Reserved plugging type water drainage, pressure reduction and drainage device and construction method thereof

By laying a concrete cushion and reserved expansion joints between the dock floor and the strongly weathered rock, and using the connecting components of sleeves and steel pipes to drain out the seepage water, the problem of water retention in the dock floor structure is solved, and the concrete is fully hardened and Improved structural durability.

CN118756732APending Publication Date: 2024-10-11CRCC HARBOR & CHANNEL ENG BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410929294.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

During the dock expansion project, the failure of the existing decompression and drainage system resulted in the retention of seepage water in the floor structure, resulting in insufficient hardening of the concrete and reduced durability. In addition, excessive internal stress occurred in the connection section between the new and old docks, and varying degrees of water seepage occurred in the structure.

Method used

Design a reserved plugged water release and pressure reduction drainage device, which includes laying a concrete cushion between the dock floor and the strongly weathered rock, reserved expansion joints and open drainage ditches, the sleeves and steel pipes are fixedly connected through connecting components, and the seepage water passes through Open ditches, steel pipes, and sleeves are used to drain underground or seawater. Graded gravel and geotextiles are used to prevent clogging. Steel pipes and steel bars are reinforced to avoid damage.

Benefits of technology

Effectively discharge seepage water, relieve the penetration pressure of the base plate, ensure concrete hardening and structural durability, and improve the overall integrity of the base plate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756732A_ABST
    Figure CN118756732A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water drainage, pressure reduction and drainage construction of docks, in particular to a reserved plugging type water drainage, pressure reduction and drainage device and a construction method thereof.The reserved plugging type water drainage, pressure reduction and drainage device comprises a dock bottom plate arranged on strongly-weathered rock, a concrete cushion layer is arranged between the dock bottom plate and the strongly-weathered rock, and an expansion joint is reserved in the dock bottom plate; a drainage open trench is formed in the top face of the dock bottom plate, a sleeve and a steel pipe are arranged in the expansion joint, water permeable holes are formed in the peripheral side of the sleeve, the bottom end of the sleeve is inserted into the concrete cushion layer, and a connecting assembly is arranged at the top end of the sleeve. The sleeve is fixedly connected with the bottom end of the steel pipe through the connecting assembly, and the top end of the steel pipe is fixedly communicated with the side wall of the open drain. The structure has the effect of ensuring the integrity and durability of the dock chamber bottom plate structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of dock water discharge and pressure relief drainage construction, and in particular to a reserved plugging type water discharge and pressure relief drainage device and a construction method thereof. Background Art

[0002] A dock is a dock-type building used for shipbuilding and repairing. It can allow ships to enter and exit after being filled with water, and can be used to repair and build ships on a dry bottom after being drained. Docks can be divided into three categories: dry docks, flooded docks, and floating docks.

[0003] In the dock expansion and extension project, the existing dock is extended 37m in the landward direction, with a dock width of 35m and a depth of 13m. The dock bottom plate adopts a non-drained, slightly decompressed reinforced concrete bottom plate, with a thickness of 1.5m in the north and south sections and 1.8m in the middle section. Tensile bored piles are set under the bottom plate. An expansion joint is set every 15m in the longitudinal direction of the bottom plate, and no expansion joint is set in the transverse direction, leaving two post-cast strips. A decompression drainage blind ditch is set every 15m at the bottom of the dock. The gaps between the cast-in-place piles are filled with jet grouting piles around the expanded dock to form a water-stop curtain and an underground blind ditch to form a decompression drainage system, which can meet the drainage and decompression capacity of the new dock.

[0004] According to the data provided in the survey report, the groundwater on the site is closely connected with seawater and is greatly affected by seawater tides. The groundwater is abundant, and the dock bottom is highly weathered slate with high permeability. During the construction, the construction personnel found that the original dock decompression drainage system failed. After the original dock tail structure was dismantled, a large amount of water gushed out at the joint of the bottom plate structure, and some of the infiltrated water was retained on the concrete bottom plate cushion layer. It could not be discharged in time through the underground drainage blind ditch to relieve the infiltrated water pressure, which was not conducive to the hardening of the concrete bottom plate and may cause concrete scouring or infiltration cracks, reducing the durability of the bottom plate concrete.

