By designing a simulation test system for train automatic driving devices, simulating the actual operation of the train, providing front line information and signal light status, and controlling the train operation simulation, it solves the automatic driving system testing problems in the existing technology and realizes the safety of the automatic driving system. Evaluation of performance, punctuality and energy-saving effect to ensure the safety and reliability of the system.

CN118732638AActive Publication Date: 2024-10-01CRRC ZHUZHOU ELECTRIC LOCOMOTIVE RESEARCH INSTITUTE CO LTD

Patent Information

Application Number
CN202310314731.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-01
Estimated Expiration
2043-03-28

AI Technical Summary

Technical Problem

The existing train automatic driving system lacks effective testing and simulation solutions and cannot meet the evaluation needs of the safety, punctuality and energy-saving effect of the locomotive automatic driving system.

Method used

A simulation test system for train automatic driving devices is designed, including a train operation monitoring device, a train operation simulation device, a control console device and a display device. By simulating the actual operation of the train, it provides front line information, signal light status and ATP protection curve , control the train operation simulation, and test the safety, punctuality and energy-saving effect of the automatic driving algorithm.

Benefits of technology

It achieves effective testing of the safety, punctuality and energy-saving effects of the autonomous driving system, ensuring the safety and reliability of the autonomous driving system put into use. It can match complex test scenarios and meet the needs of autonomous driving entry and exit, vehicle shunting and power loss. safety requirements under special working conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118732638A_ABST
    Figure CN118732638A_ABST
Patent Text Reader

Abstract

The invention provides a simulation test system and method for a train automatic driving device, in the simulation test system, a train operation monitoring device is used for providing front line information, a signal lamp state and an ATP protection curve; the train operation simulation device is used for building a train operation simulation model and simulating the actual operation of a train to obtain train operation parameters; the driver console device is used for providing a driver key signal state, an on-off state of a main circuit breaker, a state of an air braking system and a state of a traction / braking handle, receiving and sending operation state information to the train operation simulation device, and sending train operation parameters to the automatic driving device; the display device is used for displaying the automatic driving state or the manual driving state and generating a driver take-over prompt according to the abnormal signal when automatic driving is abnormal. The requirement for testing the locomotive automatic driving system before the locomotive automatic driving system is put into use can be met, and then the safety, punctuality and / or energy-saving effect of the automatic driving device can be obtained through simulation testing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of automatic train driving, and in particular to a simulation test system and method for an automatic train driving device. Background Art

[0002] The Automatic Train Operation (ATO) system is a train automatic control system that realizes functions such as automatic train driving, precise parking, platform automation operation, unmanned return, and automatic train operation adjustment.

[0003] The related technologies provide solutions for combined train / locomotive operation control simulation, or energy measurement solutions for rail transit locomotives operating in different sections, but there are no related solutions for testing and simulating locomotive automatic driving modules, which cannot meet the needs of locomotive automatic driving system testing. Summary of the invention

[0004] The present invention provides a simulation test system and method for a train automatic driving device, which can meet the demand for testing a locomotive automatic driving system before it is put into use, and then obtain the safety, punctuality and / or energy-saving effect of the automatic driving device through simulation testing, thereby ensuring the safety and reliability of the locomotive automatic driving system put into use.

[0005] In a first aspect, an embodiment of the present invention provides a simulation test system for a train automatic driving device, wherein the automatic driving device runs an automatic driving algorithm, and is used to provide a planned operation curve ahead in an automatic driving state, send train operation state information according to the signal light state of the line ahead, an ATP protection curve and train operation parameters, control a train operation simulation device to simulate the actual operation of the train, and send an abnormal signal when the automatic driving is abnormal; the simulation test system includes: a train operation monitoring device, a train operation simulation device, a driver control console device and a display device;

[0006] The train operation monitoring device is used to provide the automatic driving device and the display device with the line information ahead and the signal light status and ATP protection curve of the line ahead;

[0007] The train operation simulation device is used to build a train operation simulation model and simulate the actual operation of the train, obtain train operation parameters and send them to the driver console device and the display device;

[0008] The driver console device is used to provide the driver key signal status, the main circuit breaker opening and closing status, the air brake system status and the traction / brake handle status, receive and send the operation status information to the train operation simulation device, and send the train operation parameters to the automatic driving device;

[0009] The display device is used to display the automatic driving state or the manual driving state, and to generate a driver takeover prompt according to an abnormal signal when the automatic driving is abnormal.

[0010] In some implementations, the display device is also used to send a signal to enter or exit the automatic driving device so that the automatic driving device enters or exits the automatic driving state; the automatic driving device is also used to send a signal to enter or exit the automatic driving to the driver console device.

[0011] In some implementations, the train operation status information includes the gear level, train operation conditions and / or train control target decompression; the train operation parameters include at least one of the actual traction force / electric braking force, the maximum traction force / electric braking force that can be exerted, the current air brake system status, the train control pressure, the actual position of the train, the actual operating speed of the train and the actual operating acceleration of the train.

[0012] In some implementations, the train operation simulation device is also used to send the actual position of the train and the actual running speed of the train to the train operation monitoring device, so that the train operation monitoring device obtains the forward line information based on the actual position of the train and the actual running speed of the train.

[0013] In some implementations, the driver console device is also used to send the train start signal and the train operation parameters to the automatic driving device.

[0014] In some implementations, the train operation simulation model includes at least one of the following models:

[0015] Locomotive traction / electric brake simulation model, wheel-rail relationship model, anti-spin function model, sand spreading simulation model, air brake simulation function model, resistance model, phase separation model, train kinematics model, train position error simulation model, train speed error simulation model, simulation data storage and display model.

