Building demand response potential evaluation model construction method and device, equipment and medium
By constructing a data set of building demand response cases and generating a machine learning model, the problem of low efficiency and poor universality of building demand response assessment in the existing technology is solved, enabling rapid and accurate assessment of different types of buildings, improving assessment efficiency and Accuracy, with personnel comfort in mind.
Patent Information
- Application Number
- CN202410960423.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing building demand response potential assessment methods are difficult to quickly and accurately assess the demand response potential of different types of buildings, and are weak in universal applicability. They do not fully consider personnel comfort, and the workload of on-site experiments is large, which affects user comfort.
By determining the influencing factors of building energy performance and demand response control effect, a data set of building demand response cases is constructed, and a demand response potential assessment model is generated based on the machine learning model to achieve rapid and accurate assessment of different types of buildings.
It achieves rapid and accurate assessment of the demand response potential of different types of buildings, supports the potential assessment needs of diverse buildings in the power market, improves assessment efficiency and accuracy, and takes into account personnel comfort.
Smart Images

Figure CN118735211A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of smart grid technology, and in particular to a method, device, equipment and medium for constructing a building demand response potential assessment model. Background Art
[0002] It is urgent to build a low-carbon and zero-carbon power system and realize the green transformation of the power system. The penetration rate of renewable energy such as photovoltaic and wind power in the power system continues to increase. Although these renewable energy sources can reduce the carbon emissions of the power system, their uncertainty and inconsistency with the power load increase the instability of the power system. In addition, with the development of electrification of building terminals, urban users have gradually increased their requirements for the balance of supply and demand of the power system. At the same time, the grid capacity design is based on meeting the peak load of electricity throughout the year, but the frequency of extreme conditions is low, and the low load rate of the system under partial load conditions is a waste of power infrastructure. Demand response technology has been proven to effectively promote the consumption of renewable energy, ensure the safe and stable operation of the power grid, and achieve a balance between supply and demand of electricity. At the same time, this technology can reduce the peak load of the power grid, effectively postpone the expansion of the power grid, and avoid waste of resources.
[0003] Buildings are an important link in the energy consumption chain, accounting for about one-third of the world's total energy consumption. Buildings also have a variety of flexible resources, such as HVAC systems, building thermal inertia, active energy storage devices, lighting, etc. Therefore, buildings are a high-quality demand response resource. There are two main ways for buildings to participate in demand response. One is that large users (such as large industrial buildings) directly sign agreements with grid operators or participate in demand response bidding. The second is that small users who do not meet the market access standards (such as residential buildings and small office buildings) enter the market by signing agreements with power aggregators. Regardless of the response mode, users are required to declare to the grid in advance. To this end, users need to understand their own adjustable resources and their variable capacity and time characteristics to obtain maximum benefits. At the same time, power operators also need to grasp the demand response potential of users to support the judgment of user market access. Therefore, quantifying and evaluating the demand response potential of buildings is a prerequisite for realizing smart dispatch and response of power grids.
[0004] There are currently two main types of demand response potential assessment methods, namely field experiments and mechanism simulation methods. For the field experiment method, the outdoor temperature and humidity, indoor heat dissipation, number of indoor air conditioners, air conditioner set temperature and power adjustment before and after the response adjustment means are mainly obtained through actual measurement, and then the air conditioning load adjustable potential assessment model is established based on the above information. With the development of digital simulation technology, the mechanism simulation method is widely used in the assessment of building demand response potential. The mechanism simulation method establishes a mechanism model of the air-conditioned room, and thus obtains the air conditioning load demand response under the benchmark load and different cluster control strategies.
[0005] Obviously, although the field experiment method can obtain the demand response control results of actual buildings, the boundary adjustment and operating conditions of actual buildings have time-varying characteristics, and it is difficult to obtain reliable building baseline load and response load at the same time. In addition, the workload of field experiments is huge, which will affect the comfort of users. Therefore, this method is difficult to implement widely. The mechanism simulation method can strictly ensure that the relevant variables before and after the demand response remain consistent, and quickly obtain reliable building baseline load and response load under different operating conditions. It can solve the problems faced by the field experiment method, so it is currently widely used. However, the existing methods mostly use the start-stop method as the control method of the air-conditioning system, and do not fully consider the comfort of personnel. Therefore, the implementation process is relatively difficult. It is necessary to consider more feasible response control methods based on the comfort of personnel. In addition, the existing methods mostly develop personalized potential assessment models for a specific building type, and the obtained personalized potential assessment results cannot be applied to other types of buildings. The universality of the model is weak. In the actual market environment, there are differences in the building scale, envelope characteristics, internal disturbance level, etc. of potential users. It is necessary to develop a demand response potential assessment method for different types of buildings to achieve a rapid assessment of the demand response potential of users of different types of buildings. Summary of the invention
[0006] The present invention provides a method, device, equipment and medium for constructing a building demand response potential assessment model, which can quickly and accurately assess the demand response potential of different types of buildings.
