Maintenance strategy determination method and device, medium, electronic equipment and program

Through the digital twin model and Q-learning algorithm, maintenance strategies are updated in real time, which solves the problem of traditional maintenance strategies relying on manual experience, improves maintenance efficiency and accuracy, and reduces costs.

CN118735489APending Publication Date: 2024-10-01CHN ENERGY JIANGSU ELECTRIC ENGINEERING TECHNOLOGY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410618681.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The traditional turnaround equipment maintenance strategy relies on manual experience, has low efficiency, poor accuracy, and poor timeliness, making it difficult to monitor and predict equipment operating status in real time.

Method used

By obtaining the current digital twin model and operating data of the turnaround equipment, the Q-learning algorithm is used to train the model, update the maintenance strategy in real time, and generate the optimal maintenance plan.

Benefits of technology

It improves the accuracy and efficiency of maintenance strategies, reduces maintenance costs, and ensures the reliability and service life of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735489A_ABST
    Figure CN118735489A_ABST
Patent Text Reader

Abstract

The invention relates to a maintenance strategy determination method and device, a medium, electronic equipment and a program, and relates to the field of equipment maintenance, and the method comprises the steps: obtaining a current digital twin model of rotating machine equipment; obtaining current operation data of the rotating machine equipment; and inputting the current operation data into the current digital twinborn model to obtain the current state information of the transfer equipment and the current maintenance strategy of the transfer equipment, so that the operation and maintenance efficiency can be improved, and the operation and maintenance cost can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of equipment maintenance, and in particular, to a method, device, medium, electronic device and program for determining a maintenance strategy. Background Art

[0002] Rotating equipment refers to rotating mechanical equipment such as turbines, generators, and compressors. Such equipment usually has complex structures and dynamic characteristics, and its operating status needs to be monitored and predicted in real time to formulate appropriate maintenance strategies.

[0003] In the traditional maintenance method of transfer equipment, the formulation of maintenance strategies usually relies on manual methods, which mainly depends on the experience and subjective judgment of equipment maintenance personnel, and there are problems such as low efficiency, poor accuracy, and poor timeliness. Summary of the invention

[0004] In order to overcome the problems existing in the related art, the present disclosure provides a method, device, medium, electronic device and program for determining a maintenance strategy.

[0005] According to a first aspect of an embodiment of the present disclosure, a method for determining a maintenance strategy is provided, comprising: Get the current digital twin model of the transfer equipment; Obtaining current operating data of the transfer equipment; The current operating data is input into the current digital twin model to obtain the current status information of the transfer equipment and the current maintenance strategy of the transfer equipment.

[0006] Optionally, the current digital twin model is initialized in the following manner: Acquiring initial information of the transfer device, the initial information including geometric information, characteristic parameters and initial operation parameters; Obtaining a historical maintenance strategy for the transfer equipment; adding the initial information to a state set of an initial model; adding the history maintenance strategy to the action set of the initial model; Based on the Q learning algorithm, the initial model is trained to learn the mapping relationship between the state set and the action set to obtain an initial digital twin model.

[0007] Optionally, the method further comprises: Obtaining actual status information and actual maintenance strategy during the execution of the current maintenance strategy; Adding the actual state information to the state set of the current digital twin model to update the state set of the current digital twin model; Adding the actual maintenance strategy to the action set of the current digital twin model to update the action set of the current digital twin model; Based on the Q learning algorithm, the current digital twin model is trained to learn the mapping relationship between the updated state set and the updated action set to update the current digital twin model.

[0008] Optionally, the training of the current digital twin model to learn a mapping relationship between an updated state set and an updated action set based on a Q learning algorithm to update the current digital twin model includes: The current digital twin model is updated by a first calculation formula, wherein the first calculation formula is:

[0009] Among them, M is the current digital twin model, M' is the updated digital twin model, η is the learning rate, which indicates the influence of the actual state information and the actual maintenance strategy on the current digital twin model, and α is the discount rate, which indicates the influence of the current digital twin model on the updated digital twin model.

