Intelligent early warning and response system and method
Through the intelligent early warning and response system, data classification and deep learning models are used to dynamically adjust the early warning threshold, which solves the problems of response lag and inflexible threshold in the existing technology, achieves the accuracy of early warning and timely response, and improves system efficiency. .
Patent Information
- Application Number
- CN202411006157.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing early warning system has lagging response, insufficient flexibility in setting early warning thresholds, and the inability to effectively adjust warning levels for different situations, resulting in frequent false positives and missed negatives.
An intelligent early warning and response system is used to dynamically adjust the early warning threshold through data classification, building a network model of the Transformer module and a hybrid deep convolutional network, and combines the support vector machine to generate multiple levels of dynamic early warning thresholds to achieve comparison and response.
It achieves precise triggering of early warnings, reduces false alarms and missed alarms, ensures that relevant personnel receive early warning information as soon as possible, improves the overall effectiveness of the early warning system, and adapts to complex and changeable application environments.
Smart Images

Figure CN118736783A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of equipment early warning and response, and in particular, relates to an intelligent early warning and response system and method. Background Art
[0002] At present, early warning systems have been widely used in many fields, such as environmental monitoring, industrial production, and traffic management. These systems are usually able to collect data, conduct preliminary analysis, and trigger early warnings under certain conditions. However, existing early warning systems often have problems such as delayed response, inflexible setting of early warning thresholds, and inability to effectively adjust the early warning level for different situations.
[0003] Traditional early warning systems usually use fixed thresholds for early warning. When the collected data reaches or exceeds this fixed threshold, the system sends out an early warning signal. This method is simple and direct, but lacks flexibility and predictability, and cannot dynamically adjust the early warning threshold according to actual conditions. Therefore, an intelligent early warning and response system and method are needed to perform sensitive early warning work for equipment. Summary of the invention
[0004] In order to solve the above technical problems, the present invention proposes an intelligent early warning and response system and method to solve the problems existing in the above prior art.
[0005] To achieve the above object, the present invention provides an intelligent early warning and response system, comprising:
[0006] A data classification module, used for acquiring equipment operation data and process parameter data based on sensors, classifying the equipment operation data and process parameter data based on the BEAR model, obtaining controllable data and monitoring data, and integrating the controllable data and monitoring data into a data set to be calculated;
[0007] A prediction building module, connected to the data classification module, is used to build a network model based on a Transformer module and a hybrid deep convolutional network, train the network model, and obtain an operation prediction model;
[0008] A calculation module, connected to the prediction building module, for inputting the data set to be calculated into the operation prediction model to obtain the controllable data operation trend and the monitoring data operation trend;
[0009] A processing module, connected to the calculation module, for constructing multiple levels of dynamic warning thresholds based on historical operation data and equipment parameters, comparing the controllable data operation trend and the monitoring data operation trend with the multiple levels of dynamic warning thresholds, generating a comparison result, and triggering a corresponding level of warning and response based on the comparison result;
[0010] The alarm module is connected to the threshold building module and is used to notify relevant personnel of the corresponding level of warning and response.
[0011] To achieve the above object, the present invention provides an intelligent early warning and response method, comprising:
[0012] Acquire equipment operation data and process parameter data based on sensors, classify the equipment operation data and process parameter data based on the BEAR model, obtain controllable data and monitoring data, and integrate the controllable data and monitoring data into a data set to be calculated;
[0013] Constructing a network model based on a Transformer module and a hybrid deep convolutional network, training the network model, and obtaining a running prediction model;
[0014] Inputting the data set to be calculated into the operation prediction model to obtain the controllable data operation trend and the monitoring data operation trend;
[0015] Building multiple levels of dynamic warning thresholds based on historical operating data and equipment parameters, comparing the controllable data operating trends and monitoring data operating trends with the multiple levels of dynamic warning thresholds, and triggering corresponding levels of warnings and responses;
[0016] Notify relevant personnel of the corresponding level of warning and response.
