Modular cable tray, tray auxiliary installation mechanism and tray installation method

By opening a heat dissipation hole at the bottom of the trench unit of the cable tray and setting a support rod, the problem of poor heat dissipation effect of the cable tray is solved, and the installation process is simplified through the bridge auxiliary installation mechanism, achieving more efficient heat dissipation and installation.

CN118763571BActive Publication Date: 2025-02-14GUANGZHOU LONGJISHUPEIDIAN EQUIP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410476746.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2025-02-14
Estimated Expiration
2044-04-19

AI Technical Summary

Technical Problem

A closed space is formed between the groove cover and the buckle cover of the existing cable tray, resulting in poor heat dissipation effect of the cable and room for improvement.

Method used

A modular combined cable tray is designed, by opening a heat dissipation hole at the bottom of the groove frame unit and a supporting rod is provided in the groove frame unit. The cable is overlapped on the support rod when laying, so as to dissipate heat through the heat dissipation hole. At the same time, a bridge auxiliary installation mechanism is used to simplify the installation process and improve installation efficiency.

Benefits of technology

It effectively improves the heat dissipation effect of the cable tray, reduces the risk of cable damage, and simplifies the installation process and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118763571B_ABST
    Figure CN118763571B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of cable trays, and proposes modular cable trays, tray auxiliary installation mechanisms, and tray installation methods, wherein the modular cable tray includes a cable tray body, which is formed by splicing a number of trough frame units, and the tops of the trough frame units are buckled with buckle covers; the bottoms of the trough frame units are provided with a number of heat dissipation holes, and the trough frame units are also provided with a number of support rods, the two ends of the support rods are respectively connected to the two opposite inner walls of the trough frame units, and a spacing is left between the support rods and the bottom of the trough frame units; connecting troughs are provided between adjacent trough frame units, and the adjacent ends of the adjacent trough frame units are embedded in the connecting troughs, and the two ends of the connecting troughs are respectively connected to the adjacent ends of the trough frame units through a number of bolts and nuts. The present application has the effect of improving the heat dissipation of the cable tray.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of cable trays, and in particular to a modular combined cable tray and an installation method thereof. Background Art

[0002] During the construction of rail transit systems such as subways, it is necessary to lay and install cables on the top of the tunnel to transmit power, signals and control commands to the subway trains during their subsequent operation.

[0003] In order to better support and fix the cables, it is usually necessary to install a cable tray on the top of the tunnel before laying the cables. The cables are then laid in the cable tray to support and fix the cables and reduce mechanical damage to the cables.

[0004] In the related art, the cable tray includes a trough frame and a buckle cover, wherein the buckle cover is buckled on the top of the trough frame to limit the subsequent dust from entering the trough frame. When installing the cable tray, it is necessary to first install a number of hangers on the top of the tunnel to support the cable tray, and then install and fix the cable tray on the hangers.

[0005] With regard to the above-mentioned related technologies, after the cables are installed on the cable tray, a large amount of heat will be generated during use due to their large number and high operating power. The groove cover and buckle cover of the cable tray form a relatively closed space, which is not conducive to the heat dissipation of the cables as a whole. Therefore, there is room for improvement. Summary of the invention

[0006] In order to improve the heat dissipation effect of the cable tray, the present application provides a modular cable tray, a tray auxiliary installation mechanism and a tray installation method.

[0007] The present application provides a modular cable tray, a tray installation mechanism and a tray installation method, which adopt the following technical solutions:

[0008] A modular combined cable tray comprises a cable tray body, wherein the cable tray body is spliced ​​together by a plurality of trough frame units, and the tops of the trough frame units are buckled with buckle covers; a plurality of heat dissipation holes are opened at the bottoms of the trough frame units, and a plurality of support rods are further arranged in the trough frame units, and the two ends of the support rods are respectively connected to the two opposite inner walls of the trough frame units, and a spacing is left between the support rods and the bottoms of the trough frame units; connecting trough members are arranged between adjacent trough frame units, and the adjacent ends of the adjacent trough frame units are embedded in the connecting trough members, and the two ends of the connecting trough members are respectively connected to the adjacent ends of the adjacent trough frame units through a plurality of bolts and nuts.

[0009] By adopting the above technical solution, when laying cables later, the cables can be overlapped on several support rods, and several support rods can be used to support the cables away from the bottom of the trough frame, so as to better dissipate heat when the cables in the trough frame unit are running. On the other hand, several support rods can be used to improve the overall strength of the trough frame unit and reduce the deformation and damage of the trough frame unit. Adjacent trough frame units are connected by connecting trough parts, so that the cable tray does not need to be made in one piece, which is convenient for the transportation and installation of the cable tray.

