Grouting reinforcement construction method suitable for high-water-pressure underwater tunnel
By using grouting pressure pipes and zero-pressure pipes in the reinforced holes of submarine tunnels, combined with the directional flow of splitting and penetrating grouting fluids, it solves the problem that traditional grouting methods cannot meet the reinforcement needs under complex geological conditions, and achieves the goal of grouting Accurate assessment of effects and improvement of construction safety.
Patent Information
- Application Number
- CN202411001862.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-15
AI Technical Summary
The traditional single grouting method cannot meet the performance index requirements for reliable stratigraphic reinforcement of submarine tunnels under extremely complex and adverse geological conditions, resulting in frequent water inrush accidents. Moreover, the existing evaluation methods are complex and inaccurate, making it difficult to effectively evaluate the grouting reinforcement effect.
Grouting pressure pipes and zero-pressure pipes are installed in the reinforcement holes, and artificial water heads are set up to guide the directional flow of splitting grouting and penetration grouting slurries. The concentration of the slurry flowing out of the zero-pressure pipes is observed to accurately judge the grouting reinforcement effect.
The grouting reinforcement performance is improved, the grouting effect can be accurately evaluated, the grout leakage problem is reduced, the construction speed and safety are improved, and the safety hazards of construction workers are reduced.
Smart Images

Figure CN118774881A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of underground engineering disaster prevention and control, and in particular to a grouting reinforcement construction method suitable for high water pressure underwater tunnels. Background Art
[0002] Crossing the interface of poor geological bodies and stratum structures usually becomes a controlling project in the construction of submarine tunnels, which directly affects the construction safety. If it is not handled properly, it will induce disasters and lead to project failure. In order to achieve stability control of layered rock masses in poor geological sections, grouting reinforcement technology has been widely used around the world, playing an important role in project safety and quality assurance, and has also strongly promoted the continuous progress and rapid development of underwater tunnel and water-stratum tunnel construction technology.
[0003] However, due to the large cross-section of the submarine tunnel, unlimited water supply and continuous high water pressure, the reinforcement body needs to meet the dual functions of stability and water blocking in the face of poor geological conditions with extremely poor stability. This requires that the reinforcement body must simultaneously meet the control indicators of strength, overall stability and density, and prevent sudden water inrush accidents caused by stratum instability, and reliably block water to reduce tunnel drainage. Therefore, grouting mechanism and adaptability have become key issues in the grouting design of submarine tunnels. Domestic and foreign scholars and engineering circles have conducted a lot of research and practice on grouting reinforcement, analyzed the mechanism of action of different grouting methods and proposed corresponding applicable conditions, but most of them are for a single grouting method. However, due to the strong empirical nature of the traditional single grouting method, the performance and reliability of the grouting reinforcement body are difficult to guarantee, and engineering cases of sudden water inrush due to grouting failure occur from time to time. For example, when the Seikan Undersea Tunnel in Japan was under construction and passed through the fault zone, a water inrush accident occurred due to the separation of the grouting body from the surrounding rock, causing a large number of casualties; when the Yuanliangshan Tunnel passed through a muddy karst cave, the initial support was damaged due to the local weak links of the grouting reinforcement, and large-scale water and mud inrush occurred many times. Obviously, the traditional single grouting method is difficult to meet the performance index requirements of reliable reinforcement of the stratum under extremely complex and unfavorable geological conditions of the undersea tunnel.
[0004] On the other hand, there are four main methods for evaluating the effect of grouting reinforcement in China, namely analytical evaluation method, borehole inspection method, excavation sampling method and geophysical exploration method. The analytical evaluation method is mainly the PQt curve method, which is complicated and the analysis of the reinforcement effect is only qualitative. The borehole inspection method includes the borehole TV method, the coring rate method and the permeability coefficient method. The borehole TV method judges the grouting effect by observing the integrity of the surrounding rock of the hole wall and the filling of the cracks; the extraction rate method makes a qualitative evaluation of the reinforcement effect by measuring the extraction rate, fragmentation and water content of the rock core sample; the permeability coefficient method is to inject water into the borehole and evaluate the grouting effect by testing whether the permeability coefficient decreases. The excavation sampling method includes the mechanical parameter comparison method and the reinforcement effect observation method. The mechanical parameter comparison method reflects whether the surrounding rock strength is improved by testing and comparing the changes in mechanical parameters such as stratum moisture content, compression modulus, and compressive strength before and after grouting, thereby evaluating the grouting reinforcement effect; the reinforcement effect observation method qualitatively evaluates the reinforcement effect by observing whether there are mud gushing, water gushing, and hole collapse in the test hole. Both the drilling inspection method and the excavation sampling method require drilling holes in the structure. If too few holes are drilled, it is difficult to evaluate the overall situation, and too many holes will cause damage to the structure. The geophysical method mainly evaluates the grouting effect by measuring the changes in wave velocity and resistivity of the stratum before and after grouting by instruments. The geophysical method has a large survey depth, and the measurement results are seriously affected by the environment. It is particularly important to develop a reinforcement evaluation method that is easy to operate and can accurately evaluate the grouting effect.
