Digital twin system for unmanned system
By monitoring data in real time in unmanned systems and combining it with machine learning algorithms to build an adaptive predictive maintenance module, the problem of accuracy and reliability of fault prediction in unmanned system maintenance is solved, and the effect of reducing downtime and maintenance costs is achieved.
Patent Information
- Application Number
- CN202410887897.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing unmanned system maintenance methods are difficult to detect potential faults in time, causing the system to operate in a high-risk state, and a single prediction model is difficult to adapt to complex structures and changing environments, affecting the accuracy and reliability of fault prediction.
Develop a digital twin system for unmanned systems, monitor operating data in real time through the data acquisition and preprocessing module, build an adaptive predictive maintenance module based on historical data and machine learning algorithms, adjust the prediction model in real time, automatically plan maintenance plans, and reduce downtime, improving system availability and operational efficiency.
It achieves the accuracy and reliability of real-time monitoring of unmanned system health status and fault prediction, reduces downtime and maintenance costs, and improves system availability and operating efficiency.
Smart Images

Figure CN118734704A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of unmanned systems, and in particular to a digital twin system for unmanned systems. Background Art
[0002] With the rapid development of science and technology, unmanned systems have been widely used in many fields such as military, civilian and scientific research. The autonomy and intelligence levels of unmanned systems have been continuously improved, which has significantly improved their operating efficiency and task execution capabilities, greatly promoting technological progress and industrial upgrading in related fields. However, the complexity of unmanned systems and the uncertainty of the operating environment make their maintenance and management face huge challenges.
[0003] Traditional unmanned system maintenance methods rely on regular inspections and post-maintenance, which have many shortcomings. First, regular inspections cannot detect potential faults in a timely manner, causing the system to operate in a high-risk state. Second, post-maintenance often requires shutdown for repair, resulting in long downtime and production losses. Finally, traditional methods are difficult to adapt to the increasingly complex structure and changing operating environment of unmanned systems. In recent years, with the rise of digital twin technology, its application in the field of unmanned system maintenance has gradually received attention. However, the existing predictive maintenance methods for unmanned systems based on digital twins still have some problems. First, due to the complexity of unmanned systems and the diversity of operating environments, a single prediction model is often difficult to adapt to fault prediction needs in various situations. Second, as the operating time of the unmanned system increases, the system status and environmental conditions will change, and the accuracy and reliability of the prediction model will also be affected.
[0004] In response to the above problems, it is necessary to develop a digital twin system for unmanned systems based on adaptive predictive maintenance. By real-time monitoring of the health status of the unmanned system, combining historical data and machine learning algorithms, the prediction model can be adaptively adjusted to improve the accuracy and reliability of fault prediction. Therefore, it is of great significance to develop a digital twin system for unmanned systems based on adaptive predictive maintenance. Summary of the invention
[0005] The purpose of the present invention is to make up for the shortcomings of the existing technology and provide a digital twin system for unmanned systems, which can monitor the health status of the unmanned system in real time, combine historical data and machine learning algorithms, adaptively adjust the prediction model, and improve the accuracy and reliability of fault prediction. At the same time, the system can also automatically plan maintenance plans based on the prediction results, effectively reducing the downtime of the unmanned system and improving the system's availability and operating efficiency.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a digital twin system for unmanned systems, the system comprising the following components:
[0007] Data collection and preprocessing module: responsible for real-time collection of unmanned system operation data, including sensor data and log information, and data cleaning, integration and standardization;
[0008] Digital twin model building module: Based on the physical structure and functional characteristics of the unmanned system, a digital twin model is built to simulate the operation process of the unmanned system in real time and output status information corresponding to the actual system;
[0009] Adaptive predictive maintenance module: Combines historical data and machine learning algorithms to build a fault prediction model, monitor the health status of unmanned systems in real time, and predict the probability and time of potential faults. At the same time, the system can adaptively adjust the parameters and structure of the prediction model according to changes in real-time data to improve the accuracy of the prediction;
[0010] Maintenance plan planning module: For predicted potential failures, the system can automatically plan the corresponding maintenance plan according to the type and severity of the failure. The plan includes maintenance time, maintenance content, and required resource information, and can be displayed to the user through a visual interface. The user can adjust and optimize the maintenance plan according to the actual situation;
[0011] Real-time feedback and optimization module: collects data and information during the maintenance process in real time, and optimizes and improves the prediction model through comparison and analysis with the digital twin model. At the same time, the maintenance results and feedback information are recorded in the database to provide a reference for subsequent fault prediction and maintenance.
