Method for roof pressure relief and gas extraction through roof drainage roadway
By using a wire saw device in the top extraction tunnel to pre-crack the thick hard roof, the cracks are formed with larger spacing, which solves the problems of rockburst and low gas drainage efficiency, and achieves safer and more efficient coal mine gas control.
Patent Information
- Application Number
- CN202410890728.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-11
AI Technical Summary
Under the condition of thick hard roof, the effects of rock pressure control and gas drainage are not ideal. It is difficult to control the direction and spacing of cracks using existing hydraulic fracturing and blasting methods, resulting in incomplete pressure relief and low gas drainage efficiency.
The top extraction tunnel is used to pre-crack the roof. A wire saw device is used to set up construction wells along the strike and inclination directions in the top extraction tunnel to form pre-cracks. The guide wheel and saw rope device are used to pre-crack the thick hard roof to form a pre-cracked crack. Cracks at a certain distance reduce the bite of rock blocks and promote gas flow.
It effectively reduces the risk of ground pressure impact, improves gas drainage efficiency, enhances the top pumping tunnel function, improves work safety, and avoids the impact of thick hard roofs on coal mining work.
Smart Images

Figure CN118757153A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of coal mine gas control and comprehensive prevention and control of rock burst, and specifically relates to a method for roof pressure relief and gas extraction by utilizing a top extraction tunnel. Background Art
[0002] Rock burst is one of the major disasters in coal mines, and it is mostly caused by the bursting of coal and rock mass due to stress concentration. Thick hard roof is one of the causes of rock burst. Artificial fracturing of thick hard roof is a common means of pressure relief, such as hydraulic fracturing and explosive fracturing. However, the fracture direction of hydraulic fracturing and explosive fracturing is difficult to control, and there is almost no fracture spacing, which causes the rock mass on both sides of the fracture to still bite together tightly, and the pressure relief is not thorough enough.
[0003] Top extraction tunnel is the most effective measure to control gas. When there is gas in the coal seam and there is a thick hard roof on the coal seam, the top extraction tunnel is blocked by the thick hard roof, and the gas extraction effect is not ideal. The small spacing of the cracks produced by hydraulic fracturing and blasting of the thick hard roof is not conducive to the flow and extraction of gas. Therefore, how to effectively prevent and control rock burst and improve the gas control effect under the condition of thick hard roof has become a difficult problem that this field hopes to solve. Summary of the invention
[0004] In view of the above technical problems, the present invention proposes a method for roof pressure relief and gas extraction using a top extraction tunnel, comprising the following steps:
[0005] S1. Construct the transport tunnel and return air tunnel along the strike direction, and construct cuts along the inclination direction to connect the transport tunnel and return air tunnel to form a working face;
[0006] S2. There is a thick hard roof above the coal seam. Under the premise of taking pre-cracking measures on the thick hard roof, determine the range of the gas-conducting fracture zone; determine the range of the O-ring on the left and right sides of the inclination;
[0007] S3. On the thick hard roof, a top extraction lane is constructed along the strike in the O-shaped ring on the left and right sides of the inclination; in the top extraction lane, at the designed pre-crack position of the thick hard roof, a construction well is constructed from the top extraction lane to the thick hard roof, and the construction well is constructed vertically or inclined to the outside of the working face; the designed pre-crack position is evenly spaced along the strike from the cut eye and extends along the inclination to the construction wells on both sides;
[0008] Preferably, in step S3, the manner of deflection outward from the working face is: the bottom of the construction well inclined to the left is deflected to the left relative to the top pumping lane, and the bottom of the construction well inclined to the right is deflected to the right relative to the top pumping lane.
[0009] Preferably, in step S3, the spacing of the designed pre-splitting positions along the strike is 15-20 m.
[0010] S4. construct two boreholes in the construction well inclined to the right toward the construction well inclined to the left, the two boreholes are located on the top and bottom surfaces of the thick hard roof, the openings of the two boreholes are located in the construction well inclined to the right, and the bottoms of the holes are located in the construction well inclined to the left;
[0011] S5. A wire saw drive device is placed in the construction well inclined to the left, and guide wheels are set at four points at the bottom of the two boreholes. The saw rope is drawn out from the wire saw drive device and passes through four guide wheels in sequence before returning to the wire saw drive device;
[0012] S6. Carry out coal mining in the working face from the cutting eye toward the stop mining line, and pre-crack the thick hard roof at the designed pre-crack positions in sequence from the cutting eye toward the stop mining line; during the coal mining process, use top extraction tunnels to extract the gas generated by mining.
[0013] Preferably, in step S6, coal mining is performed first, the coal mining position is delayed by a set distance, and the thick hard roof is cut at the designed pre-splitting position by a saw rope.
[0014] Preferably, in step S6, the distance of the delayed coal mining position is 12-18 m.
[0015] Preferably, in step S6, the thick hard roof is first cut at the designed pre-splitting position by a rope saw device, and then the coal mining work is carried out.
[0016] Preferably, in step S6, pre-splitting work is performed on the thick hard roof 30m ahead of coal mining work.
