Rail transit practical training system

By designing a rail transit training system that combines the operation control center, automatic fare collection system, stations and multi-functional rail vehicles, the problem that traditional training methods cannot effectively combine theory and practice is solved, the cultivation of professional skills and cost savings are achieved, and the promotion teaching innovation.

CN118762583APending Publication Date: 2024-10-11HEBEI RAIL TRANSPORTATION VOCATIONAL & TECH COLLEGE
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411089821.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

How to cultivate more professional and comprehensive urban rail transit talents and solve the problem that traditional training methods cannot effectively combine theoretical learning and practical operation.

Method used

Design a rail transit training system, including an operation control center, automatic ticket collection system, stations, parallel tracks and open maintenance platforms. The rail vehicles are equipped with different control systems, providing a variety of driving modes and training rooms, covering the track Multiple skill areas in transportation.

Benefits of technology

It realizes the training of students' professional operating skills, shortens the development process from single skills to multiple skills, saves construction costs, and accelerates the innovation of teaching methods through an integrated curriculum system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118762583A_ABST
    Figure CN118762583A_ABST
Patent Text Reader

Abstract

The invention provides a rail transit practical training system, and relates to the technical field of professional training. The rail transit practical training system comprises an urban rail transit OCC, an urban rail transit operation AFC, three stations, a first rail, a second rail, an open maintenance platform and a rail vehicle. Wherein the first track and the second track are arranged in parallel, the three stations are sequentially arranged along the first track, and one of the three stations is provided with a turnout; the open maintenance platform is arranged at one end of the first track; the rail vehicle is arranged on the first rail or the second rail and comprises two vehicle heads, and different control systems are applied to cabs in the two vehicle heads. According to the system, students can obtain more professional and highly practical teaching, so that the students can obtain professional operation skills, and efficient combination of theoretical learning and practical operation of the students is realized. Two control systems are arranged in the two cabs of the rail vehicle, so that more professional and comprehensive talents in the aspect of urban rail transit can be cultivated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of professional training, and in particular to a rail transit training system. Background Art

[0002] With the expansion of domestic demand, many cities have ushered in a climax in rail construction. The vigorous development of urban rail construction in various places has led to an increasing demand for talents in urban rail transit and higher professional requirements.

[0003] How to cultivate more professional and comprehensive talents in urban rail transit is a major problem that needs to be solved.

[0004] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention

[0005] The present disclosure provides a rail transit training system, which at least provides a training system that can assist in cultivating more professional and comprehensive talents in urban rail transit.

[0006] Other features and advantages of the present disclosure will become apparent from the following detailed description, or may be learned in part by the practice of the present disclosure.

[0007] According to one aspect of the present disclosure, a rail transit training system is provided, including: an urban rail transit OCC (Operation Control Center), an urban rail transit operation AFC (Automatic Fare Collection System), three stations, a first track, a second track, an open maintenance platform and a rail vehicle; wherein the first track and the second track are arranged in parallel, the three stations are arranged in sequence along the first track, and one of the three stations is provided with a switch; the open maintenance platform is arranged at one end of the first track; the rail vehicle is arranged on the first track or the second track, and the rail vehicle includes two locomotives, and the driver's cabs in the two locomotives apply different control systems.

[0008] By configuring actual urban rail transit OCC, urban transportation operation AFC, stations, tracks, open maintenance platforms and rail vehicles, students can receive more professional and practical teaching, thereby acquiring professional operating skills and achieving an efficient combination of theoretical learning and practical operation.

[0009] By configuring two different control systems in the two driver's cabs of a rail vehicle, the content of trainees' practical training can be increased without adding additional costs, so that trainees can learn more about the driver's cab control system, which is conducive to cultivating more professional and comprehensive talents in urban rail transit.

[0010] The use of actual equipment is conducive to the training of trainees with the same standard as corporate employees, shortening the process of trainees' development from single skills to multiple skills, from technical ability to comprehensive professional ability. Secondly, based on teaching, we will create an integrated curriculum system and change the traditional curriculum setting through the rail transit training system, so as to facilitate the use of project teaching and other methods that can solve actual production problems, accelerate the innovation of teaching methods, and continuously develop and promote new teaching reform results.