[0012] Furthermore, the data acquisition and preprocessing module collects the operating status data and environmental data of the unmanned system in real time through various sensors and monitoring equipment deployed on the unmanned system, cleans the collected raw data, removes noise, outliers and missing values, ensures the accuracy and completeness of the data, integrates and standardizes the data to form a unified data format and storage method, facilitates subsequent data analysis and processing, and supports the subsequent digital twin model construction and fault prediction.
[0013] Furthermore, the digital twin model construction module designs the digital twin model architecture according to the physical structure and functional characteristics of the unmanned system, determines the key components, operating parameters and interaction relationships of the unmanned system that the model needs to simulate, and uses three-dimensional modeling software and simulation software tools to build a digital twin model of the unmanned system to ensure that the model can accurately reflect the physical characteristics and operating laws of the unmanned system. By comparing and verifying with the actual operating data of the unmanned system, the accuracy and reliability of the digital twin model are ensured, and the model is adjusted and optimized according to the verification results.
[0014] Furthermore, the adaptive predictive maintenance module integrates historical data and real-time data, constructs a data set for fault prediction, preprocesses and extracts features of the data to support machine learning algorithm training, selects a machine learning algorithm, uses historical data for model training, continuously adjusts the parameters and structure of the model, optimizes the model's predictive performance, uses the trained predictive model to monitor the health status of the unmanned system in real time, predicts the probability and time of potential faults based on changes in real-time data, and adaptively adjusts the parameters and structure of the predictive model based on feedback and prediction results from real-time data.
[0015] Furthermore, the adaptive predictive maintenance module uses a neural network algorithm for feature extraction. The neural network calculates the output of the hidden layer through a forward propagation algorithm. The calculation formula is: h=f(W1x+b1), where the weight matrix is W1, the bias vector is b1, the input vector is x, and f is the activation function. The forward propagation process includes multiplying the input of the input layer by the weight matrix of the hidden layer and adding the bias vector, and obtaining the output of the hidden layer through the activation function. The calculation formula is: y=g(W2h+b2), where the weight matrix is W2, the bias vector is b2, and g is the activation function of the output layer, thereby realizing the feature extraction of the health status of the unmanned system.
[0016] Furthermore, the adaptive predictive maintenance module uses mean square error as an evaluation index of the performance of the prediction model, and its algorithm formula is: Among them, MSE represents mean square error, n represents the number of samples, and y i represents the actual observed value of the i-th sample, represents the predicted value of the i-th sample. The accuracy of the prediction model is evaluated by calculating the mean square error between the predicted value and the actual value, and the parameters and structure of the prediction model are adaptively adjusted based on the mean square error to improve the accuracy of the prediction.
[0017] Furthermore, the maintenance plan planning module evaluates the severity and impact scope of potential faults based on the output of the prediction model, determines the fault types and priorities that require maintenance measures, formulates corresponding maintenance plans based on the fault assessment results, determines the maintenance time, maintenance content and detailed information of required resources, and displays the maintenance plan to the user through a visual interface. The user can adjust and optimize the maintenance plan according to actual conditions.
[0018] Furthermore, the real-time feedback and optimization module collects data and information in real time during the maintenance process, monitors the maintenance progress and effects, ensures that the maintenance process proceeds as planned, and handles abnormal situations in a timely manner. The data and information during the maintenance process are fed back to the digital twin model, and the maintenance effect is evaluated and potential problems are discovered by comparing and analyzing the actual data and model data. Based on the feedback data and information, the digital twin model and prediction model are optimized and improved.
[0019] Furthermore, the real-time feedback and optimization module uses the L2 regularization loss function to optimize and improve the digital twin model and the prediction model, and its algorithm formula is: where h w (x i ) is the model prediction value, y i is the true value, m is the number of samples, n is the number of features, W j is the weight of the Jth feature, λ is the regularization parameter, and the weight w and the bias term b are adjusted to minimize the loss function J(w,b), while using the L2 regularization term Limit the size of weights to prevent model overfitting, and through iterative optimization, achieve accurate prediction and timely maintenance of potential failures of unmanned systems.
