Centralized drainage device in soil nailing wall support drainage system

Through the centralized drainage device, vertical and horizontal drainage pipe groups and water filtering materials are used to solve the internal water evacuation problem of the soil nail wall support, reduce the risk of erosion and erosion of the soil nail wall slope, and ensure the stability of the soil nail wall sex.

CN118774152APending Publication Date: 2024-10-15CHINA NUCLEAR IND FIFTH CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410436382.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The internal drainage of the existing soil nail wall support is mainly through scattered open drainage, which can easily cause erosion and erosion of the slope surface, affect the stability of the soil nail wall, and bring serious safety hazards.

Method used

Use centralized drainage devices, including steel mesh, vertical drainage pipe groups, horizontal drainage pipe groups and water guide pipes. Through the vertical connection of the vertical drainage pipe group and the horizontal drainage pipe group, use water filtering materials and permeable holes to collect and evacuate The moisture inside the soil nail wall reduces the risk of water erosion and erosion on the slope.

Benefits of technology

This system realizes the systematic drainage inside the soil nail wall, reduces the number of drainage pipes, reduces the risk of water erosion and erosion on the slope of the soil nail wall, and ensures the stability of the soil nail wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774152A_ABST
    Figure CN118774152A_ABST
Patent Text Reader

Abstract

The invention discloses a centralized drainage device in a soil nailing wall support drainage system, which comprises a reinforcing mesh, a vertical drainage pipe group, a horizontal drainage pipe group and a water guide pipe, one surface of the reinforcing mesh is mounted on a soil nailing wall slope, the vertical drainage pipe group is mounted on the reinforcing mesh, and the horizontal drainage pipe group is mounted on the water guide pipe. The length direction of the vertical drainage pipe group is arranged along the inclination direction of the soil nailing wall slope, one end of the horizontal drainage pipe group is communicated with the vertical drainage pipe group, the horizontal drainage pipe group extends into the soil nailing wall slope, and one end of the water guide pipe is communicated with the lower end of the vertical drainage pipe group. Through the application of the centralized drainage device in the soil nailing wall support drainage system, water in a soil nailing wall is intensively guided, so that drainage in a soil nailing wall foundation pit support is smoother and more systematized, the number of drainage pipes reserved on the surface of a soil nailing wall slope is reduced, and the drainage efficiency is improved. Therefore, the risk that water flow scours and erodes the side slope of the soil nailing wall is reduced, and the stability of the soil nailing wall is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drainage structures, and in particular to a centralized drainage device in a soil nail wall support drainage system. Background Art

[0002] Soil nail walls are structures used to support natural or artificial fill slopes to maintain soil stability. They are widely used in highway, railway engineering, slope support, and geological disaster control projects to support embankments or cuttings, tunnel openings, both ends of bridges, river banks, disaster slopes, etc. In order to drain the moisture from the soil behind the wall, prevent ground water from seeping in, prevent water accumulation behind the wall from forming hydrostatic pressure, reduce the frost heave pressure of backfill in cold areas, and eliminate the expansion pressure of clay soil fillers after being soaked in water, soil nail walls need to take necessary drainage measures. The existing internal drainage of soil nail wall support mainly discharges water from the soil through dispersed open drainage, which is easy to cause scouring and erosion of the slope surface, thereby affecting the stability of the soil nail wall and posing serious safety hazards. Summary of the invention

[0003] In view of this, in order to solve the above problems, the object of the present invention is to provide a centralized drainage device in a soil nail wall support drainage system, comprising:

[0004] A steel mesh, a vertical drainage pipe group, a horizontal drainage pipe group and a water guide pipe, wherein one surface of the steel mesh is installed on a soil nail wall slope, the vertical drainage pipe group is installed on the steel mesh, the length direction of the vertical drainage pipe group is arranged along the inclination direction of the soil nail wall slope, one end of the horizontal drainage pipe group is connected to the vertical drainage pipe group, the horizontal drainage pipe group extends into the soil nail wall slope, the horizontal drainage pipe group and the vertical drainage pipe group are arranged perpendicular to each other, the horizontal height of the other end of the horizontal drainage pipe group is greater than the horizontal height of one end, and one end of the water guide pipe is connected to the lower end of the vertical drainage pipe group.

[0005] In another preferred embodiment, the vertical drainage pipe group includes: a plurality of vertical water pipes, two elbow connecting pipes and a plurality of three-way connecting pipes, each adjacent two vertical water pipes are connected by a three-way connecting pipe, one end of the elbow connecting pipe is installed on the upper end of the vertical water pipe located at the top, the other end of the elbow connecting pipe and the plurality of three-way connecting pipes are connected to the horizontal drainage pipe group, one end of the other elbow connecting pipe is installed on the lower end of the vertical water pipe located at the bottom, and one end of the guide pipe is connected to the other end of the other elbow connecting pipe.

[0006] In another preferred embodiment, each of the elbow connecting pipes is arranged in an "L" shape.

