Coal injection method
By measuring and controlling the pressure difference in the powder outlet pipe of the injection tank, the injection process is adjusted in a targeted manner, which solves the problem of clogging of the powder outlet pipe of the injection tank, ensures stable injection of the blast furnace, reduces production costs, and prevents pulverized coal pollution.
Patent Information
- Application Number
- CN202410730732.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-08
AI Technical Summary
In the blast furnace injection system, the powder discharge pipe of the injection tank is frequently clogged, resulting in insufficient injection of pulverized coal, affecting the temperature and stability of the blast furnace and possibly causing accidents.
By measuring the △P and △P standards of the powder discharge pipe of the injection tank, targeted control is carried out according to different pressure relationships, including delay, inverted tank injection, increasing tank pressure and opening the purge pipe to prevent clogging and ensure the flow rate of pulverized coal. Greater than the critical speed to prevent pipe blockage.
It ensures stable and uniform injection of the blast furnace, reduces personnel labor and labor intensity, prevents pulverized coal from polluting the environment, and improves production efficiency and safety.
Smart Images

Figure CN118745489A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of blast furnace coal injection in steel smelting, and in particular to a coal injection method. Background Art
[0002] The technology of pulverized coal injection in blast furnace is an effective means to save coke and reduce consumption and adjust furnace conditions. The injection system is one of the five major systems of the blast furnace. It is affected by the equipment condition, pulverized coal quality, process conditions, operating level, etc. Under abnormal conditions, it may sometimes cause the powder discharge of the powder discharge pipe of the injection tank to be slow, and in severe cases, the pipeline will be blocked, interrupting the continuous supply of coal to the blast furnace, resulting in the amount of pulverized coal injection failing to meet the requirements of the blast furnace, causing fluctuations in the blast furnace temperature and furnace conditions. If it lasts for a long time, it may induce accidents such as blast furnace production and quality. The blockage of the powder discharge pipe below the injection tank is a frequent location for the injection pipeline to be blocked, which is very harmful. Therefore, it is particularly important to prevent and deal with the blockage of the powder discharge pipe for stable and uniform blast furnace injection.
[0003] In view of this, the present invention is proposed. Summary of the invention
[0004] The object of the present invention is to provide a coal injection method to solve or improve the above technical problems.
[0005] The present invention can be implemented like this:
[0006] In a first aspect, the present invention provides a coal injection method, comprising the following steps:
[0007] S1: Obtain the △P and △P of the anti-blocking device of the powder outlet pipe of the injection tank in the blast furnace injection system 标 ;
[0008] The anti-blocking device for the powder outlet pipe of the spray tank comprises a first spray tank, a second spray tank, a spray main pipe, a first spray tank powder outlet pipe, a second spray tank powder outlet pipe, a first purge pipe and a second purge pipe; one end of the powder outlet pipe of the first spray tank is connected to the first spray tank, and the other end is connected to the spray main pipe; one end of the powder outlet pipe of the second spray tank is connected to the second spray tank, and the other end is connected to the spray main pipe, and the connection between the powder outlet pipe of the first spray tank and the spray main pipe merges with the connection between the powder outlet pipe of the second spray tank and the spray main pipe; wherein the first spray tank and the second spray tank work alternately; the first purge pipe is connected between the powder outlet pipe of the first spray tank and the spray main pipe, and the second purge pipe is connected between the powder outlet pipe of the second spray tank and the spray main pipe;
[0009] The tank pressure value of the first spray tank is P1, and the pressure value at the junction of the first spray tank powder outlet pipe and the second spray tank powder outlet pipe is P2, △P = P1-P2;
[0010] △P 标 =△P g +△P gv +△Pd , where △P g is the friction loss between gas and tube wall, △P gv The energy consumed by the collision between the coal powder and the pipe wall and the collision between them, △P d It is the kinetic energy consumed by the accelerated coal powder and the potential energy generated by the coal powder due to gravity;
[0011] S2: According to △P and △P 标 The relationship is handled differently according to the following situations:
[0012] If 0.5△P 标 ≤△P≤△P 标 , maintain normal powder output state;
[0013] If 0<△P<0.5△P 标 , after a delay of 25s to 35s, the can is sprayed;
[0014] If △P 标 ≤△P≤1.5△P 标 , after a delay of 25s to 35s, increase the tank pressure and keep the injection rate stable;
[0015] If 1.5△P 标 ≤△P≤2△P 标 , indicating that the powder outlet pipe of the running spray tank is blocked. At this time, open the corresponding purge pipe to purge the blocked powder outlet pipe of the spray tank.