[0016] In some implementations, the locomotive traction / electric braking simulation model is used to calculate the actual traction torque / electric braking torque generated by the motor under the applied traction torque or electric braking torque; the wheel-rail relationship model is used to build a train wheel-rail relationship model and obtain the actual traction force / electric braking force exerted by the train based on the actual traction torque / electric braking torque generated by the motor; the anti-idling function model is used to reduce the traction force / braking force so that the adhesion working point is transferred to the adhesion stability zone when the preset adhesion control algorithm of the locomotive detects idling or sliding using speed difference; the sand-spreading simulation model is used to simulate the change of the adhesion characteristics of the train when the train receives a sand-spreading signal; the air brake simulation function model is used to simulate the mechanical braking force generated by the friction between the brake shoe and the wheelset tread or brake disc; the resistance model is used to simulate the train running resistance, and the train running resistance includes basic resistance and additional resistance, the basic resistance includes the resistance generated by mechanical friction or air friction, and the additional resistance The force includes the additional resistance generated when the train passes through a specific line, and the additional resistance includes the additional resistance on the slope, the additional resistance on the curve and the additional resistance in the tunnel; the phase separation model is used to provide a phase separation area warning signal before the train passes the phase separation; the train kinematic model is used to determine the unit resultant force on the train with the train running direction as the positive direction of the force analysis, and determine the motion state of the train based on the resultant force; the train position error simulation model is used to simulate the cumulative error caused by the wheel diameter error and the random error caused by the line infrastructure; the train speed error simulation model is used to simulate the speed error generated by the speed sensor using a random function; the simulation data storage and display model is used to store and display at least one of the following information: the actual running speed of the train, the applied traction torque or electric braking torque, the actual traction force / electric braking force exerted by the train, the train running energy consumption, the train running condition, the unit resultant force on the train, the air brake decompression, the total running mileage of the train at the end of the simulation, the total running time and the total running energy consumption.

[0017] In a second aspect, an embodiment of the present invention provides a simulation test method for a train automatic driving device, which is implemented based on the simulation test system described in the first aspect, and the simulation test method includes:

[0018] Setting a train operation route by means of the train operation monitoring device;

[0019] Sending a train start signal to the automatic driving device through the driver console device, switching the train operation mode to the automatic driving mode, simulating the process of the train running from the starting station to the terminal station;

[0020] In the process of simulating the train running from the starting station to the terminal station:

[0021] The train operation monitoring device provides the line information ahead and the signal light status ahead and the ATP protection curve provided according to the signal light status;

[0022] The automatic driving device sends train operation status information according to the signal light status of the front line, the ATP protection curve and the train operation parameters, and controls the train operation simulation device to simulate the actual operation of the train;

[0023] The train operation simulation device obtains train operation parameters during the actual operation of the simulated train and sends them to the driver console device and the display device;

[0024] The driver console device receives the operation status information from the automatic driving device and sends it to the train operation simulation device, and sends the train operation parameters to the automatic driving device;

[0025] The automatic driving device sends an abnormal signal when the automatic driving is abnormal, and the display device generates a driver takeover prompt based on the abnormal signal.

[0026] In some implementations, the train operation simulation device provides actual traction torque / electric braking torque simulation during the simulation of actual train operation, calculates the actual traction force / electric braking force of the train based on the train wheel-rail relationship model, unloads the traction force / electric braking force when the train is idling, increases the train adhesion coefficient to the adhesion coefficient in a dry state when a sand-spreading signal is received, calculates the mechanical braking force of the train based on the traction / brake handle state, calculates the train operation resistance in real time based on the actual train operation speed and the line information ahead, provides a phase separation zone warning signal to the automatic driving device before the train passes the phase separation, and is in a power-off state when the train runs in the phase separation zone, and calculates the actual train operation speed and the actual train acceleration based on the unit resultant force obtained based on the train force analysis.

[0027] In some implementations, the simulation testing method is used to perform at least one of a safety test, a punctuality test, and an energy-saving test of an autonomous driving algorithm.

[0028] Beneficial effects:

[0029] The present invention realizes a complete set of railway train automatic driving simulation test solutions through the linkage interaction between the train operation monitoring device and the automatic driving device, the display device, and the train operation simulation device. The various functions provided by the train operation monitoring device, the display device, and the train operation simulation device can match the complex test scenarios of the automatic driving device, effectively test the safety, punctuality and / or energy-saving effect of the automatic driving device, and ensure the safety and reliability of the automatic driving device put into use. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and should not be regarded as limiting the scope.

[0031] Figure 1 This is a block diagram of a simulation test system for an automatic train driving device provided by an embodiment of the present invention;

[0032] Figure 2 This is an example of the data flow inside the train operation simulation device provided by an embodiment of the present invention;

[0033] Figure 3 This is an example of a virtual speed calculation process provided by an embodiment of the present invention;

[0034] Figure 4 This is an example of the change of the virtual speed of the train when the integrated speed ramp changes provided by the embodiment of the present invention;

[0035] Figure 5 It is a virtual speed difference unloading coefficient curve provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents the selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present invention.