[0011] In one embodiment of the present disclosure, the two locomotives of the rail vehicle are directly connected.

[0012] Transforming rail vehicles into two directly connected locomotives can save the space occupied by rail vehicles and reduce the cost of building a rail transit training system.

[0013] In one embodiment of the present disclosure, each of the two locomotives of the rail vehicle is configured with: an ATP (Automatic Train Protection) simulation system, an ATO (Automatic Train Operation) system, a wireless communication module and a free-wave antenna, an MMI (Multi Media Interface) display, a speed sensor, a transponder antenna, a transponder on-board interrogator and one or more of a radar; and a plurality of ground transponders are configured on both the first track and the second track.

[0014] By configuring the ATP simulation system, ATO system, wireless communication module and free wave antenna, MMI display, speed sensor, transponder antenna, transponder on-board query and radar on the front of the train, and configuring multiple ground transponders on the track, the train can have multiple driving modes, such as: NRM (Non-Restrictive Manual mode), RM (Restrictive Manual mode), IATP (Interlocking ATP Mode), ATO, FAO (Fully Automatic Operation), etc., and rail vehicles with multiple driving modes. In addition, the above configuration can also enable rail vehicles to have the capabilities of autonomous testing and positioning, overspeed protection, red light running protection, and real-time communication with trackside equipment. Rail vehicles with multiple functional capabilities can better train students and are conducive to cultivating more professional and comprehensive talents in urban rail transit.

[0015] In one embodiment of the present disclosure, the open maintenance platform includes three maintenance layers; wherein the first maintenance layer is used to inspect the bottom of the rail vehicle, the second maintenance layer is used to inspect the interior of the rail vehicle, and the third maintenance layer is used to inspect the top of the rail vehicle.

[0016] Configuring the open maintenance platform as a three-layer maintenance platform with upper, middle and lower layers will help trainees to have a more comprehensive understanding of rail vehicles, thereby better training trainees and cultivating more professional and comprehensive talents in urban rail transit.

[0017] In one embodiment of the present disclosure, the rail transit training system also includes: one or more of: a signal control training system, an urban rail power supply and distribution main substation training system, an urban rail power supply and distribution contact network worker comprehensive training system, a traction power supply simulation network training system, and an urban rail power supply and distribution traction substation training system.

[0018] By configuring rail vehicles and the above-mentioned training system in the rail transit training system, it is possible to realize the joint training of rail vehicles and the training system, so that trainees can have a more intuitive understanding of the training content and the actual control of rail vehicles, thereby better training trainees and conducive to cultivating more professional and comprehensive talents in urban rail transit.

[0019] In one embodiment of the present disclosure, the rail transit training system also includes: an urban rail vehicle door control maintenance and experimental system, an urban rail vehicle electrical control training room, an urban rail vehicle network training room, an urban rail vehicle braking system training room, an urban rail vehicle mechanical equipment maintenance training room, an urban rail vehicle motor maintenance training room, an urban rail vehicle electrical maintenance training room, an urban rail vehicle simulation driving training room, an urban rail vehicle basic driving mode training room, and an urban rail transit driver operation standard training room. One or more of the training room.

[0020] In one embodiment of the present disclosure, the rail transit training system also includes: one or more of: an urban rail transit comprehensive monitoring and miniature station comprehensive training system, a gas fire extinguishing and fire water system training room, an escalator and elevator professional training room, a HVAC system training room, and an urban rail comprehensive electromechanical equipment maintenance training room.

[0021] In one embodiment of the present disclosure, the rail transit training system also includes: one or more of an urban rail station platform on-site practical training area, an urban rail transit ticketing terminal equipment system maintenance training room, an urban operation professional network classroom, an urban rail transit operation management standard operation training room, and vehicle maintenance equipment; the urban rail station platform on-site practical training area includes one of the three stations; the urban rail transit operation management standard operation training room includes a hand-operated turnout.

