High-concentration carbon dioxide trapping system built on cement kiln system and low-carbon emission type cement clinker production line
By building a high-concentration carbon dioxide capture system on the cement kiln system, using preheating and decomposition furnace technology, combined with double-layer cylinder and electric heating, efficient carbon dioxide capture and recycling in the cement clinker production line has been achieved, solving the problem of cement The industry's carbon dioxide emission problem has been solved, and the carbon emission reduction efficiency and corporate benefits have been improved.
Patent Information
- Application Number
- CN202410856267.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-28
AI Technical Summary
The carbon dioxide emission problem in the cement industry has not yet been effectively solved. Existing technologies are difficult to capture and recycle high-concentration carbon dioxide in cement production, resulting in low carbon emission reduction efficiency and uneven investment returns.
A high-concentration carbon dioxide capture system built on a cement kiln system is designed, including a first decomposition furnace, a preheater assembly, a first gas-solid separator, a second decomposition furnace and a second gas-solid separator. The hot limestone powder is decomposed at high temperature, combined with the double-layer cylinder structure and electric heating device, to capture high-concentration carbon dioxide, and convert the carbon dioxide into carbon monoxide for fuel through the carbon monoxide generation system, forming a cycle.
It has realized the capture of high-concentration carbon dioxide in the cement clinker production line. The carbon dioxide concentration can reach more than 85%, reducing the carbon emission ratio of cement companies to more than 60%. It has also achieved ultra-low fuel consumption through recycling, achieving technological and Balance of costs and benefits.
Smart Images

Figure CN118754473A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cement clinker production, and in particular to a high-concentration carbon dioxide capture system built on a cement kiln system and a low-carbon emission cement clinker production line. Background Art
[0002] The cement industry is a major emitter of carbon dioxide. Theoretical analysis shows that according to the current level of the cement industry, the production of 1 ton of cement clinker emits about 940 kilograms of carbon dioxide. According to incomplete statistics, the carbon dioxide emitted by the cement industry accounts for about 20% of the total carbon dioxide emissions from industrial production in my country. Therefore, the cement industry is facing tremendous pressure to reduce carbon dioxide emissions.
[0003] In order to reduce carbon emissions, the first step is to cut excess production capacity. Carbon dioxide produced by limestone decomposition and coal combustion, which accounts for about 75% of the cement production process, is the main source of carbon emissions. According to my country's cement energy consumption level, each ton of cement produced produces about 0.7 to 0.8 tons of carbon dioxide. Therefore, cutting excess production capacity is the main measure for carbon emission reduction in my country's current cement industry.
[0004] The second is to seek alternative fuels. After more than 30 years of exploration, the cement industry's alternative fuel technology and experience have matured and become an important means of energy conservation and emission reduction in the cement industry in developed countries. Two-thirds of cement plants in developed countries use alternative fuels, and the average replacement ratio of combustible waste in the cement industry is 20%. A large number of production practices and experimental results in developed countries have shown that the use of alternative fuels and waste disposal in the cement industry can avoid secondary pollution while producing qualified products. It is an effective way to meet both product quality and environmental protection indicators and is technically and economically reasonable.
[0005] The third is to reduce the amount of clinker in cement, such as the limestone calcined clay cement (LC 3 Low carbon cement) application and other technologies.
[0006] However, the above methods have not been able to effectively solve the contradiction between cement production and carbon emissions. The only effective solution is to achieve effective capture of carbon dioxide within cement companies, allowing cement companies to produce high-concentration carbon dioxide in conjunction with cement production and produce a series of carbon dioxide products.
[0007] The main uses of carbon dioxide products:
[0008] 1. Main uses of industrial grade carbon dioxide products
[0009] (1) Concrete mixing
[0010] When water and carbon dioxide meet, carbonate ions are formed, which combine with free calcium ions produced during the mixing process of cement to form nanoscale calcium carbonate minerals. In this way, carbon dioxide is permanently locked in the concrete in the form of minerals, and will not re-enter the atmosphere even if the building is demolished many years later.
[0011] Generally speaking, 1m 3 Concrete requires about 15kg of liquid carbon dioxide, which reduces cement usage by about 30-45kg. The use of carbon dioxide can reduce the cost of concrete by more than 6 yuan per cubic meter. The annual concrete consumption in China is about 2.5 billion cubic meters. If 10% of it is made of carbon dioxide, the annual demand for liquid carbon dioxide will reach more than 3 million tons, which can reduce the cost of concrete by 1.5 billion yuan.
[0012] (2) Cement grinding aid
[0013] Most cement grinding aid enterprises in my country now mainly purchase chemical raw materials for compounding production processes. However, the use of carbon dioxide through chemical methods will promote the two-way linkage between cement grinding aids and the cement industry, forming a low-carbon circular industrial chain. At present, with the continuous increase in the utilization rate of cement grinding aids, the application rate of cement grinding aids by large and medium-sized cement enterprises in my country will reach about 60% in the next one or two years. Based on the total output of 1.7 billion t / a cement, the powder grinding aid dosage is 4kg / t and the liquid dosage is 1kg / t, and the market demand can reach more than 2 million t / a.
[0014] (3) Cold oil production (such as shale oil, etc.)
[0015] According to tests conducted at a certain oil field, the use of carbon dioxide for oil recovery can increase crude oil production by 15% to 31%, so the amount of carbon dioxide required by oil fields is difficult to estimate, and it is a market that will never be saturated. Tests have shown that the successful use of carbon dioxide for oil recovery requires more than 300 tons of carbon dioxide to be injected each time, even for a small or medium-sized oil well. Even if only one-tenth of my country's oil fields use carbon dioxide for oil recovery, the annual carbon dioxide required will exceed 30 million tons.
