Wide-strike subsection shallow hole blasting force ore transportation open-stope method
Through the open-site method of blasting ore transport with wide and sectioned shallow holes, using blast caving and electric rake winch transportation, the problem of residual ore loss in mining of inclined thin veins has been solved, mining efficiency and safety have been improved, and mining accuracy has been reduced. Cutting quantity.
Patent Information
- Application Number
- CN202410916574.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the mining process of inclined thin veins, ore remains in the footwall of the goaf, resulting in ore loss. Existing mining methods such as filling method, comprehensive ore retention method and open site mining method are labor-intensive, low efficiency and low safety. problem.
The open-site method of transporting ore with wide-segmented shallow holes and explosive force is used to divide the ore blocks and wide sections along the direction of the veins, set up rock drilling raises and blast holes, and use explosive force to collapse the ore and transport it through electric rake winches and mine cars. , to avoid residual accumulation on the stope floor and reduce ore loss.
It effectively avoids the loss of ore, improves mining efficiency and safety, reduces the amount of accurate mining and cutting work, and ensures that construction personnel do not need to enter the goaf area to extract ore.
Smart Images

Figure CN118757155A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of mining, and in particular to an open-pit method for transporting ore using shallow-hole blasting with wide sections. Background Art
[0002] Mining methods are the key to issues that directly affect the scale of mine production, ore loss and dilution, labor productivity, production costs, economic benefits and operational safety.
[0003] For the recovery of inclined thin veins, the horizontal layered filling method, the full ore retention method and the middle section open-pit method are generally used. Since the filling method requires the addition of filling equipment, it does not have the filling conditions; the full ore retention method will cause difficulties in ore placement, and requires manual secondary transportation of ore (or electric rake transportation), which is labor-intensive, inefficient and less safe; the open-pit mining method can use a stable upper plate as an open-pit recovery condition, which is technically feasible, but because the ore body is not inclined enough, part of the mined ore will accumulate in the lower plate of the goaf, causing ore loss. Therefore, a wide-segmented shallow hole blasting ore transportation open-pit method is urgently needed to solve the above technical problems. Summary of the invention
[0004] In order to reduce the loss of ore during the mining process, the present application provides a method for transporting ore in an open-pit by using shallow holes with wide sections.
[0005] The present application provides a method for transporting ore by blasting in an open pit with wide-segment shallow holes, which adopts the following technical solution: A method for transporting ore in an open pit with shallow holes and wide sections, comprising: S1. Arrange the stopes along the direction of the ore vein, divide them into stages along the direction of the ore vein, divide them into ore blocks within the stages, and divide them into wide sections along the direction of the ore vein according to the inclination and thickness of the ore body; S2, mining and cutting: an off-vein transport lane is arranged outside the vein and along the direction of the ore body, a prospecting lane connected with the off-vein transport lane is opened in the stope, a cutting lane connected with the prospecting lane is opened along the direction of the ore body in the stope, an electric rake road and a winch chamber are arranged in the cutting lane, a loading lane along the direction of the ore body is arranged in the stope, the loading lane is adjacent to the winch chamber, a rock drilling shaft is dug along the cutting lane, and a prospecting borehole near the rock drilling shaft is arranged at the bottom of the stope; S3, drilling blastholes from the rock drilling shaft into the thin ore veins on both sides to increase the charge density without mining the surrounding rock; S4. With the help of explosive force, the collapsed ore gathers toward the mining opening along the vein due to its own weight.
[0006] Optionally, in step S1, the ore is divided into ore blocks along the direction of the ore vein within the stage, and the length of the ore block is 40m to 50m.
[0007] Optionally, the step S1 of dividing the ore body into wide segments along the strike of the vein according to the inclination and thickness of the ore body means that the inclination is 40° to 50°, the thickness of the ore body is 1.0 to 3.0 m, and the strike length of the wide segment is 8 m to 12 m.
[0008] Optionally, under stable surrounding rock conditions, the void area after mining does not need to be supported, and pillars are left in the void area for support, with the stage pillar oblique length being 4.0m to 6.0m.