[0017] Preferably, in step S6, coal mining and gas extraction are performed by the coal mining team, and pre-cracking of the thick hard roof is performed by the maintenance team.
[0018] Preferably, in step S6, when pre-cracking the thick hard top plate at the designed pre-cracking position, the distance between the two upper guide wheels and the two lower guide wheels is continuously reduced.
[0019] The beneficial technical effects of the present invention are:
[0020] 1. The present invention uses a rope saw device to pre-crack the thick hard roof, generating pre-cracks with a certain spacing, greatly reducing the bite between the rock blocks on both sides of the pre-cracks, reducing the possibility of rock burst or reducing the impact energy when rock burst occurs. The pre-cracks with a certain spacing are conducive to the flow of gas from the goaf to the top extraction lane, improving the gas extraction efficiency and avoiding the influence of the thick hard roof.
[0021] 2. The present invention adopts the top extraction tunnel as the construction space for pre-cracking the thick hard roof, increases the function of the top extraction tunnel, avoids pre-cracking of the thick hard roof in the working face and affects the coal mining work; the pre-cracking work is staggered with the coal mining and gas extraction work, and improves the work safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the planar layout of the method for roof pressure relief and gas extraction using a top extraction tunnel according to the present invention;
[0023] Figure 2 It is a schematic diagram of the inclined section arrangement of the method for roof pressure relief and gas extraction by using the top extraction lane of the present invention;
[0024] Figure 3 It is a schematic diagram of the inclined cross-section arrangement at the top of the wire saw cutting according to the present invention;
[0025] Figure 4 yes Figure 3 A partial enlarged view of the middle part;
[0026] Figure 5 yes Figure 3 A partial enlarged view of point B in the middle;
[0027] In the figure, there are transport tunnel 1; return air tunnel 2; cut eye 3; top extraction tunnel 4; construction well 5; pre-crack 6; thick hard roof 7; air-conducting fracture zone 8; O-ring 9; compaction area 10; rope saw drive device 11; drilling hole 12; saw rope 13; guide wheel 14; and stop mining line 15. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1-5 The specific embodiments of the present invention are described in detail.
[0029] The present invention proposes a method for roof pressure relief and gas extraction using a top extraction tunnel, comprising the following steps:
[0030] S1. Figure 1 As shown, transport tunnel 1 and return air tunnel 2 are constructed along the strike direction, and cut-eye 3 is constructed along the inclination direction to connect transport tunnel 1 and return air tunnel 2 to form a working face;
[0031] S2. Figure 2 As shown, there is a thick hard roof 7 above the coal seam, such as a thick hard basic roof. When pre-cracking measures are taken on the thick hard roof 7, the range of the gas-conducting fracture zone 8 is determined according to the formation occurrence and lithology; the range of the O-ring 9 is determined in combination with the width of the working face, such as Figure 2 As shown, the area between the two dotted lines on the left and the area between the two dotted lines on the right is the range of the O-ring 9, and the area between the O-rings 9 on the left and right sides is the compaction area 10;
[0032] S3. Within the range of the gas-conducting fracture zone 8, on the thick hard roof 7, and in the O-rings 9 on the left and right sides of the inclination, a top extraction tunnel 4 is constructed respectively along the strike direction; in the top extraction tunnel 4, at the designed pre-crack position of the thick hard roof 7, a construction well 5 is constructed from the top extraction tunnel 4 to the thick hard roof 7, and the construction well 5 is constructed vertically or inclined outward from the working face; the inclination outward from the working face is as follows: the bottom of the construction well 5 on the left side of the inclination is inclined to the left relative to the top extraction tunnel 4, and the bottom of the construction well 5 on the right side of the inclination is inclined to the right relative to the top extraction tunnel 4; the construction wells 5 on the left and right sides of the inclination are arranged in pairs, and a construction well 5 is arranged at both ends of each designed pre-crack position as a pair; wherein the designed pre-crack positions are distributed along the strike direction from the cut eye 3 at equal intervals (15-20m), extending along the inclination between the paired construction wells 5 and parallel to the cut eye 3;
[0033] S4. Figure 3-5 As shown, two boreholes 12 are constructed in the construction well 5 inclined to the right toward the corresponding construction well 5 inclined to the left. The two boreholes 12 are respectively located on the top and bottom surfaces of the thick hard roof 7. The openings of the two boreholes 12 are located in the construction well 5 inclined to the right, and the bottoms of the holes are located in the construction well 5 inclined to the left.
[0034] S5. Figure 3-5 As shown, a wire saw driving device 11 is placed in the construction well 5 inclined to the left, and guide wheels 14 are set at four points in total at the hole openings and bottoms of the two boreholes 12. The saw rope 13 is led out from the wire saw driving device 11 and passes through the four guide wheels 14 in sequence before returning to the wire saw driving device 11; the saw rope 13 can be a diamond bead.
