Deep vertical shaft tunneling construction method for soft rock stratum

By using a shovel-tooth breaker, an anchor-injection integrated drill rig, and a rotary slag extraction system in shaft excavation technology, combined with cast-in-place steel formwork and air bag devices, the problems of high construction risks, high costs, and low efficiency are solved, and high efficiency and efficiency are achieved. Safe construction of deep shaft excavation in soft rock formations.

CN118774829APending Publication Date: 2024-10-15CHINA RAILWAY ELEVENTH BUREAU GROUP FIFTH ENGINEERING CO LTD +2

Patent Information

Application Number
CN202411122307.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing shaft excavation technology has problems such as high construction risks, high costs, low efficiency, and the inability to realize all-round slag extraction, especially when constructing in soft rock formations.

Method used

A shaft excavation device including a host system, a supporting platform, a cast-in-place formwork device and a derrick is used. Excavation and primary support reinforcement are carried out through a shovel-tooth breaker and an anchor-injection integrated drilling rig, and a rotary mechanism is used to drive the slag discharging system. All-round slag removal, and efficient concrete pouring and support through cast-in-place steel formwork and air bag devices.

Benefits of technology

It improves construction safety and efficiency, achieves high safety and efficient slag removal of mechanical rock breaking, reduces manual labor intensity, achieves all-round slag removal and efficient support, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774829A_ABST
    Figure CN118774829A_ABST
Patent Text Reader

Abstract

The invention provides a deep vertical shaft tunneling construction method for a soft rock stratum, which comprises the following steps of: constructing a shaft locking section of a vertical shaft, fixing a vertical shaft tunneling device at the locking section, installing, debugging and starting; the main machine system is temporarily fixed to the surrounding rock of the vertical shaft, excavation operation is conducted through the shovel tooth type breaking hammer, and slag is discharged through the slag discharging system while excavation is conducted; the formwork erecting operation platform is temporarily fixed to the shaft surrounding rock, the cast-in-place steel formwork is opened to be in a pouring state, concrete is poured on the shaft wall through the pouring window, after the concrete is formed, the strip-shaped air bag is taken down, the demolding oil cylinder is recycled at the moment, the cast-in-place steel formwork is separated from the concrete, and demolding is achieved. And the step S2 and the step S3 are circulated in the vertical shaft tunneling direction, and next ring construction is completed till vertical shaft construction is completed. The problems that an existing vertical shaft tunneling technology is large in construction risk, high in construction cost, low in construction efficiency and incapable of achieving all-directional deslagging are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of vertical shaft excavation, and in particular to a deep vertical shaft excavation construction method for soft rock formations. Background Art

[0002] The development of underground space is an urgent need faced by human society, and advancing into the depths of the earth has become a major scientific and technological strategy of our country. The deep underground space shaft is the throat passage leading to the deep underground space, and the deep underground space shaft excavation technology is the key core technology for implementing this major national strategy. The existing shaft excavation technology has various shortcomings such as poor adaptability to rock formations, high safety risks, high construction costs, and complex construction technology. For example: 1. The construction risk is high. The existing excavation technology mostly relies on manual work on the excavation face to carry out the next cycle of drilling, charging, and detonation. The gravel on the exposed surrounding rock or the slag on the wellhead are easy to fall and injure people. 2. The construction of the surrounding rock support layer of the shaft is difficult. At present, the support layer is generally assembled in the form of pipe segments. There are two ways to assemble the existing pipe segments. One is to complete the shaft first and then assemble the pipe segments. This method will greatly delay the construction progress. The other is to assemble the pipe segments while excavating the shaft. This method often uses the method of making the shaft wall or sinking the shaft wall by a gantry crane for support. The pipe segments are assembled through a large amount of support, and the labor intensity of the construction workers is high and the efficiency is low. 3. The slag discharge efficiency is low. The slag discharge can only be limited to a certain point on the working surface, and the slag discharge cannot be achieved in all directions. Summary of the invention

[0003] In view of the problems existing in the above-mentioned prior art, the present invention aims to provide a deep shaft excavation construction method for soft rock formations, so as to solve the problems of high construction risk, high construction cost, low construction efficiency and inability to achieve all-round slag discharge in the existing shaft excavation technology.

[0004] In order to achieve the above object, the present invention proposes a deep shaft excavation construction method for soft rock formations, comprising the following steps:

[0005] S1. Carry out the construction of the locking section of the shaft. After completion, fix, install, debug and start the shaft excavation device at the locking section.