[0010] Preferably, a plurality of hangers are provided on the trough frame unit, and the hangers include a transverse rod provided at the bottom of the trough frame unit, both ends of the transverse rod are vertically connected to hangers, and the top end of the hanger is vertically connected to a mounting plate.

[0011] By adopting the above technical solution, when installing the trough frame unit later, after moving the trough frame unit to the installation position, the installation plate is fixed to the top of the tunnel by expansion bolts to complete the installation and fixation of the trough frame unit. Compared with the traditional method of installing the hanger first and then installing the trough frame unit, the overall construction steps are simplified and the height error between adjacent hangers is effectively reduced when the hanger is first constructed, which affects the subsequent installation of the trough frame unit.

[0012] Preferably, a support tube is coaxially rotatably sleeved on the support rod.

[0013] By adopting the above technical solution, when the cable is subsequently pulled into the trough unit, the friction between the cable and the support rod can be reduced through the support tube, which facilitates the laying of the cable in the trough unit of the cable tray.

[0014] Preferably, a rubber strip is further provided between the transverse rod and the slot frame unit, and the top and bottom sides of the rubber strip are respectively in contact with the slot frame unit and the support rod.

[0015] By adopting the above technical solution, the rubber strips can be used for shock absorption and buffering, thereby reducing the sliding or displacement of the slot frame unit caused by vibration, making the cables in the slot frame unit less likely to be damaged.

[0016] Preferably, a bridge auxiliary installation mechanism is applied to a modular combined bridge, comprising a bracket, a sliding part is provided at the bottom of the bracket, and the sliding part is used to slide with the track in the tunnel; a main clamping part is also provided at the top of the bracket, and the main clamping part is used to clamp the trough frame unit, and the main clamping part is arranged to move up and down.

[0017] By adopting the above technical solution, when installing the slot frame unit later, after the bracket is slidably matched to the track of the tunnel through the sliding part, the bracket is slid along the track through the sliding part until the main clamping part at the top of the bracket is located below the installation position of the slot frame unit to be installed, the slot frame unit to be installed is placed on the main clamping part and the slot frame unit is clamped by the main clamping part, and then the main clamping part is moved up until the slot frame unit is moved to the installation position, and finally the mounting plate at the top of the slot frame unit hanger is fixed to the top of the tunnel through the expansion bolts to achieve the installation and fixation of the slot frame unit. The slot frame unit is clamped by the main clamping part, and the slot frame unit is temporarily positioned by the main clamping part to limit the displacement of the slot frame unit during the installation process, so as to facilitate the subsequent fixing of the mounting plate on the hanger to the top of the tunnel through the expansion bolts; at the same time, the bottom of the bracket can be slidably connected to the track inside the tunnel through the sliding part, so as to facilitate the quick and convenient movement of the bracket to the installation position below different slot frame units during the subsequent installation and construction process.

[0018] Preferably, a method for installing a modular combined cable tray, using a tray auxiliary installation mechanism, comprises the following steps:

[0019] S1: The auxiliary installation mechanism of the bridge is in place: the bracket is slidably connected to the track in the tunnel through the sliding part; the bracket is moved along the track until the main clamping part on the bracket is located below the installation position of the slot frame unit;

[0020] S2: The starting section rack unit is in place: the rack unit to be installed is clamped by the main clamping part; then the main clamping part is moved upward to move the rack unit to be installed to the installation position;

[0021] S3: Installation of the initial section trough frame unit: fix the mounting plate on the trough frame unit hanger to be installed on the top of the tunnel by using expansion bolts;

[0022] S4: Installation of the connecting slot member: Move the connecting slot member so that one end of the connecting slot member is inserted into the end of the installed slot frame unit, and connect the installed slot frame unit and the connecting slot member by bolts and nuts;

[0023] S5: releasing the clamping of the main clamping part on the installed slot frame unit, and moving the main clamping part downward until the main clamping part is separated from the installed slot frame unit;

[0024] S6: displacement of the auxiliary installation mechanism of the bridge: moving the bracket along the track until the main clamping part on the bracket is located below the installation position of the next slot frame unit;

[0025] S7: Put the common section rack unit in place: clamp the rack unit to be installed by the main clamping part, then move the main clamping part upward until the rack unit to be installed is opposite to the connecting slot member; move the rack unit to be installed horizontally so that the end of the rack unit to be installed is inserted into the connecting slot member and abuts against the end of the installed rack unit; connect the rack unit to be installed and the connecting slot member by bolts and nuts;

[0026] S8: Installation of common section trough frame units: connect the trough frame units to be installed with the connecting trough parts by bolts and nuts; fix the mounting plate on the suspender rod of the trough frame units to be installed to the top of the tunnel by expansion bolts;

[0027] S9: Repeat S4-S8 until the installation of the remaining rack units is completed.