[0005] Therefore, there is an urgent need for a grouting reinforcement construction method suitable for high-water-pressure underwater tunnels that can accurately evaluate the grouting reinforcement effect. Summary of the invention
[0006] The purpose of the present invention is to provide a grouting reinforcement construction method suitable for high water pressure underwater tunnels in view of the defects and shortcomings of the prior art. A grouting pressure pipe and a grouting zero-pressure pipe are installed in the reinforcement hole, and an artificial water head is set to guide the splitting grouting slurry and the penetration grouting slurry to flow in a directional manner as needed. By observing the concentration of the slurry flowing out of the grouting zero-pressure pipe, the grouting reinforcement effect can be accurately judged on the basis of improving the grouting reinforcement performance.
[0007] In order to achieve the above object, the present invention provides a grouting reinforcement construction method suitable for a high water pressure underwater tunnel, comprising the following steps: Step 1: Drill reinforcement holes into the rock mass in the tunnel reinforcement area and prepare grouting equipment to enter the site for construction; Step 2: Clean the reinforcement hole and conduct a water pressure test on the rock mass around the reinforcement hole to set artificial rock mass water pressure; Step 3: Install a grouting pipe in the reinforcement hole. The grouting pipe is at least two steel pipes with grouting holes, one is a grouting pressure pipe, and the other is a grouting zero-pressure pipe; Step 4: inject slurry into the grouting pressure pipe, the grouting pressure is greater than the existing environmental water pressure, and the slurry includes splitting grouting slurry and penetration grouting slurry; the grouting pressure of the grouting zero pressure pipe is zero, and the inside of the grouting zero pressure pipe is set with a rock porosity at least that entered by the splitting grouting slurry; Step 5: Evaluate the grouting effect by setting artificial rock water pressure to guide the slurry to flow in a desired direction. Judge the grouting reinforcement effect by observing the concentration of the slurry flowing out of the grouting zero-pressure pipe.
[0008] The present invention is applicable to a high-water-pressure underwater tunnel grouting reinforcement construction method. By conducting a water pressure test on the rock mass around the reinforcement hole and setting an artificial rock water pressure, the slurry can be directed to flow as needed. The two reinforcement slurries, the splitting grouting slurry and the penetration grouting slurry, are combined to improve the reinforcement effect. The concentration of the slurry flowing out of the grouting zero-pressure pipe is used to judge the grouting reinforcement effect, thereby avoiding the problem of unlimited leakage of slurry due to geological problems.
[0009] In the step one, the grouting and grouting equipment includes a splitting grouting material tank, in which a mixer and a splitting grouting pump are installed, the splitting grouting pump is connected to the splitting grouting pipe and the gas tank respectively, and the splitting grouting pipe is connected to the grouting pressure pipe. The grouting and grouting equipment also includes a permeation grouting material tank, in which a permeation grouting pump is installed, the permeation grouting pump is connected to the permeation grouting pipe and the gas tank respectively, and the permeation grouting pipe is connected to the grouting pressure pipe.
[0010] In step three, a grouting pipe is installed in the reinforcement hole. The specific method is as follows: S11: The grouting pressure pipe and the grouting zero-pressure pipe are arranged in parallel, and first grouting holes with equal spacing are arranged on the wall of the grouting pressure pipe, and second grouting holes with equal spacing are arranged on the wall of the grouting zero-pressure pipe; S12: The grouting pressure pipe and the grouting zero-pressure pipe are symmetrically distributed up and down.
[0011] In the step 4, when the rock mass needs to be reinforced and water blocked, the splitting grouting slurry is selected; for the area with more rock mass particles, the penetration grouting slurry is selected.