[0009] Optionally, in step S2, a rock drilling rise is excavated along the cutting tunnel, and a rise with a specification of 1.8m×1.5m is first opened at the location of the rock drilling rise, and then the rise specification is expanded to ore body thickness×4.0m.
[0010] Optionally, the cutting tunnel in step S2 is provided with an electric rake road and a winch chamber, and a loading tunnel along the direction of the ore body is provided in the mining area, and the loading tunnel is located at the same horizontal height as the outer transport tunnel, and a triangular loading platform with a length of 4m is built with rubble at the position of the winch chamber, and the table surface is paved with cement mortar or steel plates, and electric rake roads are arranged radially along the cutting tunnel, and a winch chamber connected to the electric rake road is arranged in the cutting tunnel, an electric rake winch is arranged in the winch chamber, a rake bucket is installed on the electric rake winch, and a mine car is arranged on the loading tunnel, and the ore is raked into the mine car by the electric rake winch.
[0011] Optionally, in step S3, blastholes are drilled from the rock drilling shaft into the thin ore veins on both sides, using a "plum blossom type" hole arrangement, with a blasthole spacing of 0.8m, a minimum resistance line of 0.7-0.8m, a drilling depth of 3.0-4.0m, and 3-6 rows of blastholes for each blasting.
[0012] Optionally, all blastholes in a segment are drilled at one time, and blasting is carried out in stages from bottom to top, and each segment is mined in sequence. The cycle period of staged blasting is from the start of each charging and blasting until all the ore that has collapsed is removed.
[0013] In summary, the present application includes at least one of the following beneficial technical effects: The open-pit mining method is combined with the explosive transportation method of ore to solve the problem of ore loss caused by the inability of ore to slide freely after blasting the ore vein with an inclination of 40° to 50°, and avoid the ore loss caused by the accumulation of a large amount of ore on the floor of the stope; The use of electric rake loading and flat-bottom structure for mining can load most of the ore remaining at the bottom of the mining area into mine cars for transportation, further reducing the loss of ore. At the same time, the mining personnel do not need to enter the goaf to dig the ore, which ensures the safety of the construction personnel and saves the mining and cutting work. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1It is a schematic diagram of the overall structure of the open-pit method of shallow-hole blasting for ore transportation with wide sections.
[0015] Figure 2 It is a schematic diagram of the connection relationship between the extravein transport lane and the cutting lane in the embodiment of the present application.
[0016] Figure 3 It is a composite geological plane map in the embodiment of this application.
[0017] Figure 4 This is a schematic diagram of the arrangement of blast holes in an embodiment of the present application.
[0018] Explanation of the accompanying reference numerals: 1. Rock drilling shaft; 2. Exploration tunnel; 3. Winch chamber; 4. Off-vein transport tunnel; 5. Cutting tunnel; 6. Loading tunnel; 7. Exploration tunnel. DETAILED DESCRIPTION
[0019] The present application is further described in detail below in conjunction with all the accompanying drawings.
[0020] The embodiment of the present application discloses an open-pit method for transporting ore by blasting in shallow holes with wide sections.
[0021] like Figures 1 to 4 As shown, a wide-strike segmented shallow hole blasting method for transporting ore in an open pit includes: S1. Arrange the mining area along the direction of the ore vein, divide it into stages along the inclination of the ore vein, and divide it into ore blocks within the stage along the direction of the ore vein. According to the inclination and thickness of the ore body, divide it into wide sections along the direction of the ore vein.
[0022] Specifically, within the stage, the ore blocks are divided along the direction of the vein. The length of the blocks is 40m to 50m, the inclination of the ore body is 40° to 50°, the thickness of the ore body is 1.0 to 3.0m, and the width of the segment is 8m to 12m. Under stable surrounding rock conditions, the empty area after mining is not supported, and pillars are left in the empty area for support. The oblique length of the stage pillars is 4.0m to 6.0m.