[0016] (4) Chemical raw materials
[0017] Carbon dioxide can be used to synthesize a variety of inorganic and organic chemical products, the largest of which are used to produce urea, ammonium bicarbonate and soda ash. In addition, it can also react with ethylene oxide to produce ethylene carbonate, and hydrolyze under certain conditions to produce ethylene glycol, thereby obtaining alcohol substances, the main raw material of cement grinding aids. Degradable plastics, propylene carbonate, dimethyl carbonate and other products.
[0018] (5) Inert medium
[0019] A large amount of carbon dioxide gas is required in the processes of metal shielded welding, the new steelmaking process of the converter top and bottom combined blowing method, fire extinguishing, animal anesthesia and slaughter, and replacement of flammable and explosive gas containers.
[0020] 2. Main uses of food grade carbon dioxide products
[0021] Food-grade carbon dioxide is mainly used in the beverage and beer industry, tobacco industry, preservation and cold chain transportation industry; high-purity carbon dioxide can be used in pharmaceuticals, electronics, biology, supercritical extraction, agricultural gas fertilizer, etc.
[0022] 3. Market demand potential for carbon dioxide products
[0023] Carbon dioxide is a valuable resource that can be utilized. It has been listed as one of the most friendly gases to humans by relevant organizations in the world and is widely used in many fields such as chemistry, food, mechanical processing, and oil extraction. However, due to the high cost of capturing pure carbon dioxide, the current global annual utilization of carbon dioxide is less than 100 million tons, which is still a great waste.
[0024] According to relevant data, the United States has a production capacity of 7.45 million t / a for liquid carbon dioxide, Japan has a production capacity of 1.17 million t / a, and Western Europe has a total consumption of 1.2 million t / a, while my country currently has only 200,000 to 280,000 t / a. From the above data, it can be seen that my country's carbon dioxide market demand potential is huge. According to relevant estimates, my country's food-grade carbon dioxide consumption will increase at an average annual rate of 30% in the next few years, and the total consumption will reach more than 10 million tons within 5 years.
[0025] 4. About carbon dioxide capture in the cement industry
[0026] In 2018, a domestic 5,000t / d cement clinker production line built and put into operation a project with an annual capture capacity of 50,000 tons of carbon dioxide using the current conventional carbon capture and purification technology. However, due to the very low carbon dioxide content in the flue gas (18-20%), the project can only produce industrial-grade liquid carbon dioxide. In addition, the production cost and investment are too high. Apart from a small contribution to reducing carbon dioxide emissions, the overall investment return is not large, and it is impossible to achieve a balance between technology, cost and return.
[0027] In summary, it is necessary to design a technically feasible, stable and reliable solution for the co-production of high-concentration carbon dioxide with limestone-based cement clinker, which will not only enable cement companies to produce a series of carbon dioxide products as a by-product of cement (or recycle carbon dioxide as fuel to achieve ultra-low consumption of fuel in cement production), thereby improving the efficiency of cement companies, but will also be a great contribution to environmental protection. Summary of the invention
[0028] In view of the above-mentioned deficiencies in the prior art, the present invention provides a high-concentration carbon dioxide capture system built on a cement kiln system and a low-carbon emission cement clinker production line.
[0029] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0030] A high-concentration carbon dioxide capture system built on a cement kiln system comprises a first decomposition furnace, a preheater assembly, and a first gas-solid separator; the feed end of the first decomposition furnace is connected to the discharge end of the preheater assembly, and the air inlet end of the first decomposition furnace is connected to the cement kiln system; the inlet end of the first gas-solid separator is connected to the outlet end of the first decomposition furnace, and the air outlet end of the first gas-solid separator is connected to the air inlet end of the preheater assembly; and also comprises a second decomposition furnace device and a second gas-solid separator, wherein:
[0031] The preheater assembly is used to introduce limestone powder and preheat it, and then introduce it into the first decomposition furnace, and the high-temperature kiln gas provided by the cement kiln system is preheated to the temperature of initial decomposition of the limestone powder;
[0032] The discharge end of the first gas-solid separator is connected to the second decomposition furnace device; the first gas-solid separator performs gas-solid separation on the gas-solid mixture discharged from the first decomposition furnace, wherein the separated high-temperature gas enters the preheater assembly for preheating the limestone powder, and the separated solid material enters the second decomposition furnace device;
[0033] The second decomposition furnace device is used to continue heating the solid material to fully decompose the solid material to obtain a gas-solid mixture containing carbon dioxide;
[0034] The inlet end of the second gas-solid separator is connected to the second decomposition furnace device, and is used to perform gas-solid separation on the gas-solid mixture containing carbon dioxide to achieve the capture of carbon dioxide.
[0035] Furthermore, the second decomposition furnace device is connected to the cement kiln system through an atmospheric jet pump; under the action of the atmospheric jet pump, the second decomposition furnace device introduces balancing wind from the cement kiln system, and the balancing wind is high-temperature air with a temperature of 900-950°C, which is used to assist in the rapid discharge of carbon dioxide from the second decomposition furnace device.
[0036] Specifically, the second decomposition furnace device includes a second decomposition furnace and a heat supply device for providing a heat source for the second decomposition furnace; the feed end of the second decomposition furnace is connected to the discharge end of the first gas-solid separator, and the outlet end of the second decomposition furnace is connected to the inlet end of the second gas-solid separator.
[0037] Furthermore, the second decomposition furnace is a double-layer cylinder structure, with an interlayer between the inner cylinder and the outer cylinder, a heat conduction channel is arranged in the interlayer, one end of the heat conduction channel is connected to the heat supply device and is spirally wound on the inner cylinder.
