Externally-hung concrete arch bar of simply supported girder bridge, deck type arch bridge and construction method of deck type arch bridge
By adding arc-shaped arch plates and pier cover beams to the simply supported beam bridge, combined with the design of the cover plates, the problem of being unable to build an arch bridge is solved, the traffic function and the aesthetic effect are both taken into consideration, material consumption and cost are reduced, and the cost is improved. It is safe and economical and suitable for old city renovation and low-carbon and environmentally friendly construction.
Patent Information
- Application Number
- CN202411057854.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-15
AI Technical Summary
In the case where arch bridges cannot be built on some urban trunk road traffic bridges, how to satisfy the traffic function of the bridge and take into account the aesthetic effect, especially the reconstruction of simply supported beam bridges in park scenic areas or historical and cultural city planning areas.
By adding arc-shaped arch plates below the bridge deck on both sides of the simply supported beam bridge, a top-supporting arch bridge shape is formed. Combined with the design of the pier cover beam and cover plate, the external concrete arch plate of the simply supported beam bridge and the top-supporting arch bridge are realized. Construction methods ensure traffic functions and aesthetic effects.
On the basis of ensuring the traffic function, the simple-supported beam bridge transformation can achieve the appearance effect of the arch bridge, which reduces the cost and material consumption, improves the safety and economic benefits, and avoids the safety hazards of large-volume formwork support. It is suitable for old buildings. Urban transformation and low-carbon environmental protection construction.
Smart Images

Figure CN118774013A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridges, and in particular relates to a simply supported beam bridge with an externally mounted concrete arch plate, an upper-bearing arch bridge and a construction method thereof. Background Art
[0002] At present, some of the city's main road traffic bridges are plane curved bridges with three-span simply supported beams. Some are located in park scenic areas and historical and cultural city planning areas. Due to the influence of the terrain elevation of the surrounding old cities, it is impossible to build arch bridges, so they can only take the form of simply supported bridges.
[0003] Therefore, a simply supported beam bridge with an external concrete arch plate, an upper-bearing arch bridge and a construction method thereof are needed to meet the traffic function of the bridge and take into account the aesthetic effect. Summary of the invention
[0004] The purpose of the present invention is to provide a simply supported beam bridge with an external concrete arch plate, an upper supported arch bridge and a construction method thereof, wherein the upper supported arch bridge shape is realized by adding arc-shaped arch plates below the bridge deck on both sides of the simply supported beam bridge, thereby satisfying the traffic function of the bridge and taking into account the aesthetic effect.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] In a first aspect, the present invention provides an external concrete arch slab of a simply supported beam bridge, comprising an arch slab body, wherein the arch slab body is configured as a rectangular concrete slab, and the bottom edge of the arch slab body is configured as an arc-shaped edge bent upward; the arch slab body is configured as an arc-shaped plate bent toward one side.
[0007] The simply supported beam bridge of the present invention has an external concrete arch plate, wherein the bottom edge of the arch plate body is bent upward into an arc shape, so as to form an arch bridge shape; the arch plate body is bent toward one side, so as to realize an upper-bearing arch bridge shape and meet the traffic function of the bridge.
[0008] Preferably, a decorative layer is provided on one side wall of the arch plate body.
[0009] Preferably, a laterally protruding step is provided at the bottom end of a side wall of one side of the arch plate body, the decorative layer is provided above the step, and the bottom surface of the decorative layer is in contact with the top surface of the step.
[0010] A second aspect of the present invention provides an arch bridge, comprising an external concrete arch plate of a simply supported beam bridge, a pier cap beam and a cover plate as described in the first aspect of the present invention, wherein the arch plate body is respectively arranged on the end surfaces at both ends of the pier cap beam; the cover plate is laid on the pier cap beam, and the two ends of the cover plate are respectively extended and laid on the arch plate body.
[0011] The top-supported arch bridge of the present invention has the external concrete arch plates of the simply supported beam bridge provided by the first aspect of the present invention externally connected to both ends of the pier cap beam, and the cap plates are laid on the pier cap beam and the arch plate body, so as to form a top-supported arch bridge, ensure the strength quality of the simply supported beam bridge, and improve construction efficiency.
[0012] Preferably, a mounting groove is provided on the top surface of the pier cap beam, and a mounting protrusion is provided on the bottom surface of the cover plate, and the mounting protrusion is arranged in the mounting groove.
[0013] Preferably, vertical gaps are respectively provided between the two ends of the top surface of the pier cap beam and the two ends of the bottom surface of the cover plate, and stoppers are respectively provided at the two ends of the top surface of the pier cap beam, and the stoppers are respectively in contact with the arch plate body.
[0014] Preferably, two ends of the cover plate extend and protrude to the outside of the arch plate body respectively, and a cavity is provided inside the cover plate.
[0015] Preferably, the number of the pier cap beams is at least two, and the plurality of the pier cap beams are evenly spaced; the number of the cover plates is at least two, and the plurality of the cover plates are spliced in sequence.