[0010] Optionally, the obtaining the current operation data of the transfer device includes: The current operation data is obtained by calculating the second calculation formula, where the second calculation formula is:

[0011] Wherein, D is the current operation data, n is the number of sensors, i is a natural number from 1 to n, d i is the partial operation data of the transfer equipment currently collected by the i-th sensor, w i is the weight of the ith sensor, indicating the importance of the partial operation data currently collected by the ith sensor in the current operation data, wherein the types of the partial operation data currently collected by each sensor are the same or different.

[0012] Optionally, inputting the current operating data into the current digital twin model to obtain current status information of the transfer equipment and a current maintenance strategy of the transfer equipment includes: The current state information is obtained by calculating through a third calculation formula, and the third calculation formula is:

[0013] Among them, s k+1 is the current state information, s k is the status information of the transfer device at the last moment, u kis the adaptive control output item of the state information in the current digital twin model, and f() is the update function of the state information in the current digital twin model.

[0014] Optionally, inputting the current operating data into the current digital twin model to obtain current status information of the transfer equipment and a current maintenance strategy of the transfer equipment includes: The current operating parameters in the current maintenance strategy are calculated by a fourth calculation formula, and the fourth calculation formula is:

[0015] Among them, p k+1 is the current operating parameter, p k is the operating parameter of the transfer device at the last moment, v k is the adaptive control output item of the operating parameters in the current digital twin model, and g() is the update function of the operating parameters in the digital twin model.

[0016] According to a second aspect of an embodiment of the present disclosure, a maintenance strategy determination device is provided, including: A first acquisition module is used to acquire a current digital twin model of the transfer equipment; A second acquisition module is used to acquire the current operation data of the transfer equipment; The first determination module is used to input the current operating data into the current digital twin model to obtain the current status information of the transfer equipment and the current maintenance strategy of the transfer equipment.

[0017] According to a third aspect of an embodiment of the present disclosure, a non-temporary computer-readable storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the steps of any one of the methods provided in the first aspect of the present disclosure are implemented.

[0018] According to a fourth aspect of an embodiment of the present disclosure, there is provided an electronic device, including: a memory having a computer program stored thereon; A processor is used to execute the computer program in the memory to implement the steps of any one of the methods provided in the first aspect of the present disclosure.

[0019] According to a fifth aspect of an embodiment of the present disclosure, a computer program is provided, comprising a computer-readable code, and when the computer program is executed by a processor, the steps of any one of the methods provided in the first aspect of the present disclosure are implemented.

[0020] Through the above technical solution, the real-time operation data of the transfer equipment is input into the real-time updated digital twin model, so as to obtain the current status information and current maintenance strategy of the transfer equipment, thereby improving the accuracy of the maintenance strategy, improving maintenance efficiency and reducing maintenance costs.

[0021] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings: Figure 1 is a flow chart of a method for determining a maintenance strategy according to an exemplary embodiment; Figure 2 is a block diagram of a device for determining a maintenance strategy according to an exemplary embodiment; Figure 3 It is a block diagram of an electronic device according to an exemplary embodiment. DETAILED DESCRIPTION

[0023] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0024] It should be noted that all actions of acquiring signals, information or data in the present disclosure are carried out in compliance with the relevant data protection laws and policies of the country where the device is located and with the authorization given by the owner of the corresponding device.

[0025] In order to make the purpose, technical solutions and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present disclosure and are not intended to limit the present disclosure. In addition, the technical features involved in each embodiment of the present disclosure described below can be combined with each other as long as they do not conflict with each other.

[0026] Figure 1 is a flow chart of a method for determining a maintenance strategy according to an exemplary embodiment. Figure 1 As shown, the method for determining the maintenance strategy includes the following steps.

[0027] In step 110, the current digital twin model of the transfer equipment is obtained.

[0028] In step 120, current operation data of the transfer equipment is obtained.

[0029] In step 130, the current operating data is input into the current digital twin model to obtain the current status information of the transfer equipment and the current maintenance strategy of the transfer equipment.

[0030] Here, the current digital twin model refers to the digital simulation model of the transfer equipment that is updated in real time, which can reflect the physical characteristics and dynamic behavior of the transfer equipment. The current operating data refers to the various parameter data collected in real time during the operation of the transfer equipment, such as temperature, pressure, speed, etc. The current status information refers to the current operating status analysis results of the transfer equipment obtained by inputting the current operating data into the digital twin model, including the health status of the transfer equipment, possible fault hazards and other information. The current maintenance strategy refers to the optimal maintenance strategy automatically generated by the digital twin model based on the current status information, including maintenance plans, replacement parts recommendations, fault prevention measures and other contents.

