Automatic control system and method for waste heat boiler drum of gas turbine unit

Through the comprehensive valve position control of the drum water adjustment control module, the problem of poor linearity and safety hazards in the drum water level control is solved, and the rapid and precise adjustment of the drum water level and low wear of the valve are achieved.

CN118775839APending Publication Date: 2024-10-15华能海南发电股份有限公司南山电厂 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410937794.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing technology cannot achieve timely and precise control of the drum water level, resulting in poor valve control linearity, large throttling losses, severe wear, and the need for manual intervention when the load changes, posing safety risks.

Method used

The steam drum water adjustment control module is used to record the valve opening and flow characteristic curves, and merge and optimize them to achieve comprehensive valve position control of the drum water control valve and the drum water bypass valve, according to the water level and flow instructions. Automatically adjust the valve opening to ensure linear and stable output of water supply flow.

Benefits of technology

It achieves rapid and precise adjustment of the drum water level, reduces valve wear, avoids safety hazards and control delays caused by mutual interference, and ensures the stability of unit operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775839A_ABST
    Figure CN118775839A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic control system and method for a waste heat boiler drum of a gas turbine unit. The system comprises a drum water feeding adjustment control module; the input end of the steam pocket water feeding adjustment control module is connected with a steam pocket water level gauge arranged on a steam pocket, a steam pocket inlet water supply flow meter and a saturated steam flow meter at a steam pocket outlet, and the output end of the steam pocket water feeding adjustment control module is connected with a steam pocket water feeding adjustment valve and a steam pocket water feeding bypass adjustment valve which are arranged on a water supply pipeline connected with the steam pocket; inlet pipelines of the steam drum water feeding adjusting valve and the steam drum water feeding bypass adjusting valve are provided with a water feeding pump used for being connected with a boiler water feeding system; according to the method, a steam drum water supply adjusting control module controls the opening degrees of a steam drum water supply adjusting valve and a steam drum water supply bypass adjusting valve through the water level of a steam drum, the current water supply flow and the saturated steam flow, and the steam drum water level is kept stable by changing the steam drum water inlet total flow; and violent change of the water level caused by sudden change of the load in the starting, stopping and normal operation processes of the unit is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of automatic control of thermal power plants, and in particular relates to an automatic control system and method for a steam drum of a waste heat boiler of a gas turbine unit. Background Art

[0002] The steam drum is a core thermal equipment in a thermal power plant. The stability of the water level in the steam drum directly affects the quality of steam and the safety of the power plant units. The main function of the steam drum is to provide a stable and reliable steam source for the unit, and at the same time store part of the working fluid and heat energy for the unit. If the water level is too high, the steam turbine will be flooded, and if the water level is too low, the boiler will dry out. Whether it is too high or too low, it will cause irreversible damage to the unit.

[0003] Figure 1 This is a schematic diagram of the typical water supply system structure of a thermal power plant.

[0004] After the feed water is pressurized by the feed water pump 5, it passes through the flow control of the drum upper water regulating valve 3 and the drum upper water bypass regulating valve 4, and then reaches the drum 1 after heat exchange in the economizer 2. The drum inlet feed water flow meter 9 is used to measure the flow Qw entering the drum, and the drum water level meter 10 is used to measure the water level Lw of the drum. A drum continuous blowdown regulating valve 7 is provided in the middle of the drum, and a drum emergency water discharge quick-opening valve 6 is provided at the lower part of the drum. The control of the drum continuous blowdown regulating valve 7 and the drum emergency water discharge quick-opening valve 6 are relatively mature. This patent mainly solves the control of the drum upper water regulating valve 3 and the drum upper water bypass regulating valve 4.

[0005] The drum water level is usually controlled by the drum water upper regulating valve 3 or the drum water upper bypass regulating valve 4 alone, or by the drum water upper regulating valve 3 and the drum water upper bypass regulating valve 4 in relay control.

[0006] When controlled separately, the feedwater flow span of the unit from startup to full load operation is extremely large, and the control of the drum water bypass regulating valve 4 alone cannot meet the flow requirements of the unit. When the drum water regulating valve 3 is used alone, the initial flow is too small, the valve opening is very small, the control linearity is poor, the throttling loss is large, and the valve wear is serious.