[0022] By configuring various training systems and training rooms in the above-mentioned multiple embodiments in the rail transit training system, the rail transit training system can cover most of the skills involved in rail transit. By uniformly planning and constructing the various training systems and training rooms, it is conducive to more scientific and reasonable training of students and to cultivating more professional and comprehensive talents in urban rail transit.

[0023] In one embodiment of the present disclosure, the rail transit training system further includes: an intermediate vehicle of a rail vehicle, wherein the intermediate vehicle is arranged at one end of the second track and is used as an intermediate vehicle maintenance training system.

[0024] In one embodiment of the present disclosure, the rail transit training system further includes: a closed-circuit television monitoring system, which is used to monitor the training area of ​​the rail transit training system and display the monitoring images on a screen in the urban rail transit OCC.

[0025] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The accompanying drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification are used to explain the principles of the present disclosure. Obviously, the accompanying drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.

[0027] Figure 1 A schematic diagram showing a rail transit training system in one embodiment of the present disclosure;

[0028] Figure 2 A schematic structural diagram of a rail vehicle in one embodiment of the present disclosure is shown;

[0029] Figure 3 A schematic diagram showing a rail transit training system in another embodiment of the present disclosure;

[0030] Figure 4 A schematic diagram showing a rail transit training system in another embodiment of the present disclosure is shown;

[0031] Figure 5 A schematic diagram of a rail transit training system in yet another embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0032] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and to fully convey the concepts of the example embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.

[0033] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the drawings represent the same or similar parts, and thus their repeated descriptions will be omitted. It should be noted that the concepts of "first", "second", etc. mentioned in the present disclosure are only used to distinguish different modules, units, components, and tracks.

[0034] like Figure 1 As shown, the rail transit training system in one embodiment of the present disclosure may include: urban rail transit OCC, urban rail transit operation AFC, three stations, a first track 11, a second track 12, an open maintenance platform 13 and a rail vehicle 14.

[0035] The first track 11 and the second track 12 are arranged in parallel, three stations are arranged in sequence along the first track 11, and one of the three stations is provided with a switch. An open maintenance platform 13 is arranged at one end of the first track 11. A rail vehicle 14 is arranged on the first track 11 or the second track 12, and the rail vehicle 14 includes two locomotives, and the driver cabs in the two locomotives use different control systems.

[0036] The three stations are respectively Station 1, Station 2 and Station 3. In one embodiment, the three stations all include a station platform and an integrated control room, and the integrated control room can control the travel of the rail vehicle 14 and the switches of the track.

[0037] The open maintenance platform 13 can be an open trench.

[0038] For example, rail vehicle 14 may include a railway electric coach.

[0039] By configuring actual urban rail transit OCC, urban transportation operation AFC, stations, tracks, open maintenance platforms and rail vehicles, students can receive more professional and practical teaching, thereby acquiring professional operating skills and achieving an efficient combination of theoretical learning and practical operation.

[0040] By configuring two different control systems in the two driver's cabs of a rail vehicle, the content of trainees' practical training can be increased without adding additional costs, so that trainees can learn more about the driver's cab control system, which is conducive to cultivating more professional and comprehensive talents in urban rail transit.

[0041] The use of actual equipment is conducive to the training of trainees with the same standard as corporate employees, shortening the process of trainees' development from single skills to multiple skills, from technical ability to comprehensive professional ability. Secondly, based on teaching, we will create an integrated curriculum system and change the traditional curriculum setting through the rail transit training system, so as to facilitate the use of project teaching and other methods that can solve actual production problems, accelerate the innovation of teaching methods, and continuously develop and promote new teaching reform results.

[0042] In one embodiment, the two locomotives of rail vehicle 14 are directly connected.

[0043] Transforming rail vehicles into two directly connected locomotives can save the space occupied by rail vehicles and reduce the cost of building a rail transit training system.

[0044] In one embodiment, Figure 2As shown, each of the two locomotives of the rail vehicle 14 is configured with: an ATP simulation system, an ATO system, a wireless communication module and a free-wave antenna, an MMI display, a speed sensor, a transponder antenna, a transponder on-board interrogator and one or more of a radar; and a plurality of ground transponders are configured on the first track 11 and the second track 13.

