A laminar spraying method for explosion-proof closed wall

Through the combination of laminar flow spraying method and prefabricated skeleton and buffer layer, a high-strength and good-sealing "sandwich" explosion-proof wall is formed, which solves the problems of worker operation risk, dust pollution and insufficient strength in the existing technology, and realizes Efficient and safe sealing effect, suitable for construction of explosion-proof sealing walls in high gas mines.

CN118728481BActive Publication Date: 2024-10-29TAIYUAN UNIVERSITY OF TECHNOLOGY
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411222279.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-10-29
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

The existing technology has safety hazards such as worker operation risks, dust pollution, insufficient strength, high cost, and the inability of a single-layer wall to effectively resist explosions in high-gas mines when building explosion-proof closed walls. Especially in high-gas mines, existing methods are difficult to Achieve efficient and safe sealing effect.

Method used

The laminar flow shotcrete method is used to form the explosion-facing wall and the back-blasting wall through prefabricated skeleton and buffer layer. Combined with shotcrete technology, a "sandwich" structure is formed. Sandbags and inclined surface design are used to improve the blast resistance and sealing performance, and through Wet spraying and duckbill-type spraying heads enable fixed-point spraying, reducing manual operations and improving process safety and efficiency.

Benefits of technology

It achieves a high-strength, well-sealed explosion-proof wall, simplifies the construction process, reduces workers' operational risks, improves safety and process efficiency, can effectively withstand the impact pressure of goaf explosions, and is suitable for sealing high-gas mines. Wall construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728481B_ABST
    Figure CN118728481B_ABST
Patent Text Reader

Abstract

The invention discloses a laminar flow spraying method for explosion-proof closed walls, which belongs to the technical field of coal mining; the explosion-proof closed walls include front explosion walls and back explosion walls on both sides, and a buffer layer in the middle; the cross sections of the front explosion wall and the back explosion wall are two right-angled trapezoids back to back, and the buffer layer is composed of a plurality of sandbags filled between the front explosion wall and the back explosion wall; the front explosion wall and the back explosion wall are both formed by spraying grout on a prefabricated skeleton; when the shock wave of the explosion in the goaf acts on the front explosion surface, a part of the impact pressure is reflected along the arc-shaped structure formed by the front explosion surface and the top plate, so as to achieve the purpose of diffusion and pressure relief; the spraying method is to spray grout at a fixed point, with a short initial setting time of the slurry, so that the slurry flows downward under the action of gravity to form a "laminar flow effect" to achieve layered covering to form a wall, the invention effectively alleviates the impact pressure, improves the explosion resistance and sealing performance of the wall, and is particularly suitable for the sealing and explosion prevention of goafs in mines with high gas content.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mining, and relates to a method for constructing an explosion-proof closed wall, in particular to a laminar flow spraying method for an explosion-proof closed wall. Background Art

[0002] In the process of coal mining, after the working face is mined, the goaf is abandoned for a long time, and there are safety hazards such as spontaneous combustion of coal and gas accumulation, which are easy to cause goaf explosion. The probability of this hazard is further increased in high-gas mines. Therefore, the effective closure of the goaf, especially in high-gas mines and the closure effect of the goaf under the action of mine pressure, will directly affect the safety of the mine. At present, the most commonly used method of closing the goaf is to isolate the communication between the goaf and the mine by building a closed wall, so as to prevent harmful gases (gas, etc.) from entering the mine, and reduce the oxygen concentration in the goaf, thereby reducing the risk of goaf explosion. The "Coal Mine Safety Regulations" stipulate that the goaf must be closed 45 days after the end of the working face mining. In summary, as an important safety facility underground, the closed wall needs to have sufficient sealing performance, construction efficiency and pressure bearing capacity.

[0003] According to their uses, enclosed walls can be divided into waterproof enclosed walls, ventilated enclosed walls, fireproof enclosed walls, filtered enclosed walls, explosion-proof enclosed walls, etc. At present, explosion-proof enclosed walls are usually constructed with stone brick walls, and their explosion-proof function can only be achieved by increasing the thickness. Not only does it require a lot of manual wall construction and high and low stone transportation, but it also takes a long time to complete and is costly. The most important thing is that after the enclosed wall is built, its top is usually unable to be completely connected to the top due to the size of the stone, and can only be leveled through subsequent methods such as spraying. Due to the limited strength of these joints, cracks are easily formed under the action of mine pressure, connecting the goaf and leaving safety hazards for goaf explosions.