[0007] In another preferred embodiment, the horizontal drainage pipe group includes: a plurality of horizontal water pipes, one end of each of the horizontal water pipes is connected to an elbow connecting pipe and a corresponding three-way connecting pipe, the horizontal height of the other end of each of the horizontal water pipes is greater than the horizontal height of one end, a plurality of water-permeable holes are opened on the outer wall of each of the horizontal water pipes, and each of the horizontal water pipes is filled with water filtering materials.

[0008] In another preferred embodiment, it further comprises: a plurality of water-filtration non-woven geotextiles, and both ends and the outer wall of each of the horizontal water pipes are provided with water-filtration non-woven geotextiles.

[0009] In another preferred embodiment, it further comprises: a drainage pit, wherein the drainage pit is arranged close to the lower end of the slope of the soil nail wall, and the other end of the water pipe is arranged above the drainage pit.

[0010] In another preferred embodiment, a concrete layer is sprayed on the other surface of the steel mesh, and the concrete layer is covered with the vertical drainage pipe group.

[0011] Due to the adoption of the above technical scheme, the present invention has the following positive effects compared with the prior art: through the application of the present invention, a centralized drainage device in a soil nail wall support drainage system is provided, which makes the internal drainage of the soil nail wall foundation pit support smoother and more systematic by centrally diverting the moisture inside the soil nail wall, reduces the number of drainage pipes reserved on the surface of the soil nail wall slope, thereby reducing the risk of scouring and erosion of the soil nail wall slope by water flow, and ensures the stability of the soil nail wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is an overall schematic diagram of a centralized drainage device in a soil nail wall support drainage system of the present invention.

[0013] In the attached figure: 1. steel mesh; 2. vertical drainage pipe group; 3. horizontal drainage pipe group; 4. water guide pipe; 5. soil nail wall slope; 6. vertical water pipe; 7. horizontal water pipe; 8. drainage pit; 9. concrete layer. DETAILED DESCRIPTION

[0014] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.

[0015] like Figure 1 As shown, a centralized drainage device in a soil nail wall support drainage system of a preferred embodiment is shown, comprising:

[0016] A steel mesh 1, a vertical drainage pipe group 2, a horizontal drainage pipe group 3 and a water guide pipe 4, wherein one surface of the steel mesh 1 is installed on a soil nail wall slope 5, the vertical drainage pipe group 2 is installed on the steel mesh 1, the length direction of the vertical drainage pipe group 2 is arranged along the inclination direction of the soil nail wall slope 5, one end of the horizontal drainage pipe group 3 is connected with the vertical drainage pipe group 2, the horizontal drainage pipe group 3 extends into the soil nail wall slope 5, the horizontal drainage pipe group 3 and the vertical drainage pipe group 2 are arranged perpendicular to each other, the horizontal height of the other end of the horizontal drainage pipe group 3 is greater than the horizontal height of one end, and one end of the water guide pipe 4 is connected with the lower end of the vertical drainage pipe group 2.

[0017] During actual use, when surface water on the road penetrates into the soil nail wall foundation pit support, the water inside the soil nail wall foundation pit support passes through the water-permeable holes and is filtered by the water filter material and collected in the horizontal water pipe 7. Since the horizontal height of the other end of the horizontal water pipe 7 is greater than the horizontal height of one end, it is convenient for the water inside the soil nail wall foundation pit support to flow into the vertical water pipe 6. The water flowing into the vertical water pipe 6 is gathered and discharged into the sump through the water guide pipe 4, thereby evacuating the water inside the soil nail wall foundation pit support and ensuring the stability of the soil nail wall.

[0018] Further, as a preferred embodiment, the vertical drainage pipe group 2 includes: a plurality of vertical water pipes 6, two elbow connecting pipes and a plurality of three-way connecting pipes, each adjacent two vertical water pipes 6 are connected by a three-way connecting pipe, wherein one end of the elbow connecting pipe is installed on the upper end of the vertical water pipe 6 located at the top, the other end of the elbow connecting pipe and the plurality of three-way connecting pipes are connected to the horizontal drainage pipe group 3, one end of the other elbow connecting pipe is installed on the lower end of the vertical water pipe 6 located at the bottom, and one end of the guide pipe is connected to the other end of the other elbow connecting pipe.

[0019] Furthermore, as a preferred embodiment, each of the elbow connecting pipes is arranged in an "L" shape.

[0020] Further, as a preferred embodiment, the horizontal drainage pipe group 3 includes: a plurality of horizontal water pipes 7, one end of each of the horizontal water pipes 7 is connected to one of the elbow connecting pipes and a corresponding one of the three-way connecting pipes, the horizontal height of the other end of each of the horizontal water pipes 7 is greater than the horizontal height of one end, the outer wall of each of the horizontal water pipes 7 is provided with a plurality of water-permeable holes, and each of the horizontal water pipes 7 is filled with water-filtering materials. Further, the water-permeable holes and the horizontal water pipes 7 are arranged at an angle to facilitate the discharge of water inside the soil through the horizontal water pipes 7, and the water-filtering materials are used to avoid blockage inside the horizontal water pipes 7, and the water-filtering materials are conventional technical means in the art and are not described in detail here.