[0020] Furthermore, the system also includes a user interaction interface for displaying the real-time operating status of the unmanned system, potential fault prediction results and maintenance suggestions. At the same time, the user can input instructions through the interface to remotely control the unmanned system or adjust the maintenance plan.
[0021] Compared with the existing technology, the digital twin system for unmanned systems has the following beneficial effects:
[0022] 1. The present invention integrates historical data and real-time data through an adaptive predictive maintenance module, combines machine learning algorithms, monitors the health status of unmanned systems in real time, and accurately predicts the probability and time of potential failures, so that the prediction model can automatically adjust model parameters and structure according to changes in real-time data, thereby continuously optimizing prediction performance, improving the accuracy and real-time nature of fault prediction, and reducing downtime and maintenance costs caused by failures.
[0023] 2. The present invention automatically plans corresponding maintenance plans according to the prediction results through an adaptive predictive maintenance module, determines the fault type and priority for which maintenance measures need to be taken by evaluating the severity and impact scope of potential faults, and formulates a detailed maintenance plan based on this, including maintenance time, maintenance content, and required resources, and displays it to the user through a visual interface. The user can adjust and optimize the maintenance plan according to actual conditions, reduce manual intervention, improve maintenance efficiency, and reduce maintenance costs, while ensuring that the unmanned system can operate continuously and stably.
[0024] Other advantages, objectives and features of the present invention will be set forth in part in the following description and, in part, will be apparent to those skilled in the art based on an examination of the following or may be taught from the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0026] Figure 1 This is a process operation diagram of a digital twin system for unmanned systems.
[0027] Figure 2 The figure is a flow chart of a digital twin system for unmanned systems. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Example 1
[0030] This embodiment describes in detail a specific application of a digital twin system for unmanned systems in the field of intelligent agricultural drones.
[0031] The data acquisition and preprocessing module is deployed on the drone. Through various sensors carried on the drone, including temperature sensors, humidity sensors, and GPS locators, farmland environmental data and drone flight status data are collected in real time. The collected raw data is cleaned, integrated, and standardized to form a unified data format and stored in the database to provide data support for subsequent digital twin model construction and fault prediction.
[0032] The digital twin model construction module uses 3D modeling software and simulation software to build a digital twin model of the smart agricultural UAV based on the physical structure and functional characteristics of the UAV. The model can accurately simulate the UAV's flight process, operation results and changes in the farmland environment. By comparing and verifying with the actual UAV operation data, the accuracy and reliability of the digital twin model can be ensured.
[0033] The adaptive predictive maintenance module integrates historical data and real-time data, uses neural network algorithms for feature extraction, and builds a model for fault prediction. The calculation formula is: h = f (W1x + b1), where the weight matrix is W1, the bias vector is b1, the input vector is x, and f is the activation function. The forward propagation process includes multiplying the input of the input layer by the weight matrix of the hidden layer and adding the bias vector, and obtaining the output of the hidden layer through the activation function. The calculation formula is: y = g (W2h + b2), where the weight matrix is W2, the bias vector is b2, and g is the activation function of the output layer. By real-time monitoring of the health status of the drone, the probability and time of potential faults are predicted. When a potential fault is predicted, the system can adaptively adjust the parameters and structure of the prediction model to improve the accuracy of the prediction. In addition, the module also has the ability of self-learning and optimization, and can continuously optimize the prediction model according to real-time data feedback to improve prediction accuracy and reliability.
[0034] The maintenance plan planning module evaluates the severity and scope of potential failures based on the output of the prediction model, and automatically plans the corresponding maintenance plan. The maintenance plan includes detailed information on maintenance time, maintenance content, and required resources, and is displayed to the user through a visual interface. Users can adjust and optimize the maintenance plan based on actual conditions to ensure that the drone can perform farmland operations in the best condition.
[0035] During the maintenance process, the real-time feedback and optimization module collects data and information in real time. By comparing and analyzing the digital twin model, the prediction model is further optimized and improved using the L2 regularization loss function. The algorithm formula is: where h w (x i ) is the model prediction value, y i is the true value, m is the number of samples, n is the number of features, W j is the weight of the Jth feature, λ is the regularization parameter, and the weight w and the bias term b are adjusted to minimize the loss function J(w,b). At the same time, the maintenance results and feedback information are recorded in the database to provide a reference for subsequent fault prediction and maintenance.
