Comprehensive energy system operation optimization method considering P2G fluctuation stabilizing capability

Through adaptive wavelet packet decomposition technology, wind power net load power is decomposed layer by layer, solving the problem of multi-band wind power power decomposition, improving wind power utilization and grid connection efficiency, and achieving effective suppression of wind power fluctuations.

CN118739341AInactive Publication Date: 2024-10-01NORTH CHINA ELECTRIC POWER UNIV

Patent Information

Application Number
CN202410737362.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively decompose low-frequency and high-frequency information in multi-band wind power power, resulting in wind power power fluctuations that cannot meet grid connection requirements and reducing wind power utilization efficiency.

Method used

The adaptive wavelet packet decomposition method is used to decompose the wind power net load power layer by layer and determine the appropriate number of decomposition layers. The low-frequency power is used as the grid-connected component and the high-frequency power is used as the P2G smoothing component to ensure the safe grid-connected wind power power.

Benefits of technology

It achieves reasonable decomposition of multi-frequency wind power power, improves wind power utilization and grid connection efficiency, and can effectively smooth wind power fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739341A_ABST
    Figure CN118739341A_ABST
Patent Text Reader

Abstract

The invention provides an integrated energy system operation optimization method considering P2G fluctuation stabilizing capacity, and belongs to the field of integrated energy system operation optimization. Comprising the steps that wind power net load power is acquired, and the wind power net load power represents the power of a to-be-connected part in wind power output power; wavelet packet decomposition is carried out on the wind power net load power, a decomposed low-frequency power component of a first frequency band is a grid-connected component, if the grid-connected component does not meet the grid-connected standard, 1 is added to the number of decomposition layers, wavelet packet decomposition continues to be carried out on the wind power net load power until the grid-connected component meets the grid-connected standard, and then the grid-connected component does not meet the grid-connected standard; and taking the sum of the decomposed high-frequency power components of the other frequency bands as a P2G stabilizing component to stabilize wind power fluctuation. According to the method, the number of decomposition layers can be adaptively determined for the multi-band wind power in different time periods, so that the decomposed wind power can be safely connected to a grid, and the utilization rate of wind power is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of integrated energy system optimization, and in particular to an integrated energy system operation optimization method taking into account the P2G fluctuation smoothing capability. Background Art

[0002] An integrated energy system is a system that interconnects multiple energy sources such as electricity, heat, cold, and gas, and designs appropriate scheduling plans and scheduling strategies for the integrated energy system under the constraints of various equipment output and system operation constraints to meet user needs. It breaks the traditional situation of mutual separation between different energy systems, improves the overall energy efficiency, and promotes the consumption of renewable energy. It is of great significance to achieve low-carbon, economic, and energy-efficient systems.

[0003] However, when the system is actually running, the power of wind power connected to the grid fluctuates to varying degrees. Wind power that does not meet the requirements is often treated as abandoned wind, which greatly reduces the utilization efficiency of wind power. Therefore, the wind power must be decomposed to meet the grid connection requirements. The commonly used wavelet packet algorithm can accurately decompose the low-frequency component and high-frequency component of wind power, but the power of wind power is complex and changeable. The decomposition parameters under a single frequency band cannot be applied to multi-frequency wind power, and cannot meet the requirements of reasonable decomposition of wind power and safe grid connection.

[0004] Based on this, in the face of complex and variable wind power, how to reasonably decompose the low-frequency and high-frequency information in multi-band wind power and improve the efficiency of wind power utilization is an urgent problem that technicians in this field need to solve. Summary of the invention

[0005] The present invention provides an integrated energy system operation optimization method taking into account the P2G fluctuation smoothing capability, which can adaptively decompose the low-frequency component and high-frequency component of wind power in multiple frequency bands, so that the decomposed wind power can be safely connected to the grid, thereby improving the utilization rate of wind power.

