Tool life early warning method, device and computer equipment based on processing equipment
By accumulating and comparing the actual demand time of the tool and the used time, we can judge whether the rated life and machining accuracy conditions are met, and early warning signals are issued, solving the problems of tool monitoring accuracy and low production efficiency in the existing technology, and realizing tool Efficient monitoring and early warning of life improve processing efficiency.
Patent Information
- Application Number
- CN202411217767.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-02
AI Technical Summary
The existing tool CNC system does not meet the actual production requirements when used in different production enterprises, resulting in a reduced accuracy of tool monitoring. Equipment not equipped with CNC system requires manual shutdown and inspection and maintenance, which is inefficient and difficult to meet the rapid response of production. Demand, resulting in reduced processing production efficiency.
By determining the actual demand time of the tool on the processing equipment and the accumulated time of use of the tool, the predicted use time is compared with the preset rated life time, and determining whether the time conditions for machining accuracy are met. If not, an alert will be issued Signals realize real-time monitoring and early warning of tool life, reducing manual maintenance needs.
It improves tool monitoring accuracy, reduces processing equipment downtime and manual maintenance, improves processing production efficiency, optimizes tool usage time management, and ensures processing quality and efficiency.
Smart Images

Figure CN118752311B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of processing and manufacturing procedures, and in particular to a tool life early warning method, device and computer equipment based on processing equipment. Background Art
[0002] In the field of mold manufacturing, tool life is a key factor in controlling costs and ensuring processing quality. In order to optimize the use of tools and maximize processing quality, real-time monitoring and effective management of tool life become particularly important. At present, the market provides some tool CNC systems, but due to the different specific production conditions of different manufacturers, there are limitations in using these tool CNC systems. These tool CNC systems may not meet the actual production requirements, resulting in reduced tool monitoring accuracy. In addition, for equipment that is not equipped with a tool CNC system, manufacturers usually need to rely on manual shutdowns for tool inspection and maintenance. This practice is not only inefficient, but also difficult to meet the needs of rapid response to production, resulting in reduced processing production efficiency. Summary of the invention
[0003] The embodiments of the present invention provide a tool life warning method, device and computer equipment based on processing equipment, aiming to solve the problems of low tool monitoring accuracy and processing production efficiency in the prior art.
[0004] In a first aspect, an embodiment of the present invention provides a tool life warning method based on a processing device, comprising:
[0005] Determine the actual time required for the tool when the part to be processed is processed on the processing equipment;
[0006] Accumulating the actual required time and the used time of the tool to obtain the predicted use time;
[0007] Comparing the predicted usage time with a preset rated life time, and determining whether the predicted usage time is less than or equal to the rated life time;
[0008] If the predicted service life is less than or equal to the rated life time, it is determined whether the predicted service life meets the time condition corresponding to the processing accuracy of the part to be processed; if the time condition is met, it is determined that the processing condition is met; if the time condition is not met, an early warning signal is issued;
[0009] If the predicted usage time is greater than the rated life time, a warning signal is issued.
[0010] In a second aspect, an embodiment of the present invention provides a tool life warning device based on a processing equipment, comprising:
[0011] A data acquisition unit, used to determine the actual time required for the tool when the part to be processed is processed on the processing equipment;
[0012] A data accumulation unit, used to accumulate the actual required time and the used time of the tool to obtain a predicted use time;
[0013] A data comparison unit, used to compare the predicted usage time with a preset rated life time, and determine whether the predicted usage time is less than or equal to the rated life time;
[0014] A data judgment unit is used to judge whether the predicted service life meets the time condition corresponding to the processing accuracy of the part to be processed if the predicted service life is less than or equal to the rated service life; if the time condition is met, it is determined that the processing condition is met; if the time condition is not met, an early warning signal is issued;
[0015] The data warning unit is used to issue a warning signal if the predicted usage time is greater than the rated life time.
[0016] In a third aspect, an embodiment of the present invention provides a computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the tool life warning method based on processing equipment according to the first aspect when executing the computer program.
