Response capability calculation method and device of energy control system, equipment and medium
By obtaining the load prediction results and historical response data, and using the response capability analysis model to determine the charging station calling strategy, the problem of unreasonable charging station calling is solved, the response capability and economic benefits of the energy control system are improved, and the stability of the power system is enhanced. .
Patent Information
- Application Number
- CN202410495394.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-10-01
AI Technical Summary
When the existing energy control system responds to fluctuations in the output of new energy sources, it is difficult to achieve reasonable adjustment in the call of charging stations, causing the stability of the power system to be affected.
By obtaining the load prediction results and using the peak-shaving and valley-filling response capability analysis models, the response capability value of the charging station is predicted, and combined with the historical response data, the charging station calling strategy is determined, and charging stations with good historical response effects are prioritized. Improve the economic benefits of energy control systems.
It realizes the reasonable deployment of charging stations, improves the response calculation accuracy and economic benefits of the energy control system, and enhances the stability of the power system.
Smart Images

Figure CN118739243A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy control technology, and in particular to a method, device, equipment and medium for calculating the response capability of an energy control system. Background Art
[0002] With the accelerated advancement of the construction of new power systems, the large-scale influx of new energy has brought huge challenges to the safety and stability of the power system. Due to the large fluctuations in the output of new energy such as wind power and photovoltaic power, it is difficult to ensure the reliable supply of electricity in the power system by relying solely on the regulation capability of the power supply side. In contrast, the power demand response mechanism will play a more important regulatory role.
[0003] However, a single controllable load has low power and scattered locations and cannot be directly called by the system. Therefore, how to realize the call of a single controllable load has become a technical problem that needs to be solved urgently. Summary of the invention
[0004] The embodiments of the present application provide a method, device, equipment and medium for calculating the response capability of an energy control system, aiming to solve the technical problems existing in the related art.
[0005] In a first aspect, an embodiment of the present application provides a method for calculating the responsiveness of an energy control system, comprising:
[0006] Obtain load forecast results of energy control systems;
[0007] According to the load forecast result, a first response capability value of each charging station of the energy control system to the peak shaving invitation demand is predicted by using a peak shaving response capability analysis model;
[0008] According to the load forecast result, a second response capability value of each charging station of the energy control system to the valley-filling invitation demand is predicted by using a valley-filling response capability analysis model;
[0009] Obtain historical response data of each charging station to peak-shaving invitation demands and valley-filling invitation demands;
[0010] A charging station calling strategy is determined according to the first response capability value and the second response capability value of each charging station and the historical response data.
[0011] In one embodiment, optionally, obtaining a load forecast result of an energy control system includes:
[0012] Calculating the short-term load forecasting result of the energy control system by using a pre-trained short-term load forecasting model;
[0013] Acquire historical load data of the time period to be predicted and the energy control system;
[0014] Determine a target historical time period similar to the time period to be predicted based on the time period to be predicted and each time period of the historical day;
[0015] The ultra-short-term load forecast result of the energy control system is calculated according to the target historical load data corresponding to the target historical time period.
[0016] In one embodiment, optionally, determining a target historical time period similar to the time period to be predicted according to the time period to be predicted and each time period of a historical day includes:
[0017] Acquire a first feature of the forecast data corresponding to the forecast time period, wherein the first feature includes at least one of the following: forecast output of new energy, forecast bidding space for coal-fired vehicles, and forecast weather;
[0018] Acquire a second feature of the historical data of each time period of the historical day, wherein the second feature includes at least one of the following: historical new energy output, historical thermal power bidding space, and historical weather;
[0019] Calculating the similarity between the time period to be predicted and each time period of historical days according to the first feature and the second feature;
[0020] According to the similarity calculation results, the time periods of the historical days are arranged in descending order according to the similarity to obtain the arrangement results;
[0021] According to the arrangement result, a preset number of time periods arranged first are selected as target historical time periods.
[0022] In one embodiment, optionally, according to the load forecast result, a peak shaving response capability analysis model is used to predict the first response capability value of each charging station of the energy control system to the peak shaving invitation demand, including:
[0023] According to the load forecast result, the first sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the peak-shaving photovoltaic storage charging area coordination layer;
[0024] According to the load forecast result, the response capacity analysis model of the peak-shaving coordinated leading layer is used to predict the second sub-response capacity value of the coordinated leading layer of each charging station of the energy control system;
[0025] The first responsiveness value is calculated according to the first sub-responsiveness value and the second sub-responsiveness value.
[0026] In one embodiment, optionally, according to the load forecasting result, a valley-filling response capability analysis model is used to predict a second response capability value of each charging station of the energy control system to a valley-filling invitation demand, including:
[0027] According to the load forecast result, the third sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the valley-filling photovoltaic storage charging area coordination layer;
[0028] According to the load forecasting result, the fourth sub-response capacity value of the overall leading layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the valley-filling type overall leading layer;
[0029] The second responsiveness value is calculated according to the third sub-responsiveness value and the fourth sub-responsiveness value.
[0030] In one embodiment, optionally, determining the charging station calling strategy according to the first response capability value and the second response capability value of each charging station and the historical response data includes:
[0031] Within the preset response capability range, priority is given to calling the target charging stations whose historical response data meet the preset requirements.