[0006] The shaft excavation device includes a main engine system, a rear supporting stand, a cast-in-place formwork device and a derrick which are arranged in sequence from bottom to top. The main engine system, the rear supporting stand and the cast-in-place formwork device are all arranged in the shaft, and the derrick is arranged above the shaft. The main engine system is provided with a shovel-tooth breaker and an anchor-injection integrated drilling rig. The rear supporting stand is a steel frame platform, which is supported as a whole on the main engine system. The derrick is connected to the main engine system and the cast-in-place formwork device through a pulling assembly, and can drive both of them to step forward respectively. The shaft excavation device is also equipped with a slag discharge system. A slewing mechanism is movably provided on the main engine system. The slewing mechanism is rigidly connected to the slag discharge system, and the slewing mechanism can rotate circumferentially around the center of the shaft.

[0007] S2, excavate the shaft;

[0008] The main engine system is temporarily fixed on the surrounding rock of the shaft, and excavation operations are carried out by a shovel-tooth breaker. The slag is discharged through the slag discharge system at the same time. Driven by the slewing mechanism, the slag discharge system rotates circumferentially to multiple positions on the excavation working face to discharge slag. After the slag is discharged, the initial support reinforcement operation is carried out by the anchor-injection integrated drilling rig.

[0009] S3, pouring of supporting layer;

[0010] The cast-in-place formwork device includes a formwork operating platform, which is an annular platform. A cast-in-place steel formwork is set up on the formwork operating platform around the well wall. The cast-in-place steel formwork is divided into two disconnected parts, and a casting window is reserved on the cast-in-place steel formwork.

[0011] The formwork operation platform is temporarily fixed on the shaft surrounding rock, and the demoulding cylinder is fully extended to open the cast-in-place steel formwork to the pouring state, and the two parts of the cast-in-place steel formwork are sealed by strip air bags, and the cast-in-place steel formwork and the shaft surrounding rock are sealed by edge-sealing air bags; concrete is poured on the shaft wall through the pouring window, and after the concrete is formed, the strip air bags are removed, and the demoulding cylinder is recovered at this time to separate the cast-in-place steel formwork from the concrete to achieve demoulding.

[0012] Specifically, the cast-in-place steel formwork is processed into several pieces in advance as needed, and when in use, it is assembled into a ring-shaped body on the formwork work platform. The ring-shaped body is divided into two parts, which are supported and fixed by hydraulic cylinders and screw rods; before assembly, it is necessary to arrange uninflated edge-sealing airbags on the outer bottom of the cast-in-place steel formwork in advance; after the corresponding section of the casting steel bars are tied, the formwork work platform is lifted by the derrick to make the cast-in-place steel formwork contact with the upper concrete; at this time, the formwork work platform is temporarily fixed on the surrounding rock of the shaft, and the demoulding cylinder is fully extended, the cast-in-place steel formwork is opened to the casting state, and then the edge-sealing airbag is inflated. After the edge-sealing airbag is inflated, it can be used as a bottom mold to adapt to the uneven initial spraying surface of the surrounding rock of the shaft to avoid leakage; and the two parts of the cast-in-place steel formwork are also tightly sealed by strip airbags; after the concrete is formed, the strip airbag is removed, and the demoulding cylinder is recovered at this time to separate the cast-in-place steel formwork from the concrete to achieve demoulding, and the edge-sealing airbag is removed after the formwork work platform steps forward.

[0013] S4, drive the main machine system and cast-in-place formwork device to step forward through the derrick, and repeat steps S2 and S3 along the shaft excavation direction to complete the next construction cycle until the shaft construction is completed.

[0014] In the above scheme: the main engine system includes an inner ring, an outer ring, a fixed working platform and a rotary working platform in a ring-shaped structure. The outer ring is fixed to the surrounding rock of the shaft through a plurality of hydraulic support shoes. The inner ring is a truss structure, which is fixed to the inner side of the outer ring. The fixed working platform is fixed below the outer ring. The rotary working platform is fixed below the inner ring. The outer end of the rotary working platform is connected to the inner end of the fixed working platform. The rotary mechanism is installed on the rotary working platform. The outer ring is fixed to the surrounding rock of the shaft through a plurality of hydraulic support shoes, which can provide insurance support during equipment maintenance and inspection and emergency power outage. The inner ring is hollow inside, which is convenient for the slag discharge system to pass through the hollow position of the inner ring.

[0015] In the above scheme: the rotary working platform is provided with a hydraulic motor for driving the rotary mechanism to rotate circumferentially. During excavation operations, the hydraulic motor can drive the rotary mechanism to rotate circumferentially, thereby driving the slag discharge system to rotate around the center of the shaft to discharge slag, thereby achieving the purpose of all-round slag discharge.

