Blasting excavation construction method for eliminating shallow points in underwater channel
By using a combination of shaped charge cover and guide tube in underwater channel construction, the problem of overexplosion in traditional blasting construction is solved, more accurate and efficient shallow-point blasting is achieved, the need for backfilling is reduced, and construction efficiency and safety are improved. sex.
Patent Information
- Application Number
- CN202410879704.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-02
AI Technical Summary
In the construction of underwater channels, traditional blasting construction methods can easily lead to super-explosion, causing damage to the floor and requiring subsequent backfilling, making the operation cumbersome.
Using the method of combining the shaped charge cover and the guide tube, the shaped charge cover is loaded at the bottom of the blast hole and a smooth filling channel is formed through the guide tube. After the shaped charge cover is detonated, a high-temperature and high-pressure annular metal jet is formed to cut the rock mass. Reduce the risk of super-explosion, and seal the top gas escape with gun mud to ensure the blasting effect.
It achieves more accurate shallow blasting, reduces the occurrence of overexplosion, reduces the need for subsequent backfilling construction, and improves construction efficiency and safety.
Smart Images

Figure CN118776403A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of underwater blasting construction, and in particular to a blasting excavation construction method for eliminating shallow points in an underwater channel. Background Art
[0002] With the development of water transportation, the scale of underwater waterway construction has continued to expand, which has put forward higher requirements for the navigation safety of underwater waterways.
[0003] Due to the combined influence of factors such as water flow and terrain, shallow spots are prone to appear in underwater waterways. The existence of shallow spots will bring great safety hazards to passing ships. Therefore, during the construction of underwater waterways, it is usually necessary to carry out blasting construction on the shallow spots underwater to eliminate them.
[0004] When blasting construction is carried out in shallow areas, usually several blast holes are drilled in the shallow area, explosives are loaded into the blast holes, and finally the explosives in the blast holes are detonated to achieve blasting construction in the shallow area.
[0005] During the shallow point blasting construction process, in order to more thoroughly blast and clear the shallow point area, the blast hole usually needs to be excavated super deep. However, this blasting method is prone to over-explosion because the explosives in the subsequent blast holes will form a blasting funnel at the bottom of the blast hole when they explode, causing damage to the bottom plate (the bedrock at the bottom of the blasting area). Therefore, after the shallow point blasting construction is completed, it is usually necessary to re-backfill the over-explosion area; the operation is relatively cumbersome. Therefore, there is room for improvement. Summary of the invention
[0006] In order to carry out blasting construction in shallow areas more accurately, the present application provides a blasting excavation construction method for eliminating shallow points in an underwater channel.
[0007] The present application provides a method for blasting and excavating underwater channels to eliminate shallow points, which adopts the following technical solutions: A blasting excavation construction method for eliminating shallow points in an underwater channel comprises the following steps: S1: Drilling operation: Drilling several blastholes in shallow areas: S2: Hole cleaning operation: clean up the debris at the bottom of the blasthole; S3: Shaped charge liner filling operation: put the shaped charge liner into the bottom of the blast hole; the shaped charge liner is made of metal, and is in the shape of a column with a small middle and large ends, and is filled with explosives; the bottom of the shaped charge liner is also coaxially connected to a conical positioning block with the tip facing downwards; S4: Explosives loading operation: filling the explosive rolls with detonators into the blast holes; S5: Detonation connection operation: connecting the detonator of the explosive roll with the detonator; S6: Shallow point blasting: The explosive roll in the blast hole is detonated by the detonator to blast the shallow point.
