Differential water control and production allocation method and device for side water gas reservoir gas well
Through the Lagrangian particle theory method, the problem of poor reliability of the phase permeability curve in the expression of water breakthrough time in edge water gas reservoirs in the existing gas well optimization production allocation method is solved, and the gas-water interface is evenly advanced and efficiently achieved. Differentiated water control and production distribution of gas wells.
Patent Information
- Application Number
- CN202310320977.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-03-29
AI Technical Summary
The existing gas well optimization production allocation method has poor reliability in controlling non-uniform water invasion in edge water gas reservoirs, mainly because it is difficult to accurately obtain the phase permeability curve, resulting in poor practical applicability.
Using the Lagrangian particle theory method, the water breakthrough time of a gas well is defined as the earliest time for any water particle in the water body to arrive at the wellbore. By obtaining the reservoir parameters and gas physical property parameters of gas wells with the same distance from the edge water, the gas well water breakthrough time under different gas well production rates is determined. The water breakthrough time is determined and fitted to determine the target gas well production to achieve uniform advancement of the gas-water interface.
Through this method, calculation errors caused by inaccurate calculation of the phase permeability curve are avoided, calculation parameters are simplified, and a basis for optimizing production is provided, ensuring uniform advancement of the air-water interface, eliminating non-uniform water intrusion in high-permeability channels, and improving This improves the accuracy and efficiency of differentiated water control and production distribution for gas wells.
Smart Images

Figure CN118728334A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method and device for differential water control and production allocation of a gas well in an edge-water gas reservoir. Background Art
[0002] With the increasing demand for natural gas energy and the continuous advancement of exploration and development to deeper levels, the geological conditions of gas reservoirs are becoming increasingly complex. Currently, more than three-quarters of conventional gas reservoirs have active edge water or bottom water. Due to the heterogeneity of the reservoir, the edge and bottom water form non-uniform water invasion along the high-permeability channel during the development process, reducing the production capacity of high-yield wells and the recoverability of high-quality reserves, which greatly reduces the stable production period and recovery rate of gas reservoirs, affecting the stable supply of natural gas. In particular, some large-scale main gas reservoirs have large gas-bearing areas, widespread edge water development, long gas-water boundaries, and non-uniform edge water invasion in different parts (refer to Figure 1b has become the main factor restricting the efficient development of gas reservoirs.
[0003] Conventional gas reservoirs mostly adopt a development model of primary well pattern deployment and stable production of gas fields through stable production of single wells. In the development process, single well production optimization is the main way to optimize and adjust gas field development, which runs through every stage of gas reservoir development. Especially for edge and bottom water gas reservoirs, by optimizing the production allocation of gas wells in different parts, while meeting the production scale of the gas field, the risk of non-uniform water invasion in the dominant channel is reduced, and the gas-water interface is advanced relatively evenly (refer to Figure 1a Therefore, optimizing the production allocation of production wells is crucial to the efficient development of gas fields. Summary of the invention
[0004] The inventors of the present invention have discovered that the existing methods for optimizing production allocation for gas wells to control non-uniform water invasion in edge-water gas reservoirs are all based on the gas front position, and the water breakthrough time is obtained by integrating the front position. The expression for water breakthrough time includes the phase permeability curve, residual gas saturation, and gas-water mobility ratio. Therefore, the existing methods for optimizing production allocation for gas wells are limited by the reliability of the phase permeability curve, which is difficult to accurately obtain, resulting in poor practical applicability of the method. In view of the above problems, it is necessary for the embodiments of the present invention to propose a method and device for differentiated water control and production allocation for gas wells in edge-water gas reservoirs to solve or partially solve the above problems. The technical solution proposed by the present invention is as follows:
[0005] In a first aspect, the present invention provides a method for differentiated water control and production allocation of a gas well in an edge-water gas reservoir, comprising:
[0006] Determine the water breakthrough time of multiple gas wells corresponding to different given gas well production rates based on the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water; wherein the water breakthrough time of the gas well is the earliest time when any water point in the water body reaches the wellbore;
[0007] The water breakthrough time of each gas well corresponding to each given gas well production is fitted to obtain the relationship between the water breakthrough time of the gas well and the reservoir parameters under different gas well production;
[0008] According to the relationship between the water breakthrough time of the gas well and the reservoir parameters under the different gas well production levels, the target gas well production corresponding to each gas well under the given gas well water breakthrough time is determined, so that each gas well is allocated production according to its corresponding target gas well production.
[0009] In an optional embodiment, determining the gas well water breakthrough times corresponding to a plurality of gas wells at different given gas well production rates based on the obtained reservoir parameters and gas physical property parameters of each gas well at the same distance from the edge water includes:
[0010] According to the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water, the water breakthrough characteristic parameters corresponding to multiple gas wells under different given gas well production rates are determined;
[0011] The water breakthrough times of the gas wells corresponding to the multiple gas wells under different given gas well production rates are determined according to the water breakthrough characteristic parameters and the reservoir parameters.
[0012] In an optional embodiment, determining water breakthrough characteristic parameters corresponding to multiple gas wells at different given gas well production rates based on reservoir parameters and gas physical property parameters of each gas well at the same distance from the edge water includes:
[0013] Substituting the different given gas well production, the reservoir parameters and the gas physical property parameters of each gas well into the following formula 1 respectively, solving formula 1 to obtain the water breakthrough characteristic parameters corresponding to the multiple gas wells under different given gas well production; wherein the reservoir parameters include formation permeability, formation effective thickness and formation porosity, and the gas physical property parameters include gas viscosity, total compressibility coefficient and gas volume coefficient;
[0014]
[0015] Where, u is the water breakthrough characteristic parameter; k is the formation permeability; h is the effective thickness of the formation; Q is the gas well production; B is the gas volume coefficient; φ is the formation porosity; μ is the gas viscosity; C t is the total compression factor;
[0016]
[0017] In an optional embodiment, determining the gas well water breakthrough times corresponding to the plurality of gas wells at different given gas well production rates according to the water breakthrough characteristic parameters and the reservoir parameters includes:
[0018] Substitute the water breakthrough characteristic parameters and the reservoir parameters corresponding to the multiple gas wells at different given gas well production rates into the following formula 2 to obtain the gas well water breakthrough times corresponding to the multiple gas wells at different given gas well production rates:
[0019]
[0020] Where, t is the time of water breakthrough in the gas well; u is the characteristic parameter of water breakthrough; k is the formation permeability; φ is the formation porosity; μ is the gas viscosity; C t is the total compression coefficient, and L is the distance from the edge water.
