Improved project evaluation improvement method based on LMDI decomposition
The improved project evaluation method based on LMDI decomposition solves the problem that traditional project management technology is difficult to evaluate the project's support for the organization's strategy, achieves quantitative analysis and decision support for the project's contribution, and improves the overall contribution of the project to the company's strategy. .
Patent Information
- Application Number
- CN202410586695.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-13
- Publication Date
- 2024-10-11
AI Technical Summary
Traditional project management techniques are difficult to intuitively evaluate whether a project supports the organizational strategy, and they lack the ability to quickly and efficiently identify improvement factors to improve the project's support for the organizational strategy.
An improved project evaluation method based on LMDI decomposition is adopted to decompose the influencing factors by establishing a project resource library, a questionnaire survey on the contribution of project types to organizational strategic support, decomposing project evaluation element groups, building an accounting model for organizational strategic contribution and an LMDI decomposition model. Provide quantitative decision support for changes in project contribution.
It reduces the risk of subjective decision-making, improves the project's contribution to the company's strategy, and provides scientific mathematical models for project results evaluation and impact factor evaluation groups to support managers in making effective decisions.
Smart Images

Figure CN118761656A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project management, and in particular to an improved project evaluation method based on LMDI decomposition. Background Art
[0002] Completing a project on time and with quality is an important goal for measuring a project. However, with the continuous development of the industry.
[0003] The traditional approach of only focusing on completing projects on time and with quality can no longer meet management's expectations for projects. The ultimate goal of a project is to provide support for the achievement of the organization's strategic goals. However, project process management is not intuitive. How to evaluate whether a project supports the organization's strategy and how to quickly and efficiently identify improvement factors for the current project to enhance the project's strategic support for the organization still requires continuous in-depth research. Summary of the invention
[0004] The purpose of this section is to summarize some aspects of the embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0005] Therefore, the purpose of the present invention is to provide an improved project evaluation method based on LMDI decomposition. Through the LMDI decomposition model, the degree of influence of each influencing factor in the impact factor evaluation group on the project result evaluation group and the organization is established, and the change in the contribution of the project is decomposed into the sum of the changes caused by each influencing factor by taking the logarithm. By calculating the change in the contribution of each influencing factor to the project and the contribution, managers are provided with quantifiable project decision support, reducing the uncertainty risk of subjective decision-making, and improving the overall contribution of the project to the company's strategic support by adjusting the special variables.
[0006] To solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:
[0007] An improved project evaluation method based on LMDI decomposition includes:
[0008] An improved project evaluation method based on LMDI decomposition includes:
[0009] S1. Establish an organizational-level project resource library based on historical projects;
[0010] S2. Based on the project type and the current strategic goals of the organization, a questionnaire survey on the contribution of project types to the organization's strategic support is established. According to the project resource library and organization definition in step S1, all projects in the project resource library are scored according to the project type and the contribution of the project to the organization's strategy through the expert system to form a project result evaluation table;
[0011] S3, decomposing each project in the project resource library, and establishing an evaluation element group for each project based on the decomposition results;
[0012] S4, organizational strategy support, comes from the contribution of the project defined in step S2, and establishes an organizational strategy contribution accounting model based on the project type in step S2;
[0013] S5. Construct the organizational contribution LMDI decomposition model based on the Kaya identity theory and steps S3 and S4; it is used to determine the degree of influence of the secondary influencing factors in the impact factor evaluation group on the project result evaluation;
[0014] S6. Through cumulative calculations and merging similar samples, the contribution of each influencing effect to the evaluation of project results is finally classified and output.
[0015] As a preferred scheme of the improved project evaluation method based on LMDI decomposition described in the present invention, a questionnaire survey on the contribution of project types to organizational strategic support is established based on project types and the current strategic goals of the organization as follows: Based on the organization's project library, combined with the current organization's project types and the organization's current strategic goals, a questionnaire survey on the contribution of project types to organizational strategic support is established.
