Pavement water seepage test equipment after asphalt pavement hot in-place recycling construction
By introducing a water diversion platform and a filling tank into the asphalt pavement water seepage test equipment, the inaccuracy problem caused by a single test water drop point is solved, a more balanced water flow distribution and sealing effect are achieved, and the accuracy and efficiency of the test results are improved.
Patent Information
- Application Number
- CN202410848504.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-01
AI Technical Summary
The existing asphalt pavement water seepage test equipment has a single test water drop point and cannot accurately reflect the water seepage situation in the test area, resulting in inaccurate test results.
A device including a test component is designed. The test component consists of a connecting ring, a measuring cylinder, a base, a water diversion platform and a stuffing tank. The water in the measuring cylinder enters the bottom of the water storage chamber through the inclined surface of the water diversion platform. A stuffing tank is provided on the bottom of the base to improve the sealing effect. , to avoid fixed landing points of water flow and enhance the accuracy of test results.
The design of the water diversion platform and filler tank prevents the test water from falling at a single point, improves the accuracy and efficiency of the water seepage test, saves sealing materials, and adapts to different test scenarios.
Smart Images

Figure CN118730855A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road engineering, and in particular to a road surface water seepage test device after in-situ hot regeneration construction of an asphalt road surface. Background Art
[0002] Asphalt thermal regeneration refers to a technology that heats, stirs, and regenerates the aged asphalt in the old asphalt pavement through heating and regeneration equipment, and then re-paves the pavement. This method is mainly used to repair aged, cracked or damaged asphalt pavements to reduce waste and environmental pollution, while also saving existing oil resources.
[0003] The asphalt pavement water permeability test is a test method to evaluate the resistance of asphalt pavement materials to water. Especially for in-situ hot-regenerated asphalt pavements, the importance of the water permeability test is related to the level of hot regeneration. It is necessary to judge whether the asphalt pavement after hot regeneration can effectively exclude water from the outside of the pavement to avoid the influence of moisture on the structure and performance of the asphalt pavement. The asphalt pavement water permeability test requires the use of special equipment, which usually includes a container with a scale and a device to seal the selected location after the point selection is completed. Then, the time, rate and degree of water in the container penetrating into the asphalt pavement are judged, so as to evaluate the water permeability of the asphalt pavement. According to the Technical Specifications for Design and Construction of Drained Asphalt Pavements (JTG / T 3350-03—2020) issued by the Ministry of Transport of the People's Republic of China, for drained asphalt pavements, it is necessary to calculate their water permeability coefficient. The specific method can be found in the construction technical specifications.
[0004] However, in the existing water seepage test equipment, it is necessary to select the test point before use, and then apply the sealing material to the point, and then place the water seepage test equipment and start the test program. The test water in the container usually falls directly, and the falling point is usually point-shaped. If the test area formed by the sealing material is larger, the test result can only reflect the water seepage situation of one point. Because the test area is in a sealed state, the water flow cannot form diffusion, resulting in the test result not necessarily accurately reflecting the actual situation of the area. Therefore, improvement is needed. Summary of the invention
[0005] The main purpose of the present invention is to provide a pavement water seepage test device after in-situ hot regeneration construction of asphalt pavement, so as to solve the problem that in the prior art, the test water drop point is single during the asphalt pavement water seepage test and cannot meet the test requirements of different situations.
[0006] In order to achieve the above object, according to one aspect of the present invention, a pavement water seepage test device after in-situ hot regeneration of an asphalt pavement is provided, the device comprising:
[0007] A test assembly, wherein the test assembly is placed vertically;
[0008] The test components include:
[0009] A connecting ring, the connecting ring is annular and has a circular gap in the middle;
[0010] A measuring cylinder, the measuring cylinder is used to contain test water, the measuring cylinder has an outlet and a switch for controlling the outlet;
[0011] A base, wherein the base has a threaded hole, and the base is detachably connected to the connecting ring;
[0012] The base comprises:
[0013] A water storage chamber, which is arranged in the middle of the base and is used to hold the test water dropped from the measuring cylinder;
[0014] A water diversion platform, which is arranged in the middle of the water storage chamber and has an inclined surface;
[0015] A water outlet hole is provided at the bottom of the water storage chamber.
[0016] Furthermore, the test component also includes:
[0017] A connecting rod, one end of which is inserted into the connecting ring, and the other end is connected to a cover plate, and a connection between the cover plate and the connecting rod has a threaded design, and a nut is provided at this position, and the connecting rod and the cover plate are fixed by the nut.
[0018] Furthermore, after the cover plate and the connecting rod are fixed, a receiving cavity is formed between the cover plate and the connecting ring, and the measuring cylinder is arranged
[0019] The measuring cylinder is in the accommodating cavity, and the bottom of the measuring cylinder is clamped in the circular gap of the connecting ring, and the top of the measuring cylinder is in contact with the cover plate, so that the measuring cylinder is fixed.
