Road construction comprehensive monitoring system suitable for highway engineering

Through the road construction comprehensive monitoring system, data on environmental, equipment and material supply factors are collected and analyzed, and mathematical models are used for early warning and adjustment, which solves the problem of factors affecting construction progress in the existing technology and achieves more efficient construction management and early warning effects. .

CN118735167AInactive Publication Date: 2024-10-01SICHUAN MINCHUANG INTELLIGENT INSTALLATION ENG CO LT

Patent Information

Application Number
CN202410726450.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technology fails to effectively integrate and analyze the impact of environmental factors, construction equipment factors and material supply factors on road construction progress, resulting in affected construction progress and difficulty in timely warning and adjustment.

Method used

A comprehensive monitoring system for road construction is designed, including a factor collection module, a classification module, a monitoring module and an operation module. It collects data through the environmental unit, construction equipment unit and material supply unit, classifies and monitors influencing factors in real time, and uses mathematical models for early warning. and reasonable allocation to ensure the stability of construction progress.

Benefits of technology

Through systematic data collection and analysis, the construction plan can be reasonably adjusted, the impact of factors on the construction progress can be reduced, the effect of monitoring and early warning can be improved, and timely warning and remediation can be carried out to ensure the normal progress of the construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735167A_ABST
    Figure CN118735167A_ABST
Patent Text Reader

Abstract

The invention discloses a road construction comprehensive monitoring system suitable for highway engineering, and relates to the technical field of road construction.According to the road construction comprehensive monitoring system, influence factors of the road construction progress are collected through a factor collection module, reasonable adjustment of a road construction scheme is facilitated, and the influence factors comprise environmental factors, construction equipment factors and material supply factors; the environment unit, the construction equipment unit and the material supply unit are adopted to collect factors influencing road construction, analysis is carried out from the perspective of each point, the influence degree of each point on the road construction can be known, management and regulation can be reasonably carried out, the influence on the road construction progress can be reduced, the monitoring and early warning effects of the road construction can be improved, and the construction efficiency can be improved. And the influence factors are integrated and analyzed in an information feedback manner to know the road construction delay risk condition, so that early warning and remedy are performed in time, and a construction scheme is reasonably formulated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of road construction, and in particular to a comprehensive road construction monitoring system suitable for highway engineering. Background Art

[0002] In recent years, with the continuous development of the economy, urbanization has become the inevitable path of development. The continuous advancement of domestic urban road construction and renovation projects has prompted the rapid development of my country's road engineering construction level.

[0003] In the Chinese patent "CN116050624B-A Comprehensive Monitoring Method and System for Highway Construction", the present invention discloses a comprehensive monitoring method and system for highway construction, including: obtaining the current road construction plan, dividing it, and determining the phased construction constraints according to the construction characteristics of each stage of construction; dynamically managing the construction process according to the phased construction constraints of the current construction stage, and obtaining the three-dimensional real-scene model of the engineering structure at the current construction stage; obtaining the road settlement deformation monitoring value according to the three-dimensional real-scene model of the engineering structure and the monitoring data of the monitoring point, building a road settlement prediction model based on deep learning, and predicting and analyzing the road settlement deformation monitoring value; obtaining the predicted value of road settlement deformation to generate early warning information, and adjusting and optimizing the phased construction constraints of the current road construction stage according to the early warning information. The present invention processes the monitoring data in real time, reduces the lag of artificial processing of monitoring data, and is conducive to the timely discovery and early warning of abnormal safety hazards in road construction projects, ensuring construction quality and safety management.

[0004] In the Chinese patent "CN116612390B-CN116612390B", the present invention relates to the field of image analysis technology, and specifically to an information management system for construction engineering, the system includes a memory and a processor, the processor executes a computer program stored in the memory to implement the following steps: determine the static and dynamic areas of each frame image in the aerial video of the construction road, and screen out adjacent frame images in which the number of static feature matching point pairs in all static areas is less than a preset number; determine the degree of movement based on the target area and each dynamic area screened out adjacent frame images; determine the registration score through the degree of movement and the image features of each group of feature matching point pairs, and then determine the optimal feature matching point pair group; determine the construction road splicing image through each optimal registration image determined by the optimal feature matching point pair group; the present invention manages the construction road splicing image, which can effectively improve the management effect of the information management system, and is mainly used in the field of road construction progress monitoring.