[0006] The first aspect of the present invention provides a method for optimizing the operation of an integrated energy system taking into account the P2G fluctuation smoothing capability, comprising:

[0007] Obtaining wind power net load power, wherein the wind power net load power represents the power of the part to be connected to the grid in the wind power output power;

[0008] Perform the n-th wavelet packet decomposition on the net load power of wind power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, where the initial value of n is 1;

[0009] If the grid-connected component does not meet the preset grid-connected standard, the decomposition layer number n is increased by 1, and the process jumps to the step of performing the n-th layer wavelet packet decomposition on the net load power of wind power, and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component;

[0010] If the grid-connected component meets the grid-connected standard, the grid-connected operation is performed on the grid-connected component, and the sum of the high-frequency power components corresponding to the remaining frequency bands is used as the P2G smoothing component to smooth the wind power fluctuation.

[0011] The second aspect of the present invention provides an integrated energy system operation optimization device taking into account the P2G fluctuation smoothing capability, comprising:

[0012] A first acquisition unit is used to acquire the net load power of wind power;

[0013] The wavelet packet decomposition unit is used to perform the n-th wavelet packet decomposition on the net load power of wind power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, wherein the initial value of n is 1;

[0014] A circulation unit, for, if the grid-connected component does not meet the preset grid-connected standard, increasing the number of decomposition layers n by 1, and jumping to the step of performing the n-th layer wavelet packet decomposition on the net load power of wind power, and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component;

[0015] The control unit is used to perform a grid-connected operation on the grid-connected component if the grid-connected component meets the grid-connected standard, and use the sum of the high-frequency power components corresponding to the remaining frequency bands as the P2G smoothing component to smooth the wind power fluctuation.

[0016] The third aspect of the present invention provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of a method for optimizing the operation of an integrated energy system taking into account the P2G fluctuation smoothing capability as described in any one of the items are implemented.

[0017] A fourth aspect of the present invention provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the steps of optimizing the operation of an integrated energy system taking into account the P2G fluctuation smoothing capability as described in any one of the items.

[0018] The beneficial effects brought by the method provided by the present invention are:

[0019] By obtaining the net load power of wind power; performing the nth wavelet packet decomposition on the net load power of wind power; using the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component; if the grid-connected component does not meet the preset grid-connected standard, the decomposition layer number n is increased by 1, and the process jumps to performing the nth wavelet packet decomposition on the net load power of wind power; if the grid-connected component meets the grid-connected standard, the sum of the high-frequency power components corresponding to the remaining frequency bands is used as the P2G smoothing component to smooth the wind power fluctuation. That is, for multi-frequency band wind power in different time periods, the decomposition layer number can be adaptively determined, so that the decomposed wind power can be safely connected to the grid, thereby improving the utilization rate of wind power. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 It is a flow chart of a comprehensive energy system operation optimization method taking into account the P2G fluctuation smoothing capability provided by an embodiment of the present invention;

[0022] Figure 2 is a schematic diagram of the decomposition of the wavelet packet algorithm provided by an embodiment of the present invention;

[0023] Figure 3 It is a structural schematic diagram of a comprehensive energy system operation optimization device taking into account the P2G fluctuation smoothing capability provided by an embodiment of the present invention;

[0024] Figure 4 is a schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0026] An integrated energy system is a system that is oriented towards meeting the electricity demand in the park, takes the power system as the core, and couples multiple energy subsystems such as natural gas, heat, and cold. It can achieve multi-energy complementarity, coordinated optimization, and improve energy utilization. The embodiment of the present invention is applied to wind power in an integrated energy system. For multi-band wind power in different time periods, the number of decomposition layers can be adaptively determined, and the decomposed wind power can be safely connected to the grid, thereby improving the utilization rate of wind power.

[0027] P2G (Power to Gas) refers to the use of surplus electricity from wind power generation, solar power generation, etc. to electrolyze water to produce hydrogen, which is then supplied to the existing gas pipeline network, or the use of electricity, water and CO2 in the atmosphere to produce methane through a methanation reaction to provide gas.

