the anchor bars are welded on site.
[0012] The invention has the advantages of convenient construction, high operability, high construction efficiency, easy control of the accuracy of the inclined surface of the embedded part, and the support frame can be made of on-site surplus materials, thus saving materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments: Figure 1 The cross section of the support frame is shown; Figure 2 It is a schematic diagram of the support frame plane; Figure 3 It is a schematic diagram of the plane of the large inclined flat plate embedded parts; Figure 4 This is a schematic diagram of opening a hole in a single steel plate; Figure 5This is a schematic diagram of the welding hole of the anchor bar plug; Figure 6 This is an illustration of anchor bar welding. DETAILED DESCRIPTION
[0014] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application. like Figure 1 As shown: A method for installing a large inclined flat plate embedded part, comprising the following steps: Step 1: Embedded parts processing.
[0015] The steel plate 1 is arranged according to the required laying area and cut into steel plate unit blocks 13, such as Figure 3 As shown (especially, the layout of the steel plate is combined with the actual situation, the size of each piece is uniform, and the size of the whole steel plate is used as much as possible to reduce waste; priority is given to meeting the operating conditions of medium-sized and smaller truck cranes to control the construction cost of steel plate installation) like Figure 4 , 5 As shown: Anchor plug welding holes 8 are provided on the steel plate. The plug welding holes are truncated cone-shaped, small at the bottom and large at the top. The diameter of the lower opening 11 is the thickness of the steel plate plus 8mm, and the diameter of the upper opening 10 is 2.25 times the plate thickness. They are arranged in a plum blossom shape according to the design requirements and are used for welding anchor bars (especially, the number and position of the anchor plug welding holes are in accordance with the design requirements). The cutting length of the anchor bar 12 is slightly longer than the design length, which is convenient for the subsequent welding of the anchor bar. The steel plate is provided with 30mm diameter vent holes 9 at intervals to ensure that the concrete fits the embedded parts.
[0016] Step 2: Install the support frame.
[0017] like Figure 1 , 2 As shown: After the equipment foundation cushion is poured and the steel cage is installed, the support frame column 2 is installed and fixed on the concrete cushion to ensure verticality. It is set at the intersection of the horizontal steel bars and the longitudinal steel bars 5 of the equipment foundation steel cage, tied or welded for reinforcement, and arranged in a matrix at a fixed spacing. A diagonal brace 3 is welded between each column. The bottom of the diagonal brace is fixed on the slope equipment foundation cushion, and the top is slightly lower than the top of the column and welded to the column. The support rod 4 is set along the entire length of the inclination direction of the integral flat plate embedded parts. Before welding, a level or total station is used to determine the top and bottom elevations of the support rod. The elevation between the top and the bottom is controlled by a laser instrument, and the straightness of the support rod itself is controlled during the welding process. It should be noted that after the support frame is installed, the elevations of the top and bottom of the rows of support rods need to be checked again, and the inclined surface of the support frame body needs to be checked with a laser instrument.
[0018] Step three: hoisting of embedded steel plates.
[0019] Lift the steel plate onto the support rod 4 of the support frame according to the pre-arranged sequence, and lift them from the bottom to the top in sequence to ensure that the flat seam between the two steel plates is tight, and the bottom of the steel plate rests on the bottom side template of the equipment foundation. At the same time, the bottom template is reinforced to prevent deformation. See the attached Figure 1 (In particular, the support piles 7 are pre-buried on the poured concrete foundation, and the formwork support rods 6 are set for reinforcement. Both can use 48.3mm×3.0mm steel pipes. You can choose the appropriate material.) Step 4: Welding of embedded anchor bars.
[0020] like Figure 6 As shown: the anchor bar 12 is cut slightly longer than the required length, and a marker is used to mark the required length. The anchor bar diameter is selected according to the design requirements. When welding, the plug welding hole 8 is inserted from the front. The extra anchor bar is exposed outside the steel plate to facilitate fixed welding. The plug welding hole needs to be fully welded. After welding, the excess anchor bar is cut off and polished.