[0016] A third aspect of the present invention provides a construction method for a deck arch bridge, characterized in that it comprises the following steps:
[0017] Construction of pre-embedded reinforcement for arch slab: pre-embed the horizontal distribution reinforcement in the arch slab body and the cap beam connecting reinforcement in the pier cap beam into the cap beam reinforcement skeleton of the pier cap beam;
[0018] Casting and curing of bridge pier cap beams: casting and curing of concrete for the bridge pier cap beams;
[0019] Erection of arch slab formwork support: erection of the arch slab formwork of the simply supported beam bridge external concrete arch slab, and binding and connecting the horizontal distribution reinforcement and the cap beam connecting steel bar, setting a formwork support for the arch slab formwork, and setting an arch frame top support at the bottom of the formwork support for the arch slab formwork;
[0020] Arch plate positioning: Lofting is carried out according to the curvature of the bridge;
[0021] Installation of the arch plate bottom mold: bending the arch plate bottom mold according to the curvature of the bottom edge of the arch plate body, and fixing the arch plate bottom mold in the arch frame top support;
[0022] Arch plate reinforcement binding: the horizontal distribution reinforcement is bound with the vertical stirrups to form an arch plate reinforcement skeleton, and a concrete protective layer pad is placed on the horizontal distribution reinforcement;
[0023] Installation of the arch plate side formwork: bending the arch plate side formwork according to the curvature of the side edge of the arch plate body, and fixing the arch plate side formwork on the formwork support of the arch plate formwork;
[0024] Arch slab concrete pouring: pouring concrete for the arch slab body to connect the arch slab body with the pier cap beam;
[0025] Arch plate formwork removal and maintenance: when the concrete strength of the arch plate body reaches or exceeds the preset strength value, the arch plate formwork is removed and the arch plate body is maintained;
[0026] Cover plate hoisting: hoist the cover plate onto the pier cap beam.
[0027] The construction method of the top-supported arch bridge provided by the present invention can achieve an appearance of the arch bridge that is better compatible with the surrounding landscape when the building space is limited and the arch bridge cannot be built, while avoiding the safety hazards caused by the large-scale formwork support scaffolding in the prior art.
[0028] Preferably, before the steps of casting and curing the bridge pier cap beam, the following steps are performed:
[0029] Setting up the pier cap beam formwork: setting up the pier cap beam formwork of the pier cap beam;
[0030] After the steps of pouring and curing the bridge pier cap beam and before the step of erecting the arch slab formwork support, the following steps are performed:
[0031] De-moulding of bridge pier cap beam: removing the bridge pier cap beam formwork;
[0032] Roughening the connection between the arch plate and the cap beam: roughening the end surfaces of both ends of the pier cap beam, and removing the floating slurry and carbonized surface concrete on the end surfaces of both ends of the pier cap beam;
[0033] In the step of installing the arch plate bottom mold, the arch plate bottom mold is set as an installation structure in which an arch frame, an arc-shaped steel pipe main beam, a small square wood beam and a bottom mold are combined and connected; the arc-shaped steel pipe main beam is bent according to the curvature of the bottom edge of the arch plate body, and the bottom mold is fixed in the arch frame top support;
[0034] In the step of installing the arch panel side form, the arch panel side form is set as an installation structure in which the side form, wooden beams, vertical steel pipes and horizontal steel pipes are combined and connected by tension bolts; the vertical steel pipes are bent according to the curvature of the side of the arch panel body.
[0035] The simply supported beam bridge externally mounted concrete arch plate, the top-bearing arch bridge and the construction method thereof provided by the present invention have the following beneficial effects:
[0036] 1. The simply supported beam bridge external concrete arch plate of the present invention has a bottom edge of the arch plate body arranged as a curved arch, and the arch plate body arranged as an arc-shaped plate, which is conducive to achieving the appearance effect of an upper-bearing arch bridge on the basis of ensuring the realization of the traffic function, and is convenient for construction and conducive to shortening the construction period.
[0037] 2. The top-supported arch bridge of the present invention adopts the external concrete arch plate of the simply supported beam bridge provided by the present invention, and is implemented through the construction method of the top-supported arch bridge provided by the present invention, which can improve the simply supported beam bridge in the prior art and achieve the effect of an arch bridge in appearance while being essentially a simply supported beam bridge. The construction cost can be reduced, the safety can be improved, the traffic function and aesthetic requirements can be met, and a technical reference can be provided for the construction of new bridges or the landscape renovation of old bridges.
[0038] 3. The construction method of the top-supported arch bridge provided by the present invention provides a solution to the technical problem in the prior art that it is impossible to build a tall arch bridge in the old city renovation due to the need to preserve historical buildings, while avoiding the safety hazards caused by the large-scale formwork support scaffolding in the prior art.
[0039] 4. The construction method of the top-supported arch bridge provided by the present invention can achieve the appearance of the arch bridge being better compatible with the surrounding landscape when the building space is limited and the arch bridge cannot be built.
