Business expansion field investigation order dispatching method

Through the combination of dynamic priority scheduling algorithm and skill matching, the problem of mismatch between skills and business and unreasonable task distribution in the field expansion of on-site survey dispatching is solved, achieving the dual guarantee of survey personnel's work efficiency and fairness, ensuring Reasonable distribution of tasks and balanced workload.

CN118735150AInactive Publication Date: 2024-10-01WEIHAI POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER COMPANY

Patent Information

Application Number
CN202410600942.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology has problems such as mismatch between staff skills and business requirements, unreasonable order of task processing, and unreasonable distribution of task volume in industry expansion on-site survey dispatch, resulting in inconvenient unified management and lack of coordination of multiple survey personnel and tasks. planning.

Method used

A dynamic priority scheduling algorithm is used to combine skill matching and load, and a multi-objective optimization method is used to integrate skill matching and load, calculate the work order priority, and assign the work order to the most matching surveyor to ensure the work order dispatching system Ensure the efficiency and fairness of survey personnel while meeting business needs.

Benefits of technology

It achieves the dual guarantee of meeting the business needs of the work order dispatch system and ensuring the work efficiency and fairness of survey personnel, ensuring reasonable distribution of tasks and balanced workload.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to the technical field of reconnaissance order dispatching, in particular to a business expansion site reconnaissance order dispatching method. The invention relates to a business expansion field investigation order dispatching method and system. The method comprises the following steps: step 1, generating an investigation work order; step 2, acquiring unprocessed business expansion application information and real-time working state information of reconnaissance personnel; 3, performing priority calculation on the investigation work orders based on a dynamic priority scheduling algorithm, and sequentially dispatching the orders based on the priorities of the investigation work orders; and 4, selecting the investigation work order with the highest priority in the investigation work orders to be processed, matching the investigation work order with all the investigation personnel in the idle state by integrating the skill matching degree and the load capacity, and distributing the work order to the investigation personnel with the highest order receiving priority P2. According to the method, the working efficiency and fairness of reconnaissance personnel can be ensured while the business requirements are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of survey dispatching, and in particular to a method for dispatching surveys on-site for business expansion. Background Art

[0002] Business expansion application is a common term used by my country's power companies in their business operations. They are mainly responsible for accepting the supply and sales of electricity. The work flow is: first, accept customers' applications for new installations, capacity increases, or changes in electricity use. Secondly, based on the customers' requirements for the scale, nature, and planning of electricity use, and based on the possibility of power supply, determine a feasible power supply plan. Then, carry out the design work and organize the construction of the power supply project, and then inspect and accept the customers' internal electrical engineering. Finally, sign power supply contracts and related agreements with customers, install meters and supply electricity to meet customers' power supply needs.

[0003] On-site survey is an important part of business expansion application. On-site survey means: after receiving the customer's application, we will check the important information such as the customer's load nature, power consumption capacity and category, and preliminarily determine the power supply and metering and billing plan based on the customer's on-site situation, and issue the on-site survey results.

[0004] At present, field surveys are generally assigned tasks manually based on survey experience. This method is traditional and extensive, not convenient for unified management, and lacks overall planning for multiple survey personnel and multiple tasks. For example, the publication number: CN114897279A discloses an intelligent survey dispatching method, which mainly reduces the time and workload of manual dispatching. However, there are still problems in task dispatching, such as mismatch between staff skills and business requirements, unreasonable order of task processing, and unreasonable distribution of work tasks. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a method for dispatching orders for on-site surveys of business expansion.

[0006] The technical solution adopted by the present invention to solve the technical problem is: the method for dispatching orders for on-site survey of business expansion includes the following steps:

[0007] Step 1: Generate a survey work order;

[0008] Step 2: Obtain unprocessed business expansion application information and real-time work status information of surveyors;

[0009] Step 3: Calculate the priority of the survey work orders based on the dynamic priority scheduling algorithm, and dispatch the work orders in order of priority;

[0010] Step 4: Select the survey work order with the highest priority among the pending survey work orders, match it with all idle surveyors by integrating skill matching and load, and assign the work order to the surveyor with the highest order priority P2.