[0017] Preferably, the process of classifying the equipment operation data and process parameter data based on the BEAR model to obtain controllable data and monitoring data includes:
[0018] Acquire historical equipment operation data and process parameters, integrate the historical equipment operation data and process parameters into a training data set and reconstruct labels;
[0019] Building a classifier based on the BERT model, training the classifier using the training data set, and performing iterative network pruning and adaptive parameter update on the trained classifier to obtain a data classifier;
[0020] The equipment operation data and process parameter data are classified based on the data classifier to obtain controllable data and monitoring data.
[0021] Preferably, the process of constructing a network model based on a Transformer module and a hybrid deep convolutional network, training the network model, and obtaining a running prediction model includes:
[0022] The Transformer module is used as a backbone network and is integrated with the hybrid deep convolutional network to construct an improved model;
[0023] Training the improved model using the training data set to obtain the operation prediction model;
[0024] The expression of the loss function of the running prediction model is:
[0025]
[0026] Among them, ∑ j F i-1 (θ i,j -θ i-1,j ) 2 It is the quadratic loss added to the parameter feature learning of the current task based on the features learned in the previous task; θ i,j represents the parameters learned by the current task model, θ i-1,j Indicates the old task parameters that are populated.
[0027] Preferably, the process of constructing multiple levels of dynamic warning thresholds based on historical operating data and equipment parameters includes:
[0028] Analyze the historical operation data and equipment parameters to obtain the frequency of historical abnormal data points;
[0029] Calculate the statistics of the frequency of each historical abnormal data point, and set multiple levels of warning thresholds based on the statistics;
[0030] Feeding back the comparison result to the warning thresholds of the multiple levels through a support vector machine to generate dynamic warning thresholds of the multiple levels;
[0031] The number of the multiple levels of dynamic warning thresholds is set based on equipment operation data and process parameter data.
[0032] Preferably, the process of setting multiple levels of warning thresholds based on the statistics further includes:
[0033] Gradually increase the load demand for each device and process, monitor and record the operating output power characteristics of the equipment system under different conditions, find the optimal load point where the net power output of the corresponding equipment and process reaches the peak through data fitting, feed the optimal load point back to the statistics of the frequency of each historical abnormal data point, and set multiple levels of warning thresholds.
[0034] Preferably, the process of notifying relevant personnel of the corresponding level of warning and response includes:
[0035] Comparing the controllable data operation trend with the multiple levels of dynamic warning thresholds to generate a comparison result, generating corresponding operations based on the comparison result, completing real-time response control of equipment and processes based on the corresponding operations, and feeding back the control results to relevant personnel;
[0036] Comparing the operating trend of the monitoring data with the multiple levels of dynamic warning thresholds to generate a comparison result, generating an equipment and process operation report based on the comparison result and feeding it back to the corresponding staff for review and processing via email;
[0037] The action expression for completing the real-time response control of the equipment and process based on the corresponding operation is:
[0038] A = {a∈P|j(a)};
[0039] Among them, A is an action set, a is a single action, and j(a) is the action execution function.
[0040] Preferably, the process of notifying relevant personnel of the corresponding level of warning and response also includes:
[0041] Comparing the controllable data operation trend and the monitoring data operation trend with the multiple levels of dynamic warning thresholds, generating a comparison result and building a data storage framework according to the controllable data operation trend and the monitoring data operation trend;
[0042] The data storage architecture is an XML architecture. In the XML architecture, the data is stored in a progressive order of acquisition time, the acquisition time is used as a constraint, the state parameters are used as detailed descriptions under the time, and the prediction results and detection results of the same acquisition time are stored accordingly according to the constraint conditions.