[0031] For example, the current digital twin model and current operating data of a certain transfer equipment are obtained, and the current operating data is input into the current digital twin model for analysis, and the following current status information can be obtained: the vibration level of the transfer equipment has increased, indicating that the bearing wear has increased; the temperature of the turbine blades has increased slightly, and there may be signs of carbon deposits or damage; the overall operating efficiency has decreased, which may be due to the performance degradation caused by component wear. Based on this current status information, the digital twin model can automatically generate the following current maintenance strategies: it is recommended to replace the bearings at the next planned downtime to prevent the transfer equipment from failing; it is recommended to clean and maintain the turbine blades to reduce the risk of temperature rise; it is recommended to conduct a comprehensive inspection and commissioning of the equipment to find out the reasons for the reduced efficiency and make corresponding repairs; it is recommended to formulate a regular inspection and maintenance plan for the next 6 months to ensure the stable operation of the transfer equipment.

[0032] The current maintenance strategy generated by the current digital twin model can propose specific maintenance measures based on the actual condition of the transfer equipment, thereby helping equipment maintenance personnel to take targeted maintenance actions in a timely manner and improve the reliability and service life of the equipment.

[0033] It should be understood that the above-mentioned current digital twin model is a virtual model established based on the physical characteristics and operating mechanism of the transfer equipment. Combined with the reinforcement learning algorithm built into the model, the current operating status of the transfer equipment can be analyzed based on the current operating data input into the model, and the best current maintenance strategy can be automatically derived. In addition, the current operating data of the transfer equipment can be continuously input into the current digital twin model for real-time update to ensure synchronization with the actual equipment, thereby improving the accuracy of the current status information output by the model and the current maintenance strategy.

[0034] Therefore, by inputting the real-time operation data of the transfer equipment into the real-time updated digital twin model, the current status information and current maintenance strategy of the transfer equipment can be obtained, thereby improving the accuracy of the maintenance strategy, improving maintenance efficiency and reducing maintenance costs.

[0035] In a possible embodiment, the current digital twin model is initialized in the following manner: obtaining initial information of the transfer equipment, the initial information including geometric information, characteristic parameters and initial operating parameters; obtaining the historical maintenance strategy of the transfer equipment; adding the initial information to the state set of the initial model; adding the historical maintenance strategy to the action set of the initial model; based on the Q learning algorithm, training the initial model to learn the mapping relationship between the state set and the action set to obtain the initial digital twin model.

[0036] Here, geometric information refers to basic information such as the physical structure, size, shape, and geometric accuracy of the rotary equipment, such as the shell size, blade length, and bearing diameter of the rotary equipment. The geometric accuracy of the rotary equipment includes the flatness and roughness of the rotary equipment. Geometric information can be collected from design drawings and three-dimensional models provided by equipment manufacturers or design units, or measured and collected using three-dimensional scanners and sensors. The collected geometric information is preprocessed to form a subset of the initial information.

[0037] Characteristic parameters include key parameters that describe the performance and operating status of the transfer equipment, such as speed, temperature, vibration, pressure, flow, etc. Characteristic parameters also include characteristic scan point cloud data sets, which contain 3D scan point cloud data obtained from 3D scanners or other sensors, which can assist the digital twin model in building a 3D model for the transfer equipment. Initial operating parameters refer to the initial operating condition parameters of the transfer equipment during normal operation, such as speed range, temperature limit, pressure set point, etc. Historical maintenance strategies refer to various maintenance measures taken for transfer equipment in the past, such as regular maintenance, parts replacement, and overhaul.

[0038] The initial model refers to the initial version of the digital twin model, which contains the default parameters of the model and has not been trained. The state set refers to the set of different state variables of the transfer equipment. Before adding the initial information to the state set of the initial model, the different state variables in the state set and the data type and value range of each state variable should be set according to the initial information. Then the value corresponding to the initial information is assigned to the corresponding state variable to form the state set of the initial model. The action set refers to a set used to collect various maintenance operations that can be taken by the transfer equipment, such as adjusting parameters, replacing parts, inspection and maintenance, etc. The Q learning algorithm is a reinforcement learning algorithm that can find the optimal mapping relationship between the state set and the action set through continuous trial and error and learning. The mapping relationship between the state set and the action set is the law learned by the digital twin model about what maintenance actions should be taken when the equipment is in a certain state.

