Mining method for underground mining of stone for facing
By digging horizontal guide holes and installing counter-cutting frames, and adjusting the sawing method, the problem of insufficient working space in underground mining is solved, and facing stone mining without stripping the upper covering layer is realized, which reduces environmental impact and improves mining efficiency. efficiency.
Patent Information
- Application Number
- CN202410891209.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-01
AI Technical Summary
In underground mining, due to insufficient working space and exposed free surface, personnel and equipment are unable to operate, making it difficult to mine facing stones.
By drilling horizontal guide holes and installing a counter-cutting frame, by adjusting the installation of the diamond bead saw and the movement direction of the wire saw host, the traditional tangential cutting method from the inside to the outside is changed to the counter-cutting method from the outside to the inside, which solves the problem of working space and exposure The problem of insufficient free space.
This eliminates the need to peel off the upper covering layer during underground mining, reduces the generation of waste residue, reduces the impact of noise and dust on the surface environment, and improves mining efficiency and safety.
Smart Images

Figure CN118728385A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of underground mining, and in particular relates to an underground mining method for facing stone. Background Art
[0002] Facing stones mainly include granite, marble, jade and other minerals. Since they need to be used as slabs, the size and integrity of the ore must be guaranteed during the mining process. Mechanical sawing is usually used for mining, and the ore with a certain size is called rough material. Facing stones at home and abroad are mainly mined in the open air and mined by mechanical sawing. The mining process is: peeling → leveling the top surface → cutting → separation → shaping → hoisting and transportation → slag removal; depending on the mining and cutting equipment, the cutting and separation are slightly different. Since open-pit mining is convenient for mechanized operations, free surfaces are easily formed during mining, which is convenient for ore separation, has large production capacity and low cost, most facing stones at home and abroad are mined in the open air.
[0003] Open-pit mining requires stripping of the surface, cleaning of vegetation, overburden and weathered layers on the top of the ore layer, and mining can only be carried out after the stripping and cleaning is completed and the top of the ore layer is completely exposed. Due to the large excavation area of open-pit mining, and the influence of weathering on the upper part of some facing stones, coupled with the development of cracks in the rock layer near the surface, they cannot be used as facing panels, resulting in the thickness of the covering layer ranging from tens of meters to about 50 meters. Open-pit mining first requires the stripping of all the upper covering layers and upper attachments (trees, vegetation, buildings, etc.), and the stripped weathered layers need to be stacked in a selected place, which not only occupies a large amount of land, but also a large amount of loose stripping materials have a great impact on the safety and environmental protection of the surrounding areas; and the dust, sewage, noise, etc. during open-pit stripping and sawing mining are very destructive to the ecological environment of the mining area, so open-pit mining has been strictly prohibited in some areas.
[0004] Although underground mining does not require stripping of the surface covering layer, it will not produce a large amount of stripping materials. During mining, pillars are left to ensure that the overlying surface does not collapse. Moreover, the operation is located underground, and the noise and dust have little impact on the surrounding area. Therefore, underground mining of facing stones has little impact on the surface ecological environment. However, due to the limited underground working space, there is no working space for personnel and sawing machinery and equipment. The separation of stones requires the separation of all 6 free surfaces. During underground mining, there is usually only one free surface directly in front, which makes it impossible for personnel and equipment to carry out operations. Therefore, underground mining is difficult to carry out.
[0005] How to solve the above technical problems has become the direction of efforts of those skilled in the art. Summary of the invention
[0006] In order to overcome the problem that personnel and equipment cannot operate due to insufficient working space and exposed free surface in existing underground mining, the present invention provides an underground mining method for facing stone. The present invention adopts the form of drilling horizontal guide holes and installing reverse cutting frames. By adjusting the installation of the diamond bead saw and the movement direction of the rope saw main machine, the traditional inside-to-outside tangent method is changed to an outside-to-inside reverse cutting method, which solves the problem that personnel and equipment cannot operate due to insufficient working space and exposed free surface in underground mining.
[0007] The technical solution adopted by the present invention is: A method for underground mining of facing stone, comprising the following specific steps: Step 1: expose the ore layer to form a rectangular working surface; Step 2: Determine the specifications of the rectangular working surface and the specifications and dimensions of the rough material; Step 3: Drill horizontal guide holes at the four corners of the front side of the rough material with the determined size; Step 4: After the four horizontal guide holes in step 3 are formed, the equipment required for the rope saw is installed in front; Step 5: After the equipment required for the rope saw in step 4 is installed, the waste material to be cut is cut; Step six, fork-load the rough material sawn in step five and transport it out.