[0037] Embodiment 1

[0038] This embodiment provides a simulation test system for a train automatic driving device, wherein the automatic driving device runs an automatic driving algorithm, which is used to provide a planned running curve ahead in the automatic driving state, send train running status information according to the signal light state of the line ahead, ATP protection curve and train running parameters, control the train running simulation device to simulate the actual running of the train, and send an abnormal signal when the automatic driving is abnormal, wherein the train running status information includes the level, the train running condition and / or the train management target decompression amount. This embodiment provides a system for railway train automatic driving simulation test, which performs simulation test on the automatic driving algorithm configured in the automatic driving device, so that before the automatic driving device is put into use, the safety, punctuality and / or energy saving effect of the automatic driving device can be tested by simulation, so as to ensure the safety and reliability of the automatic driving device put into use. It can also solve the linkage between the automatic driving device test and the simulation system (train running simulation device) and the signal system (train running monitoring device), and use the signal system as a test system, which can switch the color of the signal light of the line ahead at any time, and then test whether the automatic driving algorithm meets the protection requirements of ATP (Automatic Train Protection) under different signal light combinations. The system of this embodiment can also be used to simulate whether the automatic driving device meets the safety requirements under special conditions such as automatic driving entry and exit, shunting, and train power loss, and can meet complex test scenarios.

[0039] It should be understood that the autonomous driving device here can be an independent hardware device, such as a computer, on which an autonomous driving algorithm runs; or it can be an autonomous driving algorithm module encapsulated by the autonomous driving algorithm, and the autonomous driving algorithm module can run on a computer. The specific implementation form of the autonomous driving device is not limited in this embodiment.

[0040] like Figure 1As shown, the simulation test system of this embodiment includes: a train operation monitoring device, a train operation simulation device, a driver control console device and a display device. It should be understood that the train operation simulation device and the driver control console device here can be independent hardware devices, such as computers, and the train operation simulation algorithm runs on the train operation simulation device, and the driver control console device runs on the driver control console simulation algorithm; it can also be a train operation simulation algorithm module encapsulated by the train operation simulation algorithm, and a driver control console simulation algorithm module encapsulated by the driver control console simulation algorithm. In the case where the train operation simulation device and the driver control console device refer to the train operation simulation algorithm module encapsulated by the train operation simulation algorithm, and the driver control console simulation algorithm module encapsulated by the driver control console simulation algorithm, the train operation simulation algorithm module and the driver control console simulation algorithm module can run on the same computer with the aforementioned automatic driving algorithm module, or the three can run on the same computer separately or some of the three can run on the same computer. This embodiment does not limit the specific implementation form of the three.

[0041] in:

[0042] The train operation monitoring device (LKJ) is used to provide the automatic driving device and the display device with the information of the line ahead, the signal light status of the line ahead and the ATP protection curve;

[0043] The train operation simulation device is used to build a train operation simulation model and simulate the actual operation of the train, obtain the train operation parameters and send them to the driver console device and the display device; the train operation parameters include at least one of the actual traction force / electric braking force, the maximum traction force / electric braking force that can be exerted, the current air brake system state, the train pipe pressure, the actual train position, the actual train running speed and the actual train running acceleration. The state of the air brake system includes the state of the large gate and the small gate.

[0044] The driver console device is used to provide the driver with the key signal status, the main circuit breaker opening and closing status, the air brake system status and the traction / brake handle status, receive and send the operation status information to the train operation simulation device, and send the train operation parameters to the automatic driving device;

[0045] The display device is used to display the automatic driving status or the manual driving status, and to generate a driver takeover prompt based on the abnormal signal when the automatic driving is abnormal.

[0046] The system of this embodiment realizes a complete set of railway train automatic driving simulation test solutions through the linkage interaction between the train operation monitoring device and the automatic driving device, the display device, and the train operation simulation device. The various functions provided by the train operation monitoring device, the display device, and the train operation simulation device can match the complex test scenarios of the automatic driving device, effectively test the safety, punctuality and / or energy saving effect of the automatic driving device, and ensure the safety and reliability of the automatic driving device put into use.

[0047] The automatic driving device is the test object of the entire railway train automatic driving simulation test system. It plans the operating curve at a certain distance ahead of the train. According to the line information ahead, the actual operating speed of the train, the ATP protection curve, the actual traction of the train, the maximum traction that can be exerted, and the current status of the air brake system, it calculates and sends the current train level, train operating conditions, and train control target decompression status to control the operation of the train.

[0048] The train operation monitoring device provides the signal light related functions of the simulation test system, including the signal light status of the front line, the entry and exit signal light simulation, and the ATP protection curve (generated according to the front signal light status and the entry and exit signal light simulation). When the ATP protection curve is triggered during the train operation, the train operation monitoring device will send an emergency braking command to trigger the train to stop by emergency braking. During the train operation, the train operation monitoring device also sends the ATP protection curve, the front line information, and the front signal light to the automatic driving device and the display device, and the display device displays this information.

[0049] Furthermore, the display device is also used to send a signal to enter or exit the automatic driving device, so that the automatic driving device enters or exits the automatic driving state; the automatic driving device is also used to send a signal to enter or exit the automatic driving to the driver's console device.

[0050] In this embodiment, the display device sends a signal for entering or exiting the automatic driving device to enable the automatic driving device to enter or exit the automatic driving state, and the automatic driving device is also used to send a signal for entering or exiting the automatic driving to the driver console device. In this way, entering or exiting the automatic driving can be simulated, which can meet the testing requirements under the automatic driving entry and exit scenarios.

[0051] The above-mentioned display device can also display train operation parameters and operation status information.

[0052] Furthermore, the train operation simulation device is also used to send the actual position of the train and the actual running speed of the train to the train operation monitoring device, so that the train operation monitoring device obtains the forward line information based on the actual position of the train and the actual running speed of the train.