[0023] S2. Mining and cutting: An off-vein transport tunnel 4 is arranged outside the vein and along the direction of the ore body, a prospecting tunnel 7 which is connected with the off-vein transport tunnel 4 is opened in the mining area, a cutting tunnel 5 which is connected with the prospecting tunnel 7 is opened along the direction of the ore body in the mining area, an electric rake road and a winch chamber 3 are arranged in the cutting tunnel 5, a loading tunnel 6 is arranged along the direction of the ore body in the mining area, the loading tunnel 6 is adjacent to the winch chamber 3, a drilling shaft 1 is dug along the cutting tunnel 5, and a prospecting borehole 2 near the drilling shaft 1 is arranged at the bottom of the mining area.
[0024] Among them, during the process of excavating the rock drilling shaft 1, a shaft with a specification of 1.8m×1.5m was opened at the location of the rock drilling shaft 1, and then the shaft specification was expanded to the ore body thickness×4.0m.
[0025] Specifically, the loading tunnel 6 is at the same horizontal height as the off-vein transport tunnel 4. A triangular loading platform with a length of 4m is built with rubble at the position of the winch chamber 3. The platform surface is paved with cement mortar or steel plates. An electric rake road is arranged radially along the cutting tunnel 5. A winch chamber 3 (2.5m×2.5m×2.0m) connected to the electric rake road is arranged in the cutting tunnel 5. An electric rake winch is arranged in the winch chamber 3. A rake bucket is installed on the electric rake winch. A 30KW electric rake winch with a 0.2m³ rake bucket is used. Mine cars are arranged on the loading tunnel 6. The ore is raked into the mine car by the electric rake winch. Most of the ore remaining at the bottom of the mining area can be loaded into the mine car and transported out by the electric rake winch, thereby further reducing the loss of ore. At the same time, the miners do not need to enter the goaf to dig ore, which ensures the safety of the construction workers and saves the mining and cutting engineering workload.
[0026] S3. Drill blastholes from rock drilling shaft 1 into the thin ore veins on both sides to increase the charge density without mining the surrounding rock.
[0027] Specifically, blast holes are drilled from the rock drilling shaft 1 to the thin ore veins on both sides, with a "plum blossom" hole arrangement, a blast hole spacing of 0.8m, a minimum resistance line of 0.7-0.8m, a drilling depth of 3.0-4.0m, 3-6 rows of blast holes each time, and the number of blast holes mainly depends on the ore discharge capacity of the ore discharge hole at the bottom of the stope. If the ore discharge capacity is large, the number of blast hole rows to be blasted will be more, otherwise, it should be reduced accordingly. This is to prevent the ore transported by the explosive force from accumulating in large quantities in the lower wall of the goaf, causing difficulty in slitting and resulting in ore loss.
[0028] In addition, in order to better control the transportation distance of ore in the mining area, the throwing blasting method can be adopted according to the actual situation on site. At the same time, starting from the staged mining, the residual ore on the bottom plate of the ore body should be cleaned to facilitate the self-sliding of the ore. S4. With the help of explosive force, the collapsed ore gathers toward the mining opening along the vein due to its own weight.
[0029] Among them, in order to adopt concentrated and intensive mining, all blast holes in the section are drilled at one time, and the blasting is carried out from bottom to top in stages. The cycle period of staged blasting is from the start of each charging and blasting until all the ore collapsed is out, and each section is mined in order.
[0030] The implementation principle of an open-pit mining method with wide-segmented shallow holes and blasting to transport ore is as follows: the open-pit mining method is combined with the blasting transportation method of ore, and blastholes are drilled in thin ore veins on both sides of the rock drilling shaft 1. With the help of the explosive force, the collapsed ore is gathered to the mining opening along the vein by its own weight, thereby solving the problem of ore loss caused by the inability to flow by itself after the blasting of the ore vein with an inclination of 40° to 50°, and avoiding ore loss caused by a large amount of residual ore on the bottom plate of the mining area. The ore is collected by an electric rake winch and transported by a mine car, and most of the ore remaining at the bottom of the mining area is loaded into the mine car for transportation. The mining personnel do not need to enter the goaf to dig the ore, thereby ensuring the safety of the construction personnel.