[0016] In an alternative embodiment, ΔP g ≤10Kpa.
[0017] In an alternative embodiment, ΔP 标 =10+2.1×Q, where Q is the injection volume in kg / s.
[0018] In an optional embodiment, the internal pressures of the first purge pipe and the second purge pipe are independently not less than 1.0 MPa.
[0019] In an optional embodiment, the first spray tank powder outlet pipe is provided with a first opening, the first opening is arranged along the tangential direction of the first spray tank powder outlet pipe, and the first purge pipe is connected to the first opening;
[0020] The second spray tank powder outlet pipe is provided with a second opening, the second opening is arranged along the tangential direction of the second spray tank powder outlet pipe, and the second purge pipe is connected to the second opening.
[0021] In an optional embodiment, the first purge pipe is also provided with a first check valve, a first flow orifice plate, a first cut-off valve and a first flow regulating valve in sequence;
[0022] The second purge pipe is also provided with a second check valve, a second flow orifice plate, a second cut-off valve and a second flow regulating valve in sequence.
[0023] In an optional embodiment, the apertures of the flow holes in the first flow orifice plate and the apertures of the flow holes in the second flow orifice plate are independently 3 mm to 10 mm.
[0024] In an optional embodiment, a first manual shut-off valve and a first spray valve are provided on the pipe section between the corresponding junction of the first spray tank powder outlet pipe and the first opening;
[0025] A second manual shut-off valve and a second blowing valve are provided on the pipe section between the corresponding junction of the second blowing tank powder outlet pipe and the second opening.
[0026] In an optional embodiment, a first coal loading pipe is connected to the upper part of the first blowing tank, a first upper coal loading valve and a first lower coal loading valve are provided on the first coal loading pipe, a first blowing tank powder outlet pipe is connected to the lower part of the first blowing tank, and a first lower coal powder valve is provided on the first blowing tank powder outlet pipe section between the first blowing tank powder outlet pipe and the connection point of the first blowing tank and the first opening;
[0027] The upper part of the second blowing tank is connected to a second coal loading pipe, on which a second upper coal loading valve and a second lower coal loading valve are provided. The second blowing tank powder outlet pipe is connected to the lower part of the second blowing tank, and a second lower pulverized coal valve is provided on the second blowing tank powder outlet pipe section between the connection between the second blowing tank powder outlet pipe and the second blowing tank and the second opening.
[0028] In an optional embodiment, the first blowing tank is further provided with a first pressure relief valve, and the second blowing tank is further provided with a second pressure relief valve.
[0029] In an optional embodiment, the first spray tank and the second spray tank each independently have at least spraying, tank inversion, coal loading and waiting for spraying states, and the first spray tank powder outlet pipe and the second spray tank powder outlet pipe each independently have at least fully open, half open and normally closed states;
[0030] When the spray tank is in the state of spraying, inverting, loading powder and waiting for spraying, the corresponding purge pipes are in the normally open state.
[0031] The beneficial effects of the present invention include:
[0032] The present invention creatively proposes a method based on ΔP and ΔP 标 The above △P and △P 标The method can be accurately measured, and the flow rate of the pulverized coal in the pulverized coal outlet pipe can be ensured to be greater than the critical speed, eliminating the problem of uneven pulverized coal outlet from the injection tank, preventing pipe blockage, and facilitating stable and uniform blast furnace spraying, ensuring stable and smooth operation of the blast furnace and reducing costs and increasing efficiency. In addition, the method is easy to operate, reliable and applicable, and can reduce the workload and labor intensity of personnel, and prevent pulverized coal from being discharged into the atmosphere to pollute the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0034] Figure 1 This is a schematic structural diagram of the anti-blocking device for the powder outlet pipe of the spray tank provided by the present invention.