[0036] To sum up, this embodiment details the specific application of a digital twin system for unmanned systems in the field of intelligent agricultural drones, which realizes comprehensive monitoring and predictive maintenance of the drone operation process, which can not only improve the safety and efficiency of drone operations, but also reduce maintenance costs, and provide strong support for the development and application of intelligent agricultural drones.
[0037] Example 2
[0038] This embodiment details the specific application of a digital twin system for unmanned systems in the field of unmanned warehouses.
[0039] In an unmanned warehouse, the data collection and preprocessing module collects inventory data, environmental data, and equipment operation data in real time through various sensors and monitoring equipment deployed in the warehouse. The collected raw data is cleaned to remove noise, outliers, and missing values to ensure the accuracy and completeness of the data. Subsequently, the data is integrated and standardized to form a unified data format and storage method to provide support for subsequent data analysis and processing. The system monitors the inventory status in real time. When the inventory level is lower than the preset threshold, it automatically issues an early warning and notifies the warehouse manager to replenish the stock in time to ensure that the warehouse inventory level always remains within a reasonable range.
[0040] The digital twin model construction module constructs a corresponding digital twin model based on the layout of the unmanned warehouse, the characteristics of cargo circulation and the characteristics of equipment. The model can simulate the warehousing, storage and outbound process of goods in real time, and compare and verify with actual data to ensure the accuracy and reliability of the model. Through the digital twin model, the system can realize comprehensive monitoring and prediction of the warehouse operation process and provide decision support for warehouse management.
[0041] The adaptive predictive maintenance module integrates historical data and real-time data to construct a data set for predicting warehouse equipment failures. It trains the prediction model through machine learning algorithms, monitors the operating status of the equipment in real time, and predicts the probability and time of potential failures. Based on the prediction results, the system can plan maintenance plans in advance to reduce the impact of equipment failures on warehouse operations. In the prediction process, the module uses a neural network algorithm for feature extraction. The calculation formula is: h = f (W1x + b1), where the weight matrix is W1, the bias vector is b1, the input vector is x, and f is the activation function. The forward propagation process includes multiplying the input of the input layer by the weight matrix of the hidden layer and adding the bias vector, and obtaining the output of the hidden layer through the activation function. The calculation formula is: y = g (W2h + b2), where the weight matrix is W2, the bias vector is b2, and g is the activation function of the output layer. The mean square error (MSE) is used as the evaluation index of the prediction model performance. The algorithm formula is: Among them, MSE represents mean square error, n represents the number of samples, and y i represents the actual observed value of the i-th sample, Represents the predicted value of the i-th sample. The system can adaptively adjust the parameters and structure of the prediction model according to the changes in real-time data to improve the accuracy of the prediction.
[0042] Based on the output of the prediction model, the maintenance plan planning module evaluates the severity and scope of potential faults, determines the fault types and priorities that require maintenance measures, and then formulates a corresponding maintenance plan, including detailed information on maintenance time, maintenance content, and required resources, and displays it to the user through a visual interface. The user can adjust and optimize the maintenance plan based on actual conditions.
[0043] During the maintenance process, the real-time feedback and optimization module collects data and information in real time, and further optimizes and improves the prediction model through comparison and analysis with the digital twin model. At the same time, the maintenance results and feedback information are recorded in the database to provide a reference for subsequent fault prediction and maintenance.
[0044] At the same time, the system displays the real-time status, inventory information, and equipment operation status data of the warehouse through a visual interface. Users can view the operation of the warehouse in real time through the interface and make adjustments and optimizations as needed. At the same time, the system also supports remote monitoring and remote control functions, allowing users to manage the warehouse anytime and anywhere.
[0045] To summarize, this embodiment realizes real-time inventory monitoring, intelligent cargo flow management and predictive equipment maintenance of unmanned warehouses through a digital twin system for unmanned systems. The system provides a comprehensive, efficient and intelligent solution for the management of unmanned warehouses through data collection, model building, predictive analysis and planning steps.
