Method and system for establishing double-track tunnel micro-seismic monitoring accurate early-warning rockburst criterion

By recording the number and energy of microseismic events, combined with the cross-discrimination method and the principle of "higher rather than lower", microseismic monitoring and early warning criteria for double-line tunnels were established, which solved the problem of low early warning accuracy caused by differences in geology and microseismic activity, and achieved Fast and accurate early warning fills the gap in the establishment of microseismic monitoring and early warning criteria for double-track tunnels and improves project safety.

CN118728478APending Publication Date: 2024-10-01CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP +1
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410747299.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In double-track tunnel projects, due to differences in geology and microseismic activity, it is difficult to establish unified microseismic monitoring and early warning rock burst criteria with existing technology, resulting in a reduction in early warning accuracy, and traditional methods cannot quickly adapt to engineering needs, and there is a problem in establishing early warning criteria. blank state.

Method used

By recording the number and energy of microseismic events in double-track tunnels, the thresholds of rockbursts of each grade are determined, and energy and quantity are used as the main discrimination criteria. Combined with the cross-discrimination method and the principle of choosing the high rather than the low, a differentiated and unified early warning criterion is established. , to quickly establish microseismic monitoring and accurate early warning rock burst criteria.

Benefits of technology

It improves the accuracy and speed of microseismic monitoring and early warning, fills the gap in the establishment of microseismic monitoring and early warning criteria for double-track tunnels in the same work area, enhances the pertinence and safety of early warning, and ensures the safety of on-site construction and property safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728478A_ABST
    Figure CN118728478A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of high-burial-depth underground space safety early warning and protection, and discloses a method and system for rapidly monitoring micro-seismic of a double-track tunnel and accurately early warning rockburst, and the method comprises the steps: building quantitative criteria of high-precision rockburst of each grade of the double-track tunnel in a distinguished manner; judging whether to distinguish and establish a rockburst early warning judgment standard; and a unified tunnel early warning discrimination standard is established. The method is established on the basis of on-site actual rockburst occurrence conditions and micro-seismic activity changes, has high pertinence, can actually guide the site, and has high practical value. According to the method, different probabilistic risks in the same grade of rockburst range are quantified, the early warning accuracy is obviously improved, micro-seismic early warning of rockburst is more accurate, and the method has great significance in improving the accuracy of assisting micro-seismic monitoring and early warning of double-line rockburst.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of safety early warning and protection of deep underground space, and in particular to a method and system for rapidly establishing accurate early warning rockburst criterion for microseismic monitoring of double-line tunnels. Background Art

[0002] With the continuous development of infrastructure projects, the number of excavation and construction of double-line tunnels or tunnel groups such as highway tunnels or railway tunnels has continued to increase. However, most of the infrastructure in the west is buried underground, with a depth of more than one thousand meters. The ground stress is extremely high, which is very easy to induce rock bursts, causing casualties and property losses. At present, rock bursts, as one of the world's problems, have not been effectively and thoroughly solved. However, with the advancement of science and technology and the in-depth research of scholars on rock burst warning, microseismic monitoring technology has been successfully applied to rock burst warning, and the spatial location of rock bursts has been predicted through the "time and space intensity" changes of source parameters before rock bursts. This technology is currently recognized by the industry as one of the most effective methods for rock burst warning.

[0003] When there are obvious geological differences between the left and right tunnels, the double-track tunnel will use different microseismic parameters to quantitatively warn rockbursts. For example, the Neelum-Jhelum Tunnel in Pakistan uses different criteria to warn rockbursts because of the obvious differences in geological conditions between the left and right tunnels. Under similar geological conditions, the double-track tunnels in the same engineering area are considered to have similar radiation energy for rock fractures, and the same warning standard can be used for the tunnels on both sides. However, with the construction of different double-track tunnels, it is found that under similar geological conditions, although the number and level of rockbursts in double-track tunnels are similar, there are obvious differences in microseismic activities. The same set of quantitative microseismic monitoring and early warning models cannot be applied to both tunnels at the same time, which will lead to a decrease in the accuracy of rockburst warnings. At present, there is a blank state in the establishment of microseismic monitoring and early warning rockburst criteria for double-track tunnels. In order to ensure accurate early warning of deep-buried double-track tunnels and quickly guide on-site early warning, it is urgent to establish a method that can quickly establish accurate early warning rockburst criteria for microseismic monitoring of double-track tunnels.

[0004] In engineering applications, the existing technology for establishing rockburst criterion for microseismic monitoring and early warning of double-line tunnels has the following main technical problems:

[0005] 1. Geological differences lead to inconsistent early warning criteria: When there are obvious geological differences between the left and right sides of the tunnel, such as the Neelum-Jhelum Tunnel in Pakistan, traditional early warning methods often use a unified early warning standard, which ignores the impact of geological differences on rockburst early warning. In fact, geological differences lead to different triggering mechanisms and manifestations of rockbursts, so different early warning criteria need to be established for different geological conditions.

[0006] 2. Differences in microseismic activity under similar geological conditions: Even under similar geological conditions, there are significant differences in microseismic activity in different double-track tunnels. This difference is caused by multiple factors such as tunnel excavation methods, support methods, and construction progress. The same set of quantitative microseismic monitoring and early warning models cannot be applied to tunnels on both sides at the same time, resulting in a lower accuracy rate of early warning.

[0007] 3. Blank status of early warning criteria establishment: At present, the research on establishing microseismic monitoring and early warning rockburst criteria for double-line tunnel differentiation is still blank. This means that in existing engineering applications, there is often a lack of effective and targeted early warning criteria, resulting in inaccurate early warnings and failure to guide on-site early warning work in a timely manner.

[0008] 4. Rapidity of establishing early warning criteria: With the construction of different double-line tunnel projects, higher requirements are placed on the rapidity of establishing early warning criteria. Traditional methods of establishing early warning criteria often take a long time and cannot quickly adapt to engineering needs. Therefore, it is necessary to establish a method that can quickly establish accurate early warning rockburst criteria for microseismic monitoring of double-line tunnels to meet the rapidity requirements of engineering applications.