[0005] In summary, the application of road construction monitoring system in road construction can improve construction efficiency, ensure project quality, and ensure that the impact of construction process on the environment is minimized. However, in the process of road construction, environmental factors, construction equipment factors and material supply factors have a great impact on the progress of road construction. For example, in the process of road construction, if the illumination, temperature and humidity, air pressure, noise and water consumption in the construction environment are larger than normal data, it will affect the workers or the surrounding environment, and the construction may be stopped, which will affect the progress of construction. Among the construction equipment factors, the number of equipment also affects the progress of construction. There is no integrated analysis of the factors affecting road construction through environmental factors, construction equipment factors and material supply factors, so there are also problems in the reasonable allocation of construction materials. Summary of the invention

[0006] The purpose of the present invention is to provide a comprehensive road construction monitoring system suitable for highway engineering, so as to solve the problem of not conducting an integrated analysis of factors affecting road construction through environmental factors, construction equipment factors and material supply factors.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] A road construction integrated monitoring system suitable for highway engineering includes an integrated monitoring system, which includes a factor collection module, a classification module, a monitoring module and an operation module;

[0009] The factor collection module includes an environment unit, a construction equipment unit and a material supply unit;

[0010] The classification module includes a constant data unit and a real-time data unit;

[0011] The monitoring module includes an analysis unit and an early warning planning unit.

[0012] Preferably, the steps include:

[0013] S1, the factor collection module uses an environment unit, a construction equipment unit and a material supply unit to collect data on factors affecting road construction;

[0014] S2, the collected data is transmitted to the classification module, and the classification module classifies the collected data;

[0015] S3, the monitoring module monitors the changed data in real time to monitor the impact of the changed data on the progress of road construction;

[0016] S4. When the operation module data is not changed, the comprehensive detection system is in operation and the construction progress is not affected.

[0017] Preferably, in step S1, the environmental unit collects road construction environmental data through cameras and sensor equipment, and the collected data includes data on illumination, temperature and humidity, air pressure, noise and water consumption factors at the construction site. The construction equipment unit collects the types, models, quantities and usage time of equipment used in road construction to understand the utilization rate and operating status of the equipment. The material supply unit collects the types, specifications and quantities of materials, the supply cycle of materials, usage, and related material supplier delivery time and transportation methods.

[0018] Preferably, in step S2, the classification module classifies the data into unchanged data and real-time monitored data, and transmits them to the unchanged data unit and the real-time data unit respectively, wherein the real-time monitored data screens the detection objects, and the data with large expected loss value is the key detection data.

[0019] Preferably, in step S2, the loss function of the key influencing factors can be expressed as:

[0020]

[0021] Where, (i = 1, 2, 3 ... k, j = 1, 2, 3 ... m), T (a i , b j ) means in state b j Next, take a i The loss function when monitoring the combination, according to this formula, leads to the expected concept formula:

[0022] In the formula, R(b j |V) is the expected loss value of the factor, when R(b j The data with large |V) values ​​are the key detection data.

[0023] Preferably, in step S3, the monitoring module detects important data. When the data has not changed, the comprehensive detection system is in operation and the construction progress is not affected. When the data has changed, it is transmitted to the analysis unit, and the analysis unit compares and analyzes the changed data. When the data change affects the construction progress, the early warning planning unit issues an early warning and makes reasonable allocation so that the construction can proceed normally.

[0024] Preferably, in step S3, the changed illumination, temperature and humidity, air pressure and noise data of the construction site are compared with the specified values, and an early warning is issued if they exceed the normal values. At the same time, the construction water consumption is calculated and compared with the stored water volume to warn of insufficient stored water that may affect construction.

[0025] Preferably, the calculation formula for construction water consumption in step S3 is:

[0026] In the formula, q is the construction water consumption, K1 is the unforeseen construction water coefficient, Q1 is the annual project volume, N1 is the construction water quota, and K2 is the water imbalance coefficient.

[0027] Preferably, the early warning planning unit establishes a mathematical model for the collected data to calculate the road construction completion time and compares it with the time limited for the road construction.

[0028] Preferably, the early warning planning unit establishes a mathematical model expression as follows:

[0029]

[0030] Where: T is the completion time of road construction, Q i is the influencing factor of the i-th construction, v is the road construction work efficiency, h is the number of construction equipment, k is the number of construction equipment, and m is the total number of road construction equipment.

[0031] Compared with the known public technology, the technical solution provided by the present invention has the following beneficial effects:

[0032] 1. In this application, factors affecting the progress of road construction are collected through the factor collection module, which is helpful to reasonably adjust the road construction plan. The influencing factors include environmental factors, construction equipment factors and material supply factors. Environmental units, construction equipment units and material supply units are used to collect factors affecting road construction. Analysis from the perspective of each point helps to understand the degree of influence of each point on road construction, and then reasonably manage and control to reduce the impact on the progress of road construction, and help improve the monitoring and early warning effect of road construction. The influencing factors are integrated and analyzed through information feedback to understand the risk of road construction delays, and then timely early warning and remedy, reasonably formulate construction plans, compare the data that changes in real time during various constructions with the specified values, and issue early warnings when they exceed normal values. Early warnings are issued through early warning plan units and reasonable allocations are made to ensure normal construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A schematic diagram of a system flow of a comprehensive road construction monitoring system applicable to highway engineering according to the present invention;

[0034] Figure 2 The present invention is a schematic diagram of the steps of a comprehensive road construction monitoring system suitable for highway engineering. DETAILED DESCRIPTION

[0035] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work all belong to the protection scope of the present invention. The experimental methods in the following embodiments, unless otherwise specified, are conventional methods, and the materials, reagents, etc. used in the following embodiments, unless otherwise specified, can all be obtained from commercial channels.