[0016] In the above scheme: the rear supporting platform is a five-layer steel frame platform, the first layer of the steel frame platform is located at the bottom, and the rear supporting platform is equipped with an advance drilling rig and power equipment. The advance drilling rig is set on the second layer of the steel frame platform, and its advance drilling distance is not less than 30m. The power equipment includes an air compressor, a hydraulic pump station and a frequency converter, and the power equipment is distributed and installed on each layer of the steel frame platform. The advance drilling rig can realize the functions of geological exploration, water exploration, gas exploration, etc. The remaining space on the fifth layer of the steel frame platform can be used to install safety facilities dedicated to coal mines.

[0017] In the above scheme: the slag discharge system includes a chain bucket conveyor, a bucket, an upper slag bin and a lower slag bin. The chain bucket conveyor is fixed on the rotating mechanism, with its bottom located on the excavation working surface, and its top extends through the inner ring and inner circle to the fifth steel frame platform of the rear matching stand. A lifting cylinder is provided between the chain bucket conveyor and the rotating working platform. The upper slag bin is arranged on the fourth steel frame platform of the rear matching stand and corresponds to the discharge port of the chain bucket conveyor. The lower slag bin is arranged on the third steel frame platform of the rear matching stand. The two slag bins correspond to each other and are connected. The bucket is arranged below the lower slag bin and is connected to the derrick through a traction rope. The bottom of the lower slag bin is provided with an openable and closable outlet for discharging slag.

[0018] In step S2, the rotary mechanism drives the chain bucket conveyor to rotate and discharge slag. The chain bucket conveyor transports the slag from the working face to the upper slag bin. The slag falls from the upper slag bin into the lower slag bin and finally falls into the bucket through the outlet. When the bucket is full of slag, it is transported to the outside of the shaft through the derrick to complete the discharge of slag inside the shaft.

[0019] The lifting cylinder can drive the chain bucket conveyor to rise or fall independently.

[0020] The bucket of the chain bucket conveyor has a good self-loading function. With the auxiliary feeding of the shovel-tooth breaker, it can achieve efficient slag discharge. The bucket is also equipped with shovel teeth, which has a certain rock breaking ability and is suitable for slag discharge in soft rock formations. The top of the chain bucket conveyor is equipped with a scraper to improve the bucket unloading effect. It can also be equipped with a collecting bucket to facilitate the chain bucket conveyor to accurately deliver the slag into the upper slag bin.

[0021] In the above scheme: a weighing device is provided on the second steel frame platform of the rear supporting stand at a position corresponding to the lower slag bin, and the bucket is stored on the weighing device so as to reflect the slag loading status of the bucket in real time. Two bucket storage positions can be reserved on the second steel frame platform, and the slag is circulated by the two buckets.

[0022] In the above scheme: before each ring of excavation, the bucket chain conveyor is in a lifting state, and the shovel-tooth breaker extends toward the center of the shaft; first, the rock layer in the working area of ​​the bucket chain conveyor is broken to form a depression in the center of the working surface; then the bucket chain conveyor is lowered to the depression through the lifting cylinder to start slag discharge; the shovel-tooth breaker enters the working position and excavates from the shaft side to the center of the shaft; after completing one stroke of excavation, the shovel-tooth breaker accumulates the excavated slag in the depression where the bucket chain conveyor is located; the bucket chain conveyor rotates with the rotary working platform, the shovel-tooth breaker gathers slag, and the bucket chain conveyor discharges slag. At this time, one stroke of excavation is completed, and then the shovel-tooth breaker changes its working position to excavate the next stroke. The lifting cylinder can drive the bucket chain conveyor to lift or lower alone, and the shovel-tooth breaker is used for excavation, and has the function of slag removal and auxiliary slag feeding. The host system is equipped with multiple shovel-tooth breakers and multiple anchor-injection integrated drilling rigs.

[0023] In the above scheme: a demoulding telescopic sleeve is also provided between the two parts of the cast-in-place steel formwork, the demoulding telescopic sleeve and the demoulding oil cylinder are both arranged on the inner side wall of the cast-in-place steel formwork, and the demoulding telescopic sleeve plays a guiding role.

[0024] In the above scheme: a steel bar binding frame is set up on the formwork work platform inside the cast-in-place steel formwork. The steel bar binding frame is a ring-shaped steel frame structure, and its size is smaller than the size of the cast-in-place steel formwork in the demoulding state. A stabilizing structure is set up inside the steel bar binding frame, and the stabilizing structure is inscribed on the steel bar binding frame. The stabilizing structure can be specifically a rectangular structure composed of four stabilizing rods; a scaffolding board can be set up on the steel bar binding frame to facilitate workers to bind the cast steel bars thereon; the size of the steel bar binding frame is slightly smaller than the size of the cast-in-place steel formwork in the demoulding state, and has a certain anti-dumping effect. When the formwork work platform rises, it can prevent the cast-in-place steel formwork from over-dumping. When the demoulding cylinder is fully retracted, the cast-in-place steel formwork is retracted to the demoulding state.