[0007] According to one aspect of the present invention, a method for constructing a building demand response potential assessment model is provided, comprising:
[0008] Determine the factors affecting building energy performance and building demand response regulation effect, and determine the evaluation indicators of building demand response potential;
[0009] Taking the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and taking the building demand response potential evaluation index as output variables, a building demand response case data set is constructed; wherein the building demand response case data set includes at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables;
[0010] A preset machine learning model is trained based on the building demand response case data set to generate a building demand response potential assessment model.
[0011] According to another aspect of the present invention, there is provided a device for constructing a building demand response potential assessment model, comprising:
[0012] The influencing factor determination module is used to determine the influencing factors of building energy performance and building demand response regulation effect, and determine the evaluation indicators of building demand response potential;
[0013] A data set construction module is used to construct a building demand response case data set with the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and the building demand response potential evaluation index as output variables; wherein the building demand response case data set includes at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables;
[0014] An evaluation model generation module is used to train a preset machine learning model based on the building demand response case data set to generate a building demand response potential evaluation model.
[0015] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0016] at least one processor; and
[0017] a memory communicatively connected to the at least one processor; wherein,
[0018] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for constructing a building demand response potential assessment model described in any embodiment of the present invention.
[0019] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for constructing a building demand response potential assessment model described in any embodiment of the present invention when executed.
[0020] The scheme for constructing a building demand response potential assessment model in the embodiment of the present invention determines the factors affecting building energy performance and the factors affecting the effect of building demand response regulation, and determines the building demand response potential assessment index; takes the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and takes the building demand response potential assessment index as output variable, to construct a building demand response case data set; wherein the building demand response case data set contains at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables; based on the building demand response case data set, a preset machine learning model is trained to generate a building demand response potential assessment model. Through the technical scheme provided by the embodiment of the present invention, through the constructed building demand response potential assessment model, the demand response potential of different types of buildings can be quickly and accurately assessed, thereby effectively supporting the potential assessment needs of diversified buildings in the power market.
[0021] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0023] Figure 1 is a flow chart of a method for constructing a building demand response potential assessment model provided according to Embodiment 1 of the present invention;
[0024] Figure 2 is a flow chart of a method for constructing a building demand response potential assessment model provided by Embodiment 2 of the present invention;
[0025] Figure 3 It is a schematic diagram of a process of constructing a building demand response potential assessment model provided by an embodiment of the present invention;
[0026] Figure 4 is a schematic diagram showing a baseline case provided by an embodiment of the present invention;
[0027] Figure 5 is a schematic diagram showing a response case provided by an embodiment of the present invention;
[0028] Figure 6It is a schematic diagram of a baseline case and a response case generation process provided by an embodiment of the present invention;
[0029] Figure 7 is a schematic diagram of random simulation sampling results of various input variables provided by an embodiment of the present invention;
[0030] Figure 8 is a schematic diagram of demand response potential evaluation results in different scenarios provided by an embodiment of the present invention;
[0031] Fig. 9 is an architecture diagram for generating a building demand response case data set provided by an embodiment of the present invention;
[0032] Fig.10 It is a schematic diagram of comparison results between the predicted value and the actual value of the building demand response potential assessment model provided by an embodiment of the present invention;
[0033] Fig.11 is a structural schematic diagram of a device for constructing a building demand response potential assessment model according to a third embodiment of the present invention;
[0034] Fig.12 It is a structural schematic diagram of an electronic device for implementing the method for constructing a building demand response potential assessment model according to an embodiment of the present invention. DETAILED DESCRIPTION
[0035] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0036] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0037] Embodiment 1
[0038] Figure 1 A flowchart of a method for constructing a building demand response potential assessment model is provided for the first embodiment of the present invention. This embodiment is applicable to the case of constructing a building demand response potential assessment model. The method can be executed by a building demand response potential assessment model construction device. The building demand response potential assessment model construction device can be implemented in the form of hardware and / or software. The building demand response potential assessment model construction device can be configured in an electronic device. Figure 1 As shown, the method includes:
[0039] S110. Determine the factors influencing building energy performance and building demand response regulation effect, and determine the evaluation indicators of building demand response potential.