[0040] 5. Compared with the arch bridge construction scheme of the prior art, the construction method of the top-supported arch bridge provided by the present invention can reduce the scale and volume of the bridge, reduce the consumption of bridge steel bars, concrete and other construction materials, and reduce the consumption of bridge construction materials by about 50%, and reduce the use of brackets, formwork, etc. by about 80%, thereby saving construction materials, realizing low-carbon and environmentally friendly construction, and reducing project costs, so as to significantly improve economic benefits while achieving the same traffic function and aesthetic effect as an arch bridge.
[0041] 6. The construction method of the top-supported arch bridge provided by the present invention can realize the synchronous construction of the upper structure and the lower structure of the prefabricated box girder bridge. Compared with the cast-in-place arch bridge in the prior art, it can greatly shorten the total construction period, open traffic in advance, and significantly improve social benefits.
[0042] 7. The construction method of the top-supported arch bridge provided by the present invention can carry out formwork support construction only during the arch plate construction, thereby reducing support construction and reducing the scope of soft foundation treatment, thereby avoiding the influence of factors such as poor geology of the bridge site and low bearing capacity of the foundation on the traditional arch bridge support cast-in-place, effectively reducing the probability of safety accidents and improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1It is a schematic diagram of an externally mounted concrete arch slab of a simply supported beam bridge provided by an embodiment of the present invention.
[0044] Figure 2 It is a simplified structural diagram of a top-supported arch bridge provided by one embodiment of the present invention.
[0045] Figure 3 It is a schematic diagram of the cross-sectional structure of a top-supported arch bridge provided in one embodiment of the present invention.
[0046] Figure 4 It is a flow chart of a construction method of a top-supported arch bridge provided by one embodiment of the present invention.
[0047] Figure 5 It is a schematic diagram of the arch plate side mold structure provided by one embodiment of the present invention.
[0048] Figure 6 It is a planar positioning diagram of an arch plate in a construction method of a top-supported arch bridge provided by an embodiment of the present invention.
[0049] Figure 7 It is a layout drawing of a bridge arch plate in a construction method of a top-supported arch bridge provided by an embodiment of the present invention.
[0050] Reference numerals in the figures:
[0051] 1 is the arch plate body, 110 is the decorative layer, 120 is the step, 130 is the cement mortar, 2 is the pier cap beam, 210 is the installation groove, 3 is the cover plate, 310 is the installation protrusion, 320 is the gap, 321 is the block, 330 is the cavity, 340 is the oil felt, 350 is the coating layer, 360 is the central axis of the pile foundation, 410 is the side form, 420 is the wooden beam, 430 is the vertical steel pipe, 440 is the horizontal steel pipe, and 450 is the tension bolt. DETAILED DESCRIPTION
[0052] The present invention is further described in detail below through the accompanying drawings and specific embodiments.
[0053] Example
[0054] Please refer to Figure 1 and Figure 3 In a first aspect, the present embodiment provides a simply supported beam bridge external concrete arch plate, comprising an arch plate body 1, wherein the arch plate body 1 is configured as a rectangular concrete plate, and the bottom edge of the arch plate body 1 is configured as an arc-shaped edge that bends upward; the arch plate body 1 is configured as an arc-shaped plate that bends toward one side.
[0055] The simply supported beam bridge of this embodiment has an external concrete arch slab, and the bottom edge of the arch slab body 1 is arranged as an arc-shaped edge that bends upward, so as to form an arch bridge shape; the arch slab body 1 is arranged as an arc-shaped plate that bends toward one side, so as to realize the top-supported arch bridge shape and meet the traffic function of the bridge.
[0056] like Figure 1 and Figure 3 As shown, in some embodiments, a decorative layer 110 is provided on a side wall of the arch plate body 1 to improve the aesthetic effect.
[0057] Specifically, the inner wall of the decorative layer 110 is bonded to the outer wall of the arch plate body 1. The inner side refers to the side close to the center line of the deck arch bridge, and the outer side refers to the side away from the center line of the deck arch bridge.
[0058] like Figure 1 As shown, the shape of the overall structure of the decorative layer 110 is consistent with the arch plate body 1. For example, the overall decorative layer 110 is also configured as a rectangular plate, the overall bottom edge of the decorative layer 110 is configured as an arc edge that bends upward; the overall decorative layer 110 is configured as an arc plate that bends toward one side.
[0059] The decoration layer 110 may be provided as an integrated structure, or may be provided as a structure formed by sequentially splicing a plurality of decoration layers 110 .
[0060] like Figures 1 to 3 As shown, in some embodiments, a laterally protruding step 120 is provided at the bottom end of the side wall of one side of the arch plate body 1, and the decorative layer 110 is provided above the step 120, and the bottom surface of the decorative layer 110 is in contact with the top surface of the step 120. The decorative layer 110 is supported by the step 120, which facilitates the setting of the decorative layer 110 on the side wall of one side of the arch plate body 1 and prevents the decorative layer 110 from falling.