[0008] By adopting the above technical scheme, the explosives in the subsequent blast hole explode and then detonate the shaped charge cap at the bottom of the blast hole. Through the energy-gathering effect of the shaped charge cap's own structure, the shaped charge cap forms a high-temperature and high-pressure annular metal jet after being detonated, and an annular gap is cut out in the rock mass around the blast hole through the annular metal jet. At the same time, the high-temperature and high-pressure gas generated by the blasting further acts on the annular gap cut out by the annular metal jet, so that the annular gap is further developed, and finally a relatively flat section is formed at the bottom of the shallow point blasting area; this is conducive to more accurate blasting of shallow points, and compared with traditional shallow point blasting construction, it reduces the situation where over-blasting leads to the need for subsequent backfilling construction. The setting of the conical positioning block, on the one hand, can guide the shaped charge liner, making it easier to fill the shaped charge groove into the blast hole; on the other hand, when the shaped charge liner is placed at the bottom of the blast hole, it can be kept in a relatively vertical state by the conical positioning block, thereby reducing the situation where the shaped charge liner is tilted due to the uneven bottom of the blast hole or the presence of debris, thereby affecting the subsequent explosive cutting effect of the shaped charge liner.
[0009] Preferably, the bottom opening of the shaped charge liner is provided, the top of the conical positioning block is coaxially connected with a connecting pipe, and the top of the conical positioning block is coaxially sleeved on the bottom end of the shaped charge liner through the connecting pipe to seal the bottom opening of the shaped charge liner.
[0010] By adopting the above technical scheme, explosives can be filled into the shaped charge liner through the top opening of the shaped charge liner; the conical positioning block is connected to the bottom of the shaped charge liner through a connecting pipe, so as to realize the connection between the conical positioning block and the shaped charge liner on the one hand, and on the other hand, the conical positioning block can be used to seal the bottom opening of the shaped charge liner, which is beneficial to reduce the leakage of explosives filled in the shaped charge liner during the subsequent transportation or filling process of the shaped charge liner.
[0011] Preferably, in step S4: after the explosive roll is loaded, the top opening of the blasthole is filled with gun mud to seal the top opening of the blasthole.
[0012] By adopting the above technical solution, when the explosives in the subsequent blastholes explode, the high-temperature and high-pressure gases generated by the blasting can be restricted from overflowing from the blasthole mouths by the gun mud at the blasthole mouths, so that the high-temperature and high-pressure gases generated by the explosion of the explosives can better act on the rock mass around the blasthole, thereby facilitating more thorough blasting of the shallow area.
[0013] Preferably, in step S2, after the blasthole is cleaned, a guide tube is inserted into the blasthole and the top end of the guide tube is extended out of the water surface; In step S3 and step S4: the shaped charge liner and the explosive roll are sequentially filled into the blast hole through the guide tube; In step S4, after the explosive coil is loaded, the guide tube is removed from the blast hole.
[0014] By adopting the above technical scheme, since the wall of the blast hole is usually not smooth, it is difficult to directly load the shaped charge liner and the explosive roll; by inserting a guide tube into the blast hole, a relatively smooth and flat guide channel can be formed in the blast hole through the guide tube, so that the subsequent shaped charge liner and the explosive roll can slide smoothly into the blast hole through the guide tube, thereby reducing the friction between the shaped charge liner and the explosive roll and the unevenness of the blast hole wall when the shaped charge liner and the explosive roll are subsequently loaded into the blast hole, resulting in difficulty in loading or damage to the shaped charge liner and the explosive roll.
[0015] Preferably, in step S2, after the guide tube is inserted into the blasthole, concrete is injected into the bottom of the guide tube to form a leveling layer.
[0016] By adopting the above technical scheme, it is beneficial to improve the flatness of the bottom of the blasthole through the leveling layer, so that the subsequent shaped charge cap can better maintain a relatively vertical upright state after being placed at the bottom of the blasthole, which is beneficial to the generation of a relatively horizontal annular metal jet after the shaped charge cap is detonated, so as to better cut the rock around the blasthole.
[0017] Preferably, in step S2, before injecting concrete into the guide pipe, the river water in the guide pipe is pumped out.
[0018] By adopting the above technical solution, it is beneficial to keep the blasthole in a relatively dry state, which is convenient for the subsequent smooth injection and solidification of concrete; at the same time, it makes it easier for the subsequent shaped charge cap and explosive roll to be filled into the blasthole through the guide tube.
[0019] Preferably, in step S2, after the guide tube is inserted into the blasthole, waterproof cement is filled into the gap between the blasthole mouth and the guide tube.