[0016] As a preferred solution of the improved project evaluation method based on LMDI decomposition described in the present invention, according to the project resource library and organization definition in S1, project types are divided into R&D, engineering, and technical support.
[0017] As a preferred solution of the improved project evaluation method based on LMDI decomposition described in the present invention, in step S3, the evaluation element groups are divided into two categories: project result evaluation and impact factor evaluation groups;
[0018] The project result evaluation group is a 1-100 vector, which is the result coefficient conversion from the project result evaluation table in step S2; 1 represents the lowest contribution and 100 represents the highest contribution; the impact factor evaluation group is a two-layer structure established according to project management theory, the first layer is based on the three elements of project management including project quality, project cost, and project scope; the second level includes project characteristic indicators.
[0019] As a preferred solution of the improved project evaluation method based on LMDI decomposition described in the present invention, the impact factor evaluation group is a two-layer structure established according to project management theory. Based on project management theory, the core of controlling the project is the three elements of the project, namely, project quality, project cost, and project quality;
[0020] Based on the core of project management, the first level of project management is established with three elements, including project quality, project cost and project scope;
[0021] The second level includes project characteristic indicators: it consists of multiple dimensions such as the total number of defects, code size, total number of test cases, number of testers involved, and tester proficiency.
[0022] As a preferred solution of the improved project evaluation method based on LMDI decomposition described in the present invention, in step S4, the organizational strategy contribution calculation model is expressed as:
[0023]
[0024] Where: V is the total amount of project result evaluation, V i is the total evaluation amount of a single project result, VF i The contribution coefficient of the project type.
[0025] As a preferred solution of the improved project evaluation method based on LMDI decomposition described in the present invention, in step S5, the organizational contribution LMDI decomposition model decomposition model decomposes the factors affecting project quality as follows to obtain the factors affecting project quality;
[0026]
[0027] Where: def i is the total number of defects, Cod i is the number of software code lines and hardware nodes, test i is the number of test cases, Num i is the number of testers, G i To test the skill proficiency of the personnel, is the unit contribution mass coefficient X1, is the defect density X2, Coverage depth X3 for test cases, The average test case usage per person is X4. The average skill proficiency level of the testers X5;
[0028] According to Formula 2, it can be seen that the project result evaluation results are mainly affected by the unit contribution quality coefficient X1, defect density X2, test case coverage depth X3, per capita test case usage X4, and the average skill proficiency level of testers X5.
[0029] As a preferred solution of the improved project evaluation method based on LMDI decomposition described in the present invention, in step S6, by accumulating calculations and merging similar samples, the contribution of each influencing effect to the project result evaluation is finally classified and output as follows:
[0030] Assume that the contribution of project baseline is V0 and the contribution of project t is V t Based on formula 1, the change in the project contribution is decomposed into the sum of the changes caused by each influencing factor by taking the logarithm. The formula is as follows:
[0031] ΔV=V t -V0=ΔX1+ΔX2+ΔX3+ΔX4+ΔX5 Formula 3
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038] The unit contribution of project t, defect density, test case coverage depth, average test case usage per capita, and average skill proficiency level of testers are
[0039] The unit contribution, defect density, test case coverage depth, average test case usage, and average skill proficiency level of testers of the project benchmark are respectively
[0040] The function L(a, b) is the logarithmic mean of two positive numbers a and b, that is
[0041]
[0042] Using Formula 3-Formula 9, calculate the change and contribution of each influencing factor to the project.
[0043] Compared with the prior art, the present invention has the following beneficial effects: the present invention scientifically proposes a mathematical model of project result evaluation and influencing factor evaluation group through the LMDI decomposition method, and provides managers with quantifiable project decision support by calculating the change in contribution and contribution of each influencing factor to the project, thereby reducing the uncertainty risk of subjective decision-making and improving the overall contribution of the project to the company's strategic support by adjusting the special variables. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the present invention will be described in detail below in combination with the accompanying drawings and detailed embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0045] Figure 1 The present invention is a flowchart of an improved project evaluation method based on LMDI decomposition. DETAILED DESCRIPTION
[0046] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0047] like Figure 1 As shown, the specific steps of the improved project evaluation method based on LMDI decomposition of the present invention are as follows:
[0048] S1. Establish an organization-level project resource library based on historical projects.