[0035] Icons: 10-first blowing tank; 101-first coal loading pipe; 102-first upper coal loading valve; 103-first lower coal loading valve; 11-first blowing tank powder outlet pipe; 111-first lower pulverized coal valve; 112-first pressure relief valve; 12-first purge pipe; 13-first check valve; 14-first shut-off valve; 15-first flow regulating valve; 16-first manual shut-off valve; 17-first blowing valve; 20-second blowing tank; 201-second coal loading pipe; 202-second upper coal loading valve; 203-second lower coal loading valve; 21-second blowing tank powder outlet pipe; 211-second lower pulverized coal valve; 212-second pressure relief valve; 22-second purge pipe; 23-second check valve; 24-second shut-off valve; 25-second flow regulating valve; 26-second manual shut-off valve; 27-second blowing valve; 30-blowing main pipe. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be described clearly and completely below. If the specific conditions are not specified in the embodiments, they are carried out according to conventional conditions or conditions recommended by the manufacturer. If the manufacturer of the reagents or instruments used is not specified, they are all conventional products that can be purchased commercially.
[0037] The coal injection method provided in this application is described in detail below.
[0038] The present application proposes a coal injection method, comprising the following steps:
[0039] S1: Obtain the △P and △P of the anti-blocking device of the powder outlet pipe of the injection tank in the blast furnace injection system 标 ;
[0040] Please refer to Figure 1 The anti-blocking device for the powder outlet pipe of the spray tank comprises a first spray tank 10, a second spray tank 20, a spray main pipe 30, a first spray tank powder outlet pipe 11, a second spray tank powder outlet pipe 21, a first purge pipe 12 and a second purge pipe 22; one end of the first spray tank powder outlet pipe 11 is connected to the first spray tank 10, and the other end is connected to the spray main pipe 30; one end of the second spray tank powder outlet pipe 21 is connected to the second spray tank 20, and the other end is connected to the spray main pipe 30, and the connection between the first spray tank powder outlet pipe 11 and the spray main pipe 30 is merged with the connection between the second spray tank powder outlet pipe 21 and the spray main pipe 30; wherein the first spray tank 10 and the second spray tank 20 work alternately; the first purge pipe 12 is connected between the first spray tank powder outlet pipe 11 and the spray main pipe 30, and the second purge pipe 22 is connected between the second spray tank powder outlet pipe 21 and the spray main pipe 30;
[0041] The tank pressure value of the first spray tank 10 is defined as P1, and the pressure value at the junction of the first spray tank powder outlet pipe 11 and the second spray tank powder outlet pipe 21 is defined as P2, ΔP = P1-P2;
[0042] △P 标 =△P g +△P gv +△P d , where △P g is the friction loss between gas and tube wall, △P gv The energy consumed by the collision between the coal powder and the pipe wall and the collision between them, △P d It is the kinetic energy consumed by the accelerated coal powder and the potential energy generated by the coal powder due to gravity;
[0043] S2: According to △P and △P 标 The relationship is handled differently according to the following situations:
[0044] If 0.5△P 标 ≤△P≤△P 标 , maintain normal powder output state;
[0045] If 0<△P<0.5△P 标 , after a delay of 25s to 35s, the can is sprayed;
[0046] If △P 标 ≤△P≤1.5△P 标 , after a delay of 25s to 35s, increase the tank pressure and keep the injection rate stable;
[0047] If 1.5△P 标 ≤△P≤2△P 标 , indicating that the powder outlet pipe of the running spray tank is blocked. At this time, open the corresponding purge pipe to purge the blocked powder outlet pipe of the spray tank.
[0048] Based on the above, the present invention creatively proposes a method based on △P and △P 标 The above △P and △P 标 The method can be accurately measured, and the flow rate of the pulverized coal in the pulverized coal outlet pipe can be ensured to be greater than the critical speed, eliminating the problem of uneven pulverized coal outlet from the injection tank, preventing pipe blockage, and facilitating stable and uniform blast furnace spraying, ensuring stable and smooth operation of the blast furnace and reducing costs and increasing efficiency. In addition, the method is easy to operate, reliable and applicable, and can reduce the workload and labor intensity of personnel, and prevent pulverized coal from being discharged into the atmosphere to pollute the environment.