[0043] Compared with the prior art, the present invention has the following advantages and technical effects:
[0044] The present invention achieves accurate triggering of early warnings through intelligent prediction and dynamic setting of early warning thresholds, reducing false alarms and missed alarms. The automatic notification mechanism ensures that relevant personnel receive early warning information as soon as possible, so that they can take timely countermeasures. The optimized parameter settings and response processes improve the overall effectiveness of the early warning system, making it more adaptable to complex and changeable application environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0046] Figure 1 A schematic diagram of an intelligent early warning and response system according to an embodiment of the present invention;
[0047] Figure 2 This is a flow chart of the intelligent early warning and response method according to an embodiment of the present invention;
[0048] Figure 3A classification diagram of an embodiment of the present invention;
[0049] Figure 4 is a structural diagram of a snake-shaped Transformer module in an embodiment of the present invention;
[0050] Figure 5 2 is a structural diagram of a hybrid deep convolutional network in an embodiment of the present invention. DETAILED DESCRIPTION
[0051] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0052] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0053] Embodiment 1
[0054] like Figure 1 As shown, this embodiment provides an intelligent early warning and response system, including:
[0055] A data classification module, used for acquiring equipment operation data and process parameter data based on sensors, classifying the equipment operation data and process parameter data based on the BEAR model, obtaining controllable data and monitoring data, and integrating the controllable data and monitoring data into a data set to be calculated;
[0056] A prediction building module, connected to the data classification module, is used to build a network model based on a Transformer module and a hybrid deep convolutional network, train the network model, and obtain an operation prediction model;
[0057] A calculation module, connected to the prediction building module, for inputting the data set to be calculated into the operation prediction model to obtain the controllable data operation trend and the monitoring data operation trend;
[0058] A processing module, connected to the calculation module, for constructing multiple levels of dynamic warning thresholds based on historical operation data and equipment parameters, comparing the controllable data operation trend and the monitoring data operation trend with the multiple levels of dynamic warning thresholds, generating a comparison result, and triggering a corresponding level of warning and response based on the comparison result;
[0059] The alarm module is connected to the threshold building module and is used to notify relevant personnel of the corresponding level of warning and response.
[0060] Embodiment 2
[0061] like Figure 2 As shown, this embodiment provides an intelligent early warning and response method, including:
[0062] Acquire equipment operation data and process parameter data based on sensors, classify the equipment operation data and process parameter data based on the BEAR model, obtain controllable data and monitoring data, and integrate the controllable data and monitoring data into a data set to be calculated;
[0063] Constructing a network model based on a Transformer module and a hybrid deep convolutional network, training the network model, and obtaining a running prediction model;
[0064] Inputting the data set to be calculated into the operation prediction model to obtain the controllable data operation trend and the monitoring data operation trend;
[0065] Building multiple levels of dynamic warning thresholds based on historical operating data and equipment parameters, comparing the controllable data operating trends and monitoring data operating trends with the multiple levels of dynamic warning thresholds, and triggering corresponding levels of warnings and responses;
[0066] Notify relevant personnel of the corresponding level of warning and response.
[0067] Further optimizing the scheme, the process of classifying the equipment operation data and process parameter data based on the BEAR model to obtain controllable data and monitoring data includes:
[0068] Acquire historical equipment operation data and process parameters, integrate the historical equipment operation data and process parameters into a training data set and reconstruct labels;
[0069] like Figure 3 As shown, a classifier is constructed based on the BERT model, the classifier is trained using the training data set, and the trained classifier is iteratively network pruned and adaptively parameter updated to obtain a data classifier;
[0070] The equipment operation data and process parameter data are classified based on the data classifier to obtain controllable data and monitoring data.
[0071] The process of updating the adaptive parameters includes:
[0072] Obtaining the importance matrix obtained during the training of the sentiment classifier, and filling the stored parameters of the previous task into the blank nodes after pruning, and updating the parameters of the new task;
[0073] Based on the uncertainty regularization in the Bayesian online learning framework as a penalty term, all old task parameters are updated;
[0074] The expression of the importance matrix is:
[0075]
[0076] Among them, F i To train M i The importance matrix of the i-th task obtained when i ) represents the original loss function obtained by BERT fine-tuning the dataset of task i, t ij represents the text information in task i, y ij Indicates the corresponding category label;
[0077] The expression of the uncertain regularization term in the Bayesian online learning framework is:
[0078]
[0079] Among them, ⊙ represents element-by-element multiplication, Represents the initial standard deviation parameter of all weights in the lth layer of BERT and is used to control the stability of the learning process; and Represents the mean weight and variance weight of BERT layer l and task k; Used to judge the weight; UREG3 is used to make σ k+1 Approaching σ k .
