Highway slope photovoltaic engineering construction site selection method

Through the proposed 9 influencing factors and index system method, the site suitability index of photovoltaic projects on highway slopes is calculated, which solves the complex problem of site selection in the construction of photovoltaic projects on highway slopes and achieves quantitative evaluation and scientific improvement. , reducing construction costs and improving safety.

CN118735348APending Publication Date: 2024-10-01SHANXI JIAOKE INFORMATION SYST ENG CO LTD +2
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410913491.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

There is a lack of effective site selection methods in the construction of highway slope photovoltaic projects, and a variety of professional knowledge needs to be considered, resulting in complex site selection and high cost, which affects the safety and economy of the project.

Method used

Nine key influencing factors are proposed, including lighting conditions, grid connection conditions, terrain conditions, engineering conditions, vegetation conditions, construction difficulty, safety protection conditions, climate conditions and economic factors. The weights are determined through the expert scoring method and calculated using the index system method. Site suitability index for quantitative evaluation.

Benefits of technology

Through quantitative evaluation, we can minimize the impact of human scoring, improve the scientific site selection, help determine the suitability of photovoltaic projects on highway slopes, reduce construction costs and improve safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735348A_ABST
    Figure CN118735348A_ABST
Patent Text Reader

Abstract

The invention relates to an expressway side slope photovoltaic engineering construction site selection method, in particular to an expressway side slope photovoltaic engineering construction site selection method based on an index system method, which comprises an illumination condition, a grid connection condition, a topographic condition, an engineering condition, a vegetation condition, construction difficulty, a safety protection condition, a climate condition and economic factors. And the influence weight is determined through an expert scoring method. A site selection suitability index is calculated through an index system method, and the expressway slope photovoltaic engineering construction suitability is quantitatively evaluated. According to the method, influence factors of photovoltaic power generation project construction on the highway slope are fully considered, nine key influence factors are summarized, semi-quantitative description is carried out on the nine key influence factors, and corresponding scoring indexes are given. Different influence factors are endowed with weights, and by taking a single slope as an example, the suitability of the slope for constructing the photovoltaic project is obtained through weighted calculation. And the influence of artificial scoring is reduced to the greatest extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering digitalization technology, and in particular to a method for site selection for highway slope photovoltaic engineering construction. Background Art

[0002] Most photovoltaic power generation projects are installed in deserts and Gobi areas, which are often far away from the consumption end and have high transmission costs. Therefore, building roofs and industrial intensive areas have gradually become the main construction areas for photovoltaic power generation projects. Highways, as long-line projects, constitute a basic transportation network, in which expressways play a vital role. Building photovoltaic power generation projects along expressways can effectively utilize the transportation attributes of highways, and carrying out power transmission on existing transportation routes can greatly reduce costs. Expressways contain a large number of power-consuming facilities, and there are a large number of industrial and agricultural bases along the lines, which have sufficient potential power demand. In addition, there are a large number of idle lands along expressways, including tunnel slopes, interchanges, central isolation belts, service areas, etc., which avoids the problem of land acquisition. A large number of photovoltaic projects have been built in these areas in China. Similarly, as an important infrastructure, highway slopes also have the potential to build photovoltaic projects, but they face many challenges. Among them, site selection is the most basic issue, and safety and economy must be considered at the same time. In geotechnical engineering, site selection zoning is mainly for the evaluation and analysis of engineering geological conditions, and is often used for geological disaster risk zoning, construction site suitability zoning, and planned land zoning. It is very important to determine the weights and scoring of influencing factors during the zoning process. Currently, they are mainly determined through expert scoring method, grey correlation method, hierarchical analysis method, etc., and are widely used in assessment zoning in transportation, construction, cities, disaster prevention and mitigation, etc. Since highway slope photovoltaic engineering is an emerging field, it involves professional knowledge in geotechnical engineering and electromechanical engineering. There are currently few related methods, which has become the main reason restricting the large-scale construction of highway slope photovoltaics. Summary of the invention