[0028] Please refer to Figure 1 , which shows a flow chart of a method for optimizing the operation of an integrated energy system taking into account the P2G fluctuation smoothing capability provided by an embodiment of the present invention, which is described in detail as follows:

[0029] Step 101, obtaining wind power net load power;

[0030] In the embodiment of the present invention, the wind turbine generator set power generation indicates the power that the wind turbine generator set can output within a period of time, including a portion to be connected to the grid and a portion to be P2G leveled, and the wind power net load power is obtained from the portion to be connected to the grid.

[0031] In one embodiment, the above wind power net load power can be obtained based on the following steps:

[0032] Obtain the power generated by the wind turbine;

[0033] Obtain the power load power of the park;

[0034] The difference between the wind turbine generating power and the park power load power is taken as the wind power net load power.

[0035] The power generation capacity of a wind turbine indicates the power that can be output by the wind turbine within a period of time, and the power load power of the park indicates the power consumed by the electrical equipment connected to the power system within the park.

[0036] Step 102, performing n-th layer wavelet packet decomposition on the wind power net load power;

[0037] Wavelet packet decomposition is gradually developed on the basis of wavelet transform, and can also be called wavelet packet, subband tree and optimal subband tree structuring. Its concept is to use analysis tree to represent wavelet packet, that is, to use multiple iterations of wavelet transform to analyze the details of input signal.

[0038] Daubechies Wavelet, also known as Db wavelet, is mainly used in discrete wavelet transform. It is the most commonly used wavelet transform and is usually used in digital signal analysis, signal compression and noise removal. In fact, the commonly used Db wavelets are D2 to D20.

[0039] Wavelet packet decomposition algorithm is often used to decompose wind power. However, in practical applications, the power of wind power connected to the grid fluctuates to varying degrees. Wind power that does not meet the requirements is often treated as abandoned wind, which greatly reduces the utilization efficiency of wind power.

[0040] In order to solve the problem that it is difficult to reasonably decompose the net load power in the multi-band wind power and safely connect it to the grid for complex and changeable wind power, the present invention, based on the wavelet packet decomposition technology, adaptively determines the number of decomposition layers for the multi-band wind power in different time periods, so that the decomposed wind power can be safely connected to the grid, thereby improving the utilization rate of wind power.

[0041] In one embodiment, the net load power of wind power is decomposed by the nth layer of wavelet packets:

[0042] The low-frequency power component corresponding to the first frequency band decomposed is used as the grid-connected component, where the initial value of n is 1. That is, the nth layer 2 is reconstructed n The power components of the frequency bands are taken, and the low-frequency power component corresponding to the first frequency band is taken as the grid-connected component.

[0043] For example, the net load power can be decomposed into n layers of wavelet packets based on Db6 wavelet, and the nth layer 2 n The power components of the frequency bands are taken, and the low-frequency power component corresponding to the first frequency band is taken as the grid-connected component.

[0044] Before performing the n-th layer wavelet packet decomposition on the net load power of wind power, it is first determined whether the obtained net load power of wind power meets the grid connection standard;

[0045] If the net load power of wind power meets the grid connection standard, it will be directly connected to the grid;

[0046] If the net load power of wind power does not meet the grid connection standard, the net load power of wind power is decomposed by the nth layer of wavelet packet;

[0047] Grid connection means that the wind farm's transmission line is connected to the grid and starts to transmit power to the grid. For example, the grid connection standard is stipulated by the current national standard "Technical Regulations for Wind Farm Access to the Power System" GB / T19963-2021: For wind turbines with an installed capacity of less than 30MW, the power fluctuation requirement for grid connection within a 10-minute time window is less than 10%.

[0048] Step 103: If the grid-connected component does not meet the grid-connected standard, the number of decomposition layers n is increased by 1, and the process jumps to the step of performing the n-th layer wavelet packet decomposition on the net load power of the wind power;

[0049] In the embodiment of the present invention, when the acquired grid-connected component does not meet the grid-connected standard, it is necessary to continue to decompose the grid-connected component using the wavelet packet algorithm until the grid-connected component meets the grid-connected standard.