[0036] To achieve the above object, the present invention provides the following technical solutions:

[0037] The present invention provides a road construction integrated monitoring system applicable to highway engineering, including an integrated monitoring system, which includes a factor collection module, a classification module, a monitoring module and an operation module;

[0038] The factor collection module includes an environment unit, a construction equipment unit and a material supply unit;

[0039] The classification module includes a constant data unit and a real-time data unit;

[0040] The monitoring module includes an analysis unit and an early warning planning unit.

[0041] The present invention is further configured to include the following steps:

[0042] S1, the factor collection module uses an environment unit, a construction equipment unit and a material supply unit to collect data on factors affecting road construction;

[0043] S2, the collected data is transmitted to the classification module, and the classification module classifies the collected data;

[0044] S3, the monitoring module monitors the changed data in real time to monitor the impact of the changed data on the progress of road construction;

[0045] S4. When the operation module data is not changed, the comprehensive detection system is in operation and the construction progress is not affected.

[0046] The present invention is further configured as follows: in step S1, the environmental unit collects road construction environmental data through cameras and sensor equipment, and the collected data includes data on illumination, temperature and humidity, air pressure, noise and water consumption factors of the construction site; the construction equipment unit collects the types, models, quantities and usage time of equipment used in road construction to understand the utilization rate and operating status of the equipment; the material supply unit collects the types, specifications and quantities of materials, the supply cycle of materials, the usage amount and the delivery time and transportation methods of related material suppliers.

[0047] The present invention is further configured as follows: in step S2, the classification module classifies the data into unchanged data and real-time monitored data, and transmits them to the unchanged data unit and the real-time data unit respectively, wherein the real-time monitoring data screens the detection objects, and the data with large expected loss values ​​are the key detection data.

[0048] The present invention is further configured as follows: in step S2, the loss function of the key influencing factors can be expressed as:

[0049]

[0050] Where, (i = 1, 2, 3 ... k, j = 1, 2, 3 ... m), T (a i , b j ) means in state b j Next, take a i The loss function when monitoring the combination, according to this formula, leads to the expected concept formula:

[0051] In the formula, R(b j |V) is the expected loss value of the factor, when R(b j The data with large |V) values ​​are the key detection data.

[0052] The present invention is further configured as follows: in step S3, the monitoring module detects important data. When the data has not changed, the comprehensive detection system is in operation and the construction progress is not affected. When the data has changed, it is transmitted to the analysis unit, and the analysis unit compares and analyzes the changed data. When the data change affects the construction progress, the early warning planning unit issues an early warning and makes reasonable allocation so that the construction can proceed normally.

[0053] The present invention is further configured as follows: in step S3, the changed illumination, temperature, humidity, air pressure, and noise data of the construction site are compared with the specified values, and an early warning is issued if the values ​​exceed the normal values. At the same time, the construction water consumption is calculated and compared with the stored water volume to warn of insufficient stored water volume and the impact on construction.

[0054] The present invention is further configured as follows: Step S3, the calculation formula for construction water consumption is:

[0055] In the formula, q is the construction water consumption, K1 is the unforeseen construction water coefficient, Q1 is the annual project volume, N1 is the construction water quota, and K2 is the water imbalance coefficient.

[0056] The present invention is further configured as follows: the early warning planning unit establishes a mathematical model for the collected data to calculate the completion time of the road construction and compares it with the time limited for the road construction.

[0057] The present invention is further configured as follows: the mathematical model expression established by the early warning planning unit is:

[0058]

[0059] Where: T is the completion time of road construction, Q i is the influencing factor of the i-th construction, v is the road construction work efficiency, h is the number of construction equipment, k is the number of construction equipment, and m is the total number of road construction equipment.

[0060] In view of the above, in this application:

[0061] In this application, factors affecting the progress of road construction are collected through a factor collection module, which helps to reasonably adjust the road construction plan. The influencing factors include environmental factors, construction equipment factors and material supply factors. Environmental units, construction equipment units and material supply units are used to collect factors affecting road construction. Analysis from the perspective of each point helps to understand the degree of influence of each point on road construction, and then reasonably manage and control to reduce the impact on the progress of road construction, and help improve the monitoring and early warning effect of road construction. The influencing factors are integrated and analyzed through information feedback to understand the risk of road construction delays, and then timely early warning and remedy, reasonably formulate construction plans, compare the data that changes in real time during various constructions with the specified values, and issue early warnings when they exceed normal values. Early warnings are issued through early warning plan units and reasonable allocations are made to ensure that construction proceeds normally.