[0009] In summary, the existing technology has major technical problems in the establishment of early warning criteria for microseismic monitoring and early warning of double-line tunnels, such as the inconsistency of early warning criteria due to geological differences, the difference in microseismic activities under similar geological conditions, the blank state of early warning criteria establishment, and the need for rapid establishment of early warning criteria. In order to solve these problems, it is necessary to carry out in-depth research and exploration to establish a method that can quickly and accurately establish early warning criteria for microseismic monitoring and early warning of double-line tunnels. Summary of the invention

[0010] In view of the problems existing in the prior art, the present invention provides a method and system for quickly establishing accurate early warning rockburst criteria for microseismic monitoring of double-line tunnels.

[0011] The present invention is implemented as follows: a method for quickly establishing a double-line tunnel microseismic monitoring accurate early warning rockburst criterion, the method comprising:

[0012] S1: Differentiate and establish quantitative criteria for high-precision rockburst of various grades in double-track tunnels;

[0013] S2: Method for determining whether to distinguish and establish rockburst early warning discrimination criteria;

[0014] S3: Establish unified tunnel warning identification standards.

[0015] Further, the S1 specifically includes:

[0016] During the rock mass excavation process, rock micro-fractures, i.e. microseismic events, will inevitably occur; each microseismic event represents a micro-fracture, and the number of microseismic events and microseismic energy represent the degree of rock degradation, which can express the severity of the rock burst that may occur; the changes in the frequency and energy of microseismic events can be expressed as the activity of microseismic activities. The more active the microseismic activities are, the greater the level and probability of rock burst that may occur;

[0017] When a rockburst occurs, microfractures are bound to occur, but the presence of microfractures does not necessarily mean a rockburst will occur; therefore, before a rockburst occurs, the number and energy of microseismic events in the double-track tunnel can be recorded separately, and then the no-rockburst threshold can be determined based on the number and energy records of microseismic events. After that, the changes in microseismic activity of each level of rockburst are selected to determine the rockburst thresholds of each level.

[0018] Furthermore, before the rockburst occurs, the number and energy of microseismic events of the double-line tunnel can be recorded respectively, and then the no-rockburst threshold is determined according to the number and energy records of microseismic events. Thereafter, the rockburst thresholds of each level are determined by selecting the changes in microseismic activities of each level of rockburst, as follows:

[0019] (1) Determine the quantitative threshold of rockburst-free level for double-track tunnels

[0020] Before the rock burst occurs, the changes in the microseismic activity of the two lines are continuously recorded, and the maximum energy and the maximum number of microseismic events are recorded every day in units of days; 0 is used as the quantitative lower limit of no rock burst, and the maximum energy and number of each double-line tunnel before the rock burst occurs are used as the upper limit of the quantitative threshold of no rock burst level;

[0021] The formula is as follows:

[0022] Number of microseismic events, T h :0<(C g )≤(C g,max ) d

[0023] Microseismic event energy, T h :0<(E g )≤(E g,max ) d

[0024] Among them, C is the number of microseismic events, g is the rock burst level, which here means no rock burst, T is the tunnel, h is the tunnel type, which can be replaced by 1 or 2, that is, tunnel one or tunnel two, and d represents the number of days, that is, one day;

[0025] (2) Determine the quantitative thresholds for rockburst levels from mild to extremely severe in double-track tunnels

[0026] Select the number and energy data of three minor rockbursts in one of the tunnels (the number can be selected according to the actual situation on site. If the number of rockbursts is large, it can be appropriately increased. Three times is the minimum number for quickly determining the quantification level). Take the highest number and highest energy of microseismic events in the three minor rockbursts as the threshold of high probability of minor rockbursts; take the average of the cumulative number and cumulative energy of microseismic events in the three minor rockbursts as the threshold of medium probability of minor rockbursts; take the lowest number and average energy of microseismic events in the three minor rockbursts as the threshold of low probability of minor rockbursts; compare the lowest threshold with the highest threshold of no rockbursts, and take the smaller one as the lowest threshold. If the quantitative threshold of the minor rockburst is lower than the quantitative standard of the previous level, that is, the quantitative standard of no rockburst of the corresponding tunnel in (1), then exchange the quantitative threshold of the previous level with the exceeded threshold of the current level, and so on.

[0027] The formula is as follows:

[0028] Minor rock burst level:

[0029] Low risk:

[0030] Number of microseismic events, T h :

[0031]

[0032] Microseismic event energy, T h :

[0033]

[0034] max

[0035] Medium risk:

[0036] Number of microseismic events, T h :

[0037]

[0038] Microseismic event energy, T h :

[0039]

[0040] High risk:

[0041] Number of microseismic events: (C g+1,max ) k <(C g+1 )

[0042] Microseismic event energy: (E g+1,max ) k <(E g+1 )

[0043] Among them, g+1 is the rockburst level, which means that the level is one level higher than the no rockburst level. Here, it represents the slight rockburst level. k represents the number of selected rockbursts, and the minimum number is 3. C 1 is the number of microseismic events in tunnel 1, C 1avg is the average number of microseismic events in tunnel 1, C 2 and C 2avg The same explanation is given for Tunnel 2 as for Tunnel 1;

[0044] In the same way, determine the high, medium and low probability thresholds of minor to severe rockburst in another tunnel;

[0045] The above formula is applicable to the public announcement changes from minor rock burst to severe rock burst. The main difference is that the rock burst levels are mainly divided into: no rock burst, minor rock burst, moderate rock burst, severe rock burst, and extremely severe rock burst, and the g+i value needs to be increased by 1 on the basis of no rock burst.

[0046] Further, the S2 specifically includes:

[0047] (1) Calibration and recording with energy as the main criterion;

[0048] (2) Calibration and recording are performed using quantity as the main criterion, and the recording method is the same as the energy calibration recording method (1);

[0049] (3) The above recorded values ​​are accumulated. If the final accumulated value is greater than 3, it is necessary to establish early warning judgment standards for double-track tunnels respectively. If the final accumulated value is less than or equal to 3, a unified tunnel early warning judgment standard is established.