[0005] After the construction of the dock chamber bottom plate was completed, the old dock's pressure relief and drainage system failed, and the seepage water under the bottom plate could not form a new seepage channel in a short period of time. The seepage water pressure increased sharply, and the bottom plate caused excessive internal stress in the structure when the seepage water pressure was redistributed. As a result, the newly poured dock chamber bottom plate concrete surface and construction expansion joints at the junction of the new and old docks, as well as other weak links in the construction, showed varying degrees of seepage. Summary of the invention

[0006] In order to ensure the integrity and durability of the dock floor structure, the present application provides a reserved sealing type water drainage and pressure relief drainage device and a construction method thereof.

[0007] In the first aspect, the present application provides a reserved plugging type water discharge pressure relief drainage device, which adopts the following technical solution: A reserved plugging type water discharge and pressure relief drainage device comprises a dock floor arranged on strongly weathered rock, a concrete cushion layer is arranged between the dock floor and the strongly weathered rock, an expansion joint is reserved on the dock floor, an open drainage ditch is provided on the top surface of the dock floor, a sleeve and a steel pipe are respectively arranged in the expansion joint, a water-permeable hole is provided on the peripheral side of the sleeve, the bottom end of the sleeve is inserted into the concrete cushion layer, a connecting assembly is arranged on the top end of the sleeve, the sleeve is fixedly connected to the bottom end of the steel pipe through the connecting assembly, and the top end of the steel pipe is fixedly connected to the side wall of the open drainage ditch.

[0008] By adopting the above technical solution, when it is necessary to assemble the drainage device, a concrete cushion layer is first laid on the top surface of the strongly weathered rock, and then the dock floor is laid, and expansion joints and open drainage ditches are reserved. In the process of laying the dock floor, the sleeve is fixedly inserted into the concrete cushion layer at the position of the expansion joint, and the steel pipe is fixedly connected to the top surface of the sleeve through a connecting component to complete the assembly of the drainage device. When water seepage occurs in the dock floor, the seepage water first flows into the open drainage ditch, then flows into the steel pipe through the open drainage ditch, and then flows into the sleeve, and finally the seepage water is discharged into the groundwater or seawater, which is beneficial to ensure the integrity and durability of the dock floor structure.

[0009] Optionally, the connecting assembly includes a connecting seat, which is inserted into the top surface of the sleeve, and the side wall ring of the connecting seat is provided with an abutment ring, which is fixedly connected to the sleeve by bolts, and an inner support ring is provided on the inner side of the bottom end of the connecting seat, the steel pipe is inserted into the connecting seat, the steel pipe abuts against the top surface of the inner support ring, and the connecting seat is fixedly connected to the steel pipe by bolts.

[0010] By adopting the above technical solution, when it is necessary to connect and fix the sleeve and the steel pipe, first insert the connecting seat into the connecting groove, and then tighten the abutment ring and the sleeve by bolt threads, then insert the steel pipe into the connecting seat, and support the steel pipe by the inner support ring, and then tighten the steel pipe and the connecting seat by bolt threads. At this time, the steel pipe is fixedly connected to the sleeve through the connecting seat, which is beneficial to improve the stability of the fixed connection between the sleeve and the steel pipe.

[0011] Optionally, the sleeve is filled with graded crushed stone, and the particle size of the graded crushed stone is 19mm-31.5mm.

[0012] By adopting the above technical solution, graded crushed stone is used to filter the strongly weathered rocks and other impurities broken at the bottom to avoid clogging of the steel pipe.