[0025] In the above scheme: in step S2, after each excavation of a certain length, the center point of the shaft is calibrated using the wire pendant weight, and the excavation radius and net radius of the shaft are measured to ensure that the shaft excavation device is advanced along the cross line of the shaft; when the wire pendant weight is measuring, ventilation in the shaft is stopped, the bucket operation is stopped, the pendant weight is suspended in a bucket filled with water, and does not touch the hanging wire.

[0026] The beneficial effects of the present invention are:

[0027] 1. Mechanical rock breaking (non-blasting construction) is adopted, which is highly safe; 2. A highly integrated shaft boring machine is adopted for construction to realize parallel operations of excavation, slag discharge, anchor spraying and support, with a high degree of automation, high construction efficiency and strong adaptability to rock formations; 3. Unmanned construction is implemented on the excavation working face to ensure personnel safety to the greatest extent; 4. A slewing mechanism is provided on the main engine system, which drives the slag discharge system to rotate around the center of the shaft to discharge slag through the slewing mechanism, so as to realize all-round slag discharge; 4. Concrete is poured into the space surrounded by the edge sealing airbag, cast-in-place steel formwork and the surrounding rock of the shaft through the pouring window to form a concrete support layer. When the concrete support layer is formed, the strip airbag can be removed, and the cast-in-place steel formwork can be separated from the concrete support layer by recovering the demoulding cylinder, which is convenient for demoulding; 5. The edge sealing airbag is used as the bottom mold to adapt to the uneven initial spraying surface of the surrounding rock of the shaft, which is conducive to avoiding leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of the shaft boring device.

[0029] Figure 2 It is a structural diagram of the host system.

[0030] Figure 3It is a structural diagram of the subsequent supporting stand.

[0031] Figure 4 It is a structural diagram of the slag discharge system.

[0032] Figure 5 It is a structural schematic diagram of the cast-in-place formwork device.

[0033] Figure 6 It is a schematic diagram of the cast-in-place steel formwork being opened to the pouring state.

[0034] Figure 7 It is a schematic diagram of the cast-in-place steel formwork being retracted to the demoulding state.

[0035] Figure 8 It is a schematic diagram of the steel bar tying rack. DETAILED DESCRIPTION

[0036] like Figure 1 As shown in FIG8 , a deep shaft excavation construction method for soft rock formations mainly comprises the following steps:

[0037] S1. Carry out the construction of the locking section of the shaft. After completion, fix, install, debug and start the shaft excavation device at the locking section.

[0038] The shaft excavation device includes a main engine system A, a rear supporting stand B, a cast-in-place formwork device C and a derrick D which are arranged in sequence from bottom to top. The main engine system A, the rear supporting stand B and the cast-in-place formwork device C are all arranged in the shaft, and the derrick D is arranged above the shaft.

[0039] The main engine system A is equipped with a spade-tooth breaker 1 and an anchor-injection integrated drilling rig 2. The rear supporting stand B is a steel frame platform, which is supported as a whole on the main engine system A. The derrick D is connected to the main engine system A and the cast-in-place formwork device C through a pulling assembly, and can drive both of them to step forward. The shaft excavation device is also equipped with a slag discharge system E. The main engine system A is equipped with a slewing mechanism, which is rigidly connected to the slag discharge system E and can rotate circumferentially around the center of the shaft.

[0040] S2, excavate the shaft;

[0041] The host system A is temporarily fixed on the surrounding rock of the shaft, and excavation is carried out by the shovel-tooth breaker 1. The slag is discharged by the slag discharge system E at the same time. Driven by the slewing mechanism, the slag discharge system E rotates circumferentially to multiple positions on the excavation working face to discharge slag. After the slag is discharged, the anchor-injection integrated drilling rig 2 is used for primary support reinforcement.

[0042] S3, pouring of supporting layer;

[0043] The cast-in-place formwork device C includes a formwork platform 13, which is a ring-shaped platform. A cast-in-place steel formwork 14 is set up on the formwork platform 13 around the well wall. The cast-in-place steel formwork 14 is divided into two disconnected parts, and a casting window 21 is reserved on the cast-in-place steel formwork 14.

[0044] The formwork platform 13 is temporarily fixed on the shaft surrounding rock, and the demoulding cylinder 16 is fully extended to open the cast-in-place steel formwork 14 to the pouring state. The two parts of the cast-in-place steel formwork 14 are blocked by the strip airbag 15, and the cast-in-place steel formwork 14 and the shaft surrounding rock are blocked by the edge sealing airbag 17. Concrete is poured on the shaft wall through the pouring window 21. After the concrete is formed, the strip airbag 15 is removed, and the demoulding cylinder 16 is recovered at this time to separate the cast-in-place steel formwork 14 from the concrete to achieve demoulding.