[0050] Further, the step (1) specifically includes:

[0051] 1) Method for judging the rock burst level:

[0052] When judging the level of no rock burst, the lower limit of energy is 0 and is not considered; the difference between the upper and lower limits of the no rock burst energy threshold is compared. If the difference in the upper limit energy is less than 20% of any tunnel, it is recorded as 0; if the difference in the upper limit energy is more than 20% of any tunnel, it is recorded as 1;

[0053] Upper limit (high risk upper limit)

[0054] {(T1-T2)[(Eg, max)d]} / {T1[(Eg, max)d]orT2[(Eg, max)d]}>20%→1

[0055] {(T1-T2)[(Eg, max)d]} / {T1[(Eg, max)d]orT2[(Eg, max)d]}<20%→0;

[0056] 2) Method for judging the level of minor rockburst to severe rockburst

[0057] When judging the level from slight rockburst to severe rockburst, the upper and lower limits need to be compared by difference respectively, which is the same as the method of judging the level without rockburst. If the energy difference between the upper or lower limit is less than 20% of any tunnel, it is recorded as 0. If the upper or lower limit exceeds 20% of any tunnel, it is recorded as 1. Each level is recorded in this way.

[0058] Take a minor rock burst as an example:

[0059] Lower limit (low risk lower limit):

[0060]

[0061] Upper limit (high risk limit):

[0062] {(T1-T2)[(Eg+1, max)k]} / {T1[(Eg+1, max)k]or T2[(Eg+1, max)k}>20%→1

[0063] {(T1-T2)[(Eg+1, max)k]} / {T1[(Eg+1, max)k]or T2[(Eg+1, max)k}<20%→0

[0064] The recording method for moderate rockburst and severe rockburst is the same as above;

[0065] 3) Method for determining the level of extremely strong rockburst

[0066] When judging the level of extremely strong rockburst, the upper limit of energy is infinite and is not considered; the lower limit of the extremely strong rockburst energy threshold is compared with the difference. If the difference in the lower limit energy is less than 20% of any tunnel, it is recorded as 0; if the difference in the number exceeds 20% of any tunnel, it is recorded as 1;

[0067] Lower limit (low risk lower limit)

[0068]

[0069]

[0070] Further, the S3 specifically includes:

[0071] The cross discrimination method and the principle of taking the higher rather than the lower are added to unify the thresholds of the double-line tunnels, as follows:

[0072] (1) Unify the quantitative threshold of rockburst-free level;

[0073] (2) Unify the quantitative thresholds for rockburst levels from mild to extremely severe.

[0074] Further, the step (1) specifically includes:

[0075] The lower limit of no rock burst still starts at 0, and the upper limit is the minimum value and energy of the threshold of any tunnel in the double-track tunnel without rock burst;

[0076] Number of microseismic events: 0<(Cg)≤[T1(Cg, max)d, T2(Cg, max)d]min

[0077] Microseismic event energy: 0<(Eg)≤[T1(Eg, max)d, T2(Eg, max)d]min

[0078] Among them, C is the number of microseismic events, g is the rockburst level, which here means no rockburst, T is the tunnel, h is the tunnel type, which can be replaced by 1 or 2, that is, tunnel one or tunnel two, and d represents the number of days, that is, one day.

[0079] Further, the step (2) specifically includes:

[0080] The upper limit of low-level rock burst is used as the lower limit of the adjacent high-level rock burst. When the lower limits are unified, the lower limit threshold is also established by the number and energy minimum value of the lower limit of any double-track tunnel. The medium-risk area is established by the average value of each level of rock burst in the double-track tunnel, and the high-risk upper limit is established by the minimum value of the maximum number of any double-track tunnel. In this way, the upper and lower limits of rock bursts of various levels can be unified.

[0081] Minor rock burst level:

[0082] Low risk:

[0083] Number of microseismic events:

[0084] (Ci, min)<(Cg+1)≤((C_(1avg,g+1)+C_(2avg,g+1)) / 2)

[0085] Microseismic event energy, Th:

[0086] (Ei, min)<(Eg+1)≤((E_(1avg,g+1)+E_(2avg,g+1)) / 2)

[0087] Medium risk:

[0088] Number of microseismic events:

[0089] ((C_(1avg,g+1)+C_(2avg,g+1)) / 2)<(Cg+1)≤(Ci,max)min

[0090] Microseismic event energy, Th:

[0091] ((E_(1avg,g+1)+E_(2avg,g+1)) / 2)<(Eg+1)≤(Ei,max)min

[0092] High risk:

[0093] Number of microseismic events: (Ci, max) min < (Cg + 1)

[0094] Microseismic event energy: Ei, max)min<(Eg+1)

[0095] Among them, i and h have the same meaning, both are one of the two tunnels, and are represented by i here to distinguish them from the letters used in the distinction and establishment of the criterion; in addition, it should be noted that the establishment of this criterion is a unified quantitative criterion established on the basis of the distinction and establishment of the quantitative criterion;

[0096] Taking a minor rockburst as an example, the same quantitative criterion for moderate to extremely strong rockbursts is established.

[0097] Another object of the present invention is to provide a system for quickly establishing a double-line tunnel microseismic monitoring accurate early warning rockburst criterion by implementing the method for quickly establishing a double-line tunnel microseismic monitoring accurate early warning rockburst criterion, the system comprising:

[0098] The criterion differentiation module is used to differentiate and establish quantitative criteria for high-precision rockbursts of various grades in double-line tunnels;

[0099] A standard judgment module is used to determine whether to distinguish and establish a rockburst early warning judgment standard method;

[0100] The standard establishment module is used to establish unified tunnel warning judgment standards.

[0101] Another object of the present invention is to provide a computer device, which includes a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the method for quickly establishing the criteria for accurate early warning rockburst of microseismic monitoring of double-line tunnels.