[0038] Furthermore, the other end of the heat conduction channel is connected to the inlet end of the first gas-solid separator.
[0039] Furthermore, an electric heating device is also provided in the interlayer.
[0040] Furthermore, the carbon dioxide separated by the second gas-solid separator is discharged via the first high-temperature fan, and a heat exchanger is connected between the air inlet of the first high-temperature fan and the air outlet of the second gas-solid separator.
[0041] Based on the above-mentioned high-concentration carbon dioxide capture system, the present invention also provides a low-carbon emission cement clinker production line, including a cement kiln system, a high-concentration carbon dioxide capture system and a carbon monoxide generation system; the second gas-solid separator in the high-concentration carbon dioxide capture system is connected to the cement kiln system, and the solid matter obtained by gas-solid separation by the second gas-solid separator is introduced into the cement kiln system as a raw material for cement clinker; the carbon monoxide generation system is simultaneously connected to the high-concentration carbon dioxide capture system and the cement kiln system, and is used to introduce the high-temperature gas provided by the cement kiln system and the carbon dioxide separated by the second gas-solid separator, and after converting the carbon dioxide into carbon monoxide, it is introduced into the cement kiln system and / or the high-concentration carbon dioxide capture system as fuel.
[0042] Specifically, the carbon monoxide generation system includes a gasifier, a two-stage cyclone separator, a waste heat boiler, a purification device and a gas storage cabinet connected in sequence, and a heating jacket arranged outside the gasifier, wherein:
[0043] The gasifier is used to introduce coal, pure oxygen and carbon dioxide from a high-concentration carbon dioxide capture system respectively; the heating jacket is used to introduce high-temperature gas from a cement kiln system; under the action of high temperature, coal, pure oxygen and carbon dioxide react in the furnace of the gasifier to generate a gas-solid mixture containing carbon monoxide;
[0044] The two-stage cyclone separator is used to introduce a gas-solid mixture containing carbon monoxide and perform gas-solid separation, and the separated mixed gas containing carbon monoxide enters the waste heat boiler;
[0045] The waste heat boiler is used to cool the mixed gas and then send it to the purification device;
[0046] The purification device is used to purify the mixed gas to obtain carbon monoxide, which is then sent into the gas storage cabinet;
[0047] The gas storage cabinet is used to provide carbon monoxide to the cement kiln system and / or the first decomposition furnace.
[0048] Furthermore, the present invention also includes an auxiliary material preheater assembly, the air inlet end of the auxiliary material preheater assembly is connected to the air outlet end of the preheater assembly, and the discharge end of the auxiliary material preheater assembly is connected to the inlet end of the second gas-solid separator; the auxiliary material preheater assembly uses the high-temperature gas from the preheater assembly to preheat the cement auxiliary material, and then enters the second gas-solid separator to mix with the gas-solid mixture containing carbon dioxide, and performs gas-solid separation, and the separated calcium oxide and cement auxiliary material mixture is finally introduced into the cement kiln system.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] (1) The present invention can be directly constructed without substantially changing the existing cement kiln system and process, thereby achieving the capture of high-concentration carbon dioxide on the cement clinker production line. In this way, cement companies only need to reduce the cost of transformation to enable the cement clinker production line to have the ability to produce high-concentration carbon dioxide with limestone-made cement clinker (or high-purity activated calcium oxide), which is very cost-effective. At the same time, the present invention also achieves the purpose of the system "N to N+1" (N represents the total number of preheaters + gas-solid separators on the original cement clinker production line, and 1 represents the newly added preheater or gas-solid separator), so that the energy-saving effect of the entire production line is better.
[0051] (2) In the present invention, before the limestone powder (mainly composed of calcium carbonate) enters the second decomposition furnace, the preheating effect of the preheater assembly and the first decomposition furnace provides a good pre-basis for the decomposition of the limestone powder. Therefore, when the second decomposition furnace continues to heat the limestone powder, it can be quickly and fully decomposed.
[0052] On this basis, the heating device in the present invention adopts an external heat transfer method to heat the limestone powder in the second decomposition furnace. The advantages are: on the one hand, the external heat transfer can be achieved by selecting one or more combinations of coal combustion, biomass combustion, hot air, electromagnetic heating, etc. according to actual conditions, which is very simple and easy; on the other hand, the gas-solid mixture coming out of the first decomposition furnace is separated into gas and solid by the first gas-solid separator, and the solid material obtained is passed into the second decomposition furnace for further heating and decomposition. At this time, since no other flue gas and impurities enter the second decomposition furnace, the decomposed gas contains a very high concentration of carbon dioxide, and is finally discharged after gas-solid separation by the second gas-solid separator. Experiments show that the carbon dioxide concentration of the gas discharged after gas-solid separation by the second gas-solid separator can reach more than 85%.
[0053] In this way, the present invention not only well retains the advantages of the original preheater, decomposition furnace and gas-solid separator on the cement clinker production line, but also combines the design of the second decomposition furnace device and the second gas-solid separator to greatly improve the concentration of captured carbon dioxide. In addition, the present invention is synchronized with the existing cement kiln system capacity and can fully realize the large-scale and large-scale capture of high-concentration carbon dioxide in the cement clinker production process, so that the carbon dioxide emission reduction rate of cement enterprises can reach more than 60%.
[0054] (3) The second decomposition furnace in the present invention adopts a double-layer structure design, and a heat conduction channel is set in the interlayer of the inner tube and the outer tube. The heat conduction channel is spirally wound on the inner tube. The heat source provided by the heating device heats the limestone powder in the form of radiation heat transfer through the heat conduction channel. This heating method can effectively prolong the heat exchange time and further ensure that the limestone powder is fully decomposed in the second decomposition furnace.