[0061] Specifically, a laterally protruding step 120 is provided at the bottom end of the outer side wall of the arch plate body 1. The top and bottom surfaces of the step 120 are both configured as upwardly protruding arc surfaces, and the curvatures of the top and bottom surfaces of the step 120 are the same as the curvature of the bottom edge of the arch plate body 1. The cross section of the step 120 can be configured as a rectangle. The step 120 can be configured as an integral structure with the arch plate body 1.
[0062] like Figure 1 and Figure 3 As shown, the bottom surface of the decoration layer 110 can be connected to the top surface of the step 120, for example, the bottom surface of the decoration layer 110 can be glued to the top surface of the step 120. The outer side wall of the decoration layer 110 and the outer side wall of the step 120 can be flush in the same vertical plane.
[0063] like Figure 3 As shown, cement mortar 130 may be provided between the decorative layer 110 and the arch plate body 1. The decorative layer 110 is made of granite.
[0064] Please refer to Figure 2 and Figure 3The second aspect of this embodiment provides an upper-supported arch bridge, including a simply supported beam bridge external concrete arch plate, a pier cap beam 2 and a cover plate 3 as provided in the first aspect of this embodiment, an arch plate body 1 is respectively arranged on the end faces of both ends of the pier cap beam 2; the cover plate 3 is laid on the pier cap beam 2, and the two ends of the cover plate 3 are respectively extended and laid on the arch plate body 1.
[0065] The top-supported arch bridge of the present embodiment can be formed by externally connecting the external concrete arch plates of the simply supported beam bridge provided in the first aspect of the present embodiment to the end faces of the pier cap beam 2 at both ends, and laying the cover plate 3 on the pier cap beam 2 and the arch plate body 1, thereby ensuring the strength quality of the simply supported beam bridge and improving the construction efficiency.
[0066] Specifically, the bridge pier cap beam 2 is configured as a transverse rectangular beam. The cover plate 3 is configured as a transverse rectangular plate. The outer side wall of the cover plate 3 and the outer side wall of the arch plate body 1 can be flush in the same vertical plane. When a decorative layer 110 is provided on the outer side wall of the arch plate body 1, and when a raised step 120 is provided at the bottom end of the arch plate body 1, the outer side wall of the cover plate 3 and the outer side wall of the decorative layer 110 and the outer side wall of the step 120 can be flush in the same vertical plane.
[0067] like Figure 3 As shown, in some embodiments, the top surface of the pier cap beam 2 is provided with a mounting groove 210, and the bottom surface of the cover plate 3 is provided with a mounting protrusion 310, and the mounting protrusion 310 is arranged in the mounting groove 210; thereby facilitating the cover plate 3 to be stably covered on the pier cap beam 2.
[0068] Specifically, the cross sections of the mounting groove 210 and the mounting protrusion 310 are both set to be inverted trapezoids, for example, the cross sections of the mounting groove 210 and the mounting protrusion 310 are both set to be inverted isosceles trapezoids. The mounting groove 210 can be set in the middle of the top surface of the pier cap beam 2. The mounting groove 210 can be set in the middle of the bottom surface of the cover plate 3.
[0069] In some embodiments, vertical gaps 320 are respectively provided between the two ends of the top surface of the pier cap beam 2 and the two ends of the bottom surface of the cover plate 3, and blocks 321 are respectively provided at the two ends of the top surface of the pier cap beam 2, and the blocks 321 are respectively in contact with the arch plate body 1; thereby, the block 321 can improve the firmness and deformation resistance of the connection structure between the pier cap beam 2 and the arch plate body 1.
[0070] Specifically, the stopper 321 is configured as a rectangular block, the bottom surface of the stopper 321 is connected to the top surface of the pier cap beam 2 , and the outer side wall of the stopper 321 is connected to the inner side wall of the arch plate body 1 .
[0071] In some embodiments, both ends of the cover plate 3 extend and protrude to the outside of the arch plate body 1, and a cavity 330 is provided inside the cover plate 3; thereby reducing the weight of the cover plate 3 while ensuring the strength of the cover plate 3, thereby reducing the weight of the upper-supported arch bridge itself.
[0072] Specifically, gaps are provided between the bottom surfaces at both ends of the cover plate 3 and the top surfaces of the arch plate body 1 at both sides, and oil felt 340 may be provided in the gaps.
[0073] The cavity 330 is arranged in a rectangular shape. The cover plate 3 is a hollow plate beam, such as a box beam.
[0074] The end surfaces of the cover plate 3 and / or the end surfaces of the pier cap beam 2 are provided with a coating layer 350 at positions other than the arch plate for decorative purposes. The coating layer 350 can be made by painting.
[0075] like Figure 2 As shown, in some embodiments, at least two pier cap beams 2 are provided, and the multiple pier cap beams 2 are evenly spaced; at least two cover plates 3 are provided, and the multiple cover plates 3 are spliced in sequence, which is conducive to forming a bridge bearing foundation through the multiple pier cap beams 2, and the bridge bearing surface is formed by splicing and laying the multiple cover plates 3 in sequence on the multiple pier cap beams 2.