[0007] When the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4 are in relay control, the drum water supply bypass regulating valve 4 is usually used to control the drum water level first during the startup process. When the load reaches the switching point, the drum water supply regulating valve 3 begins to participate in controlling the drum water level. At this time, the two valves independently control the drum water level. After the drum water supply regulating valve 3 reaches a certain opening, the drum water supply bypass regulating valve 4 is automatically cut off and is turned over to the operating personnel or slowly closed at a certain rate. At this time, the drum water level is independently controlled by the drum water supply regulating valve 4. This control strategy has a complex control process, and during the relay control stage, the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4 are highly coupled and interfere with each other, resulting in poor control accuracy.

[0008] To achieve precise control of the drum water level, the current drum water level must be used as the main control method, and the inflowing feedwater flow Qw and the outflowing steam flow Qs must be balanced. When the difference ΔQ between the inflowing feedwater flow Qw and the outflowing steam flow Qs just makes up for the insufficient water level or offsets the excess water level, the drum water level is stable at zero water level. In fact, when the unit changes load, the steam flow Qs changes frequently and there is a false water level phenomenon, which requires that the control of the feedwater flow Qw must be timely and accurate, and the coupling effect of the drum upper water regulating valve 3 and the drum upper water bypass regulating valve 4 when controlling the water level must be minimized. The two valves are jointly controlled as a valve group, and the flow command Qsp sent by the automatic control system is received at the same time. Then, the respective openings are calculated according to the optimized comprehensive valve flow characteristic curve, which can ensure that the feedwater flow Qw flowing into the drum meets the requirements in a timely and accurate manner, and then maintain the normal drum water level.

[0009] The current conventional control system and control method cannot achieve this control target. When the control rights of the drum water regulating valve and the drum water bypass regulating valve are switched, manual intervention by the operating personnel is often required. Summary of the invention

[0010] In view of the above problems existing in the prior art, the present invention provides an automatic control system and method for the steam drum of a waste heat boiler of a gas turbine unit, so as to realize timely and accurate control of the water level in the steam drum, avoid serious throttling losses caused by the linear difference of valve control and serious valve wear caused by a single valve controlling the water level.

[0011] In order to achieve the above object, the present invention adopts the following technical solution:

[0012] An automatic control system for a waste heat boiler drum of a gas turbine unit, comprising a drum water supply regulation control module;

[0013] The input end of the drum water supply regulating control module is connected to a drum water level meter, a drum inlet feed water flowmeter and a drum outlet saturated steam flowmeter arranged on the drum, and the output end of the drum water supply regulating control module is connected to a drum water supply regulating valve and a drum water supply bypass regulating valve arranged on a feed water pipe connected to the drum; the inlet pipes of the drum water supply regulating valve and the drum water supply bypass regulating valve are provided with feed water pumps for connecting to the boiler feed water system.

[0014] A further improvement of the present invention is that a saturated steam pipeline is provided on the steam drum to the boiler superheater.

[0015] A further improvement of the present invention is that a continuous blowdown regulating valve for the steam drum is arranged in the middle of the steam drum.

[0016] A further improvement of the present invention is that a quick-opening valve for emergency water discharge of the steam drum is arranged at the lower part of the steam drum.

[0017] A method for automatically controlling a steam drum of a waste heat boiler of a gas turbine unit, the method being based on the automatic control system of a steam drum of a waste heat boiler of a gas turbine unit, comprising:

[0018] Close the drum water supply regulating valve and the drum water supply bypass regulating valve, maintain the output power of the feedwater pump to stabilize the outlet main pipe pressure of the feedwater pump, open the drum water supply bypass regulating valve according to the set step until the drum water supply bypass regulating valve is fully opened, record the corresponding data of the valve opening and flow rate during the opening process, and draw the valve position opening and flow rate characteristic curve of the drum water supply bypass regulating valve;

[0019] Close the drum water regulating valve and the drum water bypass regulating valve, maintain the output power of the feedwater pump to stabilize the outlet main pipe pressure, open the drum water regulating valve according to the set step until the valve is fully open, record the corresponding data of the valve opening and flow rate during the opening process, and draw the valve position opening and flow rate characteristic curve of the drum water regulating valve;