[0039] By initializing the training of the current digital twin model, the model can be equipped with basic information and maintenance experience of the transfer equipment, providing a basis for subsequent model updates.

[0040] In a possible embodiment, the method also includes: obtaining actual state information and actual maintenance strategy during the execution of the current maintenance strategy; adding the actual state information to the state set of the current digital twin model to update the state set of the current digital twin model; adding the actual maintenance strategy to the action set of the current digital twin model to update the action set of the current digital twin model; based on the Q learning algorithm, training the current digital twin model to learn the mapping relationship between the updated state set and the updated action set to update the current digital twin model.

[0041] Here, the actual maintenance strategy refers to some maintenance measures that maintenance personnel actually take that are different from the current maintenance strategy in the process of executing the current maintenance strategy recommended by the current digital twin model. For example, in the current maintenance strategy recommended by the current digital twin model, the parameter to be adjusted exceeds the upper and lower limits of the parameter. The maintenance personnel make different adjustments to the adjustment parameters according to the actual situation. The different adjustments to the parameters are the actual maintenance strategy; for another example, the current maintenance strategy recommends replacing a local part. The maintenance personnel find that the local part is not easy to replace, so they replace the component containing the local part instead. The replacement of the component is also an actual maintenance strategy.

[0042] The actual status information refers to the status of the transfer equipment observed by the maintenance personnel during the execution of the current maintenance strategy, which may be different from the current status information. The actual status information and actual maintenance strategy during the execution of the current maintenance strategy can be obtained through real-time monitoring of transfer equipment sensors and records by maintenance personnel.

[0043] Similar to the aforementioned process of adding the initial information to the state set of the initial model, the actual state information obtained is mapped to the state variables of the current digital twin model, and the state set is updated so that the current digital twin model reflects the actual operating state of the equipment. Similar to the aforementioned process of adding the historical maintenance strategy to the action set of the initial model, the actual maintenance strategy obtained is added to the action set of the current digital twin model, so that the current digital twin model has richer maintenance experience.

[0044] It should be understood that based on the Q learning algorithm, the current digital twin model is retrained to learn the optimal mapping relationship between the updated state set and action set, so as to better reflect the actual operation of the transfer equipment. By continuously updating the current digital twin model through the above method, it can be closer to reality and provide a more accurate basis for subsequent intelligent decision-making, thereby improving the maintenance efficiency and reliability of the transfer equipment.

[0045] In a possible embodiment, the Q-learning algorithm is used to train the current digital twin model to learn the mapping relationship between the updated state set and the updated action set to update the current digital twin model, including: updating the current digital twin model through a first calculation formula, wherein the first calculation formula is:

[0046] Among them, M is the current digital twin model, M' is the updated digital twin model, η is the learning rate, which indicates the influence of the actual state information and the actual maintenance strategy on the current digital twin model, and α is the discount rate, which indicates the influence of the current digital twin model on the updated digital twin model.

[0047] The above-mentioned updating of the current digital twin model by the first calculation formula specifically includes the following process. First, it can be determined that the goal of the current digital twin model to be optimized is to improve the accuracy of the prediction of the current state information and the current maintenance strategy. Then, according to the degree of difference between the current state information of the current digital twin model and the actual state information, and the degree of difference between the current maintenance strategy and the actual maintenance strategy, a corresponding reward or penalty is given to guide the current digital twin model to learn towards the optimization goal. The specific learning algorithm can adopt the Q learning algorithm. Through the interaction with the link where the current digital twin model is located, the current digital twin model continuously learns strategies and behaviors to maximize the cumulative reward. Specifically, the current digital twin model M is updated using the first calculation formula to obtain the updated digital twin model M'. Among them, η is the learning rate, which indicates the degree of influence of the actual state information and the actual maintenance strategy on the current digital twin model, and η is a value between 0 and 1. α is the discount rate, which indicates the degree of influence of the current digital twin model on the updated digital twin model, and α is a value between 0 and 1. The updated digital twin model is evaluated to check its performance in the real environment. Then, based on the evaluation results, the model parameters are adjusted to further optimize the model.