[0076] like Figure 4 As shown, the third aspect of this embodiment provides a construction method of a deck arch bridge, which is used to implement the deck arch bridge provided by the second aspect of this embodiment, and includes the following steps:
[0077] Construction of pre-embedded reinforcement of arch slab: embed the horizontal distribution reinforcement in the arch slab body 1 and the cap beam connecting reinforcement in the pier cap beam 2 into the cap beam reinforcement skeleton of the pier cap beam 2;
[0078] Pier cap beam pouring and maintenance: pouring and maintaining the concrete of the pier cap beam 2;
[0079] Erection of arch slab formwork support: Erection of arch slab formwork for external concrete arch slab of simply supported beam bridge, and binding connection of horizontal distribution reinforcement and cap beam connecting reinforcement, setting formwork support for arch slab formwork, and setting arch frame top support at the bottom of formwork support for arch slab formwork;
[0080] Arch plate positioning: Lofting is carried out according to the curvature of the bridge;
[0081] Installation of the arch plate bottom mold: bending the arch plate bottom mold according to the curvature of the bottom edge of the arch plate body 1, and fixing the arch plate bottom mold in the arch frame top support;
[0082] Arch slab reinforcement binding: Bind the horizontal distribution reinforcement with the vertical stirrups to form the arch slab reinforcement skeleton, and place concrete protective layer pads on the horizontal distribution reinforcement;
[0083] Installation of the arch plate side formwork: bending the arch plate side formwork according to the curvature of the side edge of the arch plate body 1, and fixing the arch plate side formwork on the formwork support of the arch plate formwork;
[0084] Arch slab concrete pouring: pouring concrete of the arch slab body 1 to connect the arch slab body 1 with the bridge pier cap beam 2;
[0085] Arch plate formwork removal and curing: when the concrete strength of the arch plate body 1 reaches or exceeds the preset strength value, the arch plate formwork is removed and the arch plate body 1 is cured;
[0086] Cover plate hoisting: hoist the cover plate 3 onto the pier cap beam 2.
[0087] In some embodiments, before the steps of casting and curing the bridge pier cap beam are performed, the following steps are performed:
[0088] Erection of bridge pier cap beam formwork: erection of bridge pier cap beam formwork of bridge pier cap beam 2;
[0089] After the steps of pouring and curing the bridge pier cap beam and before the step of erecting the arch slab formwork support, the following steps are performed:
[0090] Dismantling of bridge pier cap beam formwork: dismantling of bridge pier cap beam formwork;
[0091] Roughening the connection between the arch plate and the cap beam: roughening the end faces of the pier cap beam 2 at both ends, and removing the floating slurry and carbonized surface concrete on the end faces of the pier cap beam 2 at both ends;
[0092] In the step of installing the bottom formwork of the arch plate, the bottom formwork of the arch plate is set as an installation structure in which the arch frame, the arc-shaped steel pipe main beam, the small square wood beam and the bottom formwork are combined and connected; the arc-shaped steel pipe main beam is bent according to the curvature of the bottom edge of the arch plate body 1, and the bottom formwork is fixed in the top support of the arch frame;
[0093] like Figure 5 As shown, in the step of installing the side form of the arch plate, the side form of the arch plate is set as an installation structure in which the side form 410, the wooden beam 420, the vertical steel pipe 430 and the horizontal steel pipe 440 are combined and connected by the tension bolts 450; the vertical steel pipe 430 is bent according to the curvature of the side of the arch plate body 1. The construction method of the top-bearing arch bridge of this embodiment may include the following steps: when tying the cap beam reinforcement, the arch plate and the cap beam connecting reinforcement are simultaneously pre-embedded into the cap beam reinforcement skeleton, the cap beam is cast and maintained, the cap beam is demolded, the connection between the arch plate and the bridge pier cap beam 2 is roughened, the arch plate template support is set up, the arch plate is positioned, the arch plate bottom formwork is constructed, the arch plate reinforcement is tied, the arch plate side formwork is installed, the arch plate concrete is cast, the arch plate concrete is demolded and maintained, the cap plate is hoisted, and the arch plate is paved with granite decoration.
[0094] During construction, the bridge pier cap beam 2 is first cast. Before casting the bridge pier cap beam 2, the arc-shaped arch slab horizontal force-bearing reinforcement is pre-embedded in the bridge pier cap beam 2 in advance to form an effective anchoring connection with the reinforcement system of the bridge pier cap beam 2. After the strength of the bridge pier cap beam 2 reaches the design requirements, the arch slab formwork and reinforcement binding are alternately constructed by the bracket cast-in-place method; the arch slab formwork and reinforcement construction must be precisely laid out in strict accordance with the curvature of the designed circular curve. After the hidden acceptance of the reinforcement project is passed, the arch slab concrete is cast to connect the arch slab with the bridge pier cap beam 2 as a whole. The bottom elevation of the arch slab in each span is consistent with the bottom elevation of the cover slab 3, ensuring that the arch slabs on both sides of the bridge form a visual barrier to the cover slab 3, achieving the appearance of an arch bridge. Then complete the installation of the bearings and the hoisting of the prefabricated hollow slab beams to realize the traffic function and arch bridge shape.