[0020] By adopting the above technical solution, it is beneficial to improve the sealing between the forming tube and the blasthole. When the water in the forming tube is subsequently pumped out, the waterproof cement can be used to limit the external water from flowing into the forming tube through the gap between the forming tube and the blasthole, so as to facilitate faster pumping out of the river water in the forming tube.
[0021] Preferably, in step S2, before placing the guide tube into the blast hole, a release agent is applied to the inner and outer peripheries of the bottom end of the guide tube to form a release layer.
[0022] By adopting the above technical solution, when the guide tube is subsequently removed from the blast hole, the demoulding layer can be provided to make it easier for the guide tube to separate from the leveling layer, thereby facilitating the removal of the guide tube from the blast hole.
[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. By loading the shaped charge cap at the bottom of the blasthole, the explosive roll in the subsequent blasthole detonates the shaped charge cap, which forms a high-temperature and high-pressure annular metal jet and cuts the rock structure around the blasthole. At the same time, the high-temperature and high-pressure gas generated by the detonation of the explosive in the blasthole further acts on the annular gap cut by the metal jet, causing the annular gap to develop further, and finally cutting a relatively flat section at the bottom of the shallow point area, which is conducive to more accurate blasting construction of shallow points.
[0024] 2. A conical positioning block with the tip facing downward is connected to the bottom of the shaped charge liner. After the shaped charge liner is placed into the blast hole, the shaped charge liner can be kept in a relatively vertical upright state by the conical positioning block, so that a relatively horizontal annular metal jet can be formed after the shaped charge liner is detonated to cut the rock around the blast hole.
[0025] 3. By inserting a guide tube into the blasthole and making the top of the guide tube extend out of the water, a relatively smooth and flat conveying channel is formed in the blasthole using the guide tube, which facilitates the subsequent placement of the shaped charge liner into the blasthole more smoothly; at the same time, the guide tube can limit the flow of debris outside the blasthole into the blasthole, affecting the subsequent loading of the shaped charge liner and the explosive roll. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the first embodiment used to illustrate the drilling of blastholes.
[0027] Figure 2 This is a schematic diagram of the structure of the embodiment 1, which is used to illustrate the shaped charge liner, explosive roll and gun mud in the blast hole.
[0028] Figure 3 This is an explosion diagram of the first embodiment used to illustrate the shaped charge liner and the conical positioning block.
[0029] Figure 4 It is a structural schematic diagram of the second embodiment for illustrating the pouring of the leveling layer.
[0030] Figure 5 This is a schematic diagram of the second embodiment for illustrating the loading of shaped charge caps and explosive rolls.
[0031] Description of reference numerals: 1. Gun hole; 2. Shaped charge cap; 21. Conical positioning block; 211. Connecting pipe; 3. Explosive roll; 31. Detonator; 4. Gun mud; 5. Guide tube; 6. Leveling layer. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-5 This application is described in further detail.
[0033] The embodiment of the present application discloses a blasting excavation construction method for eliminating shallow points in an underwater channel.
[0034] Embodiment 1 A blasting excavation construction method for eliminating shallow points in an underwater channel comprises the following steps: S1: Drilling operation: refer to Figure 1 , a number of blast holes are drilled in the shallow area by a drilling and blasting ship 1; the specific steps are as follows: S1.1: Surface covering cleaning: Use dredgers and mud barges to excavate and clean the covering in shallow areas; S1.2: Drilling of blasthole 1: After the drilling and blasting vessel arrives at the designated location and drops anchor, the blasthole 1 is drilled in the shallow area to the designed depth by the submerged hole drill of the drilling and blasting vessel; S1.3: Repeat step S1.2 until the drilling of the remaining blastholes 1 is completed.
[0035] S2: Hole cleaning operation: Use a sediment hole cleaning machine to clean up debris, silt and other debris inside the blasthole 1.
[0036] S3: Shaped charge liner 2 filling operation: refer to Figure 2 and Figure 3 The diving workers dive underwater and put the shaped charge liner 2 into the blast hole 1, and press the shaped charge liner 2 to the bottom of the blast hole 1 through the blast stick.