[0011] The step three includes the following sub-steps:

[0012] 3-1: Retrieve detailed description of each work requirement, time of creation of the work requirement, initial priority, and importance information;

[0013] 3-2: Define the following variables:

[0014] Pi: initial priority of service request i;

[0015] Ti: the waiting time of service request i in the queue;

[0016] Ii: the importance of task i;

[0017] 3-3: Define the function f(Pi, Ti, Ii) to calculate the work order priority P1.

[0018] The expression of work order priority P1 in 3-3 is as follows:

[0019] P 1=Pi+α*T^β+γ*Ii

[0020] Among them, α, β, and γ are weight coefficients used to adjust the impact of waiting time and task importance on priority; T^β means that the impact of waiting time is nonlinear, and the longer the waiting time, the greater its impact on priority.

[0021] The skill matching degree collects the skill data of the surveyors and the job requirement data, and then calculates the skill matching degree.

[0022] The skill data and corresponding score ranges of the surveyors are as follows:

[0023] Service skills SF: 0-1 points;

[0024] Professional skills SZ: 0-1 points;

[0025] High-pressure skills SG: 0-1 points;

[0026] Low-pressure skill SD: 0-1 points;

[0027] Among them, the service-oriented skill score SF + professional skill score SZ = 1; the high-pressure skill score SG + low-pressure skill score SD = 1.

[0028] The required data and corresponding score ranges for the work are as follows:

[0029] Service skills requirements SF*: 0-1 points;

[0030] Professional skill requirements SZ*: 0-1 points;

[0031] High-pressure skill requirement SG*: 0-1 points;

[0032] Low-pressure skill requirement SD*: 0-1 points;

[0033] Among them: service-oriented skill score requirement SF* + professional skill score requirement SZ* = 1, high-pressure skill score requirement SG* + low-pressure skill score requirement SD* = 1. This application is mainly based on the above definition based on the detailed description of each job requirement, required skill information and related documents.

[0034] The skill matching degree PPD calculation formula is as follows:

[0035] PPD=1 / (SF*-SF)2+(SZ*-SZ)2+(SG*-SG)2+(SD*-SD)2.

[0036] Based on the historical data of the surveyors completing work within the set time period, the average daily workload is calculated as the load F. This application uses the historical data of the surveyors' work completion for nearly a week to ensure that the workload of all surveyors is balanced and to avoid overloading or idleness of individual employees, and calculates the average daily workload value as the load F.

[0037] Using the multi-objective optimization method to integrate skill matching and load, the calculation formula for the surveyor's order acceptance priority P2 is:

[0038] P2=Q1*PPD+Q2*1 / F;

[0039] Among them, Q1 and Q2 are important coefficients of skill matching and load respectively.

[0040] Based on the above method, the corresponding survey work order is issued to the mobile terminal of the corresponding surveyor. The surveyor checks the work order information through the mobile terminal to conduct the survey, enters the survey results into the mobile terminal, and the mobile terminal uploads the information. After the survey is completed, the skill label and score are refreshed based on the work completion record, work evaluation record and other information.

[0041] Compared with the prior art, the present invention has the following beneficial effects: it combines the dynamic priority scheduling model algorithm, the skill matching algorithm and the load degree, and uses a multi-objective optimization method to integrate the skill matching degree and the load degree, thereby ensuring that the work order dispatching system can meet business needs while also ensuring the work efficiency and fairness of the surveyors. DETAILED DESCRIPTION

[0042] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] The method of dispatching orders for on-site survey of business expansion includes the following steps:

[0044] Step 1: Generate a survey work order; specifically, the customer uploads the business expansion application information to generate a survey work order.