[0020] Furthermore, the measuring cylinder is made of a transparent material, and a scale is arranged on the side of the measuring cylinder.
[0021] Furthermore, the connecting rod is provided with a plurality of sets of counterweight blocks, and the counterweight blocks are used to increase the counterweight force so that the connection ring and the base are
[0022] The connection between the base and the asphalt pavement to be tested is tighter.
[0023] Furthermore, a filling groove is provided at the bottom of the base, and the filling groove is used to fill the sealing material so that the base and the asphalt to be tested are in contact with each other.
[0024] A sealed space is formed on the surface of the green road surface.
[0025] Furthermore, the number of the filling slots is two groups, and the two groups of filling slots are suitable for filling different types of sealing materials, thereby improving the base.
[0026] The sealing effect between the asphalt pavement to be tested.
[0027] Furthermore, the water storage cavity of the base is circumferentially provided with a matching block, and the matching block is used to connect the base to the connecting ring after the base is connected.
[0028] Shield to prevent splashing of falling test water.
[0029] Furthermore, the matching block is made of a flexible material and will deform during the connection process between the base and the connecting ring, thereby improving
[0030] Connection strength.
[0031] Furthermore, the matching block is made of rubber material.
[0032] By applying the technical solution of the present invention, a water diversion platform is arranged in the water storage cavity on the base, and the water diversion platform has an inclined surface. After the test water flowing out of the measuring cylinder passes through the water diversion platform, it will fall into various positions on the bottom surface of the water storage cavity along the inclined surface, effectively preventing the problem of inaccurate test results caused by a single landing point of the test water, and a filling groove is opened on the bottom surface of the base, and a sealing material is filled in the filling groove. Compared with the method of manually applying the sealing material on the asphalt pavement in advance, it can save sealing materials and improve the sealing effect. At the same time, by providing a detachable base, in different test scenarios, bases of different specifications can be selected as needed without replacing the entire equipment, thereby improving the test efficiency.
[0033] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0035] Figure 1 The overall schematic diagram of the pavement water seepage test equipment after the asphalt pavement in-situ hot regeneration construction according to the present invention is shown;
[0036] Figure 2 An enlarged schematic diagram of the base in the present invention is shown;
[0037] Figure 3 An enlarged schematic cross-sectional view of the base in the present invention is shown.
[0038] The above drawings include the following reference numerals:
[0039] 1. Test assembly; 11. Connecting ring; 12. Connecting rod; 13. Measuring cylinder; 14. Cover plate; 15. Counterweight; 16. Bolt;
[0040] 2. Base; 21. Water storage chamber; 22. Water diversion platform; 23. Water outlet hole; 24. Matching block; 25. Threaded hole; 26. Filling slot. DETAILED DESCRIPTION
[0041] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0042] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0043] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so as to describe the embodiments of the present invention described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0044] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0045] The present application proposes a pavement water seepage test device after in-situ hot regeneration of asphalt pavement. The device is applied to the new pavement formed after in-situ hot regeneration of asphalt pavement to perform a water seepage test. The process, parameters, and calculation method of the water seepage test can refer to the Technical Specification for Design and Construction of Drained Asphalt Pavement (JTG / T 3350-03—2020) issued by the Ministry of Transport of the People's Republic of China. It will not be described in detail in this embodiment. Figure 1 As shown, the water seepage test equipment includes:
[0046] A test assembly 1, which constitutes a part of the water seepage test equipment. The test assembly 1 is generally vertically distributed. The test assembly 1 includes a connecting ring 11, which is used to connect other components or equipment. The connecting ring 11 is annular, has a circular gap in the middle, and is provided with a plurality of connecting rods 12 along the circumference of the connecting ring 11. The connecting rods 12 are inserted into the connecting ring 11;
[0047] One end of the connecting rod 12 is inserted into the connecting ring 11, and the other end is connected to the cover plate 14, and the connection between the cover plate 14 and the connecting rod 12 has a threaded design, and a nut is provided at this position, and the connecting rod 12 and the cover plate 14 are fixed by the nut. After the cover plate 14 and the connecting rod 12 are fixed, there will be an accommodating cavity between the cover plate 14 and the connecting ring 11, and a measuring cylinder 13 is provided in the accommodating cavity. The bottom of the measuring cylinder 13 is clamped in the circular gap of the connecting ring 11, and the top thereof is in contact with the cover plate 14, and the fixing of the measuring cylinder 13 is achieved by the cover plate 14 and the connecting ring 11;
[0048] The bottom of the measuring cylinder 13 has an opening and a switch (not shown in the figure) for controlling the opening. When testing is required, the opening can be controlled by turning on the switch, so that the test liquid in the measuring cylinder flows out under the action of gravity. Specifically, the design of the opening and the switch of the measuring cylinder 13 can refer to the existing design, and will not be repeated in this embodiment and below.