[0032] In one embodiment, optionally, the method further comprises:
[0033] The load forecast result of the energy control system is updated regularly, and the charging station calling strategy is updated according to the load forecast result.
[0034] In a second aspect, an embodiment of the present application provides a responsiveness calculation device for an energy control system, comprising:
[0035] A first acquisition module is used to obtain a load prediction result of an energy control system;
[0036] A first prediction module, configured to predict, according to the load prediction result and through a peak shaving response capability analysis model, a first response capability value of each charging station of the energy control system to a peak shaving invitation demand;
[0037] A second prediction module is used to predict the second response capability value of each charging station of the energy control system to the valley-filling invitation demand according to the load prediction result and through the valley-filling response capability analysis model;
[0038] The second acquisition module is used to obtain the historical response data of each charging station to the peak shaving invitation demand and the valley filling invitation demand;
[0039] The determination module is used to determine the charging station calling strategy according to the first response capability value and the second response capability value of each charging station and the historical response data.
[0040] In a third aspect, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for calculating the response capability of the energy control system when executing the computer program.
[0041] In a fourth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned method for calculating the response capability of the energy control system are implemented.
[0042] In the scheme implemented by the above energy control system response capacity calculation method, device, equipment and medium, the load forecast result of the energy control system is obtained; according to the load forecast result, the first response capacity value of each charging station of the energy control system for the peak-shaving invitation demand is predicted through the peak-shaving response capacity analysis model; according to the load forecast result, the second response capacity value of each charging station of the energy control system for the valley-filling invitation demand is predicted through the valley-filling response capacity analysis model; the historical response data of each charging station for the peak-shaving invitation demand and the valley-filling invitation demand is obtained; according to the first response capacity value and the second response capacity value of each charging station, and the historical response data, the charging station calling strategy is determined. In the present invention, based on the load forecast result, the response capacity of each charging station is calculated, and then according to the response capacity and historical response effect of the charging station, within the response capacity range, the charging station calling strategy is determined, such as giving priority to calling charging stations with good historical response effects, and second priority to calling charging stations with greater aggregator benefits, etc., so as to achieve reasonable calling of charging stations and improve the economic benefits of the energy control system. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0044] Figure 1 A schematic flow chart of a method for calculating the responsiveness of an energy control system according to an embodiment of the present application is shown.
[0045] Figure 2 A schematic flow chart of step S101 in a method for calculating the response capability of an energy control system according to an embodiment of the present application is shown.
[0046] Figure 3 A block diagram of a responsiveness calculation device of an energy control system according to an embodiment of the present application is shown.
[0047] Figure 4 A schematic structural diagram of a computer device according to an embodiment of the present application is shown.
[0048] Figure 5 Another structural schematic diagram of a computer device according to an embodiment of the present application is shown. DETAILED DESCRIPTION
[0049] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0050] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0051] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0052] In order to solve technical problems in related technologies such as inaccurate calculation of the response capability of energy control systems and unreasonable charging station calls, the present application proposes a method, device, equipment and medium for calculating the response capability of an energy control system.
[0053] In conjunction with the accompanying drawings, some embodiments of the present application are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0054] See also Figure 1 , Figure 1 A schematic flow chart of a method for calculating the responsiveness of an energy control system according to an embodiment of the present application is shown. The method for calculating the responsiveness of an energy control system is used to solve technical problems in related technologies such as inaccurate calculation of the responsiveness of an energy control system and unreasonable charging station calls.
[0055] like Figure 1 As shown, according to an embodiment of the present application, a method for calculating the response capability of an energy control system includes:
[0056] Step S101, obtaining a load forecast result of an energy control system; wherein the energy control system may be a system with energy control capability such as a virtual power plant.
[0057] Before obtaining the load forecast results, charging pile load modeling is required. The process is as follows:
[0058] (1) Non-adjustable charging load
[0059] Modeling is done with the pile as the dimension, and the charging power curve is the predicted power curve:
[0060]
[0061] In the formula, is the charging power of charging pile c in time period t; is the predicted charging power of charging pile c in time period t.
[0062] (2) Direct-connected charging pile load
[0063] Modeling is done with the gun as the dimension, and the charging power curve is the scenario prediction power curve:
[0064] Switch type:
[0065]
[0066] γ i,t ≤α i,t
[0067] In the formula, is the charging power of charging gun i in time period t, α i,t is the charging state 0 / 1 indicator variable of charging gun i in time period t (charging is 1), γ i,t is the response state 0 / 1 indicator variable of charging gun i in time period t (participation response is 1); P i rated is the rated power of the charging gun, is the rated charging power of the electric vehicle, It is the power ratio of the charging gun during the response period.
[0068] Continuous type:
[0069]
[0070] In the formula, is the charging power of charging gun i in time period t, P i max The upper limit of power can be adjusted for the charging gun i.
[0071] (3) Flexible group loading
[0072] (a) Charging pile load modeling of a circular high-power charging stack.
[0073] Charging method analysis:
[0074] The charging power of a charging pile is limited by two factors: 1. The maximum power that the charging gun can provide; 2. The required power of the electric vehicle. Take a 4-gun fully flexible charging pile as an example:
[0075] Scenario 1: Connecting four vehicles:
[0076]
[0077] Scenario 2: Connecting three vehicles:
[0078] Three cars are charging (A, B, C). Car A requires 100kw, Car B requires 50kw, and Car C requires 100kw. At this time, the (A, D) module provides 100kw to gun A, and module B provides 50kw to gun B. Although car C requires 100kw, no other modules provide power, so the power of gun C is 60kw.