[0028] By adopting the above technical solution, after completing the installation of the trough frame unit, a connecting groove piece is installed at one end of the installed trough frame unit. When the next trough frame unit to be installed is subsequently installed, the connecting groove piece at the end of the installed trough frame unit can be used as a positioning basis for the trough frame unit to be installed. After the end of the unit to be installed is inserted into the connecting groove piece, the trough frame unit to be installed and the installed trough frame unit can be quickly and accurately connected, which is beneficial to reducing the difficulty of installation and connection of the trough frame unit.

[0029] Preferably, the main clamping part comprises a main support plate, the main support plate is arranged to move up and down, main clamping plates are arranged at opposite ends of the main support plate, and the main support plate is also provided with a main clamping driving member that drives the two main clamping plates to move relative to each other; a plurality of limiting rollers are arranged on opposite sides of the two main clamping plates for vertical rotation;

[0030] In steps S2 and S7, when the slot frame unit is clamped by the main clamping part, the slot frame unit is placed on the main support plate, and then the two main clamping plates are driven closer to each other by the main clamping driving member until the limiting rollers on the two main clamping plates abut against the two sides of the slot frame unit.

[0031] By adopting the above technical solution, after the slot frame unit is placed on the support plate, the main clamping driving member drives the limiting rollers of the two main clamping plates to abut against the opposite sides of the slot frame unit respectively, so as to achieve temporary limiting of the slot frame unit; through the setting of the limiting rollers, when the slot frame unit to be installed is subsequently moved horizontally, it is helpful to reduce the friction between the slot frame unit and the main clamping part, thereby facilitating a smoother insertion of the slot frame unit to be installed into the relative connecting slot member.

[0032] Preferably, the bracket is further provided with an auxiliary clamping portion, the auxiliary clamping portion is used to clamp the connecting slot; the auxiliary clamping portion is arranged opposite to the main clamping portion, and the auxiliary clamping portion is arranged to move up and down;

[0033] In step S6, the bracket is moved along the track so that the main clamping part is located below the installation position of the next slot frame unit and the auxiliary clamping part is located below the connecting slot member at the end of the installed slot frame unit; then the auxiliary clamping part is moved upward and the connecting slot member is clamped by the auxiliary clamping part;

[0034] In step S7, after the slot frame unit to be installed is inserted into the connecting slot member, the clamping of the connecting slot member by the auxiliary clamping part is released, and the auxiliary clamping part is moved downward until the auxiliary clamping part is separated from the connecting slot member.

[0035] By adopting the above technical solution, before the trough frame unit to be installed is inserted into the connecting trough member at the end of the installed trough frame unit, the connecting trough member is first clamped and fixed by the auxiliary clamping part, so as to reduce the situation where the hanger on the installed trough frame unit is subjected to force and deformed and damaged when the trough frame unit to be installed is subsequently inserted into the connecting trough member at the end of the installed trough frame unit.

[0036] In summary, the present application includes at least one of the following beneficial technical effects:

[0037] 1. A number of heat dissipation holes are opened at the bottom of the trough frame unit, and a number of support rods are set up in the trough frame. When laying cables in the trough frame later, the cables are laid on the support rods to make the cables cost the trough frame unit through the support rods, so that the heat generated by the subsequent cable operation can be better dissipated through the heat dissipation holes at the bottom of the trough frame unit.