[0020] According to the drum inlet feedwater flow command output by the drum water level control PID, the valve position opening and flow characteristic curve of the drum upper water regulating valve and the valve position opening and flow characteristic curve of the drum upper water bypass regulating valve are combined and optimized to obtain a function of the drum inlet feedwater flow command and the comprehensive valve positions of the drum upper water regulating valve and the drum upper water bypass regulating valve, and the drum inlet feedwater flow command and the comprehensive valve position opening characteristic curve are plotted;

[0021] The drum water supply regulating control module performs deviation calculation on the water level signal received from the drum water level gauge and the set water level offset signal, and then obtains the drum inlet feed water flow command after the drum water level PID calculation; the drum water supply regulating valve and the drum water supply bypass regulating valve allocate the opening command according to the drum inlet feed water flow command and the comprehensive valve position opening characteristic curve.

[0022] A further improvement of the present invention is that, during the load increase process, when the unit load is small, a drum water supply bypass regulating valve is used to independently supply water to the drum; when the load rises to the linear difference part between the valve position of the rear section of the drum water supply bypass regulating valve and the flow characteristic curve, the drum water supply regulating valve has a valve position opening of 15% in advance according to the flow demand of the drum; as the load continues to rise, the drum water supply regulating valve is further opened to the best linear area of ​​its valve, and the drum water supply bypass regulating valve is slowly closed according to the increase of the total flow instruction at the drum inlet until it is fully closed.

[0023] A further improvement of the present invention is that, during the load reduction process, when the unit load is large, a drum supply water regulating valve is used to independently supply water to the drum; when the load drops to before the optimal linear control of the drum supply water regulating valve, the drum supply water bypass regulating valve has a valve position opening of 27% in advance according to the flow demand of the drum; as the load continues to drop, the drum supply water regulating valve is further closed until it is fully closed; the drum supply water bypass regulating valve is first slowly opened and then slowly closed according to the decrease of the total flow command at the drum inlet, and no matter how the unit load changes, the combined valve group always maintains a linear and stable output of the drum feed water flow.

[0024] A further improvement of the present invention is that when the drum water supply regulating valve and the drum water supply bypass regulating valve are both in automatic mode and during the load increase process, the opening of the drum water supply bypass regulating valve is greater than 75%, the linearity of the flow characteristic curve corresponding to the valve opening becomes worse, and the regulating capacity of the drum water supply bypass regulating valve decreases; at this time, the drum water supply regulating valve is opened to make up for the insufficient regulating capacity of the drum water supply bypass regulating valve.

[0025] A further improvement of the present invention is that when the drum water supply regulating valve and the drum water supply bypass regulating valve are both in automatic mode and during load reduction, when the opening of the drum water supply regulating valve is less than 90%, the drum water supply bypass regulating valve is opened until the adjustment linearity deteriorates when the opening of the drum water supply regulating valve is 15%. At this time, the drum water supply regulating valve is fully closed and is independently adjusted by the drum water supply bypass regulating valve.

[0026] A further improvement of the present invention is that when either the drum water supply regulating valve or the drum water supply bypass regulating valve is in automatic mode, the flow output Q of the current valve is calculated based on the current manual valve opening, and the flow instruction of the automatic regulating valve is the drum inlet feed water flow instruction Qsp output by the drum water level control PID minus the current manual valve opening to calculate the current valve flow output Q, and then the valve opening is calculated based on the automatic valve flow characteristic curve.

[0027] The present invention has at least the following beneficial technical effects:

[0028] The present invention provides an automatic control system for the drum of a waste heat boiler of a gas turbine unit. In the prior art, when the drum inlet flow reaches the critical flow of the valve design, the drum water regulating valve and the drum water bypass regulating valve often have a certain opening, and conventional control often requires one of the valves to be switched to manual, which makes it impossible to achieve full-cycle automatic operation of the unit; or the two valves interfere with each other when they are in automatic mode, resulting in unstable drum inlet flow or frequent valve action, causing safety hazards to the unit and excessive wear of the valve. The present invention realizes the opening adjustment of the drum water regulating valve and the drum water bypass regulating valve through a drum water regulating control module, and the response is fast.