[0021] In an optional embodiment, before determining the water breakthrough characteristic parameters corresponding to a plurality of gas wells at different given gas well production rates based on the reservoir parameters and gas physical property parameters of the gas wells at the same distance from the edge water, the method further comprises:
[0022] Determine the corresponding water breakthrough characteristic function value according to the water breakthrough characteristic parameter within a given preset range;
[0023] According to the water breakthrough characteristic parameters within the preset range and the corresponding water breakthrough characteristic function values, a double logarithmic curve of the water breakthrough time function is obtained by fitting.
[0024] In an optional embodiment, determining the gas well water breakthrough times corresponding to the plurality of gas wells at different given gas well production rates according to the water breakthrough characteristic parameters and the reservoir parameters includes:
[0025] According to the given gas well production, the reservoir parameters and the gas physical property parameters, the functional group parameters corresponding to the multiple gas wells under different given gas well production are determined by the following formula 3; wherein the reservoir parameters include formation permeability, formation effective thickness and formation porosity, and the gas physical property parameters include gas viscosity, total compressibility coefficient and gas volume coefficient;
[0026]
[0027] In the formula, A is the functional group parameter; k is the formation permeability; h is the effective thickness of the formation; Q is the gas well production; B is the gas volume coefficient; φ is the formation porosity; μ is the gas viscosity; C t is the total compression factor;
[0028] According to the functional group parameters and the double logarithmic curve of the water breakthrough time function, the water breakthrough characteristic parameters corresponding to the multiple gas wells under different given gas well production rates are determined.
[0029] In an optional embodiment, the water breakthrough characteristic function value is obtained by the following formula 4:
[0030]
[0031] Where, f(u) is the water breakout characteristic function value; u is the water breakout characteristic parameter;
[0032] In an optional embodiment, the gas physical property parameters are determined by:
[0033] Obtain formation temperature, average formation pressure and gas molar composition parameters of gas wells;
[0034] The gas physical property parameters are determined according to the formation temperature, the average formation pressure and the gas molar component parameters.
[0035] In a second aspect, the present invention provides an application of the differentiated water control and production allocation method for gas wells in edge water gas reservoirs as described in the first aspect in the development of edge water gas reservoirs.
[0036] In a third aspect, the present invention provides a device for differential water control and production allocation of a gas well in an edge-water gas reservoir, comprising:
[0037] A gas well water breakthrough time determination module is used to determine the gas well water breakthrough time corresponding to multiple gas wells at different given gas well production rates based on the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water; wherein the gas well water breakthrough time is the earliest time when the water mass point reaches the wellbore;
[0038] A fitting module is used to fit the water breakthrough time of each gas well corresponding to each given gas well production, and obtain the relationship between the water breakthrough time of the gas well and the reservoir parameters under different gas well production;
[0039] The target gas well production determination module is used to determine the target gas well production corresponding to each gas well under a given gas well water breakthrough time based on the relationship between the gas well water breakthrough time and reservoir parameters under different gas well productions, so that each gas well can be allocated production according to its corresponding target gas well production.
[0040] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the differentiated water control and production allocation method for gas wells in edge water gas reservoirs as described in the first aspect.
[0041] In a fifth aspect, the present invention provides an electronic device, comprising a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus;
[0042] Memory, used to store computer programs;
[0043] The processor is used to implement the differentiated water control and production allocation method for gas wells in edge water gas reservoirs as described in the first aspect when executing the program stored in the memory.
[0044] Based on the above technical solution, the beneficial effects of the present invention compared with the prior art are as follows:
[0045] The differentiated water control and production allocation method for gas wells in edge water gas reservoirs provided in an embodiment of the present invention obtains reservoir parameters and gas physical property parameters of gas wells with different reservoir physical properties, and determines the water breakthrough time corresponding to multiple gas wells at different given gas well production rates based on the obtained reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water; wherein the water breakthrough time of the gas well is the earliest time when any water particle in the water body reaches the wellbore. The sensitivity analysis of water breakthrough time under different factors can be carried out, which provides the basis for optimizing production allocation for controlling non-uniform water invasion in edge water gas reservoirs; by fitting the water breakthrough time of each gas well corresponding to each given gas well production, the relationship between the water breakthrough time of the gas well and reservoir parameters under different gas well production is obtained; then, according to the relationship between the water breakthrough time of the gas well and reservoir parameters under different gas well production, the target gas well production corresponding to each gas well under the given gas well water breakthrough time is determined, so that each gas well is allocated production according to its corresponding target gas well production, the gas-water interface is uniformly advanced, and the gas wells with different reservoir properties are allocated production differently, and different target gas well productions are determined to achieve the same water breakthrough time, thereby eliminating non-uniform water invasion in high permeability channels. In the calculation process, the Lagrangian particle theory method is used to break through the traditional Euler field theory method, and the phase permeability curve and saturation field do not need to be used, thereby avoiding the calculation error caused by the inaccurate phase permeability curve, and simplifying the calculation parameters. The present invention is based on Lagrangian particle theory, defines the water breakthrough time of a gas well in an edge-water gas reservoir as the earliest time when any water particle in the water body reaches the wellbore, and converts the description of the fluid in the reservoir from traditional field theory to particle theory, providing new ideas and approaches for the study of water breakthrough time in gas reservoirs and other seepage problems.