[0004] At present, the construction of walls by spraying has gradually developed, but explosion-proof walls are usually thicker. If this method is used, a large amount of spraying work is required, and the working environment of the spraying site is quite harsh, such as aggregate rebound and injury, large amount of dust, etc. If the aggregate content is reduced, the strength cannot be guaranteed, and adding dust suppression measures cannot improve the working environment from the root. Therefore, if you want to use spraying to construct a closed wall, you need to find a method for constructing explosion-proof closed walls that does not require workers to operate the spraying head in real time and is suitable for closed goafs in high-gas mines.

[0005] The patent "A mining explosion-proof trapezoidal enclosed wall and its construction method" with publication number CN106837418B can be obtained in the public literature. This method is to use anchor nets and sealing cloths to form a cavity for containing slurry with surrounding rocks, inject grout into the sealing cloth, and adjust the angle of the anchor net to form a trapezoidal explosion-proof enclosed wall. This method has the following shortcomings. First, the sealing cloth in this method is only arranged on the front and back sides of the wall, and no sealing cloth is arranged in the middle area. Although the surrounding rock can be polished and fixed with the sealing cloth, there are still many small gaps in the joints of the formed cavity. When the slurry is injected, although most of the slurry will not leak at the beginning of injection, after a long period of accumulation, the internal water will precipitate and flow out from the gaps, and the proportion of aggregates will increase, which will lead to a decrease in the strength of the wall joints and poor durability. Second, when constructing a thicker enclosed wall, due to the large volume of slurry, the micro-shrinkage of concrete after forming also increases accordingly, which is easy to cause poor top connection effect. At the same time, the density of the slurry is about 1800kg / m 3 When the cross-section and wall thickness are large, the weight of the slurry in the cavity also increases, and the bearing capacity of the cavity formed by the sealing cloth and the anchor net is limited, which can easily lead to cavity damage and slurry outflow; thirdly, too much slurry will lead to a significant increase in the final setting time, slow molding, and a long wall construction period; fourthly, the closed wall built by this method is single-layer, and the explosion-proof function can only be achieved by increasing the thickness, and the rigid retaining wall needs a larger thickness than the "sandwich" retaining wall to achieve the same explosion-proof effect, which requires more cost and labor.

[0006] In the public literature, the patent "A method for rapid wall construction of heap shotcrete in coal mines" with a publication number of CN108825301B can be obtained. This method is that workers use spiral circular motion to spray slurry with special admixtures in the steel cage, and form a closed wall after the slurry solidifies. Although this method has a fast wall construction speed, it still has some shortcomings. First, this method requires the use of manually controlled spiral circular motion of the nozzle to spray, and the distance between the spray nozzle and the spray surface is usually close (about 1m). During the spraying process, it is necessary to hold it manually and work at close range for a long time. In this way, the spraying worker is too close to the spraying surface, and the aggregate rebound is large. Although admixtures can reduce the rebound rate to a certain extent, there is still a risk of aggregate rebound injuring people in a large number of spraying operations. At the same time, workers will suffer from respiratory diseases if they are in a dusty working environment for a long time; second, this method is only suitable for closed walls with a small thickness of heap shotcrete. This is because this method does not support the formwork, so it requires a denser spacing between the steel cages to carry the concrete slurry, which results in the slurry being unable to be accurately positioned when a thicker closed wall is to be constructed. The spraying head has a certain pressure, and when spraying under pressure, it is very likely that the slurry will be bonded to the shallow steel cage and block the mesh of the steel cage before the deep steel cage forms a wall. Thirdly, the closed wall built by this method is single-layer, and the explosion-proof function can only be achieved by increasing the thickness. In addition, the rigid retaining wall needs a greater thickness than the "sandwich" retaining wall to achieve the same explosion-proof effect, which requires more cost and labor. Therefore, this wall construction method is only suitable for low-gas mines or mines without the risk of explosion in the goaf. Fourthly, the surface of the closed wall built by this method is flat, and it will be completely affected by the shock wave when the goaf explodes.

[0007] In the public literature, a patent with publication number CN117345337A is available for "a construction process for sealing coal mine goaf using a grouting method". The process is to set up a template, spray grout on the template to form a wall, and repeat this three times to form a closed wall. The process has the following shortcomings. First, the process requires manual hand-holding and long-term operation during the spraying process. The distance between the spraying head and the spraying surface is usually close (about 1m), the slurry rebound is large, and there is a certain risk of aggregate rebound injuring people. At the same time, a large amount of spraying operations will cause workers to be in a dusty working environment for a long time. Inhalation of fine aggregates and dust will cause respiratory diseases. Second, the process is a closed wall composed of three groups of walls separated by a certain distance and filled with loess. If the density of the wall built by spraying is to be ensured, the template must be set up once and cannot be operated multiple times. During the wall construction process, the loess filling is completed manually, so the loess between any two groups of walls can only be filled in sections, and the template cannot be set up and formed at one time, which seriously reduces the density and strength of the wall. Third, the process needs to support the template before spraying, and three groups of walls need to be constructed and filled with loess twice. The operation process is cumbersome and the wall construction cycle is long. Fourth, the surface of the closed wall built by this process is flat, which is greatly affected by the shock wave when the goaf explodes. Summary of the invention

[0008] The present invention overcomes the shortcomings of the prior art and proposes a laminar flow spraying method for explosion-proof and airtight walls, which is particularly suitable for sealing and explosion-proofing goafs in mines with high gas content, so as to effectively relieve impact pressure and improve the explosion-proof and sealing properties of the wall.