[0029] The present invention provides an automatic control method for the steam drum of a waste heat boiler of a gas turbine unit. The method adopts a combined valve group control method, regards the control of the steam drum water regulating valve and the steam drum water bypass regulating valve as a whole, takes the steam drum inlet feed water flow instruction as a reference, fully considers the linear change and dead zone range of the valve in the entire adjustment stroke, and significantly reduces the inherent flow valve position characteristic relationship influence when adjusting a single valve, as well as the empty stroke and over-adjustment during the adjustment process. At the same time, the present invention realizes fast response of steam drum water level regulation, small valve wear, and stable linear supply of steam drum inlet feed water flow. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a typical schematic diagram of the steam drum water level control in the feed water system of a thermal power plant.

[0031] Figure 2 The present invention is a schematic diagram of an automatic control system for a waste heat boiler drum of a gas turbine unit.

[0032] Figure 3 This is a schematic diagram of the control method of the present invention.

[0033] Figure 4 It is the valve position and flow characteristic curve of the waste heat boiler drum water bypass regulating valve and the valve position and flow characteristic curve of the water supply regulating valve.

[0034] Figure 5 It is the output flow and valve position characteristic curve of the waste heat boiler drum water supply combined valve group.

[0035] Figure 6 This is the optimized valve group flow output curve.

[0036] Description of reference numerals:

[0037] 1 is the steam drum, 2 is the economizer, 3 is the steam drum water supply regulating valve, 4 is the steam drum water supply bypass regulating valve, 5 is the feed water pump, 6 is the steam drum emergency water discharge quick opening valve, 7 is the steam drum continuous sewage discharge regulating valve, 8 is the feed water main pipe pressure at the feed water pump outlet, 9 is the steam drum inlet feed water flowmeter, 10 is the steam drum water level gauge, 11 is the saturated steam flow, and 12 is the steam drum water supply regulating control module. DETAILED DESCRIPTION

[0038] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0039] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0040] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0041] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0042] It should be further understood that the term "and / or" used in the present description and the appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0043] Various structural schematic diagrams of the embodiments disclosed in the present invention are shown in the accompanying drawings. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.

[0044] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0045] Example 1

[0046] like Figure 2As shown, the present invention provides an automatic control system for a steam drum of a waste heat boiler of a gas turbine unit, comprising a steam drum water supply regulating control module 12; the input end of the steam drum water supply regulating control module 12 is connected with a steam drum water level meter 10, a steam drum inlet feed water flow meter 9 and a saturated steam flow meter 11 at a steam drum outlet arranged on the steam drum 1, and the output end of the steam drum water supply regulating control module 12 is connected with a steam drum water supply regulating valve 3 and a steam drum water supply bypass regulating valve 4 arranged on a feed water pipeline connected to the steam drum; the steam drum water supply regulating control module 12 is used for maintaining the stability of the steam drum water level by controlling the opening of the steam drum water supply regulating valve 3 and the steam drum water supply bypass regulating valve 4 and changing the total steam drum water supply flow; the inlet pipelines of the steam drum water supply regulating valve 3 and the steam drum water supply bypass regulating valve 4 are provided with a feed water pump 5 for connecting to the boiler feed water system.

[0047] In this embodiment, a saturated steam pipeline is provided on the steam drum 1 to the boiler for superheating.

[0048] In this embodiment, a continuous blowdown regulating valve 7 is provided in the middle of the drum 1, and an emergency water discharge quick-opening valve 6 is provided in the lower part of the drum.

[0049] In this embodiment, during operation, the sampled feed water is pressurized by the feed water pump 5, flows through the drum upper water regulating valve 3 or the drum upper water bypass regulating valve 4, and then enters the drum 1 after being heated by the boiler economizer 2. The saturated steam in the drum 1 enters the boiler superheater through the upper steam pipe. The feed water main pipe pressure 8 at the outlet of the feed water pump is used to measure the outlet main pipe pressure Pw of the feed water pump, the feed water flow meter 9 at the inlet of the drum is used to measure the total feed water flow Qw entering the drum, the drum water level meter 10 is used to measure the drum water level, the saturated steam flow 11 is used to measure the saturated steam flow out of the drum, the drum continuous sewage regulating valve 7 is used to discharge high-concentration boiler salt water out of the drum at the steam-water interface of the drum, and the drum emergency drain quick-opening valve 6 is used for emergency drainage when the drum water level is high.