[0045] By configuring the ATP simulation system, ATO system, wireless communication module and free wave antenna, MMI display, speed sensor, transponder antenna, transponder on-board query and radar on the front of the train, as well as configuring multiple ground transponders on the track, the train can have multiple driving modes, such as: NRM, RM, IATP (Interlocking ATP Mode), ATO, FAO, etc., and rail vehicles with multiple driving modes. In addition, the above configuration can also enable rail vehicles to have functions such as autonomous testing and positioning, overspeed protection, red light running protection, real-time communication with trackside equipment, automatic return, door and shield door management, etc., and rail vehicles with multiple functional capabilities can better train students and are conducive to cultivating more professional and comprehensive talents in urban rail transit.

[0046] The cabs at both ends of the rail vehicle 14 (cab 1 and cab 2) can control the train. The rail vehicle 14 can interface with the on-board equipment of the signal system and respond to the control commands of the signal system. It can realize automatic station announcements and prompts on the on-board broadcasting, and control the opening and closing of the doors.

[0047] In one embodiment, the open maintenance platform 13 includes three maintenance layers, wherein the first maintenance layer is used to inspect the bottom of the rail vehicle, the second maintenance layer is used to inspect the interior of the rail vehicle, and the third maintenance layer is used to inspect the top of the rail vehicle.

[0048] Configuring the open maintenance platform 13 as a three-layer maintenance platform with upper, middle and lower layers is conducive to helping trainees to have a more comprehensive understanding of rail vehicles, thereby better training trainees and cultivating more professional and comprehensive talents in urban rail transit.

[0049] In one embodiment, Figure 3 As shown, the rail transit training system also includes: one or more of: a signal control training system 301, an urban rail power supply and distribution main substation training system 302, an urban rail power supply and distribution contact network worker comprehensive training system 303, a traction power supply simulation network training system 304, and an urban rail power supply and distribution traction substation training system 305.

[0050] By configuring rail vehicles and the above-mentioned training system in the rail transit training system, it is possible to realize the joint training of rail vehicles and the training system, so that trainees can have a more intuitive understanding of the training content and the actual control of rail vehicles, thereby better training trainees and conducive to cultivating more professional and comprehensive talents in urban rail transit.

[0051] In one embodiment, Figure 3 As shown, the rail transit training system also includes: one or more of: an urban rail vehicle door control maintenance and experimental system 306, an urban rail vehicle electrical control training room 307, an urban rail vehicle network training room 308, an urban rail vehicle braking system training room 309, an urban rail vehicle mechanical equipment maintenance training room 310, an urban rail vehicle motor maintenance training room 311, an urban rail vehicle electrical maintenance training room 312, an urban rail vehicle simulation driving training room 313, an urban rail vehicle basic driving mode training room 314, and an urban rail transit driver operation standard training room 315.

[0052] In one embodiment, the urban rail vehicle brake system training room 309 includes a driver's operating platform, a brake test device, a basic brake device, an EP2002 valve (a type of valve), an air source device, and connecting pipes and other equipment. The training room can be used to complete the following training projects: operation and application of five braking modes of the urban rail vehicle driver's platform, operation and overhaul and maintenance of the air supply system, air brake (tread brake, disc brake) experiment, recognition and overhaul and maintenance of various valves (gateway valve, smart valve, auxiliary valve, etc.), recognition and overhaul and maintenance of air compressors and air cylinders and connecting pipes.

[0053] In one embodiment, the urban rail vehicle basic driving mode training room 314 includes multiple complete driving consoles and corresponding hardware control systems. The training room can be used to complete the following simulation training contents: simulation training of urban rail vehicle (electric train) startup and start-up, simulation training of urban rail vehicle line driving operation, simulation training of electric train setting events (operation fault handling), simulation training of electric train rescue drills, and simulation training of emergency response measures during safe driving of urban rail trains.

[0054] In one embodiment, the urban rail vehicle simulation driving training room 313 can be composed of a two-level simulation driving device, equipped with a driver's cab and a passenger compartment. The training projects that can be completed in the training room may include: train operation, platform door opening and closing operations, fault handling and emergency drills.