[0079] Mathematical modeling:
[0080] The guns are i, j, k, m, α ii,t Indicates that module i is charging gun i connected to the car for charging:
[0081]
[0082] Among them, the modules cannot be connected, such as i and k, then α ki,t =0; if a car is connected to charging gun i, module i directly supplies the charging gun, α ji,t =0,α ki,t =0,α mi,t =0.
[0083] Module i can only power one gun at most. Add the following constraints:
[0084] α ii,t +α ij,t +α ik,t +α im,t ≤1
[0085] α ji,t +α jj,t +α jk,t +α jm,t ≤1
[0086] α ki,t +α kj,t +α kk,t +α km,t ≤1
[0087] α mi,t +α mj,t +α mk,t +α mm,t ≤1
[0088] (b) Matrix flexible charging pile charging pile load modeling
[0089] Charging method analysis:
[0090] The charging pile is divided into a fixed power area and an adjustable power area: if the charging power demand exceeds the total module power in the fixed power area, the charging terminal calculates the number of charging modules that need to be added to this section of the DC bus and sends it to the matrix controller; the matrix controller puts the required number of charging modules in the dynamic power area into the corresponding DC bus according to the required number of charging modules, and simultaneously switches the module communication lines to the corresponding communication bus; if the charging power demand does not exceed the total module power in the fixed power area, the matrix controller does not take action.
[0091] Mathematical modeling:
[0092] The charging terminal is labeled i, and the module fixed power is P i rated , α i,t =1 indicates that the terminal is connected and charging; the subscript of the dynamic power zone module is j, and the power of the dynamic power zone module is β ij,t =1 indicates that the dynamic power zone module j supplies power to terminal i:
[0093]
[0094] Module i can only power one gun at most. Add the following constraints:
[0095]
[0096] β ij,t ≤α i,t
[0097] In order to overcome the shortcomings of the existing methods, such as the subjective setting of some parameters and the lack of matching between the prediction model and the random driving behavior of users, in addition to the short-term power load forecasting method, the probability model of the factors affecting the charging load forecasting is established by carefully classifying electric vehicles, and a load forecasting model based on the probability of charging at the moment is proposed by using probability statistics and Monte Carlo simulation methods. The daily mileage obtained by scientific analysis is used to replace the subjective initial state of charge (SOC) to derive the charging time, and the more random moment charging probability is used to replace the calculated charging period to determine the charging load. The Monte Carlo simulation method can be described as follows: 1) Based on the historical charging behavior of the charging pile, a random model of the charging behavior of the charging pile is constructed; 2) Based on the random model of the charging process, the Monte Carlo method is used for sampling, and a large number of samples are obtained to simulate the charging behavior of the charging pile.
[0098] Since the time for each electric car to arrive at the charging station is random, it is assumed to be a random variable and follow a certain distribution law, which is affected by the time-of-use electricity price and the daily car usage habits of residents. In real life, the behavior of electric vehicles arriving at the charging station in sequence can be described by the Poisson process. The Poisson process is the most basic independent incremental random process that accumulates the number of random events. Let the random counting process be {N t ,t≥0}, which means the counting process of the number of random events, which satisfies the following three conditions:
[0099] 1)N 0 =0
[0100] 2)N t is an independent incremental process, that is, for any 0≤t 1 <t 2 <… <t n ,N t For the time (t i ,t i+1 ] increment N t+s -N t Are independent of each other.
[0101] 3) For any t>0, s≥0, increment N t+s -N t Obeying Poisson distribution, let k = N t+s -N t , then in the time interval (s+t,t), the probability of a random event occurring k times is:
[0102]
[0103] This counting process is called N t is a Poisson process. If P(λ) is used to represent the Poisson distribution with parameter λ, then N t ~P(λ(t)).
[0104] The parameter λ is an important parameter of the Poisson process, which represents the number of random events that occur per unit time and determines the frequency of electric vehicles arriving at the charging station. According to the characteristics of the Poisson process, an array N of the number of electric vehicles arriving at the charging station in each t time segment can be generated. car (t)~P(λ(t)).
[0105] Charging pile short-term charging behavior simulation:
[0106] The charging process of a single charging gun in the charging pile is divided into interval time and charging time (leaving after charging is completed). The interval time from the last car leaving to the next car charging follows an exponential distribution by default, while the charging time of a car follows a normal distribution by default. At the same time, the charging power of the car also follows a normal distribution. Therefore, the charging power after the charging process is completed is calculated by multiplying the charging power by the charging time.
[0107] For the short-term time scale of charging pile charging behavior simulation, under the premise of the aforementioned Poisson process, the interval time between two charging vehicles can be assumed to obey the exponential distribution. The exponential distribution is a single-parameter distribution family, and the overall distribution is expressed as X~E(λ), sometimes also recorded as Exp(λ), and its probability density function is expressed as:
[0108] f(x)=λe -λx , where x>0
[0109] Its physical meaning is the probability that the interval between the arrival of the next car and the departure of the previous car after charging is x time.