[0003] In view of the above problems, the present invention provides a method for site selection for photovoltaic engineering construction on highway slopes, proposes 9 key influencing factors, including: lighting conditions, grid connection conditions, terrain conditions, engineering conditions, vegetation conditions, construction difficulty, safety protection conditions, climate conditions, and economic factors, proposes a percentage scoring rule, and assigns values ​​to these 9 influencing factors according to 0 to 100 points. The impact weight is determined by the expert scoring method. The site suitability index is calculated by the indicator system method to quantitatively evaluate the suitability of highway slope photovoltaic engineering construction.

[0004] A method for selecting a site for a highway slope photovoltaic project. The site suitability index is calculated using the following formula:

[0005] S=X1×w1+X2×w2+...+X9×w9;

[0006] in:

[0007] The illumination condition X1 represents the illumination duration and radiation value of the proposed site, and the weight w1 is 0.122;

[0008] The grid connection condition X2 represents the value of whether the slope location has good grid connection conditions, and the weight w2 is 0.097;

[0009] The terrain condition X3 represents the value of whether the slope and aspect of the slope meet the power generation demand, and the weight w3 is 0.125;

[0010] Engineering condition X4 represents whether the existing engineering protection form is stable and intact, and whether it can meet the load requirements of the photovoltaic structure. The weight w4 is 0.198;

[0011] Vegetation condition X5 represents the vegetation type and coverage of the proposed site, and whether it will cause shading to the photovoltaic panels, and the weight w5 is 0.073;

[0012] Construction difficulty X6 represents the value of whether the proposed site has sufficient construction space and meets the requirements for the entry of basic construction equipment, and the weight w6 is 0.099;

[0013] Safety protection condition X7 represents the traffic volume and accident rate of the proposed site, whether safety protection is in place during construction, and the value of the impact of glare on traffic conditions in the later period, and the weight w7 is 0.121;

[0014] Climate condition X8 represents the value of temperature change, wind characteristics, and rainfall and snowfall conditions of the proposed site, and the weight w8 is 0.075;

[0015] The economic factor X9 represents the construction scale of the proposed site, and the value of whether the input and output are reasonable, with a weight of 0.090;

[0016] Below 20 points is unsuitable, 20 to 40 points is less suitable, 40 to 60 points is generally suitable, 60 to 80 points is relatively suitable, and above 80 points is very suitable.

[0017] Furthermore, the illumination condition X1 is assigned values ​​of 20, 40, 60, 80, and 100 according to the duration of sunlight <4 h, 4 to 6 h, 5 to 7 h, 7 to 8 h, and 7 to 8 h, respectively.

[0018] Furthermore, the grid connection condition X2 is assigned values ​​of 20, 40, 60, 80, and 100 according to very far distance > 5 km, relatively far distance 3 to 5 km, moderate distance 1 to 3 km, relatively close distance 0.5 to 1 km, and very close distance 0 to 0.5 km, respectively.

[0019] Furthermore, the terrain condition X3 is assigned values ​​of 20, 40, 60, 80, and 100 according to steep slope and poor orientation; steep slope and bad orientation; moderate slope and average orientation; gentle slope and good orientation; and gentle slope and good orientation.

[0020] Furthermore, engineering condition X4 is assigned values ​​of 20, 40, 60, 80, and 100 according to the following conditions: if the protective measures fail and the rock and soil properties are poor, disasters are likely to occur; if the protective measures are poor and the rock and soil properties are poor, disasters may occur; if the protective measures are average and the rock and soil properties are average, disasters are unlikely to occur; if the protective measures are good and the rock and soil properties are good, disasters are unlikely to occur; if the protective measures are intact and the rock and soil properties are good, disasters will not occur.

[0021] Furthermore, the vegetation condition X5 is assigned values ​​of 20, 40, 60, 80, and 100 according to high vegetation coverage, relatively high vegetation coverage, average vegetation coverage, relatively low vegetation coverage, and low vegetation coverage, respectively.