[0035] S6. Coal mining is performed in the working face from the cutting eye 3 to the direction of the stop mining line 15. The thick hard roof 7 is pre-cracked in the construction well 5 at the designed pre-crack positions in turn from the cutting eye 3 to the direction of the stop mining line 15. When pre-cracks are performed on the thick hard roof 7, the distance between the upper two guide wheels 14 and the lower two guide wheels 14 is continuously reduced. The designed pre-crack positions will form pre-cracks 6 in the thick hard roof 7 after pre-cracks; the top extraction lane 4 is used to extract the gas generated by mining during the coal mining process;
[0036] Among them, the coal mining work is carried out first, and the coal mining position is delayed by a set distance, such as about 15m, and the thick hard roof 7 is cut at the designed pre-splitting position by the saw rope 13;
[0037] Alternatively, the thick hard roof 7 is first cut at the designed pre-splitting position by the saw rope 13, and then the coal mining work is carried out. The pre-splitting work on the thick hard roof 7 is carried out about 30m ahead of the coal mining work.
[0038] The coal mining and gas extraction work is carried out in the coal mining team, and the pre-cracking work of the thick hard roof 7 is carried out in the maintenance team, so as to avoid the workers who carry out the pre-cracking work of the thick hard roof 7 being in a high-concentration gas working environment.
[0039] Of course, the above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above embodiments. It should be noted that all equivalent substitutions and obvious deformation forms made by any technician familiar with the field under the guidance of this specification fall within the essential scope of this specification and should be protected by the present invention.
Claims
1. A method for roof pressure relief and gas extraction using a top extraction tunnel, characterized in that: The following steps are involved: S1. Construct the transport tunnel and return air tunnel along the strike direction, and construct cuts along the inclination direction to connect the transport tunnel and return air tunnel to form a working face; S2. There is a thick hard roof above the coal seam. Under the premise of taking pre-cracking measures on the thick hard roof, determine the range of the gas-conducting fracture zone; determine the range of the O-ring on the left and right sides of the inclination; S3. On the thick hard roof, a top extraction lane is constructed along the strike in the O-shaped ring on the left and right sides of the inclination; in the top extraction lane, at the designed pre-crack position of the thick hard roof, a construction well is constructed from the top extraction lane to the thick hard roof, and the construction well is constructed vertically or inclined to the outside of the working face; the designed pre-crack position is evenly spaced along the strike from the cut eye and extends along the inclination to the construction wells on both sides; S4. construct two boreholes in the construction well inclined to the right toward the construction well inclined to the left, the two boreholes are located on the top and bottom surfaces of the thick hard roof, the openings of the two boreholes are located in the construction well inclined to the right, and the bottoms of the holes are located in the construction well inclined to the left; S5. A wire saw drive device is placed in the construction well inclined to the left, and guide wheels are set at four points at the bottom of the two boreholes. The saw rope is drawn out from the wire saw drive device and passes through four guide wheels in sequence before returning to the wire saw drive device; S6. Carry out coal mining in the working face from the cutting eye toward the stop mining line, and pre-crack the thick hard roof at the designed pre-crack positions in sequence from the cutting eye toward the stop mining line; during the coal mining process, use top extraction tunnels to extract the gas generated by mining.
2. The method for roof pressure relief and gas extraction using a top extraction tunnel according to claim 1 is characterized in that: In step S3, the way of deflecting outward from the working face is: the bottom of the construction well inclined to the left is deflected to the left relative to the top pumping lane, and the bottom of the construction well inclined to the right is deflected to the right relative to the top pumping lane.
3. The method for roof pressure relief and gas extraction using a top extraction tunnel according to claim 1 or 2, characterized in that: In step S3, the spacing of the designed pre-splitting positions along the strike is 15-20 m.
4. The method for roof pressure relief and gas extraction using a top extraction tunnel according to claim 1, characterized in that: In step S6, coal mining is first performed, and the coal mining position is delayed by a set distance, and the thick hard roof is cut at the designed pre-splitting position by the saw rope.
5. The method for roof pressure relief and gas extraction using a top extraction tunnel according to claim 4 is characterized in that: The distance of the delayed coal mining position is 12-18m.
6. The method for roof pressure relief and gas extraction using a top extraction tunnel according to claim 1, characterized in that: In step S6, the thick hard roof is first cut at the designed pre-splitting position by a rope saw device, and then the coal mining work is carried out.
7. The method for roof pressure relief and gas extraction using a top extraction tunnel according to claim 6 is characterized in that: Pre-splitting work is carried out on thick and hard roof slabs and coal mining work is advanced by 30m.
8. The method for roof pressure relief and gas extraction using a top extraction tunnel according to any one of claims 1, 4 to 7, characterized in that: In step S6, coal mining and gas extraction are carried out by the coal mining team, and pre-cracking of the thick hard roof is carried out by the maintenance team.
9. The method for roof pressure relief and gas extraction using a top extraction tunnel according to any one of claims 1, 4 to 7, characterized in that: In step S6, when pre-cracking the thick hard top plate at the designed pre-cracking position, the distance between the two upper guide wheels and the two lower guide wheels is continuously reduced.