[0110] According to the formula derivation, the unbiased estimate of the λ parameter is obtained as follows:
[0111]
[0112] In the formula, is the average of the interval time in historical samples, and n is the number of samples.
[0113] The probability density function of the normal distribution is:
[0114]
[0115] Generally, X~N(μ,σ 2 ) to indicate that X has a mean of μ and a variance of σ 2 The normal distribution of .
[0116] According to the formula derivation, we can know that the unbiased estimates of the two parameters of the normal distribution are:
[0117]
[0118] like Figure 2 As shown, in one embodiment, optionally, step S101 includes:
[0119] Step S201, calculating the short-term load forecast result of the energy control system through a pre-trained short-term load forecast model;
[0120] Step S202, obtaining the historical load data of the time period to be predicted and the energy control system;
[0121] Step S203, determining a target historical time period similar to the time period to be predicted based on the time period to be predicted and each time period of the historical day;
[0122] Step S204: Calculate the ultra-short-term load forecast result of the energy control system according to the target historical load data corresponding to the target historical time period.
[0123] In one embodiment, optionally, step S203 includes:
[0124] Acquire a first feature of the forecast data corresponding to the forecast time period, wherein the first feature includes at least one of the following: forecast output of new energy, forecast bidding space for coal-fired vehicles, and forecast weather;
[0125] Acquire a second feature of the historical data of each time period of the historical day, wherein the second feature includes at least one of the following: historical new energy output, historical thermal power bidding space, and historical weather;
[0126] Calculating the similarity between the time period to be predicted and each time period of historical days according to the first feature and the second feature;
[0127] When calculating similarity, it can be implemented in the following ways:
[0128] In one embodiment, optionally, step S203 includes:
[0129] Calculating the Euclidean distance value between the target day to be predicted and each historical day according to the first feature and the second feature;
[0130] The similarity is determined according to the Euclidean distance value.
[0131] In this embodiment, the similarity between the first feature and the second feature can be determined by calculating the Euclidean distance. Specifically, given two time series A = (a 1 ,a 2 ,…,a n ) and B=(b 1 ,b 2 ,…,b n ), if measured by Minkowski distance, then:
[0132]
[0133] Where w represents the distance coefficient of Minkowski distance. Depending on the value, it can represent different distance metrics. When ω = 1, it is Manhattan distance, and when ω = ∞, it is L ∞ Norm and When ω=2, it is the Euclidean distance.
[0134] When performing similarity calculation, similarity calculations may be performed for different first features and second features respectively to obtain the similarity corresponding to each type of feature, and then a weighted sum is performed based on all types of features to determine the final similarity.
[0135] For example, for the predicted load and new energy predicted output of the target day to be predicted, the first similarity between the predicted load and the historical predicted load corresponding to the historical day, and the second similarity between the new energy predicted output and the historical new energy predicted output corresponding to the historical day are calculated by calculating the Euclidean distance, and then a weighted sum calculation is performed according to the first weight corresponding to the predicted load and the second weight corresponding to the new energy predicted output to obtain the final similarity.
[0136] According to the similarity calculation results, the time periods of the historical days are arranged in descending order according to the similarity to obtain the arrangement results;
[0137] According to the arrangement result, a preset number of time periods arranged first are selected as target historical time periods.
[0138] In this embodiment, the similarity between the first feature and the second feature can be determined by calculating the Euclidean distance. Specifically, given two time series A = (a 1 ,a 2 ,…,a n ) and B=(b 1 ,b 2 ,…,b n ), if measured by Minkowski distance, then:
[0139]
[0140] Where w represents the distance coefficient of Minkowski distance. Depending on the value, it can represent different distance metrics. When ω = 1, it is Manhattan distance, and when ω = ∞, it is L ∞ Norm and When ω=2, it is the Euclidean distance.
[0141] Furthermore, in order to ensure the accuracy of similarity calculation, the similarity may be calculated by calculating a dynamic time warping distance value (ie, DTW distance).
[0142] DTW uses dynamic programming ideas to adjust the relationship between corresponding elements of the time series at different time points to obtain an optimal curved path so that the distance between time series along the path is minimized. It can well measure the relationship between time series.
[0143] Given two time series X=(x 1 ,x2 ,...,x n ) and Y=(y 1 ,y 2 ,...,y m ) Construct a distance matrix D of order n×m n×m , whose elements are:
[0144]
[0145] The above formula represents two time series points x i and j Each set of adjacent elements in the matrix D is called a curved path, and it must satisfy the constraints of boundary, continuity and monotonicity, denoted by P = {p 1 ,p 2 ,...p s ,..,p k}j=1,2,...,m, where k is the total number of elements in the path, and element p s is the coordinate of the sth point on the path, that is, p s =(i,j). There are multiple paths P mentioned above. The purpose of DTW is to find an optimal bending path so that the total bending cost of sequences X and Y is minimized, that is:
[0146]
[0147] In order to solve the above formula, a cumulative cost matrix L is constructed by dynamic programming method, namely:
[0148] L(i,j)=D(i,j)+
[0149] min{L(i-1,j-1),L(i,j-1),L(i-1,j)}
[0150] Among them, i=1,2,...,n;j=1,2,...,m;L(0,0)=0;L(i,0)=L(0,j)=+∞。 It can be seen that the DTW distance of time series X and Y is DTW(X,Y)=L(n,m).