[0012] The splitting grouting slurry is a mixed slurry of cement slurry and water glass, and the penetration grouting slurry is a polyurethane grouting slurry.
[0013] A circular mortar-stopping wall surrounding the tunnel is provided in the rock mass in the tunnel periphery reinforcement area, more than two reinforcement holes are provided in the rock mass between the circular mortar-stopping wall and the tunnel, and a water pressure test is carried out on the rock mass around each reinforcement hole to set artificial rock water pressure.
[0014] Before the step 3, a sponge is placed at the bottom of the reinforcement hole, and after the step 5, an anchoring agent is used to seal the opening of the reinforcement hole, and then a polyurethane grouting liquid is used for secondary sealing to prevent the grout from flowing back. A cement sealing wall is also provided at the opening of the reinforcement hole.
[0015] By adopting the above-mentioned technical scheme, this method suitable for high-water-pressure underwater tunnel grouting reinforcement construction can perform specific operations according to different tunnel working conditions, which can not only improve the speed of grouting construction, but also reduce the existence of safety hazards and avoid harm to the personal safety of construction workers. The overall operation is convenient, safe and practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0017] FIG1 is a schematic structural diagram of a grouting reinforcement construction method for a high-pressure underwater tunnel according to the present invention; FIG2 is a schematic diagram of the structure of the grouting pipe installed in the reinforcement hole of the present invention; FIG. 3 is a schematic diagram of the installation structure of the suspension slurry wall of the invention. DETAILED DESCRIPTION
[0018] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the present invention.
[0019] like Figure 1-3 A grouting reinforcement construction method suitable for high water pressure underwater tunnels, comprising the following steps: Step 1: Drill reinforcement holes into the rock mass in the reinforcement area around tunnel 28, and prepare grouting equipment to enter the site for construction; Step 2: Clean the reinforcement hole and perform a water pressure test on the rock mass 10 around the reinforcement hole to set an artificial rock mass water pressure; Step 3: Install grouting pipes in the reinforcement holes. The grouting pipes are at least two steel pipes with grouting holes, one is a grouting pressure pipe 22, and the other is a grouting zero-pressure pipe 23; Step 4: inject slurry into the grouting pressure pipe 22, the grouting pressure is greater than the existing environmental water pressure, and the slurry includes splitting grouting slurry and penetration grouting slurry; the grouting pressure of the grouting zero pressure pipe is zero, and the inside of the grouting zero pressure pipe is set with a rock porosity at least entered by the splitting grouting slurry; Step 5: Evaluate the grouting effect by setting artificial rock water pressure to guide the slurry to flow in a desired direction. Judge the grouting reinforcement effect by observing the concentration of the slurry flowing out of the grouting zero-pressure pipe.
[0020] As a preferred method, in step one, the grouting and grouting equipment includes a splitting grouting material tank, in which a mixer 19 and a splitting grouting pump 17 are installed, the splitting grouting pump 17 is respectively connected to the splitting grouting pipe 20 and the gas tank 1, the splitting grouting pipe 20 is connected to the grouting pressure pipe 22, and the grouting and grouting equipment also includes an infiltration grouting material tank 3, in which an infiltration grouting pump 4 is installed, the infiltration grouting pump 4 is respectively connected to the infiltration grouting pipe 21 and the gas tank 1, and the infiltration grouting pipe 21 is connected to the grouting pressure pipe 22.
[0021] As a preferred method, in step 1, a grouting pipe is installed in the reinforcement hole. The specific method is as follows: S11: The grouting pressure pipe 22 and the grouting zero-pressure pipe 23 are arranged in parallel, and the first grouting holes 52 with equal spacing are arranged on the wall of the grouting pressure pipe 22, and the second grouting holes 44 with equal spacing are arranged on the wall of the grouting zero-pressure pipe 23; S12: The grouting pressure pipe 22 and the grouting zero-pressure pipe 23 are symmetrically distributed up and down.
[0022] In step 4, when the rock mass needs to be reinforced and water-blocked, splitting grouting slurry is selected, which is a mixture of cement slurry and water glass; for areas with more rock particles, infiltration grouting slurry is selected, which is polyurethane grouting slurry.