[0017] The embodiment of the present invention provides a tool life warning method based on processing equipment, including determining the actual required time of the tool when the part to be processed is processed on the processing equipment; accumulating the actual required time and the used time of the tool to obtain the predicted use time; comparing the predicted use time with the preset rated life time, and judging whether the predicted use time is less than or equal to the rated life time; if the predicted use time is less than or equal to the rated life time, judging whether the predicted use time meets the time condition corresponding to the processing accuracy of the part to be processed; if the time condition is met, judging that the processing condition is met, if the time condition is not met, issuing a warning signal; if the predicted use time is greater than the rated life time, issuing a warning signal. The present invention makes two judgments on the predicted use time, namely whether it meets the requirements of the rated life time and whether it meets the time condition corresponding to the processing accuracy, and feeds back the judgment result, so as to improve the tool monitoring accuracy, and does not need to manually check the tool, thereby improving the processing production efficiency.
[0018] The embodiment of the present invention also provides a tool life warning device based on processing equipment and a computer device, which also have the above-mentioned beneficial effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0020] Figure 1 A schematic diagram of a process flow of a tool life warning method based on processing equipment provided by an embodiment of the present invention;
[0021] Figure 2 A schematic diagram of a flow chart for calculating actual required time provided by an embodiment of the present invention;
[0022] Figure 3 A schematic diagram of a process for obtaining tool processing data and equipment information provided by an embodiment of the present invention;
[0023] Figure 4 A schematic diagram of a flow chart of time condition judgment provided by an embodiment of the present invention;
[0024] Figure 5 A schematic block diagram of a tool life warning device based on processing equipment provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0027] It should also be understood that the terms used in this specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the specification of the present invention and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0028] It should be further understood that the term "and / or" used in the present description and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
[0029] See below Figure 1 , Figure 1 A schematic flow chart of a tool life warning method based on processing equipment provided by an embodiment of the present invention specifically includes: steps S101 to S106.
[0030] S101, determining the actual time required for a tool when the part to be processed is processed on a processing device;
[0031] S102, accumulating the actual required time and the used time of the tool to obtain a predicted use time;
[0032] S103, comparing the predicted usage time with the preset rated life time, and determining whether the predicted usage time is less than or equal to the rated life time; if so, proceeding to step S104, if not, proceeding to step S106;
[0033] S104, judging whether the predicted usage time satisfies the time condition corresponding to the machining accuracy of the part to be machined; if so, proceeding to step S105; if not, proceeding to step S106;
[0034] S105, determining that the processing conditions are met;
[0035] S106. Issue a warning signal.
[0036] This embodiment obtains the predicted usage time through calculation, and then compares it with the rated life time. After meeting the requirements of the rated life time, it continues to determine whether the time conditions corresponding to the processing accuracy are met, thereby determining whether the processing conditions are met, realizing the tool life early warning monitoring function of the processing equipment, reducing the shutdown of the processing equipment and the occurrence of manual maintenance of the tools, improving the utilization rate of the processing equipment, and reducing the labor intensity of the operators.
[0037] In step S101 , the actual required time of the required tool needs to be calculated first.
[0038] In one embodiment, the step S101 is as follows: Figure 2 As shown, including:
[0039] S201, acquiring tool processing data of the part to be processed and equipment information of the processing equipment; wherein the tool processing data includes tool usage time, material coefficient of the part to be processed and processing accuracy of the part to be processed, and the equipment information includes equipment coefficient;
[0040] S202: Multiply the tool usage time, material coefficient and equipment coefficient to calculate the actual required time.
[0041] In this embodiment, the tool processing data required for the parts to be processed and the relevant equipment information of the processing equipment used are collected. The tool processing data mainly includes the tool usage time, the material coefficient of the parts to be processed, and the processing accuracy required for the parts to be processed. The equipment information includes the equipment coefficient of the processing equipment, and the equipment coefficient reflects the performance of the equipment and the characteristics of matching with the tool. Of course, the different types of processing equipment make the equipment coefficients of the processing equipment different, and the different materials of the parts to be processed will also affect the actual required time. Therefore, it is necessary to specify the parts to be processed and the processing equipment used, and then calculate based on the processing equipment, the parts to be processed and the tool usage time on the tool processing data to obtain the final actual required time.