[0040] Among them, the factors affecting building energy performance are key factors affecting building energy performance, the factors affecting building demand response regulation effect are key factors affecting building demand response regulation effect, and the building demand response potential evaluation index is an index used to evaluate the building demand response potential. Optionally, the factors affecting building energy performance include at least one of building scale, building envelope characteristics, and building internal disturbance level, the factors affecting building demand response regulation effect include at least one of response start time, response duration, and temperature increase amplitude; the building demand response potential evaluation index includes at least one of capacity, time, and cost.
[0041] In an embodiment of the present invention, factors affecting building energy performance and factors affecting building demand response regulation effects can be qualitatively determined by domain experts based on prior knowledge, or quantitatively determined using a sensitivity analysis method. Factors affecting building energy performance include at least one of building scale, building envelope characteristics, and building internal disturbance level. Among them, the building scale reflects the size of the building, for example, the building scale can include large buildings, medium-sized buildings, and small buildings; the building envelope characteristics reflect the climate zone and construction age of the building; and the building internal disturbance level reflects the function and construction age of the building. In an embodiment of the present invention, the global temperature regulation demand response strategy is concerned, and the key factors affecting the regulation effect of the strategy (i.e., factors affecting the regulation effect of building demand response) include at least one of the response start time, response duration, and temperature increase amplitude. The building demand response potential evaluation index can be determined based on the demand of the power market and the user's declaration content. The building demand response potential evaluation index includes at least one of capacity, time, and cost. Among them, the capacity indicator is the change in power (kW) or energy consumption (kWh) of the equipment during the demand response period; the time indicator includes the start time, duration and system recovery time of the response, which is used to measure the response speed of the equipment and its ability to maintain a certain response level; the cost indicator includes rebound cost, electricity cost, heat dissipation cost, thermal comfort cost, etc., which is used to evaluate the effect of demand response and measure the economic feasibility of demand response.
[0042] S120. Using the factors influencing the building energy performance and the factors influencing the building demand response regulation effect as input variables, and using the building demand response potential evaluation index as output variables, construct a building demand response case data set; wherein the building demand response case data set contains at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables.
[0043] In an embodiment of the present invention, a building demand response case data set is constructed based on building energy performance influencing factors, building demand response regulation effect influencing factors and building demand response potential evaluation indicators. The building demand response case data set includes at least two building demand response cases, each of which is composed of input data corresponding to the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables and output data corresponding to the building demand response potential evaluation indicator as output variable.
[0044] Optionally, taking the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and taking the building demand response potential evaluation index as output variable, constructing a building demand response case data set, including: taking the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and determining the value range of the input variables; sampling within the value range based on a random simulation method, determining at least two candidate values of the input variable, and using each of the candidate values as input data of the input variable; taking the building demand response potential evaluation index as the output variable, based on each of the input data and a preset building case simulation model, determining the demand response potential evaluation result corresponding to each of the input data, and using the demand response potential evaluation result as the output data of the output variable; taking each input data of the input variable and the corresponding output data of the output variable as a building demand response case, and generating a building demand response case data set based on at least two of the building demand response cases.
[0045] In an embodiment of the present invention, factors influencing building energy performance and factors influencing building demand response regulation effect are used as input variables, and the reasonable value range of each input variable is determined according to relevant standards. In order to ensure the diversity of building types and regulation strategies, a random simulation method is used to sample within the value range of each input variable to obtain at least two candidate values of each input variable. Exemplarily, factors influencing building energy performance include building scale, building envelope characteristics and building internal disturbance level, and factors influencing building demand response regulation effect include response start time, response duration and temperature increase amplitude. Building scale, building envelope characteristics, building internal disturbance level, response start time, response duration and temperature increase amplitude are all input variables. For each input variable, a candidate value is randomly selected from the value range corresponding to the input variable. The combination of candidate values of all input variables is used as input data of the input variable. The building demand response potential evaluation index is used as the output variable. Based on each group of input data and a preset building case simulation model, the demand response potential evaluation result corresponding to each group of input data is determined, and the demand response potential evaluation result is used as the output data of the output variable. Exemplarily, in order to improve the simulation efficiency of demand response cases, the EnergyPlus-JEPlus-Eppy batch simulation tool chain developed can be used to automatically generate building case simulation models under different building types and response strategies, and obtain corresponding demand response potential assessment results. Each set of input data of the input variables and the output data of the corresponding output variables are used as building demand response cases, and a building demand response case data set is generated based on at least two building demand response cases.
[0046] S130. Training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model.