[0046] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0047] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0049] Figure 1a Schematic diagram of uniform water invasion in edge water gas reservoir provided by the first embodiment of the present invention;
[0050] Figure 1b Schematic diagram of non-uniform water invasion in edge water gas reservoirs provided in Embodiment 1 of the present invention;
[0051] Figure 2 It is a schematic flow chart of a differentiated water control and production allocation method for a gas well in an edge-water gas reservoir provided in Embodiment 1 of the present invention;
[0052] Figure 3 is a schematic diagram of a gas reservoir model including edge water provided in the first embodiment of the present invention;
[0053] Figure 4 is a double logarithmic curve diagram of water breakthrough characteristic function of a gas well in an edge-water gas reservoir provided by the first embodiment of the present invention;
[0054] Figure 5 The curve of water breakthrough time versus permeability at different gas well production rates at a certain edge water gas reservoir 1000 m away from the edge water provided in the second embodiment of the present invention;
[0055] Figure 6 1 is a schematic diagram of the structure of a differentiated water control and production allocation device for a gas well in an edge-water gas reservoir provided in a fourth embodiment of the present invention;
[0056] Figure 7 It is a schematic diagram of the structure of an electronic device provided in Embodiment 6 of the present invention. DETAILED DESCRIPTION
[0057] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0058] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the present invention as detailed in the appended claims.
[0059] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0060] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0061] The existing methods for optimizing gas well production allocation to control non-uniform water invasion in edge-water gas reservoirs mainly include numerical simulation method and analytical formula method.
[0062] The numerical simulation method mainly uses the numerical model generated by geological modeling to give different production allocation plans for gas wells in different locations, predict the advancement speed of the gas-water interface and the development effect under different scenarios, and thus determine the reasonable production of gas wells in different locations. On the one hand, this method requires a lot of modeling and numerical simulation operations, which is labor-intensive and time-consuming. On the other hand, it relies heavily on the reliability of the phase permeability curve. From the perspective of actual application effects, due to the different physical properties of reservoirs in different locations, they have different phase permeability curve characteristics, and the actual phase permeability is difficult to accurately obtain, resulting in poor reliability of the optimization results.
[0063] In terms of analytical formula method, existing literature has proposed different optimization production allocation methods for different well types and flow patterns. Yang Furong et al. considered the non-Darcy seepage near the wellbore of a high-yield gas well, and used the basic seepage theory of gas-water two-phase to study the prediction method of water breakthrough time of edge water gas reservoirs with a straight supply boundary, and obtained the expression of water breakthrough time of gas wells considering the non-Darcy effect of gas, the distance between the gas well and the edge water, the original bound water saturation, the residual gas saturation and the gas-water mobility ratio. Based on the theory of stable seepage, Wu Keliu et al. considered the influence of the retrograde condensation of condensate oil in the reservoir on the gas phase flow, and proposed a prediction formula for the water breakthrough time of edge water condensate gas reservoirs with an approximate straight supply boundary. Huang Quanhua et al. considered the non-Darcy flow effect, the initial gas-water interface distance and the length of the horizontal well for horizontal well seepage, and used the ellipsoidal horizontal well seepage model to obtain the water breakthrough time formula of edge water gas reservoirs with a straight supply boundary. Li Jiqiang et al. proposed a formula for the breakthrough time of edge water in a multi-layer gas reservoir with interlayer heterogeneity. In addition to the distance from the gas-water interface, the relative permeability of gas and water to the formation, and the residual gas saturation, the formula also takes into account the interlayer breakthrough coefficient. These studies have promoted the rational production allocation of gas well development, but the existing studies on the breakthrough time of edge water in gas wells are based on the position of the gas front, and the breakthrough time is obtained by integrating the front position. The expression of the breakthrough time includes the phase permeability curve, residual gas saturation, gas-water fluidity ratio, etc. These are all related to the changes in the saturation field during the gas-water two-phase fluidity process. Like the numerical simulation method, they are all limited by the reliability of the phase permeability curve, which makes the reliability of direct parameter acquisition poor, resulting in poor practical applicability. In other words, the existing analytical methods are all based on the Euler field theory of fluid fluidity, and it is necessary to consider the pressure field and saturation field at different stages. Based on this, the present invention provides a differentiated water control and production allocation method for gas wells in edge-water gas reservoirs. Based on the Lagrangian particle theory, a water breakthrough time function for gas wells is established, which takes into account human and geological factors such as production allocation, distance from the gas-water interface, and reservoir formation permeability, without considering changes in relative permeability and saturation. The function is used to guide a reasonable production allocation method for gas wells that maintains uniform advancement of the gas-water interface in different locations and under different reservoir physical properties in edge-water gas reservoirs.
[0064] Embodiment 1
[0065] The embodiment of the present invention provides a method for differential water control and production allocation of gas wells in edge water gas reservoirs, referring to Figure 2 As shown, including:
[0066] S101, determining the gas well water breakthrough time corresponding to multiple gas wells at different given gas well production rates based on the obtained reservoir parameters and gas physical property parameters of each gas well at the same distance from the edge water; wherein the gas well water breakthrough time is the earliest time when any water point in the water body reaches the wellbore;
[0067] The present invention adopts the Lagrangian particle theory method, and believes that the water breakthrough time is the earliest time when any "water particle" in the water body reaches the wellbore. On this basis, the Euler field is converted into a Lagrangian particle, and the water breakthrough time equation of the gas well in the edge water gas reservoir is established. By defining the water breakthrough time function, a normalized characteristic plate is formed, which unifies the human factors and geological factors related to water invasion, including: gas well production, formation permeability, distance from edge water and water breakthrough time. Using this plate, the relationship between gas well production allocation and water breakthrough time under different physical property conditions in different parts can be calculated, and the reasonable production corresponding to gas wells with different formation permeabilities can also be calculated under the same distance from the gas-water interface to achieve the same water breakthrough time (i.e., uniform advancement of the gas-water interface), which provides an optimized production allocation basis for controlling the non-uniform advancement of edge water.