[0042] Specifically, the actual required time is obtained by multiplying the tool usage time, the material coefficient of the part to be processed, and the equipment coefficient. The calculation formula is: T 实际需求时间 = T 刀具使用时间 × C 材质系数 × C 设备系数。 T 实际需求时间 is the actual time that the corresponding tool needs to be used next; T 刀具使用时间 It is the time calculated by the programming software corresponding to the part to be processed; C 设备系数 It is the equipment coefficient of the tool in the processing equipment, which is obtained from the actual processing test. If there are multiple models of machine tools (i.e. processing equipment, the same below), one of the models is used as a reference, set as machine tool A, and other models are machine tools B, C, and so on; for example, machine tool A is used as the reference machine tool, then the equipment coefficient of machine tool A is 1, and the same parameters are used to test machine tool B, and the ratio of the tool life time on machine tool B to the tool life time on machine tool A is used as the equipment coefficient of machine tool B; C 材质系数 It is the material coefficient of the parts to be processed, which is obtained from the actual processing test. For example, the hardness of the material of a part is taken as the reference value, and its coefficient is 1. The same tool is used on the same machine tool, and the same parameters are used to test the tool life time when processing parts of different materials. The ratio of the tool life time to the reference value is used as the material coefficient of the corresponding part. To ensure the accuracy of the tool life, when introducing tools of the same type from different brands, the material coefficients of parts of different materials must be tested. It is not a fixed value.
[0043] Here is an example of a specific calculation formula: Tool processing data for selected tools shows T 刀具使用时间For 1 minute, the selected tool is assigned to a machine tool with an equipment coefficient of 1.1, and the material coefficient of the part to be processed is 1.2, then T 实际需求时间为 1*1.1*1.2 = 1.32 minutes. This calculation result is the actual required time of the tool under specific processing conditions (affected by the material of the part to be processed and the processing equipment). Through this method, it is possible to predict the use time of the tool and optimize the time management during the processing, thereby improving production efficiency and processing quality. The application of this system helps to maximize the efficiency of tool use while reducing processing errors and equipment wear caused by tool mismatch.
[0044] In one embodiment, before the step of obtaining tool processing data of the part to be processed and equipment information of the processing equipment, the following steps are included:
[0045] Obtaining and reading a tool processing sheet to obtain part data and tool processing data on the tool processing sheet;
[0046] Matching the part data and tool processing data to obtain information matching data;
[0047] The information matching data is entered into a tool database.
[0048] In this embodiment, first, a tool processing sheet is obtained, and the tool processing sheet contains part data and tool processing data. The tool processing sheet is usually generated by programming software (such as PowerMill software, the output format is EXCEL), and the tool processing sheet contains part number, part name, tool name, part material, precision tolerance (i.e., processing accuracy), processing type, tool usage time, processing depth, tool type and other information, among which the part number and part name can be classified as part data, and other information can be classified as tool processing data. Next, the part data and tool processing data on the tool processing sheet are matched (i.e., data grouping is performed according to requirements), for example, the part data can be grouped according to the part name. After the grouping is completed, the part data and tool processing data can be entered into the tool database for subsequent query.
[0049] Combination Figure 3 As shown, in one embodiment, the obtaining of tool processing data of the part to be processed and equipment information of the processing equipment includes:
[0050] S301, obtaining part data of the part to be processed;
[0051] S302, using the tool database to query tool processing data corresponding to the part data;
[0052] S303, determining the processing equipment of the part to be processed, importing the tool processing data into the data list of the processing equipment, and obtaining the equipment information of the processing equipment.
[0053] In this embodiment, the part data of the part to be processed is obtained, including the part number or part name, etc. The existing tool database is used to query the tool processing data corresponding to the corresponding part data. After the operator specifies the processing equipment, the tool processing data corresponding to the part data can be imported into the data list of the specified processing equipment, and then the equipment information (such as the equipment coefficient) of the selected processing equipment is obtained and recorded. Through the above steps, it is ensured that the tool and processing equipment information used are configured before processing, thereby improving the processing quality and production efficiency.