[0045] Specifically, the cast-in-place steel formwork 14 is processed into several pieces in advance as needed, and when in use, it is assembled into an annular body on the formwork platform 13. The annular body is divided into two parts, and the formwork is fixed by hydraulic cylinders and screw supports. Before assembly, it is necessary to lay an uninflated edge-sealing airbag 17 on the outer bottom of the cast-in-place steel formwork 14 in advance. After the corresponding section of the casting steel bars are tied, the formwork platform 13 is lifted by the derrick D so that the cast-in-place steel formwork 14 is in contact with the upper mold concrete. At this time, the formwork platform 13 is temporarily fixed on the surrounding rock of the shaft, and the demoulding cylinder 16 is fully extended, the cast-in-place steel formwork 14 is opened to the casting state, and then the edge-sealing airbag 17 is inflated. After the edge-sealing airbag 17 is inflated, it can be used as a bottom mold to adapt to the uneven initial spraying surface of the surrounding rock of the shaft to avoid leakage; and the two parts of the cast-in-place steel formwork 14 are also tightly sealed by the strip airbag 15. After the concrete is formed, the strip airbag 15 is removed, and the demoulding cylinder 16 is recovered to separate the cast-in-place steel template 14 from the concrete to achieve demoulding, and the edge sealing airbag 17 is removed after the formwork operation platform 13 steps forward.

[0046] S4, drive the main system A and the cast-in-place formwork device C to step forward through the derrick D, and repeat steps S2 and S3 along the direction of shaft excavation to complete the next round of construction until the shaft construction is completed.

[0047] Preferably, the main engine system includes an inner ring 4, an outer ring 3, a fixed working platform 5 and a rotary working platform 6 in a ring-shaped structure. The outer ring 3 is fixed to the surrounding rock of the shaft through a plurality of hydraulic support shoes. The inner ring 4 is a truss structure, which is fixed to the inner side of the outer ring 3. The fixed working platform 5 is fixed below the outer ring 3. The rotary working platform 6 is fixed below the inner ring 4. The outer end of the rotary working platform 6 is connected to the inner end of the fixed working platform 5, and the rotary mechanism is installed on the rotary working platform 6. The outer ring 3 is fixed to the surrounding rock of the shaft through a plurality of hydraulic support shoes, which can provide insurance support during equipment maintenance and inspection and emergency power failure. The inner ring 4 is hollow inside, which is convenient for the slag discharge system E to pass through the hollow position of the inner ring.

[0048] Preferably, a hydraulic motor for driving the slewing mechanism to rotate circumferentially is provided on the slewing work platform 6. During excavation operations, the hydraulic motor can drive the slewing mechanism to rotate circumferentially, thereby driving the slag discharge system E to rotate around the center of the shaft to discharge slag, thereby achieving the purpose of all-round slag discharge.

[0049] Preferably, the rear supporting platform B is a five-layer steel frame platform, the first layer of the steel frame platform is located at the bottom, and the rear supporting platform is provided with an advance drilling rig 7 and power equipment, the advance drilling rig 7 is arranged on the second layer of the steel frame platform, and its advance drilling distance is not less than 30m, and the power equipment includes an air compressor, a hydraulic pump station and a frequency converter, and the power equipment is distributed and installed on each layer of the steel frame platform. The advance drilling rig 7 can realize the functions of geological exploration, water exploration, gas exploration, etc., and the remaining space of the fifth layer of the steel frame platform can be used to install safety facilities dedicated to coal mines.

[0050] Preferably, the slag discharge system E includes a chain bucket conveyor 8, a bucket 9, an upper slag bin 10 and a lower slag bin 11. The chain bucket conveyor 8 is fixed on the rotary mechanism, with its bottom located on the excavation working surface, and its top extending through the inner ring 4 inner circle to the fifth steel frame platform of the rear supporting platform B. A lifting cylinder 12 is provided between the chain bucket conveyor 8 and the rotary working platform. The upper slag bin 10 is provided on the fourth steel frame platform of the rear supporting platform B, and corresponds to the discharge port of the chain bucket conveyor 8. The lower slag bin 11 is provided on the third steel frame platform of the rear supporting platform B, and the two slag bins correspond to each other and are connected. The bucket 9 is provided below the lower slag bin 11, and is connected to the derrick D through a traction rope. The bottom of the lower slag bin 11 is provided with an openable and closable outlet for discharging slag.

