Rod frame assembly and maintenance method
By designing a foldable rod frame assembly and maintenance method, and using friction block components and pull ropes to adjust the height of the rod frame, the difficulty and safety issues of pole frame equipment maintenance are solved, and efficient and safe maintenance operations are achieved.
Patent Information
- Application Number
- CN202411027995.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-11
AI Technical Summary
The height of the pole rack equipment is high after installation, which makes inspection and maintenance difficult. Operators cannot directly perform maintenance, which is high risk and difficult. Moreover, the tool operation is cumbersome and it is difficult to implement safe operating procedures.
Design a rod frame assembly. Through the rotational connection between the second rod and the first rod, the friction block component and the connecting rod are used to balance the swing of the second rod, reduce the height of the installation part, improve the structural stability, and adjust the third rod through the pull rope. The position of the two poles enables convenient maintenance operations.
It reduces the difficulty and risk of operations during the maintenance process, improves maintenance efficiency and operational safety, simplifies the equipment maintenance process, and reduces the demand for equipment.
Smart Images

Figure CN118757017A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of rod rack equipment, and in particular relates to a rod rack assembly and a maintenance method. Background Art
[0002] Pole racks are widely used in various fields. For example, they are used to support lighting, high-altitude monitoring, signal lights, signs, solar photovoltaic panels and other equipment. The height of the pole rack is generally high, and after installation, it is usually inconvenient to inspect and maintain it.
[0003] In the related art, when the equipment on the top of the pole frame fails or is damaged, since the top of the pole frame is several meters or even more than ten meters above the ground, the operating personnel cannot directly carry out maintenance. They need to use lifting equipment, or build a maintenance platform at the same height, or use long ladders and other equipment and tools to assist in completing the operation. The operation is high-risk and difficult. There are great difficulties in disassembling and replacing the equipment. The use of various tools of the equipment during the maintenance process will involve a series of tedious processes, making it difficult to implement safety operating procedures and protective measures. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0005] To this end, an embodiment of the present invention provides a rod frame assembly that can be folded, thereby reducing the height of the rod frame assembly and facilitating subsequent maintenance.
[0006] An embodiment of the present invention provides a rod bracket assembly maintenance method.
[0007] The rod bracket assembly of the embodiment of the present invention comprises:
[0008] A first rod, the first rod is vertically arranged, a lower end of the first rod has a support portion, the first rod is supported on the ground or a structure by the support portion, and the first rod has a first cavity;
[0009] A second rod, one end of which is rotatably connected to the upper end of the first rod, and the other end of which has a mounting portion;
[0010] a third rod, the third rod being connected to an end of the second rod close to the first rod, and the third rod extending in a direction away from the mounting portion of the second rod, and a first connecting member being provided between the third rod and the first rod;
[0011] a first connecting portion, the first connecting portion being arranged on the third rod, and the first connecting portion being used to be connected to a pull rope to adjust a swing position of the second rod relative to the first rod;
[0012] A friction block component, wherein the friction block component is disposed in the first cavity, the friction block component is movable in the first cavity along a vertical direction, and the friction block component abuts against a wall surface of the first cavity;
[0013] A connecting rod, one end of which is rotatably connected to the second rod or the third rod, and the other end of which is rotatably connected to the friction block component.
[0014] The embodiments of the present invention can improve the structural stability of the rod frame assembly, reduce the height of the mounting portion by folding the second rod during maintenance, and improve maintenance efficiency. The friction block component can also be used to balance the force during the folding of the second rod, thereby improving the convenience and safety of operation and reducing the demand for equipment.
[0015] In some embodiments, the friction block component includes:
[0016] a body, the body being disposed in the first cavity;
[0017] a first friction block, wherein the first friction block is arranged on the body;
[0018] A sliding block is arranged on the main body, and the first friction block and the sliding block are respectively arranged on two opposite sides of the main body.
[0019] In some embodiments, the number of the first friction blocks is multiple, and the multiple first friction blocks are arranged at intervals on the same side of the body;
[0020] And / or, the main body has a second cavity, the sliding block is arranged in the second cavity, the sliding block is movable in the second cavity along a direction approaching the first friction block and a direction away from the first friction block, and a first elastic member is provided between the sliding block and the main body.