[0054] In step S102, the actual required time of the tool used for the part to be processed is first obtained, and then the used time of the tool used for the part to be processed on the current processing equipment is queried, and finally the actual required time and the used time are mathematically accumulated to obtain the predicted use time of the tool. The predicted use time of the tool can reflect the total use time of the tool after completing the current processing task.
[0055] Furthermore, the tool usage time refers to the cumulative actual usage time of the tool on multiple processed parts. For example, the selected tool has processed parts A, B, and C, then T 已使用时间 =TA 已使用时间 + TB 已使用时间 +TC 已使用时间。
[0056] In step S103, the calculated predicted usage time is compared with the preset rated life time of the tool to determine whether the predicted usage time is less than or equal to the rated life time. The rated life time is preset based on the tool design and the manufacturer's test data, indicating the total time that the tool can be safely used before its performance begins to deteriorate.
[0057] In step S104, if the predicted usage time is less than or equal to the rated life time, the next step of evaluation is continued. For the tools that continue to be available, it will be checked whether the predicted usage time meets the time condition corresponding to the processing accuracy required by the part to be processed, that is, whether the accuracy standard specified for the part can be achieved under the current state of the tool. If the predicted usage time meets the time condition corresponding to the processing accuracy, it is determined that the tool meets the processing conditions and can continue to be used for the processing task. If the predicted usage time of the tool does not meet the time condition corresponding to the processing accuracy, an early warning signal will be issued to remind the operator to pay attention to the current condition of the tool and replace the tool in time.
[0058] Combination Figure 4As shown, in one embodiment, step S104 includes:
[0059] S401. Obtain the time condition corresponding to the machining accuracy of the part to be machined, where the time condition is a preset time range corresponding to the machining accuracy;
[0060] S402. Determine whether the predicted usage time is within the preset time range. If so, proceed to step S403; if not, proceed to step S404;
[0061] S403. Determine that the machining conditions are met;
[0062] S404. Send out a warning signal.
[0063] In this embodiment, first, it is necessary to obtain the preset time range directly related to the machining accuracy requirements of the part to be machined. The preset time range is preset based on the performance and historical data of the tool to ensure that the tool can achieve or maintain the required machining accuracy within this time range. Subsequently, evaluate whether the predicted usage time falls within this preset time range. If the predicted usage time is within the preset time range, it is determined that the tool meets the machining conditions, indicating that the tool is sufficient to complete the machining task in the current state. Conversely, if the predicted usage time exceeds the preset time range, a warning signal will be sent.
[0064] For example, the used time of the selected tool is 1 minute, the actual required time is 2 minutes, and the preset time range corresponding to the machining accuracy requirement of ±0.05 mm for the tool processing order is 2 minutes < T < 3.5 minutes. The total time for the selected tool to machine this part is: T 预测使用时间 = T 已使用时间 + T 实际需求时间, That is, 1 minute + 2 minutes = 3 minutes, and 3 minutes is within the preset time range T, meeting the machining accuracy grade requirements of this workpiece. If the predicted usage time is greater than the preset time range, a warning signal will be sent. In addition, the accuracy grades corresponding to different life stages of different tools are different, which are obtained through actual machining tests and preset in the tool database.
[0065] In one embodiment, after the step of determining that the machining conditions are met, it includes:
[0066] After machining the part to be machined according to the actual required time, update the used time of the tool to the predicted usage time.
[0067] In this embodiment, after determining that the tool meets the processing conditions, the part to be processed will be processed according to the actual required time. After the processing task is completed, the tool's used time is automatically updated to the previously calculated predicted use time. This update process involves modifying the relevant records in the tool database to ensure that the records accurately reflect the latest use of the tool. In this way, the present invention ensures that the tool's use record is always kept up to date, which helps to more accurately manage the tool's maintenance and replacement cycle.
[0068] In step S105, when the predicted usage time exceeds the rated life time, an early warning signal is automatically issued. This early warning signal can be a visual or audible warning to remind the operator that the tool has reached or exceeded its preset usage limit and needs to be checked or replaced immediately to prevent the processing quality from deteriorating or the processing equipment from malfunctioning.
[0069] In one embodiment, after the step of issuing the warning signal, the following steps are included:
[0070] After replacing the tool of the processing equipment, resetting the usage time of the tool;
[0071] Return to calculate the new predicted usage time and continue with the subsequent judgment steps.