[0049] S2. Based on the project type and the current strategic goals of the organization, establish a questionnaire survey on the contribution of project types to organizational strategic support. According to the project resource library and organizational definition in step S1, project types can be divided into R&D, engineering, technical support, etc., and all projects in the project resource library are scored according to project type and the contribution of the project to the organizational strategy through the expert system to form a project result evaluation table, as shown in Table 1.
[0050] Table 1-Project Results Evaluation Table
[0051]
[0052] S3. Decompose the projects in the project resource library into single projects, and establish evaluation element groups for each project based on the projects in the project resource library. The element groups are divided into two categories: project result evaluation group and impact factor evaluation group. The project result evaluation group is a 1-100 vector, which comes from the comprehensive evaluation results of the project in step S2. 1 represents the lowest contribution, and 100 represents the highest contribution; the impact factor evaluation group is a two-layer structure, established according to project management theory. The first layer is based on the three elements of project management, including project quality, project cost, and project scope; the second level includes project characteristic indicators. In this case, since the project scope and project cost have been determined at the beginning of the project, the basic requirement for the successful completion of the project is that the actual cost of the project does not exceed the planned cost, and the project completes the development within the scope of the project. Therefore, the project scope and project cost can be regarded as uncontrollable constants in this case. Reducing or increasing the project can be regarded as a major risk of the project, which is a risk that should be avoided as much as possible during project implementation. Therefore, this case only involves successfully completed projects, considering control through project quality, and the contribution of project quality to the organization and its related content are regarded as variables, including the total number of defects, code size, total number of test cases, number of testers, and tester proficiency. The evaluation element group is shown in Table 2;
[0053] Table 2 - Evaluation element groups
[0054]
[0055] S4, organizational strategy support, mainly comes from the contribution of several types of projects defined in S2. Based on the project types in S2, an organizational strategy contribution accounting model is established. The model is:
[0056]
[0057] Where: V is the total amount of project result evaluation, V i is the total evaluation amount of a single project result, VF i For Project
[0058] Type Contribution Coefficient
[0059] The model calculation results are shown in the following table (taking the data in Table 2 as an example):
[0060] V=1*68+70*1+0.6*70+0.8*90+0.8*80=316.
[0061] S5. Build the organizational contribution LMDI decomposition model based on S3 and S4. It is used to determine the degree of influence of each influencing factor in the impact factor evaluation group on the project result evaluation group and the organization. Based on the principle of Kaya identity, this model decomposes the factors affecting project quality as follows to obtain the factors affecting project quality.
[0062]
[0063] Where: def i is the total number of defects, Cod i is the number of software code lines and hardware nodes, test i is the number of test cases, Num i is the number of testers, G i To test the skill proficiency of the personnel, is the unit contribution mass coefficient X1, is the defect density X2, Coverage depth X3 for test cases, The average test case usage per person is X4. The average skill proficiency level of the testers X5;
[0064] According to formula 2, the project result evaluation results are mainly affected by the unit contribution quality coefficient X1, defect density X2, test case coverage depth X3, per capita test case usage X4, and the average skill proficiency level of testers X5.
[0065] Since the scope and cost of the project have been determined at the beginning of the project, the basic requirement for the successful completion of the project is that the actual cost of the project does not exceed the planned cost. The project has completed the development within the scope of the project, which has been determined at the beginning of the project and usually does not change. In the management process, the quality of the project is affected by factors such as defect density X2 and per capita test case usage X4, which ultimately affects the contribution of the project to the organization. Therefore, V i Affected by X1, X2, X3, X4, X5.