[0013] Optionally, the side wall of the sleeve is covered with a geotextile, the weight density of the geotextile is 400g / ㎡, and the connecting seat is provided with a covering mechanism for fixing both ends of the geotextile.

[0014] By adopting the above technical solution, the side wall of the sleeve is covered with a geotextile, and the geotextile is used to isolate the cement mortar, so that the cement mortar enters the sleeve to avoid clogging the sleeve.

[0015] Optionally, the covering mechanism includes a clamping ear, which is arranged on the circumference of the connecting seat, and the clamping ear and the side wall of the connecting seat form a clamping space, and the two ends of the geotextile are respectively clamped in the clamping space, and the clamping ear is provided with a tightening component for strengthening the fixation of the geotextile.

[0016] By adopting the above technical solution, when the geotextile needs to be fixed, the geotextile is first wrapped around the side wall of the sleeve, and then the ends of the geotextile are respectively inserted into the clamping space, and finally the ends of the geotextile are tightened by the tightening assembly. At this time, the geotextile is fixedly wrapped around the sleeve, which is beneficial to improve the stability of the geotextile wrapped sleeve.

[0017] Optionally, the tightening assembly includes a rubber plug, one end of the rubber plug passes through the clamping ear, one end of the rubber plug extends into the clamping space, and a boss is provided on a side wall of the rubber plug.

[0018] By adopting the above technical solution, when it is necessary to further fix the two ends of the geotextile, the rubber plug is fixedly inserted into the clamping ear under the action of the boss, and the geotextile is tightened, which is beneficial to improve the stability of fixing one end of the geotextile in the clamping space.

[0019] Optionally, a slot is provided on the side wall of the steel pipe, a clamping strip is provided in the slot, a screw is provided on the outside of the clamping strip, a pressing piece is provided on the sliding sleeve of the side wall of the screw, and a nut is connected to the thread of the screw.

[0020] By adopting the above technical solution, during the process of laying the dock floor, the clamping strip is slid into the clamping groove, and then the pressing piece is put on the screw rod, and at the same time, the pressing piece is pressed against the steel bars laid on the dock floor, and finally the nut is tightened with threads. At this time, the steel pipe is connected and fixed to the steel bars pre-tied for laying the dock floor, thereby avoiding damage or breakage of the steel pipe during concrete pouring.

[0021] Optionally, a drain outlet is provided at the connection between the steel pipe and the open drainage ditch, guide rods are provided on both sides of the drain outlet, a fixed seat is provided in the open drainage ditch, one end of the guide rod is connected to the fixed seat, a blocking piece and a spring are respectively slidably sleeved on the guide rod, one end of the spring is fixedly connected to the fixed seat, and the other end of the spring is fixedly connected to the blocking piece, filter gratings are removably provided on both sides of the fixed seat, ears are provided on the inner side of the filter grating, and the blocking piece abuts against the ears.

[0022] By adopting the above technical solution, when the drain outlet is used normally, the plugging piece is pulled in the direction away from the drain outlet, the plugging piece squeezes the spring, and then the filter grating is connected to the two sides of the fixed seat, and the plugging piece is limited by the ear at the same time. The filter grating is used to filter the seepage water and reduce the clogging of the drain outlet by impurities. When the drainage volume is reduced in the later period, the filter grating can be removed, the spring releases the squeezing force, and drives the plugging piece to seal the drain outlet, thereby reducing the drainage pressure of the concrete cushion layer and the strongly weathered rock.

[0023] In a second aspect, the present application provides a reserved plugging type water discharge pressure relief drainage construction method, comprising the following steps: S1: Pour concrete cushion on the strongly weathered rock according to the construction drawings; S2: Prepare the sleeve and steel pipe required for construction in advance, and fix the sleeve and the steel pipe together through the connecting assembly at the construction site, and then bury the lower part of the assembled sleeve in the concrete cushion layer; S3: Dock floor construction: after the concrete cushion layer solidifies, the dock floor reinforcement is tied, and expansion joints and open drainage ditches are reserved; S4: During the steel bar binding process, the pre-connected and fixed sleeve and steel pipe are installed in the reserved expansion joint, and the steel pipe is reinforced with steel bars; S4: After the steel bars of the dock floor are tied, concrete is poured, and the dock floor is formed after the concrete solidifies.