[0047] In an embodiment of the present invention, a building demand response case data set is input into a preset machine learning model, so as to automatically learn the nonlinear association between input variables and output variables in the building demand response case data set through the machine learning model until a preset training condition is reached, thereby generating a building demand response potential assessment model. The preset machine learning model includes models such as support vector machines, random forests, and neural networks, and the embodiment of the present invention does not limit the type of the preset machine learning model.
[0048] Optionally, training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model includes: normalizing the building demand response case data set; training a preset machine learning model based on the normalized building demand response case data set to generate a building demand response potential assessment model. Since the building demand response case data set is composed of feature variables of different dimensions and magnitudes, for example, the demand response duration is an integer with a value of 1 or 2, and the building width and height are floating point numbers less than 100, if the above variables are directly used to construct the building demand response potential assessment model, the model prediction accuracy will be poor. Therefore, the demand response case data set can be normalized first to unify the magnitude of each variable and convert it into a dimensionless variable. Then, the preset machine learning model is trained based on the normalized building demand response case data set to generate a building demand response potential assessment model. Optionally, after the model training is completed, the output value can be denormalized to restore it to the building demand response potential, so that the model can be used to predict the building demand response potential under any specified building type and response strategy scenario.
[0049] The method for constructing a building demand response potential assessment model in the embodiment of the present invention determines the factors affecting building energy performance and the factors affecting the effect of building demand response regulation, and determines the building demand response potential assessment index; takes the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and takes the building demand response potential assessment index as output variable, to construct a building demand response case data set; wherein the building demand response case data set contains at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables; based on the building demand response case data set, a preset machine learning model is trained to generate a building demand response potential assessment model. Through the technical solution provided by the embodiment of the present invention, through the constructed building demand response potential assessment model, the demand response potential of different types of buildings can be quickly and accurately assessed, thereby effectively supporting the potential assessment needs of diversified buildings in the power market.
[0050] In some embodiments, before training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model, it also includes: obtaining meteorological condition information corresponding to each building demand response case in the building demand response case data set; training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model, including: training a preset machine learning model based on the building demand response case data set and the meteorological condition information corresponding to each building demand response case in the building demand response case data set to generate a building demand response potential assessment model. The advantage of such a setting is that, through the constructed building demand response potential assessment model, the demand response potential of different types of buildings under different meteorological conditions can be quickly and accurately assessed.
[0051] Due to different meteorological conditions, the demand response potential of a building may also be different. Therefore, in an embodiment of the present invention, the meteorological condition information corresponding to each building demand response case in the building demand response case data set is obtained, and the building demand response case data set and the meteorological condition information corresponding to each building demand response case in the building demand response case data set are input into a preset machine learning model to learn the correlation between input variables and output variables under different meteorological conditions, and generate a building demand response potential evaluation model. Among them, the building demand response potential evaluation model can predict and evaluate the demand response potential of different types of buildings under different adjustment demand response strategies under different meteorological conditions.
[0052] In some embodiments, after training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model, it also includes: obtaining building feature information and response strategy scenario information of the building to be assessed; inputting the building feature information and the response strategy scenario information into the building demand response potential assessment model, and evaluating the demand response potential of the building to be assessed according to the output result of the building demand response potential assessment model. In an embodiment of the present invention, the building feature information and response strategy scenario information of the building to be assessed are obtained, wherein the building feature information of the building to be assessed may include relevant feature information such as the building scale, building envelope structure characteristics and building internal disturbance level of the building to be assessed, and the response strategy scenario information may include relevant information such as the response start time, response duration and temperature increase amplitude of the building to be assessed. The building feature information and response strategy scenario information of the building to be assessed are input into the building demand response potential assessment model, so that the building demand response potential assessment model analyzes the building feature information and response strategy scenario information of the building to be assessed, thereby evaluating the demand response potential of the building to be assessed according to the output result of the building demand response potential assessment model.
[0053] Optionally, the demand response potential of the building to be evaluated is evaluated according to the output result of the building demand response potential evaluation model, including: obtaining the output result of the building demand response potential evaluation model, and performing a denormalization process on the output result; and using the denormalized output result as the demand response potential evaluation result of the building to be evaluated. Since the building demand response case data set is normalized in order to improve the accuracy of the building demand response potential evaluation model in predicting the building demand response potential when training the building demand response potential evaluation model, after obtaining the output result of the building demand response potential evaluation model, the output result is denormalized, so that the demand response potential evaluation result of the building to be evaluated can be directly obtained.
[0054] Embodiment 2
[0055] Figure 2 A flowchart of a method for constructing a building demand response potential assessment model provided in the second embodiment of the present invention is shown in FIG. Figure 2 As shown, the method includes:
[0056] S210. Determine the factors influencing building energy performance and building demand response regulation effect, and determine the evaluation indicators of building demand response potential.