[0068] The water breakthrough time of a gas well is defined as the earliest time when any "water point" in the water body reaches the wellbore (refer to Figure 3 As shown). Since seepage mechanics adopts the continuum mechanics hypothesis of Euler's point of view, various solution variables are expressed according to field theory. Field theory cannot give the trajectory of particle motion, nor the time required for particles to move from one position to another, that is, the time of water breakthrough considering edge water cannot be obtained under Euler description. The Lagrangian method in fluid mechanics studies the law of change of motion parameters (position coordinates, velocity, acceleration, etc.) of each particle of the fluid with time. The Lagrangian description focuses on fluid particles and regards physical quantities as functions of body coordinates and time, which is consistent with the problem considered by this method. Therefore, it is necessary to first establish the conversion relationship between the two descriptions.
[0069] Assume that the velocity field described by Euler is known:
[0070]
[0071] Where V is the field velocity, (x, y, z) is the field coordinate, t is the time, and v x 、v y 、v z are the coordinate components, i, j, k are unit coordinate vectors.
[0072] The velocity of the particle described by the Lagrangian method is:
[0073]
[0074] The integration of the equation can obtain the trajectory of the fluid particle under Lagrangian description:
[0075]
[0076] In the formula, c 1 ,c 2 ,c 3 is the position of the fluid particle at the initial moment.
[0077] Therefore, the edge water breakthrough time of gas well production can be obtained by combining the Euler and Lagrangian methods and solving the particle motion trajectory.
[0078] The present invention defines the earliest time when the water particle ("fastest water particle") arrives at the wellbore as the water breakthrough time of the gas reservoir, so that the area between the fastest water particle and the wellbore is still gas, and the movement of the fastest water particle mainly comes from the pressure gradient (pressure drop funnel) generated by the gas flow in front, and the gas-water two-phase flow is behind the "fastest water particle". Investigating the movement trajectory of the water particle that arrives at the wellbore first, assuming that the well position is the coordinate origin, its trajectory equation can be expressed as r(c1, c2, c3, t), then the 0-r area before the water particle arrives at the wellbore is still single-phase gas seepage, and the water breakthrough time can be completely solved using the single-phase seepage equation.
[0079] Assuming that the test formation permeability of a homogeneous infinite formation is k, according to the seepage theory, the pressure distribution during point source constant flow production is obtained as:
[0080]
[0081] Where:
[0082] p i —Original formation pressure, Pa;
[0083] Q—surface production of oil and gas wells, m 3 / s;
[0084] μ—viscosity of fluid in the formation, Pa.s;
[0085] B—volume coefficient of fluid, m 3 / m 3 ;
[0086] k—formation permeability, m 2 ;
[0087] h—effective formation thickness, m;
[0088] —reservoir porosity, decimal;
[0089] C t —Total reservoir compressibility, Pa -1 ;
[0090] r—the distance from any point in the formation to the well, m;
[0091] t—fluid flow time, s;
[0092] Exponential integral function.
[0093] According to Darcy's law, the fluid seepage velocity at any point and at any time in the formation can be obtained:
[0094]
[0095] According to the transformation relationship between Euler and Lagrange, the relationship between the velocity V(r, t) and the distance r of the fluid particle is obtained:
[0096]
[0097] If the radial distance between the water body and the well is L(m), the equation can be written as:
[0098]
[0099] Use the substitution method to simplify the above equation, let Then we have:
[0100]
[0101]
[0102]
[0103]
[0104] In the above formula 1.8, when the surface production of oil and gas wells, i.e., the gas well production Q, is given, the root u of the equation is a dimensionless parameter that includes the water breakthrough time and the edge water distance. Therefore, u can be defined as a water breakthrough characteristic parameter. It can be seen from the solution of the equation that the equation is difficult to solve analytically.
[0105] Considering the equation does not contain u, so we can define a new function f(u) and rewrite the equation as follows:
[0106]
[0107] The above equation can be defined as the characteristic equation of bedrock water breakthrough time, that is, Solve for u.
[0108] According to the expressions of u and f(u), for gas wells with a distance of L from the edge water, the reservoir properties and PVT parameters under the initial pressure are fixed, and different gas well production Q corresponds to different water breakthrough times. Therefore, the expected water breakthrough time can be achieved by changing the gas well production. For heterogeneous gas reservoirs, gas wells with the same distance from the edge water have large differences in reservoir properties. To maintain uniform advancement of the gas-water interface, differentiated production allocation is carried out for gas wells with different reservoir properties, and different gas well production is determined to achieve the same water breakthrough time, thereby eliminating non-uniform water invasion in high-permeability channels.
[0109] S102, fitting the gas well water breakthrough time corresponding to each gas well at each given gas well production, to obtain the relationship between the gas well water breakthrough time and reservoir parameters under different gas well productions;
[0110] For each given gas well production, the water breakthrough time of each gas well corresponding to the given gas well production is fitted to obtain the relationship between the water breakthrough time of the gas well and the reservoir parameters under the given gas well production, thereby obtaining the relationship between the water breakthrough time of the gas well and the reservoir parameters under different given gas well productions. By interpolating the relationship between the water breakthrough time of the gas well and the reservoir parameters under different given gas well productions, the relationship between the water breakthrough time of the gas well and the reservoir parameters under different gas well productions can be obtained. Figure 5 As shown in FIG. 1 , it is a curve showing the change of water breakthrough time with formation permeability at different gas well production levels in a gas well located 1000 m away from the edge water in a certain edge water gas reservoir.
[0111] S103. According to the relationship between the water breakthrough time of the gas well and the reservoir parameters under the different gas well production rates, determine the target gas well production corresponding to each gas well under the given gas well water breakthrough time, so that each gas well is allocated production according to its corresponding target gas well production.
[0112] The reservoir parameters of each gas well are known. By determining the relationship between the water breakthrough time of the gas well and the reservoir parameters under different gas well production, the gas well production corresponding to the gas wells with different reservoir physical properties at the same gas well water breakthrough time can be obtained to ensure that the heterogeneous gas reservoir maintains uniform advancement of the gas-water interface, thereby eliminating the non-uniform water invasion of the high permeability channel. As a specific example, assuming that the permeabilities of the four gas wells in different directions at a distance of L = 1000m from the edge water are 0.65, 1.20, 2.55 and 4.40mD respectively, and assuming that the water breakthrough time of the gas wells is 1000d, refer to Figure 5 The curves of water breakthrough time of gas wells changing with formation permeability at different gas well production levels are shown. The production allocations of the above four gas wells are 60, 40, 200,000 cubic meters per day, respectively.