[0055] (4) The present invention also provides an electric heating device in the interlayer, which together with the heat conduction channel provides a heat source for the second decomposition furnace. The electric heating method is very advantageous in areas with conditions (such as small hydropower stations with cost advantages, or new energy power plants that mainly use photovoltaic and wind power generation). It can further stabilize the working conditions of the decomposition furnace without increasing the electricity cost to a small extent, so that the decomposition rate of the cement material can be stabilized to more than 96%, thereby achieving the purpose of "adapting measures to local conditions".
[0056] (5) In the present invention, the heat conduction channel is also connected to the first gas-solid separator. After heat transfer to the second decomposition furnace, the heat source is introduced from the first gas-solid separator into the preheater assembly, so that the remaining heat energy can continue to be utilized, further ensuring the preheating effect of the material and the stability of the preheating temperature.
[0057] (6) Since the decomposition of limestone powder in the second decomposition furnace will produce carbon dioxide (i.e.: CaCO3→CaO+CO2↑), and as carbon dioxide is continuously produced, a partial pressure will be formed. When the carbon dioxide partial pressure reaches a certain pressure, a side reaction will occur in the second decomposition furnace: CaO+CO2→CaCO3, which affects the decomposition of limestone powder. Therefore, the present invention also introduces a balancing wind from the cement kiln system to the second decomposition furnace, which utilizes the function of the atmospheric jet pump to realize forced ventilation in the second decomposition furnace, assist in the rapid discharge of carbon dioxide from the second decomposition furnace, and thereby prevent the calcium oxide after the decomposition of limestone powder from reacting with carbon dioxide to regenerate calcium carbonate.
[0058] (7) The present invention is provided with a carbon monoxide generation system. By utilizing coal, pure oxygen and carbon dioxide to react at high temperature, after combining gas-solid separation, cooling and purification processes, a high-purity carbon monoxide product can be obtained and provided as fuel to the cement kiln system and / or high-concentration carbon dioxide capture system. In this way, the present invention effectively realizes the internal circulation of carbon dioxide in the cement clinker production line and the ultra-low consumption of cement production fuel, achieving the purpose of low carbon emissions, and can also realize the sale of carbon assets, which can be said to kill two birds with one stone and fully achieve a balance between technology, cost and benefits.
[0059] (8) The present invention also provides an auxiliary material preheater assembly. By feeding limestone powder and cement auxiliary materials into different preheaters respectively, not only can the carbon dioxide concentration be further increased (the highest concentration can reach about 95%), but also because the limestone is ground separately, the fineness can be appropriately relaxed, thereby reducing the power consumption of raw material grinding and further reducing the production cost.
[0060] (9) The various links of the present invention are closely linked, complementary and interrelated, and the production of cement clinker, high-purity activated calcium oxide, carbon dioxide and carbon monoxide is effectively connected in series and circulated, which not only provides cement companies with more product choices and brings greater revenue, but also makes a great contribution to environmental protection. Therefore, the present invention is very suitable for large-scale promotion and application in the cement industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 This is a schematic diagram of the structure of Example 1 of the present invention.
[0062] Figure 2 This is a schematic diagram of the structure of the second decomposition furnace in Example 1 of the present invention.
[0063] Figure 3 This is a schematic diagram of the structure of Example 2 of the present invention.
[0064] Figure 4 This is a schematic diagram of the structure of Example 4 of the present invention.
[0065] The names of the parts corresponding to the reference numerals are:
[0066] 1-first decomposition furnace, 2-preheater assembly, 3-auxiliary material preheater assembly, 4-first gas-solid separator, 5-second decomposition furnace, 6-heat conduction channel, 7-atmospheric jet pump, 8-heat supply device, 9-second gas-solid separator, 10-heat exchanger, 11-first high-temperature fan, 12-cement kiln system, 1201-rotary kiln, 1202-tertiary air duct, 1203-grate cooler, 1204-AQC boiler, 13-carbon monoxide generation system, 1301-coal bunker, 1302-gasification furnace, 1303-heating jacket, 1304-two-stage cyclone separator, 1305-waste heat boiler, 1306-purification device, 1307-gas storage cabinet, 1308-second high-temperature fan, 1309-slag cooler, 1310-high-pressure blower. DETAILED DESCRIPTION
[0067] The present invention is further described below in conjunction with the accompanying drawings and embodiments. The embodiments of the present invention include but are not limited to the following embodiments.
[0068] Example 1
[0069] This embodiment provides a carbon dioxide capture system that can directly capture high-concentration carbon dioxide on an existing cement clinker production line. Figure 1 As shown, the structure of this embodiment mainly includes a first decomposition furnace 1, a preheater assembly 2, a first gas-solid separator 4, a second decomposition furnace device and a second gas-solid separator 9. The feed end of the first decomposition furnace 1 is connected to the discharge end of the preheater assembly 2, and the air inlet end of the first decomposition furnace 1 is connected to the cement kiln system; the inlet end of the first gas-solid separator 4 is connected to the outlet end of the first decomposition furnace 1, the discharge end of the first gas-solid separator 4 is connected to the second decomposition furnace device, and the air outlet end of the first gas-solid separator 4 is connected to the air inlet end of the preheater assembly 2. The first decomposition furnace 1, the preheater assembly 2 and the first gas-solid separator 4 in this embodiment are all equipment on the original cement clinker production line. In this embodiment, the preheater assembly 2 is composed of preheaters C1-C4; the first gas-solid separator 4 adopts a cyclone separator, which is used to perform gas-solid separation on the gas-solid mixture transported from the first decomposition furnace 1.