[0049] In some embodiments, the above ΔP g ≤10Kpa. Correspondingly, △P 标 It can be obtained in the following way: △P 标 =10+2.1×Q, =wherein, Q is the injection volume, in kg / s.
[0050] In the above-mentioned equipment, the first spray tank powder outlet pipe 11 is provided with a first opening, the first opening is arranged along the tangential direction of the first spray tank powder outlet pipe 11, and the first purge pipe 12 is connected to the first opening. Similarly, the second spray tank powder outlet pipe 21 is provided with a second opening, the second opening is arranged along the tangential direction of the second spray tank powder outlet pipe 21, and the second purge pipe 22 is connected to the second opening. By opening a hole in the tangential direction of the powder outlet elbow, it can be ensured that the airflow direction at the opening is parallel to the coal flow direction.
[0051] The first purge pipe 12 is also provided with a first check valve 13, a first flow orifice (not shown), a first shut-off valve 14 and a first flow regulating valve 15 in sequence. The first check valve 13 is relatively close to the first spray tank powder outlet pipe 11, and the first flow regulating valve 15 is relatively far away from the first spray tank powder outlet pipe 11. Similarly, the second purge pipe 22 is also provided with a second check valve 23, a second flow orifice (not shown), a second shut-off valve 24 and a second flow regulating valve 25 in sequence. The second check valve 23 is relatively close to the second spray tank powder outlet pipe 21, and the second flow regulating valve 25 is relatively far away from the second spray tank powder outlet pipe 21.
[0052] For example, the apertures of the flow holes in the first flow orifice plate and the apertures of the flow holes in the second flow orifice plate can be independently 3 mm to 10 mm, such as 3 mm, 5 mm or 10 mm, etc. The flow rate of the purge gas (such as nitrogen) in the purge pipe can be controlled by controlling the aperture size of the flow holes.
[0053] A first manual shut-off valve 16 and a first blowing valve 17 are provided on the pipe section between the corresponding junction of the first spray tank powder outlet pipe 11 and the first opening; wherein the first manual shut-off valve 16 is relatively close to the spray main pipe 30, and the first blowing valve 17 is relatively far away from the spray main pipe 30. Similarly, a second manual shut-off valve 26 and a second blowing valve 27 are provided on the pipe section between the corresponding junction of the second spray tank powder outlet pipe 21 and the second opening; wherein the second manual shut-off valve 26 is relatively close to the spray main pipe 30, and the second blowing valve 27 is relatively far away from the spray main pipe 30.
[0054] The upper part of the above-mentioned first blowing tank 10 is connected to the first coal loading pipe 101, and the first coal loading pipe 101 is provided with a first upper coal loading valve 102 and a first lower coal loading valve 103 (the first upper coal loading valve 102 is located above the first lower coal loading valve 103), the first blowing tank powder outlet pipe 11 is connected to the lower part of the first blowing tank 10, and the first blowing tank powder outlet pipe 11 pipe section between the connection between the first blowing tank 10 and the first opening is provided with a first lower pulverized coal valve 111. Similarly, the upper part of the second blowing tank 20 is connected to the second coal loading pipe 201, and the second coal loading pipe 201 is provided with a second upper coal loading valve 202 and a second lower coal loading valve 203 (the second upper coal loading valve 202 is located above the second lower coal loading valve 203), the second blowing tank powder outlet pipe 21 is connected to the lower part of the second blowing tank 20, and the second blowing tank powder outlet pipe 21 section between the connection between the second blowing tank powder outlet pipe 21 and the second blowing tank 20 and the second opening is provided with a second lower pulverized coal valve 211.
[0055] Furthermore, the first blowing tank 10 is further provided with a first pressure relief valve 112 , and the second blowing tank 20 is further provided with a second pressure relief valve 212 .
[0056] The first spray tank 10 and the second spray tank 20 are independently at least in the states of spraying, inverting, loading coal and waiting for spraying, and the first spray tank powder outlet pipe 11 and the second spray tank powder outlet pipe 21 are independently at least in the states of fully open, half open and normally closed. When the spray tank is in the states of spraying, inverting, loading coal and waiting for spraying, the corresponding purge pipes are in the normally open state. Among them, the internal pressure of the first purge pipe 12 and the second purge pipe 22 is independently not less than 1.0MPa.