[0021] In some embodiments, the friction block component further includes a friction plate and a sliding plate, both of which are fixed in the first cavity, the friction plate slidingly fits and abuts against the first friction block, and the sliding plate slidingly fits and abuts against the sliding block.
[0022] In some embodiments, the friction block component further includes a counterweight block, which is disposed in the first cavity and connected to the body.
[0023] In some embodiments, the counterweight block has a second friction block and a magnetic attraction plate, the second friction block is arranged corresponding to the friction plate, and the magnetic attraction plate is arranged between the counterweight block and the friction block.
[0024] In some embodiments, the connecting rod is disposed between the third rod and the body, a first groove is disposed on the side wall of the first rod, and the connecting rod is inserted into the first groove.
[0025] In some embodiments, the first rod and the second rod are rotatably connected via a first axis, and when the second rod is in a horizontal state, the distance between the connection point between the connecting rod and the body and the first axis is m, and the distance between the connection point between the connecting rod and the third rod and the first axis is n, then 0.6≤m / n≤1.3, and 1 / 6L≤n≤1 / 3L, where L is the distance between the mounting portion of the second rod and the first axis;
[0026] And / or, the cross section of the first rod is rectangular, the cross section of the third rod is U-shaped, the first rod and the third rod are both provided with a first hole, and after the third rod is parallel to and abuts against the first rod, the first hole on the first rod corresponds to the first hole on the third rod and is connected through the first connecting member;
[0027] And / or, a pulley is provided on the first rod, and the pull rope is connected to the first connecting part after passing through the pulley.
[0028] The rod bracket assembly maintenance method of the embodiment of the present invention is used to repair the rod bracket assembly described in any of the above embodiments, and specifically comprises the following steps:
[0029] Determine the position of the rod bracket assembly to be inspected, and connect one end of the pull rope to the first connecting portion of the third rod;
[0030] Removing the first connecting member, loosening the pull rope, and controlling the rotation speed of the second rod relative to the first rod until the mounting portion of the second rod is lowered to a preset height;
[0031] Overhauling the equipment on the installation portion;
[0032] After the inspection is completed, the pull rope is pulled down to raise the height of the mounting portion until the second rod is restored to a vertical state.
[0033] In some embodiments, the step of loosening the drawstring further comprises the following steps:
[0034] An electromagnet device is arranged on the side of the first rod, and the electromagnet device corresponds to the counterweight block;
[0035] adjusting the magnetic force of the electromagnet device to a first preset value;
[0036] loosening the drawstring and detecting the tension of the drawstring;
[0037] Determining whether the tension of the pull rope is greater than a first threshold;
[0038] If so, the magnetic force of the electromagnet device is increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 2 is a schematic structural diagram of a rod bracket assembly according to an embodiment of the present invention.
[0040] Figure 2 It is a schematic cross-sectional structural diagram of a rod bracket assembly according to an embodiment of the present invention.
[0041] Figure 3 It is a schematic structural diagram of a friction block component according to an embodiment of the present invention.
[0042] Figure 4 It is a process flow chart of a rod rack assembly maintenance method according to an embodiment of the present invention.
[0043] Figure 5 It is a process flow chart of a rod rack assembly maintenance method according to another embodiment of the present invention.
[0044] Reference numerals:
[0045] 100, rod frame assembly;
[0046] 1. first rod; 11. supporting part; 12. first cavity; 13. pulley;
[0047] 2. second rod; 21. mounting portion; 22. first axis;
[0048] 3. third rod; 31. first connecting portion; 32. first hole;
[0049] 4. Connecting rod;
[0050] 5. Friction block component; 51. Main body; 52. First friction block; 53. Sliding block; 54. First elastic member; 55. Friction plate; 56. Sliding plate; 57. Counterweight block; 58. Second friction block; 59. Magnetic plate;
[0051] 6. Pull rope;
[0052] 7. Electromagnet device. DETAILED DESCRIPTION
[0053] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0054] The following combination Figure 1-Figure 5 The rod bracket assembly and maintenance method of the embodiment of the present invention are described in detail.