[0053] In this embodiment, in the process of simulating the actual operation of the train by the train operation simulation model built by the train operation simulation device, the actual position of the train and the actual running speed of the train are sent to the train operation monitoring device to provide the train monitoring device with a basis for obtaining the line information ahead, which is then provided by the train monitoring device to the automatic driving device and the display device. While providing the line information ahead, the train monitoring device also provides the automatic driving device with the corresponding signal light status and ATP protection curve of the line ahead. The automatic driving device sends the train level, train operating conditions and / or train control target decompression amount according to the line information ahead, the signal light status of the line ahead and the ATP protection curve, controls the train operation simulation device to simulate the actual operation of the train, and sends an abnormal signal when the automatic driving is abnormal. The display device generates a driver takeover prompt according to the abnormal signal, thereby exiting the automatic driving, and the driver's console device simulates and controls the train operation, providing the driver's key signal status, the main circuit breaker's on and off status, the air brake system status, and the traction / brake handle status, etc.

[0054] In some cases, the driver control console device is also used to send a train start signal and train operation parameters to the automatic driving device. By sending a train start signal to simulate the train start operation, the driver control console device sends the train operation parameters received from the train operation simulation device to the automatic driving device in the automatic driving state to generate train operation state information and feedback it to the driver control console device, which then sends it to the train operation simulation device to continue simulating train operation.

[0055] The train operation simulation device builds the train kinematic model and other related simulation models according to the force conditions in the traction direction during the train operation. For example, the traction calculation model is established according to the "Traction Calculation Regulations", and then the locomotive and vehicle models and the model simulating the external operating environment of the train are built. In one example, the data flow inside the train operation simulation device is as follows: Figure 2 shown.

[0056] In some implementations, the train operation simulation model constructed by the train operation simulation device includes at least one of the following models:

[0057] Locomotive traction / electric brake simulation model, wheel-rail relationship model, anti-spin function model, sand spreading simulation model, air brake simulation function model, resistance model, phase separation model, train kinematics model, train position error simulation model, train speed error simulation model, simulation data storage and display model.

[0058] The locomotive traction / electric braking simulation model is used to calculate the actual traction torque / electric braking torque generated by the motor under the applied traction torque or electric braking torque, and the applied traction torque or electric braking torque is determined according to the level.

[0059] In some implementations, when calculating the actual traction torque / electric braking torque generated by the motor under the applied traction torque / electric braking torque, three factors may be considered: the motor traction / braking characteristic envelope, the maximum impact rate, and the communication delay.

[0060] (1) Consider the motor traction / braking characteristic envelope: If the applied traction torque / electric braking torque exceeds (is smaller than or larger than) the motor traction / electric braking characteristic envelope, the actual traction torque / electric braking torque shall be the value on the motor traction / electric braking envelope.

[0061] (2) Considering the maximum impact rate: Based on the maximum impact rate and the force analysis of the train, the range of the traction torque / electric braking torque at the next simulation step can be calculated. The calculated formulas are shown in (1) to (3) below. The actual traction torque / electric braking torque cannot exceed this range.

[0062]

[0063] F=Ma1+Fd (2)

[0064]

[0065] Where a1 represents the train acceleration of the current simulation step, a0 represents the train acceleration of the previous simulation step, △t represents the simulation step, jerk represents the impact rate limit value, i.e., the maximum impact rate, F represents the train traction force / electric braking force, M represents the total weight of the train, Fd represents the train resistance, R represents the wheel diameter, Rg represents the transmission ratio, N represents the number of motors in the vehicle, and T represents the traction torque / electric braking torque.

[0066] (3) Considering the communication delay time: Establishing the data receiving sequence, considering the communication delay time of several cycles, so that the locomotive traction / electric braking simulation is closer to the real situation with communication delay.

[0067] The above wheel-rail relationship model is used to build a train wheel-rail relationship model and calculate the actual traction force / electric braking force of the train based on the actual traction torque / electric braking torque generated by the motor.

[0068] In some implementations, the train wheel-rail relationship model can be expressed by the following equations (4) to (8):

[0069] The equation of motion of the locomotive:

[0070] Motor motion equation:

[0071] Adhesive properties:

[0072] F t =Mj *μ(V s ) (7)

[0073] (V s )=ω m *RV t (8)

[0074] In the formula, v t is the locomotive speed; M is the total weight of the train; J m T is the moment of inertia of the motor, wheelset and its accessories converted to the wheelset; m is the motor torque; F d (v t ) is the locomotive running resistance; R is the locomotive wheel radius; R g is the transmission ratio; ω m is the motor angular velocity; FT is the locomotive traction force, Ft is the wheelset traction force, M j is the locomotive axle weight, μ(V s ) is the creep velocity, a, b, c, d are the adhesion characteristic curve coefficients.

[0075] In a typical example the adhesion characteristic curve coefficients can be as follows:

[0076]

[0077] Road condition 1 corresponds to dry road conditions, road condition 4 corresponds to wet and slippery road conditions, and road conditions 2 and 3 are between dry and wet and slippery road conditions.

[0078] The anti-slip function model is used to reduce the traction force / braking force to transfer the adhesion working point to the adhesion stable zone when the preset adhesion control algorithm of the locomotive detects the occurrence of slip or sliding by using the speed difference.

[0079] This embodiment may adopt a simple anti-idling function model. When the locomotive's adhesion control algorithm detects that the locomotive is idling / skidding through the speed difference, the traction / braking force must be immediately and quickly reduced to transfer the adhesion working point to the adhesion stable zone as soon as possible to prevent the idling / skidding from worsening.

[0080] The basic principle of virtual speed difference protection is: by calculating and comparing the difference between the locomotive virtual speed calculated by the anti-idling function model and the locomotive actual speed provided by the train operation monitoring device, and adjusting the given torque of the motor according to a certain relationship based on the difference, so that the locomotive can quickly exit from these states and restore adhesion when idling and sliding occur.