[0057] In some implementations, the actual operation may be performed in the following manner:
[0058] Step (1): On-site inspection of the powder outlet pipe, gas source, etc. of the spray tank, and determination of the powder outlet pipe opening, gas source interface location, and pipeline direction, etc.;
[0059] In this step, the design drawings and on-site investigations are combined to shorten the pipeline distance and reduce bends as much as possible. The opening is set in the tangent direction of the powder outlet pipe. The nitrogen pressure in the pipeline is greater than 1.0MPa, and other gas sources in the pipeline are reduced as much as possible to prevent mutual interference.
[0060] Step (2): Prepare several φ32mm steel pipes, check valves, cut-off valves, flow control valves, φ10mm flow plates, flanges, flow meters and other materials.
[0061] Among them, the check valve is mainly used to prevent coal powder from entering the pipeline, blocking the pipeline and affecting the valve action. The flow plate can slightly control the nitrogen flow in the pipeline. The cut-off valve is mainly used to effectively cut off the gas source when the valve is operated beside the machine or under maintenance. The flow regulating valve is used for the main control room to remotely control the gas volume used in the purge pipe.
[0062] Step (3): Plan time reasonably and use the time period for on-site production. After the first spraying tank powder outlet pipe 11 stops spraying, the tank body is in an empty tank pressure relief state, the first spray valve 17 and the first shut-off valve 14 are closed, and the first pressure relief valve 112 remains open.
[0063] Step (4): Open a hole (defined as the first opening) in the tangential direction of the bend of the powder outlet pipe 11 of the first blowing tank, ensure that the airflow direction at the opening is parallel to the coal flow direction, and weld or flange-connect the φ32mm short tube, the first check valve 13, the first flow orifice, the first shut-off valve 14, and the first flow regulating valve 15 to the powder outlet pipe opening in sequence. The first flow orifice is installed between the two flanges of the first shut-off valve 14 outlet. Finally, install the first flow meter at the inlet and connect it to the nitrogen source.
[0064] Step (5): Perform a pressure test on the newly connected first purge pipe 12 to check for leaks. If there is a leak, re-weld the leaking point, tighten the flange screws, etc. until there is no leakage.
[0065] In the above steps (4) and (5), the entire component assembly time is within 20 minutes, and the single tank spraying will not affect the blast furnace. The first opening position is determined in the first spray tank powder outlet pipe 11, the short pipes are parallelly connected, and then the flanges are welded, the first check valve 13, the first flow orifice plate, the first shut-off valve 14, the first flow regulating valve 15 are installed, and the gas source pipe is connected. Then close the first pressure relief valve 112, open the main valve of the gas source pipe to flush the first spray tank powder outlet pipe 11 with nitrogen for pressure testing and leak detection, mark the leaking point after it is found, close the main valve of the gas source pipe, open the first pressure relief valve 112 to release the pressure, and then repair the leak until the pipeline and valve are leak-proof.
[0066] In the above process, the welding of short pipes and flanges and the connection of valves should be carried out under normal pressure after nitrogen purging. During the hole opening and welding process, the pressure relief valve of the first blowing tank 10 and the first lower pulverized coal valve 111 are opened, and the first blowing valve 17 and the first cut-off valve 14 at its front end are effectively closed to ensure that there is no gas blowby. The pulverized coal in the first blowing tank 10 is blown clean and the spraying is stopped to release the pressure. The valve switching sequence is: close the first blowing valve 17 → close the first manual cut-off valve 16 → open the first pressure relief valve 112 → open the first lower pulverized coal valve 111. After the pressure of the first blowing tank powder outlet pipe 11 and the first blowing tank 10 is released to zero, subsequent construction can be carried out.
[0067] Step (6): After the first purge pipe 12 is successfully connected, open the first manual shut-off valve 16, close the first pressure relief valve 112 and the first lower pulverized coal valve 111, open the first lower coal loading valve 103 and the first upper coal loading valve 102, and start loading pulverized coal in the first injection tank 10. After loading and pressurizing, wait for injection.