[0066] Assume that the contribution of project baseline is V0 and the contribution of project t is V t Based on formula 1, the change in the project contribution is decomposed into the sum of the changes caused by each influencing factor by taking the logarithm. The formula is as follows:
[0067] ΔV=V t -V1=ΔX1+ΔX2+ΔX3+ΔX4+ΔX5 Formula 3
[0068]
[0069]
[0070]
[0071]
[0072]
[0073]
[0074] The unit contribution of project t, defect density, test case coverage depth, average test case usage per capita, and average skill proficiency level of testers are
[0075] The unit contribution, defect density, test case coverage depth, average test case usage, and average skill proficiency level of testers of the project benchmark are respectively Using formula 3-formula 9, we can calculate the change and contribution of each influencing factor to the project, which can be used as a basis for subsequent accumulation calculations. Since there are many individual projects, the project values are summarized in units of years. The results of the above model are shown in Table 3 and Table 4 below:
[0076] Table 3 - Decomposition results
[0077] years ΔV <![CDATA[ΔX1]]> <![CDATA[ΔX2]]> <![CDATA[ΔX3]]> <![CDATA[ΔX4]]> <![CDATA[ΔX5]]> 2021-2023 40.75 -8.3 -0.25 12.3 15.3 21.7 2019-2021 38.79 -7.3 -0.21 11.3 16.3 18.7 Cumulative Effect 79.54 -15.6 -0.46 23.6 31.6 40.4
[0078] Table 4- Contribution rate of each effect
[0079]
[0080] The positive sign in front of the value represents a driving effect, and the negative sign represents an inhibitory effect. For example, the higher the defect density, the more significant the inhibitory effect on the contribution. From the above, we can see that improving the coverage depth of test cases is more effective than improving the proficiency of testers' evaluation skills. Therefore, based on the cumulative effect visualization results, we can quickly sort: test case coverage depth > testers' evaluation skill proficiency > per capita test case practicality, so that management can make effective decisions quickly.
[0081] The invention provides an improved project evaluation method based on LMDI decomposition, which establishes an organization-level project resource library based on historical projects, establishes a questionnaire survey on the contribution of project types to organizational strategic support according to project types and current strategic goals of the organization, and evaluates and scores the contribution of projects in the resource library to organizational strategic support through an expert system according to the questionnaire survey results, and then decomposes the projects in the project resource library into evaluation element groups: result element groups and influencing factor evaluation groups, wherein the project evaluation score is the result element group, and the influencing factor evaluation group is a two-layer architecture, wherein the first layer is based on the three elements of project management including project quality, project cost and project scope; and the second layer includes project characteristic indicators, including the total number of defects, code scale, total number of test cases, number of tester inputs, tester proficiency and the like. Based on the above evaluation tuples, we construct the organizational strategic contribution accounting model and propose a LMDI decomposition model through the principle of Kaya identity. We establish a mathematical model of the relationship between the degree of influence of each influencing factor in the influencing factor evaluation group and the project's contribution to the organizational strategic support. Then, we decompose the change in the project contribution into the sum of the changes caused by each influencing factor by taking the logarithm. Finally, by calculating the change and contribution of each influencing factor to the project, we provide managers with quantifiable project decision support, reduce the uncertainty risk of subjective decision-making, and improve the overall contribution of the project to the company's strategic support by adjusting the special variables.
[0082] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced by equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. An improved project evaluation method based on LMDI decomposition, characterized in that: include: S1. Establish an organizational-level project resource library based on historical projects; S2. Based on the project type and the current strategic goals of the organization, a questionnaire survey on the contribution of project types to the organization's strategic support is established. According to the project resource library and organization definition in step S1, all projects in the project resource library are scored according to the project type and the contribution of the project to the organization's strategy through the expert system to form a project result evaluation table; S3, decomposing each project in the project resource library, and establishing an evaluation element group for each project based on the decomposition results; S4, organizational strategy support, comes from the contribution of the project defined in step S2, and establishes an organizational strategy contribution accounting model based on the project type in step S2; S5. Construct the organizational contribution LMDI decomposition model based on the Kaya identity theory and steps S3 and S4; it is used to determine the degree of influence of the secondary influencing factors in the impact factor evaluation group on the project result evaluation; S6. Through cumulative calculations and merging similar samples, the contribution of each influencing effect to the evaluation of project results is finally classified and output.