[0024] By adopting the above technical scheme, the sleeve in the water discharge and pressure relief drainage hole device is placed in the concrete dock bottom plate and the concrete cushion layer. If the amount of seepage water increases due to high tide or other factors, the water retained on the concrete cushion layer will be partially discharged in a timely and effective manner to relieve the seepage pressure of the dock bottom plate, ensure the hardening of the dock bottom plate concrete, and better achieve the durability required by the design.

[0025] In summary, this application includes the following beneficial technical effects: The sleeve in the water discharge and pressure relief drainage hole device is placed in the concrete dock bottom plate and the concrete cushion layer. If the amount of seepage water increases due to high tide or other factors, the water retained on the concrete cushion layer will be discharged in a timely and effective manner to relieve the seepage pressure of the dock bottom plate, ensure the hardening of the dock bottom plate concrete, and better achieve the durability required by the design. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the segmented construction of the dock floor of the present application; Figure 2 It is a construction diagram of the reserved plugging type water discharge and pressure relief drainage device of the present application; Figure 3 It is a schematic diagram of the connection between the sleeve and the steel pipe of the present application; Figure 4 is a cross-sectional view of the connection socket of the present application; Figure 5 It is a schematic diagram of the structure of the rubber plug of the present application; Figure 6 It is a top view of a partial section of the open drainage ditch of the present application.

[0027] Explanation of the reference numerals: 1. Dock bottom plate; 2. Strongly weathered rock; 3. Concrete cushion; 4. Expansion joint; 5. Open drainage ditch; 6. Sleeve; 7. Steel pipe; 8. Connecting seat; 9. Abutment ring; 10. Inner support ring; 11. Graded crushed stone; 12. Clip ear; 13. Rubber plug; 14. Boss; 15. Slot; 16. Clip strip; 17. Screw; 18. Pressing piece; 19. Nut; 20. Drain outlet; 21. Guide rod; 22. Fixed seat; 23. Blocking piece; 24. Spring; 25. Filter grating; 26. Clip ear; 27. Geotextile; 28. Water-permeable hole. DETAILED DESCRIPTION

[0028] The following is combined with Figure 1-6 This application is described in further detail.

[0029] Example: In the first aspect, the present application provides a reserved plugging type water discharge pressure relief drainage device, see Figure 1 and Figure 2 , including a dock floor 1, which is built on a strongly weathered rock 2. A concrete cushion layer 3 is fixedly laid on the top surface of the strongly weathered rock 2, and the dock floor 1 is fixedly laid on the top surface of the concrete cushion layer 3. An expansion joint 4 is reserved on the dock floor 1, and an open drainage ditch 5 is provided on the top surface of the dock floor 1. A sleeve 6 and a steel pipe 7 are fixedly installed in the expansion joint 4, and a water-permeable hole 28 is provided on the peripheral side of the sleeve 6. The bottom end of the sleeve 6 is inserted into the concrete cushion layer 3, and the sleeve 6 abuts against the top surface of the strongly weathered rock 2. The steel pipe 7 is vertically arranged, and the bottom end of the steel pipe 7 is inserted into the sleeve 6, and the sleeve 6 is provided with a connecting component for fixedly connecting with the bottom end of the steel pipe 7, and the top end of the steel pipe 7 is fixedly connected to the side wall of the open drainage ditch 5.