[0050] The drum water level Lw measured by the drum water level meter 10, the feed water flow Qw measured by the drum inlet feed water flow meter 9 and the saturated steam flow Qs measured by the saturated steam flow 11 are connected to the drum water supply regulating control module 12, and the output control instructions of the drum water supply regulating control module are sent to the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4.

[0051] The drum water level Lw measured by the drum water level meter 10, the feed water flow Qw measured by the drum inlet feed water flowmeter 9 and the saturated steam flow Qs measured by the saturated steam flow 11 are connected to the drum water supply regulating control module 12. The output control of the drum water supply regulating control module is connected to the valve opening instruction AO of the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4, which is used to control the opening of the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4 to keep the drum water level within the normal range.

[0052] Example 2

[0053] This embodiment provides an automatic control method for a waste heat boiler drum of a gas turbine unit, comprising the following steps:

[0054] Step 1: Close the drum water regulating valve 3 and the drum water bypass regulating valve 4, stabilize the outlet main pipe pressure 8 of the feed water pump 5, slowly open the drum water bypass regulating valve 4 by increasing the opening by 5% each time until the drum water bypass regulating valve 4 is fully opened, record the corresponding data of the valve opening and flow rate during the opening process, and draw the valve position opening and flow rate characteristic curve, such as Figure 4 shown.

[0055] Step 2: Close the drum water regulating valve 3 and the drum water bypass regulating valve 5, stabilize the outlet main pipe pressure 8 of the feed water pump 5, and slowly open the drum water regulating valve 3 by increasing the opening by 5% each time until the valve is fully open. Record the corresponding data of the valve opening and flow rate during the opening process, and draw the valve position opening and flow rate characteristic curve, such as Figure 5 shown.

[0056] Step 3: According to the first two steps, the valve position opening and flow corresponding curves of the drum water regulating valve 3 and the drum water bypass regulating valve 4 are obtained. According to the drum inlet feed water flow command output by the drum water level control PID, the curves of the drum water regulating valve 3 and the drum water bypass regulating valve 4 are optimized and merged, and the appropriate valve overlap is set to obtain a joint valve position corresponding function of the drum inlet feed water flow command and the drum water regulating valve 3 and the drum water bypass regulating valve 4. The valve position opening and flow characteristic curves are plotted, as shown in FIG. Figure 6 shown.

[0057] The drum water supply regulating control module 12 first performs deviation calculation on the water level signal received from the drum water level meter 10 and the water level offset signal set by the operator, and then calculates the drum inlet feedwater flow command after the drum water level PID calculation. The drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4 allocate the opening command of their respective valves according to the drum inlet feedwater flow command and the comprehensive valve position opening characteristic curve. This curve takes the flow rate as the optimization purpose, fully considers the linear change and dead zone range of the valve in the entire adjustment stroke, so that the drum inlet feedwater flow command can be timely and accurately expressed by the comprehensive valve position function of the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4, avoiding empty stroke and over-adjustment during the adjustment process.

[0058] According to the valve position opening and flow characteristic curve, the middle section of the valve stroke is the most linear of the entire valve. When it is close to the fully open or fully closed position, the linearity of the valve position corresponding to the flow is relatively poor, so the reasonable optimization of the valve flow characteristic is the key. The valve position opening and flow characteristic curve of a single valve are fixed, so the drum water regulating valve 3 and the drum water bypass regulating valve 4 are regarded as a combined valve group, and the overlap of the two valves is appropriately optimized to make the valve position and flow characteristic curve corresponding to the entire valve group more linear.

[0059] In this embodiment, during the load increase process, the drum water supply bypass regulating valve 4 is used to independently supply water to the drum when the unit load is small; when the load rises to the linear difference part between the valve position of the rear section of the drum water supply bypass regulating valve 4 and the flow characteristic curve, the drum water supply regulating valve 3 has a valve position opening of 15% in advance according to the flow demand of the drum; as the load continues to rise, the drum water supply regulating valve 3 is further opened to the best linear area of ​​its valve, and the drum water supply bypass regulating valve 4 is slowly closed according to the increase of the total flow instruction at the drum inlet until it is fully closed.