[0048] Through the above-mentioned iterative training and optimization process, the current digital twin model can continuously learn the mapping relationship between status information and maintenance strategies, making it closer to the actual operation of the transfer equipment, thereby improving the accuracy of the prediction of status information and maintenance strategies.

[0049] In a possible embodiment, step 120 includes: The current operation data is obtained by calculating the second calculation formula, where the second calculation formula is:

[0050] Wherein, D is the current operation data, n is the number of sensors, i is a natural number from 1 to n, d i is the partial operation data of the transfer equipment currently collected by the i-th sensor, w i is the weight of the ith sensor, indicating the importance of the partial operation data currently collected by the ith sensor in the current operation data, wherein the types of the partial operation data currently collected by each sensor are the same or different.

[0051] For example, three sensors can be used to collect temperature data, humidity data, and pressure data of the transfer equipment respectively. Through statistical analysis and correlation analysis, the importance of the data collected by each sensor for evaluating the operation quality and performance of the transfer equipment can be measured. As in the previous example, temperature data may be the most critical indicator, and humidity data and pressure data may be relatively secondary. Based on the above analysis results, an experiment can be designed to verify the influence of some operating data collected by each sensor on the current operating data, and the weight coefficients of the temperature sensor, humidity sensor, and pressure sensor are w respectively. 1 、w 2 and w 3 . The partial operation data collected by the three sensors 1 ,d 2 and 3 , according to their respective weights w 1 、w 2 and w 3 , weighted sum is performed through the second calculation formula to obtain the current operating data D.

[0052] Through the above method, the data collected by multiple sensors can be fully utilized, and different weights can be assigned according to the importance of the data, so as to improve the accuracy and representativeness of the current operating data, thereby providing more comprehensive and reliable input data for the subsequent update and output of the current digital twin model.

[0053] In a possible embodiment, step 130 includes: obtaining the current state information by calculating using a third calculation formula, wherein the third calculation formula is:

[0054] Among them, s k+1 is the current state information, s k is the status information of the transfer device at the last moment, u k is the adaptive control output item of the state information in the current digital twin model, and f() is the update function of the state information in the current digital twin model.

[0055] For example, s k and k+1 It can be the temperature of the transfer equipment. The power of the transfer equipment can affect the temperature of the transfer equipment. k can be the adaptive control output item of the power of the transfer equipment at the current moment to the temperature of the transfer equipment, that is, the influence coefficient, so the third calculation formula can be s k+1 =s k +u k ·s k , where the symbol represents the dot product.

[0056] In a possible embodiment, step 130 includes: calculating the current operating parameters in the current maintenance strategy by using a fourth calculation formula, and the fourth calculation formula is:

[0057] Among them, p k+1 is the current operating parameter, p k is the operating parameter of the transfer device at the last moment, v k is the adaptive control output item of the operating parameters in the current digital twin model, and g() is the update function of the operating parameters in the digital twin model.

[0058] For example, p k+1 and p k can be the power of the transfer equipment, v k can be the power adjustment parameter of the transfer equipment at the current moment, and the fourth calculation formula can be k+1 =p k +v k ·p k , where the symbol represents the dot product.

[0059] In summary, the current digital twin model of the transfer equipment, combined with the current operating data, can improve the accuracy of predicting the current status information of the transfer equipment and the current maintenance strategy that needs to be taken. This method of determining the maintenance strategy based on digital twins can greatly improve maintenance efficiency and decision-making accuracy, thereby reducing maintenance costs.

[0060] Figure 2 2 is a block diagram of a maintenance strategy determination device 200 according to an exemplary embodiment. Figure 2 The device includes: a first acquisition module 210, a second acquisition module 220 and a first determination module 230.

[0061] A first acquisition module 210 is used to acquire a current digital twin model of the transfer equipment; A second acquisition module 220 is used to acquire the current operation data of the transfer device; The first determination module 230 is used to input the current operating data into the current digital twin model to obtain the current state information of the transfer equipment and the current maintenance strategy of the transfer equipment.