[0008] In the step 1, the rectangular working surface is formed as follows: underground mining first requires excavation of a tunnel, the tunnel specifications of which are not less than 5×5m; when the tunnel is excavated to the ore layer, the ore layer is exposed along the direction of the ore body or the thickness direction by blasting, and the exposed surface forms a relatively regular rectangular plane with a height of 5m and a length of 10~30m as the rectangular working surface.
[0009] The bottom plate in front of the ore layer needs to be leveled, and the bottom plate in front of the ore layer is leveled by sawing and pulling the bottom in a tangential manner with a rope saw. After leveling, the slope of the bottom plate is not greater than 0.3%.
[0010] In the step 2, the rough material specifications are divided along the width and height directions of the rectangular working surface, and are divided into upper and lower layers along the height direction. The rough material specifications of the upper layer are 2m high, 2m long, and 2m wide; the lower layer is 2m high, 2m long, and 2m wide; when mining, the upper layer is mined first, and after the upper layer is sawed and loaded forklift for transportation, the lower layer is mined.
[0011] In the step three, the method for drilling the horizontal guide hole is: after the front side of the ore layer is exposed and leveled, the rough material is divided into regular sizes, and holes are drilled at the four corners of the front side of the rough material along the determined rough material specifications, with a hole depth of 2m; after the core is taken out through the casing, a regular horizontal guide hole with a diameter of 200mm is formed.
[0012] The horizontal guide hole is drilled by a horizontal water-mill drilling machine, and the horizontal water-mill drilling machine punches and forms the hole in one step. In the step 4, the equipment required for installing the rope saw at least includes a rope saw track, a rope saw main unit, a driving flywheel, a guide wheel, a reverse cutting frame, a reverse cutting support frame and a diamond bead saw. The rope saw main unit is arranged on the rope saw track, and the rope saw main unit is connected to the driving flywheel. The driving flywheel has two guide wheels on the side close to the rough material; guide wheels are provided at both ends of the reverse cutting frame, and the guide wheels at both ends are connected by steel pipes, and the guide wheel on the inner side is arranged on the rock wall in the horizontal guide hole; the guide wheel in the lower horizontal guide hole on the outer side of the reverse cutting frame in the upper horizontal guide hole is fixed on the reverse cutting support frame below; after the rope saw main unit, the guide wheel, the reverse cutting frame, the reverse cutting support frame and the driving flywheel are installed, the diamond bead saw on the side that needs reverse cutting is set up.
[0013] The reverse cutting support frame includes a horizontal drag rod, a fixed tray and a vertical support rod. One side of the fixed tray is fixed on the rock wall of the stone to be quarried, and the other side is connected to the horizontal drag rod. The upper end of the vertical support rod is connected to the outer end of the horizontal drag rod, and the lower end of the vertical support rod is fixed to the bottom plate.
[0014] In the step 5, the specific steps of sawing the rough material are as follows: First, saw the left and right sides of the rough material to be cut. According to the mining sequence, first, the reverse cutting frame is installed in the upper and lower horizontal guide holes on the left side of the rough material to be cut, the guide wheels at both ends of the upper and lower reverse cutting frames are fixed, and the diamond bead saw is installed along the guide wheels in the upper and lower horizontal guide holes and the guide wheels outside the holes. After the reverse pressure state is formed, the sawing starts. The main machine of the rope saw moves closer to the rough material as the diamond bead saw moves inward in reverse pressure sawing, so that the diamond bead saw moves from the outside to the inside in sawing. After the reverse cutting of the left side of the rough material is completed, the corresponding reverse cutting frame is installed in the upper and lower horizontal guide holes on the right side of the rough material to be cut, and the right side diamond bead saw is re-installed. After the reverse pressure state is formed, the right side of the rough material is sawed according to the process of sawing the left side of the rough material. Second, saw the top, back and bottom of the rough material to be cut. After the left and right sides of the rough material to be cut are cut by the reverse pressure diamond bead saw, the diamond bead saw is taken out, and the diamond bead saw is re-installed along the reverse cutting frames corresponding to the upper horizontal guide holes on the left and right sides of the rough material, so that the diamond bead saw forms reverse pressure along the boundary line of the top surface of the rough material, so that the diamond bead saw cuts from the outside to the inside, and the top surface of the rough material is separated; after the top surface of the rough material is separated, the installation direction of the diamond bead saw and the moving direction of the rope saw host are adjusted, so that the rope saw host moves along the bottom rail in the direction away from the rough material, so that the diamond bead saw cuts the back of the rough material from top to bottom to the bottom, and the back of the rough material is completely separated; after the back of the rough material is separated, the corresponding reverse cutting frame is taken out, and only the fixed guide wheel is installed near the openings of the two horizontal guide holes at the bottom, and the rough material is sawed from the inside to the outside along the inner side of the bottom surface in a tangent manner to pull the bottom; after the bottom pulling is completed, the free surfaces of the left and right sides, the top, the back and the bottom of the rough material have been separated, and the 6 free surfaces of the rough material have been separated.