[0060] In this embodiment, during the load reduction process, when the unit load is large, the drum water supply regulating valve 3 is used to independently supply water to the drum; when the load drops to before the optimal linear control of the drum water supply regulating valve 3, the drum water supply bypass regulating valve 4 has a valve position opening of 27% in advance according to the flow demand of the drum; as the load continues to drop, the drum water supply regulating valve 3 is further closed until it is fully closed; the drum water supply bypass regulating valve 4 is first slowly opened and then slowly closed according to the decrease of the total flow command at the drum inlet. No matter how the unit load changes, the combined valve group always maintains a linear and stable output of the drum feed water flow.

[0061] In this embodiment, when the drum water regulating valve 3 and the drum water bypass regulating valve 4 are both in automatic mode; during the load increase process, the opening of the drum water bypass regulating valve 3 is greater than 75%, the linearity of the flow characteristic curve corresponding to the valve opening becomes worse, and the regulating capacity of the drum water bypass regulating valve 4 decreases. At this time, the drum water regulating valve 3 is slowly opened to make up for the insufficient regulating capacity of the drum water bypass regulating valve 4. During the load reduction process, when the opening of the drum water regulating valve 3 is less than 90%, the drum water bypass regulating valve 3 is slowly opened until the opening of the drum water regulating valve 3 is 15%, and the regulating linearity becomes worse. At this time, the drum water regulating valve 3 is fully closed, and the drum water bypass regulating valve 4 is independently regulated.

[0062] In this embodiment, when either the drum water supply regulating valve 3 or the drum water supply bypass regulating valve 4 is in automatic mode, the system calculates the flow output Q of the current valve according to the current manual valve opening, and the flow instruction of the automatic regulating valve is the drum inlet feed water flow instruction Qsp output by the drum water level control PID minus the current manual valve opening to calculate the flow output Q of the current valve, and then calculates the valve opening according to the automatic valve flow characteristic curve.

[0063] In this embodiment, no matter how the load changes, the regulation of the total flow rate at the drum inlet can be ensured to be always stable, thereby avoiding disturbances caused by the switching of control rights of the total flow rate at the drum inlet due to mutual interference between the drum water supply regulating valve and the drum water supply bypass regulating valve when the load is increased or decreased.

[0064] Example 3

[0065] like Figure 3 As shown, this embodiment provides an automatic control method for a waste heat boiler drum of a gas turbine unit, specifically:

[0066] 1. Close the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4, stabilize the outlet main pipe pressure 8 of the feed water pump 5, slowly open the drum water supply bypass regulating valve 4 by increasing the opening by 5% each time until the valve is fully open, record the corresponding data of the valve opening and flow rate during the opening process, and draw the valve position opening and flow rate characteristic curve.

[0067] Table 1

[0068]

[0069]

[0070] 2. Close the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 5, stabilize the outlet main pipe pressure 8 of the feed water pump 5, slowly open the drum water supply regulating valve 3 by increasing the opening by 5% each time until the valve is fully open, record the corresponding data of the valve opening and flow rate during the opening process, and draw the valve position opening and flow rate characteristic curve.

[0071] Table 2

[0072]

[0073]

[0074] 3. According to the first two steps, the valve position opening and flow correspondence curves of the drum water supply regulating valve 3 and the valve position opening and flow correspondence curves of the drum water supply bypass regulating valve 4 are obtained. According to the drum inlet feed water flow instruction output by the drum water level control PID, the curves of the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4 are optimized and merged, and a suitable valve overlap is set to obtain a joint valve position correspondence function of the drum inlet feed water flow instruction and the drum water supply regulating valve 3 and the drum water supply bypass regulating valve 4, and the valve position opening and flow characteristic curves are plotted.

[0075] Table 3

[0076]

[0077]

[0078] 4. The water level Lw measured by the drum water level gauge 10 is subtracted from the water level setting value bias Lbias to obtain the water level deviation ΔL. The water level deviation ΔL is calculated by PID to obtain the feedwater flow setting value Qsp that achieves water level balance. The difference between the feedwater flow setting value Qsp and the actual feedwater flow is the feedwater flow that needs to be supplemented, and the change in steam flow when the load changes is added to obtain the final valve group flow command Qo.

[0079] 5. When the drum water bypass regulating valve and the drum water regulating valve are both in automatic mode, the valve group flow command Qo is obtained through function F1(x) to obtain the drum valve group flow command Qo and the valve position opening command of the drum water bypass regulating valve. The valve group flow command Qo is obtained through function F2(x) to obtain the drum valve group flow command Qo and the valve position opening command of the drum water regulating valve.

