Calculation method for water level at inlet position of water inlet channel of flood discharge gate
By establishing a one-dimensional mathematical model of water flow to calculate the water level at the entrance of the floodgate inlet channel, the problem of water level difference error in the design of the floodgate is solved, and the accuracy and precision of the flood diversion test are improved.
Patent Information
- Application Number
- CN202410867031.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-11
AI Technical Summary
In the design of the floodgate, the existing technology tends to ignore the water level difference at the entrance of the floodgate inlet channel, resulting in errors in the judgment of the discharge capacity.
By establishing a one-dimensional mathematical model of water flow from the upstream river mouth to the floodgate inlet canal, the water level at the entrance of the floodgate inlet canal is calculated, replacing the water level in front of the gate, as the flood diversion control water level for review of discharge capacity, and by adjusting the water surface drop, until The error is less than or equal to the threshold.
The accuracy of the flood diversion control water level in the flood diversion test is improved, the error of the flood diversion test is reduced, and the accuracy of the flood diversion test is improved.
Smart Images

Figure CN118761276A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of flood discharge gates, and in particular to a method for calculating a water level at an inlet position of a water inlet channel of a flood discharge gate. Background Art
[0002] Unlike the conventional forward water diversion of the flood gate, in some projects, the flood gate inlet channel is obliquely intersected with the upstream river channel, and the inlet channel is lateral inflow. After the inlet, there is a curved river channel, and the channel width gradually shrinks, further generating local head loss. The design scheme tends to ignore this part of the along-the-way and local head loss when calculating the total head loss. According to the analysis of the test results, there is a certain water level difference from the inlet of the flood gate inlet channel to the gate. If the flow capacity of the flood gate is simply judged by comparing the actual measured water level before the gate with the calculated water level before the gate provided by the design scheme, there will be a certain error. Summary of the invention
[0003] The purpose of the present invention is to overcome the above-mentioned shortcomings in the prior art and provide a method for calculating the water level at the inlet of the flood discharge gate inlet channel, so as to replace the water level before the gate with the water level at the inlet of the flood discharge gate inlet channel as the flood diversion control water level for verifying the discharge capacity.
[0004] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:
[0005] A method for calculating the water level at the inlet of a flood discharge gate inlet channel comprises the following steps:
[0006] Step 1: Establish a one-dimensional water flow mathematical model from the upstream river mouth to the flood discharge gate inlet channel, and determine the upstream inlet water level H1 according to the upstream inlet flow Q of the flood diversion condition;
[0007] Step 2: Preset the water surface gradient α, and calculate the water level H2 at the flood gate inlet channel according to the following formula: H2 = H1-αL, where L is the distance from the upstream inlet to the flood gate inlet channel;
[0008] Step 3: Substitute the calculated water level H2 at the inlet channel of the flood discharge gate into the one-dimensional water flow mathematical model to calculate the upstream inlet water level H'1;
[0009] Step 4: Compare the upstream inlet water level H'1 obtained by the mathematical model in step 3 with the upstream inlet water level H1 determined in step 1;
[0010] If the upstream inlet water level H'1 obtained by the mathematical model in step three is greater than the upstream inlet water level H1 determined in step one, the water surface gradient α in step two is modified, and the mathematical model calculation is performed again according to steps two to four, until the upstream inlet water level H'1 obtained by the mathematical model in step three is less than or equal to the upstream inlet water level H1 determined in step one, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step three and the upstream inlet water level H1 determined in step one is less than or equal to a threshold value;
[0011] Step 5: Record the water level H2 at the flood discharge gate inlet channel when the upstream inlet water level H1 obtained by the mathematical model in step 3 is less than or equal to the upstream inlet water level H1 determined in step 1, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step 3 and the upstream inlet water level H1 determined in step 1 is less than or equal to the threshold.
[0012] As a preferred embodiment of the present invention, the basic equations used in the one-dimensional water flow mathematical model include the water flow continuity equation and the water flow motion equation, wherein:
[0013] The continuity equation for water flow is:
[0014]
[0015] The equation of motion is:
[0016]
[0017] Where: x is the process flow; Q is the flow rate; Z is the water level; g is the acceleration of gravity; t is the time; q l is the lateral injection flow per unit length; A is the water-passing cross-sectional area; R is the cross-sectional hydraulic radius; β is the kinetic energy correction coefficient; η is the roughness coefficient.
[0018] As a preferred embodiment of the present invention, the numerical method adopted by the one-dimensional water flow mathematical model is the finite volume method.
[0019] As a preferred embodiment of the present invention, the one-dimensional water flow mathematical model adopts flow inlet boundary conditions, and when a tributary flows in, the flow boundary conditions are set at the tributary confluence point.