[0055] See also Figure 1-Figure 3The rod frame assembly 100 of the embodiment of the present invention includes a first rod 1, a second rod 2, a third rod 3 and a first connecting portion. The first rod 1 is vertically arranged, and the lower end of the first rod 1 has a supporting portion 11. The first rod 1 is supported on the ground or a structure by the supporting portion 11, and the first rod 1 has a first cavity 12; one end of the second rod 2 is rotatably connected to the upper end of the first rod 1, and the other end of the second rod 2 has a mounting portion 21; the third rod 3 is connected to an end of the second rod 2 close to the first rod 1, and the third rod 3 extends in a direction away from the mounting portion 21 of the second rod 2, and a first connecting member is provided between the third rod 3 and the first rod 1; the first connecting portion 31 is provided on the third rod 3, and the first connecting portion 31 is used to connect with the pull rope 6 to adjust the swing position of the second rod 2 relative to the first rod 1.
[0056] It should be understood that the support portion 11 is a fixed plate, which is fixed on the pile foundation, or the support portion 11 is a pre-buried section at the bottom of the first rod, which is used to be pre-buried under the ground. When the first connecting member between the first rod 1 and the third rod 3 is removed, the second rod 2 can rotate freely around the first rod 1. At this time, in order to ensure the smooth rotation of the structure, it is necessary to pull it through the pull rope 6. By gradually loosening the pull rope 6, the swing position of the second rod 2 relative to the first rod 1 is adjusted.
[0057] Under normal circumstances, the first pole 1 and the second pole 2 are both in a roughly vertical state, and the mounting portion 21 at the top of the second pole 2 is installed with lighting, high-altitude monitoring, signal lights, signs, solar photovoltaic panels and other equipment. When the equipment on the top of the mounting portion 21 fails or is damaged, the connection between the first pole 1 and the third pole 3 is loosened, and the second pole 2 is rotated to make the mounting portion 21 of the second pole 2 descend, which is convenient for maintenance personnel to work and reduces the difficulty and risk of construction.
[0058] The rod frame assembly 100 also includes a friction block component 5 and a connecting rod 4. The friction block component 5 is arranged in the first cavity 12. The friction block component 5 is movable in the first cavity 12 along the vertical direction. The friction block component 5 abuts against the wall surface of the first cavity 12; one end of the connecting rod 4 is rotatably connected to the second rod 2 or the third rod 3, and the other end of the connecting rod 4 is rotatably connected to the friction block component 5.
[0059] Since the overall height of the rod frame assembly 100 is relatively high, which can reach nearly ten meters or even higher, in order to lower the mounting portion 21 of the second rod 2 to an appropriate position, the length of the second rod 2 is also several meters. When the second rod 2 swings, its structural stability deteriorates due to its excessive cantilever. The third rod 3 in the embodiment of the present invention can balance the second rod 2 and can pull the third rod 3 through the friction block component 5, thereby reducing the force acting on the pull rope 6, making the overall structural stability better, and improving the structural stability during the process of laying down the second rod 2.
[0060] The embodiment of the present invention can improve the structural stability of the rod frame assembly 100, and can reduce the height of the mounting portion 21 by folding the second rod 2 during maintenance, thereby improving maintenance efficiency. The friction block component 5 can also be used to balance the force during the folding process of the second rod 2, thereby improving the convenience and safety of operation and reducing the demand for equipment.
[0061] In some embodiments, the friction block component 5 includes a main body 51, a first friction block 52 and a sliding block 53. The main body 51 is arranged in the first cavity 12; the first friction block 52 is arranged on the main body 51; the sliding block 53 is arranged on the main body 51, and the first friction block 52 and the sliding block 53 are respectively arranged on opposite sides of the main body 51.
[0062] That is to say, when the second rod 2 rotates from a vertical state to a horizontal state (the mounting portion 21 descends), the connecting rod 4 is connected between the third rod 3 and the main body 51. At this time, the connecting rod 4 provides a pulling force with a certain angle to the vertical direction to the main body 51, so that the first friction block 52 of the main body 51 fits and abuts against the inner wall of the first cavity 12, and the friction force is used to reduce the force acting on the pull rope 6.