[0015] In the step six, the cut rough material is completely separated from the rock mass, and after the sawing is completed, the rope saw main machine and the guide wheel are removed, and a forklift is used to fork load the separated rough material, and the separated rough material is fork-loaded onto a flatbed truck and transported out along the tunnel.
[0016] Beneficial effects of the present invention: The present invention solves the problem of underground mining of facing stones. During the mining process, there is no need to peel off the upper covering layer, and a large amount of waste slag will not be generated. Moreover, noise and dust are all located in the underground tunnels and working surfaces, and will not cause a major impact on the surface ecological environment.
[0017] The present invention adopts the form of setting a horizontal guide hole and installing a reverse cutting frame. By adjusting the installation of the bead saw and the movement direction of the rope saw main body, the traditional inside-to-outside tangent method is changed to an outside-to-inside reverse cutting method, thereby solving the problem of insufficient working space and exposed free surface in underground mining, which makes it impossible for personnel and equipment to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The present invention will be further described in detail below with reference to the accompanying drawings.
[0019] Figure 1 It is a front view of underground mining sawing of the present invention.
[0020] Figure 2 It is a side view of wire saw cutting.
[0021] Figure 3 It is a three-dimensional schematic diagram of the rough material.
[0022] In the figure: 1. facing stone ore body; 2. rope saw track; 3. rope saw main machine; 4. driving flywheel; 5. guide wheel; 6. diamond bead saw; 7. horizontal guide hole; 8. reverse cutting frame; 9. horizontal drag rod; 10. fixed tray; 11. vertical support rod; 12. front of the block; 13. back of the block; 14. top of the block; 15. bottom of the block; 16. left of the block; 17. right of the block. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] Various structural schematic diagrams of the embodiments disclosed in the present invention are shown in the accompanying drawings. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0025] Embodiment 1: In order to overcome the problem that personnel and equipment cannot operate due to insufficient working space and exposed free surface in existing underground mining, the present invention provides Figure 1-3 The method for underground mining of facing stone is shown in the figure. The present invention adopts the form of drilling horizontal guide holes and installing reverse cutting frames. By adjusting the installation of the diamond bead saw and the movement direction of the rope saw main unit, the traditional tangent method from inside to outside is changed to the reverse cutting method from outside to inside, thereby solving the problem that personnel and equipment cannot operate in underground mining due to insufficient working space and exposed free surface.
[0026] A method for underground mining of facing stone, comprising the following specific steps: Step 1: expose the ore layer to form a rectangular working surface; Step 2: Determine the specifications of the rectangular working surface and the specifications and dimensions of the rough material; Step 3, drilling horizontal guide holes 7 at the four corners of the front surface 12 of the blank of determined size; Step 4: After the four horizontal guide holes 7 in step 3 are formed, the equipment required for the rope saw is installed in front; Step 5: After the equipment required for the rope saw in step 4 is installed, the waste material to be cut is cut; Step six, fork-load the rough material sawn in step five and transport it out.
[0027] The present invention solves the problem of underground mining of facing stones. During the mining process, there is no need to peel off the upper covering layer, and a large amount of waste slag will not be generated. Moreover, noise and dust are all located in the underground tunnels and working surfaces, and will not cause a major impact on the surface ecological environment.
[0028] The present invention is provided with a horizontal guide hole 7 and a reverse cutting frame 8 for installing. By adjusting the installation of the diamond bead saw 6 and the movement direction of the rope saw main unit 3, the traditional tangent method from inside to outside is changed to a reverse cutting method from outside to inside, thereby solving the problem that personnel and equipment cannot operate in underground mining due to insufficient working space and exposed free surface.
[0029] Embodiment 2: Based on Example 1, in this embodiment, preferably, in the step one, the rectangular working surface is formed as follows: underground mining first requires a tunnel for excavation, and the tunnel specification is not less than 5×5m; when the tunnel is excavated to the ore layer, the ore layer is exposed along the direction of the ore body or the thickness direction by blasting, and the exposed surface forms a relatively regular rectangular plane with a height of 5m and a length of 10~30m as the rectangular working surface.