[0050] In one embodiment, if the grid-connected component does not meet the grid-connected standard, the number of decomposition layers n is increased by 1, and the process jumps to step 102 to continue to perform the n-th layer wavelet packet decomposition on the grid-connected component until the grid-connected component meets the grid-connected standard.

[0051] Before adding 1 to the decomposition layer number n, it is first determined whether the obtained grid-connected component, that is, the low-frequency power component corresponding to the first frequency band, meets the grid-connected standard.

[0052] Step 104: If the grid-connected component meets the grid-connected standard, a grid-connected operation is performed on the grid-connected component, and the sum of the high-frequency power components corresponding to the remaining frequency bands is used as a P2G smoothing component to smooth the wind power fluctuation;

[0053] In an embodiment of the present invention, if the grid-connected component meets the grid-connected standard, the grid-connected component is connected to the grid, and the sum of the high-frequency power components corresponding to the remaining frequency bands is used as the P2G suppression component. When the P2G suppression component meets the P2G access frequency, the suppression of the P2G suppression component is achieved.

[0054] In one embodiment, if the grid-connected component meets the grid-connected standard, a grid-connected operation is performed on the grid-connected component, and the sum of the high-frequency power components corresponding to the remaining frequency bands is used as a P2G smoothing component to smooth the wind power fluctuation, including:

[0055] Connect the grid-connected components that meet the grid-connection standards;

[0056] Get the P2G smoothing component;

[0057] If the P2G suppression component does not meet the P2G access frequency, the P2G suppression component is treated as a high frequency loss;

[0058] If the P2G suppression component meets the P2G access frequency, the P2G suppression component is suppressed and controlled.

[0059] Before performing smoothing control on the P2G smoothing component, it is necessary to obtain the maximum absolute value of the P2G smoothing component and the upper limit of the input power fluctuation of the P2G device.

[0060] Among them, the maximum absolute value of the P2G smoothing component is obtained, including:

[0061] First, obtain the sum of the high-frequency power components corresponding to the remaining frequency bands:

[0062] When the net load power of wind power is decomposed by the wavelet packet of the nth layer, the low-frequency power component corresponding to the first frequency band decomposed by the wavelet packet for the net load power of wind power is expressed as: S (n,0) (t), the remaining frequency band components are expressed as: S (n,i)(t), (i=2 n -1);

[0063] When the net load power of wind power meets the grid connection standard, that is, when the low-frequency power component corresponding to the first frequency band decomposed meets the grid connection standard, the optimal number of decomposition layers of the wavelet packet is determined to obtain the sum of the remaining frequency band components: As a P2G stabilization component;

[0064] It is expressed as:

[0065]

[0066] The maximum absolute value of the P2G suppression component is expressed as: |p h (t)|.

[0067] Before taking the sum of the high-frequency power components corresponding to the remaining frequency bands as the P2G suppression component, it is necessary to determine whether the P2G suppression component meets the P2G access frequency:

[0068] If the maximum absolute value of the P2G suppression component is not greater than the upper limit of the P2G device input power fluctuation, it is considered that the P2G suppression component meets the P2G access frequency;

[0069] If the maximum absolute value of the P2G suppression component is greater than the upper limit of the P2G device input power fluctuation, it is considered that the P2G suppression component does not meet the P2G access frequency.

[0070] Figure 2 Schematic diagram of wavelet packet algorithm decomposition provided by an embodiment of the present invention, which is described in detail as follows:

[0071] Wavelet packet decomposition is gradually developed on the basis of wavelet transform, and can also be called wavelet packet, subband tree and optimal subband tree structuring. Its concept is to use analysis tree to represent wavelet packet, that is, to use multiple iterations of wavelet transform to analyze the details of input signal.