[0062] Optionally, the maintenance strategy determination device further includes a digital twin model initialization module, which is used to: Acquiring initial information of the transfer device, the initial information including geometric information, characteristic parameters and initial operation parameters; Obtaining a historical maintenance strategy for the transfer equipment; adding the initial information to a state set of an initial model; adding the history maintenance strategy to the action set of the initial model; Based on the Q learning algorithm, the initial model is trained to learn the mapping relationship between the state set and the action set to obtain an initial digital twin model.

[0063] Optionally, the maintenance strategy determination device further includes a digital twin model updating module, including: The third acquisition module is used to obtain the actual state information and the actual maintenance strategy during the execution of the current maintenance strategy; A first updating module, configured to add the actual state information to the state set of the current digital twin model to update the state set of the current digital twin model; A second updating module, configured to add the actual maintenance strategy to the action set of the current digital twin model to update the action set of the current digital twin model; The fourth updating module is used to train the current digital twin model to learn the mapping relationship between the updated state set and the updated action set based on the Q learning algorithm, so as to update the current digital twin model.

[0064] Optionally, the fourth updating module is used to: The current digital twin model is updated by a first calculation formula, wherein the first calculation formula is:

[0065] Among them, M is the current digital twin model, M' is the updated digital twin model, η is the learning rate, which indicates the influence of the actual state information and the actual maintenance strategy on the current digital twin model, and α is the discount rate, which indicates the influence of the current digital twin model on the updated digital twin model.

[0066] Optionally, the second acquisition module 220 is used to: The current operation data is obtained by calculating the second calculation formula, where the second calculation formula is:

[0067] Wherein, D is the current operation data, n is the number of sensors, i is a natural number from 1 to n, d i is the partial operation data of the transfer equipment currently collected by the i-th sensor, w i is the weight of the ith sensor, indicating the importance of the partial operation data currently collected by the ith sensor in the current operation data, wherein the types of the partial operation data currently collected by each sensor are the same or different.

[0068] Optionally, the first determining module 230 is configured to: The current state information is obtained by calculating through a third calculation formula, and the third calculation formula is:

[0069] Among them, s k+1 is the current state information, s k is the status information of the transfer device at the last moment, u k is the adaptive control output item of the state information in the current digital twin model, and f() is the update function of the state information in the current digital twin model.

[0070] Optionally, the first determining module 230 is configured to: The current operating parameters in the current maintenance strategy are calculated by a fourth calculation formula, and the fourth calculation formula is:

[0071] Among them, p k+1 is the current operating parameter, p k is the operating parameter of the transfer device at the last moment, v k is the adaptive control output item of the operating parameters in the current digital twin model, and g() is the update function of the operating parameters in the digital twin model.

[0072] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.

[0073] Figure 3 FIG. 1 is a block diagram of an electronic device 300 according to an exemplary embodiment. Figure 3 As shown, the electronic device 300 may include: a processor 301 , a memory 302 . The electronic device 300 may also include one or more of a multimedia component 303 , an input / output (I / O) interface 304 , and a communication component 305 .

[0074] The processor 301 is used to control the overall operation of the electronic device 300 to complete all or part of the steps in the above-mentioned method for determining the maintenance strategy. The memory 302 is used to store various types of data to support the operation of the electronic device 300. For example, these data may include instructions for any application or method used to operate on the electronic device 300, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 302 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk. The multimedia component 303 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 302 or sent through the communication component 305. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 304 provides an interface between the processor 301 and other interface modules, and the other interface modules may be keyboards, mice, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 305 is used for wired or wireless communication between the electronic device 300 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G, 4G, NB-IOT, eMTC or other 5G, etc., or a combination of one or more of them, is not limited here. Therefore, the corresponding communication component 305 may include: Wi-Fi module, Bluetooth module, NFC module, etc.

[0075] In an exemplary embodiment, the electronic device 300 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned maintenance strategy determination method.

[0076] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned method for determining the maintenance strategy are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 302 including program instructions, and the above-mentioned program instructions can be executed by the processor 301 of the electronic device 300 to complete the above-mentioned method for determining the maintenance strategy.

[0077] In another exemplary embodiment, a computer program is also provided. The computer program has a code portion for executing the above-mentioned maintenance strategy determination method when executed by the programmable device.