[0030] Preferably, the bottom plate in front of the ore layer needs to be leveled, and the bottom plate in front of the ore layer is leveled by sawing and pulling the bottom in a tangential manner with a rope saw, and the slope of the bottom plate after leveling is not greater than 0.3%.
[0031] In the present invention, when the tunnel is excavated to a width of the rough material that is twice the distance from the ore layer, the surrounding rock in front of the ore layer is peeled off by loosening blasting to avoid blasting to generate new cracks in the ore layer. The ore layer is exposed along the direction of the ore body or the thickness direction, and the exposed surface forms a relatively regular rectangular plane. In order to ensure that the exposed ore front is flat, the exposed surface can be cut and leveled by a rope saw. In addition, in order to ensure the flatness of the equipment operation, the bottom plate in front of the ore layer also needs to be leveled, and the bottom plate in front of the ore layer can be cut and pulled by a rope saw to level the bottom plate, and the slope is generally not more than 0.3%.
[0032] Preferably, in the step 2, the rough material specifications are divided along the width and height directions of the rectangular working surface, and divided into upper and lower layers along the height direction. The rough material specifications of the upper layer are 2m high, 2m long, and 2m wide; the lower layer is 2m high, 2m long, and 2m wide; when mining, the upper layer is mined first, and after the upper layer is sawed and loaded forklift for transportation, the lower layer is mined.
[0033] In the present invention, since the thickness of the facing stone ore layer is relatively large, considering the operation of personnel and the operability of equipment, combined with the specifications and sizes of rough materials, the front height of the exposed working surface ore layer is usually controlled to be below 2-5m, and the width direction is usually controlled to be 20-30m to ensure the safety of the overall mine room. The rough material specifications are divided along the height and width directions, and the specifications are generally not more than 3m in length, not more than 2m in width, and not more than 3m in height. The total height of the working surface does not exceed 5m. In the overall order, the upper layer is mined first, and then the lower layer is mined. Due to the restrictions of the height of the working platform and the height of the rough material fork loading, the height of the rough material in the upper layer should not exceed 2m.
[0034] Preferably, in the step three, the method for drilling the horizontal guide hole 7 is: after the front side of the ore layer is exposed and leveled, the rough material is divided into regular sizes, and holes are punched at the four corners of the front side 12 of the rough material along the determined rough material specifications, with a hole depth of 2m; after the core is taken out through the casing, a regular horizontal guide hole 7 with a diameter of 200mm is formed.
[0035] Preferably, the horizontal guide hole 7 is drilled by a horizontal water-mill drilling machine, and the horizontal water-mill drilling machine punches and forms the holes in one step. Preferably, in the step 4, the equipment required for installing the rope saw at least includes a rope saw track 2, a rope saw main unit 3, a driving flywheel 4, a guide wheel 5, a reverse cutting frame 8, a reverse cutting support frame and a diamond bead saw 6, the rope saw main unit 3 is arranged on the rope saw track 2, the rope saw main unit 3 is connected to the driving flywheel 4, and the driving flywheel 4 has two guide wheels 5 on the side close to the rough material; guide wheels 5 are provided at both ends of the reverse cutting frame 8, and the guide wheels 5 at both ends are connected by steel pipes, and the guide wheel 5 on the inner side is arranged on the rock wall inside the horizontal guide hole 7; the guide wheel 5 in the lower horizontal guide hole 7 on the outer side is fixed on the bottom plate, and the guide wheel 5 on the outer side of the reverse cutting frame 8 in the upper horizontal guide hole 7 is fixed on the lower reverse cutting support frame; after the rope saw main unit 3, the guide wheel 5, the reverse cutting frame 8, the reverse cutting support frame and the driving flywheel 4 are installed, the diamond bead saw 6 on the side that needs reverse cutting is set up.
[0036] Preferably, the reverse cutting support frame includes a horizontal drag rod 9, a fixed tray 10 and a vertical support rod 11, one side of the fixed tray 10 is fixed on the rock wall of the stone to be quarried, and the other side is connected to the horizontal drag rod 9, the upper end of the vertical support rod 11 is connected to the outer end of the horizontal drag rod 9, and the lower end of the vertical support rod 11 is fixed to the bottom plate.