[0045] Step 2: Obtain unprocessed business expansion application information and real-time work status information of surveyors; use the rolling time domain optimization algorithm to divide the time domain into equally spaced hour domains, and use a static optimization algorithm in each hour domain. In this application, all unprocessed business expansion application information and real-time work status information of surveyors are retrieved from the energy Internet marketing service system every 10 seconds.

[0046] Step 3: Calculate the priority of the survey work order based on the dynamic priority scheduling algorithm, and dispatch the work order in order of priority; the work order with the highest priority P1 will be dispatched first.

[0047] The step three includes the following sub-steps:

[0048] 3-1: Dynamic priority scheduling model algorithm, which takes into account the initial priority, waiting time and importance of the business request, and retrieves the detailed description of each work demand, the time when the work demand was generated, the initial priority, importance and other information from the energy Internet marketing service system;

[0049] 3-2: Define the following variables:

[0050] Pi: initial priority of service request i;

[0051] Ti: the waiting time of business request i in the queue (the difference between the current working time and the time when the demand is generated);

[0052] Ii: the importance of task i;

[0053] 3-3: Define the function f(Pi, Ti, Ii) to calculate the work order priority P1.

[0054] 3. A method for dispatching work orders for on-site survey of business expansion according to claim 2, characterized in that the work order priority P1 in 3-3 is expressed as follows:

[0055] P 1=Pi+α*T^β+γ*Ii

[0056] Among them, α, β, and γ are weight coefficients used to adjust the impact of waiting time and task importance on priority; T^β indicates that the impact of waiting time is nonlinear, and the longer the waiting time, the greater its impact on priority. The longer the waiting time, the higher the priority of the task; the greater the importance of the task, the higher its priority. This can prevent some low-priority business requests from being unprocessed for a long time, while also ensuring that important tasks can be processed in a timely manner.

[0057] Step 4: Use the multi-objective optimization method to integrate skill matching and load, select the survey work order with the highest priority among the pending survey work orders, match it with all idle survey personnel, and assign the work order to the survey personnel with the highest order priority P2.

[0058] The skill matching degree collects the skill data of the surveyors and the job requirement data, and then calculates the skill matching degree.

[0059] The skill data and corresponding score ranges of the surveyors are as follows:

[0060] Service skills SF: 0-1 points;

[0061] Professional skills SZ: 0-1 points;

[0062] High-pressure skills SG: 0-1 points;

[0063] Low-pressure skill SD: 0-1 points;

[0064] Among them, the service-oriented skill score SF + professional skill score SZ = 1; the high-pressure skill score SG + low-pressure skill score SD = 1.

[0065] The required data and corresponding score ranges for the work are as follows:

[0066] Service skills requirements SF*: 0-1 points;

[0067] Professional skill requirements SZ*: 0-1 points;

[0068] High-pressure skill requirement SG*: 0-1 points;

[0069] Low-pressure skill requirement SD*: 0-1 points;

[0070] Among them: service-oriented skill score requirement SF* + professional skill score requirement SZ* = 1, high-pressure skill score requirement SG* + low-pressure skill score requirement SD* = 1. This application is mainly based on the above definition based on the detailed description of each job requirement, required skill information and related documents.

[0071] The skill matching degree PPD calculation formula is as follows:

[0072] PPD=1 / (SF*-SF)2+(SZ*-SZ)2+(SG*-SG)2+(SD*-SD)2.

[0073] Based on the historical data of the surveyors completing work within the set time period, the average daily workload is calculated as the load F. This application uses the historical data of the surveyors' work completion for nearly a week to ensure that the workload of all surveyors is balanced and to avoid overloading or idleness of individual employees, and calculates the average daily workload value as the load F.

[0074] Using the multi-objective optimization method to integrate skill matching and load, the calculation formula for the surveyor's order acceptance priority P2 is:

[0075] P2=Q1*PPD+Q2*1 / F;

[0076] Among them, Q1 and Q2 are important coefficients of skill matching and load respectively.