[0113] The present invention relates to a gas well optimized production allocation method for controlling non-uniform water invasion based on fluid particle motion theory in the process of developing edge water gas reservoirs. The method obtains reservoir parameters and gas physical property parameters of gas wells with different reservoir physical properties, and according to the obtained reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water, determines the gas well water breakthrough time corresponding to multiple gas wells under different given gas well production rates; wherein the gas well water breakthrough time is the earliest time when any water particle in the water body reaches the wellbore. Sensitivity analysis of water breakthrough time under different factors can be performed, providing a basis for optimizing production allocation for controlling non-uniform water invasion in edge-water gas reservoirs; by fitting the water breakthrough time corresponding to each gas well at each given gas well production, the relationship between the water breakthrough time of the gas well and reservoir parameters under different gas well productions can be obtained; then, according to the relationship between the water breakthrough time of the gas well and reservoir parameters under different gas well productions, the target gas well production corresponding to each gas well under a given gas well water breakthrough time can be determined, so that each gas well can be allocated production according to its corresponding target gas well production, the gas-water interface can be uniformly advanced, and differentiated production can be allocated for gas wells with different reservoir properties, and different target gas well productions can be determined to achieve the same water breakthrough time, thereby eliminating non-uniform water invasion in high-permeability channels. In the calculation process, the Lagrangian particle theory method is used to break through the traditional Euler field theory method, and the phase permeability curve and saturation field do not need to be used, thereby avoiding the calculation error caused by inaccurate phase permeability curve, and simplifying the calculation parameters. The present invention is based on Lagrangian particle theory, defines the water breakthrough time of a gas well in an edge-water gas reservoir as the earliest time when any water particle in the water body reaches the wellbore, and converts the description of the fluid in the reservoir from traditional field theory to particle theory, providing new ideas and approaches for the study of water breakthrough time in gas reservoirs and other seepage problems.
[0114] In a specific embodiment, the above step S101, according to the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water, determines the gas well water breakthrough time t corresponding to multiple gas wells at different given gas well production rates, including:
[0115] S1011, determining water breakthrough characteristic parameters u corresponding to multiple gas wells at different given gas well production rates based on reservoir parameters and gas physical property parameters of gas wells at the same distance from edge water;
[0116] S1012. Determine the gas well water breakthrough times t corresponding to the multiple gas wells at different given gas well production rates based on the water breakthrough characteristic parameter u and the reservoir parameters.
[0117] In a specific embodiment, the above step S1011, according to the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water, determines the water breakthrough characteristic parameters corresponding to multiple gas wells at different given gas well production rates, including:
[0118] Substituting the different given gas well production, the reservoir parameters and the gas physical property parameters of each gas well into the following formula 1 respectively, solving formula 1 to obtain the water breakthrough characteristic parameters u corresponding to the multiple gas wells under different given gas well production; wherein the reservoir parameters include formation permeability, formation effective thickness and formation porosity, and the gas physical property parameters include gas viscosity, total compressibility coefficient and gas volume coefficient;
[0119]
[0120] Where, u is the water breakthrough characteristic parameter; k is the formation permeability; h is the effective thickness of the formation; Q is the gas well production; B is the gas volume coefficient; φ is the formation porosity; μ is the gas viscosity; C t is the total compression factor;
[0121]
[0122] In a specific embodiment, the step S1012 of determining the gas well water breakthrough times corresponding to the plurality of gas wells at different given gas well production rates according to the water breakthrough characteristic parameters and the reservoir parameters includes:
[0123] Substitute the water breakthrough characteristic parameter u and the reservoir parameter corresponding to the multiple gas wells at different given gas well production rates into the following formula 2 to obtain the gas well water breakthrough time corresponding to the multiple gas wells at different given gas well production rates:
[0124]
[0125] Where, t is the time of water breakthrough in the gas well; u is the characteristic parameter of water breakthrough; k is the formation permeability; φ is the formation porosity; μ is the gas viscosity; C t is the total compression coefficient, and L is the distance from the edge water.
[0126] There is no analytical formula for the root of the above formula 1.9, so the Newton iteration method is considered to be used to obtain the root of the equation, and the equation is made into a plate, and the root of the equation is obtained by the plate interpolation method. The water breakthrough time function equation (1.9) established based on the Lagrange particle method in the present invention is related to the water breakthrough time of the gas well with the human influence factors (gas well production, i.e., the allocated production) and the geological influence factors (formation permeability, distance from the edge water), forming a reference Figure 4 The normalized water breakthrough time function curve is shown.
[0127] Based on this, in a specific embodiment, before determining the water breakthrough characteristic parameters corresponding to multiple gas wells at different given gas well production rates according to the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water as described in step S1011, the method further includes:
[0128] S10101. Determine a corresponding water breakthrough characteristic function value f(u) according to a given water breakthrough characteristic parameter u within a preset range; the water breakthrough characteristic function value is obtained by the following formula 4:
[0129]
[0130] Where, f(u) is the water breakout characteristic function value; u is the water breakout characteristic parameter;
[0131] Substitute each water breakthrough characteristic parameter u within a given preset range into the above formula 4 to obtain the corresponding water breakthrough characteristic function value f(u).
[0132] S10102. According to the water breakthrough characteristic parameter u and the corresponding water breakthrough characteristic function value f(u) within the preset range, a double logarithmic curve of the water breakthrough time function is obtained by fitting.
[0133] As a specific embodiment, given the range of the independent variable u [0.01, 10], the corresponding value of f(u) is calculated using the above formula 4, and the relationship between the two is plotted as a reference Figure 4 The double logarithmic curve of water breakthrough time function is shown.