[0037] In the present invention, Figure 2 As shown, when installing the equipment required for the wire saw, first lay two parallel rails, the rail gauge is determined according to the wire saw main machine 3, and the wire saw main machine 3 is installed on the wire saw track 2 formed by the rails. The movement direction of the wire saw main machine 3 is as shown in FIG. Figure 2As shown by the arrow; then, according to the order of cutting the left side first and then the right side, the reverse cutting frame 8 on the upper left side of the rough material to be cut is first set up, and the reverse cutting frame 8 is equipped with guide wheels 5 at both ends, and the middle part is connected by a steel pipe. The fixture of the guide wheel 5 on the inner end is connected in parallel with the connecting steel pipe, and the fixture of the guide wheel 5 on the outer side is connected vertically with the connecting steel pipe. The guide wheel 5 on the inner side is fixed on the rock wall in the horizontal guide hole 7, and the guide wheel 5 in the lower horizontal guide hole 7 on the outer side is directly fixed on the bottom plate. The lower end of the guide wheel in the upper horizontal guide hole 7 on the outer side is fixed to the horizontal drag rod 9 on the reverse cutting frame support frame through a connecting fixed rod. The reverse cutting frame support frame is composed of a horizontally movable horizontal drag rod 9, a fixed tray 10 and a vertical support rod 11. After the rope saw main machine 3, the guide wheel 5, the reverse cutting frame 8, and the reverse cutting support frame are installed, the diamond bead saw 6 is set up. The method steps for cutting the left and right sides are basically the same except for the position. The rope saw process on the right side refers to the saw process on the left side, and the rope saw on the right side is not specifically described in the present invention.
[0038] Preferably, in step 5, the specific steps of sawing the rough material to be cut are: First, saw the left and right sides of the rough material to be cut. According to the mining sequence, first, the reverse cutting frame 8 is installed in the upper and lower horizontal guide holes 7 on the left side 16 of the rough material to be cut, and the guide wheels 5 at both ends of the upper and lower reverse cutting frames 8 are fixed. The diamond bead saw 6 is installed along the guide wheels 5 in the upper and lower horizontal guide holes 7 and the guide wheels 5 outside the holes. After the reverse pressure state is formed, the sawing starts. The rope saw host 3 advances toward the rough material as the diamond bead saw 6 reverses and saws inward, so that the diamond bead saw 6 advances from the outside to the inside. After the reverse cutting of the left side of the rough material is completed, the corresponding reverse cutting frame 8 is installed in the upper and lower horizontal guide holes 7 on the right side 17 of the rough material to be cut, and the right side diamond bead saw 6 is re-installed. After the reverse pressure state is formed, the right side of the rough material is sawed according to the process of sawing the left side of the rough material. Second, saw the top, back and bottom of the rough material to be cut. After the left side 16 and the right side 17 of the rough material to be cut are cut by the back-pressure diamond bead saw 6, the diamond bead saw 6 is taken out, and the diamond bead saw 6 is set up again along the back-cutting frame 8 corresponding to the upper horizontal guide holes 7 on the left and right sides of the rough material, so that the diamond bead saw 6 forms a back pressure along the boundary line of the top surface of the rough material, so that the diamond bead saw 6 is sawed from the outside to the inside, and the top surface 14 of the rough material is separated; after the top surface 14 of the rough material is separated, the installation direction of the diamond bead saw 6 and the moving direction of the rope saw main machine 3 are adjusted, so that the rope saw main machine 3 moves along the direction away from the rough material The steel rail at the bottom moves, so that the diamond bead saw 6 cuts the back side 13 of the rough material from top to bottom to the bottom, and completely separates the back side 13 of the rough material; after the back side 13 of the rough material is separated, the corresponding reverse cutting frame 8 is taken out, and only the fixed guide wheel 5 is installed near the openings of the two horizontal guide holes 7 at the bottom, and the rough material bottom is pulled from the inside to the outside in a tangential manner along the inner side of the bottom surface 15 of the rough material; after the bottom pulling is completed, the free surfaces of the left and right sides, the top, the back and the bottom of the rough material have been separated, and the 6 free surfaces of the rough material have been separated, and the six surfaces of the rough material are as follows Figure 3 shown.
[0039] Preferably, in step six, the rough material to be cut is completely separated from the rock mass, and after sawing is completed, the rope saw main unit 3 and the guide wheel 5 are removed, and a forklift is used to fork load the separated rough material, and the separated rough material is fork-loaded onto a flatbed truck and transported out along the tunnel.
[0040] In the present invention, the separated rough materials are forklifted onto a flatbed truck and then transported along the lane. The rated forklift weight of the forklift should be greater than the weight of the rough materials. In the present invention, a 30t forklift is preferably used for forklift transportation.