[0072] The wavelet packet is defined as:

[0073]

[0074] In the formula, {h k} k∈Z represents the low-frequency filter coefficient, {g k} k∈Z are the high-frequency filter coefficients, and gk =(-1)kh 1-k, n represents the number of wavelet packet decomposition layers, and t is the time parameter.

[0075] The wavelet packet decomposition algorithm is:

[0076]

[0077] In the formula, represents the low-frequency coefficients of the nth layer decomposition, represents the high-frequency coefficient of the nth layer decomposition, and S represents the original signal;

[0078] The wavelet packet reconstruction algorithm is as follows:

[0079]

[0080] In the formula, S n,0 [k] represents the reconstructed low-frequency signal, S n,1 [k] represents the reconstructed high-frequency signal, h k-2j represents the low-frequency filter coefficients reconstructed by wavelet packets, g k-2j represents the high-frequency filter coefficients reconstructed by wavelet packets, represents the low-frequency reconstruction coefficient, represents the high-frequency reconstruction coefficient.

[0081] In the embodiment of the present invention, S(0,0) represents the net load power of wind power. When the net load power of wind power is greater than zero and does not meet the grid connection standard, the net load power of wind power is decomposed by n-layer wavelet packets.

[0082] Exemplarily, when n is equal to 1, S(1,0) is the low-frequency power component corresponding to the first frequency band decomposed, and S(1,1) is the high-frequency component corresponding to the remaining frequency bands;

[0083] Determine whether S(1,0) meets the grid connection standard:

[0084] If S(1,0) meets the grid connection standard, the grid connection operation is performed on the grid connection component, and the sum of the high frequency power components corresponding to the remaining frequency bands is used as the P2G smoothing component;

[0085] If S(1,0) does not meet the grid connection standard, then n is increased by 1 and the wavelet packet decomposition of S(1,0) is continued.

[0086] Exemplarily, when n is equal to 2, S(1,0) is subjected to wavelet packet decomposition, S(2,0) is the low-frequency power component corresponding to the first frequency band decomposed, and S(1,1) is decomposed into S(2,2) and S(2,3). S(2,1), S(2,2), and S(2,3) are the high-frequency components corresponding to the remaining frequency bands.

[0087] Determine whether S(2,0) meets the grid connection standard:

[0088] If S(2,0) meets the grid connection standard, the grid connection operation is performed on the grid connection component, and the sum of the high frequency power components corresponding to the remaining frequency bands is used as the P2G smoothing component;

[0089] If S(2,0) does not meet the grid connection standard, n is increased by 1, and wavelet packet decomposition of S(2,0) is continued.

[0090] For example, when n is equal to n-1, S(n-1,0) is decomposed by wavelet packet, S(n,0) is the low-frequency power component corresponding to the first frequency band decomposed, S(n,1), S(n,2 n -2)、S(n,2 n -1) is the high frequency component corresponding to the remaining frequency bands;

[0091] Determine whether S(n,0) meets the grid connection standard:

[0092] If S(n,0) satisfies the grid connection standard, the grid connection operation is performed on the grid connection component, and the sum of the high frequency power components corresponding to the remaining frequency bands is used as the P2G smoothing component;

[0093] If S(n,0) does not meet the grid connection standard, then n is increased by 1 and S(n,0) is continuously subjected to wavelet packet decomposition.

[0094] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0095] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.

[0096] Figure 3 The structure diagram of a comprehensive energy system operation optimization device taking into account the P2G fluctuation smoothing capability provided by an embodiment of the present invention is shown. For the convenience of explanation, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:

[0097] like Figure 3 As shown, a comprehensive energy system operation optimization device 3 taking into account the P2G fluctuation smoothing capability includes: a first acquisition unit 31, a wavelet packet decomposition unit 32, a circulation unit 33, and a control unit 34.