[0009] In order to achieve the above object, the present invention is achieved through the following technical solutions:

[0010] An explosion-proof closed wall comprises a front blast wall and a rear blast wall on both sides, and a buffer layer between the front blast wall and the rear blast wall; the cross sections of the front blast wall and the rear blast wall are two right-angled trapezoids back to back, and the front blast surface of the front blast wall and the rear blast surface of the rear blast wall are both inclined surfaces; the buffer layer is composed of a number of sandbags filled between the front blast wall and the rear blast wall; the front blast wall and the rear blast wall are both formed by spraying grout on a prefabricated skeleton; when the explosion shock wave in the goaf acts on the front blast surface, a part of the shock pressure is reflected along the arc-shaped structure formed by the front blast surface and the roof, thereby offsetting a certain amount of the incident shock pressure and achieving the purpose of diffusion pressure relief.

[0011] Furthermore, grooves are arranged on the bottom plate and both sides of the tunnel in the well; a part of the front blast wall and the back blast wall are located in the grooves and another part is located outside the grooves, and a buffer layer is located in the grooves.

[0012] Furthermore, the prefabricated frame is a steel cage, and the steel cage is fixed to the sides and top plate of the tunnel underground by anchor rods.

[0013] A laminar flow spraying method for explosion-proof closed walls comprises the following steps:

[0014] S1. Excavate and cut grooves on the bottom plate and both sides of the tunnel corresponding to the location where the explosion-proof closed wall is planned to be sprayed;

[0015] S2. Arrange multiple rows of anchor rods on both sides and the roof of the tunnel, and the anchor rods are used to fix the steel cage;

[0016] S3, arranging steel cages symmetrically on both sides of the groove, and fixing the steel cages to the anchor rods, wherein a part of the steel cage is located inside the groove and another part is located outside the groove;

[0017] S4. Fill the space between the steel cages on both sides of the cut groove with several sandbags to form a buffer layer;

[0018] S5. Arrange a grouting operation point and set a grouting head on one side of the blast-proof wall. The grouting head is set so that the grouting point is aimed at the shoulder angle between the top plate and the steel cage; the coverage area includes and exceeds the wall of the explosion-proof closed wall and contacts the surrounding rock;

[0019] S6. Start spraying of the blast wall: the slurry is sprayed from the spray head in a fan shape to the shoulder angle between the top plate and the steel cage. The slurry flows downward and expands first at the bottom plate. When the spraying time reaches the initial setting time of the slurry, the initially sprayed slurry turns into a plastic fluid, and the diffusion reaches the maximum. With the continuous spraying of the subsequent slurry, the fluid layer covers the solidified slurry. When the amount of slurry reaches the standard, the spraying is stopped, and the spraying of the blast wall is completed.

[0020] S7. Set up a shotcrete operation point on one side of the back blasting wall and spray-build the back blasting wall according to the method of S6.

[0021] Furthermore, the spraying operation point is set at a distance of 10m~15m from the explosion-proof enclosed wall; the spraying operation point includes the arrangement of the stockpile site, wet sprayer, mixer, mixing barrel, water pipe and air duct.

[0022] Furthermore, the number of the spraying heads is determined according to the cross-sectional dimensions of the tunnel, and the spraying heads are fixed by brackets, and the spraying heads are duckbill-type spraying heads.

[0023] Furthermore, observation holes, drain holes and measure holes are fixed on the fixed steel cage.

[0024] Furthermore, two rows of anchor rods are respectively installed at the positions corresponding to the installation of the front blast wall and the back blast wall, one row is correspondingly arranged in the groove, and the other row is correspondingly arranged outside the groove; a group of steel cages are first arranged on both sides of the groove, and fixed with the row of anchor rods located on the inner side of the groove, and then another group of steel cages are arranged on the outside of both sides of the groove, and the other group of steel cages is fixedly connected with the row of anchor rods on the outer side of the groove, and the two groups of steel cages on the same side are tied and fixed with wire.

[0025] Furthermore, the sandbags are filled with yellow sand; the ingredients of the slurry include cement, sand, gravel and accelerating agent.