[0095] The construction method of the deck arch bridge of this embodiment may specifically include the following steps:
[0096] Construction of pre-embedded reinforcement for arch slab: The full-length arch slab is only connected to the bridge pier cap beam 2, which bears the gravity load of the arch slab. When constructing the reinforcement for the bridge pier cap beam 2, the anchoring reinforcement is pre-embedded on the connection interface between the arch slab and the bridge pier cap beam 2 according to the design drawings, and the anchoring length of the anchoring reinforcement is strictly controlled to ensure good force.
[0097] Among them, the usual arch slab refers to the arch slabs on both sides of the bridge that are arranged as a full-length structure along the longitudinal direction of the bridge, that is, a seamless whole concrete slab.
[0098] Casting and maintenance of pier cap beams: Since the arch bridge in this embodiment is a flat curved bridge and the piers are arranged radially, the pier cap beams 2 are also arranged radially. Before the construction of the pier cap beams 2, the plane positions of the two ends of the pier cap beams 2 are precisely controlled, and the full transverse length of the pier cap beams 2 reserves the thickness of the arch plates on both sides to avoid the pier cap beams 2 occupying the thickness space of the arch plates on both sides after casting, resulting in a reduction in the thickness of the arch plates.
[0099] The total length of a single pier cap beam 2 is 29.6m, and the height and width of the cross-section dimensions are both over 1m. According to the "Standard for Construction of Large Volume Concrete" (GB50496-2018), the construction of pier cap beam 2 should be carried out in accordance with large volume concrete construction. If necessary, large volume concrete can require the concrete mixing station to add expansion fiber anti-cracking waterproofing agent to improve the crack resistance of concrete. In order to prevent the large temperature difference between the inside and outside of the cap beam caused by hydration heat, the temperature difference is controlled within 25°C during construction by adopting the method of cooling with internal metal condensation pipes and external covering insulation to prevent temperature cracks caused by excessive temperature difference between the inside and outside. After the demolding of the pier cap beam 2, it can be continuously insulated and moisturized for fourteen days to prevent harmful cracks.
[0100] Arch slab formwork support erection: The maximum height of the arch slab can be 236cm, the minimum mid-span height can be 64cm, the thickness can be 15cm, and the support cast-in-place method can be used. Before the arch slab formwork support is erected, the foundation treatment and ground hardening can be carried out first, and a 10cm thick C15 concrete cushion can be used to ensure that the foundation bearing capacity reaches more than 120Kpa. The width of the arch slab formwork support is at least 50cm wider than the width of the arch slab to facilitate formwork support; continuous scissors braces are set on the longitudinal facade of the arch slab formwork support, and a diagonal brace is set every five spans to ensure the strength, rigidity and stability of the arch slab formwork support.
[0101] Arch plate positioning: including,
[0102] Accurately stake out and check the plane position and elevation of the arch plate: Figure 6 As shown, according to the bridge plane curve position diagram, the pile foundation coordinates and the position positioning of the pier cap beam 2, the arc-shaped arch plate can be set out in an arc shape, and the four pier cap beams 2 are connected into three broken lines, such as Figure 7 As shown, the length L extended outward from the center point of each broken line segment, for example, the length L extended outward from the center point of each broken line segment of the arch plate on the inner side of the bending direction of the bridge is 5.0 cm, and the length L extended outward from the center point of the arch plate on the outer side is 5.5 cm. The position is taken as the center point of the arc.
[0103] Treatment of construction joints at the junction of the pier cap beam and the arch slab: There is a construction joint at the junction of the pier cap beam 2 and the arch slab. The pier cap beam 2 is the direct load-bearing component of the arch slab, and the quality of the concrete bonding between the two construction joints is very critical. Before tying the steel bars of the arch slab, the two end surfaces of the pier cap beam 2 should be roughened in advance. When roughening, attention should be paid to the roughening quality, and the surface slurry, loose and uncompacted, and carbonized surface concrete should be removed, so that the fresh concrete surface of the pier cap beam 2 can be leaked after roughening. The roughening interface should be vertical, and no inclined surfaces or tooth joints should appear. Excessive roughening should not cause structural damage to the cap beam. After roughening, rinse with clean water, and immediately carry out the arch slab bottom plate, side formwork and steel bar tying operations.
[0104] Construction of arch bottom formwork: The arch bottom formwork adopts the installation method of arch frame + arc steel pipe main beam + square wood small beam + bottom formwork. The diameter of the steel pipe main beam can be set to Φ48mm, and the steel pipe main beam is bent into an arc shape in advance according to the curvature of the longitudinal vertical curve of the arch plate, and fixed in the top support of the arch frame; the side length × length of the square wood small beam can be 80×100mm, and multiple square wood small beams are set at intervals of 10cm and arranged perpendicular to the steel pipe main beam. The surface of the arch bottom formwork is flat, and the installation is as tight as possible to prevent the concrete pouring from leaking and producing honeycomb surface.