[0102] In combination with the above technical solutions and the technical problems solved, please analyze the advantages and positive effects of the technical solutions to be protected by the present invention from the following aspects:

[0103] First, in view of the technical problems existing in the above-mentioned prior art, some creative technical effects are brought about after solving the problems. The specific description is as follows:

[0104] 1. The first step of building a double-line tunnel can no longer fill the gap in improving the accuracy of overall microseismic monitoring and early warning of rock bursts under similar geological conditions;

[0105] 2. Currently, there is no method for early warning of high, medium and low probability risks among different rockburst levels. This method realizes the quantitative judgment of various risks of rockbursts of the same level.

[0106] 3. Setting "3" as the criterion for determining whether to establish a distinction between double-track tunnels is mainly because if the difference is small, there is no need to distinguish and establish, which will increase the workload on site. If the difference is large and no distinction is made, it will affect the accuracy of the warning.

[0107] 4. Using the correspondence between the actual rock burst and microseismic activities on site as a quantitative criterion can make the on-site early warning method more targeted and the early warning more accurate.

[0108] 5. The purpose of adding the principle of going higher rather than lower and the cross-discrimination method is to increase the safety reserve of rock burst warning and ensure that the warning can be low, but no unpredicted situations will occur.

[0109] 6. The “number of microseismic events” and “microseismic energy” are used as the main criteria for identification because these two microseismic parameters are the most capable of reflecting the changes in microseismic activity. In addition, rapid identification of the risk of rockburst on site requires “few parameters and high efficiency”, and the parameter selection of this method reflects this purpose.

[0110] The present invention fills the gap in establishing a quantitative criterion method for distinguishing and early warning rockbursts in microseismic monitoring and early warning of double-line tunnels under similar geological conditions in the same work area, and is of great significance for improving the accuracy of early warning of rockbursts by microseismic monitoring technology. In addition, the method is established based on the actual rockburst occurrence situation and changes in microseismic activity on site, has strong project pertinence, can actually guide the site, and has strong practical value. Moreover, the method quantifies the different probability risks within the same level of rockburst, significantly improves the accuracy of early warning, and makes microseismic early warning of rockbursts more accurate, which is of great significance for improving the accuracy of microseismic monitoring and early warning of double-line rockbursts. The proposal of a precise and rapid early warning method can effectively warn of on-site rockbursts, guide on-site construction and support time and support strength, effectively ensure on-site safe construction and property conservation, and effectively ensure the safety of personnel and property on site.

[0111] Second, the expected benefits and commercial value of the technical solution of the present invention after transformation are:

[0112] The present invention fills the gap in establishing a quantitative criterion method for distinguishing and early warning rockbursts in microseismic monitoring and early warning of double-line tunnels under similar geological conditions in the same work area, and is of great significance for improving the accuracy of early warning of rockbursts by microseismic monitoring technology. In addition, the method is established based on the actual rockburst occurrence situation and changes in microseismic activity on site, has strong project pertinence, can actually guide the site, and has strong practical value. Moreover, the method quantifies the different probability risks within the same level of rockburst, significantly improves the accuracy of early warning, and makes microseismic early warning of rockbursts more accurate, which is of great significance for improving the accuracy of microseismic monitoring and early warning of double-line rockbursts. The proposal of a precise and rapid early warning method can effectively warn of on-site rockbursts, guide on-site construction and support time and support strength, effectively ensure on-site safe construction and property conservation, and effectively ensure the safety of personnel and property on site.

[0113] Third, the present invention has made significant technical progress in solving the technical problems existing in the industrial application of the prior art, which is specifically reflected in the following four aspects:

[0114] The present invention solves the problem of rock burst warning caused by geological differences and high ground stress during the excavation of double-track tunnels. Traditional rock burst warning methods are often difficult to adapt to the warning needs of double-track tunnels under different geological conditions, resulting in low warning accuracy. The present invention effectively improves the accuracy and reliability of warning by distinguishing and establishing quantitative criteria for high-precision rock bursts of various levels in double-track tunnels, providing a strong guarantee for tunnel construction safety.

[0115] In the process of establishing rockburst early warning criteria, the present invention fully considers the frequency and energy changes of microseismic events, and realizes accurate prediction of rockburst characteristics and levels by continuously recording and analyzing microseismic data. This technological advancement not only improves the timeliness of early warning, but also provides a more scientific and reasonable rockburst risk assessment method for tunnel construction.

[0116] The present invention fully considers the differences in geological conditions of double-track tunnels when determining whether to distinguish and establish rockburst early warning discrimination standards. For double-track tunnels under different geological conditions, the present invention proposes a method for establishing early warning discrimination standards respectively, which effectively avoids early warning errors caused by geological differences and improves the pertinence and effectiveness of early warning.

[0117] The present invention realizes the standardization and regularization of rockburst warning for double-line tunnels by establishing a unified tunnel early warning discrimination standard. This not only improves the efficiency and accuracy of early warning, but also provides standardized guidance and management basis for tunnel construction safety. At the same time, the implementation of the present invention also promotes the development and progress of tunnel construction safety technology, and provides experience and solutions that can be used as reference for similar projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0118] Figure 1This is a flow chart of a method for quickly establishing a criterion for accurate early warning rockburst of microseismic monitoring of a double-line tunnel provided by an embodiment of the present invention;

[0119] Figure 2 It is a flow chart of a method for judging and distinguishing and establishing a quantitative standard for early warning of a double-line tunnel provided by an embodiment of the present invention;

[0120] Figure 3 It is a system structure diagram for quickly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0121] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0122] The following are two specific application examples of a method for quickly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst judgment method:

[0123] ###Example 1:

[0124] 1. Differentiate and establish quantitative criteria for high-precision rockburst of various grades in double-track tunnels (S1)

[0125] 1. Continuous recording of microseismic events and energy

[0126] -During the excavation of the double-track tunnel, a microseismic monitoring system was used to continuously record the number of microseismic events and microseismic energy every day.