[0030] When constructing the drainage device, first lay the concrete cushion layer 3 on the top surface of the strongly weathered rock 2, and at the same time leave space for the installation of the sleeve 6. Then, the sleeve 6 is fixedly connected to the steel pipe 7 through the connecting assembly at the construction site, and then the sleeve 6 is fixedly installed in the installation space. After the concrete cushion layer 3 solidifies, the dock floor 1 is then laid, and the expansion joint 4 and the open drainage ditch 5 are reserved. While laying the dock floor 1, the steel pipe 7 is reinforced to complete the construction of the drainage device. When water seepage occurs at a weak position of the dock floor 1, the seepage water first flows into the open drainage ditch 5, then flows into the steel pipe 7 along the open drainage ditch 5, and then flows into the sleeve 6, and finally the seepage water is discharged into the groundwater or seawater.

[0031] For details, see Figure 3 and Figure 4 The connection assembly includes a connection seat 8. The bottom end of the connection seat 8 is inserted into the top surface of the sleeve 6, and the side wall fixing ring of the connection seat 8 is provided with an abutting ring 9. The abutting ring 9 abuts against the top surface of the sleeve 6, and the abutting ring 9 is fixedly connected to the top surface of the sleeve 6 by bolts. The inner fixing ring of the bottom end of the connection seat 8 is provided with an inner supporting ring 10, the steel pipe 7 is inserted into the connection seat 8, and the bottom end of the steel pipe 7 abuts against the top surface of the inner supporting ring 10. The connection seat 8 is fixedly connected to the steel pipe 7 by bolts.

[0032] In order to facilitate the quick assembly of the sleeve 6 and the steel pipe 7 at the construction site, it is difficult to position the vertically arranged steel pipe 7 instead of welding. At this time, the connecting seat 8 is first inserted into the sleeve 6 so that the abutment ring 9 is close to the top surface of the sleeve 6, and then the abutment ring 9 and the sleeve 6 are tightened with bolt threads, so that the connecting seat 8 and the sleeve 6 are fixedly connected. Then the steel pipe 7 is vertically inserted into the connecting seat 8, so that the bottom end of the steel pipe 7 is abutted against the top surface of the inner support ring 10, and then the connecting seat 8 and the steel pipe 7 are tightened with bolt threads, and finally the steel pipe 7 is fixedly connected to the sleeve 6 through the connecting seat 8.

[0033] See also Figure 2 In order to prevent the broken strongly weathered rock 2 and other impurities from clogging the sleeve 6, the sleeve 6 is filled with graded crushed stone 11, wherein the particle size of the graded crushed stone 11 is 19mm-31.5mm. Under the action of the graded crushed stone 11, it not only does not affect the discharge of seepage water through the sleeve 6, but also helps to prevent the broken strongly weathered rock 2 and other impurities from clogging the sleeve 6.

[0034] See also Figure 2 , Figure 4 and Figure 5 At the same time, in order to prevent cement mortar from entering the sleeve 6, the side wall of the sleeve 6 is covered with a geotextile 27. Among them, the weight density of the geotextile 27 is 400g / ㎡. At the same time, in order to facilitate improving the stability of the geotextile 27 covering the sleeve 6, the connecting seat 8 is installed with a covering mechanism. The covering mechanism includes a clamping ear 12, and the clamping ear 12 is fixed to the peripheral side of the connecting seat 8. The clamping ear 12 is made of metal material, the clamping ear 12 has metal toughness, and the clamping ear 12 and the connecting seat 8 enclose a clamping space for the geotextile 27.

[0035] It is worth mentioning that, in order to further fix the geotextile 27, the clamping ear 12 is equipped with a tightening assembly, which includes a rubber plug 13. There are multiple rubber plugs 13, the side wall of the rubber plug 13 is fixedly connected with a boss 14, and multiple rubber plugs 13 are respectively inserted into the clamping ear 12.