[0022] Furthermore, the construction difficulty X6 is assigned values ​​of 20, 40, 60, 80, and 100 according to the following conditions: small working area, difficult construction; limited working area, difficult construction; certain working area, barely implementable; large working area, easy implementation; good working conditions, smooth implementation.

[0023] Furthermore, the safety protection condition X7 is assigned values ​​of 20, 40, 60, 80, and 100 according to heavy traffic volume, few lanes, narrow terrain, and high accident rate; heavy traffic volume and high accident rate; average traffic volume and average accident rate; small traffic volume and low accident rate; small traffic volume, many lanes, and extremely low accident rate.

[0024] Furthermore, the climate condition X8 is assigned values ​​of 20, 40, 60, 80, and 100 according to whether the rainfall is heavy or the wind and sand are heavy; whether the rainfall is large or the wind and sand are large; whether the rainfall is kind or the wind and sand are average; whether the rainfall is small or the wind and sand are small; and whether the rainfall is small or the wind and sand are small.

[0025] Furthermore, the economic factor X9 is assigned values ​​of 20, 40, 60, 80, and 100 according to profit rate <0%; profit rate 0% to 18%; profit rate 18% to 25%; profit rate 25% to 30%; and profit rate > 30%. The profit rate is calculated as follows:

[0026]

[0027] E p =H×P×K1;

[0028] Wherein, M is the annual rate of return; Ep is the annual power generation, in kW·h; C is the electricity price, in yuan / (kW·h); V is the total investment, in yuan; H is the local standard sunshine hours, in h; P is the component installation capacity, in kW; K1 is the system comprehensive efficiency coefficient, ranging from 0.75 to 0.85.

[0029] The present invention fully considers the influencing factors of the construction of photovoltaic power generation projects on highway slopes, summarizes 9 key influencing factors, describes them semi-quantitatively, and gives corresponding scoring indicators. Different influencing factors are given weights. Taking a single slope as an example, the suitability of its construction of photovoltaic projects is obtained through weighted calculation, which minimizes the impact of human scoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is the highway slope site suitability zoning map;

[0031] Figure 2 It is a flow chart of quantitative calculation of site selection;

[0032] Figure 3 This is a distribution diagram of factors affecting the construction of photovoltaic projects on highway slopes;

[0033] Figure 4 It is the result of suitability zoning for photovoltaic construction on highway slopes. DETAILED DESCRIPTION

[0034] The following is a further detailed description of a method for selecting a site for a highway slope photovoltaic project construction in conjunction with the accompanying drawings and specific embodiments of the present invention:

[0035] Example:

[0036] Based on the existing relevant standards and specifications and the factors affecting photovoltaic engineering construction involved in the project, and considering the particularity of highway slopes, nine key influencing factors are proposed, including: lighting conditions, grid connection conditions, terrain conditions, engineering conditions, vegetation conditions, construction difficulty, safety protection conditions, climate conditions, and economic factors. The main impact of these nine factors on slope photovoltaic engineering construction is reflected in economic costs and safety and stability.

[0037] In terms of economic cost, the quantitative factor of the lighting condition is the standard sunshine hours at the project construction site. The standard sunshine duration should be more than 4 hours, so as to guarantee the basic power generation and ensure that the project is effective and can be put into use. The grid connection condition is for photovoltaic power generation to be integrated into the national grid system. According to the local photovoltaic policy, the impact of the two modes of full grid connection and self-generation and self-use of surplus power grid connection are considered respectively. Under the full grid connection mode, photovoltaic grid connection mainly considers the convenience of grid connection conditions, and the distance between the slope and the substation is used as a quantitative evaluation standard. The self-generation and self-use of surplus power grid connection mode mainly considers nearby slopes with high electricity consumption such as service areas, tunnels and toll stations, and mainly calculates the distance between the slope and the highway consumption point. The analysis is based on the local electricity price, and the relationship between distance and cost is mainly calculated. Economic conditions refer to the relationship between input and output, which can be calculated specifically by the following formula:

[0038]

[0039] E p =H×P×K1 (2)

[0040] Among them, M is the annual rate of return; Ep is the annual power generation, kW·h; C is the electricity price, yuan / (kW·h); V is the total investment, yuan; H is the local standard sunshine hours, h; P is the component installation capacity, kW; K1 is the system comprehensive efficiency coefficient, ranging from 0.75 to 0.85. The annual rate of return of general photovoltaic power generation projects is between 18% and 30%. If it is lower than 18%, it means that the area is not suitable for the construction of photovoltaic power generation projects.

[0041] In terms of safety and stability, terrain conditions mainly refer to the slope and slope direction of the slope. The slope of the highway is generally 53° (cut slope) and 37° (embankment slope). If the slope of the highway is too high, it will affect the light intensity. Therefore, when building a photovoltaic project on the cut slope, the bracket form should be appropriately adjusted so that the angle of the photovoltaic module meets the power generation requirements. In addition, the impact of glare should be fully considered, especially in mountainous areas with large bends. The solar light reflection illumination of the photovoltaic modules of the proposed site should be between 10 and 20 lx (lux). In order to prevent glare caused by night driving lighting, the photovoltaic modules on the cut slope should be at least 3m away from the ground. Protection conditions refer to whether the safety guardrails, warning signs and other measures along the highway are in place. The construction of photovoltaic projects may require traffic control along the route, which involves the organization of traffic safety construction and is also an element that cannot be ignored. In addition, climate conditions are the key factors that induce geological disasters, and they will also affect the power generation efficiency of photovoltaic projects. For example, in windy weather, it is necessary to consider the firmness of the connection of photovoltaic modules, and in windy and sandy weather, the focus should be on the problem of sand and dust covering affecting the power generation efficiency.

[0042] In addition, there are three factors that affect both safety and stability, as well as construction costs. Among them, engineering conditions mainly refer to the engineering geological conditions of the slopes. Geological disaster-prone areas such as dangerous rocks, debris flows, karst development, landslide development, and seismic fault zones have a greater impact on photovoltaic projects. In addition, when selecting a site on the slope of an existing highway, the type and characteristics of existing protective measures also have a greater impact on the overall stability. Vegetation conditions mainly refer to the height of vegetation growth. If it is too high and exceeds the photovoltaic components, it is easy to cause shading and affect the power generation efficiency. The difficulty of engineering construction is also a major factor that must be considered, involving the impact of material transportation, construction space, and equipment entry. If the construction difficulty is too great and the cost is high, the economic benefits should be fully evaluated.

[0043] In order to simplify the site selection process and improve the scientific nature of site selection, it is proposed to use the index system method to quantitatively analyze the site selection situation. The site selection results are quantitatively expressed by the site suitability index, which is calculated according to the following formula:

[0044] S=X1×w1+X2×w2+...+X9×w9 (3)

[0045] Among them, X i represents the impact factor score; w i Indicates the weight of the impact factor. The specific calculation results are as follows Figure 2 shown.

[0046] The weights of different influencing factors were determined by the expert scoring method. The site selection indicators were described in detail and scored in the range of 1 to 10 for each indicator. By organizing 20 experts in geotechnical engineering, electromechanical engineering, road engineering, safety and finance to score, the weights of each factor were calculated and listed in Table 1.