[0098] A first acquisition unit 31 is used to acquire the net load power of wind power;

[0099] The wavelet packet decomposition unit 32 is used to perform the n-th wavelet packet decomposition on the net load power of wind power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, wherein the initial value of n is 1;

[0100] The loop unit 33 is used for, if the grid-connected component does not meet the preset grid-connected standard, increasing the number of decomposition layers n by 1, and jumping to the step of performing the n-th layer wavelet packet decomposition on the net load power of wind power, and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component;

[0101] The control unit 34 is configured to perform a grid-connected operation on the grid-connected component if the grid-connected component meets the grid-connected standard, and use the sum of the high-frequency power components corresponding to the remaining frequency bands as the P2G smoothing component to smooth the wind power fluctuation.

[0102] In one implementation, the first acquisition unit 31 is further used to acquire the power generated by the wind turbine set and the power load power of the park, and use the difference between the power generated by the wind turbine set and the power load power of the park as the net load power of wind power.

[0103] In one implementation, a comprehensive energy system operation optimization device 3 taking into account the P2G fluctuation smoothing capability further includes a first judgment unit, which is further used to judge whether the wind power net load power is greater than 0 before the wavelet packet decomposition unit 32 performs the n-th layer wavelet packet decomposition on the wind power net load power;

[0104] Correspondingly, the wavelet packet decomposition unit 32 is specifically configured to, if the wind power net load power is greater than 0, perform an n-th layer of wavelet packet decomposition on the wind power net load power.

[0105] In one implementation, an integrated energy system operation optimization device 3 taking into account the P2G fluctuation smoothing capability also includes a second judgment unit for judging whether the wind power net load power meets the grid connection standard before performing the n-th layer wavelet packet decomposition on the wind power net load power and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid connection component.

[0106] Correspondingly, the circulation unit 33 is specifically used to, if the wind power net load power does not meet the grid connection standard, increase the decomposition layer number n by 1, perform the nth layer wavelet packet decomposition on the wind power net load power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid connection component.

[0107] In one implementation, the low-frequency power component is expressed as: S (n,0) (t), the high frequency power components corresponding to the remaining frequency bands are expressed as: S (n,i) (t)(i=2 n -1), the P2G smoothing component is expressed as:

[0108]

[0109] Among them, S represents the original signal in the net load power of wind power, n represents the number of wavelet packet decomposition layers, t is the time parameter, and i is the number of corresponding high-frequency power components in the remaining frequency bands.

[0110] In one implementation, the control unit 34 is specifically configured to obtain a P2G suppression component; determine whether the P2G suppression component satisfies a P2G access frequency; and if the P2G suppression component satisfies a P2G access frequency, perform suppression control on the P2G suppression component.

[0111] In one implementation, a comprehensive energy system operation optimization device 3 taking into account the P2G fluctuation suppression capability further includes a second acquisition unit for obtaining an upper limit value of the P2G device input power fluctuation and a maximum absolute value of the P2G suppression component;

[0112] An integrated energy system operation optimization device 3 taking into account the P2G fluctuation suppression capability also includes a third judgment unit, which is used to obtain a P2G suppression component in a control unit 34; judge whether the P2G suppression component meets the P2G access frequency; if the P2G suppression component meets the P2G access frequency, then judge whether the P2G suppression component meets the P2G access frequency before performing suppression control on the P2G suppression component.

[0113] If the maximum absolute value of the P2G suppression component is not greater than the upper limit of the P2G device input power fluctuation, it is considered that the P2G suppression component meets the P2G access frequency;

[0114] If the maximum absolute value of the P2G suppression component is greater than the upper limit of the P2G device input power fluctuation, it is considered that the P2G suppression component does not meet the P2G access frequency.

[0115] Figure 4 It is a schematic diagram of an electronic device provided by an embodiment of the present invention.

[0116] like Figure 4 As shown, the electronic device 4 of this embodiment includes: a processor 40, a memory 41, and a computer program 42 stored in the memory 41 and executable on the processor 40. When the processor 40 executes the computer program 42, the steps in the above-mentioned data processing method embodiments are implemented, for example Figure 1 Alternatively, when the processor 40 executes the computer program 42, the functions of each module / unit in the above-mentioned device embodiments are realized, for example Figure 3 The functions of the units 31 to 34 are shown.