[0036] When the geotextile 27 needs to be fixed, the end of the geotextile 27 is first inserted into the clamping space, and then the clamping ears 12 are bent inwards by using the toughness of the metal. At this time, the clamping ears 12 initially press the end of the geotextile 27 into the clamping space. Then, multiple rubber plugs 13 are inserted into the clamping ears 12 in sequence. Under the action of the boss 14, the rubber plugs 13 are fixed in the clamping space, and one end of the rubber plug 13 presses the end of the geotextile 27 tightly. At this time, the end of the geotextile 27 is stably fixed in the clamping space.

[0037] It is worth mentioning that see Figure 3 In order to prevent the steel pipe 7 from being damaged or broken during the concrete pouring process of the dock floor 1, a clamping groove 15 is provided on the side wall of the steel pipe 7, and the clamping groove 15 is provided along the vertical direction of the steel pipe 7. A clamping strip 16 is provided in the clamping groove 15 for sliding, and a screw 17 is fixed on the outside of the clamping strip 16. A pressing piece 18 is provided on the side wall of the screw 17 for sliding. The cross section of the pressing piece 18 is in the shape of a step, and the pressing piece 18 is used to tighten the steel bars tied before laying the dock floor 1. A nut 19 is also threadedly connected to the screw 17, and the nut 19 is located on the outside of the pressing piece 18.

[0038] When the steel bars required for laying the dock floor 1 are tied, the pressing piece 18 is slid on the screw rod 17 to make the pressing piece 18 close to the steel bars, and then the nut 19 is screwed and tightened. Under the action of the pressing piece 18, the steel pipe 7 is fixedly connected to the steel bars, thereby improving the hardness of the steel pipe 7 and avoiding breakage.

[0039] It should be noted that see Figure 2 and Figure 6 A drainage port 20 is provided at the connection between the steel pipe 7 and the drainage ditch 5. After a period of time, a new seepage channel is formed on the dock floor 1, the groundwater seepage water pressure is relatively stable, and the durability of the concrete reaches the design requirements. At this time, the drainage volume of the water discharge pressure relief drainage hole device is reduced, so the drainage port 20 can be closed.

[0040] To this end, guide rods 21 are fixedly connected to both sides of the drain outlet 20, and a fixed seat 22 is fixedly connected in the open drain ditch 5, and one end of the guide rod 21 is fixedly connected to the fixed seat 22. A plugging piece 23 and a spring 24 are slidably sleeved on the guide rod 21, respectively. The plugging piece 23 is used to block the drain outlet 20, and the spring 24 is located between the plugging piece 23 and the fixed seat 22, one end of the spring 24 is fixedly connected to the fixed seat 22, and the other end of the spring 24 is fixedly connected to the plugging piece 23. The two sides of the fixed seat 22 are also detachably connected with a filter grating 25, which is used to drain the seepage into the steel pipe 7 to prevent impurities from clogging the steel pipe 7, and the inner side of the filter grating 25 is fixedly connected with a clamp 26, and the plugging piece 23 abuts against the side of the clamp 26 facing the fixed seat 22.

[0041] When the drain outlet 20 is in use, the blocking member 23 is moved toward the fixing seat 22, and the blocking member 23 presses the spring 24. Then, the filter grating 25 is installed on both sides of the fixing seat 22, and the filter grating 25 is pressed against the clamping ear 26 under the force of the spring 24. When the drain outlet 20 needs to be blocked, the filter grating 25 is removed, and the spring 24 releases its elastic force, and drives the blocking member 23 to move away from the fixing seat 22, so that the blocking member 23 blocks the drain outlet 20.

[0042] Working principle of a reserved plugging type water discharge pressure relief drainage device: Before laying the dock floor 1, the sleeve 6 is fixedly connected to the steel pipe 7 through the connecting seat 8 at the construction site. Then, during the laying of the concrete cushion 3, the sleeve 6 is first filled with graded gravel 11, and then the sleeve 6 is covered with a geotextile 27, and the cloth end of the geotextile 27 is fixed by the clamping ear 12 and the rubber plug 13. Then, the sleeve 6 is buried in the concrete cushion 3. At present, the sleeve 6 is fixedly connected to the top surface of the strongly weathered rock 2 through the geotextile 27.