[0023] In order to further improve the reinforcement effect, a circular grouting wall 27 surrounding the tunnel 28 is provided in the rock mass in the reinforcement area around the tunnel 28. More than two reinforcement holes are provided in the rock mass 10 between the circular grouting wall 27 and the tunnel 28, and a water pressure test is performed on the rock mass 10 around each reinforcement hole to set artificial rock mass water pressure. Before step 3, a sponge 2 is provided at the bottom of the reinforcement hole. After completing step 5, an anchor 24 is used to block the orifice of the reinforcement hole, and then a polyurethane grouting liquid 25 is used for secondary blocking. A cement blocking wall 26 is also provided at the orifice of the reinforcement hole to prevent the grout from flowing back out.
[0024] As a specific implementation method of the method of the present invention: Step (1): Determine the drilling location and preparatory work. After the drilling location is determined according to the preliminary geological survey data, complete the work of water supply, power supply, access and site leveling; use the total station to test the drilling position of the drilling hole according to the design requirements, and set up observation points in the drilling hole position and extension line direction; after the drilling location is determined, arrange the drilling equipment and grouting equipment to enter the site; the drilling equipment includes a directional drilling rig, a measurement while drilling system, and a mud circulation system; the grouting equipment includes grouting materials, a mixer, a grouting pump, and a grouting pipe; after the drilling location and orientation are determined and the preparatory work is completed, adjust the azimuth and the drilling inclination according to the design requirements and fix the drilling rig. Before drilling, check whether the various systems of the drilling rig are complete. After the inspection is qualified, prepare to drill the reinforcement hole, drill according to the designed trajectory, drill to the specified position, and finally complete the drilling of the reinforcement hole in the rock body of the reinforcement area around tunnel 28.
[0025] Step (2): Clean the reinforcement hole and perform a water pressure test on the rock mass 10 around the reinforcement hole to set artificial rock mass water pressure.
[0026] Step (3): A sponge 2 is arranged at the bottom of the reinforcement hole and then a grouting pipe is installed. The grouting pipe is at least two steel pipes with grouting holes, one is a grouting pressure pipe 22, and the other is a grouting zero-pressure pipe 23; the grouting pressure pipe 22 and the grouting zero-pressure pipe 23 are symmetrically distributed up and down, ready for grouting.
[0027] Step (4): inject slurry into the grouting pressure pipe 22, the grouting pressure is greater than the existing environmental water pressure, and the slurry includes splitting grouting slurry and infiltration grouting slurry; the grouting pressure of the grouting zero pressure pipe is zero, and the inside of the grouting zero pressure pipe is set with at least the rock mass porosity entered by the splitting grouting slurry. After the grouting material is prepared, the pipeline of the splitting grouting pump 17 and the pipeline of the infiltration grouting pump 4 are connected, and the pipeline of the splitting grouting pump 17 and the infiltration grouting pump 4 are tested for smoothness and discharge of the material, and the construction technicians verify that the splitting grouting pump 17 and the infiltration grouting pump 4 can operate normally. After that, ensure that the slurry materials are always mixed according to the required ratio, and there must be no material interruption or pump stoppage; the specific process is that the splitting grouting material tank 18 is equipped with a mixer 19 and a splitting grouting pump 17, the splitting grouting pump 17 is connected to the splitting grouting pipe 20 and the gas tank 1 respectively, the splitting grouting pipe 20 is connected to the grouting pressure pipe 22, and the grouting equipment also includes a permeation grouting material tank 3, the permeation grouting material tank 3 is equipped with a permeation grouting pump 4, the permeation grouting pump 4 is connected to the permeation grouting pipe 21 and the gas tank 1 respectively, and the permeation grouting pipe 21 is connected to the grouting pressure pipe 22. The mixed slurry of cement slurry and water glass in the splitting grouting material tank 18 is transported to the grouting zero-pressure pipe 23 through the grouting pipe 20 to reinforce and stop the rock mass.
[0028] Step (5): Grouting process. The slurry veins formed by splitting grouting constitute an interlaced skeleton structure. However, considering that it is subjected to high water pressure, penetration and extrusion grouting are implemented on the strata between the slurry veins, so that the skeleton formed is composited into an overall structure, and then the penetration grouting material is used for on-site grouting, with a grouting pressure of 1.0 to 1.5 MPa to improve the reinforcement effect.
[0029] Step (6): Evaluation of grouting effect. By setting the artificial rock mass water pressure, the slurry is guided to flow in a desired direction. By observing the concentration of the slurry flowing out of the grouting zero-pressure pipe 23, the grouting reinforcement effect can be accurately evaluated.