[0080] The network pruning process includes:
[0081] The weights of each layer are ranked based on the magnitude of the ratio of mean weight to standard deviation of the retained parameters; in each round of pruning, a certain proportion of weights with the lowest ratio of mean weight to standard deviation of the retained parameters are released.
[0082] After pruning, the performance of the model will decrease due to the sudden change of network connections. In order to restore the performance of the model after pruning, this embodiment retrains the retained weights for several rounds of iterations. When performing network retraining, in order to facilitate the learning of subsequent tasks, the importance matrix obtained by the model gradient calculation is also obtained, that is, F i When the importance matrix is obtained, the weights of the current task are sorted, and the sorted weights are stored to fill the pruned network nodes. In the importance matrix obtained, in order to facilitate matrix calculation, the importance matrix values that do not belong to the current task are set to zero.
[0083] Further optimizing the scheme, the process of constructing a network model based on the Transformer module and the hybrid deep convolutional network, training the network model, and obtaining a running prediction model includes:
[0084] like Figure 4-5 As shown, the Transformer module is used as a backbone network and fused with the hybrid deep convolutional network to construct an improved model;
[0085] The Transformer structure calculates the attention score of the global features of the equipment and process. The global features of the equipment and process are obtained based on the Transformer module, and its input is the features that are reduced in size through the average pooling layer to reduce the computational cost. The specific process is that each pixel in the feature is mapped to a high-dimensional embedding vector, each pixel is regarded as a token, and its features are represented by the embedding vector. Then the token embedding operation is performed. Since the Transformer algorithm itself does not contain the position information of the sequence, it is necessary to add positional encodings to represent the position information of each pixel. The positional encoding is a fixed vector whose value varies according to the position of the pixel. Combining positional encoding with token embedding helps the model understand the different position information in the sequence. The input vector after token embedding is normalized by the layer, and each input vector is converted into three different vectors: query, key, and value. The above vector is obtained by multiplying the input vector with different weight matrices, and then the multi-head attention mechanism is operated, and the result is obtained by using residual connection. After layer normalization and fully connected network operation, the representation ability of the vector is improved, and finally the residual connection is used to obtain the final output vector.
[0086] Multi-head attention mechanism, the attention layer of the model is divided into multiple independent heads, and the attention weights of the global features of the equipment and process are calculated. The specific process is that each head maps the query vector, key vector and value vector through linear transformation, and then performs a dot product operation on the query vector and the key vector, and divides it by the square root of the key vector dimension to ensure gradient stability, and finally obtains the land use feature attention score of the Transformer structure.
[0087] At the same time, the Binary Mixed Depthwise Convolution (BMDC) module is used to capture the target fine-grained scale information of land use characteristics;
[0088] The improved model is trained using the sample set to generate the feature calculation model.
[0089] Precision, recall, average precision (AP) and mean average precision (mAP) are used as evaluation indicators.
[0090] Precision is the proportion of true positive samples among all predicted positive samples, and is calculated as:
[0091]
[0092] Among them, TP is the number of positive samples predicted by the model as positive samples, and FP is the number of negative samples predicted by the model as positive samples.
[0093] The recall rate is the proportion of all true positive samples that are predicted to be positive samples. The formula is as follows:
[0094]
[0095] Among them, TP is the number of positive samples predicted by the model as positive samples, and FN is the number of positive samples predicted by the model as negative samples.
[0096] The horizontal axis of the PR curve is the recall rate, and the vertical axis is the precision rate, which is also called the precision-recall curve. The average precision is the surface area enclosed under the PR curve. The formula is as follows:
[0097]
[0098] In the field of target detection, data sets usually contain multiple categories. AP is often used to measure the detection effect of a model for a certain category of targets. If the detection effect of multiple categories of targets is evaluated, the AP value of each category needs to be summed and averaged to obtain the mean average precision. mAP is a more comprehensive evaluation indicator that can reflect the overall performance of the model in multi-category target detection tasks. The formula is as follows:
[0099]
[0100] The IoU threshold affects the mAP value of the model. The commonly used mAP indicators are mAP@0.5 and mAP@0.5:0.95. mAP@0.5 represents the average precision of all categories when the IoU threshold is 0.5.