[0117] Exemplarily, the computer program 42 may be divided into one or more modules / units, which are stored in the memory 41 and executed by the processor 40 to complete the present invention. The one or more modules / units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 42 in the electronic device 4. For example, the computer program 42 may be divided into a first acquisition unit, a wavelet packet decomposition unit, a circulation unit, and a control unit, and the specific functions of each unit are as follows:

[0118] A first acquisition unit is used to acquire the net load power of wind power;

[0119] The wavelet packet decomposition unit is used to perform the n-th wavelet packet decomposition on the net load power of wind power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, wherein the initial value of n is 1;

[0120] A circulation unit, for, if the grid-connected component does not meet the preset grid-connected standard, increasing the number of decomposition layers n by 1, and jumping to the step of performing the n-th layer wavelet packet decomposition on the net load power of wind power, and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component;

[0121] The control unit is used to perform a grid-connected operation on the grid-connected component if the grid-connected component meets the grid-connected standard, and use the sum of the high-frequency power components corresponding to the remaining frequency bands as the P2G smoothing component to smooth the wind power fluctuation.

[0122] The electronic device 4 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The electronic device may include, but is not limited to, a processor 40 and a memory 41. Those skilled in the art will appreciate that Figure 4 It is only an example of the electronic device 4 and does not constitute a limitation of the electronic device 4. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the electronic device may also include input and output devices, network access devices, buses, etc.

[0123] The processor 40 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0124] The memory 41 may be an internal storage unit of the electronic device 4, such as a hard disk or memory of the electronic device 4. The memory 41 may also be an external storage device of the electronic device 4, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the electronic device 4. Further, the memory 41 may also include both an internal storage unit and an external storage device of the electronic device 4. The memory 41 is used to store the computer program and other programs and data required by the electronic device. The memory 41 may also be used to temporarily store data that has been output or is to be output.

[0125] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0126] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0127] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0128] In the embodiments provided by the present invention, it should be understood that the disclosed devices / electronic devices and methods can be implemented in other ways. For example, the device / electronic device embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0129] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0130] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0131] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.

[0132] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A method for optimizing the operation of an integrated energy system taking into account the P2G fluctuation-smoothing capability, wherein the integrated energy system includes wind power, It is characterized in that The method comprises: Obtaining wind power net load power, wherein the wind power net load power represents the power of the part to be connected to the grid in the wind power output power; Perform the n-th wavelet packet decomposition on the net load power of wind power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, where the initial value of n is 1; If the grid-connected component does not meet the preset grid-connected standard, the decomposition layer number n is increased by 1, and the process jumps to the step of performing the n-th layer wavelet packet decomposition on the net load power of wind power, and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component; If the grid-connected component meets the grid-connected standard, the grid-connected operation is performed on the grid-connected component, and the sum of the high-frequency power components corresponding to the remaining frequency bands is used as the P2G smoothing component to smooth the wind power fluctuation.

2. According to claim 1, a comprehensive energy system operation optimization method taking into account the P2G fluctuation smoothing capability, It is characterized in that The obtaining of wind power net load power comprises: Obtain the power generated by the wind turbine; Obtain the power load power of the park; The difference between the wind turbine generating power and the park power load power is taken as the wind power net load power.

3. According to claim 1, a comprehensive energy system operation optimization method taking into account the P2G fluctuation smoothing capability, It is characterized in that Before performing the n-th wavelet packet decomposition on the wind power net load power, the method further includes: Determining whether the wind power net load power is greater than 0; Correspondingly, the n-th layer wavelet packet decomposition of the wind power net load power includes: If the wind power net load power is greater than 0, the wind power net load power is subjected to an n-th layer of wavelet packet decomposition.