[0049] In order to facilitate observation and recording of parameters, the measuring cylinder 13 is made of a transparent material, such as glass. In order to facilitate transportation and assembly, the transparent material can also be plastic, acrylic, polynitrile film, etc.;
[0050] like Figure 1-Figure 2 As shown, in order to cooperate with the test assembly 1 to complete the water seepage test, the bottom of the test assembly 1 is connected to a base 2, the base 2 is circular, and the circumferential size of the base 2 is larger than the circumferential size of the connecting ring 11, the base 2 is in contact with the surface of the asphalt pavement, so the larger base 2 can support the entire test assembly 1;
[0051] like Figure 2As shown, a plurality of threaded holes 25 are provided on the base 2, and bolts 16 are provided in the threaded holes 25. After the connecting ring 11 is connected to the base 2, the connecting ring 11 and the base 2 are fixed by the bolts 16. At the same time, the middle part of the base 2 has a water storage chamber 21, and the water storage chamber 21 is used to receive the test water flowing out of the measuring cylinder 13. In order to prevent the test water from having a fixed falling point, a water diversion platform 22 is provided in the middle position of the water storage chamber 21. The side of the water diversion platform 22 has an inclined surface. After the switch of the measuring cylinder 13 is turned on, the test water in the measuring cylinder 13 will fall from the outlet to the surface of the water diversion platform 22, and then flow to various positions in the water storage chamber 21 through the inclined surface, thereby avoiding the fixed falling point of the test water affecting the test result;
[0052] In different test scenarios, the test area often has different sizes. For example, in the test of ordinary roads, the area of the test point is usually smaller than the area of the test point on the expressway. In this case, it is necessary to replace the test equipment with different specifications. In this embodiment, if the area of the test point is different, the base 2 of different specifications can be replaced, as long as the base 2 of different specifications has corresponding threaded holes 25, without replacing the entire device, thereby improving the versatility and adaptability of the device and reducing the test cost.
[0053] like Figure 2 As shown, a plurality of water outlet holes 23 are provided at the bottom of the water storage chamber 21. After the test water flows into the water storage chamber 21 through the water inlet platform 22, it will flow from the water outlet holes 23 to the back of the base 2, that is, the asphalt pavement to be tested, thereby completing the water seepage test, making the flow direction of the test water more balanced, and improving the accuracy of the test data and the validity of the test results;
[0054] In order to prevent the test water from splashing and affecting the test results, Figure 2 As shown, a matching block 24 is also provided in the circumference of the water storage chamber 21. The matching block 24 can be inserted into the connecting ring 11 when the connecting ring 11 is connected to the base 2, so as to shield the test water falling during the test to prevent it from splashing and affecting the accuracy of the test results. The matching block 24 is made of a flexible material. In this embodiment, the matching block 24 is made of rubber. When the connecting ring 11 is connected to the base 2, the matching block 24 can be deformed and inserted into the connecting ring 11;
[0055] like Figure 3As shown, in order to ensure the sealing between the lower bottom surface of the base 2 and the asphalt pavement to be tested during the test, a filling groove 26 is provided on the lower bottom surface of the base 2. The filling groove 26 is used to accommodate sealing materials. The sealing materials can be fusion agents, asphalt tapes, silicone resins, etc., which are not limited in this embodiment. Before using the equipment, the filling groove 26 on the bottom surface of the base 2 is filled with sealing materials, and the surface is placed on the asphalt pavement to be tested. After applying downward pressure to the base 2, the water outlet area of the base 2 will form a sealed space with the asphalt pavement, thereby meeting the test standards. In order to improve the sealing effect, the number of the filling grooves 26 can be multiple groups, and sealing materials of different materials can be filled in multiple groups of filling grooves 26 to prevent errors in the method of manually setting the sealing materials in the prior art, and the method of first applying the sealing material to the asphalt pavement will cause certain waste, and the effect is not as good as the scheme in this embodiment. At the same time, manual errors will also affect the test effect and the accuracy of the test data.
[0056] It should be noted that no matter how many filling slots 26 there are, it is necessary to ensure that the position of the filling slots 26 in the base 2 is larger than the position of the water outlet holes 23 in the water storage chamber 21 to prevent the problem of sealing failure, and the accompanying drawings are only a schematic reference. After the base 2 is connected to the connecting ring 11, the water storage chamber 21 should be in a sealed state;
[0057] like Figure 1 As shown, in order to improve the test effect, a counterweight block 15 is also sleeved on the connecting rod 12. The weight of the counterweight block 15 can generate a certain gravity, so that the connection between the connecting ring 11 and the base 2 is tighter, and at the same time, the connection between the base 2 and the asphalt pavement to be tested is tighter. In order to increase the counterweight force, the number of the counterweight blocks 15 can be multiple groups.