[0026] Furthermore, the inclination angle of the sprayed front blast wall and the back blast wall is determined as the tunnel height changes, and the wall volume of the explosion-proof closed wall is calculated based on the inclination angle, thereby obtaining the amount of dry material in the slurry when the front blast wall and the back blast wall meet the standard, thereby determining whether the spraying of the front blast wall and the back blast wall is completed.

[0027] The beneficial effects of the present invention compared with the prior art are as follows:

[0028] 1. Compared with related explosion-proof closed wall construction technologies, the present invention does not require complex processes such as artificial stacking of stones, formwork support and dismantling, and other multiple steps. Only by spraying in combination with prefabricated skeletons and buffer layers, an explosion-proof wall with high initial strength, good sealing and pressure relief effect can be formed. Most of the work can be completed on the ground, and the underground work is mainly spraying. While ensuring stability and strength, the present invention simplifies the construction process of the explosion-proof closed wall, greatly shortens the operation time in high-gas areas underground, and improves safety.

[0029] 2. The spraying method of the present invention is to spray slurry at a fixed point, with a short initial setting time of the slurry, so that the slurry flows downward under the action of gravity to form a "laminar effect" to achieve layered coverage into a wall. The constructed wall not only has a high initial strength, but also has basically no hollows inside due to the flow of the slurry. The continuous pressure spraying at the top plate position improves the adhesion of the slurry at this location, and the top connection effect is good. In addition, the sulphoaluminate cement has a certain micro-expansion characteristic, which greatly reduces the probability of cracking of the closed wall in the later stage.

[0030] 3. The spraying of the closed wall is achieved by fixing the duckbill spraying head on the wooden point column to form a fixed-point fan-shaped radiation, and then through the "laminar effect". It does not require workers to operate the spraying head in real time to carry out effective spraying operations, eliminating the impact of slurry rebound and dust on the personal safety of the spraying head operator during the spraying process, and improving the working environment. At the same time, it also avoids the potential danger of being injured by explosions in the goaf during the construction of the closed wall due to long-term operation in high-gas accumulation areas and too close distances. The spraying wall method based on the fact that no human operation of the spraying head is required can make the wall on the closed side of the closed wall (explosion-facing wall) be formed in one go, effectively ensuring the strength and stability of the closed wall.

[0031] 4. The spraying method adopts wet spraying, that is, the spraying material is mixed in the mixing barrel in advance and then injected into the spraying machine. This method can not only strictly control the water-cement ratio and ensure the strength of the closed wall in the later stage, but also greatly reduce the dust on site. In addition, the spraying head does not require manual operation, which effectively improves the working environment when spraying the wall.

[0032] 5. The enclosed wall is a "sandwich structure" consisting of a front blast wall, a buffer layer, and a back blast wall, and the walls on both sides have a certain inclination angle. When an explosion occurs in the goaf, the front blast wall will first bear the main impact energy. The inclined surface and the top are arranged in an arc-like shape. Part of the impact pressure is reflected at the arc, which can offset a small part of the shock wave. If the front blast wall is damaged, when the impact energy encounters the buffer layer, the sandbags will have an energy-absorbing and pressure-relieving effect. At the same time, the scattered yellow sand has a certain fire-extinguishing effect. Finally, a small part of the impact energy acts on the back blast wall. The back blast wall is arranged in an inclined manner. In addition to its own strength, it also has a high anti-dumping property, which effectively improves the stability of the sprayed enclosed wall when an explosion occurs in the goaf.

[0033] 6. Compared with the traditional stone closed wall method, the sprayed closed wall method has strong applicability to the tunnel section. Whether it is a trapezoidal, rectangular or arched tunnel, it can be quickly sprayed, and the operation process is basically the same. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 This is a flow chart of laminar spraying of explosion-proof closed walls according to the present invention;

[0035] Figure 2 It is a left side view of the explosion-proof closed wall of the present invention;

[0036] Figure 3 This is a front view of the explosion-proof closed wall of the present invention;

[0037] Figure 4 is a schematic structural diagram of the bracket described in the embodiment;

[0038] Figure 5 It is a structural schematic diagram of the duckbill type spray head described in the embodiment;

[0039] Figure 6 This is the curve of the inclined surface angle changing with the tunnel height.

[0040] Among them: 1-front blast wall; 2-buffer layer; 3-back blast wall; 4-rebar cage; 5-anchor rod; 6-top plate; 7-bottom plate; 8-cut groove; 9-spraying pipeline; 10-observation hole; 11-measure hole; 12-drain hole; 13-spraying head; 14-clamp; 15-wooden point column; 16-tenon. DETAILED DESCRIPTION

[0041] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention is further described in detail in conjunction with the embodiments and the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. The technical solutions of the present invention are described in detail below in conjunction with the embodiments and the accompanying drawings, but the scope of protection is not limited thereto.