[0057] S220. Taking the factors influencing the building energy performance and the factors influencing the building demand response regulation effect as input variables, determine the value range of the input variables.
[0058] S230. Sampling is performed within a value range based on a random simulation method to determine at least two candidate values of the input variable, and each candidate value is used as input data of the input variable.
[0059] Figure 3 A schematic diagram of the construction process of a building demand response potential assessment model provided in an embodiment of the present invention. In the embodiment of the present invention, a typical office building located in a certain area is selected as the research object, and the applicability of the method of the present invention is verified by taking peak shaving-day-ahead demand response as the scenario. In addition, the present invention constructs a temperature sequence based on the typical meteorological year data of the region, and specifically selects the hourly temperature data of a high temperature concentration period of 35 consecutive days (July 8 to August 11) as the meteorological boundary for subsequent simulation.
[0060] In the embodiment of the present invention, based on the prior knowledge of domain experts, three factors, namely building scale, building envelope characteristics and building internal disturbance level, are used as building energy performance influencing factors. Table 1 shows the value ranges corresponding to the building energy performance influencing factors provided in the embodiment of the present invention.
[0061] Table 1 Value ranges corresponding to factors affecting building energy performance
[0062]
[0063] For the building scale parameters, the total width, aspect ratio and total height of the building are determined as input variables, and the sampling ranges are 25-100m, 1-2, and 15-100m respectively. For the building envelope parameters, the value range of the building window-to-wall ratio is set to 0.2-0.8, the value range of the total heat transfer coefficient of the building envelope is set to 3-35W / (m2K), and the value range of the exterior wall heat storage coefficient and the roof heat storage coefficient are both 5-15W / (m2K). For the building's internal disturbance level parameters, personnel density, lighting power density, and equipment power density are selected as key influencing factors. At the same time, in order to reflect the differentiated internal disturbance conditions of different office buildings, two types of high and low level internal disturbance schedules are set. Both schedules set office hours from 7:00 to 19:00, but the internal disturbance levels during office hours are different. Table 2 is the internal disturbance schedule provided by an embodiment of the present invention.
[0064] Table 2 Internal interference timetable
[0065]
[0066] In addition, for demand response regulation parameters (that is, factors affecting the effect of building demand response regulation), the indoor temperature in summer is controlled at 26-28°C based on the thermal comfort level within the specification. Therefore, the demand response temperature adjustment range is set to +2°C, and the adjustment step is 0.5°C, that is, an increase of 1°C, 1.5°C, and 2°C. If there are four time periods for demand response, and for the demand response of office buildings, the waist peak (12:00-16:00) is selected as the response period. Based on this, the embodiment of the present invention sets four demand response start time modes, namely: 12:00, 13:00, 14:00, and 15:00, and sets two demand response duration modes, namely: 1h and 2h. It should be noted that when the demand response start time is 15:00, its duration is only 1h.
[0067] Figure 4 A schematic diagram showing a baseline case provided by an embodiment of the present invention. Figure 4 As shown in Figure 2, the input variables and their dimensions for forming different baseline cases are shown. Among them, the factors affecting building energy performance include the building scale (building width, height, aspect ratio), building envelope characteristics (window-to-wall ratio, total heat transfer coefficient of envelope structure, external wall heat storage coefficient, roof heat storage coefficient) and building internal disturbance level (personnel / lighting / equipment density) in Table 2. The randomly sampled candidate values of the above-mentioned building energy performance influencing factors are permuted and combined to form 160 buildings with different characteristics, ensuring the diversity and completeness of the buildings. Each building has two levels of internal disturbance schedules corresponding to it, and a total of 320 building cases are obtained. These cases will be simulated as baseline cases, representing the load curves of the buildings when no demand response regulation strategy is adopted.
[0068] Figure 5 The following is a schematic diagram showing a response case provided by an embodiment of the present invention. Figure 5 As shown, Figure 5 Different response cases were formed by further combining various demand response regulation parameters. The response case is based on the baseline case, adding factors affecting the effect of building demand response regulation (i.e., response start time, response duration, and temperature increase). The three groups of input variables are arranged and combined to form 21 demand response scenarios, that is, each baseline case corresponds to 21 response cases, and finally 6720 demand response scenarios are formed.
[0069] S240. Taking the building demand response potential evaluation index as the output variable, based on each input data and a preset building case simulation model, determine the demand response potential evaluation result corresponding to each input data, and use the demand response potential evaluation result as the output data of the output variable.