[0151] Step S102, predicting the first response capability value of each charging station of the energy control system to the peak shaving invitation demand through the peak shaving response capability analysis model according to the load forecast result;
[0152] In one embodiment, optionally, step S102 includes:
[0153] According to the load forecast result, the first sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the peak-shaving photovoltaic storage charging area coordination layer;
[0154] Among them, the objective function of the response capability analysis model of the peak-shaving photovoltaic storage charging regional coordination layer is to maximize the demand response benefits and grid-connected photovoltaic benefits, which can be expressed as:
[0155]
[0156] in, represents the response capacity reported by photovoltaic charging station i in time period t, represents the demand response / peak regulation subsidy price at time period t, ρ s represents the probability of random scene s, represents the grid-connected power of distributed photovoltaic p in time period t under random scenario s, represents the transformer conversion efficiency coefficient, represents the grid-connected energy price of photovoltaic p in time period t, represents the power purchased by photovoltaic charging station i in time period t under random scenario s, represents the energy price at time period t.
[0157] The constraints are:
[0158] (1) Demand response capacity (peak shaving type)
[0159]
[0160] in, Baseline power of solar-storage charging station i;
[0161] (2) System load balancing constraints:
[0162]
[0163] in, represents the discharge power of the energy storage system e in time period t under random scenario s; represents the charging power of the energy storage system e in time period t under random scenario s; represents the self-generated and self-used power of distributed photovoltaic p in time period t under random scenario s; represents the power consumption of charging pile c in time period t under random scenario s;
[0164] (3) Transformer capacity limitation:
[0165]
[0166] Among them, P iM Indicates the upper limit of the power transmission of the photovoltaic charging station i transformer, is the transformer capacity; η i is the power factor of the transformer, λ i is the transformer efficiency, It represents the power purchased by the PV-storage-charging station at time period t under random scenario s.
[0167] (4) Energy storage system operation constraints:
[0168] Energy storage power unit power relationship:
[0169]
[0170]
[0171] Among them, E e,s,t represents the electric energy of energy storage system e in time period t under random scenario s, It represents the discharge efficiency of the energy storage system e; represents the charging efficiency of the energy storage system e, represents the charging power of the energy storage system e in time period t under random scenario s, represents the discharge power of energy storage system e in time period t under random scenario s, Represents the discharge efficiency of the energy storage system.
[0172] Energy storage system battery SOC state constraints:
[0173]
[0174] in, Indicates the upper and lower limits of the electric energy of the energy storage system e; represents the lower limit of SOC of energy storage system e, represents the upper limit of SOC of energy storage system e, E e,s,t represents the electric energy of energy storage system e in time period t under random scenario s, E e,t represents the electric energy of the energy storage system e in time period t;
[0175] Energy storage power unit charging and discharging power constraints:
[0176]
[0177] in, represents the maximum charging power of the energy storage system e, Represents the maximum discharge power of the energy storage system e.
[0178] Energy storage power unit cycle end power control
[0179]
[0180] in, It represents the allowable fluctuation range of the energy storage system SOC at the end of the day, E e,t=T represents the energy state of the energy storage system e at the end of the day,
[0181] Energy storage power unit cycle limit DOD e,s
[0182] The number of cycles is approximately the total amount of charge during the period / energy storage capacity
[0183]
[0184] in, represents the charging power of the energy storage system e in time period t under random scenario s, represents the charging efficiency of the energy storage system e, Indicates the upper and lower limits of the electric energy of the energy storage system e, Represents the upper limit of the daily equivalent cycle number of energy storage system k.
[0185] Distributed photovoltaic operation constraints:
[0186]
[0187] represents the self-generated power of distributed photovoltaic p in time period t under random scenario s, represents the grid-connected power of distributed photovoltaic p in time period t under random scenario s, It represents the predicted power of distributed photovoltaic p in time period t under random scenario s.
[0188] Electric vehicle charging load operation constraints (rigidity):
[0189]
[0190] in, represents the power consumption of charging pile c in time period t under random scenario s, It represents the predicted power of charging pile p in time period t under random scenario s.
[0191] Electric vehicle charging load operation constraints (direct connection type):
[0192] ① The matching relationship between charging pile load and transaction power
[0193]
[0194] ②Charging load demand constraints
[0195] in, represents the charging efficiency of electric vehicles connected to charging transaction r, It represents the charging demand of electric vehicles connected to charging transaction r under random scenario s.
[0196] ③Charging time constraints:
[0197]
[0198] in, Indicates the starting time point of charging transaction r accessing the electric vehicle under random scenario s; It represents the charging demand of electric vehicles connected to charging transaction r under random scenario s.
[0199] ④Charging gun adjustment constraints
[0200] Direct switch type:
[0201]
[0202] In the formula, Indicates the rated power of the charging gun. Indicates the rated charging power of electric vehicles. Indicates the power ratio of the charging gun during the response period. represents the charging status of charging transaction r in time period t under random scenario s, represents the response state of charging transaction r in time period t under random scenario s;
[0203] Direct connection type:
[0204]
[0205] In the formula, The charging gun has adjustable power upper and lower limits.