[0063] When the second rod 2 rotates from a horizontal state to a vertical state (the mounting portion 21 rises), the connecting rod 4 provides a thrust to the main body 51. At this time, the sliding block 53 abuts against the inner wall of the first cavity 12, which can reduce the friction between the main body 51 and the inner wall of the first cavity 12, making it easier for the second rod 2 to rotate to a vertical direction.
[0064] Optionally, the body 51 is a metal block, the sliding block 53 can be a copper block or a graphite block, and the first friction block 52 is an asbestos friction material or a carbon fiber friction material. The sliding block 53 and the first friction block 52 are embedded in the body 51 .
[0065] In some embodiments, there are multiple first friction blocks 52 , and the multiple first friction blocks 52 are arranged at intervals on the same side of the body 51 .
[0066] There are multiple first friction blocks 52, and the multiple first friction blocks 52 are arranged at intervals in the vertical direction. Since the force direction of the main body 51 will change with the swing of the second rod 2, therefore, when the first friction block 52 is a whole block, it is easy to cause inconsistent friction degrees in different parts, resulting in poor contact effect. When the first friction block 52 is set to be multiple blocks, on the one hand, it can improve the convenience of replacement, and on the other hand, it can make each first friction block 52 have a corresponding friction inclination angle according to its own position, thereby ensuring that the contact surface between the friction block and the inner wall of the first cavity 12 is in contact, and the practicality is better.
[0067] In some embodiments, the main body 51 has a second cavity, the sliding block 53 is disposed in the second cavity, the sliding block 53 is movable in the second cavity along a direction close to the first friction block 52 and a direction away from the first friction block 52, and a first elastic member 54 is provided between the sliding block 53 and the main body 51.
[0068] It should be understood that in order to make the first friction block 52 and the sliding block 53 effectively fit with the inner wall of the first cavity 12 and avoid swinging, the embodiment of the present invention arranges a first elastic member 54 between the sliding block 53 and the main body 51, so that the height of the sliding block 53 protruding from the main body 51 can float within a certain range. In addition, due to the wear of the first friction block 52, the first elastic member 54 can adjust the fit between the first friction block 52 and the inner wall of the first cavity 12 to ensure that the opposite sides of the main body 51 are in contact with the inner wall of the first cavity 12.
[0069] In some embodiments, the friction block component 5 also includes a friction plate 55 and a sliding plate 56, both of which are fixed in the first cavity 12, the friction plate 55 slides and abuts against the first friction block 52, and the sliding plate 56 slides and abuts against the sliding block 53.
[0070] In order to prevent the first friction block 52 and the sliding block 53 from directly contacting and rubbing with the first rod 1, which may cause the first rod 1 to be worn and its performance to be degraded or damaged, a friction plate 55 and a sliding plate 56 are provided in the embodiment of the present invention. The friction plate 55 and the sliding plate 56 are fixed in the first cavity 12, and the body 51 is provided between the friction plate 55 and the sliding plate 56. The first friction block 52 is in contact with the friction plate 55, and the sliding block 53 is in contact with the sliding plate 56.
[0071] The friction plate 55 and the sliding plate 56 can also reinforce the structure of the first rod 1, improve the stability of the structure, and prevent the first rod 1 from being deformed or broken due to local stress during use.
[0072] In some embodiments, the friction block component 5 further includes a counterweight block 57 . The counterweight block 57 is disposed in the first cavity 12 , and the counterweight block 57 is connected to the body 51 .
[0073] The embodiment of the present invention can provide a downward force on the main body 51 through the provision of the counterweight block 57, thereby forming a combined force with the force acting on the main body 51 by the connecting rod 4, thereby improving the balance of the abutment force between the first friction block 52 and the friction plate 55 at different positions and improving the force-bearing performance of the main body 51.
[0074] The counterweight 57 can be a cement column, a lead column or a metal column.
[0075] In some embodiments, the counterweight block 57 has a second friction block 58 and a magnetic attraction plate 59 . The second friction block 58 is arranged corresponding to the friction plate 55 , and the magnetic attraction plate 59 is arranged between the counterweight block 57 and the friction block.