[0070] In the embodiment of the present invention, the average reduction amount of cooling load in the response period is used as the building demand response potential evaluation index, wherein the average reduction amount of cooling load refers to the average value of the difference between the cooling load of the baseline case and the cooling load of the response case in the demand response period, as shown in formula (1):
[0071]
[0072] Among them, y is the output variable, that is, the average reduction (kW); Load base (t) and Load DR (t) are the hourly simulated loads (kW) of the baseline case and its corresponding response case at time t; t start and t end are the response start time and response end time respectively; T is the response duration (h).
[0073] Based on the value ranges of the various input variables in Table 1, the embodiment of the present invention uses the EnergyPlus-JEPlus-Eppy batch simulation tool chain to automatically generate different baseline cases and response cases. Figure 6 A schematic diagram of a baseline case and a response case generation process provided by an embodiment of the present invention. Figure 6 As shown in the figure, (1) first, EnergyPlus was used to establish two template building models with different internal disturbance levels, and JEPlus was used to batch generate template idf. files of 320 building case models; (2) secondly, EPPY was used to batch modify the above template idf. files to generate 320 baseline building models and 6720 demand response models; (3) finally, based on the high temperature meteorological boundary for 35 consecutive days, the baseline load (11,200 different types of baseline cases) and response load (235,200 different types of demand response cases) of different building cases under all demand response strategies were obtained through simulation calculation, and the demand response potential evaluation results were obtained. Figure 7 A schematic diagram of random simulation sampling results of various input variables provided in an embodiment of the present invention, such as Figure 7 As shown, it can be seen that different candidate values are evenly distributed within the value range, indicating the diversity and randomness of the candidate values. Figure 8 A schematic diagram of the demand response potential evaluation results under different scenarios provided by the embodiment of the present invention, such as Figure 8 As shown, the load reduction is distributed between 20kW and 6600kW and concentrated between 300kW and 1400kW. The load reduction covers a wide range and includes extreme situations. There are also building sizes or demand response scenarios with insufficient load reduction capacity.
[0074] S250: taking each input data of the input variable and the output data of the corresponding output variable as a building demand response case, and generating a building demand response case data set based on at least two building demand response cases.
[0075] Based on the input data corresponding to the input variables and the output data corresponding to the output variables obtained from the aforementioned simulation, a building demand response case data set is generated. Fig. 9 An architectural diagram for generating a building demand response case dataset provided by an embodiment of the present invention.
[0076] S260. Obtain meteorological condition information corresponding to each building demand response case in the building demand response case dataset.
[0077] S270. Normalize the building demand response case data set.
[0078] S280. Based on the normalized building demand response case data set and the meteorological condition information corresponding to each building demand response case in the building demand response case data set, a preset machine learning model is trained to generate a building demand response potential assessment model.
[0079] In an embodiment of the present invention, the mean-variance normalization method can be used to process variables of different dimensions and magnitudes in the building demand response case data set. The processed variable values will be used to train the building demand response potential assessment model. When predicting the response potential, the inverse normalization method is used to restore the predicted value of the building demand response potential assessment model to the demand response potential assessment result.
[0080] Exemplarily, a BP neural network is used as a preset machine learning model to learn the relationship between each input variable and output variable. For example, the input layer of the BP neural network is set with 22 neurons, representing 22 input variables, and the output layer of the BP neural network is set with 1 neuron, representing the demand response potential assessment result. Usually, a neural network with 1 hidden layer can accurately simulate various nonlinear problems. Therefore, the embodiment of the present invention sets 1 hidden layer, and the number of neurons is determined according to an empirical formula, as shown in formula (2):
[0081]
[0082] Where l is the number of neurons in the hidden layer; m is the number of neurons in the input layer; n is the number of neurons in the output layer; and a is a constant between [1,10]. According to formula (2), a=10 is taken, the number of neurons in the hidden layer is determined to be 15, and the Sigmoid function is selected as the activation function of each neuron.
[0083] In addition, in the embodiment of the present invention, the Adam optimizer can be used to optimize the hyperparameters of the neural network, the learning rate can be set to 0.01, and the number of iterations can be set to 50 generations. The mean square error (MSE) is selected to calculate the error level between the predicted value and the actual value, as shown in formula (3):
[0084]
[0085] in, represents the predicted value of the i-th iteration; y i represents the actual value of the i-th iteration; n is the number of samples.