[0206] (8) Electric vehicle charging load operation constraints (automatic power distribution / flexible group charging):
[0207] ① The matching relationship between charging pile load and transaction power
[0208]
[0209] ②Charging load demand constraints
[0210] in, represents the charging demand of electric vehicles connected to charging transaction r under random scenario s;
[0211] ③Charging time constraints:
[0212]
[0213] ④Charging pile load
[0214]
[0215]
[0216] Where j represents the subscript of the charging terminal accessed by transaction r; k represents the charging module k contained in the charging pile c, β jk,s,t Indicates that in random scenario s, charging module k supplies power to charging transaction r access terminal j.
[0217] According to the load forecast result, the response capacity analysis model of the peak-shaving coordinated leading layer is used to predict the second sub-response capacity value of the coordinated leading layer of each charging station of the energy control system;
[0218] Among them, the objective function of the response capability analysis model of the peak-cutting coordinated leading layer is expressed as:
[0219] Maximizing the benefits of demand response:
[0220]
[0221] Among them, ρ s represents the probability of random scene s, represents the power purchased by the energy control system in time period t under random scenario s, represents the energy price at time period t, represents the declared response power of proxy user l in time period t, represents the demand response subsidy price of proxy user l in period t.
[0222] The constraints are:
[0223] Energy control system demand response capacity (peak shaving type)
[0224]
[0225] in, represents the response declared capacity of the energy control system in time period t, Indicates the baseline power of distributed charging pile account number c, represents the power consumption of charging pile c in time period t under random scenario s, represents the response power of the photovoltaic charging station i in time period t, which is optimized by the regional coordination layer;
[0226] (2) System load balancing constraints:
[0227]
[0228] For distributed charging piles, add constraints such as formulas (1-6) to (1-10-7).
[0229] The first responsiveness value is calculated according to the first sub-responsiveness value and the second sub-responsiveness value.
[0230] Step S103, predicting the second response capability value of each charging station of the energy control system to the valley-filling invitation demand through the valley-filling response capability analysis model according to the load forecast result;
[0231] In one embodiment, optionally, according to the load forecasting result, a valley-filling response capability analysis model is used to predict a second response capability value of each charging station of the energy control system to a valley-filling invitation demand, including:
[0232] According to the load forecast result, the third sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the valley-filling photovoltaic storage charging area coordination layer;
[0233] Among them, the objective function of the response capability analysis model of the valley-filling photovoltaic storage charging regional coordination layer is to maximize the demand response benefits and grid-connected photovoltaic benefits, which can be expressed as:
[0234]
[0235] in, represents the response capacity reported by photovoltaic charging station i in time period t, represents the demand response / peak regulation subsidy price at time period t, ρ s represents the probability of random scene s, represents the grid-connected power of distributed photovoltaic p in time period t under random scenario s, represents the transformer conversion efficiency coefficient, represents the grid-connected energy price of photovoltaic p in time period t, represents the power purchased by photovoltaic charging station i in time period t under random scenario s, represents the energy price at time period t.
[0236] The constraints are:
[0237] (1) Demand response capacity (valley filling type)
[0238]
[0239] The remaining constraints are the same as those in the response capacity analysis model of the peak-shaving solar-storage charging regional coordination layer.
[0240] According to the load forecasting result, the fourth sub-response capacity value of the overall leading layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the valley-filling type overall leading layer;
[0241] Among them, the objective function of the response capability analysis model of the valley-filling coordinated leading layer is expressed as:
[0242] Maximizing the benefits of demand response:
[0243]
[0244] Among them, ρ s represents the probability of random scene s, represents the power purchased by the energy control system in time period t under random scenario s, represents the energy price at time period t, represents the declared response power of proxy user l in time period t, represents the demand response subsidy price of proxy user l in period t.
[0245] The constraints are:
[0246] Energy control system demand response capacity (valley filling type)
[0247]
[0248] in, represents the response declared capacity of the energy control system in time period t, Indicates the baseline power of distributed charging pile account number c, represents the power consumption of charging pile c in time period t under random scenario s, represents the response power of the photovoltaic charging station i in time period t, which is optimized by the regional coordination layer;
[0249] The remaining constraints are the same as those in the response capacity analysis model of the peak-shaving solar-storage charging regional coordination layer.
[0250] The second responsiveness value is calculated according to the third sub-responsiveness value and the fourth sub-responsiveness value.
[0251] For decentralized access charging pile resources, photovoltaic storage charging stations, and proxy users, the response capacity for valley-filling invitation demand response and the peak-shaving capacity of the D-day peak-shaving curve are predicted and analyzed. The optimization period is 96 points on the operating day with a resolution of 15 minutes.
[0252] Step S104, obtaining historical response data of each charging station to peak shaving invitation demands and valley filling invitation demands;
[0253] Step S105 , determining a charging station calling strategy according to the first response capability value and the second response capability value of each charging station and the historical response data.
[0254] In one embodiment, optionally, step S105 includes:
[0255] Within the preset response capability range, priority is given to calling the target charging stations whose historical response data meet the preset requirements.