[0076] Since the mass of the counterweight 57 remains unchanged, and the force exerted on the main body 51 by the second rod 2 during the swinging process is always floating and changing, therefore, in order to ensure the stability of the force on the pull rope 6, reduce the tension on the pull rope 6, and improve the convenience of operation, a second friction block 58 and a magnetic plate 59 are provided on the counterweight 57 in the embodiment of the present invention. The second friction block 58 can be in contact with the friction plate 55. The magnetic plate 59 is a plate supported by a magnetic material that can be magnetically attracted. When an electromagnet is provided on the outside of the first rod 1, the magnetic plate 59 can be attracted, thereby increasing the pressure of the second friction block 58 on the friction plate 55 and increasing the friction force, thereby adjusting the mass of the counterweight 57.
[0077] In application, the magnetic force of the electromagnet can be automatically adjusted by detecting the tension on the pull rope 6, thereby ensuring the stability of the tension on the pull rope 6, improving stability and reducing damage to the equipment when operators use mechanical equipment or manpower.
[0078] In some embodiments, the connecting rod 4 is disposed between the third rod 3 and the body 51 , a first groove is disposed on the side wall of the first rod 1 , and the connecting rod 4 is inserted into the first groove.
[0079] It should be understood that the connecting rod 4 can be arranged between the second rod 2 and the main body 51, and can also be arranged between the third rod 3 and the main body 51. In the embodiment of the present invention, the connecting rod 4 is arranged between the third rod 3 and the main body 51, which is convenient for the structural arrangement on the first rod 1, improves the symmetry of the force, and makes the second rod 2 and the connecting rod 4 respectively located on both sides of the first rod 1, which is convenient for the arrangement of other equipment and on-site operation, avoids workers working under the second rod 2, and reduces the operation risk.
[0080] In some embodiments, the first rod 1 and the second rod 2 are rotatably connected via the first axis 22. When the second rod 2 is in a horizontal state, the distance between the connection point between the connecting rod 4 and the body 51 and the first axis 22 is m, and the distance between the connection point between the connecting rod 4 and the third rod 3 and the first axis 22 is n. Then 0.6≤m / n≤1.3, and 1 / 6L≤n≤1 / 3L, where L is the distance between the mounting portion 21 of the second rod 2 and the first axis 22.
[0081] It should be understood that m / n can be 0.6, 0.75, 0.96, 1.1 or 1.3. When m / n is too small, the horizontal force acting on the body 51 will be too large, which will have a great impact on the structure of the first rod 1 and require a high structural strength of the first rod 1. If the structural strength of the first rod 1 is not enough, it will easily cause the rod to bend or break. When m / n is too large, the friction between the first friction block 52 and the friction plate 55 will be small, and the third rod 3 cannot be pulled well. The tension adjustment ability of the pull rope 6 is small, which is not conducive to the operation of the staff.
[0082] Furthermore, n can be 1 / 6L, 1 / 5L or 1 / 3L. When n is less than 1 / 6L, the force arm will be too small, the stability will be difficult to control, the structural stability will be poor, and it will be difficult to ensure the overall structural stability after installation or during maintenance. When n is greater than 1 / 3L, the length of the third rod 3 will be too long, the cost will be high, and the length of the connecting rod 4 will be too long, the overall height of the first rod 1 will be difficult to control, and the practicality will be poor.
[0083] In some embodiments, the cross-section of the first rod 1 is rectangular, the cross-section of the third rod 3 is U-shaped, and the first rod 1 and the third rod 3 are both provided with a first hole 32. After the third rod 3 is parallel to and abuts against the first rod 1, the first hole 32 on the first rod 1 and the first hole 32 on the third rod 3 correspond to each other and are connected by a first connecting member.
[0084] The first connecting member is a pin. When the second rod 2 is rotated to a vertical state, the first hole 32 of the first rod 1 corresponds to the first hole 32 of the third rod 3. The first rod 1 and the third rod 3 are connected by the pin to ensure the overall structural stability.
[0085] In addition, since the embodiment of the present invention includes the counterweight block 57 and the main body 51, a pulling effect is exerted on the lower end of the third rod 3, thereby ensuring the stability of the second rod 2 and the third rod 3. In the event of severe convective weather, the swing of the second rod 2 can be tuned by the counterweight block 57, thereby reducing the vibration frequency of the rod frame assembly 100, thereby playing the role of a damper and achieving good stability.