[0043] During the laying process of the dock floor 1 , the pressing piece 18 is used to tighten the steel bars tied to the dock floor 1 , so as to prevent the steel pipe 7 from breaking during the laying process of the dock floor 1 .

[0044] After the dock floor 1 is laid, if the amount of seepage water increases due to expansion or other factors, the seepage water is first discharged into the open drainage ditch 5, then discharged into the steel pipe 7 through the drain port 20, and then discharged into the sleeve 6, and finally discharged into the groundwater or seawater through the water-permeable holes 28 opened on the side wall of the sleeve 6, thereby ensuring the integrity and durability of the dock floor structure.

[0045] In a second aspect, the present application provides a reserved plugging type water discharge pressure relief drainage construction method, comprising the following steps: S1: According to the construction drawings, excavate the foundation pit, fill the gaps between the cast-in-place piles with jet grouting piles to form a water-stop curtain, expose the strongly weathered rock 2 at the bottom of the foundation pit, and pour a concrete cushion layer 3 on the strongly weathered rock 2; S2: Prepare the sleeve 6 and steel pipe 7 required for construction in advance, and fix the sleeve 6 and steel pipe 7 together through the connecting seat 8 at the construction site, then fill the sleeve 6 with graded crushed stone 11, and then wrap the sleeve 6 with geotextile 27, fix the end of the geotextile 27 with the clip ears 12 and the rubber plug 13, and then bury the lower part of the sleeve 6 in the concrete cushion 3; S3: Construction of dock floor 1. After the concrete cushion layer 3 solidifies, the reinforcement of dock floor 1 is tied, and expansion joint 4 and open drainage ditch 5 are reserved; S4: During the steel bar binding process, the assembled sleeve 6 and steel pipe 7 are placed in the reserved expansion joint 4, and the steel bars are tightened by the pressing piece 18 to vertically reinforce the steel pipe 7; S5: After the steel bars of the dock bottom plate 1 are tied, concrete is poured. After the concrete solidifies, the dock bottom plate 1 is formed, and the construction of the dock bottom plate 1 and the plugging type water discharge and pressure relief drainage device is completed.

[0046] In summary, the sleeve 6 in the water discharge and pressure relief drainage hole device is placed in the concrete dock floor 1 and the concrete cushion layer 3. If the amount of seepage water increases due to high tide or other factors, the water retained on the concrete cushion layer 3 will be partially discharged in a timely and effective manner to relieve the seepage pressure of the dock floor 1, ensure the hardening of the concrete of the dock floor 1, and better achieve the durability required by the design.

[0047] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A reserved plugging type water discharge pressure relief drainage device, comprising a dock floor (1) arranged on a strongly weathered rock (2), characterized in that: A concrete cushion layer (3) is arranged between the dock bottom plate (1) and the strongly weathered rock (2); an expansion joint (4) is reserved on the dock bottom plate (1); an open drainage ditch (5) is provided on the top surface of the dock bottom plate (1); a sleeve (6) and a steel pipe (7) are respectively arranged in the expansion joint (4); a water-permeable hole (28) is provided on the peripheral side of the sleeve (6); the bottom end of the sleeve (6) is inserted into the concrete cushion layer (3); a connecting component is arranged on the top end of the sleeve (6); the sleeve (6) is fixedly connected to the bottom end of the steel pipe (7) through the connecting component; and the top end of the steel pipe (7) is fixedly connected to the side wall of the open drainage ditch (5).

2. A reserved plugging type water discharge and pressure relief drainage device according to claim 1, characterized in that: The connecting assembly comprises a connecting seat (8), the connecting seat (8) is inserted through the top surface of the sleeve (6), the side wall ring of the connecting seat (8) is provided with an abutment ring (9), the abutment ring (9) is fixedly connected to the sleeve (6) by bolts, an inner support ring (10) is provided on the inner side of the bottom end of the connecting seat (8), the steel pipe (7) is inserted into the connecting seat (8), the steel pipe (7) abuts against the top surface of the inner support ring (10), and the connecting seat (8) is fixedly connected to the steel pipe (7) by bolts.