[0021] Furthermore, as a preferred embodiment, it further comprises: a plurality of water-filtering nonwoven geotextiles, and both ends and the outer wall of each horizontal water pipe 7 are provided with water-filtering nonwoven geotextiles. Furthermore, the water-filtering nonwoven geotextiles prevent the water-permeable holes and the horizontal water pipe 7 from being blocked.

[0022] Furthermore, as a preferred embodiment, it also includes: a plurality of filter tubes and filter fillers, one end of each filter tube is installed at the other end of a corresponding horizontal water pipe 7, and the filter filler is filled in the filter tube, wherein the filter filler is composed of crushed stone, pea stone and coarse sand with a volume ratio of 1:1:1 and a particle size ranging from large to small. Furthermore, in actual use, the coarse sand, pea stone and crushed stone are sequentially filled into the filter tube with a volume ratio of 1:1:1, and a three-stage filtration is formed by the coarse sand, pea stone and crushed stone to filter the impurities in the water in the soil layer, avoid the blockage of a plurality of horizontal water pipes 7 and a plurality of vertical water pipes 6, and extend the service life of the drainage device.

[0023] Further, as a preferred embodiment, the outer wall of each horizontal water pipe 7 is provided with a plurality of water-permeable holes, the other end of each horizontal water pipe 7 is sealed, and the outer wall of each horizontal water pipe 7 is wrapped with a double-layer dense mesh. Further, the double-layer dense mesh helps to ensure a good water filtering effect while avoiding clogging of the filter material pores, which affects long-term use.

[0024] Further, as a preferred embodiment, it further comprises: a drainage pit 8, the drainage pit 8 is arranged near the lower end of the soil nail wall slope 5, and the other end of the water guide pipe 4 is arranged above the drainage pit 8. Furthermore, the drainage pit 8 avoids erosion of the bottom of the soil nail wall slope 5 by discharging water flowing out of the water guide pipe 4.

[0025] Furthermore, as a preferred embodiment, a concrete layer 9 is sprayed on the other surface of the steel mesh 1, and the concrete layer 9 covers the vertical drainage pipe group 2.

[0026] The above description is only a preferred embodiment of the present invention, and does not limit the implementation mode and protection scope of the present invention. For those skilled in the art, it should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A centralized drainage device in a soil nail wall support drainage system, It is characterized in that include: A steel mesh, a vertical drainage pipe group, a horizontal drainage pipe group and a water guide pipe, wherein one surface of the steel mesh is installed on a soil nail wall slope, the vertical drainage pipe group is installed on the steel mesh, the length direction of the vertical drainage pipe group is arranged along the inclination direction of the soil nail wall slope, one end of the horizontal drainage pipe group is connected to the vertical drainage pipe group, the horizontal drainage pipe group extends into the soil nail wall slope, the horizontal drainage pipe group and the vertical drainage pipe group are arranged perpendicular to each other, the horizontal height of the other end of the horizontal drainage pipe group is greater than the horizontal height of one end, and one end of the water guide pipe is connected to the lower end of the vertical drainage pipe group.

2. The centralized drainage device in the soil nail wall support drainage system according to claim 1, It is characterized in that The vertical drainage pipe group includes: a plurality of vertical water pipes, two elbow connecting pipes and a plurality of three-way connecting pipes, each adjacent two vertical water pipes are connected by a three-way connecting pipe, one end of the elbow connecting pipe is installed on the upper end of the vertical water pipe located at the top, the other end of the elbow connecting pipe and the plurality of three-way connecting pipes are connected to the horizontal drainage pipe group, one end of the other elbow connecting pipe is installed on the lower end of the vertical water pipe located at the bottom, and one end of the guide pipe is connected to the other end of the other elbow connecting pipe.

3. The centralized drainage device in the soil nail wall support drainage system according to claim 1, It is characterized in that Each of the elbow connecting pipes is arranged in an "L" shape.

4. The centralized drainage device in the soil nail wall support drainage system according to claim 2, It is characterized in that The horizontal drainage pipe group includes: a plurality of horizontal water pipes, one end of each of the horizontal water pipes is connected to an elbow connecting pipe and a corresponding three-way connecting pipe, the horizontal height of the other end of each horizontal water pipe is greater than the horizontal height of one end, a plurality of water-permeable holes are opened on the outer wall of each horizontal water pipe, and each horizontal water pipe is filled with water filtering material.

5. The centralized drainage device in the soil nail wall support drainage system according to claim 4, It is characterized in that Also includes: A plurality of water-filtering non-woven geotextiles are provided, and both ends and the outer wall of each horizontal water pipe are provided with water-filtering non-woven geotextiles.

6. The centralized drainage device in the soil nail wall support drainage system according to claim 1, It is characterized in that Also includes: A drainage pit is arranged near the lower end of the soil nail wall slope, and the other end of the water guide pipe is arranged above the drainage pit.

7. The centralized drainage device in the soil nail wall support drainage system according to claim 1, It is characterized in that A concrete layer is sprayed on the other surface of the steel mesh, and the concrete layer is covered with the vertical drainage pipe group.