[0042] The relative gas outburst volume of a mine is 12.6m 3 / t, a high-gas mine, mainly mining No. 8 coal seam, which is explosive; the spontaneous combustion tendency of the coal seam belongs to Class II, which is a spontaneous combustion coal seam, and the spontaneous combustion period is 84 days. At present, the 8103 working face has been mined. In order to ensure the safety of the mine and improve the ventilation system, a permanent explosion-proof closed wall needs to be built. Figures 1 to 6 The construction of the explosion-proof closed wall adopts the laminar flow spraying method proposed in this embodiment, and the specific steps are as follows:

[0043] Step 1: Ground preparation

[0044] (1) The construction location of the explosion-proof enclosed wall is determined to be 8m inside the entrance of the working face transport lane. The lane section is a rectangular section with a width of 4.2m and a height of 3.2m. The area of ​​the section is 13.44m 2 ,according to Figure 6 The angle of the inclined surface is 57°. The dimensions of the front blast wall 1 and the back blast wall 3 are designed to be 800mm thick at the top and 2500mm thick at the bottom. The volume of the front blast wall 1 and the back blast wall 3 (including the groove 8) is approximately 22.806m 3 The water-cement ratio of the designed shotcrete slurry is 0.5, and the composition of the slurry is the mass ratio of cement: sand: gravel: accelerator of 1:1.5:1.7:0.05. According to actual measurements, the bulk density of cement is 1615kg / m 3 , the bulk density of sand is 1692kg / m 3 The bulk density of the stone is 1703kg / m 3 The bulk density of the quick-setting agent is 1368kg / m 3 , then the bulk density of dry material is 1674.5kg / m 3 It is concluded that the front blast wall 1 and the back blast wall 3 of the designed size of the spraying construction each require about 25.46 tons of dry materials, so the standard dry material consumption for the construction of the front blast wall 1 and the back blast wall 3 is about 30.55 tons.

[0045] (2) Design an explosion-proof enclosed wall, which includes a front blast wall 1 and a rear blast wall 3 located on both sides, and a buffer layer 2 between the front blast wall 1 and the rear blast wall 3; the overall top thickness of the explosion-proof enclosed wall is 1.9m and the bottom thickness is 5.3m.

[0046] (3) Design a steel cage 4, which is used as a prefabricated skeleton to support the front blast wall 1 and the rear blast wall 3. The single size of the steel cage 4 is 600 mm in length, 300 mm in width and 400 mm in height, and a total of 238 steel cages 4 are required. The steel cage 4 is manufactured by prefabricating multiple rectangular steel cages on the ground using HRB400 threaded steel. The steel bars are connected by electric welding, with a spacing of 100 mm between the steel bars. The cages are staggered and fixed with iron wire.

[0047] The processing of the steel cage 4 requires the setting of positioning plates to ensure the spacing and size. The bending angle during the steel bar welding process cannot exceed four degrees. The axis misalignment of the two steel bars is required to be controlled within two millimeters. Care must be taken to prevent the steel cage from deformation during transportation.

[0048] (4) Buffer layer 2 is composed of several sandbags, the dimensions of which are 600 mm in length, 300 mm in width and 100 mm in height, and a total of 224 sandbags are required. The sandbags are made by filling 50 kg of yellow sand into canvas sandbags for later use. The particle size of yellow sand is 0.35-0.5 mm, with high density and low air permeability. The sandbags can be used as buffer layer 2 when an explosion occurs in the goaf, and can also form a fire isolation zone after destruction.

[0049] (5) The slurry is prepared according to the proportion of cement 14.38t, sand 21.56t, gravel 24.44t and accelerator 0.72t. After mixing evenly, it is bagged for later use.

[0050] In this embodiment, the cement is sulphoaluminate cement, with an initial setting time of about 8 minutes, a final setting time of about 15 minutes, a 1d compressive strength of not less than 35MPa, and a 7d compressive strength of not less than 45MPa. The sand is medium-coarse sand with a particle size of about 1mm and a moisture content of not more than 5%. The maximum particle size of the gravel shall not be greater than 10mm.

[0051] The water used for slurry stirring is ordinary tap water, and acidic water with a pH value less than 4 shall not be used.

[0052] (6) Anchor rods 5: Anchor rods 5 need to be arranged on both sides and the top plate of the tunnel. Anchor rods 5 are made of MG500 threaded steel bars with a specification of Φ20mm×2200mm, with 500mm exposed, and are used to fix the steel cage 4.