[0046] Example 3
[0047] The steps of the system based on Example 1 and Example 2 are as follows:
[0048] (1) System initialization and setup: Install and start the system, complete the necessary hardware and software configuration, set up and build the corresponding digital twin model in the digital twin model construction module according to the physical structure and functional characteristics of the unmanned system, set the parameters of the data acquisition and preprocessing module, and ensure that the system can correctly collect and preprocess the operating data of the unmanned system;
[0049] (2) Data collection and preprocessing: The data collection and preprocessing module starts to collect the operating data of the unmanned system in real time, including sensor data and log information, and cleans, integrates and standardizes the collected raw data to ensure the accuracy and consistency of the data;
[0050] (3) Digital twin model operation: The digital twin model construction module simulates the operation process of the unmanned system in real time based on the processed data, and the system outputs status information corresponding to the actual system for subsequent analysis and prediction;
[0051] (4) Adaptive predictive maintenance: The adaptive predictive maintenance module combines historical data and machine learning algorithms to build a fault prediction model, monitor the health status of the unmanned system in real time, and use the prediction model to predict the probability and time of potential faults. According to the changes in real-time data, the parameters and structure of the prediction model are adaptively adjusted to improve the accuracy of the prediction;
[0052] (5) Maintenance plan planning: When a potential failure is predicted, the maintenance plan planning module automatically plans the corresponding maintenance plan. The maintenance plan includes maintenance time, maintenance content, and required resource information, and is displayed to the user through a visual interface. The user can adjust and optimize the maintenance plan according to the actual situation.
[0053] (6) Execute maintenance plan: Users perform maintenance work according to the maintenance plan to ensure the normal operation of the unmanned system. During the maintenance process, the system collects maintenance data and information in real time for subsequent analysis and optimization;
[0054] (7) Real-time feedback and optimization: The real-time feedback and optimization module collects data and information during the maintenance process, compares and analyzes them with the digital twin model, and further optimizes and improves the prediction model based on the comparison results to improve the prediction accuracy and maintenance efficiency of the system. The maintenance results and feedback information are recorded in the database to provide a reference for subsequent fault prediction and maintenance.
[0055] (8) System monitoring and continuous operation: The system runs continuously, monitors the health status of the unmanned system in real time, and performs fault prediction and maintenance plan planning. Users can view the system's operating status, fault prediction results, and maintenance plan information through a visual interface. As needed, users can set system parameters and adjust configurations to meet the needs of different unmanned systems.
[0056] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A digital twin system for unmanned systems, characterized in that: The system consists of the following components: Data collection and preprocessing module: responsible for real-time collection of unmanned system operation data, including sensor data and log information, and data cleaning, integration and standardization; Digital twin model building module: Based on the physical structure and functional characteristics of the unmanned system, a digital twin model is built to simulate the operation process of the unmanned system in real time and output status information corresponding to the actual system; Adaptive predictive maintenance module: Combines historical data and machine learning algorithms to build a fault prediction model, monitor the health status of unmanned systems in real time, and predict the probability and time of potential faults. At the same time, the system can adaptively adjust the parameters and structure of the prediction model according to changes in real-time data to improve the accuracy of the prediction; Maintenance plan planning module: For predicted potential failures, the system can automatically plan the corresponding maintenance plan according to the type and severity of the failure. The plan includes maintenance time, maintenance content, and required resource information, and can be displayed to the user through a visual interface. The user can adjust and optimize the maintenance plan according to the actual situation; Real-time feedback and optimization module: collects data and information during the maintenance process in real time, and optimizes and improves the prediction model through comparison and analysis with the digital twin model. At the same time, the maintenance results and feedback information are recorded in the database to provide a reference for subsequent fault prediction and maintenance.
2. The digital twin system for unmanned systems according to claim 1, characterized in that: The data acquisition and preprocessing module collects the operating status data and environmental data of the unmanned system in real time through various sensors and monitoring equipment deployed on the unmanned system, cleans the collected raw data, removes noise, outliers and missing values, ensures the accuracy and completeness of the data, integrates and standardizes the data, and forms a unified data format and storage method to facilitate subsequent data analysis and processing, so as to support the subsequent digital twin model construction and fault prediction.
3. The digital twin system for unmanned systems according to claim 1, characterized in that: The digital twin model construction module designs the digital twin model architecture according to the physical structure and functional characteristics of the unmanned system, determines the key components, operating parameters and interaction relationships of the unmanned system that the model needs to simulate, and uses three-dimensional modeling software and simulation software tools to build a digital twin model of the unmanned system to ensure that the model can accurately reflect the physical characteristics and operating laws of the unmanned system. By comparing and verifying with the actual operating data of the unmanned system, the accuracy and reliability of the digital twin model are ensured, and the model is adjusted and optimized according to the verification results.