[0020] As a preferred solution of the present invention, the one-dimensional water flow mathematical model adopts a water level outlet boundary condition.
[0021] As a preferred embodiment of the present invention, the water level-flow relationship of the estuary section is calculated by the backwater surface line of the reservoir area.
[0022] As a preferred solution of the present invention, the error value between the upstream inlet water level H'1 obtained by the mathematical model in step three and the upstream inlet water level H1 determined in step one is less than or equal to 3%.
[0023] The invention also discloses a test method for a flood diversion project, comprising the following steps:
[0024] A: Select the geometric scale, determine the simulation range of the flood diversion project model, and make the model meet the similarity of gravity, similarity of gradient, similarity of resistance, similarity of water flow movement and similarity of water flow continuity;
[0025] B: Make a model, make the inlet channel of the flood gate obliquely intersect with the upstream river channel, the inlet channel has lateral inflow, an upstream wing wall is set upstream of the flood gate, and a stilling pool, apron, flexible sea cover and overflow weir are set downstream of the flood gate;
[0026] C: Set up water gauge and flow rate measurement system;
[0027] D: Determine the flood diversion control water level according to any of the methods for calculating the water level at the inlet channel of the flood discharge gate, and conduct a flood diversion test.
[0028] As a preferred embodiment of the present invention, step D further comprises determining a model tailgate water level, wherein the model tailgate water level is provided by a one-dimensional water flow mathematical model.
[0029] As a preferred embodiment of the present invention, the upstream inlet water level H'1 obtained by the mathematical model in step three is less than or equal to the upstream inlet water level H1 determined in step one, and the corresponding tailgate water level when the error value between the upstream inlet water level H'1 obtained by the mathematical model in step three and the upstream inlet water level H1 determined in step one is less than or equal to the threshold is used as the model tailgate water level of step D.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] The present invention provides a method for calculating the water level at the inlet of a flood discharge gate inlet channel, in which the water level at the inlet of the flood discharge gate inlet channel replaces the water level before the gate as the flood diversion control water level for verifying the discharge capacity, thereby improving the accuracy of the flood diversion control water level in a flood diversion test, reducing the error of the flood diversion test, and improving the accuracy of the flood diversion test. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 Schematic diagram of the variable arrangement of the finite volume method.
[0033] Figure 2 This is the selected calculation area and section distribution diagram.
[0034] Figure 3 This is the scope and layout diagram of the flood diversion project test model.
[0035] Figure 4 This is the structural layout diagram of the flood diversion project.
[0036] Markings in the figure: 1- hub, 2- upper boundary of the model, 3- lower boundary of the model, 4- sluice gate, 5- inlet channel, 6- outlet channel, 7- upstream wing wall, 8- first stilling pool, 9- first guard tank, 10- flexible apron, 11- overflow weir, 12- second stilling pool, 13- second guard tank. DETAILED DESCRIPTION
[0037] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0038] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0039] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0040] In addition, the expressions “first”, “second”, “third”, etc. that appear in the terms are merely descriptions used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0041] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0042] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
[0043] Example 1
[0044] A method for calculating the water level at the inlet of a flood discharge gate inlet channel comprises the following steps:
[0045] Step 1: Establish a one-dimensional water flow mathematical model from the upstream river mouth to the flood discharge gate inlet channel, and determine the upstream inlet water level H1 according to the upstream inlet flow Q of the flood diversion condition;
[0046] The basic equations used in the one-dimensional water flow mathematical model include the water flow continuity equation and the water flow motion equation, where:
[0047] The continuity equation for water flow is:
[0048]
[0049] The equation of motion is:
[0050]
[0051] Where: x is the process flow; Q is the flow rate; Z is the water level; g is the acceleration of gravity; t is the time; q l is the lateral injection flow per unit length; A is the water-passing cross-sectional area; R is the cross-sectional hydraulic radius; β is the kinetic energy correction coefficient; η is the roughness coefficient.
[0052] The numerical method used in the one-dimensional water flow mathematical model is the finite volume method, and the specific discretization process is as follows:
[0053] The first step is variable arrangement:
[0054] The finite volume method first divides the solution area into discrete control volumes, such as Figure 1As shown in Figure 1, the computational river section is divided into similar control volumes. The vector Q and scalar A are arranged alternately at nodes that differ by half a grid, and a point is arranged at the center of each control volume. The region boundary is the outer boundary of the control volume.