[0037] In this embodiment, the shaped charge liner 2 is made of metal copper, and an annular shaped groove is provided on the outer periphery of the shaped charge liner 2 to make the shaped charge liner 2 a columnar body with a small middle and large ends. The shaped charge liner 2 is filled with emulsion explosive.
[0038] The bottom of the shaped charge liner 2 is provided with an opening so that the emulsion explosive can be filled into the shaped charge liner 2 through the opening. The bottom of the shaped charge liner 2 is also coaxially connected with a conical positioning block 21, and the tip of the conical positioning block 21 is arranged downward; the top of the conical positioning block 21 is coaxially connected with a connecting pipe 211, and the connecting pipe 211 is coaxially sleeved on the outer periphery of the bottom end of the shaped charge liner 2 through a threaded structure.
[0039] By setting the shaped charge cap 2, after the explosion of the shaped charge caps 2 at the bottom of several blast holes 1, the shaped charge caps 2 can form a high-temperature and high-pressure annular metal jet under the action of its own energy-gathering structure, so as to cut an annular slit in the rock mass around the blast hole 1, and then the high-temperature and high-pressure gas generated by the explosion of the explosive inside the blast hole continues to act on the annular gap, and finally a relatively flat section can be formed at the bottom of the shallow point blasting area.
[0040] The setting of the conical positioning block 21, on the one hand, realizes the blocking of the bottom opening of the shaped charge liner 2 to limit the leakage of the emulsion explosive inside the shaped charge liner 2; on the other hand, when the shaped charge liner 2 is subsequently placed into the blast hole 1, it can be guided by the conical positioning block 21 to facilitate the filling of the shaped charge liner 2; at the same time, after the shaped charge liner 2 is placed into the blast hole 1, the conical positioning block 21 can be used to keep the shaped charge liner 2 in a relatively vertical standing state, thereby reducing the situation where the shaped charge liner 2 is tilted due to the uneven bottom of the blast hole 1, thereby affecting the subsequent explosion effect of the shaped charge liner 2.
[0041] S4: Explosives loading operation: The specific steps are as follows: S4.1: A diving operator dives underwater and places the explosive roll 3 containing the detonator 31 into the blast hole 1, and presses it through a blast stick until it abuts against the top of the shaped charge liner 2.
[0042] S4.2: After the explosive roll 3 is loaded, the taphole 1 is filled with taphole mud 4 to prevent the high-temperature and high-pressure gas generated by the subsequent explosion of the explosive roll 3 from overflowing through the taphole 1.
[0043] In this embodiment, the explosive roll 3 is made of emulsion explosive, and the detonator 31 is a non-electric conductive detonator.
[0044] S5: Detonation connection operation: connect the detonating cord of the detonator 31 on the explosive roll 3 to the detonator. After the connection is completed, move the drilling and blasting ship outside the blasting area, and set a cordon around the blasting area.
[0045] S6: Shallow point blasting: The explosive roll 3 in the blast hole 1 is detonated by the detonator to blast the shallow point area.
[0046] The present application loads a shaped charge cap 2 at the bottom of a blasthole 1, and when the explosive rolls 3 in several subsequent blastholes 1 explode, the shaped charge cap 2 at the bottom of the blasthole 1 is detonated together. The shaped charge cap 2 forms a high-pressure and high-speed annular metal jet under the action of its own energy-gathering structure to cut the rock mass around the blasthole 1. At the same time, the high-temperature and high-pressure airflow generated after the explosion inside the blasthole 1 continues to act on the annular gap cut by the metal jet and further develops the annular gap. Finally, a relatively complete section is formed at the bottom of the shallow point blasting area, which reduces the occurrence of over-explosion during traditional shallow point blasting construction and is conducive to more accurate blasting construction in shallow point areas.
[0047] Embodiment 2 The difference between the second embodiment and the first embodiment is that: A blasting excavation construction method for eliminating shallow points in an underwater channel comprises the following steps: S1: Drilling operation: refer to Figure 1, drilling a number of blast holes 1 in a shallow area by a drilling and blasting ship: the specific steps are the same as those in the first embodiment, so they are not repeated here.