4. The digital twin system for unmanned systems according to claim 1, characterized in that: The adaptive predictive maintenance module integrates historical data and real-time data, constructs a data set for fault prediction, preprocesses and extracts features of the data to support machine learning algorithm training, selects a machine learning algorithm, uses historical data for model training, continuously adjusts the parameters and structure of the model, optimizes the model's predictive performance, uses the trained predictive model to monitor the health status of the unmanned system in real time, predicts the probability and time of potential faults based on changes in real-time data, and adaptively adjusts the parameters and structure of the predictive model based on feedback from real-time data and prediction results.
5. The digital twin system for unmanned systems according to claim 4, characterized in that: The adaptive predictive maintenance module uses a neural network algorithm for feature extraction. The neural network calculates the output of the hidden layer through a forward propagation algorithm. The calculation formula is: h=f(W1x+b1), where the weight matrix is W1, the bias vector is b1, the input vector is x, and f is the activation function. The forward propagation process includes multiplying the input of the input layer by the weight matrix of the hidden layer and adding the bias vector, and obtaining the output of the hidden layer through the activation function. The calculation formula is: y=g(W2h+b2), where the weight matrix is W2, the bias vector is b2, and g is the activation function of the output layer, thereby realizing the feature extraction of the health status of the unmanned system.
6. The digital twin system for unmanned systems according to claim 4, characterized in that: The adaptive predictive maintenance module uses mean square error as the evaluation index of the prediction model performance, and its algorithm formula is: Among them, MSE represents mean square error, n represents the number of samples, and y i represents the actual observed value of the i-th sample, represents the predicted value of the i-th sample. The accuracy of the prediction model is evaluated by calculating the mean square error between the predicted value and the actual value, and the parameters and structure of the prediction model are adaptively adjusted based on the mean square error to improve the accuracy of the prediction.
7. The digital twin system for unmanned systems according to claim 1, characterized in that: The maintenance plan planning module evaluates the severity and impact scope of potential faults based on the output of the prediction model, determines the fault types and priorities that require maintenance measures, formulates corresponding maintenance plans based on the fault assessment results, determines the maintenance time, maintenance content and detailed information of required resources, and displays the maintenance plan to the user through a visual interface. The user can adjust and optimize the maintenance plan according to actual conditions.
8. The digital twin system for unmanned systems according to claim 1, characterized in that: The real-time feedback and optimization module collects data and information in real time during the maintenance process, monitors the maintenance progress and effect, ensures that the maintenance process proceeds as planned, and handles abnormal situations in a timely manner. It feeds back the data and information of the maintenance process to the digital twin model, evaluates the maintenance effect and discovers potential problems by comparing and analyzing the actual data and model data, and optimizes and improves the digital twin model and prediction model based on the feedback data and information.
9. The digital twin system for unmanned systems according to claim 8, characterized in that: The real-time feedback and optimization module uses the L2 regularization loss function to optimize and improve the digital twin model and prediction model. The algorithm formula is: where h w (x i ) is the model prediction value, y i is the true value, m is the number of samples, n is the number of features, W j is the weight of the Jth feature, λ is the regularization parameter, and the weight w and the bias term b are adjusted to minimize the loss function J(w,b), while using the L2 regularization term Limit the size of weights to prevent model overfitting, and through iterative optimization, achieve accurate prediction and timely maintenance of potential failures of unmanned systems.
10. The digital twin system for unmanned systems according to claim 1, characterized in that: The system also includes a user interaction interface for displaying the real-time operating status of the unmanned system, potential fault prediction results and maintenance suggestions. At the same time, the user can input instructions through the interface to remotely control the unmanned system or adjust the maintenance plan.
Citation Information
Cited By
Intelligent data acquisition system of special pump
CN119247861A
Network security digital substitute protection method and system
CN119299242A
Multi-sensor integrated system for remote monitoring of industrial equipment
CN119511910A
Fault prediction method, device and equipment for turbo molecular pump and medium
CN119692549A
Fault detection and root cause analysis system for multi-source energy system
CN119760607A