[0038] 2. When installing the trough frame unit, the bottom of the auxiliary installation mechanism can be first slid on the track in the tunnel through the sliding part, and then the bracket can be moved along the track so that the main clamping part is located below the installation position of the trough frame unit. Then, after the trough frame unit to be installed is fixed on the main clamping part, the main clamping part is moved upward until the trough frame unit is located at the installation position. The main clamping part is used to temporarily fix the trough frame unit to be installed, so as to reduce the shaking of the trough frame unit when the fixing plate on the top of the peripheral hanger of the trough frame unit is fixed on the top of the tunnel, so as to facilitate the installation and fixation of the trough frame unit;

[0039] 3. By first installing a connecting groove part at the end of the installed groove frame unit, using the connecting groove part as the positioning reference for the next groove frame unit to be installed, and then inserting the groove frame unit to be installed into the connecting groove part, the groove frame unit to be installed and the installed groove frame unit can be quickly aligned with each other, which is conducive to reducing the difficulty of docking between adjacent groove frame units. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a structural schematic diagram used to illustrate the cable tray in an embodiment of the present application.

[0041] Figure 2 yes Figure 1 Enlarged schematic diagram of part A in the middle.

[0042] Figure 3 It is a schematic diagram of the structure of the connecting groove member used to illustrate the embodiment of the present application.

[0043] Figure 4 It is a structural schematic diagram used to illustrate the auxiliary installation mechanism in an embodiment of the present application.

[0044] Figure 5 It is a schematic diagram of the state when the embodiment of the present application is used to install the slot frame unit through the bridge frame auxiliary installation mechanism.

[0045] Figure 6 yes Figure 4 Enlarged schematic diagram of part B in the middle.

[0046] Figure 7 yes Figure 4 Enlarged schematic diagram of part C in the middle.

[0047] Figure 8 yes Figure 5 Enlarged schematic diagram of part D in the middle.

[0048] Description of reference numerals:

[0049] 1. Slot frame unit; 10. Heat dissipation hole; 11. Buckle cover; 12. Support rod; 13. Support pipe; 14. Hanger; 141. Transverse rod; 142. Hanger; 143. Mounting plate; 2. Connecting slot; 3. Bracket; 31. Pulley; 311. Annular limit groove; 32. Main clamping part; 320. Main lifting drive; 321. Main support plate; 322. Main clamping plate; 323. Main clamping drive; 324. Limiting roller; 33. Auxiliary clamping part; 330. Auxiliary lifting drive; 331. Auxiliary support plate; 332. Auxiliary clamping plate; 333. Auxiliary clamping drive; 34. Ladder; 35. Fence; 4. Tunnel; 41. Track. DETAILED DESCRIPTION

[0050] The following is combined with Figure 1-8 This application is described in further detail.

[0051] The embodiments of the present application disclose a modular cable tray, a tray auxiliary installation mechanism and a tray installation method.

[0052] A modular cable tray, referring to Figure 1 and Figure 2 , including a cable tray body, which is formed by splicing a plurality of trough frame units 1, each of which has a buckle cover 11 buckled on the top of the trough frame unit 1, and a plurality of heat dissipation holes 10 evenly opened on the bottom of the trough frame unit 1. A plurality of support rods 12 are also arranged in the trough frame unit 1, and the plurality of support rods 12 are evenly distributed along the length direction of the trough frame unit 1, and the two ends of the support rods 12 are respectively welded to the two opposite inner side walls of the trough frame unit 1.

[0053] By setting up a plurality of support rods 12, when laying cables in the cable bridge later, the cables will be overlapped on the plurality of support rods 12 in the trough frame unit 1, so as to utilize the plurality of support rods 12 to support the cables away from the bottom of the trough frame unit 1, so as to facilitate the heat generated by the cables to be better dissipated from the heat dissipation holes 10 at the bottom of the trough frame unit 1; at the same time, the plurality of support rods 12 can also form a supporting skeleton located in the trough frame unit 1, so as to enhance the overall strength of the trough frame unit 1 and reduce the deformation and damage of the trough frame unit 1.

[0054] The support rods 12 are all provided with support tubes 13, which are coaxially rotatably sleeved on the support rods 12, and the outer circumference of the support tubes 13 is also wrapped with a rubber layer. Through the above arrangement, when the cable is subsequently passed through and pulled into the trough frame unit 1, the friction between the cable and the support rods 12 can be reduced by the support tubes 13, so that the cable can be pulled and installed on the cable tray.