[0021] Furthermore, the support frame includes columns, struts, and diagonal braces; the columns are made of hot-rolled ribbed steel bars with a diameter of 25 mm or more, fixed on the slope equipment foundation cushion layer, and the columns are set at the intersection of the horizontal steel bars and the longitudinal steel bars of the equipment foundation steel cage, and are reinforced by binding or welding; according to the area required for laying the embedded parts, the columns can be arranged in a matrix at a spacing of 500mm-1000mm; diagonal braces are set between each column to ensure the stability of the support frame, and the diagonal braces are made of hot-rolled ribbed steel bars with a diameter of 25 mm or more, one end of which is fixed on the slope equipment foundation cushion layer, and the other end is welded to the top of the column; the struts are made of angle steel or channel steel, and are set along the inclination direction of the overall flat embedded parts, and are firmly welded to the top of the column.
[0022] The present invention controls the elevation and inclination of embedded parts by setting a support frame, the embedded anchor bars are welded by perforation plug welding, the steel plates are cut and holes are opened in a processing plant, the steel plates are installed and fixed on site by the support frame, and then the anchor bars are welded on site.
[0023] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A method for installing a large inclined flat plate embedded part, characterized in that It includes the following steps: Step 1: Embedded parts processing; Step 2: Install the support frame; Step 3: Lifting of embedded steel plates; Step 4: Welding of embedded anchor bars.
2. The method for installing a large inclined flat plate embedded part according to claim 1, characterized in that: Step one specifically includes: the embedded parts are made of steel plates, the steel plates are arranged according to the required laying area, and are cut into single pieces. Anchor plug welding holes are opened on the steel plates in a plum blossom shape for welding anchor bars.
3. The method for installing a large inclined flat plate embedded part according to claim 2, characterized in that: The cutting length of anchor bars is longer than the designed length to facilitate the subsequent welding of anchor bars; 30mm diameter vent holes are arranged at intervals on the steel plate to ensure the fit between concrete and embedded parts.
4. The method for installing a large inclined flat plate embedded part according to claim 1, characterized in that: Step 2 specifically includes: after the equipment foundation cushion is poured and the steel cage is installed, the support frame columns are installed and fixed on the concrete cushion to ensure verticality. The columns are arranged in a matrix at a fixed interval, and diagonal braces are welded between each column; the support rods are set along the entire length of the inclination direction of the integral flat plate embedded parts. Before welding, a level or total station is used to determine the top and bottom elevations of the support rods, and the elevation between the top and the bottom is controlled by a laser.
5. The method for installing a large inclined flat plate embedded part according to claim 1, characterized in that: Step three specifically includes: hoisting the steel plates onto the support frame according to the pre-arranged sequence, ensuring that the flat seams between the two steel plates are tight, and the bottom of the steel plates rest against the bottom template of the equipment foundation, while taking reinforcement measures on the bottom template to prevent deformation.
6. The method for installing a large inclined flat plate embedded part according to claim 1, characterized in that: Step 4 specifically includes: the anchor bar cutting length is slightly longer than the design required length, and the required length is marked with a marker pen. When welding, the plug welding hole is inserted from the front, and the extra anchor bar is exposed outside the steel plate to facilitate fixed welding. The plug welding hole must be welded full. After welding is completed, the excess anchor bar is cut off and polished flat, and the large inclined flat plate embedded parts are installed.
7. The method for installing a large inclined flat plate embedded part according to claim 1, characterized in that: The support frame includes columns, struts, and diagonal braces; the columns are made of hot-rolled ribbed steel bars with a diameter of 25 mm or more, fixed on the foundation cushion of the slope equipment, and the columns are arranged at the intersection of the horizontal steel bars and the longitudinal steel bars of the equipment foundation steel cage, and are reinforced by binding or welding; according to the area required for laying the embedded parts, the columns can be arranged in a matrix at a spacing of 500mm-1000mm; diagonal braces are arranged between each column to ensure the stability of the support frame, and the diagonal braces are made of hot-rolled ribbed steel bars with a diameter of 25 mm or more, one end of which is fixed on the foundation cushion of the slope equipment, and the other end is welded to the top of the column; the struts are made of angle steel or channel steel, and are arranged along the inclination direction of the overall flat embedded parts, and are firmly welded to the top of the column.
Citation Information
Patent Citations
Method for mounting and constructing large I-shaped cant pre-embedded parts
CN106320715A
Construction method for large steel plate embedded part of wall
CN106968347A
Installation method for pre-embedded iron parts
CN109306740A
Installation method of large embedded part
CN111218991A
Special-shaped inclined embedded part structure
CN220908721U