[0081] Obtaining the correct virtual speed is an important guarantee for the effectiveness of virtual speed difference protection. Figure 3 An example of a process for calculating the virtual speed of a locomotive is shown, where the locomotive integrated speed v cTake the motor speed of a certain axis, and use a low-pass filter for speed filtering. The function expression of the low-pass filter is as follows:

[0082]

[0083] Where F(s) represents the filter function, and the parameter τ should be greater than the time constant of the locomotive transmission system, which can be adjusted in combination with on-site debugging. Figure 4 It shows that when the locomotive integrated speed v c The corresponding locomotive virtual speed v when the slope changes v process of change.

[0084] When the locomotive virtual speed is obtained, the virtual speed difference can be calculated:

[0085] Δv = locomotive wheel speed - locomotive virtual speed

[0086] After determining the virtual speed difference Δv, press Figure 5 The virtual speed difference unloading coefficient k is calculated, where k=1 corresponds to the case where no idling occurs, and the rest corresponds to the case where idling or sliding occurs.

[0087]

[0088] Wherein, Δv0 and Δv1 represent the set virtual speed lower limit and upper limit respectively.

[0089] The motor given torque adjustment algorithm is:

[0090] The current motor given torque = the motor given torque in the previous simulation cycle × k.

[0091] The sand spreading simulation model is used to simulate the change of the train adhesion characteristics when the train receives the sand spreading signal. In some cases, after the train receives the sand spreading signal, the train adhesion coefficient is increased to the adhesion coefficient in the dry state.

[0092] The air brake simulation function model is used to simulate the mechanical braking force generated by the friction between the brake shoe and the wheel set tread or brake disc.

[0093] In conventional traction calculations, the emergency braking force of the train is calculated according to formula (11):

[0094]

[0095] In the formula, represents the converted friction coefficient, B represents the emergency braking force, P represents the weight of the locomotive, G represents the weight of the train, g represents the acceleration of gravity, θ h It indicates the converted braking rate of the train, which is related to the material of the brake shoe.

[0096] When the train is in emergency braking, the unit braking force is calculated according to formula (12):

[0097]

[0098] Where b represents the unit braking force.

[0099] When the train is normally braked, the unit braking force is calculated according to formula (13):

[0100] b c =β c ·b (N / kN) (13)

[0101] Where b c Denotes the unit braking force, β c It represents the commonly used braking coefficient, and its value is related to the decompression of the air brake.

[0102] In the calculation of the braking idling time, since the braking effect is not immediately generated when the train applies air brakes, the transmission of the air wave in the train pipe requires a certain amount of time, so the rise of the vehicle brake cylinder pressure (or brake shoe pressure) is manifested as a changing process. To simplify the calculation, under the premise of ensuring that the braking distance remains unchanged, the time from the application of air brakes to the assumed instant when the brake shoe pressure of the entire train suddenly rises to the maximum value corresponding to the target decompression amount of the train pipe is defined as the braking idling time. The size of the idling time is related to the exhaust time of the train during air braking, and its calculation can be determined through special tests and theoretical analysis.

[0103] When the train is in emergency braking, the idling time can be calculated according to formula (14):

[0104] t k =(1.6+0.065n)(1-0.028i j ) (s) (14)

[0105] When a freight train is normally braked, the idling time is calculated according to formula (15):

[0106] t k =(1.6+0.017r·n)(1-0.032i j ) (s) (15)

[0107] Where, t k represents the idling time; r represents the train pipe pressure reduction, kPa; n represents the number of traction vehicles; i j Indicates the added slope of the braking section in thousandths.

[0108] The distance traveled by the train during the idling time is the braking idling distance, which is generally calculated based on the initial braking speed and uniform speed. k It can be calculated using formula (16):

[0109]

[0110] Wherein, v0 represents the initial braking speed, km / h.

[0111] Braking effective distance S e It can be calculated using formula (17):

[0112]

[0113] Where v1 and v2 represent the initial and final velocities of the speed interval within the calculation step, respectively, in km / h; w0 represents the unit basic resistance of the train, in N / kN.

[0114] The braking distance of the train is the sum of the braking idling distance and the braking effective distance, as shown in formula (18):

[0115] S z =S k +S e (18)

[0116] The above resistance model is used to simulate the train running resistance. The train running resistance includes basic resistance and additional resistance. The basic resistance includes the resistance caused by mechanical friction or air friction. The additional resistance includes the additional resistance generated when the train passes through a specific line. The additional resistance includes ramp additional resistance, curve additional resistance and tunnel additional resistance.

[0117] (a) Basic resistance

[0118] The basic resistance comes from mechanical friction, air friction, etc., and is related to the inherent characteristics of the locomotive and vehicle. It can be calculated using an empirical formula obtained from a large number of tests, as shown in formula (19).

[0119] w′0=a+bv+cv 2 (N / kN) (19)

[0120] Where v is the train speed, km / h; a, b, c are empirical constants related to the models of locomotives and vehicles.

[0121] The unit basic resistance w0 of the train is the mass-weighted average of the unit basic resistances of the locomotive and the vehicle, which can be calculated using formula (20). When the train formation is long (for example, more than 2 cars), only the vehicle basic resistance can be calculated.

[0122]

[0123] Wherein, w′0 represents the basic unit resistance of the locomotive, N / kN; w″0 represents the basic unit resistance of the vehicle, N / kN.

[0124] (b) Additional resistance

[0125] Additional resistance is the extra resistance generated when a train passes through specific line conditions such as ramps, curves, tunnels, etc. According to the line conditions when it is generated, it can be divided into three types: ramp additional resistance, curve additional resistance and tunnel additional resistance.