[0055] Two hangers 14 are provided on the trough frame unit 1, and the two hangers 14 are respectively located at the two ends of the trough frame unit 1. The trough frame unit 1 includes a transverse rod 141 provided on the outer wall of the bottom of the trough frame unit 1. The length direction of the transverse rod 141 is perpendicular to the length direction of the trough frame unit 1, and the two ends of the transverse rod 141 extend out of the opposite sides of the trough frame unit 1. The transverse rod 141 is fixed to the bottom of the trough frame single tube by fastening screws. Both ends of the transverse rod 141 are vertically upwardly provided with hangers 142, which are screws. The hangers 142 are threadedly penetrated on the transverse rod 141 to achieve adjustable length of the hangers 142. The hangers 142 are threadedly connected with two limit nuts; the two limit nuts are respectively abutted against the top and bottom sides of the transverse rod 141. The top of the hangers 142 is vertically connected with a mounting plate 143, and the mounting plate 143 is provided with a plurality of through holes for the expansion bolts to be inserted. By setting the hanger 14, after the trough frame unit 1 is moved into place, the position of the hanger 142 is adjusted to make the mounting plate 143 abut against the top of the tunnel 4, and then the mounting plate 143 is fixed to the top of the tunnel 4 by the expansion bolts, and the installation and fixation of the trough frame unit 1 can be completed. Compared with the traditional method of first installing the hanger 14 and then installing the trough frame unit 1, the construction steps are simplified and the overall construction efficiency is improved.

[0056] A rubber strip is bonded to the upper surface of the transverse rod 141 and the rubber strip is tightly set against the bottom of the trough frame unit 1. After the trough frame unit 1 is installed on the top of the tunnel 4 through the hanger 14, the rubber strip can be used to dampen the trough frame unit 1 and the hanger 14 to limit the displacement or deformation of the trough frame unit 1, so that the cables that need to be installed in the trough frame unit 1 are not easily damaged.

[0057] Reference Figure 1 and Figure 3The adjacent ends of the adjacent slot frame units 1 are each provided with a connecting slot member 2, and the adjacent ends of the adjacent connecting slot members 2 are respectively embedded in the two ends of the connecting slot members 2, and the two ends of the connecting slot members 2 are respectively connected to the ends of the adjacent slot frame units 1 through a plurality of bolts and nuts.

[0058] The present application also discloses a bridge auxiliary installation mechanism, which is applied to a modular cable bridge. Figure 1 and Figure 4 , including a bracket 3, a sliding part is provided at the bottom of the bracket 3, and the sliding part is used to slide with the internal track 41 of the tunnel 4. A main clamping part 32 and a secondary clamping part 33 are also provided at the top of the bracket 3, the main clamping part 32 is used to clamp the slot frame unit 1, and the secondary clamping part 33 is used to clamp the connecting slot member 2. The main clamping part 32 and the secondary clamping part 33 are arranged opposite to each other, and both the main clamping part 32 and the secondary clamping part 33 are arranged to move up and down.

[0059] Reference Figure 5 and Figure 6 The sliding part includes a plurality of pulleys 31 rotatably mounted at both ends of the bottom of the bracket 3. The rotation axis of the pulley 31 is horizontally arranged. The outer circumference of the pulley 31 is provided with an annular limiting groove 311 for the slide rail on the track 41 to be embedded. When the bracket 3 is subsequently installed, the pulleys 31 at both ends of the bottom of the bracket 3 are respectively embedded into the two slide rails of the track 41 inside the tunnel 4 through the annular limiting groove 311, so that the bracket 3 can slide along the track 41.

[0060] The main clamping part 32 includes a main support plate 321 and a main lifting drive member 320. The main lifting drive member 320 includes two main lifting cylinders vertically arranged on the top of the bracket 3; the main support plate 321 is located above the two main lifting cylinders, and the piston rods of the two main lifting cylinders are connected to the bottom of the main support plate 321, so that the main support plate 321 can be moved up and down.

[0061] The bottom end of the main lifting cylinder is fixed to the top of the bracket 3 through a connecting flange and bolts, so that the main clamping part can be detachably connected to the bracket 3, which is convenient for adjusting the position of the main clamping part 32.

[0062] Main clamping plates 322 are provided at opposite ends of the main support plate 321, and the main support plate 321 and the two main clamping plates 322 form a slot-shaped space for the slot frame unit 1 to be embedded. The main support plate 321 is also provided with a main clamping driving member 323 for driving the two main clamping plates 322 to move relative to each other. The main clamping driving member 323 includes two main clamping cylinders, which are respectively located on the sides of the two main clamping plates 322 that are away from each other, and the piston rod ends of the main clamping cylinders are connected to the opposite main clamping plates 322, so that the two main clamping plates 322 can be relatively moved. A plurality of limiting rollers 324 are rotatably installed on the opposite sides of the two main clamping plates 322, and the axial direction of the limiting rollers 324 is vertically arranged.