[0134] In a specific embodiment, the step S1012 described above, determining the gas well water breakthrough times corresponding to the plurality of gas wells at different given gas well production rates according to the water breakthrough characteristic parameter u and the reservoir parameter, includes:
[0135] S10121. According to the given gas well production, the reservoir parameters and the gas physical property parameters, determine the functional group parameters corresponding to the multiple gas wells at different given gas well productions by the following formula 3; wherein the reservoir parameters include formation permeability, formation effective thickness and formation porosity, and the gas physical property parameters include gas viscosity, total compressibility coefficient and gas volume coefficient;
[0136]
[0137] In the formula, A is the functional group parameter; k is the formation permeability; h is the effective thickness of the formation; Q is the gas well production; B is the gas volume coefficient; φ is the formation porosity; μ is the gas viscosity; C t is the total compression factor;
[0138] Based on a plurality of different given gas well productions, the given gas well productions, the reservoir parameters of each gas well and the gas physical property parameters are substituted into the above formula 3 to obtain the functional group parameters corresponding to the plurality of gas wells under the corresponding different given gas well productions.
[0139] S10122. Determine water breakthrough characteristic parameters corresponding to the multiple gas wells at different given gas well production rates based on the functional group parameters and the double logarithmic curve of the water breakthrough time function.
[0140] From formula 1.9, we know that the value of f(u) is equal to the functional group parameter A. Once the functional group parameter A is determined, the water characteristic function value f(u) is determined. If the value of f(u) is known, we can use the reference Figure 4 The plate shown in the figure uses the plate interpolation method to calculate u, so that the water breakthrough time t of the gas well can be calculated according to the above formula 2.
[0141] In an optional embodiment, the gas physical property parameters are determined by:
[0142] S201, obtaining formation temperature, average formation pressure and gas molar component parameters of the gas well;
[0143] S202. Determine gas physical property parameters according to the formation temperature, formation average pressure and gas molar component parameters.
[0144] According to the formation temperature, average formation pressure and gas molar component parameters, the gas physical property parameters are determined by commonly used PVT software or commonly used gas reservoir engineering formulas. The specific calculation process can refer to the specific description in the prior art and will not be repeated here.
[0145] Compared with the existing methods, the advantages of the method of the present invention are mainly manifested in the following three aspects: first, based on the Lagrangian particle theory, the water breakthrough time of a gas well in an edge-water gas reservoir is defined as the earliest time when any water particle in the water body reaches the wellbore, and the description of the fluid in the reservoir is converted from the traditional field theory to the particle theory, which provides a new idea and approach for the study of the water breakthrough time of gas reservoirs and other seepage problems; second, for the first time, the human factors and geological factors characterizing the water breakthrough characteristics such as single well production allocation, distance from edge water, water breakthrough time, formation permeability, etc. are unified to form a normalized gas well water breakthrough characteristic function plate and calculation table, which can perform sensitivity analysis of water breakthrough time under different factors, and provide a basis for optimizing production allocation for controlling non-uniform water invasion in edge-water gas reservoirs; third, there is no need to use the phase permeability curve in the calculation process, thereby avoiding the calculation error caused by inaccurate phase permeability curve, and simplifying the calculation parameters at the same time.
[0146] Embodiment 2
[0147] In order to more clearly explain the differentiated water control and production allocation method for edge water gas reservoirs provided by the embodiment of the present invention and verify the accuracy of the method, the method is applied to perform production allocation, as follows:
[0148] 1. Given the gas well production and gas physical properties at a certain distance from the edge water, calculate the water breakthrough time of the gas well under the production allocation conditions:
[0149] The above mentioned method of using Newton iteration method to solve the water breakthrough time of homogeneous formation is given, but Newton iteration is only a numerical solution method, which requires the calculation program to input parameters and calculate the parameter group. Only after that can the calculation and solution be performed. Here we will give a curve graphic algorithm, which is more intuitive.
[0150] The specific application steps are as follows:
[0151] S301. Collect and organize gas reservoir parameters: formation permeability k, formation porosity and effective thickness of the formation h;
[0152] S302, collecting parameters required for calculating gas physical property parameters: formation temperature, formation average pressure, gas molar composition (or mixed gas relative density) parameters;
[0153] S303. Calculate the physical parameters of gas under formation conditions using the high-pressure physical parameters of gas: gas viscosity μ, total compressibility coefficient C t and gas volume coefficient B;
[0154] S304, given gas well production Q;
[0155] S305: Calculate the functional group parameters of the gas well production using the reservoir parameters obtained in step 301, the gas physical property parameters calculated in step S303, and the gas well production function group parameters given in step S304. Numeric value;
[0156] S306, in Figure 4 Draw in The point where the horizontal line intersects the f(u) curve is the root u of the equation that needs to be solved. Using this root, the water breakthrough time t can be obtained through the above formula 2.
[0157] Here is a specific example. For a given well, when the gas well production Q, formation permeability k, and formation porosity are known, Gas viscosity μ, total compressibility coefficient C t and gas volume coefficient B, its parameters and calculated PVT are shown in Table 1.
[0158] name Numeric unit Formation permeability 6.5 mD Formation porosity 6.09 % Effective thickness of formation 79.8 m Formation temperature 145 ℃ Average formation pressure 85.7 MPa Gas viscosity 0.036 mPa.s Total compression factor 0.008657 1 / MPa Gas volume coefficient 0.002764 <![CDATA[m 3 / m 3 <!-- 11 -->]]> Gas well production 29.71 <![CDATA[10 4 m 3 / d]]>
[0159] Table 1
[0160] According to the data in Table 1, the functional group parameters are calculated:
[0161]
[0162] pass Figure 4The root of the equation is u = 0.036. According to the definition of u, the relationship between the water appearance time t (in days) and the distance from the edge water L can be obtained:
[0163]
[0164] If the distance between the well and the edge water is L = 2000m, the time to see water is t = 938.8 days.