[0080] 6. When the drum water supply bypass regulating valve is in automatic M2_AUTO and the drum water supply regulating valve is in manual: the valve group flow command Qo is minus the valve position opening of the drum water supply regulating valve and the feed water flow corresponding to the flow function F4(x), to obtain the feed water flow required by the drum water supply bypass regulating valve, and then calculate the valve position command of the water supply bypass regulating valve according to the valve opening command F5(x) corresponding to the water supply bypass regulating valve flow.

[0081] 7. When the drum water supply regulating valve is in automatic M1_AUTO and the drum water supply bypass regulating valve is in manual: the valve group flow command Qo is minus the valve position opening of the drum water supply bypass regulating valve and the feed water flow corresponding to the flow function F4(x), to obtain the feed water flow required to be provided by the drum water supply regulating valve, and then calculate the valve position command of the water supply regulating valve according to the valve opening command F6(x) corresponding to the water supply regulating valve flow.

[0082] The present invention provides a system and method for controlling the drum inlet feedwater flow rate based on water level and flow state to realize the drum water supply valve and the drum water supply bypass valve. When the drum water level Lw is lower than the set value (0+Lbias) of the drum water level, the drum water level can be quickly replenished to the set water level. When the drum water level Lw is higher than the set value (0+Lbias) of the drum water level, the drum water level can be timely reduced to the set water level. When the drum water level Lw is consistent with the set value (0+Lbias) of the drum water level, the current valve position state is maintained to maintain the drum water level.

[0083] The present invention provides a system and method for controlling the drum inlet feedwater flow rate based on water level and flow state to realize the drum water supply regulating valve and the drum water supply bypass regulating valve. During the whole control process, the drum water supply regulating valve and the drum water supply bypass regulating valve can open or close in a timely, linear and accurate manner following the valve group flow instruction Qo. The drum water level can be regulated quickly and reliably throughout the load cycle. The hysteresis or over-regulation of the drum water level regulation caused by poor valve regulation linearity or mutual interference is avoided, which causes the unstable water level and then affects the safe operation of the unit.

[0084] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0085] In addition, it should be understood that although this specification is described in accordance with the implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art. The above content is only to illustrate the technical idea of ​​the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution according to the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.

Claims

1. An automatic control system for a waste heat boiler drum of a gas turbine unit, characterized in that: It includes a drum water supply regulating control module (12); The input end of the drum water regulation control module (12) is connected to a drum water level meter (10) arranged on the drum (1), a drum inlet feed water flow meter (9) and a drum outlet saturated steam flow meter (11), and the output end of the drum water regulation control module (12) is connected to a drum water regulation valve (3) and a drum water bypass regulation valve (4) arranged on a feed water pipeline connected to the drum; the inlet pipelines of the drum water regulation valve (3) and the drum water bypass regulation valve (4) are provided with a feed water pump (5) for connecting to a boiler feed water system.

2. The automatic control system of the waste heat boiler drum of a gas turbine unit according to claim 1, characterized in that: A saturated steam pipeline is arranged on the steam drum (1) to the boiler superheater.

3. The automatic control system of the waste heat boiler drum of a gas turbine unit according to claim 1, characterized in that: A steam drum continuous sewage discharge regulating valve (7) is arranged in the middle of the steam drum (1).

4. The automatic control system of the waste heat boiler drum of a gas turbine unit according to claim 1, characterized in that: A quick-opening valve (6) for emergency water discharge of the steam drum is arranged at the lower part of the steam drum.