[0256] The response capacity prediction can be made for the short-term load forecast results and the ultra-short-term load forecast results respectively. For the short-term load forecast results, the total response capacity of the energy control system is decomposed. Within the predicted response capacity range, the charging stations with good historical response effects can be used first, and the resources with greater benefits to the aggregator can be used second. Similarly, for the ultra-short-term load forecast results, the total response capacity of the energy control system is decomposed. Within the ultra-short-term predicted response capacity range, the day-ahead plan is tracked as much as possible. Among the stations that need to increase the response volume, the stations with good historical effects are used first, and the resources with greater benefits to the aggregator can be used second.
[0257] In one embodiment, optionally, the method further comprises:
[0258] The load forecast result of the energy control system is updated regularly, and the charging station calling strategy is updated according to the load forecast result.
[0259] In this embodiment, the load forecasting results of the energy control system can be updated based on information such as market release information and market clearing results, thereby further updating the charging station calling strategy to ensure the real-time and rationality of the strategy.
[0260] Figure 3 A block diagram of a responsiveness calculation device of an energy control system according to an embodiment of the present application is shown.
[0261] like Figure 3 As shown, in a second aspect, an embodiment of the present application provides a response capability calculation device 30 for an energy control system, comprising:
[0262] A first acquisition module 31 is used to obtain a load prediction result of an energy control system;
[0263] A first prediction module 32 is used to predict the first response capability value of each charging station of the energy control system to the peak shaving invitation demand according to the load prediction result and through the peak shaving response capability analysis model;
[0264] A second prediction module 33 is used to predict the second response capability value of each charging station of the energy control system to the valley-filling invitation demand according to the load prediction result and through the valley-filling response capability analysis model;
[0265] The second acquisition module 34 is used to obtain the historical response data of each charging station to the peak shaving invitation demand and the valley filling invitation demand;
[0266] The determination module 35 is used to determine the charging station calling strategy according to the first response capability value and the second response capability value of each charging station and the historical response data.
[0267] In one embodiment, optionally, the first acquisition module 31 includes:
[0268] A first calculation unit, used to calculate the short-term load forecasting result of the energy control system through a pre-trained short-term load forecasting model;
[0269] A data acquisition unit, used to acquire historical load data of the time period to be predicted and the energy control system;
[0270] A determination unit, configured to determine a target historical time period similar to the time period to be predicted based on the time period to be predicted and each time period of the historical day;
[0271] The second calculation unit is used to calculate the ultra-short-term load forecasting result of the energy control system according to the target historical load data corresponding to the target historical time period.
[0272] In one embodiment, optionally, the determining unit is configured to:
[0273] Acquire a first feature of the forecast data corresponding to the forecast time period, wherein the first feature includes at least one of the following: forecast output of new energy, forecast bidding space for coal-fired vehicles, and forecast weather;
[0274] Acquire a second feature of the historical data of each time period of the historical day, wherein the second feature includes at least one of the following: historical new energy output, historical thermal power bidding space, and historical weather;
[0275] Calculating the similarity between the time period to be predicted and each time period of historical days according to the first feature and the second feature;
[0276] According to the similarity calculation results, the time periods of the historical days are arranged in descending order according to the similarity to obtain the arrangement results;
[0277] According to the arrangement result, a preset number of time periods arranged first are selected as target historical time periods.
[0278] In one embodiment, optionally, the first prediction module 32 includes:
[0279] A first prediction unit is used to predict the first sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system according to the load prediction result and through the response capacity analysis model of the peak-shaving photovoltaic storage charging area coordination layer;
[0280] A second prediction unit is used to predict the second sub-response capacity value of the overall leading layer of each charging station of the energy control system according to the load prediction result and through the response capacity analysis model of the peak shaving overall leading layer;
[0281] The third calculation unit is configured to calculate the first responsiveness value according to the first sub-responsiveness value and the second sub-responsiveness value.
[0282] In one embodiment, optionally, the second prediction module includes:
[0283] A third prediction unit is used to predict the third sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system according to the load prediction result and through the response capacity analysis model of the valley-filling photovoltaic storage charging area coordination layer;
[0284] A fourth prediction unit is used to predict, according to the load prediction result, a fourth sub-response capacity value of the overall leading layer of each charging station of the energy control system through a response capacity analysis model of a valley-filling type overall leading layer;
[0285] The fourth calculation unit is configured to calculate the second responsiveness value according to the third sub-responsiveness value and the fourth sub-responsiveness value.
[0286] In one embodiment, optionally, the determining module is used to:
[0287] Within the preset response capability range, priority is given to calling the target charging stations whose historical response data meet the preset requirements.
[0288] In one embodiment, optionally, the device further comprises:
[0289] An updating module is used to regularly update the load forecasting result of the energy control system and update the charging station calling strategy according to the load forecasting result.
[0290] For the specific definition of the responsiveness calculation device based on the energy control system, please refer to the definition of the responsiveness calculation method based on the energy control system mentioned above, which will not be repeated here. Each module in the above-mentioned responsiveness calculation device based on the energy control system can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0291] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 4 As shown. The computer device includes a processor, a memory, a network interface and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile and / or volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external client via a network connection. When the computer program is executed by the processor, it implements the functions or steps of a service-side method for calculating the response capability of an energy control system.
[0292] In one embodiment, a computer device is provided. The computer device may be a client, and its internal structure diagram may be as follows: Figure 5 As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected via a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external server via a network connection. When the computer program is executed by the processor, it implements the functions or steps of a client side of a response capability calculation method based on an energy control system.