[0048] S2: Hole cleaning operation: refer to Figure 4 and Figure 5 , the specific steps are as follows: S2.1: Use a sediment cleaning machine to clean up debris, silt and other debris inside the blasthole 1; S2.2: Installation of guide tube 5: insert guide tubes 5 that match the blasthole 1 into the blasthole 1 one by one, and make the top of the guide tube 5 protrude out of the water surface. Specifically, the guide tube 5 is a stainless steel metal tube with an overall wall thickness of 1mm; before installing the guide tube 5, apply a release agent on the inner and outer peripheries of the bottom end of the guide tube 5 to form a release layer.
[0049] S2.3: Sealing operation of the gap between the guide tube 5 and the blast hole 1: a diver dives underwater and fills waterproof cement in the annular gap between the guide tube 5 and the opening of the blast hole 1; S2.4: Pumping operation of blasthole 1: insert the pumping pipe of the pumping equipment into the guide pipe 5 and press it down to the bottom of the guide pipe 5, and pump out the river water inside the blasthole 1 through the pumping equipment; S2.5: pouring construction of the leveling layer 6: inserting the grouting pipe of the grouting equipment into the bottom end of the guide pipe 5 and injecting concrete slurry into the bottom end of the guide pipe 5 through the grouting equipment to form the leveling layer 6. Specifically, the concrete slurry adopts underwater quick-setting concrete.
[0050] S3: Loading operation of the shaped charge liner 2: The operator places the shaped charge liner 2 into the top of the guide tube 5, and presses the shaped charge liner 2 to the bottom of the guide tube 5 through a firing rod, and makes the conical positioning block 21 at the bottom of the shaped charge liner 2 abut against the leveling layer 6.
[0051] S4: Explosives loading operation: The specific steps are as follows: S4.1: The operator places the explosive roll 3 equipped with the detonator 31 into the guide tube 5 and presses the explosive roll 3 through the blasting stick until the explosive roll 3 abuts against the top of the shaped charge liner 2.
[0052] S4.2: Removal of guide tube 5: Pull out guide tube 5 from the bottom of blasthole 1; when pulling out guide tube 5, first press down the explosive roll 3 in guide tube 5 by using a gun stick, then pull out guide tube 5 in blasthole 1 upward, and use the gun stick pressed down to limit the explosive roll 3 in guide tube 5 and the shaped charge cap 2 to move upward together with guide tube 5.
[0053] S4.3: Reference Figure 2 and Figure 5 After the guide tube 5 is pulled out, the top opening of the blasthole 1 is filled with gun mud 4 to limit the high-temperature and high-pressure gas generated by the subsequent explosion of the explosive roll 3 from overflowing through the opening of the blasthole 1.
[0054] S5: Detonation connection operation: connect the detonating cord on the detonator 31 of the explosive roll 3 to the detonator. After the connection is completed, move the drilling and blasting ship outside the blasting area, and set a cordon around the blasting area.
[0055] S6: Shallow point blasting: The explosive roll 3 in the blast hole 1 is detonated by the detonator to blast the shallow point area.
[0056] By inserting the guide tube 5 into the blasthole 1 and making the top end of the guide tube 5 extend out of the water surface, on the one hand, the guide tube 5 can limit the subsequent influx of underwater silt, gravel and other debris into the blasthole 1; on the other hand, after the river water in the guide tube 5 is pumped out, a relatively dry, stable and smooth guide channel can be formed in the guide tube 5, which is convenient for the subsequent shaped charge liner 2 and the explosive roll 3 to be loaded into the blasthole 1 more smoothly and steadily through the guide tube 5; at the same time, the loading of the shaped charge liner 2 and the explosive roll 3 does not require diving operations, which is beneficial to reducing the difficulty of loading the shaped charge liner 2 and the explosive roll 3.
[0057] Before installing the guide tube 5 , a release agent is applied to the inner and outer peripheries of the bottom of the guide tube 5 to form a release layer, so that the guide tube 5 can be better separated from the leveling layer 6 when the guide tube 5 is subsequently pulled out of the blast hole 1 .