3. A reserved plugging type water discharge and pressure relief drainage device according to claim 1, characterized in that: The sleeve (6) is filled with graded crushed stone (11), and the particle size of the graded crushed stone (11) is 19 mm-31.5 mm.

4. A reserved plugging type water discharge and pressure relief drainage device according to claim 2, characterized in that: The side wall of the sleeve (6) is covered with a geotextile (27), the weight density of the geotextile (27) is 400g / ㎡, and the connecting seat (8) is provided with a covering mechanism for fixing the two ends of the geotextile (27).

5. A reserved plugging type water discharge and pressure relief drainage device according to claim 4, characterized in that: The covering mechanism comprises a clamping ear (12), wherein the clamping ear (12) is arranged on the peripheral side of the connecting seat (8), and the clamping ear (12) and the side wall of the connecting seat (8) enclose a clamping space, wherein the two ends of the geotextile (27) are respectively clamped in the clamping space, and the clamping ear (12) is provided with a tightening component for strengthening and fixing the geotextile (27).

6. A reserved plugging type water discharge and pressure relief drainage device according to claim 5, characterized in that: The tightening assembly comprises a rubber plug (13), one end of the rubber plug (13) passes through the clamping ear (12), one end of the rubber plug (13) extends into the clamping space, and a boss (14) is provided on the side wall of the rubber plug (13).

7. The reserved plugging type water discharge and pressure relief drainage device according to claim 1, characterized in that: The side wall of the steel pipe (7) is provided with a slot (15), a clip strip (16) is clipped in the slot (15), a screw rod (17) is arranged on the outside of the clip strip (16), a pressing piece (18) is slidingly sleeved on the side wall of the screw rod (17), and a nut (19) is connected to the thread of the screw rod (17).

8. The reserved plugging type water discharge and pressure relief drainage device according to claim 1, characterized in that: A drainage port (20) is provided at the connection between the steel pipe (7) and the open drainage ditch (5), guide rods (21) are provided on both sides of the drainage port (20), a fixed seat (22) is provided in the open drainage ditch (5), one end of the guide rod (21) is connected to the fixed seat (22), a blocking member (23) and a spring (24) are respectively slidably sleeved on the guide rod (21), one end of the spring (24) is fixedly connected to the fixed seat (22), and the other end of the spring (24) is fixedly connected to the blocking member (23), filter gratings (25) are detachably provided on both sides of the fixed seat (22), a clamping ear (26) is provided on the inner side of the filter grating (25), and the blocking member (23) abuts against the clamping ear (26).

9. A reserved plugging type water discharge and pressure relief drainage construction method, based on a reserved plugging type water discharge and pressure relief drainage device according to any one of claims 1 to 8, characterized in that: The steps include: S1: pouring a concrete cushion layer (3) on the strongly weathered rock (2) according to the construction drawings; S2: Preparing the sleeve (6) and steel pipe (7) required for the construction in advance, and fixing the sleeve (6) and the steel pipe (7) together through a connecting assembly at the construction site, and then burying the lower part of the assembled sleeve (6) in the concrete cushion layer (3); S3: Construction of the dock floor (1). After the concrete cushion layer (3) solidifies, the steel bars of the dock floor (1) are tied, and expansion joints (4) and open drainage ditches (5) are reserved; S4: During the process of steel bar binding, the pre-connected and fixed sleeve (6) and steel pipe (7) are installed in the reserved expansion joint (4), and the steel pipe (7) is reinforced with steel bars; S4: After the steel bars of the dock bottom plate (1) are tied, concrete is poured, and after the concrete solidifies, the dock bottom plate (1) is formed.