[0101] Training the improved model using the training data set to obtain the operation prediction model;
[0102] The expression of the loss function of the running prediction model is:
[0103]
[0104] Among them, ∑ j F i-1 (θ i,j -θ i-1,j ) 2 It is the quadratic loss added to the parameter feature learning of the current task based on the features learned in the previous task; θ i,j represents the parameters learned by the current task model, θ i-1,j Indicates the old task parameters that are populated.
[0105] Further optimizing the scheme, the process of constructing multiple levels of dynamic warning thresholds based on historical operation data and equipment parameters includes:
[0106] Analyze the historical operation data and equipment parameters to obtain the frequency of historical abnormal data points;
[0107] Calculate the statistics of the frequency of each historical abnormal data point, and set multiple levels of warning thresholds based on the statistics;
[0108] Feeding back the comparison result to the warning thresholds of the multiple levels through a support vector machine to generate dynamic warning thresholds of the multiple levels;
[0109] The number of the multiple levels of dynamic warning thresholds is set based on equipment operation data and process parameter data.
[0110] To further optimize the solution, the process of setting multiple levels of warning thresholds based on the statistics also includes:
[0111] Gradually increase the load demand for each device and process, monitor and record the operating output power characteristics of the equipment system under different conditions, find the optimal load point where the net power output of the corresponding equipment and process reaches the peak through data fitting, feed the optimal load point back to the statistics of the frequency of each historical abnormal data point, and set multiple levels of warning thresholds.
[0112] Further optimizing the scheme, the process of notifying relevant personnel of the corresponding level of warning and response includes:
[0113] Comparing the controllable data operation trend with the multiple levels of dynamic warning thresholds to generate a comparison result, generating corresponding operations based on the comparison result, completing real-time response control of equipment and processes based on the corresponding operations, and feeding back the control results to relevant personnel;
[0114] Comparing the operating trend of the monitoring data with the dynamic warning thresholds of the multiple levels to generate a comparison result, generating an equipment and process operation report based on the comparison result and feeding it back to the corresponding staff for review and processing via email;
[0115] The action expression for completing the real-time response control of the equipment and process based on the corresponding operation is:
[0116] A = {a∈P|j(a)};
[0117] Among them, A is an action set, a is a single action, and j(a) is the action execution function.
[0118] Further optimizing the scheme, the process of notifying relevant personnel of the corresponding level of warning and response also includes:
[0119] Comparing the controllable data operation trend and the monitoring data operation trend with the multiple levels of dynamic warning thresholds, generating a comparison result and building a data storage framework according to the controllable data operation trend and the monitoring data operation trend;
[0120] The data storage architecture is an XML architecture. In the XML architecture, the data is stored in a progressive order of acquisition time, the acquisition time is used as a constraint, the state parameters are used as detailed descriptions under the time, and the prediction results and detection results of the same acquisition time are stored accordingly according to the constraint conditions.
[0121] Application Condition 1: Monitor and alarm the heating devices in each heating chamber of the vacuum welding furnace. The normal welding temperature is 400℃ with an error of ±3℃; (Take V43BZ as an example)
[0122] Initial warning (first level warning): 400-420 degrees Celsius, the flux volatilization begins to accelerate, affecting the solder wetting, which may cause welding quality defects;
[0123] Warning level (secondary warning): When the temperature of the heating device reaches 420-430 degrees Celsius, the volatilization of the flux is further accelerated, increasing the temperature difference between the electronic components and the substrate, causing increased thermal stress and resulting in substrate warping;
[0124] Warning (Level 3 Warning): When the temperature of the heating device reaches 430-450 degrees Celsius, this temperature will affect the welding quality. If the temperature is too high, the flux will evaporate too quickly and the solder will not be fully wetted, which will cause welding defects.