[0047] Table 1 Weights of factors affecting highway slope photovoltaic construction

[0048]

[0049] Table 2 Scoring criteria for factors affecting photovoltaic construction on highway slopes

[0050]

[0051] A statistical analysis was conducted on the basic properties of the geological conditions, climate conditions, and lighting conditions along a highway in Shanxi Province to obtain a large amount of basic data, which were processed and scored according to Table 2. In addition, the locations of all slopes on the highway were counted, the effective construction area of ​​the slopes was clarified, and the photovoltaic suitability zoning of the slopes along the highway was formed. Since the traffic volume on the highway is average and the accident rate is low, the safety condition of the entire line is taken as 60 points. In addition, it is assumed that all photovoltaic power generation is used for grid connection during the calculation, so only the distance between the slope and the substation is calculated. The economic cost calculation of photovoltaic construction refers to the relevant provisions in the current specifications, mainly including material costs, personnel costs, machinery costs, management fees, etc. According to the engineering price standards of Shanxi Province, the average cost of slope photovoltaic projects is calculated to be 1,200 yuan / m 2 . According to the effective area of ​​the slope, the total cost is calculated. The local area belongs to the third-class resource area, and the price of photovoltaic power generation is 0.55 yuan / (kW·h). Therefore, the input-output ratio is calculated according to equations (1) and (2). Finally, the distribution of the influencing factors of the photovoltaic engineering construction along the highway slope is calculated, as follows: Figure 3 shown.

[0052] according to Figure 3 The calculation results of the influencing factors are combined with the weight assignments in Table 1 to conduct a comprehensive analysis of the locations of different slopes. The calculated data are shown in Table 3. Due to space limitations, only the table header and data examples are listed.

[0053] It is worth noting that words or letters cannot be recognized during quantitative calculations. Therefore, the content involving words and letters will be quantified before calculation, and the slope direction will be converted into the form of 0 to 360 degrees. Disaster susceptibility and economic costs are expressed in numbers from 1 to 5, and the larger the number, the lower the degree. When calculating the stratum lithology, different types of strata are assigned values, and the values ​​are assigned from 1 to 6 according to the properties of the rock and soil. The larger the value, the better the lithology. The calculation obtained the suitability zoning of highway slope photovoltaic projects by point allocation, such as Figure 4 shown.

[0054] The examples of the present invention are described in detail above in conjunction with the embodiments, but the present invention is not limited to the above examples. Various changes can be made within the knowledge scope of ordinary technicians in the field without departing from the purpose of the present invention, and should also be regarded as the protection scope of the present invention.

Claims

1. A method for selecting a site for a highway slope photovoltaic project, characterized in that: The site suitability index is calculated using the following formula: S=X1×w1+X2×w2+...+X9×w9; in: The illumination condition X1 represents the illumination duration and radiation value of the proposed site, and the weight w1 is 0.122; The grid connection condition X2 represents the value of whether the slope location has good grid connection conditions, and the weight w2 is 0.097; The terrain condition X3 represents the value of whether the slope and aspect of the slope meet the power generation demand, and the weight w3 is 0.125; Engineering condition X4 represents whether the existing engineering protection form is stable and intact, and whether it can meet the load requirements of the photovoltaic structure. The weight w4 is 0.198; Vegetation condition X5 represents the vegetation type and coverage of the proposed site, and whether it will cause shading to the photovoltaic panels, and the weight w5 is 0.073; Construction difficulty X6 represents the value of whether the proposed site has sufficient construction space and meets the requirements for the entry of basic construction equipment, and the weight w6 is 0.099; Safety protection condition X7 represents the traffic volume and accident rate of the proposed site, whether safety protection is in place during construction, and the value of the impact of glare on traffic conditions in the later period, and the weight w7 is 0.121; Climate condition X8 represents the value of temperature change, wind characteristics, and rainfall and snowfall conditions of the proposed site, and the weight w8 is 0.075; The economic factor X9 represents the construction scale of the proposed site, and the value of whether the input and output are reasonable, with a weight w9 of 0.090; A site suitability index below 20 points is unsuitable, 20 to 40 points are relatively unsuitable, 40 to 60 points are generally suitable, 60 to 80 points are relatively suitable, and above 80 points are very suitable.