[0051] In step S2, the rotary mechanism drives the chain bucket conveyor 8 to rotate and discharge slag. The chain bucket conveyor 8 transports the slag from the working face to the upper slag bin 10. The slag falls from the upper slag bin 10 into the lower slag bin 11 and finally falls into the bucket 9 through the outlet. When the bucket 9 is full of slag, it is transported to the outside of the shaft through the derrick D to complete the discharge of slag inside the shaft.

[0052] The lifting cylinder 12 can drive the chain bucket conveyor 8 to rise or fall independently.

[0053] The bucket of the chain bucket conveyor 8 has a good self-loading function. With the auxiliary slag feeding of the shovel-tooth breaker 1, it can achieve efficient slag discharge. The bucket is also equipped with shovel teeth, which has a certain rock breaking ability and is suitable for slag discharge in soft rock formations. A scraper is provided on the top of the chain bucket conveyor 8 to improve the bucket unloading effect. It can also be equipped with a collecting bucket to facilitate the chain bucket conveyor 8 to accurately deliver the slag into the upper slag bin.

[0054] Preferably, a weighing device (not shown) is provided at a position corresponding to the lower slag bin 11 on the second steel frame platform of the rear supporting stand B, and the bucket 9 is stored on the weighing device so as to reflect the slag loading status of the bucket 9 in real time. Two storage positions for the bucket 9 can be reserved on the second steel frame platform, and the two buckets 9 can circulate the slag.

[0055] Preferably, before each ring of excavation, the bucket chain conveyor 8 is in a lifting state, and the shovel-tooth breaker 1 extends toward the center of the shaft; first, the rock stratum in the working area of ​​the bucket chain conveyor 8 is broken to form a depression in the center of the working surface. Then, the bucket chain conveyor 8 is lowered to the depression by the lifting cylinder 12, and slag discharge begins. The shovel-tooth breaker 1 enters the working position and excavates from the shaft side toward the center of the shaft. After excavating a stroke, the shovel-tooth breaker 1 accumulates the excavated slag in the depression where the bucket chain conveyor 8 is located; the bucket chain conveyor 8 rotates with the rotary working platform, the shovel-tooth breaker 1 gathers the slag, and the bucket chain conveyor 8 discharges the slag. At this time, one stroke of excavation is completed, and then the shovel-tooth breaker 1 changes its working position to excavate the next stroke. The lifting cylinder 12 can drive the chain bucket conveyor 8 to lift or lower independently. The shovel-tooth breaker 1 is used for excavation and has the functions of slag removal and auxiliary slag feeding. The host system A is provided with multiple shovel-tooth breakers 1 and multiple anchor-injection drilling rigs 2.

[0056] Preferably, a demoulding telescopic sleeve 18 is provided between the two parts of the cast-in-place steel formwork 14. The demoulding telescopic sleeve 18 and the demoulding oil cylinder 16 are both provided on the inner side wall of the cast-in-place steel formwork 14, and the demoulding telescopic sleeve 18 plays a guiding role.

[0057] Preferably, a steel bar binding frame 19 is set up on the formwork platform 13 inside the cast-in-place steel formwork 14. The steel bar binding frame 19 is a ring-shaped steel frame structure, and its size is smaller than the size of the cast-in-place steel formwork 14 in the demoulding state. A stabilizing structure is set up inside the steel bar binding frame 19, and the stabilizing structure is inscribed on the steel bar binding frame 19. The stabilizing structure can be a rectangular structure composed of four stabilizing rods 20; a scaffolding board can be set up on the steel bar binding frame 19 to facilitate workers to bind the cast steel bars thereon; the size of the steel bar binding frame 19 is slightly smaller than the size of the cast-in-place steel formwork 14 in the demoulding state, and has a certain anti-dumping effect. When the formwork platform 13 rises, it can prevent the cast-in-place steel formwork 14 from over-dumping. When the demoulding cylinder 16 is fully retracted, the cast-in-place steel formwork A is retracted to the demoulding state.

[0058] It is best to use a wire pendant to calibrate the center point of the shaft after each excavation of a certain length (5 to 10m), measure the shaft excavation radius (excavation diameter) and net radius (net diameter), and ensure that the shaft excavation device is advanced along the cross line of the shaft; when the wire pendant is measured, the shaft is ventilated and the bucket is stopped, the pendant is suspended in a bucket filled with water, and does not touch the wire. The shaft is ventilated using a local pressure-type ventilation method, and a 3*110kW axial flow fan is arranged near the wellhead on the ground; a Φ1500mm anti-static and flame-retardant wind tube is hung along the shaft wall for pressure-type ventilation. The fan is arranged in a one-for-one configuration to meet the requirements of dual power supply, dual fans and automatic conversion. A combined ventilation and dust removal system combining pressure-type ventilation and dust removal fans can be designed to improve the construction and production environment and ensure personal safety.