[0125] Shutdown alarm (four-level warning): When the heating device reaches 450 degrees Celsius, it will automatically shut down to prevent damage to the equipment.
[0126] Application condition 2: Monitor the nitrogen filling rate of the vacuum welding furnace. The normal nitrogen filling rate is 50L / min, and the nitrogen concentration in the cabin is maintained at 2500ppm under high temperature environment.
[0127] Through the combination of artificial intelligence and digital technology, it is possible to set up a manual adjustment system and an artificial intelligence adjustment method at the same time under graded warning. By predicting the relationship between the nitrogen filling rate and the nitrogen concentration in the cabin, the rate is adjusted according to the predicted nitrogen concentration results while warning. If the predicted concentration decreases, the filling rate is increased. If the predicted concentration increases, in order to avoid waste and unnecessary pressure relief device operation, the flow rate is reduced in time for adaptive adjustment. The warning levels are as follows:
[0128] There are several levels of warning, such as:
[0129] Initial warning (first level warning): The nitrogen concentration parameter slightly deviates from the normal range, within the range of 2500ppm±500, and the flow rate is 40-60L / min, but it does not affect the current work. It will not cause quality problems such as major oxidation of the workpiece.
[0130] Prompt level (secondary warning): The flow rate decreases to less than 40L / min, the oxygen concentration rises to more than 3000PPm, and the equipment parameters begin to deviate continuously. There may be valve leakage, pipeline leakage, etc., and the problem needs to be found in time. At this time, the flow rate should be increased by intelligent adjustment to increase the nitrogen concentration in the cabin to prevent high-temperature oxidation of weldments;
[0131] Warning (Level 3 warning): The flow rate decreases to less than 10L / min, the oxygen concentration rises to greater than 3500PPm, and the equipment parameters begin to deviate continuously. There may be valve blockage, pipeline blockage, nitrogen shortage, etc. At this time, the flow rate should be increased by intelligent adjustment, the nitrogen concentration in the cabin should be increased, and the reducing agent (formic acid valve opening) should be increased to accelerate the reduction and prevent high-temperature oxidation of the weldment; the equipment performance is seriously degraded, resulting in a rapid decline in production quality. Measures should be taken immediately for maintenance or manual operation should be switched to intervene.
[0132] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. An intelligent early warning and response system, characterized in that: include: A data classification module, used for acquiring equipment operation data and process parameter data based on sensors, classifying the equipment operation data and process parameter data based on a BEAR model, obtaining controllable data and monitoring data, and integrating the controllable data and monitoring data into a data set to be calculated; A prediction building module, connected to the data classification module, is used to build a network model based on a Transformer module and a hybrid deep convolutional network, train the network model, and obtain an operation prediction model; A calculation module, connected to the prediction building module, for inputting the data set to be calculated into the operation prediction model to obtain the controllable data operation trend and the monitoring data operation trend; A processing module, connected to the calculation module, for constructing multiple levels of dynamic warning thresholds based on historical operation data and equipment parameters, comparing the controllable data operation trend and the monitoring data operation trend with the multiple levels of dynamic warning thresholds, generating a comparison result, and triggering a corresponding level of warning and response based on the comparison result; The alarm module is connected to the threshold building module and is used to notify relevant personnel of the corresponding level of warning and response.
2. An intelligent early warning and response method, characterized in that: The following steps are involved: Acquire equipment operation data and process parameter data based on sensors, classify the equipment operation data and process parameter data based on the BEAR model, obtain controllable data and monitoring data, and integrate the controllable data and monitoring data into a data set to be calculated; Constructing a network model based on a Transformer module and a hybrid deep convolutional network, training the network model, and obtaining a running prediction model; Inputting the data set to be calculated into the operation prediction model to obtain the controllable data operation trend and the monitoring data operation trend; Building multiple levels of dynamic warning thresholds based on historical operating data and equipment parameters, comparing the controllable data operating trends and monitoring data operating trends with the multiple levels of dynamic warning thresholds, and triggering corresponding levels of warnings and responses; Notify relevant personnel of the corresponding level of warning and response.