[0058] From the above description, it can be seen that the above-mentioned embodiment of the present invention achieves the following technical effects: by providing a water diversion platform 22 in the water storage chamber 21 on the base 2, the water diversion platform 22 has an inclined surface, and the test water flowing out of the measuring cylinder 13 will fall into various positions on the bottom surface of the water storage chamber 21 along the inclined surface after passing through the water diversion platform 22, effectively preventing the problem of inaccurate test results caused by a single landing point of the test water, and a filling groove 26 is opened on the bottom surface of the base 2, and sealing material is filled in the filling groove 26. Compared with the method of manually applying sealing material on the asphalt pavement in advance, it can save sealing material while improving the sealing effect.
[0059] Unless otherwise specifically stated, the relative arrangement of the parts and steps described in these embodiments, numerical expressions and numerical values do not limit the scope of the present invention. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, method and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, method and equipment should be regarded as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.
[0060] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.
[0061] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings. They are only for the convenience of describing the present invention and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the devices or elements referred to must have a specific direction or be constructed and operated in a specific direction. Therefore, they cannot be understood as limiting the scope of protection of the present invention. The directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.
[0062] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement, characterized in that: The equipment includes: A test assembly (1), wherein the test assembly (1) is placed vertically; The test component (1) comprises: A connecting ring (11), the connecting ring (11) is annular, and has a circular gap in the middle of the connecting ring (11); A measuring cylinder (13), the measuring cylinder (13) is used to contain test water, the measuring cylinder (13) has an outlet and a switch for controlling the outlet; A base (2), wherein the base (2) has a threaded hole (25), and the base (2) is detachably connected to the connecting ring (11); The base (2) comprises: A water storage chamber (21), the water storage chamber (21) being arranged in the middle of the base (2), the water storage chamber (21) being used to contain test water dropped from the measuring cylinder (13); A water diversion platform (22), the water diversion platform (22) is arranged in the middle of the water storage chamber (21), and the water diversion platform (22) has an inclined surface; A water outlet hole (23), wherein the water outlet hole (23) is provided at the bottom of the water storage chamber (21).
2. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 1 is characterized in that: The test component (1) further comprises: A connecting rod (12), one end of which is inserted into the connecting ring (11), and the other end of which is connected to a cover plate (14), and a connection between the cover plate (14) and the connecting rod (12) has a threaded design, and a nut is provided at this position, and the connecting rod (12) and the cover plate (14) are fixed by the nut.
3. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 2 is characterized in that: After the cover plate (14) and the connecting rod (12) are fixed, a receiving cavity is formed between the cover plate (14) and the connecting ring (11), and the measuring cylinder (13) is arranged in the receiving cavity. The bottom of the measuring cylinder (13) is clamped in the circular gap of the connecting ring (11), and the top of the measuring cylinder (13) is in contact with the cover plate (14), so that the measuring cylinder (13) is fixed.
4. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 1 is characterized in that: The measuring cylinder (13) is made of a transparent material, and a scale is arranged on the side of the measuring cylinder (13).
5. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 2 is characterized in that: The connecting rod (12) is sleeved with a plurality of groups of counterweight blocks (15), and the counterweight blocks (15) are used to increase the counterweight force, thereby making the connection between the connecting ring (11) and the base (2) tighter, and at the same time making the connection between the base (2) and the asphalt pavement to be tested tighter.
6. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 1 is characterized in that: The bottom of the base (2) is provided with a filling groove (26), and the filling groove (26) is used to fill the sealing material so that the base (2) and the surface of the asphalt pavement to be tested form a sealed space.
7. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 6 is characterized in that: The number of the filling grooves (26) is two groups, and the two groups of filling grooves (26) are suitable for filling different types of sealing materials, thereby improving the sealing effect between the base (2) and the asphalt pavement to be tested.
8. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 1 is characterized in that: The water storage chamber (21) of the base (2) is circumferentially provided with matching blocks (24), and the matching blocks (24) are used to shield after the base (2) is connected to the connecting ring (11), so as to prevent the falling test water from splashing out.
9. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 8, characterized in that: The matching block (24) is made of a flexible material and will deform during the connection process between the base (2) and the connecting ring (11), thereby improving the connection strength.
10. The pavement water seepage test equipment after in-situ hot regeneration of asphalt pavement according to claim 9, characterized in that: The matching block (24) is made of rubber material.