2. According to claim 1, the improved project evaluation method based on LMDI decomposition is characterized in that: Based on the project types and the current strategic goals of the organization, a questionnaire survey on the contribution of project types to the strategic support of the organization is established as follows: Based on the organization's project library, combined with the current project types of the organization and the current strategic goals of the organization, a questionnaire survey on the contribution of project types to the strategic support of the organization is established.
3. According to the improved project evaluation method based on LMDI decomposition according to claim 1, it is characterized in that: According to the project resource library and organization definition in S1, project types are divided into R&D, engineering, and technical support.
4. The improved project evaluation method based on LMDI decomposition according to claim 1 is characterized in that: In step S3, the evaluation element groups are divided into two categories: project result evaluation and impact factor evaluation groups; The project result evaluation group is a 1-100 vector, which is the result coefficient conversion from the project result evaluation table in step S2; 1 represents the lowest contribution and 100 represents the highest contribution; the impact factor evaluation group is a two-layer structure established according to project management theory, the first layer is based on the three elements of project management including project quality, project cost, and project scope; the second level includes project characteristic indicators.
5. The improved project evaluation method based on LMDI decomposition according to claim 4 is characterized in that: The impact factor evaluation group is a two-tier structure, established according to the project management theory. Based on the project management theory, the core of controlling the project is the three elements of the project, namely, project quality, project cost, and project quality; Based on the core of project management, the first level of project management is established with three elements, including project quality, project cost and project scope; The second level includes project characteristic indicators: it consists of multiple dimensions such as the total number of defects, code size, total number of test cases, number of testers involved, and tester proficiency.
6. The improved project evaluation method based on LMDI decomposition according to claim 1 is characterized in that: In step S4, the organizational strategy contribution calculation model is expressed as: Where: V is the total amount of project result evaluation, V i is the total evaluation amount of a single project result, VF i The contribution coefficient of the project type.
7. The improved project evaluation method based on LMDI decomposition according to claim 1 is characterized in that: In step S5, the organizational contribution LMDI decomposition model decomposition model decomposes the factors affecting project quality as follows to obtain the factors affecting project quality; Where: def i is the total number of defects of the i-th project, Cod i is the number of software code lines and hardware nodes of the i-th project, test i is the number of test cases for the i-th project, Num i is the number of testers for the i-th project, G i is the skill proficiency of the tester for the i-th project, is the unit contribution quality coefficient X1 of the i-th item, is the defect density X2 of the i-th item, The test case coverage depth for the i-th project is X3, is the average test case usage per capita of the i-th project X4, is the average skill proficiency level of testers for the i-th project X5; According to Formula 2, it can be seen that the project result evaluation result is mainly affected by the unit contribution quality coefficient X1, defect density X2, test case coverage depth X3, per capita test case usage X4, and the average skill proficiency level of testers X5. By substituting the actual process data of the project into Formula 2, X1-X5 in Formula 2 can be calculated.
8. The improved project evaluation method based on LMDI decomposition according to claim 1 is characterized in that: In step S6, by accumulating calculations and merging similar samples (such as projects of the same year and type), the contribution V of each impact effect on the project result evaluation is finally classified and output as follows: Assume that the contribution of project baseline is V0 and the contribution of project t is V t Based on formula 1, the change in the project contribution is decomposed into the sum of the changes caused by each influencing factor by taking the logarithm. The formula is as follows: ΔV = V t -V0 = ΔX1 + ΔX2 + ΔX3 + ΔX4 + ΔX5 Equation 3 The unit contribution of project t, defect density, test case coverage depth, average test case usage per capita, and average skill proficiency level of testers are The unit contribution, defect density, test case coverage depth, average test case usage, and average skill proficiency level of testers of the project benchmark are respectively Using Formula 3-Formula 9, calculate the change and contribution of each influencing factor to the project.