[0068] That is, the process is performed after ensuring that the newly installed first purge pipe 12 is leak-proof, and the first spray tank 10 is restored to a normal working state.
[0069] Step (7): After the first spray tank 10 starts spraying, the second spray tank 20 stops spraying, and the second purge pipe 22 is installed on the second spray tank 20 according to the method of the first spray tank 10.
[0070] Step (8): Open the gas sources in the first purge pipe 12 and the second purge pipe 22 connected to the first spray tank 10 and the second spray tank 20, operate the corresponding shut-off valves on site, remotely operate the flow regulating valve, record the flow changes in the flow meter, and determine the working conditions of each valve and the gas supply conditions of each purge pipe.
[0071] Step (9): The first spray tank 10 and the second spray tank 20 are in the states of spraying, tank inversion, coal loading, waiting for spraying, etc., and the nitrogen purge pipe at the lower end of the powder outlet pipe is in several working states such as fully open, half open or normally closed according to needs.
[0072] The first spray tank 10 and the second spray tank 20 are controlled and adjusted in the same manner, the only difference being that they are used crosswise during operation. That is, when the first spray tank 10 is spraying, the second spray tank 20 is not spraying; and when the second spray tank 20 is spraying, the first spray tank 10 is not spraying.
[0073] It should be noted that after the first purge pipe 12 and the second purge pipe 22 of the first spray tank 10 and the second spray tank 20 are manufactured, the maximum gas volume of each purge pipe is the gas volume passing through the flow hole, and the opening of the flow regulating valve can further control the nitrogen flow of the flow plate to prevent the coal powder from settling in the powder outlet pipe. In the working state, the spray valves on each powder outlet pipe are closed and not closed. In the way of closing the spray valve, there is excess powder in the pipeline after stopping the spraying or powder leaks during the powder filling process (when the lower coal powder valve leaks), by opening the nitrogen in the purge pipe, the coal powder is always in a fluidized state, will not settle, and will not be compacted, and will not produce powder discharge lag when spraying, avoiding pipe blockage. In the method of normally opening the injection valve, due to the effect of the purge air, the remaining powder in the pipe after the spraying tank stops spraying, the powder leaked from the lower pulverized coal valve (when the lower pulverized coal valve is leaking), and the pulverized coal poured into the powder outlet pipe of the spraying tank through the three-pronged pipe during the spraying of another tank are directly sent to the injection main pipe 30 by the purge air. The pulverized coal in the pipe is always in a fluidized state and will not settle. If the powder outlet pipe is blocked during the injection, the lower pulverized coal valve can be closed, the powder return pipe valve can be opened, and the nitrogen in the purge pipe can be opened to purge the pulverized coal in the blocked lower pulverized coal valve into the pulverized coal bin. After the purging is clean, the injection can be resumed. The treatment is simple, convenient, environmentally friendly, and has little impact on the blast furnace. The maximum nitrogen consumption of the general purge pipe is 50m 3 / h. When the spray tank is spraying, inverting the tank, loading powder, waiting for spraying, etc., the purge air is always on. The flow of the flow orifice plate can be further controlled by controlling the opening of the cut-off valve to achieve the best effect. The powder discharge of the spray tank is normal, the cut-off valve on the purge pipe can be remotely closed, and the purge pipe is on standby, saving nitrogen.
[0074] As for the powder discharge pipe, whether the powder can be discharged smoothly is judged by the difference P1-P2=△P between the tank pressure value P1 and the starting pressure value P2 (the pressure at the confluence). The coal powder can pass smoothly only when △P>0; if △P exceeds the critical value, the coal powder will settle in the powder discharge pipe, causing the injection rate to decrease or even the pipeline to be blocked.
[0075] The reasonable △P value is related to the injection volume, coal powder fluidization, coal powder transportation characteristics, pipeline resistance coefficient, etc. This value generally accounts for 10% of the total injection resistance loss. The △P value includes the friction loss between the gas and the pipe wall (△P g ), the energy consumed by the collision between the coal powder and the pipe wall and the collision between them (△P gv ), the kinetic energy consumed by the coal powder at an accelerated rate and the potential energy generated by the coal powder due to gravity (△P d ), △P g The maximum is 10KPa, by calculating △P 标 =△P g +△P gv +△P d =10+2.1×Q (Q is the injection volume, unit is kg / s), △P 标P1, P2 and injection volume are all connected to the PLC of the coal injection main control room, and △P and △P are calculated by the program. 标 , and displayed on the spray screen, the system compares the two values and performs automatic control operations, the normal state is 0.5△P 标 ≤△P≤△P 标 , the screen displays blue, higher than △P 标 Displayed in red.