[0070] The second decomposition furnace device is connected to the first gas-solid separator 4, and the inlet end of the second gas-solid separator 9 is connected to the second decomposition furnace device. In this embodiment, the second gas-solid separator 9 also adopts a cyclone separator. The second decomposition furnace device and the second gas-solid separator 9 are both newly added devices on the original cement clinker production line, and are key equipment for capturing high-concentration carbon dioxide. Specifically, the second decomposition furnace device includes a second decomposition furnace 5 and a heat supply device 8, wherein: the feed end of the second decomposition furnace 5 is connected to the discharge end of the first gas-solid separator 4, and the outlet end of the second decomposition furnace 5 is connected to the inlet end of the second gas-solid separator 9. In this embodiment, the second decomposition furnace 5 is a double-layer cylinder structure, and there is an interlayer between the inner cylinder (lining) and the outer cylinder, and a heat conduction channel 6 is arranged in the interlayer, and one end of the heat conduction channel 6 is connected to the heat supply device 8 and is spirally wound on the inner cylinder; the outer cylinder is made of heat-insulating and refractory materials to achieve heat insulation, and the inner cylinder is made of high-temperature resistant materials, such as Figure 2 As shown. The heat supply device 8 in this embodiment adopts the scheme recorded in patent announcement number CN219530903U, which is used to provide a heat source for the second decomposition furnace 5, that is, the heat supply device 8 uses coal gangue as raw material, and after decarbonization and desulfurization, generates high-temperature gas to supply to the second decomposition furnace 5. And based on the characteristics of the scheme recorded in CN219530903U, this embodiment can not only realize the high-value utilization of coal gangue in the preparation of cement clinker and the co-production of carbon dioxide, but also greatly reduce the cost of cement clinker co-production of high-concentration carbon dioxide.
[0071] In addition, a heat exchanger 10 is connected to the gas outlet end of the second gas-solid separator 9 , and a first high-temperature fan 11 is also connected to the outlet end of the heat exchanger 10 .
[0072] The process of capturing high concentration carbon dioxide in this embodiment is as follows:
[0073] 1. Initially, the cement kiln system introduces high-temperature kiln gas into the first decomposition furnace 1, and the high-temperature kiln gas enters the preheater assembly 2 through the first decomposition furnace 1 and the first gas-solid separator 4, and flows along the path of "C4-C3-C2-C1". At the same time, the cement raw material (mainly a mixed powder of limestone and cement auxiliary materials) is introduced into the preheater assembly 2 and preheated with the high-temperature kiln gas. The specific preheating process is as follows: the cement raw material is fed from the air inlet duct of the preheater C1. Under the action of the high-temperature kiln gas, the cement raw material is preheated and brought into the preheater C1. Then the cement raw material and the airflow swirl in C1, and gas-solid separation occurs. The cement raw material enters the air inlet duct of the preheater C2 through the discharge port of C1.
[0074] The cement raw material entering the C2 air inlet duct of the preheater also undergoes the same process as above under the action of the high-temperature kiln gas, that is, the process of "C2 air inlet duct-C2-C2 discharge port-C3 air inlet duct-C3-C4 air inlet duct-C4", and finally enters the first decomposition furnace 1 through the C4 discharge port, while the high-temperature kiln gas in the preheater component 2 is discharged through C1 after cooling, and is processed by the back-end system and equipment (such as SP boiler) for the next step.
[0075] 2. In the first decomposition furnace 1, under the action of high-temperature kiln gas, the cement raw material continues to be preheated to the temperature at which the limestone powder is initially decomposed, and then enters the first gas-solid separator 4 for gas-solid separation, wherein the separated high-temperature gas enters the preheater assembly 2 to continue to be used for preheating the cement raw material introduced subsequently, and the separated solid mixture enters the second decomposition furnace 5. The decomposition of limestone is a physical and chemical process affected by many factors, and its specific temperature range varies depending on the external conditions and the characteristics of limestone. A large number of past studies have shown that the decomposition temperature of most limestones is usually in the range of 850 to 1000°C, and a small amount of decomposition will begin when the temperature approaches 800°C. Therefore, combined with practice, the cement raw material can be preheated to about 830°C, at which time not only the effect of initial decomposition of limestone powder is best, but also it is conducive to the solid mixture entering the second decomposition furnace 5 under the action of airflow.
[0076] 3. In the second decomposition furnace 5, the high-temperature gas provided by the heat supply device 8 flows into the heat conduction channel 6. Under the radiation heat transfer effect of the heat conduction channel 6, the solid mixture continues to be heated until the limestone powder therein is fully decomposed to obtain a gas-solid mixture, in which the solid is mainly calcium oxide and cement auxiliary materials, and the gas is mainly carbon dioxide. Practice shows that when heated to 900-950°C, the effect of fully decomposing the limestone powder is best, and the solid materials in the gas-solid mixture are also easy to be transported to the next link under the action of the airflow. If the heating temperature is too high, for example, exceeding 1200°C, it is easy to cause local melting of the solid materials, resulting in blockage in the decomposition furnace, which is not conducive to the transportation of solid materials.