[0055] In one embodiment, the urban rail transit driver operation standard training room 315 can be composed of two sets of teaching and integrated equipment, including a driver's console, a train dispatching console, and a duty officer's console, which are used to conduct practical teaching and training for electric passenger car drivers, train dispatchers, and station duty officers. The practical training projects that can be implemented in the training room may include: pre-departure inspection, EMU experiment, section mainline operation, fault handling, and emergency handling.

[0056] In one embodiment, Figure 3 As shown, the rail transit training system also includes: one or more of: an urban rail transit comprehensive monitoring and miniature station comprehensive training system 316, a gas fire extinguishing and fire water system training room 317, an escalator and elevator professional training room 318, a HVAC system training room 319, and an urban rail comprehensive electromechanical equipment maintenance training room 320.

[0057] In one embodiment, the integrated monitoring and miniature station training system 316 for urban rail transit includes an IBP (Integrated Backup Panel), an integrated monitoring console, a station ATS (Automatic Train Supervision) workstation and a station broadcast. The training room is used to train the job skills of station duty stationmasters, train duty officers, passenger duty officers and station attendants.

[0058] The Integrated Supervisory Control System (ISCS) enables information exchange and resource sharing among various specialized equipment in subway stations, improves the level of automation, and enhances the safety, reliability, and responsiveness of the system, ultimately achieving the goal of reducing staff and increasing efficiency. ISCS is the focus of subway automation construction. Most of the electromechanical equipment in subway stations is monitored and controlled by ISCS, which is the core of subway electromechanical / automated station operations.

[0059] ISCS generally integrates: Building Automation System (BAS), Fire Alarm System (FAS), Platform Screen Doors (PSD) system, etc. ISCS generally interconnects: Automatic Fare Collection System (AFC), Public Address System (PA), Passenger Information System (PIS), Clock System (CLK) system, etc.

[0060] Among them, BAS is used to centrally monitor, control and manage the environment and air conditions, ventilation, water supply and drainage, lighting, passenger guidance, escalators and elevators, shield doors, flood prevention doors and other building equipment and systems in subway buildings. FAS is an automatic fire fighting system installed in buildings or other places for early detection and notification of fires, and timely and effective measures to control and extinguish fires. PSD is a safety and energy-saving device used in urban rail transit, which can completely isolate the platform waiting area from the train entry and stop area, improving operational safety and passenger comfort.

[0061] AFC is used to realize the automatic processing of the whole process of rail transit ticketing, ticket checking, billing, charging, statistics, clearing, and management. PA is used to provide background music and broadcast programs on the train. PIS is a service system that provides passengers with various information in rail transit tools such as subways and light rails. It relies on multimedia network technology and takes computer systems as the core. By setting up display terminals in station halls, platforms, entrances and exits, and trains, passengers can understand train operation information and public media information in a timely and accurate manner. CLK is responsible for providing a unified time base for the entire system to ensure time synchronization between systems.

[0062] Figure 3 The planning and design drawings of three stations and two sections of urban rail transit are given.

[0063] In one embodiment, Figure 3 As shown, the rail transit training system also includes: one or more of: an urban rail station platform on-site practical training area 321, an urban rail transit ticketing terminal equipment system maintenance training room 322, an urban transportation professional network classroom 323, an urban rail transit operation management standard operation training room 324, and vehicle maintenance equipment 325; the urban rail station platform on-site practical training area 321 includes one of the three stations; the urban rail transit operation management standard operation training room 324 includes a hand-operated turnout.

[0064] In one embodiment, the urban rail transit operation management standard operation training room 324 includes four modules, namely the vehicle control training area, the dispatching workbench, the turnout training area and the platform door training area. Through the three-dimensional modeling technology, the three-dimensional engine technology, the virtual reality interaction technology, and the matching physical equipment to build a training environment, the environment can be used for the core positions of urban rail transit operation management, such as train attendants, dispatchers, station attendants and other positions to cooperate in the operation. The main training projects of the training room include: emergency handling of platform door failures, emergency handling of signal failures, manual turnouts and other operations.