[0076] When red is displayed, it is divided into the following different situations:
[0077] (a): If 0<△P<0.5△P 标 , it means that the injection is in the final stage, the amount of coal is reduced, and the powder-gas ratio is reduced. Accordingly, the tank-inverted injection is carried out after a delay of 25s to 35s (such as 30s);
[0078] (b): If △P 标 ≤△P≤1.5△P 标 , it means that the powder spraying rate decreases. Accordingly, after a delay of 30s, the system automatically takes measures to increase the tank pressure to keep the spraying rate stable;
[0079] (c): If 1.5△P 标 ≤△P≤2△P 标 , it means that the resistance of pulverized coal in the pulverizing pipe is further increased, the pulverizing rate is further reduced, the nitrogen in the purge pipe is automatically turned on, and the nitrogen volume is automatically adjusted according to the △P level to improve the conveying power;
[0080] (d) If △P>2△P 标 , it means the powder outlet pipe is blocked and alarm is triggered. Accordingly, the tank is automatically emptied immediately and the system automatically closes the lower pulverized coal valve of the original injection tank. The operator first closes the manual shut-off valve, remotely opens the valve of the powder return pipe between the manual shut-off valve and the injection valve, and returns the accumulated powder in the pipe to the pulverized coal bin. The recovery of nitrogen flow in the purge pipe indicates that the powder outlet pipe has been purged clean and coal can be loaded to resume injection.
[0081] In summary, the coal injection method provided by the present invention increases the power of coal powder transportation by adding a wind source to the powder outlet pipe, thereby preventing coal powder from settling. There are two ways of discharging powder from the spray tank: upper powder discharge and lower powder discharge. In the lower powder discharge method, the powder outlet pipe is more easily blocked. The power of coal powder transportation in the powder outlet pipe is its own weight and tank pressure, and the movement mode is approximately wave-like movement. However, the coal powder first descends and then rises during transportation in the powder outlet pipe. When overcoming friction resistance and its own gravity, the resistance loss is large, the speed decreases in the ascending section, and the local coal powder flow rate will be lower than the critical sedimentation speed of coal powder in the pipeline. In this process, due to the poor fluidization effect of coal powder, insufficient transportation power, poor transportation performance (such as heavy water content, coarse particle size, etc.), the flow rate of some coal powder is reduced, the rear-end coal powder transportation is delayed, the powder outlet pipe discharges unsmoothly, the instantaneous injection rate decreases, and the blast furnace injection is unstable; if the coal powder rate is further reduced, it will produce sedimentation, and the sedimented coal powder will further accumulate at the lowest end of the pipeline, which will cause pipeline blockage, interrupt the coal supply to the blast furnace, and cause the blast furnace to stop spraying. By carrying out the above steps (1) to (9), a purge pipe is added to compensate for the resistance loss of the ascending section pipeline, ensuring that the pulverized coal flow rate in the pulverized coal outlet pipe is greater than the critical speed, eliminating the pulverized coal outlet from the injection tank and preventing pipe blockage, which is beneficial to the stable and uniform injection of the blast furnace, ensuring the stable and smooth operation of the blast furnace and reducing costs and increasing efficiency.