[0165] 2. Under the same distance from edge water, water breakthrough time under different production allocations for gas wells with different reservoir properties:
[0166] Reference Figure 5 As shown in the figure, the gas well production (10 4 m 3 / d) (other parameters are the same as in Table 1). It can be seen that when the permeability is the same, the higher the gas well production, the shorter the water breakthrough time; under the same production allocation conditions (that is, under the same gas well production conditions), the higher the permeability, the shorter the water breakthrough time. Using this figure, it is possible to perform differentiated production allocation for gas wells in edge water gas reservoirs with reservoir heterogeneity and control the edge water advancement speed to achieve the goal of uniform advancement of the gas-water interface. Assuming that the permeabilities of four gas wells in different directions at a distance of L = 1000m from the edge water of the gas reservoir are 0.65, 1.20, 2.55 and 4.40mD respectively, if they are all uniformly allocated production at 400,000 cubic meters / d, from Figure 5 It can be seen that the water breakthrough time of the gas wells is 1301, 1000, 734 and 535 days respectively, which leads to non-uniform advancement of the gas-water interface in different directions and premature water invasion in high permeability areas. To control the uniform advancement of the gas-water interface in different directions, assuming that the water breakthrough time of the gas wells is 1000 days, the production allocation of the above four gas wells is 60, 40, 20 and 50,000 cubic meters / day respectively. Through the above differentiated production allocation, the purpose of controlling non-uniform water invasion is achieved.
[0167] Embodiment 3
[0168] An embodiment of the present invention provides an application of the differentiated water control and production allocation method for gas wells in edge water gas reservoirs as described in any one of the aforementioned method embodiments in the development of edge water gas reservoirs.
[0169] Embodiment 4
[0170] The embodiment of the present invention provides a device for differential water control and production allocation of a gas well in an edge water gas reservoir, referring to Figure 6 As shown, including:
[0171] The gas well water breakthrough time determination module 401 is used to determine the gas well water breakthrough time corresponding to multiple gas wells at different given gas well production rates based on the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water; wherein the gas well water breakthrough time is the earliest time when the water mass point reaches the wellbore;
[0172] The fitting module 402 is used to fit the gas well water breakthrough time corresponding to each gas well at each given gas well production, and obtain the relationship between the gas well water breakthrough time and the reservoir parameters under different gas well productions;
[0173] The target gas well production determination module 403 is used to determine the target gas well production corresponding to each gas well under a given gas well water breakthrough time based on the relationship between the gas well water breakthrough time and reservoir parameters under different gas well productions, so that each gas well can be allocated production according to its corresponding target gas well production.
[0174] The differentiated water control and production allocation device for gas wells in edge-water gas reservoirs provided in an embodiment of the present invention has an implementation principle and technical effects similar to those of any of the aforementioned method embodiments, which will not be repeated here.
[0175] Embodiment 5
[0176] An embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon. When the program is executed by a processor, the method for differentiated water control and production allocation for gas wells in edge-water gas reservoirs described in any one of the aforementioned method embodiments is implemented.
[0177] The computer-readable storage medium may be included in the device / apparatus described in the above embodiment; or it may exist independently without being assembled into the device / apparatus. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the method according to the embodiment of the present invention is implemented.
[0178] According to an embodiment of the present invention, the computer-readable storage medium may be a non-volatile computer-readable storage medium, for example, may include but is not limited to: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, apparatus, or device.
[0179] Embodiment 6
[0180] An embodiment of the present invention provides an electronic device, referring to Figure 7As shown, it includes a processor 111, a communication interface 112, a memory 113 and a communication bus 114, wherein the processor 111, the communication interface 112 and the memory 113 communicate with each other through the communication bus 114.
[0181] Memory 113, used for storing computer programs;
[0182] The processor 111 is configured to implement the differentiated water control and production allocation method for gas wells in edge-water gas reservoirs described in any one of the aforementioned method embodiments when executing the program stored in the memory 113 .
[0183] The implementation principle and technical effect of the electronic device provided by the embodiment of the present invention are similar to those of any of the aforementioned method embodiments, and will not be repeated here.
[0184] The above-mentioned memory 113 can be an electronic memory such as a flash memory, an EEPROM (electrically erasable programmable read-only memory), an EPROM, a hard disk or a ROM. The memory 113 has a storage space for program codes for executing any method steps in the above-mentioned method. For example, the storage space for program codes may include various program codes for implementing various steps in the above method respectively. These program codes can be read from or written into one or more computer program products. These computer program products include program code carriers such as hard disks, compact disks (CDs), memory cards or floppy disks. Such computer program products are usually portable or fixed storage units. The storage unit may have a storage segment or storage space arranged similarly to the memory 113 in the above-mentioned electronic device. The program code can be compressed, for example, in an appropriate form. Generally, the storage unit includes a program for executing the method steps according to an embodiment of the present invention, that is, a code that can be read by, for example, a processor 111, and when these codes are run by an electronic device, the electronic device performs the various steps in the method described above.
[0185] In this document, relational terms such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. The orientation or position relationship indicated by the terms "upper", "lower", etc. is based on the orientation or position relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0186] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict. The present invention is not limited to any single aspect, any single embodiment, or any combination and / or permutation of these aspects and / or embodiments. Each aspect and / or embodiment of the present invention can be used alone, or in combination with one or more other aspects and / or other embodiments.
[0187] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A method for differentiated water control and production allocation in gas wells of edge water gas reservoirs, characterized in that: include: Determine the water breakthrough time of multiple gas wells corresponding to different given gas well production rates based on the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water; wherein the water breakthrough time of the gas well is the earliest time when any water point in the water body reaches the wellbore; The water breakthrough time of each gas well corresponding to each given gas well production is fitted to obtain the relationship between the water breakthrough time of the gas well and the reservoir parameters under different gas well production; According to the relationship between the water breakthrough time of the gas well and the reservoir parameters under the different gas well production levels, the target gas well production corresponding to each gas well under the given gas well water breakthrough time is determined, so that each gas well is allocated production according to its corresponding target gas well production.
2. The method for differentiated water control and production allocation in edge water gas reservoirs according to claim 1, characterized in that: The method of determining the gas well water breakthrough time corresponding to a plurality of gas wells at different given gas well production rates according to the obtained reservoir parameters and gas physical property parameters of each gas well at the same distance from the edge water comprises: According to the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water, the water breakthrough characteristic parameters corresponding to multiple gas wells under different given gas well production rates are determined; The water breakthrough times of the gas wells corresponding to the multiple gas wells under different given gas well production rates are determined according to the water breakthrough characteristic parameters and the reservoir parameters.