[0072] In this embodiment, after the warning signal is issued, the operator can check and replace the tool. After the tool is replaced, the used time of the new tool will be automatically reset, for example, set to zero. This reset operation can be achieved by updating the relevant records in the tool database to ensure that the records accurately reflect the latest usage status of the tool. When the tool used time is reset, the step of calculating the predicted use time of the new tool will be returned. Then the predicted use time will continue to be compared with the preset rated life time, and it will be determined whether the predicted use time is less than or equal to the rated life time; if it is less than or equal to the rated life time, it will continue to determine whether the predicted use time meets the time condition corresponding to the processing accuracy of the part to be processed; if the time condition is met, it is determined that the processing condition is met, and if the predicted use time is greater than the rated life time or does not meet the time condition, a warning signal will be issued.
[0073] Furthermore, each tool on each processing equipment can be monitored in real time. After confirming the replacement of the tool, the current usage time of the corresponding tool will be reset to 0, and the tool usage time can be recorded again and the life warning can be issued.
[0074] In one embodiment, the tool life warning method based on processing equipment further includes:
[0075] Obtain tool usage information of multiple processing equipment, and display the tool usage information of each processing equipment on the UI interface; wherein the tool usage information includes warning information, tool usage time, and tool quantity.
[0076] In this embodiment, tool usage information of multiple processing equipment is collected. This tool usage information includes the usage time of the tools on each device, the number of tools, and warning information related to the tools. It is displayed on the user interface (UI interface), showing the tool status of multiple devices at the same time, and further showing the tool usage information of multiple tools of each device. The user interface not only displays information, but also provides warning information. The operator can see the warning information of different tools of multiple processing equipment on the user interface, and can replace the warning tools in advance.
[0077] A user interface window of this embodiment can display 16 processing equipment at the same time, and each processing equipment can display the usage of 32 types of tools, and the number of displayed equipment and tools can be increased or decreased according to the size of the user interface. Early warning prompts are given to tools whose tool life has expired, avoiding the manual tool life management method of disassembling and inspecting each tool of each processing equipment. Remote monitoring can also be achieved. In one user interface, the tools of multiple processing equipment can be operated and controlled without having to operate on the processing equipment at the processing site. The present invention can evaluate the service life of the tool in advance to avoid insufficient tool life during the processing process.
[0078] Combination Figure 5 As shown, Figure 5 A schematic block diagram of a tool life warning device based on a processing equipment provided by an embodiment of the present invention, the tool life warning device 500 based on the processing equipment comprises:
[0079] The data acquisition unit 501 is used to determine the actual time required for the tool when the part to be processed is processed on the processing equipment;
[0080] A data accumulation unit 502 is used to accumulate the actual required time and the used time of the tool to obtain a predicted use time;
[0081] A data comparison unit 503 is used to compare the predicted usage time with a preset rated life time, and determine whether the predicted usage time is less than or equal to the rated life time;
[0082] The data judgment unit 504 is used to judge whether the predicted service life meets the time condition corresponding to the processing accuracy of the part to be processed if the predicted service life is less than or equal to the rated service life; if the time condition is met, it is determined that the processing condition is met; if the time condition is not met, a warning signal is issued;
[0083] The data warning unit 505 is used to issue a warning signal if the predicted usage time is greater than the rated life time.
[0084] In this embodiment, the data acquisition unit 501 determines the actual required time of the tool when the part to be processed is processed on the processing equipment; the data accumulation unit 502 accumulates the actual required time and the usage time of the tool to obtain the predicted usage time; the data comparison unit 503 compares the predicted usage time with the preset rated life time, and determines whether the predicted usage time is less than or equal to the rated life time; the data judgment unit 504 determines whether the predicted usage time meets the time condition corresponding to the processing accuracy of the part to be processed if the predicted usage time is less than or equal to the rated life time; if the time condition is met, it is determined that the processing condition is met, and if the time condition is not met, a warning signal is issued; the data warning unit 505 issues a warning signal if the predicted usage time is greater than the rated life time.