[0063] The auxiliary clamping part 33 includes an auxiliary support plate 331 and an auxiliary lifting drive member 330. Both the auxiliary support plate 331 and the lifting drive member are located at the top of the bracket 3, and the auxiliary support plate 331 is located above the auxiliary lifting drive member 330. The auxiliary lifting drive member 330 includes two auxiliary lifting oil cylinders vertically arranged at the top of the bracket 3; the bottom ends of the auxiliary lifting oil cylinders are fixed to the top of the bracket 3 through connecting flanges and bolts. The piston rods of the two auxiliary lifting oil cylinders are connected to the bottom of the auxiliary support plate 331, so that the auxiliary support plate 331 can be moved up and down.

[0064] Auxiliary clamping plates 332 are provided at both ends of the auxiliary support plate 331, and the auxiliary support plate 331 and the two auxiliary clamping plates 332 form a groove-shaped space for the connecting groove member 2 to be embedded. The auxiliary support plate 331 is also provided with an auxiliary clamping driving member 333 for driving the two auxiliary clamping plates 332 to move relative to each other. The auxiliary clamping driving member 333 includes two auxiliary clamping cylinders, which are respectively located on the sides of the two auxiliary clamping plates 332 that are away from each other, and the piston rod ends of the auxiliary clamping cylinders are both connected to the opposite auxiliary clamping plates 332, so that the two auxiliary clamping plates 332 can be relatively moved.

[0065] A ladder 34 is installed on the top of the support 3 to facilitate construction workers to travel back and forth between the top of the support 3 and the ground. A fence 35 is also arranged on the top of the support 3 to improve the safety performance of the top of the support 3.

[0066] The present application also discloses a bridge installation method, using the above bridge auxiliary installation mechanism, referring to Figure 5 , Figure 7 and Figure 8 , including the following steps:

[0067] S1: The bridge auxiliary installation mechanism is in place: the sliding part at the bottom of the bracket 3 is slidably connected to the track 41 in the tunnel 4; the bracket 3 is moved along the track 41 until the main clamping part 32 at the top of the bracket 3 is located below the installation position of the slot frame unit 1.

[0068] S2: The starting section rack unit 1 is in place: The specific steps are as follows:

[0069] S2.1: Clamp the rack unit 1 to be installed by the main clamping part 32: Place the rack unit 1 to be installed on the main support plate 321, and drive the two main clamping plates 322 to approach each other by the main clamping driving member 323 until the limiting rollers 324 on the opposite sides of the two main clamping plates 322 respectively abut against the opposite sides of the rack unit 1;

[0070] S2.2: The main clamping portion 32 is driven upward by the main lifting driving member 320 to move the rack unit 1 to be installed to the installation position;

[0071] S2.3: Rotate the two suspension rods 142 at both ends of the transverse rod 141 until the mounting plates 143 at the top ends of the suspension rods 142 abut against the top of the tunnel 4 .

[0072] S3: Installation of the initial section trough frame unit 1: Fix the mounting plate 143 on the suspension rod 142 of the trough frame unit 1 to be installed to the top of the tunnel 4 by means of expansion bolts.

[0073] S4: Installation of the connecting slot member 2: Move the connecting slot member 2 so that one end of the connecting slot member 2 is inserted into the end of the installed slot frame unit 1, and connect the installed slot frame unit 1 and the connecting slot member 2 by bolts and nuts.

[0074] S5: releasing the clamping of the main clamping part 32 on the installed rack unit 1, and moving the main clamping part 32 downward until the main clamping part 32 is separated from the installed rack unit 1; the specific steps are as follows:

[0075] S5.1: The two main clamping plates 322 are driven away from each other by the main clamping driving member 323 until the limiting rollers 324 on the main clamping plates 322 are separated from the slot frame unit 1;

[0076] S5.2: The main support plate 321 is driven downward by the lifting drive member until the two main clamping plates 322 are located at the bottom of the slot frame unit 1.

[0077] S6: Shifting of the bridge auxiliary installation mechanism: Move the bracket 3 along the track 41 until the main clamping part 32 on the bracket 3 is moved below the installation position of the next slot frame unit 1; and make the auxiliary clamping part 33 on the bracket 3 located below the connecting slot part 2 at the end of the installed slot frame unit 1.