[0065] By configuring various training systems and training rooms in the above-mentioned multiple embodiments in the rail transit training system, the rail transit training system can cover most of the skills involved in rail transit. By uniformly planning and constructing the various training systems and training rooms, it is conducive to more scientific and reasonable training of students and to cultivating more professional and comprehensive talents in urban rail transit.

[0066] In one embodiment, Figure 4 As shown, the rail transit training system further includes: an intermediate vehicle 15 of the rail vehicle, which is arranged at one end of the second track and is used as an intermediate vehicle maintenance training system.

[0067] In one embodiment, the rail transit training system further includes: a closed-circuit television monitoring system, which is used to monitor the training area of ​​the rail transit training system and display the monitoring images on a screen in the urban rail transit OCC.

[0068] In one embodiment, Figure 5 As shown, the rail transit training system also includes: urban train dispatching and command training room.

[0069] In one embodiment, a train dispatching and command training room for urban trains is equipped with a train sandbox, including multiple stations and a train depot. Each station and train depot is equipped with a terminal device of the train automatic monitoring system.

[0070] The main training projects of the urban train dispatching and command training room include: organizing students to simulate depot dispatchers, signal tower attendants, train dispatchers, station train attendants, station attendants and other positions to perform depot shunting operations, depot entry and exit operations, station CBTC (Communication Based Train Control System) mode, interlocking mode reception and dispatch operations, and telephone blocking under abnormal circumstances. Through practical training exercises, students can master the basic simulation operation skills of train attendants, station attendants and other positions.

[0071] In vocational education institutions, urban rail transit is a subject with strong operability and practicality, and practical training is particularly important. This is determined by the training objectives of vocational schools in terms of educational objects. Vocational education should cultivate practical technical talents for social and economic development. In the training objectives of urban rail majors, students should not only have rich professional theoretical knowledge, but also have strong professional operational skills. It can be seen that the construction and research of rail transit training system is of great significance.

[0072] First: The construction of the rail transit training system meets social needs.

[0073] With the development of society and the advancement of science and technology, more and more positions have put forward higher requirements for professional and technical workers. From the perspective of vocational education development, it is an inevitable requirement for social development to strengthen the construction of a comprehensive system of urban rail professional teaching and training, realize the efficient combination of students' theoretical learning and practical operation, and focus on the cultivation of skills.

[0074] Second: The construction of a rail transit training system is necessary to promote cooperation between schools and enterprises.

[0075] The development of vocational colleges needs to be based on the work requirements of enterprises. By building a comprehensive system of urban rail teaching and training, establishing a regional shared training base, strengthening cooperation with surrounding enterprises and industries, establishing a multi-party joint scientific research and training platform, broadening the source channels of training equipment, complementing and assisting each other, coordinating talent, funds and technical resources, and jointly building high-level training bases, reducing low-level duplicate investment, improving the efficiency of resource utilization of training bases, and truly establishing a platform for the integration of industry, academia and research.

[0076] Third: The construction of a rail transit training system is necessary to improve vocational education.

[0077] The construction of the training room is based on job requirements and aims to cultivate professional talents needed by urban rail transit enterprises, which will help to better improve the overall vocational education framework of our college.

[0078] Fourth: The construction of a rail transit training system is necessary to promote teaching reform.

[0079] First, the construction of the training base should meet the needs of student training and "double-qualified" teacher training, use scientific methods and advanced technical equipment to train students who are as standardized as corporate employees, and shorten the process of students' development from single skills to multiple skills, from technical ability to comprehensive professional ability. Secondly, based on teaching, we should create an integrated curriculum system, change the traditional curriculum through base construction, adopt project teaching and other methods that can solve actual production problems, accelerate the innovation of teaching methods, and continuously develop and promote new teaching reform results.

[0080] Fifth: The construction of a rail transit training system serves the needs of society.

[0081] Through the construction of an integrated training system that integrates teaching and training, it is open to all kinds of vocational colleges and enterprises in the region, as well as to the society, to carry out labor training, skill appraisal, enterprise technological transformation and technological innovation, etc., to maximize the promotion of school-enterprise cooperation, realize resource sharing, and become a training base for skilled and scarce talents, a training base for rural labor transfer, and a bridge for school-enterprise cooperation, to cultivate more professional talents and serve social needs.