[0058] By injecting concrete slurry into the bottom of the guide tube 5 to form a leveling layer 6, it is helpful to improve the flatness of the bottom of the blast hole 1, so that after the shaped charge liner 2 is subsequently placed at the bottom of the blast hole 1, the shaped charge liner 2 can better maintain a vertical standing state.
[0059] By pumping out the river water in the guide tube 5 before injecting concrete into the guide tube 5, it is beneficial to form a relatively dry environment in the blasthole 1, which is beneficial to the coagulation of the subsequent leveling layer 6 concrete and makes it easier for the subsequent shaped charge cap 2 and explosive roll 3 to slide to the bottom of the blasthole 1.
[0060] By filling the gap between the opening of the blasthole 1 and the guide tube 5 with waterproof cement, it is helpful to limit the river water outside the blasthole 1 from flowing into the blasthole 1 through the gap, thereby facilitating the subsequent more rapid and thorough extraction of the river water in the guide tube 5.
[0061] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for blasting and excavating underwater channels to eliminate shallow spots, characterized in that: The following steps are involved: S1: Drilling operation: Drilling several blastholes in shallow areas (1): S2: Hole cleaning operation: clean the bottom debris of the blasthole (1); S3: shaped charge liner (2) loading operation: placing the shaped charge liner (2) into the bottom of the blast hole (1); the shaped charge liner (2) is made of metal, and is in the shape of a column with a small middle and large ends, and the shaped charge liner (2) is filled with explosives; the bottom of the shaped charge liner (2) is also coaxially connected to a conical positioning block (21) with a downwardly pointed end; S4: Explosive filling operation: filling the explosive roll (3) equipped with the detonator (31) into the blast hole (1); S5: Detonation connection operation: connecting the detonator (31) of the explosive roll (3) to the detonator; S6: Shallow point blasting: The explosive roll (3) in the blast hole (1) is detonated by a detonator to blast a shallow point.
2. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 1, characterized in that: The bottom of the shaped charge liner (2) is provided with an opening, the top of the conical positioning block (21) is coaxially connected with a connecting pipe (211), and the top of the conical positioning block (21) is coaxially sleeved on the bottom end of the shaped charge liner (2) through the connecting pipe (211) to block the bottom opening of the shaped charge liner (2).
3. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 2, characterized in that: In step S4: after the explosive roll (3) is loaded, the top opening of the blasthole (1) is filled with gun mud (4) to seal the top opening of the blasthole (1).
4. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 1, characterized in that: In step S2, after the blasthole (1) is cleaned, a guide tube (5) is inserted into the blasthole (1) and the top end of the guide tube (5) is extended out of the water surface; In step S3 and step S4: the shaped charge liner (2) and the explosive roll (3) are sequentially filled into the blast hole (1) through the guide tube (5); In step S4, after the explosive roll (3) is loaded, the guide tube (5) is removed from the blast hole (1).
5. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 4, characterized in that: In step S2, after the guide tube (5) is inserted into the blasthole (1), concrete is injected into the bottom of the guide tube (5) to form a leveling layer (6).
6. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 5, characterized in that: In step S2, before injecting concrete into the guide pipe (5), the river water in the guide pipe (5) is pumped out.
7. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 6, characterized in that: In step S2, after the guide tube (5) is inserted into the blast hole (1), waterproof cement is filled into the gap between the blast hole (1) and the guide tube (5).
8. The method for blasting and excavating underwater channels to eliminate shallow spots according to claim 5, characterized in that: In step S2, before the guide tube (5) is placed into the blast hole (1), a release agent is applied to the inner and outer peripheries of the bottom end of the guide tube (5) to form a release layer.
Citation Information
Patent Citations
Case circular discontinuous energy concentrating jet flow cracker
CN103983153A
Composite reflection energy concentration and buffering energy dissipation device and blast construction method based on device
CN108645300A
Precise charging method for locally collapsed blast hole
CN115615274A
Hole bottom buffering energy dissipation method for underwater blasting
CN116007462A
Medium deep hole explosion energy focusing flat bottom bullet and use method
CN1556367A