[0086] In some embodiments, a pulley 13 is provided on the first rod 1, and the pull rope 6 is connected to the first connecting portion 31 after passing through the pulley 13. The pull rope 6 can be adjusted by the pulley 13 to ensure that the direction of the pull rope 6 at the operating end is always straight, thereby improving the stability of the operation.
[0087] like Figure 4 As shown, the rod bracket assembly 100 maintenance method of the embodiment of the present invention is used to repair the rod bracket assembly 100 in any of the above embodiments, and specifically includes the following steps:
[0088] S101, determine the position of the rod frame assembly 100 to be repaired, and connect one end of the pull rope 6 to the first connection portion 31 of the third rod 3. When a rod frame assembly 100 fails or is damaged, determine the position of the corresponding rod frame assembly 100, move some auxiliary repair tools or a repair vehicle to the corresponding position, and then connect the first connection portion 31 of the third rod 3 with the pull rope 6. The first connection portion 31 can be a hook or a hook ring.
[0089] For example, one end of the pull rope 6 is connected to the first connection portion 31, and the other end of the pull rope 6 is connected to the winch. The rotation position of the second rod 2 is adjusted by controlling the forward and reverse rotation of the winch.
[0090] S102, remove the first connecting member, loosen the pull rope 6, and control the rotation speed of the second rod 2 relative to the first rod 1 until the mounting portion 21 of the second rod 2 is lowered to a preset height.
[0091] For example, the mounting portion 21 is lowered to 2 meters from the ground. At this time, the operator can work on the maintenance vehicle and place the disassembled parts directly on the vehicle at the same time, or directly install the parts on the vehicle to the mounting portion 21 of the second rod 2, thereby improving work efficiency.
[0092] S103, inspect and repair the equipment on the installation part 21; for example, if the solar panel is damaged, the old one can be removed and replaced with a new one.
[0093] S104, after the inspection is completed, the pull rope 6 is pulled down to raise the height of the mounting portion 21 until the second rod 2 is reset to a vertical state. The second rod 2 is reset by pulling down the pull rope 6, and the pull rope 6 can be reeled in by a winch to reset the second rod 2.
[0094] like Figure 5 As shown, in some embodiments, the step of loosening the drawstring 6 further includes the following steps:
[0095] S201. Arrange an electromagnet device 7 on the side of the first rod 1, and the electromagnet device 7 corresponds to the counterweight 57; the electromagnet device 7 can be fixed on the outside of the first rod 1, for example, a mounting seat is provided on the side of the first rod 1, which is specifically used to fix the electromagnet device 7, so as to facilitate direct alignment installation during operation.
[0096] S202, adjusting the magnetic force of the electromagnet device 7 to a first preset value; determining the first preset value according to the size parameters of the first rod 1, the second rod 2 and the third rod 3, that is, the first preset value matches different models of the rod frame assembly 100, and has a corresponding initial value during production, which can ensure the structural stability in the initial position.
[0097] S203, loosen the pull rope 6 and detect the tension of the pull rope 6; as the second rod 2 swings, the tension fluctuates greatly. Therefore, if it is not controlled, it will cause a large change in the pulling force on the winch, affecting the structural stability of the winch and posing a risk to the construction operation.
[0098] S204: Determine whether the tension of the pull rope 6 is greater than a first threshold.
[0099] S205, if yes, increase the magnetic force of the electromagnet device 7. When the pulling force of the pull rope 6 is greater than the first threshold, adjust the magnetic force of the electromagnet device 7, and then adjust the friction between the second friction block 58 and the friction plate 55, so as to increase the pulling force of the counterweight block 57 on the body 51.
[0100] The present invention can safely and quickly lower the installation end of the second rod to a required position near the ground by rotating and folding, thereby avoiding the safety risks caused by using auxiliary tools of lifting equipment and high-altitude operations.