[0055] The second step is to solve the equation discretely:
[0056] The finite volume method uses control volumes to discretize equations. Based on the grids obtained in the first step, equations (1) and (2) are integrated in different control volumes and discretized based on control nodes to obtain the following discrete equations:
[0057] Continuity equation
[0058]
[0059] Equations of motion
[0060]
[0061] Where u is the flow velocity; n is the total number of time steps, i is a certain time step, and Δ is the calculation step size.
[0062] The boundary conditions in the one-dimensional water flow model calculation usually include the inlet and outlet boundaries of the river. In this model, the above boundary conditions are processed as follows:
[0063] 1) Inlet boundary: Use flow inlet boundary conditions, that is, give the inlet cross-section flow and inlet water flow direction. When there are tributaries, set the flow boundary conditions at the tributary confluence.
[0064] 2) Outlet boundary: adopt water level outlet boundary condition.
[0065] In a specific embodiment, when the upstream river has a 20-year flood and a 50-year flood, the corresponding upstream river mouth water level is 63.40m and 64.60m respectively. Using the water flow mathematical model, the canal is considered to divert 1000m3 / s (upstream river has a 20-year flood) and 1600m3 / s from the upstream river. 3 / s (a 50-year flood occurs in the upstream river), while the other tributaries have no flood flow, and the upstream inlet water level H1 is determined to be 63.40m and 64.60m respectively.
[0066] The topographic data adopts the 1:2000 river topographic map measured in the engineering river section. A river merges into the upstream river at the estuary, and the confluence belongs to the reservoir area. The water level-flow relationship of the estuary section can be calculated through the backwater surface line of the reservoir area. Therefore, the upstream estuary section is selected as the control section of the one-dimensional water flow model of the natural river channel of a river. The section spacing is 500m, and a total of 58 sections are arranged. The selected calculation area and section distribution are shown in Figure 2 .
[0067] Step 2: Preset the water surface gradient α, and calculate the water level H2 at the flood gate inlet channel according to the following formula: H2 = H1-αL, where L is the distance from the upstream inlet to the flood gate inlet channel;
[0068] The preset value of the water surface gradient α can be determined based on experience or can be taken according to the recommended value of the specification, such as the "Canal Navigation Standard" (JTS180-2-2011), "General Design Specification for Ship Locks" (JTJ305-2001), "Design Specification for Ship Lock Water Conveyance System" (JTJ306-2001), "Technical Code for Water Flow and Sediment Simulation in Inland Waterways and Ports" (JTS / T 231-4-2018), etc.
[0069] Step 3: Substitute the calculated water level H2 at the inlet channel of the flood discharge gate into the one-dimensional water flow mathematical model, and reversely calculate to obtain the upstream inlet water level H'1.
[0070] Step 4: Compare the upstream inlet water level H'1 obtained by the mathematical model in step 3 with the upstream inlet water level H1 determined in step 1;
[0071] If the upstream inlet water level H'1 obtained by the mathematical model in step 3 is greater than the upstream inlet water level H1 determined in step 1, the water surface gradient α in step 2 is modified, and the mathematical model calculation is performed again according to steps 2 to 4, until the upstream inlet water level H'1 obtained by the mathematical model in step 3 is less than or equal to the upstream inlet water level H1 determined in step 1, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step 3 and the upstream inlet water level H1 determined in step 1 is less than or equal to a threshold value; the threshold value is usually less than or equal to 3%, that is, the upstream inlet water level H1 obtained by the mathematical model in step 3 and the upstream inlet water level U1 determined in step 1 should be as close as possible. More preferably, the threshold value is less than or equal to 1%.
[0072] Step 5: Record the water level H2 at the flood discharge gate inlet channel when the upstream inlet water level H'1 obtained by the mathematical model in step 3 is less than or equal to the upstream inlet water level H1 determined in step 1, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step 3 and the upstream inlet water level H1 determined in step 1 is less than or equal to the threshold.
[0073] In a specific embodiment, for a 50-year flood condition in the upstream river, the flood diversion capacity of the hub flood gate is expected to be 1600m 3 / s, the corresponding calculation method of the water level at the inlet of the flood discharge gate is shown in Table 1 below:
[0074] Table 1 Calculation process of upstream river flood diversion volume of 1600m3 / s in 50-year return period
[0075]
[0076] That is, after many trial calculations and many modifications to the water surface gradient, the upstream inlet water level H'1 calculated by the final mathematical model is 64.6m, which is consistent with the upstream inlet water level H1=64.6m determined according to the diversion volume. At this time, the water level H2=64.00m at the inlet channel of the flood discharge gate calculated by the numerical model is extracted, and H2=64.00m is used as the diversion control water level for discharge capacity verification, which can improve the accuracy of the diversion control water level in the flood diversion test, reduce the error of the flood diversion test, and improve the accuracy of the flood diversion test.