2. The method for selecting a site for a highway slope photovoltaic project according to claim 1, characterized in that: The light condition X1 is assigned values ​​of 20, 40, 60, 80, and 100 according to the duration of sunlight <4h, 4-6h, 5-7h, 7-8h, and 7-8h, respectively.

3. The method for selecting a site for a highway slope photovoltaic project according to claim 2, characterized in that: The grid connection condition X2 is assigned values ​​of 20, 40, 60, 80, and 100 according to very far distance > 5 km, relatively far distance 3 to 5 km, moderate distance 1 to 3 km, relatively close distance 0.5 to 1 km, and very close distance 0 to 0.5 km.

4. The method for selecting a site for a highway slope photovoltaic project according to claim 3, characterized in that: The terrain condition X3 is assigned values ​​of 20, 40, 60, 80, and 100 according to the following: large slope and poor orientation; large slope and bad orientation; moderate slope and average orientation; gentle slope and good orientation; and gentle slope and good orientation.

5. The method for selecting a site for a highway slope photovoltaic project according to claim 4, characterized in that: Engineering condition X4 is assigned values ​​of 20, 40, 60, 80, and 100 according to the failure of protective measures and poor rock and soil properties, which make disasters easy to occur; poor protective measures and poor rock and soil properties, which make disasters possible; average protective measures and average rock and soil properties, which make disasters unlikely to occur; good protective measures and good rock and soil properties, which make disasters difficult to occur; and intact protective measures and good rock and soil properties, which make disasters not occur.

6. The method for selecting a site for a highway slope photovoltaic project according to claim 5, characterized in that: The vegetation condition X5 is assigned values ​​of 20, 40, 60, 80, and 100 according to high vegetation coverage, relatively high vegetation coverage, average vegetation coverage, relatively low vegetation coverage, and low vegetation coverage, respectively.

7. The method for selecting a site for a highway slope photovoltaic project according to claim 6, characterized in that: The construction difficulty X6 is assigned values ​​of 20, 40, 60, 80, and 100 according to the following criteria: small working area, difficult construction; limited working area, difficult construction; certain working area, barely implemented; large working area, easy implementation; good working conditions, smooth implementation.

8. The method for selecting a site for a highway slope photovoltaic project according to claim 7, characterized in that: Safety protection condition X7 is assigned values ​​of 20, 40, 60, 80, and 100 according to heavy traffic, few lanes, narrow terrain, and high accident rate; heavy traffic, high accident rate; average traffic, average accident rate; light traffic, low accident rate; light traffic, many lanes, and extremely low accident rate.

9. The method for selecting a site for a highway slope photovoltaic project according to claim 8, characterized in that: Climate condition X8 is assigned values ​​of 20, 40, 60, 80, and 100 according to heavy rainfall or heavy wind and sand; relatively large rainfall or relatively large wind and sand; moderate rainfall or average wind and sand; relatively small rainfall or relatively small wind and sand; and relatively small rainfall or relatively small wind and sand.

10. The method for selecting a site for a highway slope photovoltaic project according to claim 9, characterized in that: The economic factor X9 is assigned 20, 40, 60, 80, and 100 respectively according to profit rate <0%; profit rate 0% to 18%; profit rate 18% to 25%; profit rate 25% to 30%; profit rate > 30%. The profit rate is calculated as follows: AND p =H×P×K1; Wherein, M is the annual rate of return; Ep is the annual power generation, in kW·h; C is the electricity price, in yuan / (kW·h); V is the total investment, in yuan; H is the local standard sunshine hours, in h; P is the component installation capacity, in kW; K1 is the system comprehensive efficiency coefficient, ranging from 0.75 to 0.85.

Citation Information

Cited By

  • Road slope photovoltaic power station layout method and system and power generation device

    CN120355081A

  • Centralized photovoltaic construction site selection suitability evaluation method based on three-dimensional evaluation model

    CN120430676A

  • Photovoltaic development suitability evaluation method considering extremely low irradiation event

    CN122694304A