[0077] In addition, during the decomposition process, as carbon dioxide is continuously produced, a partial pressure will be formed. When the carbon dioxide partial pressure reaches a certain pressure, it is easy to produce a side reaction and regenerate calcium carbonate (i.e., CaO+CO2→CaCO3). Therefore, in order to effectively prevent the occurrence of this phenomenon, in this embodiment, the air inlet end of the second decomposition furnace 5 is connected to the cement kiln system through the atmospheric jet pump 7. Under the action of the atmospheric jet pump, part of the high-temperature gas in the cement kiln system is introduced and forms a balanced wind (high-temperature air) to be passed into the second decomposition furnace 5. Relying on the flow of the balanced wind, carbon dioxide can be assisted to be quickly discharged from the second decomposition furnace, the occurrence of side reactions can be reduced as much as possible, and the main reaction (i.e., CaCO3→CaO+CO2↑) can be smoothly carried out, so that the limestone powder can be basically completely decomposed. At the same time, considering that the introduction of the balanced wind will reduce the temperature in the second decomposition furnace 5, the temperature of the balanced wind passed into the second decomposition furnace 5 is 900-950°C, which is basically equivalent to the temperature in the second decomposition furnace 5, and the difference between the two does not exceed 35°C.
[0078] In addition, in order to further make full use of the heat source of the heating device 8, the other end of the heat conduction channel 6 is connected to the inlet end of the first gas-solid separator 4. The high-temperature gas flows in the heat conduction channel 6, provides heat for the second decomposition furnace 5, and then enters the preheater assembly 2 through the first gas-solid separator 4 for heat energy recycling.
[0079] 4. The gas-solid mixture decomposed by the second decomposition furnace 5 enters the second gas-solid separator 9, where gas-solid separation is performed. The separated gas (wherein the concentration of carbon dioxide can reach 85-90%) is cooled by the heat exchanger 10 and discharged by the first high-temperature fan 11, and then processed by the back-end system for the next step, such as purification of carbon dioxide, thereby obtaining various high-purity carbon dioxide products; or used to produce other products (such as carbon monoxide). The separated mixture of calcium oxide and cement auxiliary materials enters the cement kiln system, and finally obtains cement clinker products after being processed by the cement kiln system.
[0080] In addition, if cement clinker is not produced, cement auxiliary materials may not be added, and the separated calcium oxide is not introduced into the cement kiln system, thereby obtaining a high-purity active calcium oxide product and co-producing high-concentration carbon dioxide. Thus, this embodiment can enable the cement clinker production line to have the ability to co-produce high-concentration carbon dioxide with limestone-made cement clinker (or high-purity active calcium oxide). At the same time, this embodiment also achieves the purpose of "changing 5 to 6" preheaters on the cement clinker production line, making the energy-saving effect of the entire production line better.
[0081] Example 2
[0082] like Figure 3As shown, the difference from Example 1 is that in this embodiment, preheaters C3 and C4 are combined as a preheater assembly 2, preheaters C1 and C2 are combined as an auxiliary material preheater assembly 3, and the discharge port of C2 is connected to the inlet end of the second gas-solid separator 9. In this way, limestone powder and cement auxiliary material can be fed into the air inlet ducts of C3 and C1 respectively, wherein the preheating process of limestone powder is: C3 air inlet duct—C3—C3 discharge port—C4 air inlet duct—C4—C4 discharge port, and finally enters the first decomposition furnace 1, and the subsequent process is the same as that in Example 1; the preheating process of cement auxiliary material is: C1 air inlet duct—C1—C1 discharge port—C2 air inlet duct—C2—C2 discharge port, the cement auxiliary material is preheated (usually preheated to about 500°C for the best effect), and then enters the second gas-solid separator 9, and is mixed with the gas-solid mixture coming out of the second decomposition furnace 5. At this time, according to the principle of instantaneous heat transfer, the temperature of the cement auxiliary material can be basically consistent with the temperature of the gas-solid mixture in an instant, and then enters the subsequent process, and the subsequent process is the same as that in Example 1.
[0083] Compared with Example 1, in this embodiment, limestone powder and cement auxiliary materials are fed into the preheater component 2 and the auxiliary material preheater component 3 respectively, which can not only further increase the carbon dioxide concentration (the highest concentration can reach about 95%), but also because the limestone is ground separately, the fineness can be appropriately relaxed, thereby reducing the power consumption of raw material grinding.
[0084] Example 3
[0085] The difference from Example 1 or 2 is that in this embodiment, an electric heating device is also provided in the interlayer of the second decomposition furnace 5, which together with the heat conduction channel 6 provides a heat source for the second decomposition furnace 5. The electric heating device in this embodiment adopts the existing technology, and can be preferably adopted according to the actual situation in areas with conditions (such as small hydropower stations with cost advantages, or new energy power plants that mainly use photovoltaic and wind power generation). On this basis, this embodiment is more advantageous than Example 1 or 2, because it can further stabilize the working conditions of the decomposition furnace under the premise that the increase in electricity cost is not large, so that the decomposition rate of cement material can be stably reached above 96%.
[0086] Example 4
[0087] This embodiment provides a low-carbon emission cement clinker production line, which mainly includes three parts: a cement kiln system 12, a high-concentration carbon dioxide capture system and a carbon monoxide generation system 13. Figure 4As shown, the cement kiln system 12 is the same as the prior art, and is mainly composed of a rotary kiln 1201, a tertiary air duct 1202, a grate cooler 1203, and an AQC boiler 1204; the high-concentration carbon dioxide capture system is the same as Example 2, wherein: the air inlet end of the second decomposition furnace 5 is connected to the kiln tail of the rotary kiln 1201, and the balance wind in the second decomposition furnace 5 is provided by the tertiary air duct 1202; the calcium oxide and cement auxiliary materials separated by the second gas-solid separator 9 enter the rotary kiln 1201 and are calcined into cement clinker.
[0088] The carbon monoxide generation system 13 mainly utilizes the gas provided by the high-concentration carbon dioxide capture system (the carbon dioxide concentration can reach up to about 95%), and then converts the carbon dioxide into carbon monoxide to provide fuel for the cement kiln system 12 and / or the high-concentration carbon dioxide capture system, thereby realizing the fuel recycling regeneration in the cement clinker production process.