[0126] Unit ramp additional resistance w i It is numerically equal to the slope of the slope in thousandths i, which can be calculated according to formula (21):

[0127] w i =i (N / kN) (21)

[0128] Among them, positive values ​​are used for uphill roads and negative values ​​are used for downhill roads.

[0129] Unit curve additional resistance w r It can be calculated according to formula (22):

[0130]

[0131] Where R represents the curve radius, m.

[0132] Unit tunnel additional resistance w s It can be calculated according to formula (23):

[0133] w s =0.00013L s (N / kN) (23)

[0134] Where, L s Indicates the length of the tunnel, m.

[0135] In the traction calculation, the unit slope resistance w is added i 、Unit curve additional resistance w r , and unit tunnel additional resistance w s Combined into a unit to add additional resistance w j , w j Numerically equal to the addition of the slope in thousandths i j , as shown in formula (24):

[0136] w j =i j =w i +w r +w s =i+w r +w s (N / kN) (24)

[0137] The unit running resistance w of the train is the sum of the unit basic resistance of the train and the unit additional resistance caused by the line conditions, as shown in formula (25).

[0138] w=w0+w j (N / kN) (25)

[0139] When a train with a longer train set runs on a line, it may cover multiple ramps and curves. At this time, the use of the traditional single-particle model for calculation will produce large errors. In order to more accurately calculate the additional resistance of the train, the train length should be considered in the traction calculation. In some examples, the "homogeneous rod" model can be used, assuming that the mass of all locomotives or vehicles is evenly distributed according to their own length, that is, the locomotive or vehicle per unit length has the same mass. For each simulation calculation step, the unit ramp additional resistance, unit curve additional resistance and unit tunnel additional resistance are weighted and summed according to the length of the section covered by the locomotive or vehicle length, and converted into the unit added additional resistance of each locomotive or vehicle. The unit added additional resistance w of the kth locomotive or vehicle is j k The calculation formula is shown in formula (26).

[0140]

[0141] Where, L k — locomotive or vehicle length, m;

[0142] i p —The slope of the pth slope in thousandths;

[0143] l p —The length of the pth ramp, m;

[0144] l q —The length of the qth curve, m;

[0145] R q —The radius of the qth curve, m;

[0146] l r —The length of the rth tunnel, m;

[0147] n1—the number of ramps;

[0148] n2—the number of locations;

[0149] n3—The number of the tunnel.

[0150] The unit additional resistance of the entire train is obtained by weighted average of the masses of all locomotives and vehicles in the train formation, as shown in formula (27).

[0151]

[0152] In the formula, m k— Section k. The mass of the vehicle or locomotive;

[0153] N—total number of locomotives and vehicles;

[0154] x—the position of the train on the line.

[0155] The above phase split model is used to provide a phase split area warning signal before the train passes through the phase split area. When the train runs in the phase split area, the train is in a power-off state.

[0156] The above train kinematic model is used to determine the unit resultant force on the train with the train running direction as the positive direction of force analysis, and determine the motion state of the train based on the resultant force.

[0157] The motion state of a train depends on the resultant force it is subject to, which is a function of the train's current operating conditions, current speed, and train position. Taking the train's running direction as the positive direction of the force analysis, the unit resultant force acting on the train is shown in equation (28).

[0158] c(v,x,N t ,N b ,β c )=f trac (v,N t )-b brk (v,N b ,β c )-w0(v)-g(x) (28)

[0159] In the formula, f trac —Unit traction of the train, N / kN;

[0160] b brk —Unit braking force of train, N / kN;

[0161] w0—train unit basic resistance, N / kN;

[0162] g(x)—train unit additional resistance, N / kN;

[0163] N t —Locomotive traction handle level;

[0164] N b —Locomotive electric brake handle level;

[0165] β c —Common braking coefficient.

[0166] According to Newton's second law, the train motion equation can be described as

[0167]

[0168]

[0169] Where ξ is the acceleration coefficient, ξ = 0.0981 / (1+α), α is the rotational mass coefficient, which is 0.06. c represents the resultant force, and v represents the virtual velocity.

[0170] The above train position error simulation model is used to simulate the cumulative error caused by wheel diameter error and the random error caused by line infrastructure. The cumulative error caused by wheel diameter error is calculated by the following formula: ΔS = ΔR × N, where ΔS represents the cumulative value of the position error, ΔR represents the wheel diameter error, and N represents the number of circles the train wheel has traveled. The random error is simulated using the normal distribution function. When passing the signal, the error is reset to zero.

[0171] The train speed error simulation model is used to simulate the speed error generated by the speed sensor using a random function. The train speed error simulation model is used to simulate the speed error generated by the speed sensor using a random function.

[0172] The above-mentioned simulation data storage and display model is used to store and display at least one of the following information: the actual running speed of the train, the applied traction torque or electric braking torque, the actual traction force / electric braking force exerted by the train, the train running energy consumption, the train running condition, the unit force on the train, the air brake decompression, and the total running mileage, total running time and total running energy consumption of the train at the end of the simulation. Among them, the actual running speed of the train, the applied traction torque or electric braking torque, the actual traction force / electric braking force exerted by the train, the train running energy consumption, the train running condition, the unit force on the train, and the air brake decompression are displayed in the form of curves.

[0173] This embodiment provides a set of railway locomotive automatic driving simulation test solutions, which can test the safety, punctuality, and energy-saving effect of the automatic driving algorithm. Using the signal system device as a test system, the color of the signal light can be switched at any time to test whether the automatic driving algorithm meets the ATP protection requirements under different signal light combinations. It can also simulate whether the automatic driving device meets the safety requirements under special working conditions such as automatic driving cut-in and exit, shunting, and train power loss.