[0062] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A road construction comprehensive monitoring system suitable for highway engineering, characterized in that: including a comprehensive monitoring system, which includes a factor collection module, a classification module, a monitoring module and an operation module; The factor collection module includes an environment unit, a construction equipment unit and a material supply unit; The classification module includes a constant data unit and a real-time data unit; The monitoring module includes an analysis unit and an early warning planning unit.

2. A road construction comprehensive monitoring system suitable for highway engineering according to claim 1, characterized in that: The following steps are involved: S1, the factor collection module uses an environment unit, a construction equipment unit and a material supply unit to collect data on factors affecting road construction; S2, the collected data is transmitted to the classification module, and the classification module classifies the collected data; S3, the monitoring module monitors the changed data in real time to monitor the impact of the changed data on the progress of road construction; S4. When the operation module data is not changed, the comprehensive detection system is in operation and the construction progress is not affected.

3. A road construction comprehensive monitoring system suitable for highway engineering according to claim 2, characterized in that: In step S1, the environmental unit collects road construction environmental data through cameras and sensor equipment. The collected data includes data on illumination, temperature and humidity, air pressure, noise and water consumption factors at the construction site. The construction equipment unit collects the types, models, quantities and usage time of equipment used in road construction to understand the utilization rate and operating status of the equipment. The material supply unit collects the types, specifications and quantities of materials, the supply cycle of materials, usage, and the delivery time and transportation methods of related material suppliers.

4. A road construction comprehensive monitoring system suitable for highway engineering according to claim 2, characterized in that: In step S2, the classification module classifies the data into unchanged data and real-time monitored data, and transmits them to the unchanged data unit and the real-time data unit respectively, wherein the real-time monitored data screens the detection objects, and the data with large expected loss value is the key detection data.

5. A road construction comprehensive monitoring system suitable for highway engineering according to claim 4, characterized in that: In step S2, the loss function of the key influencing factors can be expressed as: Where, (i = 1, 2, 3 ... k, j = 1, 2, 3 ... m), T (a i , b j ) means in state b j Next, take a i The loss function when monitoring the combination, according to this formula, leads to the expected concept formula: In the formula, R(b j |V) is the expected loss value of the factor, when R(b j The data with large |V) values ​​are the key detection data.

6. A road construction comprehensive monitoring system suitable for highway engineering according to claim 1, characterized in that: In step S3, the monitoring module detects important data. When the data has not changed, the comprehensive detection system is in operation and the construction progress is not affected. When the data has changed, it is transmitted to the analysis unit, and the analysis unit compares and analyzes the changed data. When the data change affects the construction progress, the early warning planning unit issues an early warning and makes reasonable allocation so that the construction can proceed normally.

7. A road construction comprehensive monitoring system suitable for highway engineering according to claim 6, characterized in that: In step S3, the changed illumination, temperature, humidity, air pressure, and noise data of the construction site are compared with the specified values, and an early warning is issued if they exceed the normal values. At the same time, the construction water consumption is calculated and compared with the stored water volume to warn of insufficient stored water that may affect construction.

8. A road construction comprehensive monitoring system suitable for highway engineering according to claim 7, characterized in that: The calculation formula of construction water consumption in step S3 is: In the formula, q is the construction water consumption, K1 is the unforeseen construction water coefficient, Q1 is the annual project volume, N1 is the construction water quota, and K2 is the water imbalance coefficient.

9. A road construction comprehensive monitoring system suitable for highway engineering according to claim 6, characterized in that: The early warning planning unit establishes a mathematical model for the collected data to calculate the completion time of the road construction and compares it with the time limit for the road construction.

10. A road construction comprehensive monitoring system suitable for highway engineering according to claim 9, characterized in that: The mathematical model expression established by the early warning planning unit is: Where: T is the completion time of road construction, Q i is the influencing factor of the i-th construction, v is the road construction work efficiency, h is the number of construction equipment, k is the number of construction equipment, and m is the total number of road construction equipment.

Citation Information

Patent Citations

  • Road surface monitoring system, and method and device for determining arrangement positions of sensors

    CN113804242A

  • Engineering construction progress monitoring system and method based on Internet of Things

    CN115358726A

  • Comprehensive monitoring method and system for highway road construction

    CN116050624A

  • Information management system for constructional engineering

    CN116612390A

  • Engineering construction progress management system and operation method

    CN117236684A

Cited By

  • A highway construction environment monitoring visual early warning system

    CN120525209B