[0053] The yield strength of anchor 5 is 335 MPa, the tensile strength is 490 MPa, the elongation is 18%, and the yield load is 157 kN. The preload torque must reach 200 N·m. Anchor 5 is anchored with resin, and the anchoring length must not be less than 1 / 3 of the rod length. The actual anchoring force must be greater than 1.5 times the yield load of anchor 5, which is 157 kN.

[0054] The row spacing is determined according to the wall width to ensure that there are no less than 2 rows of anchor rods 5 in the front blast wall 1 and the back blast wall 3. The spacing is determined according to the tunnel section to ensure that there are no less than 4 anchor rods in the top plate and no less than 3 anchor rods in the tunnel side. It can be increased as appropriate according to the site conditions. In this embodiment, the spacing of the anchor rods 5 is 900mm, the row spacing is 400mm, there are 13 anchor rods in each row, 4 rows in total, and 52 anchor rods in total.

[0055] All the materials used for the above-mentioned sprayed closed wall are transported underground.

[0056] Step 2: Underground preparation

[0057] (1) Excavation of groove 8: Clean the surrounding rock surface at the location of the explosion-proof sealed wall spraying to the hard coal rock layer, and excavate a groove 8 with a depth of 500 mm and a width of 900 mm on the bottom plate and both sides; the width of the groove 8 is designed to include the 300 mm wide steel cage 4 of the front blast wall 1 and the back blast wall 3 on both sides, and the 300 mm wide sandbag of the middle buffer layer 2.

[0058] The size of the groove 8 can be changed as appropriate according to the size of the tunnel and the manifestation of mine pressure. Generally speaking, the larger the cross-section of the tunnel, the more severe the mine pressure, and the width and depth of the groove 8 will be increased accordingly. The groove 8 can be excavated using a mining chain mechanical cutter to first cut a number of cracks along the designed bottom plate position according to the designed depth, with a crack spacing of 50mm, and then use an air-leg pneumatic rock drill to crush the cut cracks into slag and fish them out, and then chisel the groove wall flat. The angle of the groove wall is perpendicular to the bottom plate, and the error shall not be greater than 4°.

[0059] (2) Driving anchor rods 5: Anchor rods 5 need to be arranged on both sides and the roof of the tunnel. Two rows of anchor rods 5 are driven at the positions corresponding to the installation of the front blast wall 1 and the back blast wall 3. One row is set in the groove 8, and the other row is set outside the groove 8. Figure 2 As shown, a total of 8 anchor rods 5 (4 on one side) are symmetrically arranged on the side of the lane in each row, and 5 anchor rods 5 are arranged on the top plate.

[0060] (3) Install the steel cage 4: place the steel cage 4 and sandbags at the corresponding position of the groove 8; specifically, first arrange a group of steel cages 4 with a width of 300 mm on both sides of the groove 8, and fix them with a row of anchor rods 5 on the inner side of the groove 8, and then arrange another group of steel cages 4 with a width of 300 mm on the outer side of the groove 8, and fix them with a row of anchor rods 5 on the outer side of the groove 8. The two groups of steel cages 4 on the same side are tied and fixed with wires, that is, the total width of the steel cages 4 of the front blast wall 1 and the back blast wall 3 is 600 mm.

[0061] (4) Arrange the buffer layer 2: Place several sandbags in the groove 8 corresponding to the buffer layer 2 to fill the space of the buffer layer 2; when arranging the top of the buffer layer 2, the capacity of the sandbags can be changed as appropriate to achieve the effect of connecting the top as much as possible. At the same time, the spraying pipeline 9 is placed at the midpoint of the top plate, and a fire extinguishing grouting hole is reserved at the end. The observation hole 10, the drain hole 12 and the measure hole 11 are fixed at the corresponding positions.

[0062] Step 3: Spraying the blast wall 1

[0063] (1) Arrange the spraying operation point: On one side of the explosion-proof wall 1, a spraying operation point is set up about 15m away from the explosion-proof closed wall, including the arrangement of the stockpile site, wet sprayer, mixer, mixing barrel, water pipe, and air duct. The stockpile site must be dry and free of water accumulation, and have certain anti-seepage measures. The best distance for the spraying operation point is about 15m, and it should not be too far to prevent the spraying pipeline from being too long and causing pipe blockage. The pressure of the water pipe and air duct must meet the requirements of the wet sprayer. The speed of the mixer shall not be less than 100 rpm, and the minimum requirement is that the capacity of the mixing barrel can provide 20 minutes of spraying.

[0064] (2) Determine the number of shotcrete heads 13 according to the cross-sectional dimensions of the tunnel, arrange a bracket on one side of the blast wall 1, and fix the shotcrete head 13 at 2 / 3 of the bracket height, so that the shotcrete landing point is aligned with the shoulder angle between the tunnel roof and the steel cage 4 (the landing point can be determined by trial spraying in advance to ensure accuracy).