[0174] Embodiment 2

[0175] This embodiment provides a simulation test method for a train automatic driving device, which is implemented based on the simulation test system of the first embodiment. The simulation test method of this embodiment includes:

[0176] Setting the train running route through the train running monitoring device;

[0177] Send a train start signal to the automatic driving device through the driver's console device, switch the train operation mode to the automatic driving mode, and simulate the process of the train running from the starting station to the terminal station;

[0178] In the process of simulating the train running from the starting station to the terminal station:

[0179] The train operation monitoring device provides the line information ahead, the signal light status ahead and the ATP protection curve determined according to the signal light status;

[0180] The automatic driving device sends train operation status information according to the signal light status, ATP protection curve and train operation parameters of the line ahead, and controls the train operation simulation device to simulate the actual operation of the train;

[0181] The train operation simulation device obtains train operation parameters during the actual operation of the simulated train and sends them to the driver's console device and the display device;

[0182] The driver control console device receives the operation status information from the automatic driving device and sends it to the train operation simulation device, and sends the train operation parameters to the automatic driving device;

[0183] The automatic driving device sends an abnormal signal when the automatic driving is abnormal, and the display device generates a prompt for the driver to take over according to the abnormal signal.

[0184] Furthermore, the train operation simulation device provides actual traction torque / electric braking torque simulation during the simulation of actual train operation, calculates the actual traction force / electric braking force of the train based on the train wheel-rail relationship model, and unloads the traction force / electric braking force when the train is idling; when receiving a sand-spreading signal, the train adhesion coefficient is increased to the adhesion coefficient in a dry state to make the train's traction and braking performance better; the train's mechanical braking force is calculated based on the state of the traction / brake handle; the train's running resistance is calculated in real time based on the actual running speed of the train and the line information ahead; a phase separation zone warning signal is provided to the automatic driving device before the train passes the phase separation, and the train is in a power-off state when the train runs in the phase separation zone; the actual running speed of the train and the actual acceleration of the train are calculated based on the unit resultant force obtained from the train force analysis.

[0185] In practical applications, the method of this embodiment can be used to perform at least one of the safety test, punctuality test and energy-saving test of the autonomous driving algorithm.

[0186] Safety test of the automatic driving algorithm: The train operation monitoring device simulates the changes of the signal lights during the actual driving process. When the ATP protection curve changes, the automatic driving device automatically changes the train level and air brake instructions to control the train status. The train operation simulation device mobilizes its locomotive traction / electric brake simulation model, wheel-rail relationship model and other sub-models to output the train acceleration and speed information. The train speed curve does not trigger the ATP protection curve and drives safely. In addition, a section of the line can be selected to simulate the brake test and test the air brake performance. The driver's console device controls the automatic driving entry and exit to test whether the train meets the requirements for safe driving. Change the train formation of the train operation simulation device to shunting mode or train power loss mode, and test whether the automatic driving device meets the safety requirements under special circumstances. The train position error simulation model simulates the cumulative error caused by wheel diameter error. When the train passes the signal, the position is correct and the error is cleared. When there is a train position error, the line information received by the automatic driving device is different from the actual train position information. Test whether the automatic driving algorithm still meets the safety requirements in the error state.

[0187] Punctuality test of the automatic driving algorithm: select a certain line through the train operation monitoring device, simulate the actual station stop, pass phase, and the train operation module simulates the actual train traction system and air brake system to respond to the driving instructions of the automatic driving device. Run from the starting station to the terminal station, and test whether the running time of the whole line and the running time between stations meet the punctuality requirements.

[0188] Testing of energy efficiency of autonomous driving algorithms: Refer to the above method to compare the energy consumption of manual driving and autonomous driving, and test whether the autonomous driving algorithm meets the energy-saving requirements. This will not be repeated here.

[0189] In the several embodiments provided in the embodiments of the present invention, it should be understood that the disclosed apparatus and method can also be implemented in other ways. The apparatus and method embodiments described above are merely illustrative.

[0190] It should be noted that, in this article, the terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. The terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a..." does not exclude the presence of other identical elements in the process, method, article or device including the element.

[0191] Although the embodiments disclosed in the present invention are as above, the above contents are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.

Claims

1. A simulation test system for an automatic train driving device, characterized in that: The automatic driving device runs an automatic driving algorithm, which is used to provide a planned operation curve ahead in the automatic driving state, send train operation status information according to the signal light state of the line ahead, the ATP protection curve and the train operation parameters, control the train operation simulation device to simulate the actual operation of the train, and send an abnormal signal when the automatic driving is abnormal; The simulation test system comprises: a train operation monitoring device, a train operation simulation device, a driver control console device and a display device; The train operation monitoring device is used to provide the automatic driving device and the display device with the line information ahead and the signal light status and ATP protection curve of the line ahead; The train operation simulation device is used to build a train operation simulation model and simulate the actual operation of the train, obtain train operation parameters and send them to the driver console device and the display device; The driver console device is used to provide the driver key signal status, the main circuit breaker opening and closing status, the air brake system status and the traction / brake handle status, receive and send the operation status information to the train operation simulation device, and send the train operation parameters to the automatic driving device; The display device is used to display the automatic driving state or the manual driving state, and to generate a driver takeover prompt according to an abnormal signal when the automatic driving is abnormal.

2. The simulation test system for the automatic train driving device according to claim 1, characterized in that: The display device is also used to send a signal to the automatic driving device to enter or exit the automatic driving, so that the automatic driving device enters or exits the automatic driving state; the automatic driving device is also used to send a signal to the driver console device to enter or exit the automatic driving.