[0086] In the embodiment of the present invention, the process of establishing the building demand response potential assessment model is divided into a training phase and a verification phase. The training phase is to fit the model through training samples, which mainly includes two processes: forward calculation and back propagation. After each training, the model is verified. Back propagation is not performed in the verification phase, so the model parameters will not be changed. Fig.10 A schematic diagram showing the comparison results of the predicted value and the actual value of the building demand response potential assessment model provided by an embodiment of the present invention, Fig.10 As shown, by analyzing the accuracy of the building demand response potential assessment model from the perspective of different response times, it can be found that no matter when the power grid initiates the demand response, the prediction results of the potential assessment model can be well close to the true value. This can further illustrate that the building demand response potential assessment model constructed in the embodiment of the present invention can accurately predict the building load reduction under different building physical structures, envelope structures, meteorological conditions, internal disturbance levels and response control strategy scenarios, and support the power grid to carry out market access capacity determination for potential multi-type building users.
[0087] S290: Obtain architectural feature information and response strategy scenario information of the building to be evaluated.
[0088] S2100: input the building feature information and the response strategy scenario information into the building demand response potential assessment model, obtain the output result of the building demand response potential assessment model, and perform denormalization processing on the output result.
[0089] S2110. Use the output result after the denormalization processing as the demand response potential assessment result of the building to be assessed.
[0090] The technical solution provided by the embodiment of the present invention can quickly and accurately evaluate the demand response potential of different types of buildings by constructing a building demand response potential evaluation model, thereby effectively supporting the potential evaluation needs of diversified buildings in the power market.
[0091] Embodiment 3
[0092] Fig.11 This is a schematic diagram of a structure of a device for constructing a building demand response potential assessment model provided by Embodiment 3 of the present invention. Fig.11 As shown, the device comprises:
[0093] The influencing factor determination module 1110 is used to determine the influencing factors of building energy performance and building demand response regulation effect, and determine the building demand response potential evaluation index;
[0094] The data set construction module 1120 is used to construct a building demand response case data set with the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and the building demand response potential evaluation index as output variables; wherein the building demand response case data set includes at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables;
[0095] The evaluation model generation module 1130 is used to train a preset machine learning model based on the building demand response case data set to generate a building demand response potential evaluation model.
[0096] Optionally, the data set construction module is used to:
[0097] Taking the factors influencing the building energy performance and the factors influencing the building demand response regulation effect as input variables, determining the value range of the input variables;
[0098] Sampling within the value range based on a random simulation method, determining at least two candidate values of the input variable, and using each of the candidate values as input data of the input variable;
[0099] Taking the building demand response potential evaluation index as the output variable, based on each of the input data and a preset building case simulation model, determining the demand response potential evaluation result corresponding to each of the input data, and using the demand response potential evaluation result as the output data of the output variable;
[0100] Each input data of the input variable and the output data of the corresponding output variable are used as a building demand response case, and a building demand response case data set is generated based on at least two of the building demand response cases.
[0101] Optionally, the evaluation model generation module is used to:
[0102] Normalizing the building demand response case data set;
[0103] The preset machine learning model is trained based on the normalized building demand response case data set to generate a building demand response potential assessment model.
[0104] Optionally, also include:
[0105] A meteorological condition information acquisition module, used for acquiring meteorological condition information corresponding to each building demand response case in the building demand response case data set before training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model;
[0106] The evaluation model generation module is used to:
[0107] Based on the building demand response case data set and the meteorological condition information corresponding to each building demand response case in the building demand response case data set, a preset machine learning model is trained to generate a building demand response potential assessment model.
[0108] Optionally, the factors affecting building energy performance include at least one of building scale, building envelope structure characteristics and building internal disturbance level; the factors affecting building demand response regulation effect include at least one of response start time, response duration and temperature increase amplitude; the building demand response potential evaluation index includes at least one of capacity, time and cost.
[0109] Optionally, also include:
[0110] A feature information acquisition module is used to obtain building feature information and response strategy scenario information of the building to be evaluated after training a preset machine learning model based on the building demand response case data set to generate a building demand response potential evaluation model;
[0111] The demand response potential assessment module is used to input the building feature information and the response strategy scenario information into the building demand response potential assessment model, and evaluate the demand response potential of the building to be assessed based on the output result of the building demand response potential assessment model.
[0112] Optionally, the demand response potential assessment module is used to:
[0113] Obtaining an output result of the building demand response potential assessment model, and performing a denormalization process on the output result;
[0114] The output result after the denormalization process is used as the demand response potential assessment result of the building to be assessed.
[0115] The device for constructing a building demand response potential assessment model provided in an embodiment of the present invention can execute the method for constructing a building demand response potential assessment model provided in any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.
[0116] Embodiment 4
[0117] Fig.12 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0118] like Fig.12 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0119] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0120] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a method for constructing a building demand response potential assessment model.