[0089] Specifically, the carbon monoxide generation system in this embodiment includes a coal bunker 1301, a gasifier 1302, a two-stage cyclone separator 1304, a waste heat boiler 1305, a purification device 1306 and a gas storage cabinet 1307 connected in sequence, a heating jacket 1303 arranged outside the gasifier 1302, and a second high-temperature fan 1308 and a slag cooler 1309 both connected to the gasifier 1302, wherein:
[0090] The coal bunker 1301 is used to pass the coal (such as low-rank coal or blue charcoal) that has been homogenized and crushed, and then fed into the gasifier 1302 by a screw feeder. In addition to coal, pure oxygen (purity ≥ 99%) and carbon dioxide discharged from the high-concentration carbon dioxide capture system are also introduced into the gasifier 1302 (introduced by the second high-temperature fan 1308, and blown into the gasifier after passing through the air distribution plate and the hood). The gasifier 1302 in this embodiment adopts a normal pressure circulating fluidized bed pulverized coal gasifier (or a new type of gas continuous gasifier), using carbon dioxide and oxygen as gasification media (when the coal used is low-rank coal, the water vapor generated by the water contained in it is heated is also one of the gasification media), and various coals are gasified at high temperature. The air flow velocity in the furnace is between 5 and 7 m / s, with a very high heat and mass transfer rate, and the gasification pressure is controlled at about 0.15 MPa.
[0091] The heating jacket 1303 outside the gasifier 1302 is fed with tertiary air (temperature of 1000-1100°C) from the kiln head of the cement kiln system. Under the action of high temperature, the coal, pure oxygen and carbon dioxide in the furnace of the gasifier 1302 react to generate a gas-solid mixture containing carbon monoxide. The coal slag discharged from the gasifier 1302 can be used as a cement mixing material after being cooled by the slag cooler 1309, and is used in the production of cement products such as LC 3 Low carbon cement products.
[0092] The main reactions in the furnace of gasifier 1302 are as follows:
[0093] C+O2→CO2
[0094] C+CO2→2CO
[0095]
[0096] Among them, in addition to participating in the reaction, carbon dioxide also acts as a heat carrier and a temperature regulator, controlling the maximum temperature in the furnace below the ash melting point of the coal and preventing coal slag from agglomerating.
[0097] In addition, when low-rank coal is used, in addition to the above main reactions, there are also the following reactions:
[0098] C+H2O=CO+H2
[0099] This reaction also produces carbon monoxide and can also displace some of the hydrogen.
[0100] Furthermore, after the high-temperature gas in the heating jacket 1303 is cooled, it can be recovered to the AQC boiler 1204 of the cement kiln system 12 via the high-pressure blower 1310 for power generation.
[0101] The two-stage cyclone separator 1304 is used to introduce the above-mentioned gas-solid mixture containing carbon monoxide and perform gas-solid separation. The separated mixed gas containing carbon monoxide enters the waste heat boiler 1305; the separated solid matter (mainly unburned pulverized coal) returns to the gasifier 1302 to continue to participate in the reaction.
[0102] The waste heat boiler 1305 is used to cool the incoming mixed gas and then send it to the purification device 1306. The water vapor generated by the waste heat boiler cooling can be used as water vapor for power generation.
[0103] The purification device 1306 is used to purify the mixed gas after cooling to obtain carbon monoxide, and then send it to the gas storage cabinet 1307. The purification device 1306 in this embodiment adopts the existing MDEA decarbonization device + desulfurization equipment, first uses MDEA technology to remove carbon dioxide from the mixed gas (the removed carbon dioxide can be returned to the gasification furnace 1302 to participate in the reaction), and then performs desulfurization and deoxygenation treatment to obtain carbon monoxide gas with a purity of about 95%, which is finally stored in the gas storage cabinet 1307 and provided as fuel to the cement kiln system 12 and / or the first decomposition furnace 1, so that carbon dioxide can be recycled.
[0104] The present invention seems simple, but it is not easy to imagine that only by continuously cultivating in the field of cement production and related chemical technology can a simple, reliable and industrialized and large-scale solution be used to effectively connect the cement clinker production line with other product production lines in series and form a cycle, thereby providing cement companies with more product choices and greater revenue, and also contributing to environmental protection. Therefore, compared with the prior art, the present invention has outstanding substantive features and significant progress.
[0105] The above embodiments are only preferred implementation modes of the present invention and should not be used to limit the protection scope of the present invention. Any changes or modifications that are made to the main design concept and spirit of the present invention and have no substantive significance, and the technical problems they solve are still consistent with the present invention, should be included in the protection scope of the present invention.
Claims
1. A high-concentration carbon dioxide capture system built on a cement kiln system, comprising a first decomposition furnace (1), a preheater assembly (2), and a first gas-solid separator (4); the feed end of the first decomposition furnace (1) is connected to the discharge end of the preheater assembly (2), and the air inlet end of the first decomposition furnace (1) is connected to the cement kiln system; the inlet end of the first gas-solid separator (4) is connected to the outlet end of the first decomposition furnace (1), and the air outlet end of the first gas-solid separator (4) is connected to the air inlet end of the preheater assembly (2); characterized in that, It also includes a second decomposition furnace device and a second gas-solid separator (9), wherein: The preheater assembly (2) is used to introduce limestone powder and preheat it, and then introduce it into the first decomposition furnace (1), and the high-temperature kiln gas provided by the cement kiln system is preheated to the temperature at which the limestone powder is initially decomposed; The discharge end of the first gas-solid separator (4) is connected to the second decomposition furnace device; the first gas-solid separator performs gas-solid separation on the gas-solid mixture discharged from the first decomposition furnace, wherein the separated high-temperature gas enters the preheater assembly to preheat the limestone powder, and the separated solid material enters the second decomposition furnace device; The second decomposition furnace device is used to continue heating the solid material so that the solid material is fully decomposed to obtain a gas-solid mixture containing carbon dioxide; The inlet end of the second gas-solid separator (9) is connected to the second decomposition furnace device and is used to perform gas-solid separation on the gas-solid mixture containing carbon dioxide to achieve the capture of carbon dioxide.