[0293] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor executes the computer program, the above-mentioned method for calculating the response capability based on the energy control system is implemented.
[0294] It should be noted that the above functions or steps that can be implemented by the computer-readable storage medium or electronic device can refer to the relevant description in the aforementioned method embodiment. To avoid repetition, they will not be described one by one here.
[0295] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0296] It should be understood that, although the terms first, second, etc. may be used to describe the setting unit in the embodiments of the present application, these setting units should not be limited to these terms. These terms are only used to distinguish the setting units from each other. For example, without departing from the scope of the embodiments of the present application, the first setting unit may also be referred to as the second setting unit, and similarly, the second setting unit may also be referred to as the first setting unit.
[0297] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0298] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0299] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0300] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0301] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A method for calculating the response capability of an energy control system, characterized in that: include: Obtain load forecast results of energy control systems; According to the load forecast result, a first response capability value of each charging station of the energy control system to the peak shaving invitation demand is predicted by using a peak shaving response capability analysis model; According to the load forecast result, a second response capability value of each charging station of the energy control system to the valley-filling invitation demand is predicted by using a valley-filling response capability analysis model; Obtain historical response data of each charging station to peak-shaving invitation demands and valley-filling invitation demands; A charging station calling strategy is determined according to the first response capability value and the second response capability value of each charging station and the historical response data.
2. The method according to claim 1, characterized in that Obtain load forecast results for energy control systems, including: Calculating the short-term load forecasting result of the energy control system by using a pre-trained short-term load forecasting model; Acquire historical load data of the time period to be predicted and the energy control system; Determine a target historical time period similar to the time period to be predicted based on the time period to be predicted and each time period of the historical day; The ultra-short-term load forecast result of the energy control system is calculated according to the target historical load data corresponding to the target historical time period.
3. The method according to claim 2, characterized in that Determining a target historical time period similar to the time period to be predicted according to the time period to be predicted and each time period of the historical day, including: Acquire a first feature of the forecast data corresponding to the forecast time period, wherein the first feature includes at least one of the following: forecast output of new energy, forecast bidding space for coal-fired vehicles, and forecast weather; Acquire a second feature of the historical data of each time period of the historical day, wherein the second feature includes at least one of the following: historical new energy output, historical thermal power bidding space, and historical weather; Calculating the similarity between the time period to be predicted and each time period of historical days according to the first feature and the second feature; According to the similarity calculation results, the time periods of the historical days are arranged in descending order according to the similarity to obtain the arrangement results; According to the arrangement result, a preset number of time periods arranged first are selected as target historical time periods.
4. The method according to claim 1, characterized in that: According to the load forecast result, the first response capability value of each charging station of the energy control system to the peak shaving invitation demand is predicted by using the peak shaving response capability analysis model, including: According to the load forecast result, the first sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the peak-shaving photovoltaic storage charging area coordination layer; According to the load forecast result, the response capacity analysis model of the peak-shaving coordinated leading layer is used to predict the second sub-response capacity value of the coordinated leading layer of each charging station of the energy control system; The first responsiveness value is calculated according to the first sub-responsiveness value and the second sub-responsiveness value.
5. The method according to claim 1, characterized in that: According to the load forecasting result, the second response capability value of each charging station of the energy control system to the valley filling invitation demand is predicted by using the valley filling response capability analysis model, including: According to the load forecast result, the third sub-response capacity value of the photovoltaic storage charging area coordination layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the valley-filling photovoltaic storage charging area coordination layer; According to the load forecasting result, the fourth sub-response capacity value of the overall leading layer of each charging station of the energy control system is predicted by using the response capacity analysis model of the valley-filling type overall leading layer; The second responsiveness value is calculated according to the third sub-responsiveness value and the fourth sub-responsiveness value.
6. The method according to claim 1, characterized in that Determining a charging station calling strategy according to the first response capability value and the second response capability value of each charging station and the historical response data includes: Within the preset response capability range, priority is given to calling the target charging stations whose historical response data meet the preset requirements.
7. The method according to any one of claims 1 to 6, characterized in that The method further comprises: The load forecast result of the energy control system is updated regularly, and the charging station calling strategy is updated according to the load forecast result.
8. A response capability calculation device for an energy control system, characterized in that: include: A first acquisition module is used to obtain a load forecast result of an energy control system; A first prediction module, configured to predict, according to the load prediction result and through a peak shaving response capability analysis model, a first response capability value of each charging station of the energy control system to a peak shaving invitation demand; A second prediction module is used to predict the second response capability value of each charging station of the energy control system to the valley-filling invitation demand according to the load prediction result and through the valley-filling response capability analysis model; The second acquisition module is used to obtain the historical response data of each charging station to the peak shaving invitation demand and the valley filling invitation demand; The determination module is used to determine the charging station calling strategy according to the first response capability value and the second response capability value of each charging station and the historical response data.
9. A computer device, characterized in that: include: at least one processor; and, a memory communicatively coupled to the at least one processor; The memory stores instructions executable by the at least one processor, wherein the instructions are configured to execute the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: Computer executable instructions are stored, and the computer executable instructions are used to execute the method according to any one of claims 1 to 7.