[0121] In some embodiments, the building demand response potential assessment model construction method can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the building demand response potential assessment model construction method described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the building demand response potential assessment model construction method in any other appropriate manner (for example, by means of firmware).
[0122] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0123] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0124] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0125] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0126] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0127] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0128] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0129] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for constructing a building demand response potential assessment model, characterized in that: include: Determine the factors affecting building energy performance and building demand response regulation effect, and determine the evaluation indicators of building demand response potential; Taking the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and taking the building demand response potential evaluation index as output variables, a building demand response case data set is constructed; wherein the building demand response case data set includes at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables; A preset machine learning model is trained based on the building demand response case data set to generate a building demand response potential assessment model.
2. The method according to claim 1, characterized in that Taking the factors influencing building energy performance and the factors influencing building demand response regulation effect as input variables, and taking the building demand response potential evaluation index as output variable, a building demand response case data set is constructed, including: Taking the factors influencing the building energy performance and the factors influencing the building demand response regulation effect as input variables, determining the value range of the input variables; Sampling within the value range based on a random simulation method, determining at least two candidate values of the input variable, and using each of the candidate values as input data of the input variable; Taking the building demand response potential evaluation index as the output variable, based on each of the input data and a preset building case simulation model, determining the demand response potential evaluation result corresponding to each of the input data, and using the demand response potential evaluation result as the output data of the output variable; Each input data of the input variable and the output data of the corresponding output variable are used as a building demand response case, and a building demand response case data set is generated based on at least two of the building demand response cases.
3. The method according to claim 1, characterized in that The preset machine learning model is trained based on the building demand response case data set to generate a building demand response potential assessment model, including: Normalizing the building demand response case data set; The preset machine learning model is trained based on the normalized building demand response case data set to generate a building demand response potential assessment model.
4. The method according to claim 1, characterized in that: Before training a preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model, the method further includes: Acquire meteorological condition information corresponding to each building demand response case in the building demand response case dataset; The preset machine learning model is trained based on the building demand response case data set to generate a building demand response potential assessment model, including: Based on the building demand response case data set and the meteorological condition information corresponding to each building demand response case in the building demand response case data set, a preset machine learning model is trained to generate a building demand response potential assessment model.
5. The method according to any one of claims 1 to 4, characterized in that: The factors affecting the building energy performance include at least one of the building scale, the building envelope structure characteristics and the building internal disturbance level; the factors affecting the building demand response regulation effect include at least one of the response start time, the response duration and the temperature increase amplitude; the building demand response potential evaluation index includes at least one of capacity, time and cost.
6. The method according to claim 1, characterized in that After training the preset machine learning model based on the building demand response case data set to generate a building demand response potential assessment model, the method further includes: Obtain architectural feature information and response strategy scenario information of the building to be evaluated; The building characteristic information and the response strategy scenario information are input into the building demand response potential evaluation model, and the demand response potential of the building to be evaluated is evaluated according to the output result of the building demand response potential evaluation model.
7. The method according to claim 6, characterized in that According to the output result of the building demand response potential evaluation model, the demand response potential of the building to be evaluated is evaluated, including: Obtaining an output result of the building demand response potential assessment model, and performing a denormalization process on the output result; The output result after the denormalization process is used as the demand response potential assessment result of the building to be assessed.
8. A device for constructing a building demand response potential assessment model, characterized in that: include: The influencing factor determination module is used to determine the influencing factors of building energy performance and building demand response regulation effect, and determine the evaluation indicators of building demand response potential; A data set construction module is used to construct a building demand response case data set with the building energy performance influencing factors and the building demand response regulation effect influencing factors as input variables, and the building demand response potential evaluation index as output variables; wherein the building demand response case data set includes at least two building demand response cases, and each building demand response case is composed of input data corresponding to the input variables and output data corresponding to the output variables; An evaluation model generation module is used to train a preset machine learning model based on the building demand response case data set to generate a building demand response potential evaluation model.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for constructing a building demand response potential assessment model according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the building demand response potential assessment model construction method according to any one of claims 1 to 7 when executed.
Citation Information
Patent Citations
Evaluation method and system based on building energy consumption flexible adjustment potential indexes
CN112990574A
Industrial user demand response potential prediction method and storage medium
CN113570164A
Demand response potential assessment method based on deep forest
CN113919594A
Multi-scene two-stage demand response resource optimization scheduling method, device and equipment
CN114580919A
Virtual power plant load sensing method and device
CN115705608A
Cited By
Method and device for predicting building energy consumption demand response
CN121480885A