[0085] In one embodiment, the data acquisition unit 501 includes:
[0086] A parameter acquisition unit, used to acquire tool processing data of the part to be processed and equipment information of the processing equipment; wherein the tool processing data includes tool use time, material coefficient of the part to be processed and processing accuracy of the part to be processed, and the equipment information includes equipment coefficient;
[0087] The multiplication unit is used to multiply the tool usage time, the material coefficient and the equipment coefficient to calculate the actual required time.
[0088] In one embodiment, the tool life warning device 500 based on the processing equipment further includes:
[0089] A reading unit, used for acquiring and reading a tool processing sheet to obtain part data and tool processing data on the tool processing sheet;
[0090] A matching unit, used for matching the part data and the tool processing data to obtain information matching data;
[0091] An input unit is used to input the information matching data into a tool database.
[0092] In one embodiment, the parameter acquisition unit includes:
[0093] A part unit, used for acquiring part data of the part to be processed;
[0094] A query unit, used for querying the tool processing data corresponding to the part data using the tool database;
[0095] The import unit is used to determine the processing equipment of the part to be processed, import the tool processing data into the data list of the processing equipment, and obtain the equipment information of the processing equipment.
[0096] In one embodiment, the data determination unit 504 includes:
[0097] A time condition acquisition unit, used to acquire the time condition corresponding to the machining accuracy of the part to be machined, wherein the time condition is a preset time range corresponding to the machining accuracy;
[0098] A time range determination unit, used to determine whether the predicted usage time is within the preset time range;
[0099] a processing unit, configured to determine that a processing condition is satisfied if the predicted usage time is within the preset time range;
[0100] The early warning unit is used to send out an early warning signal if the predicted usage time is not within the preset time range.
[0101] In one embodiment, the tool life warning device 500 based on the processing equipment further includes:
[0102] An updating unit is used to update the usage time of the tool to the predicted usage time after the part to be processed is processed according to the actual required time.
[0103] In one embodiment, the tool life warning device 500 based on the processing equipment further includes:
[0104] A reset unit, used to reset the usage time of the tool after the tool of the processing equipment is replaced;
[0105] The return unit is used to return to calculate the new predicted usage time and continue with the subsequent judgment steps.
[0106] In one embodiment, the tool life warning device 500 based on the processing equipment further includes:
[0107] The data display unit is used to obtain tool usage information of multiple processing equipment and display the tool usage information of each processing equipment on the UI interface; wherein the tool usage information includes warning information, tool usage time, and tool quantity.
[0108] Since the embodiments of the apparatus part correspond to the embodiments of the method part, please refer to the description of the embodiments of the method part for the embodiments of the apparatus part, which will not be repeated here.
[0109] The embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed, the steps provided in the above embodiment can be implemented. The storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0110] The embodiment of the present invention also provides a computer device, which may include a memory and a processor, wherein a computer program is stored in the memory, and when the processor calls the computer program in the memory, the steps provided in the above embodiment may be implemented. Of course, the computer device may also include various network interfaces, power supplies and other components.
[0111] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the various embodiments can be referred to each other. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of this application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of this application.
[0112] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprises", "comprising" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. A tool life warning method based on processing equipment, characterized in that: include: Determine the actual time required for the tool when the part to be processed is processed on the processing equipment; Accumulating the actual required time and the used time of the tool to obtain the predicted use time; Comparing the predicted usage time with a preset rated life time, and determining whether the predicted usage time is less than or equal to the rated life time; If the predicted service life is less than or equal to the rated life time, it is determined whether the predicted service life meets the time condition corresponding to the processing accuracy of the part to be processed; if the time condition is met, it is determined that the processing condition is met; if the time condition is not met, an early warning signal is issued; If the predicted usage time is greater than the rated life time, a warning signal is issued; The step of determining the actual time required for a tool when the part to be processed is processed on the processing equipment includes: Acquire tool processing data of the part to be processed and equipment information of the processing equipment; wherein the tool processing data includes tool usage time, material coefficient of the part to be processed and processing accuracy of the part to be processed, and the equipment information includes equipment coefficient; multiply the tool usage time, material coefficient and equipment coefficient to calculate the actual required time; The determining whether the predicted usage time satisfies the time condition corresponding to the machining accuracy of the part to be machined; if the time condition is satisfied, determining that the machining condition is satisfied, and if the time condition is not satisfied, issuing a warning signal, comprises: obtaining the time condition corresponding to the machining accuracy of the part to be machined, wherein the time condition is a preset time range corresponding to the machining accuracy, and the preset time range is preset based on the performance and historical data of the tool; determining whether the predicted usage time is within the preset time range; if the predicted usage time is within the preset time range, determining that the machining condition is satisfied; if the predicted usage time is not within the preset time range, issuing a warning signal.