[0065] In this embodiment, the bracket uses wooden point columns 15 as the skeleton, three wooden columns are arranged in the form of a tripod at the bottom, and two opposing wooden columns are arranged at the top. The two are connected and fixed by equal-length tenons 16. The top and bottom wooden point columns 15 must be connected to the top and bottom and stable; a clamp 14 is used in the middle to clamp the spray head 13 so that the spray head 13 is fixed to more than 2 / 3 of the height of the bracket.

[0066] In this embodiment, the spray head 13 is a duckbill type spray head, including a connected flat mouth and a round mouth of the spray head, and the whole is made of polyurethane material. The spray angle is 0°~50°. When the distance from the spray point is 1~1.5m, the lateral coverage range is about 1.3~1.9m. The height of the flat mouth of the spray head is not less than 15mm, the width is not less than 150mm, the length is not less than 20mm, the diameter of the round mouth is not less than 80mm, and the conversion length between the flat mouth and the round mouth of the spray head shall not be less than 200mm.

[0067] Specifically in this embodiment, two brackets are fixed on one side of the blast wall 1 at a distance of about 3m from the cutting groove 8, so that the coverage area of ​​a single shotcrete head 13 is 1.8m, and the angle is adjusted and clean water is delivered for test shooting to ensure that the landing point is aligned with the top of the steel cage 4, and the coverage area includes and exceeds the wall of the explosion-proof enclosed wall and contacts the surrounding rock.

[0068] (3) Open the mixing barrel, adjust the speed to 150r / min, add dry materials and clean water according to the water-cement ratio of 0.5, stir evenly, open the slurry inlet valve and air pressure valve, and start the spraying of the anti-blasting wall 1. The slurry is sprayed from the spraying head 13 in a fan shape to the shoulder angle between the tunnel roof and the steel cage 4. The slurry flows downward and first expands at the bottom plate. When the spraying is about 10 minutes (initial setting time), the slurry turns into a "plastic fluid" and the diffusion reaches the maximum. With the continuous spraying of subsequent slurry, the fluid layer covers the solidified "slurry". When the amount of dry material reaches the standard, stop spraying and the spraying of the anti-blasting wall 1 is completed.

[0069] (4) Close the grout inlet valve, reduce the air pressure, inject clean water into the wet sprayer, and clean the pipeline for 10 minutes. Cut off the grouting pipeline 9 at a distance of 1.5m from the buffer layer 2 and temporarily block the pipeline opening. Hang the grouting pipeline 9 at a distance of 300mm from the top plate, and use it as a fire extinguishing grouting hole later.

[0070] Step 4: Spraying back blast wall 3

[0071] On one side of the back blasting wall 3, a grouting operation point is set, and the back blasting wall 3 is sprayed according to the method of step three.

[0072] The cross-sections of the front blast wall 1 and the back blast wall 3 are two right-angled trapezoids back to back, and the front blast surface of the front blast wall 1 and the back blast surface of the back blast wall 3 are both inclined surfaces; when the explosion shock wave in the goaf acts on the wall, a part of the impact pressure will be reflected along the arc-shaped structure formed by the inclined surface and the top plate, offsetting a certain amount of the incident impact pressure, thereby achieving the purpose of diffusion pressure relief.

[0073] The above content is a further detailed description of the present invention in combination with a specific preferred embodiment. It cannot be determined that the specific embodiments of the present invention are limited to this. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the present invention, which should be regarded as belonging to the present invention and the scope of patent protection determined by the submitted claims.