[0031] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method of transporting ore in an open-pit by means of shallow holes with wide sections, characterized in that: include: S1. Arrange the stopes along the direction of the ore vein, divide them into stages along the direction of the ore vein, divide them into ore blocks within the stages, and divide them into wide sections along the direction of the ore vein according to the inclination and thickness of the ore body; S2, mining and cutting: an off-vein transport tunnel (4) is arranged outside the vein and along the direction of the ore body, a prospecting tunnel (7) is opened in the stope and communicates with the off-vein transport tunnel (4), a cutting tunnel (5) is opened in the stope and communicates with the prospecting tunnel (7) along the direction of the ore body, an electric rake road and a winch chamber (3) are arranged in the cutting tunnel (5), a loading tunnel (6) is arranged in the stope along the direction of the ore body, the loading tunnel (6) is adjacent to the winch chamber (3), a rock drilling shaft (1) is excavated along the cutting tunnel (5), and a prospecting borehole (2) near the rock drilling shaft (1) is arranged at the bottom of the stope; S3, drilling blastholes from the rock drilling shaft (1) into the thin ore veins on both sides to increase the charge density without mining the surrounding rock; S4. With the help of explosive force, the collapsed ore gathers toward the mining opening along the vein due to its own weight.
2. The method of wide-segmented shallow hole blasting and ore transportation in an open-pit according to claim 1 is characterized by: In the stage described in step S1, the ore is divided into ore blocks along the direction of the ore vein, and the length of the ore block is 40m to 50m.
3. The method of wide-segmented shallow hole blasting and ore transportation in an open-pit according to claim 1 is characterized by: According to step S1, the wide segments are divided along the direction of the ore vein according to the inclination and thickness of the ore body, which means that the inclination is 40° to 50°, the thickness of the ore body is 1.0 to 3.0 m, and the length of the wide segment is 8 m to 12 m.
4. The method of wide-segmented shallow hole blasting and ore transportation in an open-pit according to claim 1 is characterized by: Under stable surrounding rock conditions, the void area after mining does not need to be supported. Pillars are left in the void area for support, and the inclined length of the stage pillars is 4.0m to 6.0m.
5. The method of wide-segmented shallow hole blasting and ore transportation in an open-pit according to claim 1 is characterized by: In step S2, a rock drilling shaft (1) is excavated along the cutting tunnel (5). First, a shaft with a specification of 1.8m×1.5m is opened at the location of the rock drilling shaft (1), and then the shaft specification is expanded to the ore body thickness×4.0m.
6. The method of wide-segmented shallow hole blasting and ore transportation in an open-pit according to claim 1 is characterized by: The cutting tunnel (5) described in step S2 is provided with an electric rake road and a winch chamber (3), and the mining area is provided with a loading tunnel (6) along the direction of the ore body, and the loading tunnel (6) is located at the same horizontal height as the outer transport tunnel (4). A triangular loading platform with a length of 4m is built with rough stones at the position of the winch chamber (3), and the platform surface is paved with cement mortar or steel plates. The electric rake road is arranged radially along the cutting tunnel (5), and a winch chamber (3) connected to the electric rake road is arranged in the cutting tunnel (5). An electric rake winch is arranged in the winch chamber (3), and a rake bucket is installed on the electric rake winch. A mine car is arranged on the loading tunnel (6), and the ore is raked into the mine car by the electric rake winch.
7. The method of wide-segmented shallow hole blasting and ore transportation in an open pit according to claim 1 is characterized by: In step S3, blastholes are drilled from the rock drilling shaft (1) into the thin ore veins on both sides, using a "plum blossom" hole arrangement, with a blasthole spacing of 0.8m, a minimum resistance line of 0.7-0.8m, a drilling depth of 3.0-4.0m, and 3-6 rows of blastholes for each blasting.
8. The method of wide-segmented shallow hole blasting and ore transportation in an open pit according to claim 1 is characterized by: All blastholes within a segment are drilled at one time, and blasting is carried out in stages from bottom to top, and each segment is mined in sequence. The cycle period of staged blasting is from the start of each charging and blasting until all the ore that has fallen is removed.
Citation Information
Patent Citations
Open field mining method of high sublevel explosive force transport ore
CN109958438A
Improved process for mining steeply inclined lenticular ore body by stage room method
CN115110955A