[0078] S7: The common segment rack unit 1 is in place. The specific steps are as follows:

[0079] S7.1: Clamp the rack unit 1 to be installed by the main clamping part 32: Place the rack unit 1 to be installed on the main support plate 321, and drive the two main clamping plates 322 to approach each other by the main clamping driving member 323 until the limiting rollers 324 on the opposite sides of the two main clamping plates 322 respectively abut against the two sides of the rack unit 1;

[0080] S7.2: The main clamping part 32 is driven upward by the main lifting driving member 320 until the slot frame unit 1 to be installed on the main clamping part 32 is opposite to the connecting slot member 2 at the end of the installed slot frame unit 1;

[0081] S7.3: Temporary fixation of the connecting groove member 2: The auxiliary support plate 331 is driven upward by the auxiliary lifting driving member 330 until the auxiliary support plate 331 abuts against the bottom of the connecting groove member 2; then the two auxiliary clamping plates 332 are driven to approach each other by the auxiliary clamping driving member 333 until the two auxiliary clamping plates 332 abut against the two sides of the connecting groove member 2 respectively, and the connecting groove member 2 is clamped by the auxiliary clamping part 33 to achieve temporary limit fixation of the connecting groove member 2;

[0082] S7.4: Horizontally move the trough frame unit 1 to be installed so that the end of the trough frame unit 1 to be installed is inserted into the connecting trough member 2 and abuts against the end of the installed trough frame unit 1;

[0083] S7.5: The temporary fixation of the connecting groove member 2 is released: the two auxiliary clamping plates 332 are driven away from the connecting groove member 2 by the auxiliary clamping driving member 333, and the auxiliary supporting plate 331 is driven downward by the auxiliary lifting driving member 330 until the two auxiliary clamping parts 33 are located below the connecting groove member 2.

[0084] By first installing the connecting slot member 2 at the end of the installed slot frame unit 1, and then inserting the end of the slot frame unit 1 to be installed into the connecting slot member 2, and using the connecting slot member 2 as the positioning reference of the connecting slot member 2 to be installed, it is convenient to achieve rapid docking between the installed slot frame unit 1 and the slot frame unit 1 to be installed. By installing a plurality of limiting rollers 324 on the opposite sides of the two main clamping plates 322, it is convenient to reduce the friction between the slot frame unit 1 and the main clamping part 32 when the slot frame unit 1 to be installed is subsequently moved to be inserted into the connecting slot member 2.

[0085] S8: Installation of common segment rack unit 1, the specific steps are as follows:

[0086] S8.1: Connect the end of the trough frame unit 1 to be installed with the connecting trough member 2 by means of bolts and nuts;

[0087] S8.2: Rotate the suspension rods 142 at both ends of the bottom transverse rod 141 of the trough frame unit 1 to be installed until the mounting plates 143 at the top ends of the two suspension rods 142 abut against the top of the tunnel 4, and fix the mounting plates 143 to the top of the tunnel 4 by expansion bolts.

[0088] S9: Repeat S4-S8 until the installation of the remaining rack units 1 is completed.