3. The simulation test system for the automatic train driving device according to claim 1, characterized in that: The train running status information includes the level, train running condition and / or train management target pressure reduction; The train operation parameters include at least one of the actual traction force / electric braking force, the maximum traction force / electric braking force that can be exerted, the current air brake system status, the train pipe pressure, the actual position of the train, the actual running speed of the train and the actual running acceleration of the train.

4. The simulation test system for the automatic train driving device according to claim 3, characterized in that: The train operation simulation device is also used to send the actual position of the train and the actual running speed of the train to the train operation monitoring device, so that the train operation monitoring device obtains the forward line information based on the actual position of the train and the actual running speed of the train.

5. The simulation test system for the automatic train driving device according to claim 1, characterized in that: The driver control console device is also used to send the train start signal and the train operation parameters to the automatic driving device.

6. The simulation test system for the automatic train driving device according to claim 1, characterized in that: The train operation simulation model includes at least one of the following models: Locomotive traction / electric brake simulation model, wheel-rail relationship model, anti-spin function model, sand spreading simulation model, air brake simulation function model, resistance model, phase separation model, train kinematics model, train position error simulation model, train speed error simulation model, simulation data storage and display model.

7. The simulation test system for the automatic train driving device according to claim 6, characterized in that: The locomotive traction / electric braking simulation model is used to calculate the actual traction torque / electric braking torque generated by the motor under the applied traction torque or electric braking torque; The wheel-rail relationship model is used to build a train wheel-rail relationship model and to obtain the actual traction force / electric braking force exerted by the train according to the actual traction torque / electric braking torque generated by the motor; The anti-idling function model is used to reduce the traction force / braking force to transfer the adhesion working point to the adhesion stable zone when the preset adhesion control algorithm of the locomotive detects the occurrence of idling or sliding by using the speed difference; The sand spreading simulation model is used to simulate the change of the adhesion characteristics of the train when the train receives the sand spreading signal; The air brake simulation function model is used to simulate the mechanical braking force generated by the friction between the brake shoe and the wheel set tread or brake disc; The resistance model is used to simulate the train running resistance, and the train running resistance includes basic resistance and additional resistance. The basic resistance includes resistance caused by mechanical friction or air friction, and the additional resistance includes additional resistance generated when the train passes through a specific line, and the additional resistance includes additional resistance on slopes, additional resistance on curves, and additional resistance in tunnels. The phase separation model is used to provide a phase separation area warning signal before the train passes through the phase separation; The train kinematics model is used to determine the unit resultant force on the train with the train running direction as the positive direction of the force analysis, and determine the motion state of the train based on the resultant force; The train position error simulation model is used to simulate the cumulative error caused by wheel diameter error and the random error caused by line infrastructure; The train speed error simulation model is used to simulate the speed error generated by the speed sensor using a random function; The simulation data storage and display model is used to store and display at least one of the following information: the actual running speed of the train, the applied traction torque or electric braking torque, the actual traction force / electric braking force exerted by the train, the train running energy consumption, the train running conditions, the unit force on the train, the air brake decompression, the total mileage of the train at the end of the simulation, the total running time and the total running energy consumption.

8. A simulation test method for an automatic train driving device, characterized in that: Based on the simulation test system of any one of claims 1 to 7, the simulation test method comprises: Setting a train operation route by means of the train operation monitoring device; Sending a train start signal to the automatic driving device through the driver console device, switching the train operation mode to the automatic driving mode, simulating the process of the train running from the starting station to the terminal station; In the process of simulating the train running from the starting station to the terminal station: The train operation monitoring device provides the line information ahead and the signal light status ahead and the ATP protection curve provided according to the signal light status; The automatic driving device sends train operation status information according to the signal light status of the front line, the ATP protection curve and the train operation parameters, and controls the train operation simulation device to simulate the actual operation of the train; The train operation simulation device obtains train operation parameters during the actual operation of the simulated train and sends them to the driver console device and the display device; The driver console device receives the operation status information from the automatic driving device and sends it to the train operation simulation device, and sends the train operation parameters to the automatic driving device; The automatic driving device sends an abnormal signal when the automatic driving is abnormal, and the display device generates a driver takeover prompt based on the abnormal signal.

9. The simulation test method of the automatic train driving device according to claim 8, characterized in that: The train operation simulation device provides actual traction torque / electric braking torque simulation in the process of simulating the actual operation of the train, obtains the actual traction force / electric braking force of the train according to the train wheel-rail relationship model, unloads the traction force / electric braking force when the train is idling, increases the train adhesion coefficient to the adhesion coefficient in a dry state when a sand-spreading signal is received, calculates the mechanical braking force of the train according to the state of the traction / brake handle, calculates the train operation resistance in real time according to the actual running speed of the train and the line information ahead, provides a phase separation area warning signal to the automatic driving device before the train passes the phase separation, and the train is in a power-off state when the train runs in the phase separation area. The actual running speed of the train and the actual acceleration of the train are calculated according to the unit resultant force obtained from the train force analysis.

10. The simulation test method of the automatic train driving device according to claim 8, characterized in that: Used to perform at least one of safety testing, punctuality testing and energy-saving testing of autonomous driving algorithms.

Citation Information

Patent Citations

  • Model development and simulation test system and method for rail transit automatic pilot system

    CN101916311A

  • Train automatic driving control method and system

    CN111284529A

  • Testing method and device for locomotive intelligent driving software

    CN113742196A

  • Train automatic driving system testing device and method

    CN114253246A

  • Automatic driving test method and device, computer equipment and storage medium

    CN114371015A

Cited By

  • Freight train automatic driving simulation device and method

    CN121348796A