[0059] To ensure construction safety, monitoring sensors can be scientifically arranged according to the standards and requirements for harmful gas prevention and control in coal mine inclined shaft construction, and online monitoring and alarm systems for gases and dust such as methane, carbon monoxide, carbon dioxide, oxygen, and temperature can be configured to achieve alarm and power-off response when harmful gas concentration exceeds the limit. Ventilation, dust removal and exhaust systems can be configured to form a comprehensive harmful gas disposal technology for coal mine vertical shaft construction.

Claims

1. A deep shaft excavation construction method for soft rock formations, characterized in that: The following steps are involved: S1. Carry out the construction of the locking section of the shaft. After completion, fix, install, debug and start the shaft excavation device at the locking section; The shaft excavation device comprises a main engine system (A), a rear supporting platform (B), a cast-in-place formwork device (C) and a derrick (D) which are arranged in sequence from bottom to top. The main engine system (A), the rear supporting platform (B) and the cast-in-place formwork device (C) are all arranged in the shaft, and the derrick (D) is arranged above the shaft. The main engine system (A) is provided with a shovel-tooth breaker (1) and an anchor-injection integrated drilling rig (2). The rear supporting platform (B) is a steel frame platform which is supported on the main engine system (A) as a whole. The derrick (D) is connected to the main engine system (A) and the cast-in-place formwork device (C) through a pulling assembly and can drive the two to step forward respectively. The shaft excavation device is also equipped with a slag discharge system (E). A slewing mechanism is movably provided on the main engine system (A), and the slewing mechanism is rigidly connected to the slag discharge system (E). The slewing mechanism can rotate circumferentially around the center of the shaft. S2, excavate the shaft; The main engine system (A) is temporarily fixed on the surrounding rock of the shaft, and excavation is performed by a spade-tooth breaker (1). During excavation, slag is discharged by a slag discharge system (E). Driven by a slewing mechanism, the slag discharge system (E) rotates circumferentially to multiple positions on the excavation working face to discharge slag. After the slag is discharged, an anchor-injection integrated drilling rig (2) is used to perform primary support and reinforcement operations; S3, pouring of supporting layer; The cast-in-place formwork device (C) comprises a formwork operation platform (13), wherein the formwork operation platform (13) is an annular platform, a cast-in-place steel formwork (14) is arranged on the formwork operation platform (13) around the well wall, the cast-in-place steel formwork (14) is divided into two parts, and a casting window (21) is reserved on the cast-in-place steel formwork (14); The formwork operation platform (13) is temporarily fixed on the surrounding rock of the shaft, and the demoulding cylinder (16) is fully extended, so that the cast-in-place steel formwork (14) is opened to the pouring state, and the two parts of the cast-in-place steel formwork (14) are blocked by the strip airbag (15), and the cast-in-place steel formwork (14) and the surrounding rock of the shaft are blocked by the edge sealing airbag (17); concrete is poured on the shaft wall through the pouring window (21), and after the concrete is formed, the strip airbag (15) is removed, and the demoulding cylinder (16) is recovered at this time to separate the cast-in-place steel formwork (14) from the concrete, thereby realizing demoulding; S4. Drive the main machine system (A) and the cast-in-place formwork device (C) step by step through the derrick (D), and repeat steps S2 and S3 along the direction of shaft excavation to complete the next construction cycle until the shaft construction is completed.

2. The deep shaft excavation construction method for soft rock formation according to claim 1 is characterized in that: The main engine system comprises an inner ring (4), an outer ring (3), a fixed working platform (5) and a rotary working platform (6) in a ring-shaped structure. The outer ring (3) is fixed to the surrounding rock of the shaft by a plurality of hydraulic support shoes. The inner ring (4) is a truss structure, which is fixed on the inner side of the outer ring (3). The fixed working platform (5) is fixed below the outer ring (3). The rotary working platform (6) is fixed below the inner ring (4). The outer end of the rotary working platform (6) is connected to the inner end of the fixed working platform (5). The rotary mechanism is installed on the rotary working platform (6).

3. The deep shaft excavation construction method for soft rock formation according to claim 2 is characterized in that: The rotary working platform (6) is provided with a hydraulic motor for driving the rotary mechanism to rotate circumferentially.

4. The deep shaft excavation construction method for soft rock formation according to claim 1 is characterized in that: The rear supporting platform (B) is a five-layer steel frame platform, the first layer of the steel frame platform is located at the bottom, and the rear supporting platform is provided with an advance drilling rig (7) and power equipment. The advance drilling rig (7) is arranged on the second layer of the steel frame platform, and its advance drilling distance is not less than 30m. The power equipment includes an air compressor, a hydraulic pump station and a frequency converter, and the power equipment is distributed and installed on each layer of the steel frame platform.