[0077] For a 20-year flood condition in the upstream river, the flood diversion capacity of the flood discharge gate of this hub is expected to be 1000m 3 / s, the calculation method of the water level at the inlet of the corresponding flood discharge gate is shown in Table 2 below:
[0078] Table 2 Calculation process of upstream river flood diversion volume of 1000m3 / s in 20-year return period
[0079]
[0080] That is, after many trial calculations and many modifications to the water surface gradient, the upstream inlet water level H'1 calculated by the final mathematical model is 63.40m, which is consistent with the upstream inlet water level H1=63.40m determined according to the diversion volume. At this time, the water level H2=63.10m at the inlet channel of the flood discharge gate calculated by the digital model is extracted, and H2=63.10m is used as the diversion control water level for discharge capacity verification, which can improve the accuracy of the diversion control water level in the diversion test, reduce the error of the diversion test, and improve the accuracy of the diversion test.
[0081] Example 2
[0082] The present invention also provides a test method for a flood diversion project, comprising the following steps:
[0083] A: Select the geometric scale, determine the simulation range of the flood diversion project model, and make the model meet the similarity of gravity, similarity of gradient, similarity of resistance, similarity of water flow movement and similarity of water flow continuity;
[0084] The model simulation range should be able to fully reflect the river flow characteristics of the river section where the project is located, and reserve a sufficiently long adjustment transition section upstream and downstream to meet the requirements of similar water flow conditions, that is, it is necessary to determine the location of hub 1 in the model, and the model upper boundary 2 and model lower boundary 3 of hub 1. According to the river flow characteristics of the project section, the test task requirements, and considering the size of the test site, water supply capacity and other related factors, a normal model with a geometric scale of 1:1 to 1:200 can usually be selected. See the model range and layout diagram for details. Figure 3 .
[0085] This model is designed according to the gravity similarity criterion, and its similarity relations and similarity scales are as follows:
[0086] (1) Gravity similarity: Where: v —— velocity scale; λ h ——Water depth ratio.
[0087] (2) Similar gradient: Where: J ——gradient ratio; λ L ——Length ratio.
[0088] (3) Similar resistance: Where: n ——Riverbed roughness ratio.
[0089] (4) Similar water flow movement: Where: t(水) ——Time scale for water flow movement.
[0090] (5) Continuous similarity of water flow: λ Q =λ v λ h λ L , where: Q ——Flow rate scale.
[0091] If the geometric scale is selected as 1:60, then λ L =λ h =60. L =λ h =60 Substituting into the above formulas, we can obtain the similarity scale values of the water flow motion of this model (see Table 3).
[0092] Table 3 Overall hydraulic model scale list
[0093]
[0094] B: Make a model, make the inlet channel 5 of the flood gate 4 obliquely intersect with the upstream river channel, and the outlet channel 6 obliquely intersect with the downstream river channel. The inlet channel 5 is a lateral inflow, and the outlet channel 6 is a lateral outflow. An upstream wing wall 7 is set upstream of the flood gate 4, and a first stilling pool 8, a first protection tank 9, a flexible sea cover 10, an overflow weir 11, a second stilling pool 12 and a second protection tank 13 are set downstream of the flood gate 4 in sequence, as shown in FIG. Figure 4 shown.
[0095] The model is made using the cross-section panel method, and the cross-section panels are appropriately increased for the river sections and locations where the channel turns, hub flood discharge gates, and ship locks are located, and the contour line method is used to accurately control the riverbed topography. The plane position of the model is controlled by triangulation and main and secondary guide wires, and the elevation is measured by a level.
[0096] C: Set up a water gauge and flow velocity measurement system. In order to determine the water level changes along the river section near the dam of the hub, a certain number of water gauges are arranged on the left and right sides of the channel and the spillway on the model.
[0097] D: Determine the flood diversion control water level according to the method for calculating the water level at the inlet of the flood discharge gate inlet channel described in Example 1, and conduct a flood diversion test.
[0098] As a preferred embodiment of the present invention, step D further includes determining a model tailgate water level, and the model tailgate water level is provided by a one-dimensional water flow mathematical model. The tailgate water level corresponding to the upstream inlet water level H'1 obtained by the mathematical model in step 3 is less than or equal to the upstream inlet water level H1 determined in step 1, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step 3 and the upstream inlet water level H1 determined in step 1 is less than or equal to a threshold value is extracted as the model tailgate water level of step D.