[0041] The present invention provides a method for underground mining of facing stone, and the specific implementation process is as follows: 1. Ore layer, forming a rectangular working surface When the facing stone ore body 1 is mined underground, it is first necessary to excavate a tunnel, and the tunnel specifications are generally not less than 5×5m; when the tunnel is excavated to the ore layer, the present invention preferably adopts a loose blasting blasting method to expose the ore layer along the direction of the ore body or the thickness direction, and the exposed surface forms a relatively regular rectangular plane with a height of 5m and a length of 10~30m. In order to ensure that the exposed ore front is flat, the exposed surface can be cut and leveled with a rope saw. In addition, in order to ensure the flatness of the equipment operation, the bottom plate in front of the ore layer also needs to be leveled, and the bottom plate in front of the ore layer is leveled by sawing and pulling the bottom in a tangent manner, and the slope of the bottom plate after leveling is not more than 0.3%.
[0042] 2. Determination of surface specifications and rough material dimensions Due to the large thickness of the facing stone ore layer, considering the operation of personnel and the operability of equipment, combined with the specifications and sizes of the rough materials, the front height of the exposed working surface ore layer is usually controlled at 5m, and the width direction is usually controlled at 10~30m to ensure the safety of the overall mine room. The rough material specifications are divided along the width and height directions. In order to ensure the safety of the upper layer operation and the forklift fork loading, the rough material specifications of the upper layer are 2m high, 2m long, and 2m wide (in the depth direction); the lower layer is 2m high, 2m long, and 2m wide (in the depth direction). First, the upper layer is mined, and after the upper layer is sawed and forked and shipped, the lower layer is mined.
[0043] 3. Drilling horizontal holes After the front of the ore layer is exposed and leveled, the rough blocks are divided into regular sizes. The four corners of the rough block front 12 are perforated along the determined rough block specifications. A horizontal water-grinding drilling machine can be used to drill horizontal holes, and the hole depth is usually 2m. The drilling machine perforates the holes in one step, and the core is taken out through the casing to form a regular horizontal guide hole 7 with a diameter of 200mm. Figure 1 shown.
[0044] 4. Install the rope saw mainframe 3, guide wheel 5, reverse cutting frame 8, reverse cutting support frame, and set up the bead saw After the four horizontal guide holes 7 are formed, the rope saw is installed in the front. First, two parallel rails are laid. The rail gauge is determined according to the rope saw main unit 3, and the rope saw main unit 3 is installed on the rails. First, the upper left reverse cutting frame 8 is set up. The reverse cutting frame 8 is installed with guide wheels 5 at both ends. The middle part is connected by a steel pipe. The guide wheel 5 fixing device at the inner end is connected in parallel with the connecting steel pipe, and the guide wheel 5 fixing device at the outer side is connected vertically with the connecting steel pipe. The guide wheel 5 fixing device on the inner side is fixed to the rock wall inside the horizontal guide hole 7, and the guide wheel 5 fixing device in the lower guide hole on the outer side is directly fixed to the bottom plate. The guide wheel 5 on the outer side of the reverse cutting frame 8 in the upper guide hole is fixed to the lower reverse cutting support frame, and the support frame is composed of a horizontal movable drag rod, a fixed tray and a vertical support rod. The fixed tray is directly fixed on the rock wall of the stone to be quarried, and the vertical support rod is connected to the horizontal drag rod through a lap joint, and the bottom is fixed to the bottom plate. After the wire saw mainframe 3, guide wheel 5, reverse cutting frame 8 and reverse cutting support frame are installed, set up the diamond bead saw along the reverse cutting on the left side, such as Figure 2 shown.
[0045] 5. Sawing (1) Sawing the left and right sides of the rough material to be cut According to the mining sequence, first install the reverse cutting frame 8 on the upper and lower horizontal guide holes 7 on the left side of the rough material to be cut, fix the guide wheels 5 at both ends of the upper and lower reverse cutting frames 8, install the diamond bead saw 6 along the guide wheels 5 in the upper and lower horizontal guide holes 7 and the guide wheels 5 outside the holes, and start sawing after the reverse pressure state is formed (such as Figure 2As shown in the figure, the wire saw main machine 3 moves closer to the rough material as the diamond bead saw 6 pushes inwards to saw and cut, so that the diamond bead saw 6 pushes inwards to saw and cut from the outside. After the reverse cutting of the left side of the rough material is completed, the reverse cutting frame 8 is installed in the upper and lower horizontal guide holes 7 on the right side, and the right bead saw is re-installed to form a reverse pressure state, and the right side of the rough material is sawed according to the process of sawing the left side of the rough material.