5. The deep shaft excavation construction method for soft rock formation according to claim 4 is characterized in that: The slag discharge system (E) comprises a chain bucket conveyor (8), a hanging bucket (9), an upper slag bin (10) and a lower slag bin (11). The chain bucket conveyor (8) is fixedly mounted on the rotary mechanism, with its bottom located on the excavation working surface, and its top extending through the inner ring (4) inner circle to the fifth steel frame platform of the rear supporting platform (B). A lifting cylinder (12) is arranged between the chain bucket conveyor (8) and the rotary working platform. The upper slag bin (10) is arranged on the fourth steel frame platform of the rear supporting platform (B) and corresponds to the discharge port of the chain bucket conveyor (8). The lower slag bin (11) is arranged on the third steel frame platform of the rear supporting platform (B). The two slag bins correspond to each other and are connected. The hanging bucket (9) is arranged below the lower slag bin (11) and is connected to the derrick (D) through a traction rope. The bottom of the lower slag bin (11) is provided with an openable and closable outlet for discharging slag. In step S2, the slewing mechanism drives the chain bucket conveyor (8) to rotate and discharge slag. The chain bucket conveyor (8) transports the slag from the working surface to the upper slag bin (10). The slag then falls from the upper slag bin (10) into the lower slag bin (11) and finally falls into the bucket (9) through the outlet. When the bucket (9) is filled with slag, it is transported to the outside of the shaft through the derrick (D), thereby completing the discharge of slag inside the shaft.

6. The deep shaft excavation construction method for soft rock formations according to claim 5 is characterized in that: A weighing device is provided on the second steel frame platform of the rear supporting stand (B) at a position corresponding to the lower slag bin (11), and the bucket (9) is stored on the weighing device.

7. The deep shaft excavation construction method for soft rock formation according to claim 5, characterized in that: Before each ring of excavation, the bucket chain conveyor (8) is in a lifting state, and the shovel-tooth breaker (1) extends toward the center of the shaft; first, the rock layer in the working area of ​​the bucket chain conveyor (8) is broken to form a depression in the center of the working surface; then, the bucket chain conveyor (8) is lowered to the depression by the lifting cylinder (12) to start slag discharge; the shovel-tooth breaker (1) enters the working position and excavates from the shaft wall to the center of the shaft; after completing one stroke of excavation, the shovel-tooth breaker (1) accumulates the excavated slag in the depression where the bucket chain conveyor (8) is located; the bucket chain conveyor (8) rotates together with the revolving working platform, the shovel-tooth breaker (1) gathers slag, and the bucket chain conveyor (8) discharges slag. At this time, one stroke of excavation is completed, and then the shovel-tooth breaker (1) changes its working position to excavate the next stroke.

8. The deep shaft excavation construction method for soft rock formations according to claim 1 is characterized by: A demoulding telescopic sleeve (18) is also provided between the two parts of the cast-in-place steel formwork (14), and the demoulding telescopic sleeve (18) and the demoulding oil cylinder (16) are both provided on the inner side wall of the cast-in-place steel formwork (14).

9. The deep shaft excavation construction method for soft rock formation according to claim 1, characterized in that: A steel bar binding frame (19) is set up on the formwork operation platform (13) inside the cast-in-place steel formwork (14). The steel bar binding frame (19) is a ring-shaped steel frame structure, and its size is smaller than the size of the cast-in-place steel formwork (14) in the demoulding state. A stabilizing structure is set up inside the steel bar binding frame (19), and the stabilizing structure is inscribed on the steel bar binding frame (19).

10. The deep shaft excavation construction method for soft rock formation according to claim 1, characterized in that: In step S2, after each excavation of a certain length, the center point of the shaft is calibrated using the wire hanging pendant weight, and the excavation radius and net radius of the shaft are measured to ensure that the shaft excavation device is advanced along the cross line of the shaft; when the wire hanging pendant weight is measured, ventilation in the shaft is stopped, the bucket operation is stopped, the pendant weight is suspended in a bucket filled with water, and does not touch the hanging wire.

Citation Information

Patent Citations

  • Novel vertical shaft heading machine and construction method thereof

    CN106761763A

  • Vertical shaft non-suspension segmented stepping descending type integral metal formwork

    CN107083976A

  • Tunnel shaft construction method

    CN110984999A

  • Multifunctional impact rock cracking equipment

    CN115596452A

  • Vertical shaft heading machine

    CN117108288A

Cited By

  • Multi-layer rear matching system for full-section vertical shaft reaming heading machine

    CN119900565A