[0078] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0079] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0080] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A method for determining a maintenance strategy, characterized in that: include: Get the current digital twin model of the transfer equipment; Obtaining current operating data of the transfer equipment; The current operating data is input into the current digital twin model to obtain the current status information of the transfer equipment and the current maintenance strategy of the transfer equipment.

2. The method according to claim 1, characterized in that The current digital twin model is initialized in the following way: Acquiring initial information of the transfer device, the initial information including geometric information, characteristic parameters and initial operation parameters; Obtaining a historical maintenance strategy for the transfer equipment; adding the initial information to a state set of an initial model; adding the history maintenance strategy to the action set of the initial model; Based on the Q learning algorithm, the initial model is trained to learn the mapping relationship between the state set and the action set to obtain an initial digital twin model.

3. The method according to claim 1, characterized in that Also includes: Obtaining actual status information and actual maintenance strategy during the execution of the current maintenance strategy; Adding the actual state information to the state set of the current digital twin model to update the state set of the current digital twin model; Adding the actual maintenance strategy to the action set of the current digital twin model to update the action set of the current digital twin model; Based on the Q learning algorithm, the current digital twin model is trained to learn the mapping relationship between the updated state set and the updated action set to update the current digital twin model.

4. The method according to claim 3, characterized in that The Q-learning algorithm is used to train the current digital twin model to learn the mapping relationship between the updated state set and the updated action set to update the current digital twin model, including: The current digital twin model is updated by a first calculation formula, wherein the first calculation formula is: Among them, M is the current digital twin model, M' is the updated digital twin model, η is the learning rate, which indicates the influence of the actual state information and the actual maintenance strategy on the current digital twin model, and α is the discount rate, which indicates the influence of the current digital twin model on the updated digital twin model.

5. The method according to any one of claims 1 to 4, characterized in that: The obtaining of the current operation data of the transfer device includes: The current operation data is obtained by calculating the second calculation formula, where the second calculation formula is: Wherein, D is the current operation data, n is the number of sensors, i is a natural number from 1 to n, d i is the partial operation data of the transfer equipment currently collected by the i-th sensor, w i is the weight of the ith sensor, indicating the importance of the partial operation data currently collected by the ith sensor in the current operation data, wherein the types of the partial operation data currently collected by each sensor are the same or different.

6. The method according to any one of claims 1 to 4, characterized in that: The inputting the current operation data into the current digital twin model to obtain the current state information of the transfer equipment and the current maintenance strategy of the transfer equipment includes: The current state information is obtained by calculating through a third calculation formula, and the third calculation formula is: Among them, s k+1 is the current state information, s k is the status information of the transfer device at the last moment, u k is the adaptive control output item of the state information in the current digital twin model, and f() is the update function of the state information in the current digital twin model.

7. The method according to any one of claims 1 to 4, characterized in that: The inputting the current operation data into the current digital twin model to obtain the current state information of the transfer equipment and the current maintenance strategy of the transfer equipment includes: The current operating parameters in the current maintenance strategy are calculated by a fourth calculation formula, and the fourth calculation formula is: Among them, p k+1 is the current operating parameter, p k is the operating parameter of the transfer device at the last moment, v k is the adaptive control output item of the operating parameters in the current digital twin model, and g() is the update function of the operating parameters in the digital twin model.

8. A device for determining a maintenance strategy, characterized in that: include: A first acquisition module is used to acquire a current digital twin model of the transfer equipment; A second acquisition module is used to acquire the current operation data of the transfer equipment; The first determination module is used to input the current operating data into the current digital twin model to obtain the current status information of the transfer equipment and the current maintenance strategy of the transfer equipment.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

10. An electronic device, characterized in that: include: a memory having a computer program stored thereon; A processor, configured to execute the computer program in the memory to implement the steps of the method according to any one of claims 1 to 10.

11. A computer program comprising computer readable code, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Energy system maintenance method, device and system and storage medium

    CN111476386A

  • Transmission machine lubrication strategy control method and device based on digital twinning technology

    CN116149192A

  • Pre-training model acquisition method for online synchronization of digital twin model

    CN117057255A

  • Digital twin architecture, model evaluation system, and model running method

    WO2023246568A1