3. The method for differentiated water control and production allocation of gas wells in edge water gas reservoirs according to claim 2, characterized in that: The method of determining water breakthrough characteristic parameters corresponding to a plurality of gas wells at different given gas well production rates based on reservoir parameters and gas physical property parameters of each gas well at the same distance from the edge water includes: Substituting the different given gas well production, the reservoir parameters and the gas physical property parameters of each gas well into the following formula 1 respectively, solving formula 1 to obtain the water breakthrough characteristic parameters corresponding to the multiple gas wells under different given gas well production; wherein the reservoir parameters include formation permeability, formation effective thickness and formation porosity, and the gas physical property parameters include gas viscosity, total compressibility coefficient and gas volume coefficient; Where, u is the water breakthrough characteristic parameter; k is the formation permeability; h is the effective thickness of the formation; Q is the gas well production; B is the gas volume coefficient; φ is the formation porosity; μ is the gas viscosity; C t is the total compression factor; 4. The method for differentiated water control and production allocation in edge water gas reservoirs according to claim 2, characterized in that: The step of determining the water breakthrough times of the gas wells corresponding to the plurality of gas wells at different given gas well production rates according to the water breakthrough characteristic parameters and the reservoir parameters includes: Substitute the water breakthrough characteristic parameters and the reservoir parameters corresponding to the multiple gas wells at different given gas well production rates into the following formula 2 to obtain the gas well water breakthrough times corresponding to the multiple gas wells at different given gas well production rates: Where, t is the time of water breakthrough in the gas well; u is the characteristic parameter of water breakthrough; k is the formation permeability; φ is the formation porosity; μ is the gas viscosity; C t is the total compression coefficient, and L is the distance from the edge water.
5. The method for differentiated water control and production allocation in edge water gas reservoirs according to claim 2, characterized in that: Before determining the water breakthrough characteristic parameters corresponding to the plurality of gas wells at different given gas well production rates according to the reservoir parameters and gas physical property parameters of the gas wells at the same distance from the edge water, the method further comprises: Determine the corresponding water breakthrough characteristic function value according to the water breakthrough characteristic parameter within a given preset range; According to the water breakthrough characteristic parameters within the preset range and the corresponding water breakthrough characteristic function values, a double logarithmic curve of the water breakthrough time function is obtained by fitting.
6. The method for differentiated water control and production allocation in edge water gas reservoirs according to claim 5, characterized in that: The step of determining the water breakthrough times of the gas wells corresponding to the plurality of gas wells at different given gas well production rates according to the water breakthrough characteristic parameters and the reservoir parameters includes: According to the given gas well production, the reservoir parameters and the gas physical property parameters, the functional group parameters corresponding to the multiple gas wells under different given gas well production are determined by the following formula 3; wherein the reservoir parameters include formation permeability, formation effective thickness and formation porosity, and the gas physical property parameters include gas viscosity, total compressibility coefficient and gas volume coefficient; In the formula, A is the functional group parameter; k is the formation permeability; h is the effective thickness of the formation; Q is the gas well production; B is the gas volume coefficient; φ is the formation porosity; μ is the gas viscosity; C t is the total compression factor; According to the functional group parameters and the double logarithmic curve of the water breakthrough time function, the water breakthrough characteristic parameters corresponding to the multiple gas wells under different given gas well production rates are determined.
7. The method for differentiated water control and production allocation in edge water gas reservoirs according to claim 5, characterized in that: The water breakthrough characteristic function value is obtained by the following formula 4: Where, f(u) is the water breakout characteristic function value; u is the water breakout characteristic parameter; 8. The method for differentiated water control and production allocation in edge water gas reservoirs according to claim 2, characterized in that: The gas physical property parameters are determined in the following manner: Obtain formation temperature, average formation pressure and gas molar composition parameters of gas wells; The gas physical property parameters are determined according to the formation temperature, the average formation pressure and the gas molar component parameters.
9. Application of the differentiated water control and production allocation method for gas wells in edge water gas reservoirs as claimed in any one of claims 1 to 8 in the development of edge water gas reservoirs.
10. A device for differentiated water control and production allocation in gas wells of edge water gas reservoirs, characterized in that: include: A gas well water breakthrough time determination module is used to determine the gas well water breakthrough time corresponding to multiple gas wells at different given gas well production rates based on the reservoir parameters and gas physical property parameters of each gas well with the same distance from the edge water; wherein the gas well water breakthrough time is the earliest time when the water mass point reaches the wellbore; A fitting module is used to fit the water breakthrough time of each gas well corresponding to each given gas well production, and obtain the relationship between the water breakthrough time of the gas well and the reservoir parameters under different gas well production; The target gas well production determination module is used to determine the target gas well production corresponding to each gas well under a given gas well water breakthrough time based on the relationship between the gas well water breakthrough time and reservoir parameters under different gas well productions, so that each gas well can be allocated production according to its corresponding target gas well production.
11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the differentiated water control and production allocation method for gas wells in edge-water gas reservoirs as described in any one of claims 1 to 8 is implemented.
12. An electronic device, characterized in that: It includes a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; Memory, used to store computer programs; The processor is used to implement the differentiated water control and production allocation method for gas wells in edge water gas reservoirs as described in any one of claims 1 to 8 when executing the program stored in the memory.
Citation Information
Patent Citations
Water breakthrough time prediction method and device of edge water gas pool horizontal well
CN107977732A
Method and device for predicting water breakthrough time of gas well of heterogeneous edge water gas reservoir
CN112836438A
Edge-bottom water gas reservoir horizontal well production allocation dynamic optimization method
CN114893154A
Method and device for determining breakthrough time of horizontal bottom water of multi-medium bottom water gas reservoir
CN115217467A
Evaluation Method and Evaluation Device for Water Breakthrough Risk of Production Wells in Aquifer Drive Gas Reservoirs
US20160145994A1