[0099] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for calculating the water level at the inlet of a flood discharge gate, characterized in that: The following steps are involved: Step 1: Establish a one-dimensional water flow mathematical model from the upstream river mouth to the flood discharge gate inlet channel, and determine the upstream inlet water level H1 according to the upstream inlet flow Q of the flood diversion condition; Step 2: Preset the water surface gradient α, and calculate the water level H2 at the flood gate inlet channel according to the following formula: H2 = H1-αL, where L is the distance from the upstream inlet to the flood gate inlet channel; Step 3: Substitute the calculated water level H2 at the inlet channel of the flood discharge gate into the one-dimensional water flow mathematical model to calculate the upstream inlet water level H'1; Step 4: Compare the upstream inlet water level H'1 obtained by the mathematical model in step 3 with the upstream inlet water level H1 determined in step 1; If the upstream inlet water level H'1 obtained by the mathematical model in step three is greater than the upstream inlet water level H1 determined in step one, the water surface gradient α in step two is modified, and the mathematical model calculation is performed again according to steps two to four, until the upstream inlet water level H'1 obtained by the mathematical model in step three is less than or equal to the upstream inlet water level H1 determined in step one, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step three and the upstream inlet water level H1 determined in step one is less than or equal to a threshold value; Step 5: Record the water level H2 at the flood discharge gate inlet channel when the upstream inlet water level H'1 obtained by the mathematical model in step 3 is less than or equal to the upstream inlet water level H1 determined in step 1, and the error value between the upstream inlet water level H'1 obtained by the mathematical model in step 3 and the upstream inlet water level H1 determined in step 1 is less than or equal to the threshold.
2. The method for calculating the water level at the inlet of the flood discharge gate according to claim 1, characterized in that: The basic equations used in the one-dimensional water flow mathematical model include the water flow continuity equation and the water flow motion equation, where: The continuity equation for water flow is: The equation of motion is: Where: x is the process flow; Q is the flow rate; Z is the water level; g is the acceleration of gravity; t is the time; q l is the lateral injection flow per unit length; A is the water-passing cross-sectional area; R is the cross-sectional hydraulic radius; β is the kinetic energy correction coefficient; η is the roughness coefficient.
3. The method for calculating the water level at the inlet of the flood discharge gate according to claim 2, characterized in that: The numerical method adopted by the one-dimensional water flow mathematical model is the finite volume method.
4. The method for calculating the water level at the inlet of the flood discharge gate according to claim 1, characterized in that: The one-dimensional water flow mathematical model adopts flow inlet boundary conditions, and when a tributary flows in, the flow boundary conditions are set at the tributary inlet.
5. The method for calculating the water level at the inlet of the flood discharge gate according to claim 4, characterized in that: The one-dimensional water flow mathematical model adopts a water level outlet boundary condition.
6. The method for calculating the water level at the inlet of the flood discharge gate according to claim 1, characterized in that: The water level-flow relationship at the estuary section is calculated through the backwater surface line of the reservoir area.
7. The method for calculating the water level at the inlet of the flood discharge gate according to any one of claims 1 to 6, characterized in that: The error value between the upstream inlet water level H1 obtained by the mathematical model in step three and the upstream inlet water level H1 determined in step one is less than or equal to 3%.
8. A test method for a flood diversion project, characterized in that: The following steps are involved: A: Select the geometric scale, determine the simulation range of the flood diversion project model, and make the model meet the similarity of gravity, similarity of gradient, similarity of resistance, similarity of water flow movement and similarity of water flow continuity; B: Make a model, make the inlet channel of the flood gate obliquely intersect with the upstream river channel, the inlet channel has lateral inflow, an upstream wing wall is set upstream of the flood gate, and a stilling pool, apron, flexible sea cover and overflow weir are set downstream of the flood gate; C: Set up water gauge and flow rate measurement system; D: Determine the flood diversion control water level according to the calculation method of the water level at the inlet of the flood discharge gate as described in any one of claims 1 to 7, and conduct a flood diversion test.
9. The test method for flood diversion engineering according to claim 8, characterized in that: Step D also includes determining a model tailgate water level, where the model tailgate water level is provided by a one-dimensional water flow mathematical model.
10. The test method for flood diversion engineering according to claim 9, characterized in that: The upstream inlet water level H'1 obtained by the mathematical model in step three is less than or equal to the upstream inlet water level H1 determined in step one, and the corresponding tailgate water level when the error value between the upstream inlet water level H'1 obtained by the mathematical model in step three and the upstream inlet water level H1 determined in step one is less than or equal to the threshold is extracted as the model tailgate water level of step D.
Citation Information
Cited By
Method and device for automatically extracting flood discharge section of river-crossing bridge
CN120493353A