2. The tool life warning method based on processing equipment according to claim 1 is characterized in that: After determining that the processing conditions are met, the following steps are performed: After the part to be processed is processed according to the actual required time, the used time of the tool is updated to the predicted used time.
3. The tool life warning method based on processing equipment according to claim 1 is characterized in that: Following the steps to raise early warning signals include: After replacing the tool of the processing equipment, resetting the usage time of the tool; Return to calculate the new predicted usage time and continue with the subsequent judgment steps.
4. The tool life warning method based on processing equipment according to claim 1 is characterized in that: Before the step of obtaining tool processing data of the part to be processed and equipment information of the processing equipment, the method includes: Obtaining and reading a tool processing sheet to obtain part data and tool processing data on the tool processing sheet; Matching the part data and tool processing data to obtain information matching data; The information matching data is entered into a tool database.
5. The tool life warning method based on processing equipment according to claim 4 is characterized in that: The obtaining of tool processing data of the part to be processed and equipment information of the processing equipment includes: Acquiring part data of the part to be processed; Using the tool database to query tool processing data corresponding to the part data; Determine the processing equipment of the part to be processed, import the tool processing data into the data list of the processing equipment, and obtain the equipment information of the processing equipment.
6. The tool life warning method based on processing equipment according to claim 1 is characterized in that: Also includes: Obtain tool usage information of multiple processing equipment, and display the tool usage information of each processing equipment on the UI interface; wherein the tool usage information includes warning information, tool usage time, and tool quantity.
7. A tool life warning device based on processing equipment, characterized in that: include: A data acquisition unit, used to determine the actual time required for the tool when the part to be processed is processed on the processing equipment; A data accumulation unit, used to accumulate the actual required time and the used time of the tool to obtain a predicted use time; A data comparison unit, used to compare the predicted usage time with a preset rated life time, and determine whether the predicted usage time is less than or equal to the rated life time; A data judgment unit is used to judge whether the predicted service life meets the time condition corresponding to the processing accuracy of the part to be processed if the predicted service life is less than or equal to the rated service life; if the time condition is met, it is determined that the processing condition is met; if the time condition is not met, an early warning signal is issued; A data warning unit, configured to issue a warning signal if the predicted usage time is greater than the rated life time; The data acquisition unit includes: a parameter acquisition unit, used to acquire tool processing data of the part to be processed, and equipment information of the processing equipment; wherein the tool processing data includes tool use time, material coefficient of the part to be processed and processing accuracy of the part to be processed, and the equipment information includes equipment coefficient; a multiplication unit, used to multiply the tool use time, material coefficient and equipment coefficient to calculate the actual required time; The data judgment unit includes: a time condition acquisition unit, used to obtain the time condition corresponding to the machining accuracy of the part to be machined, wherein the time condition is a preset time range corresponding to the machining accuracy, and the preset time range is preset based on the performance and historical data of the tool; a time range judgment unit, used to judge whether the predicted usage time is within the preset time range; a machining unit, used to determine that the machining condition is met if the predicted usage time is within the preset time range; and an early warning unit, used to issue an early warning signal if the predicted usage time is not within the preset time range.
8. A computer device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and running on the processor. When the processor executes the computer program, the tool life warning method based on processing equipment as described in any one of claims 1 to 6 is implemented.
Citation Information
Patent Citations
Adaptive matching and control method, system and equipment for numerical control machine tool cutter
CN116141058A
Numerical control system
JP1988295157A
Tool management method in machining system
JP1992122536A
Method and apparatus for detecting tool life
JP2011230206A
Method for predicting remaining life of numerical control machine tool
US20220146462A1