Claims

1. A laminar flow spraying method for explosion-proof closed walls, characterized in that: The following steps are involved: S1. Excavate and cut grooves (8) on the bottom plate and both sides of the tunnel corresponding to the location where the explosion-proof closed wall is planned to be sprayed; S2. Arranging multiple rows of anchor rods (5) on both sides and the roof of the tunnel, wherein the anchor rods (5) are used to fix the steel cage (4); S3, arranging the steel cage (4) symmetrically on both sides of the groove (8), and fixedly connecting the steel cage (4) to the anchor rod (5), wherein a part of the steel cage (4) is located inside the groove (8) and another part is located outside the groove (8); S4, filling the space between the steel cages (4) on both sides of the cut groove (8) with a plurality of sandbags to form a buffer layer (2); S5. Arrange a grouting operation point and set a grouting head (13) on one side of the explosion-proof wall (1). The grouting operation point is set at a distance of 10m to 15m from the explosion-proof sealed wall. The grouting head (13) is set at a position so that the grouting point is aligned with the shoulder angle between the top plate and the steel cage (4). The coverage area includes and exceeds the wall of the explosion-proof sealed wall and contacts the surrounding rock. S6. Start spraying of the blast wall (1): arrange a support on one side of the blast wall (1), and fix the spray head (13) at 2 / 3 of the height of the support, so that the spraying point is aligned with the shoulder angle between the tunnel roof and the steel cage (4); The number of the grouting heads (13) is determined according to the cross-sectional dimensions of the tunnel, the grouting heads (13) being duckbill-type grouting heads; the duckbill-type grouting heads have a flat nozzle at one end and a round nozzle at the other end; the spraying angle of the grouting heads (13) is 0° to 50°, and when the distance from the spraying point is 1 to 1.5 m, the lateral coverage range is 1.3 to 1.9 m; the height of the flat nozzle of the grouting heads (13) is ≥15 mm, the width of the flat nozzle is ≥150 mm, the length of the flat nozzle is ≥20 mm, the diameter of the round nozzle of the grouting heads (13) is ≥80 mm, and the conversion length between the flat nozzle and the round nozzle is ≥200 mm; The slurry is sprayed from the spray head (13) in a fan shape to the shoulder angle between the top plate and the steel cage (4). The slurry flows downward and first expands at the bottom plate. When the initial setting time of the slurry is reached 10 minutes after the spraying, the initially sprayed slurry turns into a plastic fluid and the diffusion degree reaches the maximum. With the continuous spraying of the subsequent slurry, the fluid layer covers the solidified slurry. When the amount of slurry reaches the standard, the spraying is stopped and the spraying of the blast wall (1) is completed. S7, setting a shotcrete operation point on one side of the back blast wall (3), and spraying the back blast wall (3) according to the method of S6; The formed explosion-proof closed wall comprises a front explosion wall (1) and a rear explosion wall (3) on both sides, and a buffer layer (2) between the front explosion wall (1) and the rear explosion wall (3); the cross-sections of the front explosion wall (1) and the rear explosion wall (3) are two right-angled trapezoids placed back to back, and the front explosion surface of the front explosion wall (1) and the rear explosion surface of the rear explosion wall (3) are both inclined surfaces; when the shock wave of the explosion in the goaf acts on the front explosion surface, a part of the shock pressure is reflected along the arc-shaped structure formed by the front explosion surface and the roof, thereby offsetting a part of the incident shock pressure and achieving the purpose of diffusion pressure relief.

2. The laminar flow spraying method for explosion-proof closed wall according to claim 1, characterized in that: The spraying operation site includes the layout of the stockpile site, wet sprayer, mixer, mixing barrel, water pipes and air ducts.

3. The laminar flow spraying method for explosion-proof closed wall according to claim 1, characterized in that: An observation hole (10), a drain hole (12) and a measure hole (11) are fixed on the fixed steel cage (4).

4. The laminar flow spraying method for explosion-proof closed wall according to claim 1, characterized in that: Two rows of anchor rods (5) are respectively arranged at positions corresponding to the installation of the front blast wall (1) and the rear blast wall (3), one row of which is correspondingly arranged in the groove (8), and the other row of which is correspondingly arranged outside the groove (8); a group of steel cages (4) are respectively arranged on both sides of the groove (8) and fixed to the row of anchor rods (5) located on the inner side of the groove (8), and then another group of steel cages (4) are respectively arranged outside the two sides of the groove (8), and the other group of steel cages (4) are fixedly connected to the row of anchor rods (5) outside the groove (8), and the two groups of steel cages (4) on the same side are tied and fixed by wire.

5. The laminar flow spraying method for explosion-proof closed wall according to claim 1, characterized in that: The sandbags are filled with yellow sand; the slurry comprises cement, sand, gravel and accelerating agent.

6. The laminar flow spraying method for explosion-proof closed wall according to claim 1, characterized in that: The angle of the inclined surface of the sprayed front blast wall (1) and the back blast wall (3) is determined as the height of the tunnel changes, and the wall volume of the explosion-proof closed wall is calculated based on the angle of the inclined surface, thereby obtaining the amount of dry material in the slurry when the front blast wall (1) and the back blast wall (3) reach the standard, thereby determining whether the spraying of the front blast wall (1) and the back blast wall (3) is completed.

Citation Information

Patent Citations

  • A trapezoidal sealed wall for mining and its construction method

    CN106837418B

  • A method for rapid wall construction using shotcrete in underground coal mines

    CN108825301B

  • Construction process for manufacturing closed coal mine goaf by using guniting method

    CN117345337A

  • Mine stopping, permanent stopping form and method of installing same

    CA2390614A1

  • Mine anti-explosion trapezoidal sealing wall and construction method thereof

    CN106837418A