5. An automatic control method for a waste heat boiler drum of a gas turbine unit, characterized in that: The method is based on an automatic control system for a waste heat boiler drum of a gas turbine unit according to any one of claims 1 to 4, comprising: Close the drum water supply regulating valve (3) and the drum water supply bypass regulating valve (4), maintain the output power of the feed water pump (5) to stabilize the outlet main pipe pressure (8) of the feed water pump, open the drum water supply bypass regulating valve (4) according to the set step until the drum water supply bypass regulating valve (4) is fully opened, record the corresponding data of the valve opening and flow rate during the opening process, and draw a valve position opening and flow rate characteristic curve of the drum water supply bypass regulating valve (4); Close the drum water supply regulating valve (3) and the drum water supply bypass regulating valve (4), maintain the output power of the feed water pump (5) to stabilize the outlet main pipe pressure (8), open the drum water supply regulating valve (3) according to the set step until the valve is fully opened, record the corresponding data of the valve opening and flow rate during the opening process, and draw a valve position opening and flow rate characteristic curve of the drum water supply regulating valve (3); According to the drum inlet feedwater flow rate instruction output by the drum water level control PID, the valve position opening and flow rate characteristic curve of the drum upper water regulating valve (3) and the valve position opening and flow rate characteristic curve of the drum upper water bypass regulating valve (4) are combined and optimized to obtain a function of the drum inlet feedwater flow rate instruction and the comprehensive valve positions of the drum upper water regulating valve (3) and the drum upper water bypass regulating valve (4), and the drum inlet feedwater flow rate instruction and the comprehensive valve position opening characteristic curve are obtained by plotting; The drum water supply regulating control module (12) performs deviation calculation on the water level signal received from the drum water level meter (10) and the set water level offset signal, and then obtains the drum inlet feed water flow instruction after the drum water level PID calculation; the drum water supply regulating valve (3) and the drum water supply bypass regulating valve (4) distribute the opening instruction according to the drum inlet feed water flow instruction and the comprehensive valve position opening characteristic curve.

6. The automatic control method of the waste heat boiler drum of a gas turbine unit according to claim 5, characterized in that: During the load increase process, when the unit load is small, the drum water bypass regulating valve (4) is used to independently supply water to the drum; when the load rises to the linear difference part between the valve position of the rear section of the drum water bypass regulating valve (4) and the flow characteristic curve, the drum water regulating valve (3) has a 15% valve position opening in advance according to the flow demand of the drum; as the load continues to rise, the drum water regulating valve (3) is further opened to the best linear area of ​​its valve, and the drum water bypass regulating valve (4) is slowly closed according to the increase of the total flow instruction of the drum inlet until it is fully closed.

7. The automatic control method of the waste heat boiler drum of a gas turbine unit according to claim 5, characterized in that: During the load reduction process, when the unit load is large, the drum water supply regulating valve (3) is used to independently supply water to the drum; when the load drops to before the optimal linear control of the drum water supply regulating valve (3), the drum water supply bypass regulating valve (4) has a valve position opening of 27% in advance according to the flow demand of the drum; as the load continues to drop, the drum water supply regulating valve (3) is further closed until it is fully closed; the drum water supply bypass regulating valve (4) is first slowly opened and then slowly closed according to the decrease of the total flow command of the drum inlet. No matter how the unit load changes, the combined valve group always maintains the linear and stable output of the drum feed water flow.

8. The automatic control method of the waste heat boiler drum of a gas turbine unit according to claim 5, characterized in that: When the drum water supply regulating valve (3) and the drum water supply bypass regulating valve (4) are both in automatic mode and during the load increase process, the opening degree of the drum water supply bypass regulating valve (3) is greater than 75%, the flow characteristic curve corresponding to the valve opening becomes linearly worse, and the regulating capacity of the drum water supply bypass regulating valve (4) decreases; at this time, the drum water supply regulating valve (3) is opened to make up for the insufficient regulating capacity of the drum water supply bypass regulating valve (4).

9. The automatic control method of the waste heat boiler drum of a gas turbine unit according to claim 5, characterized in that: When the drum water regulating valve (3) and the drum water bypass regulating valve (4) are both in automatic mode and during load reduction, when the opening of the drum water regulating valve (3) is less than 90%, the drum water bypass regulating valve (3) is opened until the drum water regulating valve (4) opens to 15% and the regulation linearity deteriorates. At this time, the drum water regulating valve (3) is fully closed and the drum water bypass regulating valve (4) is independently regulated.

10. The automatic control method of the waste heat boiler drum of a gas turbine unit according to claim 5, characterized in that: When either the drum water supply regulating valve (3) or the drum water supply bypass regulating valve (4) is in automatic mode, the flow output Q of the current valve is calculated based on the current manual valve opening. The flow command of the automatic regulating valve is the drum inlet feed water flow command Qsp output by the drum water level control PID minus the current manual valve opening to calculate the flow output Q of the current valve. The valve opening is then calculated based on the valve flow characteristic curve in the automatic mode.