[0077] Based on the above method, the corresponding survey work order is issued to the mobile terminal of the corresponding surveyor. The surveyor checks the work order information through the mobile terminal to conduct the survey, enters the survey results into the mobile terminal, and the mobile terminal uploads the information. After the survey is completed, the skill label and score are refreshed based on the work completion record, work evaluation record and other information.

[0078] The above descriptions are only optional embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention specification under the inventive concept of the present invention, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A method for dispatching orders for on-site survey of business expansion, characterized in that: The following steps are involved: Step 1: Generate a survey work order; Step 2: Obtain unprocessed business expansion application information and real-time work status information of surveyors; Step 3: Calculate the priority of the survey work orders based on the dynamic priority scheduling algorithm, and dispatch the work orders in order of priority; Step 4: Select the survey work order with the highest priority among the pending survey work orders, match it with all idle surveyors by integrating skill matching and load, and assign the work order to the surveyor with the highest order priority P2.

2. A method for dispatching business expansion site surveys according to claim 1, characterized in that: The step three includes the following sub-steps: 3-1: Retrieve detailed description of each work requirement, time of creation of the work requirement, initial priority, and importance information; 3-2: Define the following variables: Pi: initial priority of service request i; Ti: the waiting time of service request i in the queue; Ii: the importance of task i; 3-3: Define the function f(Pi, Ti, Ii) to calculate the work order priority P1.

3. A method for dispatching business expansion site surveys according to claim 2, characterized in that: The expression of the work order priority P1 in 3-3 is as follows: P 1=Pi+α*T^β+γ*Ii Among them, α, β, and γ are weight coefficients used to adjust the impact of waiting time and task importance on priority; T^β means that the impact of waiting time is nonlinear, and the longer the waiting time, the greater its impact on priority.

4. The method for dispatching orders for on-site survey of business expansion according to claim 2, characterized in that: The skill matching degree collects the skill data of the surveyors and the job requirement data, and then calculates the skill matching degree.

5. A method for dispatching business expansion site surveys according to claim 4, characterized in that: The skill data and corresponding score ranges of the surveyors are as follows: Service skills SF: 0-1 points; Professional skills SZ: 0-1 points; High-pressure skills SG: 0-1 points; Low-pressure skill SD: 0-1 points; Among them, service-oriented skill score SF + professional skill score SZ = 1; High-pressure skill score SG + low-pressure skill score SD = 1.

6. A method for dispatching business expansion site surveys according to claim 5, characterized in that: The required data and corresponding score ranges for the work are as follows: Service skills requirements SF*: 0-1 points; Professional skill requirements SZ*: 0-1 points; High-pressure skill requirement SG*: 0-1 points; Low-pressure skill requirement SD*: 0-1 points; Among them: service-oriented skill score requirement SF*+professional skill score requirement SZ*=1, high-pressure skill score requirement SG*+low-pressure skill score requirement SD*=1.

7. The method for dispatching business expansion site surveys according to claim 5, characterized in that: The skill matching degree PPD calculation formula is as follows: PPD=1 / (SF*-SF) 2 +(NW*-NW) 2 +(SG*-SG) 2 +(SD*-SD) 2 。 8. The method for dispatching business expansion site surveys according to claim 5, characterized in that: The daily workload average is calculated as the load F based on the historical data of the surveyors completing work within a set time period.

9. The method for dispatching business expansion site surveys according to claim 4, characterized in that: The calculation formula of the order priority P2 is: P2=Q1*PPD+Q2*1 / F; Among them, Q1 and Q2 are important coefficients of skill matching and load respectively.

Citation Information

Patent Citations

  • Intelligent investigation dispatching method

    CN114897279A

  • Photovoltaic power station mobile operation method based on dynamic adaptive task scheduling strategy

    CN106485417A

  • A scheduling method and device for installation and maintenance work orders

    CN107506880A

  • Worker friend order sending method, system and equipment based on personnel positioning

    CN114511204A

  • Customer service order sending method based on artificial intelligence

    CN117391347A

Cited By

  • Management method of power grid operation maintenance dispatching task

    CN119228086A