[0127] -Record the maximum microseismic event energy (Eg,max)d and the maximum number of microseismic events (Cg,max)d per day in units of days.

[0128] 2. Determination of the quantitative threshold of rockburst level

[0129] - Take 0 as the lower limit of no rock burst.

[0130] - Before rockburst occurs, the maximum energy (Eg,max)d and the maximum number (Cg,max)d before rockburst occur are used as the upper limit of the quantitative threshold of no rockburst level.

[0131] 3. Determination of quantitative threshold of minor rockburst level

[0132] -Select the number and energy data of microseismic events of three minor rockbursts in the tunnel.

[0133] -Calculate the highest number of microseismic events (Cg+1,max)k and the highest microseismic energy (Eg+1,max)k as high probability occurrence thresholds.

[0134] -Calculate the average value of the cumulative number of microseismic events (C1avg, C2avg) and the average value of the cumulative microseismic energy as the medium probability occurrence threshold.

[0135] -Take the lowest number of microseismic events and average microseismic energy among the three times as the low probability occurrence threshold.

[0136] 2. Methods for determining whether to establish rockburst warning criteria (S2)

[0137] - Compare the geological exposure of the double-track tunnels, analyze the geological differences, and consider whether it is necessary to establish rockburst warning criteria.

[0138] 3. Establish a unified tunnel warning identification standard (S3)

[0139] -If the geological differences are not significant, a unified early warning judgment standard can be established, otherwise it needs to be established separately.

[0140] ###Example 2:

[0141] 1. Detailed Recording and Analysis of Microseismic Data

[0142] 1. Data Collection

[0143] -Install microseismic monitoring systems in both tunnels to collect microseismic event counts and microseismic energy data.

[0144] 2. Data Analysis

[0145] - Conduct statistical analysis on daily data, including frequency of microseismic events, energy changes, etc.

[0146] - Analyze the activity of microseismic activities and predict the potential of rock bursts based on data changes.

[0147] 2. Establishment of Quantitative Criteria

[0148] 1. Quantitative criteria for no rockburst

[0149] -Set energy and event number thresholds below which there is no rockburst risk.

[0150] 2. Quantitative criteria for minor to extremely severe rockbursts

[0151] -Set thresholds for different rockburst levels based on historical data and actual on-site conditions.

[0152] -Set three risk levels: high, medium and low, and give corresponding early warning measures.

[0153] 3. Establishment of early warning judgment criteria

[0154] 1. Unify the criteria

[0155] -If the geological conditions of the double-track tunnels are similar, a unified early warning judgment standard can be established.

[0156] 2. Differentiate the criteria

[0157] -If there are significant differences in the geological conditions of the double-track tunnels, it is necessary to establish early warning judgment criteria separately.

[0158] IV. Implementation of the Early Warning System

[0159] -According to the established early warning criteria, a rockburst early warning system is established to monitor microseismic data in real time and issue early warning information in a timely manner based on data changes.

[0160] These two embodiments show how to use the method of quickly establishing the accurate early warning rockburst criterion for microseismic monitoring of double-line tunnels according to the provided claims and descriptions. In practical applications, it is also necessary to adjust and optimize according to the specific engineering conditions and geological conditions.

[0161] like Figure 1 As shown, an embodiment of the present invention provides a method for quickly establishing a double-line tunnel microseismic monitoring accurate early warning rockburst criterion, the method comprising:

[0162] S1: Differentiate and establish quantitative criteria for high-precision rockburst of various grades in double-track tunnels;

[0163] S2: Method for determining whether to distinguish and establish rockburst early warning discrimination criteria;

[0164] S3: Establish unified tunnel warning identification standards.

[0165] The S1 specifically includes:

[0166] During the rock mass excavation process, rock micro-fractures, i.e. microseismic events, will inevitably occur; each microseismic event represents a micro-fracture, and the number of microseismic events and microseismic energy represent the degree of rock degradation, which can express the severity of the rock burst that may occur; the changes in the frequency and energy of microseismic events can be expressed as the activity of microseismic activities. The more active the microseismic activities are, the greater the level and probability of rock burst that may occur;

[0167] When a rockburst occurs, microfractures are bound to occur, but the presence of microfractures does not necessarily mean a rockburst will occur; therefore, before a rockburst occurs, the number and energy of microseismic events in the double-track tunnel can be recorded separately, and then the no-rockburst threshold can be determined based on the number and energy records of microseismic events. After that, the changes in microseismic activity of each level of rockburst are selected to determine the rockburst thresholds of each level.

[0168] Before the rockburst occurs, the number and energy of microseismic events of the double-line tunnel can be recorded respectively, and then the no-rockburst threshold is determined according to the number and energy records of microseismic events. Thereafter, the rockburst thresholds of each level are determined by selecting the changes in microseismic activities of each level of rockburst, as follows:

[0169] (1) Determine the quantitative threshold of rockburst-free level for double-track tunnels

[0170] Before the rock burst occurs, the changes in the microseismic activity of the two lines are continuously recorded, and the maximum energy and the maximum number of microseismic events are recorded every day in units of days; 0 is used as the quantitative lower limit of no rock burst, and the maximum energy and number of each double-line tunnel before the rock burst occurs are used as the upper limit of the quantitative threshold of no rock burst level;

[0171] The formula is as follows:

[0172] Number of microseismic events, T h :0<(C g )≤(C g,max ) d

[0173] Microseismic event energy, T h :0<(E g )≤(E g,max ) d

[0174] Among them, C is the number of microseismic events, g is the rock burst level, which here means no rock burst, T is the tunnel, h is the tunnel type, which can be replaced by 1 or 2, that is, tunnel one or tunnel two, and d represents the number of days, that is, one day;

[0175] (2) Determine the quantitative thresholds for rockburst levels from mild to extremely severe in double-track tunnels

[0176] Select the number and energy data of three minor rockbursts in one of the tunnels (the number can be selected according to the actual situation on site. If the number of rockbursts is large, it can be appropriately increased. Three times is the minimum number for quickly determining the quantification level). Take the highest number and highest energy of microseismic events in the three minor rockbursts as the threshold of high probability of minor rockbursts; take the average of the cumulative number and cumulative energy of microseismic events in the three minor rockbursts as the threshold of medium probability of minor rockbursts; take the lowest number and average energy of microseismic events in the three minor rockbursts as the threshold of low probability of minor rockbursts; compare the lowest threshold with the highest threshold of no rockbursts, and take the smaller one as the lowest threshold. If the quantitative threshold of the minor rockburst is lower than the quantitative standard of the previous level, that is, the quantitative standard of no rockburst of the corresponding tunnel in (1), then exchange the quantitative threshold of the previous level with the exceeded threshold of the current level, and so on.