[0105] Arch plate reinforcement binding: When a laterally protruding step 120 is provided at the bottom end of one side wall of the arch plate body 1, the arch plate cross-section is L-shaped, and the reinforcement can be tied in the order of first the protruding part of the bottom step 120 and then the upper part. The steel bar skeleton is arranged in a flat and long structure, and its longitudinal length along the bridge is 47.96m. Since the steel bar skeleton is relatively flexible and easy to become unstable, and because the steel bar skeleton itself has its own curvature, it is preferred to adopt auxiliary reinforcement measures such as setting reinforcing ribs during construction to ensure the overall rigidity and stability of the steel bar skeleton, so as to avoid distortion and deformation due to vibration and other reasons during the pouring process, which affects the thickness of the concrete protective layer. Before pouring concrete, the installed steel bars should be inspected for hidden works, and after passing the inspection, the subsequent closed side formwork and concrete pouring construction can be carried out.
[0106] Arch side form installation: Figure 5 As shown, since the arch plate is a long and curved flat member, the installation of the arch plate side formwork must be accurately positioned according to the circular curvature, including the plane position and elevation, and must be firm and reliable. The formwork reinforcement of the arch plate side formwork adopts the method of side formwork 410 + wooden beam 420 + vertical steel pipe 430 + horizontal steel pipe 440 and tension bolt 450. The diameter of the horizontal steel pipe 440 can be set to Φ48mm, and the horizontal steel pipe 440 is bent in advance according to the circular curvature of the arch plate in the steel bar processing shed, and then the horizontal steel pipe 440 is set every 40cm from bottom to top along the arch plate side formwork; the diameter of the tension bolt 450 can be set to Φ14mm, and the vertical steel pipe 430 and the tension bolt 450 are set every 50cm along the width direction of the arch plate. A diagonal brace is set every two spans on both sides of the arch plate side formwork, and the diagonal brace is fastened to the formwork bracket of the arch plate side formwork through fasteners to ensure the stability of the arch plate side formwork. The side form 410 may be made of bamboo plywood.
[0107] Arch slab concrete pouring: Arch slab concrete can be poured in one go. The pouring sequence is from the arch foot to the arch top, from low to high, and from the middle span to the side span symmetrically. Before pouring, rinse the roughened surface of the pier cap beam 2 with clean water, and use cement paste (1:1.8~1:2.0) with the same ratio as the concrete to spread the interface to facilitate the effective bonding of the newly poured concrete and the cap beam, and ensure the quality of the construction joint. Concrete pouring should be horizontally layered and continuously poured. During the pouring process, the vibrator rod should be inserted into the lower layer of concrete for at least 10cm. The vibration is completed when the concrete no longer sinks, no longer bubbles, and the surface begins to overflow.
[0108] Arch slab demoulding and maintenance: After the arch slab is poured and the concrete strength reaches 2.5Mpa or above, the formwork is removed and maintenance is carried out. When the formwork is removed, workers are not allowed to hit the formwork hard, and it is strictly forbidden to drop the formwork from a high place. The demoulding sequence is from the side span to the middle span, and from the arch top to the arch foot. During the maintenance process, water should be applied frequently every day to keep the surface of the arch slab moist to prevent the concrete surface from losing water too quickly and causing shrinkage cracks.
[0109] Cover plate lifting: The cover plate 3 can be set as a box beam with flange plates on both sides, and the arch plate is set under the flange plate of the box beam, and there can be only a 1.0 cm gap between the top surface of the arch plate and the bottom surface of the flange plate. Before lifting the box beam, recheck the relationship between the arch top elevation and the bottom elevation of the box beam flange to ensure that after the box beam is dropped, there is no point-to-point contact between the bottom of the flange plate and the top of the arch plate to avoid concentrated loads.
[0110] The box girder hoisting is carried out after the concrete strength of the arch plate reaches the design strength, in order to prevent the box girder hoisting from causing cracks in the arch plate body 1 when the arch plate strength is relatively low. The test results of the test blocks cured under the same conditions on site shall be used to check whether the concrete strength of the arch plate reaches the design strength. Before the box girder is hoisted, the support pedestal and the support elevation shall be reviewed, and the center position of the rubber support shall be ensured to be consistent with the design support point of the box girder. After preparation, a 130t truck crane can be used to lift the box girder, and the beam can be slowly lowered to ensure that the support does not undergo dislocation and deformation. Among them, the support is set at the bottom of the cover plate 3, and the support pedestal is set at the bottom of the support.
[0111] The decorative layer of the arch plate: The decorative layer 110 can be made of granite. After the cover plate 3 is hoisted, the main structure of the bridge is completed, and the construction of the bridge auxiliary structure and decoration begins. Due to the need for landscape effect, the curved arch plate is decorated with granite. Before the formal paving of granite, the layout is arranged in advance, and the line is marked on the arch plate, and cement mortar 130 is used to wet-paste from bottom to top.