3. The intelligent early warning and response method according to claim 2 is characterized in that: The process of classifying the equipment operation data and process parameter data based on the BEAR model to obtain controllable data and monitoring data includes: Acquire historical equipment operation data and process parameters, integrate the historical equipment operation data and process parameters into a training data set and reconstruct labels; Building a classifier based on the BERT model, training the classifier using the training data set, and performing iterative network pruning and adaptive parameter update on the trained classifier to obtain a data classifier; The equipment operation data and process parameter data are classified based on the data classifier to obtain controllable data and monitoring data.
4. The intelligent early warning and response method according to claim 3 is characterized in that: The process of constructing a network model based on the Transformer module and the hybrid deep convolutional network, training the network model, and obtaining a running prediction model includes: The Transformer module is used as a backbone network and is integrated with the hybrid deep convolutional network to construct an improved model; Training the improved model using the training data set to obtain the operation prediction model; The expression of the loss function of the running prediction model is: Among them, Σ j F i-1 (θ i,j -θ i-1,j ) 2 It is the quadratic loss added to the parameter feature learning of the current task based on the features learned in the previous task; θ i,j represents the parameters learned by the current task model, θ i-1,j Indicates the old task parameters that are populated.
5. The intelligent early warning and response method according to claim 2 is characterized in that: The process of constructing multiple levels of dynamic warning thresholds based on historical operation data and equipment parameters includes: Analyze the historical operation data and equipment parameters to obtain the frequency of historical abnormal data points; Calculate the statistics of the frequency of each historical abnormal data point, and set multiple levels of warning thresholds based on the statistics; Feeding back the comparison result to the warning thresholds of the multiple levels through a support vector machine to generate dynamic warning thresholds of the multiple levels; The number of the multiple levels of dynamic warning thresholds is set based on equipment operation data and process parameter data.
6. The intelligent early warning and response method according to claim 5 is characterized in that: The process of setting multiple levels of warning thresholds based on the statistics also includes: Gradually increase the load demand for each device and process, monitor and record the operating output power characteristics of the equipment system under different conditions, find the optimal load point where the net power output of the corresponding equipment and process reaches the peak through data fitting, feed the optimal load point back to the statistics of the frequency of each historical abnormal data point, and set multiple levels of warning thresholds.
7. The intelligent early warning and response method according to claim 2 is characterized in that: The process of notifying relevant personnel of the corresponding level of warning and response includes: Comparing the controllable data operation trend with the multiple levels of dynamic warning thresholds to generate a comparison result, generating corresponding operations based on the comparison result, completing real-time response control of equipment and processes based on the corresponding operations, and feeding back the control results to relevant personnel; Comparing the operating trend of the monitoring data with the multiple levels of dynamic warning thresholds to generate a comparison result, generating an equipment and process operation report based on the comparison result and feeding it back to the corresponding staff for review and processing via email; The action expression for completing the real-time response control of the equipment and process based on the corresponding operation is: A = {a∈P|j(a)}; Among them, A is an action set, a is a single action, and j(a) is the action execution function.
8. The intelligent early warning and response method according to claim 2 is characterized in that: The process of notifying relevant personnel of the corresponding level of warning and response also includes: Comparing the controllable data operation trend and the monitoring data operation trend with the multiple levels of dynamic warning thresholds, generating a comparison result and building a data storage framework according to the controllable data operation trend and the monitoring data operation trend; The data storage architecture is an XML architecture. In the XML architecture, the data is stored in a progressive order of acquisition time, the acquisition time is used as a constraint, the state parameters are used as detailed descriptions under the time, and the prediction results and detection results of the same acquisition time are stored accordingly according to the constraint conditions.
Citation Information
Patent Citations
Method for detecting and identifying fire smoke in open space of ultrahigh-voltage transformer substation
CN116342999A
Self-adaptive parameter updating-based lifelong emotion classification method
CN117435737A
Alarm response method and system based on multistage intelligent linkage
CN117472701A
Geological disaster early warning system used in coal mining process
CN118097896A
System and method for event prevention and prediction
US20210035437A1