[0101] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0102] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0103] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0104] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0105] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0106] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A rod bracket assembly, characterized in that: include: A first rod, the first rod is vertically arranged, a lower end of the first rod has a support portion, the first rod is supported on the ground or a structure by the support portion, and the first rod has a first cavity; A second rod, one end of which is rotatably connected to the upper end of the first rod, and the other end of which has a mounting portion; a third rod, the third rod being connected to an end of the second rod close to the first rod, and the third rod extending in a direction away from the mounting portion of the second rod, and a first connecting member being provided between the third rod and the first rod; a first connecting portion, the first connecting portion being arranged on the third rod, and the first connecting portion being used to be connected to a pull rope to adjust a swing position of the second rod relative to the first rod; A friction block component, wherein the friction block component is disposed in the first cavity, the friction block component is movable in the first cavity along a vertical direction, and the friction block component abuts against a wall surface of the first cavity; A connecting rod, one end of which is rotatably connected to the second rod or the third rod, and the other end of which is rotatably connected to the friction block component.
2. The rod bracket assembly according to claim 1, characterized in that: The friction block component comprises: a body, the body being disposed in the first cavity; a first friction block, wherein the first friction block is arranged on the body; A sliding block is arranged on the main body, and the first friction block and the sliding block are respectively arranged on two opposite sides of the main body.
3. The rod bracket assembly according to claim 2, characterized in that: There are multiple first friction blocks, and the multiple first friction blocks are arranged at intervals on the same side of the body; And / or, the main body has a second cavity, the sliding block is arranged in the second cavity, the sliding block is movable in the second cavity along a direction approaching the first friction block and a direction away from the first friction block, and a first elastic member is provided between the sliding block and the main body.
4. The rod bracket assembly according to claim 2, characterized in that: The friction block component further comprises a friction plate and a sliding plate, both of which are fixed in the first cavity, the friction plate and the sliding plate are slidably fitted and abutted against the first friction block, and the sliding plate and the sliding block are slidably fitted and abutted against each other.
5. The rod bracket assembly according to claim 4, characterized in that: The friction block component further includes a counterweight block, which is disposed in the first cavity and connected to the body.
6. The rod bracket assembly according to claim 5, characterized in that: The counterweight block comprises a second friction block and a magnetic attraction plate. The second friction block is arranged corresponding to the friction plate, and the magnetic attraction plate is arranged between the counterweight block and the friction block.
7. The rod bracket assembly according to any one of claims 1 to 6, characterized in that: The connecting rod is arranged between the third rod and the body, a first groove is arranged on the side wall of the first rod, and the connecting rod is inserted into the first groove.
8. The rod bracket assembly according to claim 7, characterized in that: The first rod and the second rod are rotatably connected via a first axis. When the second rod is in a horizontal state, the distance between the connection point between the connecting rod and the body and the first axis is m, and the distance between the connection point between the connecting rod and the third rod and the first axis is n, then 0.6≤m / n≤1.3, and 1 / 6L≤n≤1 / 3L, where L is the distance between the mounting portion of the second rod and the first axis; And / or, the cross section of the first rod is rectangular, the cross section of the third rod is U-shaped, the first rod and the third rod are both provided with a first hole, and after the third rod is parallel to and abuts against the first rod, the first hole on the first rod corresponds to the first hole on the third rod and is connected through the first connecting member; And / or, a pulley is provided on the first rod, and the pull rope is connected to the first connecting part after passing through the pulley.
9. A method for repairing a rod rack assembly, characterized in that: Used to overhaul the rod bracket assembly according to any one of claims 1 to 8, specifically comprising the following steps: Determine the position of the rod bracket assembly to be inspected, and connect one end of the pull rope to the first connecting portion of the third rod; Removing the first connecting member, loosening the pull rope, and controlling the rotation speed of the second rod relative to the first rod until the mounting portion of the second rod is lowered to a preset height; Overhauling the equipment on the installation portion; After the inspection is completed, the pull rope is pulled down to raise the height of the mounting portion until the second rod is restored to a vertical state.
10. The rod bracket assembly maintenance method according to claim 9, characterized in that: The step of loosening the drawstring also includes the following steps: An electromagnet device is arranged on the side of the first rod, and the electromagnet device corresponds to the counterweight block; adjusting the magnetic force of the electromagnet device to a first preset value; loosening the drawstring and detecting the tension of the drawstring; Determining whether the tension of the pull rope is greater than a first threshold; If so, the magnetic force of the electromagnet device is increased.