[0112] The above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
[0113] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0114] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to has a specific orientation, is constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0115] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
Claims
1. A simply supported beam bridge with an external concrete arch slab. It is characterized in that include: The arch plate body is configured as a rectangular concrete plate, the bottom edge of the arch plate body is configured as an arc edge that bends upward; the arch plate body is configured as an arc plate that bends toward one side.
2. The external concrete arch slab of a simply supported beam bridge according to claim 1, It is characterized in that A decorative layer is arranged on one side wall of the arch plate body.
3. The external concrete arch slab of a simply supported beam bridge according to claim 2, It is characterized in that A laterally protruding step is arranged at the bottom end of a side wall of one side of the arch plate body, the decorative layer is arranged above the step, and the bottom surface of the decorative layer contacts the top surface of the step.
4. A deck arch bridge, It is characterized in that It comprises the external concrete arch slab of a simply supported beam bridge, a pier cap beam and a cover plate as described in any one of claims 1 to 3, wherein the arch slab body is respectively arranged on the end faces at both ends of the pier cap beam; the cover plate is laid on the pier cap beam, and the two ends of the cover plate are respectively extended and laid on the arch slab body.
5. The deck arch bridge according to claim 4, It is characterized in that The top surface of the pier cap beam is provided with a mounting groove, and the bottom surface of the cover plate is provided with a mounting protrusion, and the mounting protrusion is arranged in the mounting groove.
6. The deck arch bridge according to claim 5, It is characterized in that Vertical gaps are respectively arranged between the two ends of the top surface of the pier cap beam and the two ends of the bottom surface of the cover plate, and stoppers are respectively arranged at the two ends of the top surface of the pier cap beam, and the stoppers are respectively in contact with the arch plate body.
7. The deck arch bridge according to claim 6, It is characterized in that Two ends of the cover plate extend and protrude to the outside of the arch plate body respectively, and a cavity is arranged inside the cover plate.
8. The deck arch bridge according to any one of claims 5 to 7, It is characterized in that The number of the bridge pier cap beams is at least two, and the plurality of the bridge pier cap beams are evenly spaced; the number of the cover plates is at least two, and the plurality of the cover plates are spliced in sequence.
9. A construction method for a deck arch bridge, for implementing the deck arch bridge as claimed in any one of claims 4 to 8, It is characterized in that The following steps are involved: Construction of pre-embedded reinforcement for arch slab: pre-embed the horizontal distribution reinforcement in the arch slab body and the cap beam connecting reinforcement in the pier cap beam into the cap beam reinforcement skeleton of the pier cap beam; Casting and curing of bridge pier cap beams: casting and curing of concrete for the bridge pier cap beams; Erection of arch slab formwork support: erection of the arch slab formwork of the simply supported beam bridge external concrete arch slab, and binding and connecting the horizontal distribution reinforcement and the cap beam connecting steel bar, setting a formwork support for the arch slab formwork, and setting an arch frame top support at the bottom of the formwork support for the arch slab formwork; Arch plate positioning: Lofting is carried out according to the curvature of the bridge; Installation of the arch plate bottom mold: bending the arch plate bottom mold according to the curvature of the bottom edge of the arch plate body, and fixing the arch plate bottom mold in the arch frame top support; Arch plate reinforcement binding: the horizontal distribution reinforcement is bound with the vertical stirrups to form an arch plate reinforcement skeleton, and a concrete protective layer pad is placed on the horizontal distribution reinforcement; Installation of the arch plate side formwork: bending the arch plate side formwork according to the curvature of the side edge of the arch plate body, and fixing the arch plate side formwork on the formwork support of the arch plate formwork; Arch slab concrete pouring: pouring concrete for the arch slab body to connect the arch slab body with the pier cap beam; Arch plate formwork removal and maintenance: when the concrete strength of the arch plate body reaches or exceeds the preset strength value, the arch plate formwork is removed and the arch plate body is maintained; Cover plate hoisting: hoist the cover plate onto the pier cap beam.
10. The construction method of a deck arch bridge according to claim 9, It is characterized in that Before pouring and curing the bridge pier cap beam, the following steps are performed: Setting up the pier cap beam formwork: setting up the pier cap beam formwork of the pier cap beam; After the steps of pouring and curing the bridge pier cap beam and before the step of erecting the arch slab formwork support, the following steps are performed: De-moulding of bridge pier cap beam: removing the bridge pier cap beam formwork; Roughening the connection between the arch plate and the cap beam: roughening the end surfaces of both ends of the pier cap beam, and removing the floating slurry and carbonized surface concrete on the end surfaces of both ends of the pier cap beam; In the step of installing the arch plate bottom mold, the arch plate bottom mold is set as an installation structure in which an arch frame, an arc-shaped steel pipe main beam, a small square wood beam and a bottom mold are combined and connected; the arc-shaped steel pipe main beam is bent according to the curvature of the bottom edge of the arch plate body, and the bottom mold is fixed in the arch frame top support; In the step of installing the arch panel side form, the arch panel side form is set as an installation structure in which the side form, wooden beams, vertical steel pipes and horizontal steel pipes are combined and connected by tension bolts; the vertical steel pipes are bent according to the curvature of the side of the arch panel body.