2. A high concentration carbon dioxide capture system built on a cement kiln system according to claim 1, characterized in that: The second decomposition furnace device is connected to the cement kiln system via an atmospheric jet pump (7); under the action of the atmospheric jet pump, the second decomposition furnace device introduces balancing wind from the cement kiln system, and the balancing wind is high-temperature air with a temperature of 900-950° C., which is used to assist in the rapid discharge of carbon dioxide from the second decomposition furnace device.
3. A high concentration carbon dioxide capture system built on a cement kiln system according to claim 1 or 2, characterized in that: The second decomposition furnace device comprises a second decomposition furnace (5) and a heat supply device (8) for providing a heat source for the second decomposition furnace; the feed end of the second decomposition furnace (5) is connected to the discharge end of the first gas-solid separator (4), and the outlet end of the second decomposition furnace (5) is connected to the inlet end of the second gas-solid separator (9).
4. A high concentration carbon dioxide capture system built on a cement kiln system according to claim 3, characterized in that: The second decomposition furnace (5) is a double-layer cylinder structure, with an interlayer between the inner cylinder and the outer cylinder, a heat conduction channel (6) being arranged in the interlayer, one end of the heat conduction channel (6) being connected to a heat supply device (8) and being spirally wound on the inner cylinder.
5. A high concentration carbon dioxide capture system built on a cement kiln system according to claim 4, characterized in that: The other end of the heat-conducting channel (6) is connected to the inlet end of the first gas-solid separator (4).
6. A high concentration carbon dioxide capture system built on a cement kiln system according to claim 5, characterized in that: An electric heating device is also arranged in the interlayer.
7. A high concentration carbon dioxide capture system built on a cement kiln system according to claim 1, 2, 4, 5 or 6, characterized in that: The carbon dioxide separated by the second gas-solid separator (9) is discharged via a first high-temperature fan (11), and a heat exchanger (10) is also connected between the air inlet of the first high-temperature fan (11) and the air outlet of the second gas-solid separator (9).
8. A low-carbon emission cement clinker production line, comprising a cement kiln system, characterized in that: It also includes the high-concentration carbon dioxide capture system as described in any one of claims 1 to 7, and a carbon monoxide generation system; the second gas-solid separator in the high-concentration carbon dioxide capture system is connected to the cement kiln system, and the solid matter obtained by gas-solid separation by the second gas-solid separator is introduced into the cement kiln system as a raw material for cement clinker; the carbon monoxide generation system is connected to the high-concentration carbon dioxide capture system and the cement kiln system at the same time, and is used to introduce the high-temperature gas provided by the cement kiln system and the carbon dioxide separated by the second gas-solid separator, and after converting the carbon dioxide into carbon monoxide, it is introduced into the cement kiln system and / or the high-concentration carbon dioxide capture system as fuel.
9. A low-carbon emission cement clinker production line according to claim 8, characterized in that: The carbon monoxide generation system comprises a gasifier (1302), a two-stage cyclone separator (1304), a waste heat boiler (1305), a purification device (1306) and a gas storage cabinet (1307) connected in sequence, and a heating jacket (1303) arranged outside the gasifier (1302), wherein: The gasifier is used to introduce coal, pure oxygen and carbon dioxide from a high-concentration carbon dioxide capture system respectively; the heating jacket is used to introduce high-temperature gas from a cement kiln system; under the action of high temperature, coal, pure oxygen and carbon dioxide react in the furnace of the gasifier to generate a gas-solid mixture containing carbon monoxide; The two-stage cyclone separator is used to introduce a gas-solid mixture containing carbon monoxide and perform gas-solid separation, and the separated mixed gas containing carbon monoxide enters the waste heat boiler; The waste heat boiler is used to cool the mixed gas and then send it to the purification device; The purification device is used to purify the mixed gas to obtain carbon monoxide, which is then sent into the gas storage cabinet; The gas storage cabinet is used to provide carbon monoxide to the cement kiln system and / or the first decomposition furnace.
10. A low-carbon emission cement clinker production line according to claim 8 or 9, characterized in that: The invention also comprises an auxiliary material preheater component (3), the air inlet end of the auxiliary material preheater component (3) is connected to the air outlet end of the preheater component (2), and the discharge end of the auxiliary material preheater component (3) is connected to the inlet end of the second gas-solid separator (9); the auxiliary material preheater component uses the high-temperature gas from the preheater component to preheat the cement auxiliary material, and then the auxiliary material enters the second gas-solid separator to be mixed with the gas-solid mixture containing carbon dioxide, and the gas-solid separation is carried out, and the separated calcium oxide and cement auxiliary material mixture is finally introduced into the cement kiln system.
Citation Information
Patent Citations
A method for producing cement clinker that is compatible with both carbide slag and limestone as raw materials
CN102260052A
Method for trapping carbon dioxide in cement kiln flue gas and generating by carbon dioxide
CN106914116A
Continuous trapping and generating apparatus for carbon dioxide in cement kiln flue gas
CN106914117A
Device and method used for realizing coal gasification production through tail gas circulation
CN109897672A
Carbon emission-free lime kiln coal gas production system
CN110423023A