[0046] (2) Sawing the top, back and bottom surfaces of the rough material to be cut After the left and right sides are sawed with the counter-pressure bead saw, the diamond bead saw 6 is taken out, and the diamond bead saw 6 is re-installed along the counter-cutting frame 8 of the upper horizontal guide holes 7 on the left and right sides of the rough material, so that the diamond bead saw 6 forms a counter-pressure along the boundary line of the top surface 14 of the rough material, so that the diamond bead saw 6 is sawed from the outside to the inside, and the top surface 14 of the rough material is separated; after the top surface is separated, the installation direction of the diamond bead saw 6 and the moving direction of the rope saw host 3 are adjusted, so that the rope saw host 3 moves along the bottom rail in the direction away from the rough material, so that the diamond bead saw 6 cuts the back side 13 of the rough material from top to bottom to the bottom, and the back side 13 of the rough material is completely separated; after the back side 13 of the rough material is separated, the counter-cutting frame 8 is taken out, and the fixed guide wheel 5 is only installed near the openings of the two horizontal guide holes 7 at the bottom, and the rough material bottom is sawed from the inside to the outside in a tangential manner along the inner side of the bottom surface 15 of the rough material to pull the bottom. After the bottom pulling is completed, the free surfaces on the left and right sides, top, back and bottom of the block have been separated, and the six free surfaces of the block have been separated.
[0047] 6. Fork Mounting All five sides of the rough material have been sawed, and together with the front side before separation, the six free faces of the rough material have been formed, and it is completely separated from the rock mass. After sawing is completed, the rope saw main machine 3, fixed guide wheel 5, etc. are dismantled, and a 30t forklift is used for forkloading. The separated rough material is forkloaded onto a flatbed truck and transported out along the tunnel.
[0048] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0049] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0050] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. Any design that is the same or similar to the present invention belongs to the protection scope of the present invention. The device structures and method steps not described in detail in the present invention are all prior art and will not be further described in the present invention.
Claims
1. A method for underground mining of facing stone, characterized in that: The specific steps are: Step 1: expose the ore layer to form a rectangular working surface; Step 2: Determine the specifications of the rectangular working surface and the specifications and dimensions of the rough material; Step 3, drilling horizontal guide holes (7) at the four corners of the front side (12) of the rough material with the determined size; Step 4, after the four horizontal guide holes (7) in step 3 are formed, the equipment required for the rope saw is installed in front; Step 5: After the equipment required for the rope saw in step 4 is installed, the waste material to be cut is cut; Step six, fork-load the rough material sawn in step five and transport it out.
2. The underground mining method for facing stone according to claim 1, characterized in that: In the step 1, the rectangular working surface is formed as follows: underground mining first requires excavation of a tunnel, the tunnel specifications of which are not less than 5×5m; when the tunnel is excavated to the ore layer, the ore layer is exposed along the direction of the ore body or the thickness direction by blasting, and the exposed surface forms a relatively regular rectangular plane with a height of 5m and a length of 10~30m as the rectangular working surface.
3. The underground mining method for facing stone according to claim 2, characterized in that: The bottom plate in front of the ore layer needs to be leveled, and the bottom plate in front of the ore layer is leveled by sawing and pulling the bottom in a tangential manner with a rope saw. After leveling, the slope of the bottom plate is not greater than 0.3%.
4. The underground mining method for facing stone according to claim 1, characterized in that: In the step 2, the rough material specifications are divided along the width and height directions of the rectangular working surface, and are divided into upper and lower layers along the height direction. The rough material specifications of the upper layer are 2m high, 2m long, and 2m wide; the lower layer is 2m high, 2m long, and 2m wide; when mining, the upper layer is mined first, and after the upper layer is sawed and loaded forklift for transportation, the lower layer is mined.
5. The underground mining method for facing stone according to claim 1, characterized in that: In the step 3, the method for drilling the horizontal guide hole (7) is as follows: after the front side of the ore layer is exposed and leveled, the rough material is divided into regular sizes, and holes are drilled at the four corners of the front side (12) of the rough material along the determined rough material specifications, with a hole depth of 2m; after the core is taken out through the casing, a regular horizontal guide hole (7) with a diameter of 200mm is formed.
6. The underground mining method for facing stone according to claim 5, characterized in that: The horizontal guide hole (7) is excavated by a horizontal water-mill drilling machine, and the horizontal water-mill drilling machine punches and forms the hole in one step.