[0177] The formula is as follows:

[0178] Minor rock burst level:

[0179] Low risk:

[0180] Number of microseismic events, T h :

[0181]

[0182] Microseismic event energy, T h :

[0183]

[0184] max

[0185] Medium risk:

[0186] Number of microseismic events, T h :

[0187]

[0188] Microseismic event energy, T h :

[0189]

[0190] High risk:

[0191] Number of microseismic events: (C g+1,max ) k <(C g+1 )

[0192] Microseismic event energy: (E g+1,max ) k <(E g+1 )

[0193] Among them, g+1 is the rockburst level, which means that the level is one level higher than the no rockburst level. Here, it represents the slight rockburst level. k represents the number of selected rockbursts, and the minimum number is 3. C 1 is the number of microseismic events in tunnel 1, C 1avg is the average number of microseismic events in tunnel 1, C 2 and C 2avg The same explanation is given for Tunnel 2 as for Tunnel 1;

[0194] In the same way, determine the high, medium and low probability thresholds of minor to severe rockburst in another tunnel;

[0195] The above formula is applicable to the public announcement changes from minor rock burst to severe rock burst. The main difference is that the rock burst levels are mainly divided into: no rock burst, minor rock burst, moderate rock burst, severe rock burst, and extremely severe rock burst, and the g+i value needs to be increased by 1 on the basis of no rock burst.

[0196] The S2 specifically includes:

[0197] (1) Calibration and recording with energy as the main criterion;

[0198] (2) Calibration and recording are performed using quantity as the main criterion, and the recording method is the same as the energy calibration recording method (1);

[0199] (3) Figure 2 As shown, the above recorded values ​​are accumulated. If the final accumulated value is greater than 3, it is necessary to establish double-track tunnel early warning judgment standards respectively. If the final accumulated value is ≤3, a unified tunnel early warning judgment standard is established.

[0200] The step (1) specifically comprises:

[0201] 1) Method for judging the rock burst level:

[0202] When judging the level of no rock burst, the lower limit of energy is 0 and is not considered; the difference between the upper and lower limits of the no rock burst energy threshold is compared. If the difference in the upper limit energy is less than 20% of any tunnel, it is recorded as 0; if the difference in the upper limit energy is more than 20% of any tunnel, it is recorded as 1;

[0203] Upper limit (high risk upper limit)

[0204] {(T1-T2)[(Eg, max)d]} / {T1[(Eg, max)d]or T2[(Eg, max)d]}>20%→1

[0205] {(T1-T2)[(Eg, max)d]} / {T1[(Eg, max)d]or T2[(Eg, max)d]}<20%→0;

[0206] 2) Method for judging the level of minor rockburst to severe rockburst

[0207] When judging the level from slight rockburst to severe rockburst, the upper and lower limits need to be compared by difference respectively, which is the same as the method of judging the level without rockburst. If the energy difference between the upper or lower limit is less than 20% of any tunnel, it is recorded as 0. If the upper or lower limit exceeds 20% of any tunnel, it is recorded as 1. Each level is recorded in this way.

[0208] Take a minor rock burst as an example:

[0209] Lower limit (low risk lower limit):

[0210]

[0211] Upper limit (high risk limit):

[0212] {(T1-T2)[(Eg+1, max)k]} / {T1[(Eg+1, max)k]or T2[(Eg+1, max)k}>20%→1

[0213] {(T1-T2)[(Eg+1, max)k]} / {T1[(Eg+1, max)k]or T2[(Eg+1, max)k}<20%→0

[0214] The recording method for moderate rockburst and severe rockburst is the same as above;

[0215] 3) Method for determining the level of extremely strong rockburst

[0216] When judging the level of extremely strong rockburst, the upper limit of energy is infinite and is not considered; the lower limit of the extremely strong rockburst energy threshold is compared with the difference. If the difference in the lower limit energy is less than 20% of any tunnel, it is recorded as 0; if the difference in the number exceeds 20% of any tunnel, it is recorded as 1;

[0217] Lower limit (low risk lower limit)

[0218]

[0219] The S3 specifically includes:

[0220] The cross discrimination method and the principle of taking the higher rather than the lower are added to unify the thresholds of the double-line tunnels, as follows:

[0221] (1) Unify the quantitative threshold of rockburst-free level;

[0222] (2) Unify the quantitative thresholds for rockburst levels from mild to extremely severe.

[0223] The step (1) specifically comprises:

[0224] The lower limit of no rock burst still starts at 0, and the upper limit is the minimum value and energy of the threshold of any tunnel in the double-track tunnel without rock burst;

[0225] Number of microseismic events: 0<(Cg)≤[T1(Cg, max)d, T2(Cg, max)d]min

[0226] Microseismic event energy: 0<(Eg)≤[T1(Eg, max)d, T2(Eg, max)d]min

[0227] Among them, C is the number of microseismic events, g is the rockburst level, which here means no rockburst, T is the tunnel, h is the tunnel type, which can be replaced by 1 or 2, that is, tunnel one or tunnel two, and d represents the number of days, that is, one day.