[0030] Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. Those skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and purpose of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A grouting reinforcement construction method suitable for high water pressure underwater tunnels, comprising the following steps: Step 1: Drill reinforcement holes into the rock mass in the reinforcement area around the tunnel (28) and prepare grouting equipment to enter the site for construction; Step 2: Clean the reinforcement hole and perform a water pressure test on the rock mass (10) around the reinforcement hole to set an artificial rock mass water pressure; Step 3: Install a grouting pipe in the reinforcement hole. The grouting pipe is at least two steel pipes with grouting holes, one is a grouting pressure pipe (22), and the other is a grouting zero-pressure pipe (23); Step 4, injecting slurry into the grouting pressure pipe (22), wherein the grouting pressure is greater than the existing environmental water pressure, and the slurry includes splitting grouting slurry and penetration grouting slurry; the grouting pressure of the grouting zero pressure pipe is zero, and the inside of the grouting zero pressure pipe is provided with a rock mass porosity at least that which can be entered by the splitting grouting slurry; Step 5: Evaluate the grouting effect by setting artificial rock water pressure to guide the slurry to flow in a desired direction. Judge the grouting reinforcement effect by observing the concentration of the slurry flowing out of the grouting zero-pressure pipe.
2. A grouting reinforcement construction method suitable for high water pressure underwater tunnels according to claim 1, characterized in that: The grouting equipment in step 1 comprises a splitting grouting material tank, wherein a mixer (19) and a splitting grouting pump (17) are installed in the splitting grouting material tank (18), the splitting grouting pump (17) is connected to a splitting grouting pipe (20) and a gas tank (1), respectively, and the splitting grouting pipe (20) is connected to a grouting pressure pipe (22). The grouting equipment also comprises an infiltration grouting material tank (3), wherein an infiltration grouting pump (4) is installed in the infiltration grouting material tank (3), the infiltration grouting pump (4) is connected to a infiltration grouting pipe (21) and a gas tank (1), respectively, and the infiltration grouting pipe (21) is connected to a grouting pressure pipe (22).
3. The method for grouting reinforcement of underwater tunnels under high water pressure according to claim 1, characterized in that: In step three, a grouting pipe is installed in the reinforcement hole. The specific method is as follows: S11: The grouting pressure pipe (22) and the grouting zero-pressure pipe (23) are arranged in parallel, and first grouting holes (52) with equal spacing are arranged on the wall of the grouting pressure pipe (22), and second grouting holes (44) with equal spacing are arranged on the wall of the grouting zero-pressure pipe (23); S12: The grouting pressure pipe (22) and the grouting zero pressure pipe (23) are symmetrically distributed up and down.
4. The method for grouting reinforcement of underwater tunnels under high water pressure according to claim 1, characterized in that: In the step 4, when the rock mass needs to be reinforced and water blocked, the splitting grouting slurry is selected; for the area with more rock mass particles, the penetration grouting slurry is selected.
5. The method for grouting reinforcement of underwater tunnels under high water pressure according to claim 4 is characterized in that: The splitting grouting slurry is a mixed slurry of cement slurry and water glass, and the penetration grouting slurry is a polyurethane grouting slurry.
6. The method for grouting reinforcement of underwater tunnels under high water pressure according to claim 1, characterized in that: A circular grouting wall (27) surrounding the tunnel (28) is provided in the rock mass in the reinforced area around the tunnel (28), more than two reinforcement holes are provided in the rock mass (10) between the circular grouting wall (27) and the tunnel (28), and a water pressure test is performed on the rock mass (10) around each reinforcement hole to set artificial rock mass water pressure.
7. The method for grouting reinforcement of underwater tunnels under high water pressure according to claim 1, characterized in that: Before the step 3 is started, a sponge (2) is provided at the bottom of the reinforcement hole, and after the step 5 is completed, an anchoring agent (24) is used to seal the opening of the reinforcement hole, and then a polyurethane grouting liquid (25) is used for secondary sealing.
8. The method for grouting reinforcement of a high-pressure underwater tunnel according to claim 7, characterized in that: The opening of the reinforcement hole is also provided with a cement sealing wall (26).
Citation Information
Cited By
Testing device and method for simulating tunnel seepage grouting reinforcement under different water pressures
CN118730743A
Dynamic regulation and control method and control system for tunneling and grouting reinforcement of water-rich layered surrounding rock tunnel
CN120819385A