4. According to claim 1, a comprehensive energy system operation optimization method taking into account the P2G fluctuation smoothing capability, It is characterized in that Before performing the n-th wavelet packet decomposition on the net load power of wind power and using the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, the method further includes: Determining whether the wind power net load power meets the grid connection standard; Correspondingly, performing the n-th wavelet packet decomposition on the net load power of wind power and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component includes: If the net load power of wind power does not meet the grid connection standard, the decomposition layer number n is increased by 1, the net load power of wind power is decomposed by the nth layer of wavelet packet, and the low-frequency power component corresponding to the first frequency band decomposed is used as the grid connection component.

5. A method for optimizing the operation of an integrated energy system taking into account the P2G fluctuation-smoothing capability according to any one of claims 1 to 4, It is characterized in that The low frequency power component is expressed as: S (n,0) (t); The high frequency power components corresponding to the remaining frequency bands are expressed as: S (n,i) (t),(i=2 n -1); The P2G suppression component is expressed as: Among them, S represents the original signal in the net load power of wind power, n represents the number of wavelet packet decomposition layers, t is the time parameter, and i is the number of corresponding high-frequency power components in the remaining frequency bands.

6. A comprehensive energy system operation optimization method taking into account the P2G fluctuation smoothing capability according to claim 5, It is characterized in that The method of taking the sum of the high frequency power components corresponding to the remaining frequency bands as the P2G smoothing component to smooth the wind power fluctuation includes: Get the P2G smoothing component; Determining whether the P2G suppression component satisfies a P2G access frequency; If the P2G suppression component meets the P2G access frequency, the P2G suppression component is suppressed and controlled.

7. A method for optimizing the operation of an integrated energy system taking into account the P2G fluctuation-smoothing capability according to claim 6, It is characterized in that The determining whether the P2G suppression component satisfies the P2G access frequency includes: Get the upper limit of the input power fluctuation of the P2G device; Get the maximum absolute value of the P2G smoothing component; If the maximum absolute value of the P2G suppression component is not greater than the upper limit of the P2G device input power fluctuation, it is considered that the P2G suppression component meets the P2G access frequency; If the maximum absolute value of the P2G suppression component is greater than the upper limit of the P2G device input power fluctuation, it is considered that the P2G suppression component does not meet the P2G access frequency.

8. An integrated energy system operation optimization device taking into account the P2G fluctuation smoothing capability, the integrated energy system comprising wind power, It is characterized in that The device comprises: A first acquisition unit is used to acquire the net load power of wind power; The wavelet packet decomposition unit is used to perform the n-th wavelet packet decomposition on the net load power of wind power, and use the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component, wherein the initial value of n is 1; A circulation unit, for, if the grid-connected component does not meet the preset grid-connected standard, increasing the number of decomposition layers n by 1, and jumping to the step of performing the n-th layer wavelet packet decomposition on the net load power of wind power, and taking the low-frequency power component corresponding to the first frequency band decomposed as the grid-connected component; The control unit is used to perform a grid-connected operation on the grid-connected component if the grid-connected component meets the grid-connected standard, and use the sum of the high-frequency power components corresponding to the remaining frequency bands as the P2G smoothing component to smooth the wind power fluctuation.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the integrated energy system operation optimization method taking into account the P2G fluctuation smoothing capability as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the integrated energy system operation optimization method taking into account the P2G fluctuation smoothing capability as described in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Hybrid energy storage capacity optimal configuration method based on volatility margin

    CN112310988A

  • New energy power fluctuation stabilizing method and system, electronic equipment and storage medium

    CN116054198A

  • Virtual power plant hybrid energy storage capacity configuration method based on variable-proportion fuel gas hydrogen doping

    CN117096909A

  • Control method, device and electronic device for hybrid energy storage system

    JP7407894B1

Cited By

  • Wind power fluctuation stabilizing system based on energy storage system

    CN119482537A

  • Electric bicycle charging monitoring method, system and device and storage medium

    CN120270077A