[0228] The step (2) specifically comprises:

[0229] The upper limit of low-level rock burst is used as the lower limit of the adjacent high-level rock burst. When the lower limits are unified, the lower limit threshold is also established by the number and energy minimum value of the lower limit of any double-track tunnel. The medium-risk area is established by the average value of each level of rock burst in the double-track tunnel, and the high-risk upper limit is established by the minimum value of the maximum number of any double-track tunnel. In this way, the upper and lower limits of rock bursts of various levels can be unified.

[0230] Minor rock burst level:

[0231] Low risk:

[0232] Number of microseismic events:

[0233] (Ci, min)<(Cg+1)≤((C_(1avg,g+1)+C_(2avg,g+1)) / 2)

[0234] Microseismic event energy, Th:

[0235] (Ei, min)<(Eg+1)≤((E_(1avg,g+1)+E_(2avg,g+1)) / 2)

[0236] Medium risk:

[0237] Number of microseismic events:

[0238] ((C_(1avg,g+1)+C_(2avg,g+1)) / 2)<(Cg+1)≤(Ci,max)min

[0239] Microseismic event energy, Th:

[0240] ((E_(1avg,g+1)+E_(2avg,g+1)) / 2)<(Eg+1)≤(Ei,max)min

[0241] High risk:

[0242] Number of microseismic events: (Ci, max) min < (Cg + 1)

[0243] Microseismic event energy: Ei, max)min<(Eg+1)

[0244] Among them, i and h have the same meaning, both are one of the two tunnels, and are represented by i here to distinguish them from the letters used in the distinction and establishment of the criterion; in addition, it should be noted that the establishment of this criterion is a unified quantitative criterion established on the basis of the distinction and establishment of the quantitative criterion;

[0245] Taking a minor rockburst as an example, the same quantitative criterion for moderate to extremely strong rockbursts is established.

[0246] 2. Application Examples: In order to prove the creativity and technical value of the technical solution of the present invention, this section provides application examples of the technical solution of the claims on specific products or related technologies.

[0247] like Figure 3 As shown, an embodiment of the present invention provides a system for quickly establishing a double-line tunnel microseismic monitoring accurate early warning rockburst criterion for implementing the method for quickly establishing a double-line tunnel microseismic monitoring accurate early warning rockburst criterion, the system comprising:

[0248] The criterion differentiation module is used to differentiate and establish quantitative criteria for high-precision rockbursts of various grades in double-line tunnels;

[0249] A standard judgment module is used to determine whether to distinguish and establish a rockburst early warning judgment standard method;

[0250] The standard establishment module is used to establish unified tunnel warning judgment standards.

[0251] An embodiment of the present invention provides a computer device, which includes a memory and a processor. The memory stores a computer program. When the computer program is executed by the processor, the processor executes the steps of the method for quickly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion.

[0252] It should be noted that the embodiments of the present invention can be implemented by hardware, software, or a combination of software and hardware. The hardware part can be implemented using dedicated logic; the software part can be stored in a memory and executed by an appropriate instruction execution system, such as a microprocessor or dedicated design hardware. It can be understood by a person of ordinary skill in the art that the above-mentioned devices and methods can be implemented using computer executable instructions and / or contained in a processor control code, such as a carrier medium such as a disk, CD or DVD-ROM, a programmable memory such as a read-only memory (firmware), or a data carrier such as an optical or electronic signal carrier. Such code is provided on the carrier medium. The device and its modules of the present invention can be implemented by hardware circuits such as very large-scale integrated circuits or gate arrays, semiconductors such as logic chips, transistors, etc., or programmable hardware devices such as field programmable gate arrays, programmable logic devices, etc., can also be implemented by software executed by various types of processors, and can also be implemented by a combination of the above-mentioned hardware circuits and software, such as firmware.

[0253] 3. Evidence of the effects of the embodiments. The embodiments of the present invention have achieved some positive effects during the development or use process, and indeed have great advantages over the prior art. The following content is described in conjunction with the data, charts, etc. of the test process.

[0254] The ××× method provided by the embodiment of the present invention

[0255] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.

Claims

1. A method for quickly establishing accurate early warning rockburst criteria for microseismic monitoring of double-line tunnels. It is characterized in that The method includes: S1: Differentiate and establish quantitative criteria for high-precision rockburst of various grades in double-track tunnels; S2: Method for determining whether to distinguish and establish rockburst early warning discrimination criteria; S3: Establish unified tunnel warning identification standards.

2. The method for quickly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 1, It is characterized in that The S1 specifically includes: During the excavation of rock mass, rock micro-fractures, i.e. microseismic events, will inevitably occur. Each microseismic event represents a micro-fracture. The number of microseismic events and microseismic energy represent the degree of rock degradation and can express the severity of the rock burst that may occur. The changes in the frequency and energy of microseismic events can be expressed as the activity of microseismic activity. The more active the microseismic activity, the greater the level and probability of rock burst that may occur. When a rockburst occurs, microfractures are bound to occur, but the presence of microfractures does not necessarily mean a rockburst will occur; therefore, before a rockburst occurs, the number and energy of microseismic events in the double-track tunnel can be recorded separately, and then the no-rockburst threshold can be determined based on the number and energy records of microseismic events. After that, the changes in microseismic activity of each level of rockburst are selected to determine the rockburst thresholds of each level.

3. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 2, It is characterized in that Before the rockburst occurs, the number and energy of microseismic events of the double-line tunnel can be recorded respectively, and then the no-rockburst threshold is determined according to the number and energy records of microseismic events. Thereafter, the rockburst thresholds of each level are determined by selecting the changes in microseismic activities of each level of rockburst, as follows: (1) Determine the quantitative threshold of rockburst-free level for double-track tunnels: Before the rock burst occurs, the changes in the microseismic activity of the two lines are continuously recorded, and the maximum energy and the maximum number of microseismic events are recorded every day in units of days; 0 is used as the quantitative lower limit of no rock burst, and the maximum energy and number of each double-line tunnel before the rock burst occurs are used as the upper limit of the quantitative threshold of no rock burst level; (2) Determine the quantitative thresholds of rockburst levels from mild to extremely strong in double-track tunnels: The number and energy data of microseismic events of three minor rockbursts in one of the tunnels were selected, and the highest number of microseismic events and the highest microseismic energy among the three minor rockbursts were taken as the threshold for high probability of minor rockbursts; the average number of cumulative microseismic events and the average cumulative microseismic energy among the three minor rockbursts were taken as the threshold for medium probability of minor rockbursts; the lowest number of microseismic events and the average microseismic energy among the three minor rockbursts were taken as the threshold for low probability of minor rockbursts; The lowest threshold is compared with the highest threshold without rock burst. The smaller one is used as the lowest threshold. If the quantitative threshold in the minor rock burst is lower than the quantitative standard of the previous level, the quantitative threshold in the previous level is exchanged with the threshold exceeded in this level, and the probability level exchange is analogous. In the same way, the high, medium and low probability thresholds of slight to severe rockburst in another tunnel were determined.

4. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 1, It is characterized in that The S2 specifically includes: Evaluate whether it is necessary to establish rockburst warning standards under different geological and construction conditions. If necessary, further refine the warning identification standards; and establish warning identification standards suitable for various geological conditions by analyzing the characteristics of microseismic activities under different geological conditions to ensure the scientificity and applicability of the warning standards.

5. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 1, It is characterized in that The S3 specifically includes: Under the premise of ensuring reliability and accuracy, a unified rockburst warning identification standard for the tunnel is formulated to ensure that consistent warning standards are adopted in the entire double-track tunnel; and through feedback from actual rockburst occurrences, the reliability of the warning methods and identification standards is verified and improved. At the same time, the warning threshold is adjusted and optimized in a timely manner according to the actual construction situation to improve the accuracy and timeliness of the warning.

6. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 1, It is characterized in that The S2 specifically includes: (1) Calibration and recording with energy as the main criterion; (2) Calibration and recording are performed using quantity as the main criterion, and the recording method is the same as the energy calibration recording method (1); (3) The above recorded values ​​are accumulated. If the final accumulated value is greater than 3, it is necessary to establish early warning judgment standards for double-track tunnels respectively. If the final accumulated value is less than or equal to 3, a unified tunnel early warning judgment standard is established.

7. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 6, It is characterized in that The step (1) specifically comprises: 1) Method for judging the rock burst level: When judging the level of no rock burst, the lower limit of energy is 0 and is not considered; the difference between the upper and lower limits of the no rock burst energy threshold is compared. If the difference in the upper limit energy is less than 20% of any tunnel, it is recorded as 0; if the difference in the upper limit energy is more than 20% of any tunnel, it is recorded as 1; 2) Method for judging the level of minor rockburst to severe rockburst When judging the level from slight rockburst to severe rockburst, the upper and lower limits need to be compared by difference respectively, which is the same as the method of judging the level without rockburst. If the energy difference between the upper or lower limit is less than 20% of any tunnel, it is recorded as 0. If the upper or lower limit exceeds 20% of any tunnel, it is recorded as 1. Each level is recorded in this way. 3) Method for determining the level of extremely strong rockburst When judging the level of extremely strong rockburst, the upper limit of energy is infinite and is not considered; the lower limit of the extremely strong rockburst energy threshold is compared with the difference. If the difference in the lower limit energy is less than 20% of any tunnel, it is recorded as 0; if the difference in the number exceeds 20% of any tunnel, it is recorded as 1.

8. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 1, It is characterized in that The S3 specifically includes: The cross discrimination method and the principle of taking the higher rather than the lower are added to unify the thresholds of the double-line tunnels, as follows: (1) Unify the quantitative threshold of rockburst-free level; (2) Unify the quantitative thresholds for rockburst levels from mild to extremely severe.

9. A method for quickly establishing a double-line tunnel microseismic monitoring and accurate early warning rock burst judgment method as described in claim 7, It is characterized in that The step (1) specifically comprises: The lower limit of no rock burst still starts at 0, and the upper limit is the minimum value and energy of the threshold of any tunnel in the double-track tunnel without rock burst; Number of microseismic events: 0<(Cg)≤[T1(Cg, max)d, T2(Cg, max)d]min Microseismic event energy: 0<(Eg)≤[T1(Eg, max)d, T2(Eg, max)d]min Among them, C is the number of microseismic events, g is the rockburst level, which here means no rockburst, T is the tunnel, h is the tunnel type, which can be replaced by 1 or 2, that is, tunnel one or tunnel two, and d represents the number of days, that is, one day.

10. The method for rapidly establishing a double-line tunnel microseismic monitoring and accurate early warning rockburst criterion as claimed in claim 7, It is characterized in that The step (2) specifically comprises: The upper limit of low-level rock burst is taken as the lower limit of the adjacent high-level rock burst. When the lower limit is unified, the lower limit threshold is established by the number and minimum energy value of the lower limit of any double-track tunnel. The medium-risk area is established by the average value of each level of rock burst in the double-track tunnel, and the high-risk upper limit is established by the minimum value of the maximum number of any double-track tunnel. In this way, the upper and lower limits of rock bursts of various levels can be unified.

11. A system for quickly establishing a criterion for accurate early warning rockburst of microseismic monitoring of a double-line tunnel by implementing the method for quickly establishing a criterion for accurate early warning rockburst of microseismic monitoring of a double-line tunnel as claimed in any one of claims 1 to 9, It is characterized in that The system includes: The criterion differentiation module is used to differentiate and establish quantitative criteria for high-precision rockbursts of various grades in double-line tunnels; A standard judgment module is used to determine whether to distinguish and establish a rockburst early warning judgment standard method; The standard establishment module is used to establish unified tunnel warning judgment standards.

Citation Information

Cited By

  • Rock burst early warning method and system based on micro-seismic energy and support stress coupling monitoring

    CN119914361A

  • Micro-seismic monitoring and early warning system for rockburst in tunnel / hole operation period

    CN119936988A

  • A microseismic monitoring and early warning system for rockburst during tunnel / cave operation

    CN119936988B

  • Rockburst early warning effect evaluation method and system after data processing error elimination

    CN120162668A