[0082] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. The present disclosure is intended to cover any variations, uses or adaptations of the present disclosure, which follow the general principles of the present disclosure and include common knowledge or customary technical means in the art that are not disclosed in the present disclosure. The description and examples are to be regarded as exemplary only, and the true scope of the present disclosure is indicated by the appended claims.

Claims

1. A rail transit training system, characterized in that: include: Urban rail transit operation control center OCC, urban rail transit operation automatic ticket vending and checking system AFC, three stations, the first track, the second track, the open maintenance platform and rail vehicles; Wherein, the first track and the second track are arranged in parallel, the three stations are arranged in sequence along the first track, and one of the three stations is provided with a turnout; The open maintenance platform is arranged at one end of the first track; The rail vehicle is arranged on the first track or the second track, and the rail vehicle comprises two locomotives, and the driver cabs in the two locomotives apply different control systems.

2. The rail transit training system according to claim 1, characterized in that: The two locomotive heads of the rail vehicle are directly connected.

3. The rail transit training system according to claim 1, characterized in that: Each of the two locomotives of the rail vehicle is equipped with: an automatic train protection ATP simulation system, an automatic train control ATO system, a wireless communication module and a free wave antenna, a multimedia interactive MMI display, a speed sensor, a transponder antenna, a transponder onboard interrogator and one or more of a radar; A plurality of ground transponders are disposed on the first track and the second track.

4. The rail transit training system according to claim 1, characterized in that: The open maintenance platform includes three maintenance levels; Among them, the first inspection layer is used for inspecting the bottom of the rail vehicle, the second inspection layer is used for inspecting the inside of the rail vehicle, and the third inspection layer is used for inspecting the top of the rail vehicle.

5. The rail transit training system according to claim 1, characterized in that: Also includes: One or more of the following: signal control training system, urban rail power supply and distribution main substation training system, urban rail power supply and distribution contact network worker comprehensive training system, traction power supply simulation network training system, and urban rail power supply and distribution traction substation training system.

6. The rail transit training system according to claim 1, characterized in that: Also includes: One or more of the following: urban rail vehicle door control maintenance and experimental system, urban rail vehicle electrical control training room, urban rail vehicle network training room, urban rail vehicle braking system training room, urban rail vehicle mechanical equipment maintenance training room, urban rail vehicle motor maintenance training room, urban rail vehicle electrical maintenance training room, urban rail vehicle simulation driving training room, urban rail vehicle basic driving mode training room, and urban rail transit driver operation standard training room.

7. The rail transit training system according to claim 1, characterized in that: Also includes: One or more of the following: comprehensive urban rail transit monitoring and miniature station comprehensive training system, gas fire extinguishing and fire water system training room, escalator and elevator professional training room, HVAC system training room, and urban rail comprehensive electromechanical equipment maintenance training room.

8. The rail transit training system according to claim 1, characterized in that: Also includes: One or more of the following: urban rail station platform practical training area, urban rail transit ticket terminal equipment system maintenance training room, urban transportation professional network classroom, urban rail transit operation management standard operation training room, and vehicle maintenance equipment; The urban rail station platform and station practical training area includes one of the three stations; The urban rail transit operation management standard operation training room includes a hand-operated turnout.

9. The rail transit training system according to claim 1, characterized in that: Also includes: An intermediate vehicle of a rail vehicle, the intermediate vehicle is arranged at one end of the second track and is used as an intermediate vehicle maintenance training system.

10. The rail transit training system according to claim 1, characterized in that: Also includes: The closed-circuit television monitoring system is used to monitor the training area of ​​the rail transit training system and display the monitoring images on the screen in the urban rail transit OCC.

Citation Information

Patent Citations

  • Rail transit multi-work type united practice simulated training system

    CN102103806A

  • Track traffic simulation system

    CN103745624A

  • Rail transit comprehensive practical training platform

    CN211087575U