7. The underground mining method for facing stone according to claim 1, characterized in that: In the fourth step, the equipment required for installing the wire saw at least includes a wire saw track (2), a wire saw main unit (3), a driving flywheel (4), a guide wheel (5), a reverse cutting frame (8), a reverse cutting support frame and a diamond bead saw (6). The wire saw main unit (3) is arranged on the wire saw track (2), the wire saw main unit (3) is connected to the driving flywheel (4), and the driving flywheel (4) is provided with two guide wheels (5) on the side close to the rough material; both ends of the reverse cutting frame (8) are provided with guide wheels (5), and the guide wheels (5) at both ends are provided with guide wheels (6) at both ends. 5) are connected by a steel pipe, the guide wheel (5) on the inner side is arranged on the rock wall inside the horizontal guide hole (7); the guide wheel (5) in the lower horizontal guide hole (7) on the outer side is fixed to the bottom plate, and the guide wheel (5) on the outer side of the reverse cutting frame (8) in the upper horizontal guide hole (7) is fixed to the reverse cutting support frame below; after the rope saw main machine (3), the guide wheel (5), the reverse cutting frame (8), the reverse cutting support frame and the driving flywheel (4) are installed, the diamond bead saw (6) on the side that needs reverse cutting is set up.
8. The underground mining method for facing stone according to claim 7, characterized in that: The reverse cutting support frame comprises a horizontal drag rod (9), a fixed tray (10) and a vertical support rod (11); one side of the fixed tray (10) is fixed to the rock wall of the stone to be quarried, and the other side is connected to the horizontal drag rod (9); the upper end of the vertical support rod (11) is connected to the outer end of the horizontal drag rod (9), and the lower end of the vertical support rod (11) is fixed to the bottom plate.
9. The underground mining method for facing stone according to claim 1, characterized in that: In the step 5, the specific steps of sawing the rough material are as follows: First, saw the left and right sides of the rough material to be cut. According to the mining sequence, first, a reverse cutting frame (8) is installed in the upper and lower horizontal guide holes (7) on the left side (16) of the rough material to be cut, and the guide wheels (5) at both ends of the upper and lower reverse cutting frames (8) are fixed. The diamond bead saw (6) is installed along the guide wheels (5) inside the upper and lower horizontal guide holes (7) and the guide wheels (5) outside the holes. After the reverse pressure state is formed, the sawing starts. The rope saw main machine (3) moves toward the rough material as the diamond bead saw (6) moves inward in reverse pressure sawing, so that the diamond bead saw (6) moves from the outside to the inside in sawing. After the reverse cutting of the left side of the rough material is completed, the corresponding reverse cutting frame (8) is installed in the upper and lower horizontal guide holes (7) on the right side (17) of the rough material to be cut, and the right side diamond bead saw (6) is re-installed. After the reverse pressure state is formed, the right side of the rough material is sawed according to the process of sawing the left side of the rough material. Second, saw the top, back and bottom of the rough material to be cut. After the left side (16) and the right side (17) of the rough material to be cut are cut by the counter-pressure diamond bead saw (6), the diamond bead saw (6) is taken out, and the diamond bead saw (6) is re-installed along the counter-cutting frame (8) corresponding to the upper horizontal guide holes (7) on the left and right sides of the rough material, so that the diamond bead saw (6) forms a counter-pressure along the boundary line of the top surface of the rough material, so that the diamond bead saw (6) is sawed from the outside to the inside, and the top surface (14) of the rough material is separated; after the top surface (14) of the rough material is separated, the installation direction of the diamond bead saw (6) and the moving direction of the wire saw main machine (3) are adjusted, so that the wire saw main machine ( 3) Move along the steel rail at the bottom in the direction away from the rough material, so that the diamond bead saw (6) cuts the back side (13) of the rough material from top to bottom to completely separate the back side (13) of the rough material; after the back side (13) of the rough material is separated, the corresponding reverse cutting frame (8) is taken out, and only the fixed guide wheel (5) is installed near the openings of the two horizontal guide holes (7) at the bottom, and the rough material bottom (15) is sawed from the inside to the outside in a tangential manner to pull the bottom; after the bottom pulling is completed, the free surfaces of the left and right sides, the top, the back and the bottom of the rough material are separated, and the six free surfaces of the rough material are separated.
10. The underground mining method for facing stone according to claim 1, characterized in that: In the sixth step, after the cut rough material is completely separated from the rock mass and the sawing is completed, the rope saw main unit (3) and the guide wheel (5) are removed, and a forklift is used to fork load the separated rough material, and the separated rough material is fork-loaded onto a flatbed truck and transported out along the tunnel.
Citation Information
Cited By
Rope saw coal mining method and device for steeply inclined coal seam
CN121497341A
Method and device for sawing coal in steep seam
CN121497341B