[0082] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A coal injection method, characterized in that: The following steps are involved: S1: Obtain the △P and △P of the anti-blocking device of the powder outlet pipe of the injection tank in the blast furnace injection system 标 ; The anti-blocking device for the powder outlet pipe of the spray tank comprises a first spray tank, a second spray tank, a spray main pipe, a first spray tank powder outlet pipe, a second spray tank powder outlet pipe, a first purge pipe and a second purge pipe; one end of the powder outlet pipe of the first spray tank is connected to the first spray tank, and the other end is connected to the spray main pipe; one end of the powder outlet pipe of the second spray tank is connected to the second spray tank, and the other end is connected to the spray main pipe, and the connection between the powder outlet pipe of the first spray tank and the spray main pipe merges with the connection between the powder outlet pipe of the second spray tank and the spray main pipe; wherein the first spray tank and the second spray tank work alternately; the first purge pipe is connected between the powder outlet pipe of the first spray tank and the spray main pipe, and the second purge pipe is connected between the powder outlet pipe of the second spray tank and the spray main pipe; The tank pressure value of the first spray tank is P1, the pressure value at the junction of the first spray tank powder outlet pipe and the second spray tank powder outlet pipe is P2, ΔP = P1-P2; △P 标 =△P g +△P gv +△P d , where △P g is the friction loss between gas and tube wall, △P gv The energy consumed by the collision between the coal powder and the pipe wall and the collision between them, △P d It is the kinetic energy consumed by the accelerated coal powder and the potential energy generated by the coal powder due to gravity; S2: According to △P and △P 标 The relationship is handled differently according to the following situations: If 0.5△P 标 ≤△P≤△P 标 , maintain normal powder output state; If 0<△P<0.5△P 标 , after a delay of 25s to 35s, the can is sprayed; If △P 标 ≤△P≤1.5△P 标 , after a delay of 25s to 35s, increase the tank pressure and keep the injection rate stable; If 1.5△P 标 ≤△P≤2△P 标 , indicating that the powder outlet pipe of the running spray tank is blocked. At this time, open the corresponding purge pipe to purge the blocked powder outlet pipe of the spray tank.
2. The coal injection method according to claim 1, characterized in that: △P g ≤10Kpa。 3. The coal injection method according to claim 2, characterized in that: △P 标 =10+2.1×Q, where Q is the injection volume in kg / s.
4. The coal injection method according to claim 1, characterized in that: The internal pressures of the first purge pipe and the second purge pipe are independently not less than 1.0 MPa.
5. The coal injection method according to claim 1, characterized in that: The first spray tank powder outlet pipe is provided with a first opening, the first opening is arranged along the tangential direction of the first spray tank powder outlet pipe, and the first purge pipe is connected to the first opening; The second spray tank powder outlet pipe is provided with a second opening, the second opening is arranged along the tangential direction of the second spray tank powder outlet pipe, and the second purge pipe is connected to the second opening.
6. The coal injection method according to claim 5, characterized in that: The first purge pipe is also provided with a first check valve, a first flow orifice plate, a first cut-off valve and a first flow regulating valve in sequence; The second purge pipe is also provided with a second check valve, a second flow orifice plate, a second cut-off valve and a second flow regulating valve in sequence.
7. The coal injection method according to claim 6, characterized in that: The apertures of the flow holes in the first flow orifice plate and the apertures of the flow holes in the second flow orifice plate are independently 3 mm to 10 mm.
8. The coal injection method according to claim 5, characterized in that: A first manual shut-off valve and a first spray valve are provided on the pipe section between the confluence and the first opening of the first spray tank powder outlet pipe; A second manual shut-off valve and a second blowing valve are provided on the pipe section between the second spray tank powder outlet pipe corresponding to the confluence and the second opening.
9. The coal injection method according to claim 5, characterized in that: The upper part of the first blowing tank is connected to a first coal loading pipe, the first coal loading pipe is provided with a first upper coal loading valve and a first lower coal loading valve, the first blowing tank powder outlet pipe is connected to the lower part of the first blowing tank, and the first blowing tank powder outlet pipe section between the connection between the first blowing tank powder outlet pipe and the first blowing tank and the first opening is provided with a first lower coal powder valve; A second coal loading pipe is connected to the upper part of the second blowing tank, and a second upper coal loading valve and a second lower coal loading valve are provided on the second coal loading pipe. The second blowing tank powder outlet pipe is connected to the lower part of the second blowing tank, and a second lower coal powder valve is provided on the second blowing tank powder outlet pipe section between the connection between the second blowing tank powder outlet pipe and the second blowing tank and the second opening.
10. The coal injection method according to claim 9, characterized in that: The first spray tank is further provided with a first pressure relief valve, and the second spray tank is further provided with a second pressure relief valve.