[0089] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A bridge installation method, characterized in that: The bridge frame comprises a cable bridge frame body, which is formed by splicing a plurality of trough frame units (1), and the top of each trough frame unit (1) is buckled with a buckle cover (11); a plurality of heat dissipation holes (10) are opened at the bottom of each trough frame unit (1), and a plurality of support rods (12) are also arranged in each trough frame unit (1), and the two ends of each support rod (12) are respectively connected to the two opposite inner side walls of the trough frame unit (1), and a spacing is left between each support rod (12) and the bottom of each trough frame unit (1); connecting trough members (2) are arranged between adjacent trough frame units (1), and the adjacent ends of adjacent trough frame units (1) are embedded in the connecting trough members (2), and the two ends of each connecting trough member (2) are respectively connected to the adjacent ends of adjacent trough frame units (1) through a plurality of bolts and nuts; A plurality of hangers (14) are arranged on the trough frame unit (1), and the hangers (14) include a transverse rod (141) arranged at the bottom of the trough frame unit (1), both ends of the transverse rod (141) are vertically connected to hangers (142), and the top of the hanger (142) is vertically connected to a mounting plate (143); A bridge auxiliary installation mechanism applied to the bridge comprises a bracket (3), wherein a sliding portion is provided at the bottom of the bracket (3), and the sliding portion is used to slide with a track (41) in a tunnel (4); a main clamping portion (32) is also provided at the top of the bracket (3), and the main clamping portion (32) is used to clamp the trough frame unit (1), and the main clamping portion (32) is arranged to move up and down; The bridge installation method using the bridge auxiliary installation mechanism comprises the following steps: S1: The bridge auxiliary installation mechanism is in place: the bracket (3) is slidably connected to the track (41) in the tunnel (4) through the sliding part; the bracket (3) is moved along the track (41) until the main clamping part (32) on the bracket (3) is located below the installation position of the slot frame unit (1); S2: The starting section trough frame unit (1) is in place: the trough frame unit (1) to be installed is clamped by the main clamping part (32); then the main clamping part (32) is moved upward to move the trough frame unit (1) to be installed to the installation position; S3: Installation of the initial section trough frame unit (1): fixing the mounting plate (143) on the suspension rod (142) of the trough frame unit (1) to be installed to the top of the tunnel (4) by means of expansion bolts; S4: Installation of the connecting slot member (2): moving the connecting slot member (2) so that one end of the connecting slot member (2) is inserted into the end of the installed slot frame unit (1), and the installed slot frame unit (1) and the connecting slot member (2) are connected by bolts and nuts; S5: releasing the clamping of the main clamping part (32) on the installed slot frame unit (1), and moving the main clamping part (32) downward until the main clamping part (32) is separated from the installed slot frame unit (1); S6: displacement of the bridge auxiliary installation mechanism: moving the bracket (3) along the track (41) until the main clamping portion (32) on the bracket (3) is located below the installation position of the next slot frame unit (1); S7: Put the common section trough frame unit (1) in place: clamp the trough frame unit (1) to be installed by the main clamping part (32), then move the main clamping part (32) upward until the trough frame unit (1) to be installed is opposite to the connecting trough member (2); move the trough frame unit (1) to be installed horizontally so that the end of the trough frame unit (1) to be installed is inserted into the connecting trough member (2) and abuts against the end of the installed trough frame unit (1); connect the trough frame unit (1) to be installed and the connecting trough member (2) by bolts and nuts; S8: Installation of the common section trough frame unit (1): connecting the trough frame unit (1) to be installed and the connecting trough member (2) by means of bolts and nuts; fixing the mounting plate (143) on the suspension rod (142) of the trough frame unit (1) to be installed to the top of the tunnel (4) by means of expansion bolts; S9: Repeat S4-S8 until the installation of the remaining rack units (1) is completed; The bracket (3) is also provided with an auxiliary clamping portion (33), and the auxiliary clamping portion (33) is used to clamp the connecting groove member (2); the auxiliary clamping portion (33) is arranged opposite to the main clamping portion (32), and the auxiliary clamping portion (33) is arranged to move up and down; In step S6, the bracket (3) is moved along the track (41) so that the main clamping portion (32) is located below the installation position of the next slot frame unit (1) and the auxiliary clamping portion (33) is located below the connecting slot member (2) at the end of the installed slot frame unit (1); then the auxiliary clamping portion (33) is moved upward and the connecting slot member (2) is clamped by the auxiliary clamping portion (33); In step S7, after the slot frame unit (1) to be installed is inserted into the connecting slot member (2), the clamping of the connecting slot member (2) by the auxiliary clamping portion (33) is released, and the auxiliary clamping portion (33) is moved downward until the auxiliary clamping portion (33) is separated from the connecting slot member (2).

2. A bridge installation method according to claim 1, characterized in that: A support tube (13) is also coaxially rotatably sleeved on the support rod (12).

3. A bridge installation method according to claim 2, characterized in that: A rubber strip is also provided between the transverse rod (141) and the slot frame unit (1), and the top and bottom sides of the rubber strip are respectively in contact with the slot frame unit (1) and the support rod (12).

4. A bridge installation method according to claim 1, characterized in that: The main clamping part (32) comprises a main support plate (321), the main support plate (321) is arranged to move up and down, main clamping plates (322) are arranged at opposite ends of the main support plate (321), and the main support plate (321) is also provided with a main clamping driving member (323) for driving the two main clamping plates (322) to move relative to each other; a plurality of limiting rollers (324) are arranged on opposite sides of the two main clamping plates (322) for vertical rotation; In steps S2 and S7, when the slot frame unit (1) is clamped by the main clamping part (32), the slot frame unit (1) is placed on the main support plate (321), and then the two main clamping plates (322) are driven to approach each other by the main clamping driving member (323) until the limiting rollers (324) on the two main clamping plates (322) abut against the two sides of the slot frame unit (1).

Citation Information

Patent Citations

  • Cable erection bridge structure for electromechanical engineering

    CN116345370A

  • Supporting device for cable bridge

    CN219960011U