Method and system for evaluating online operation error of low-voltage current transformer for power distribution network, and medium
By online collecting and analyzing the data of distribution network current transformers, a multi-constraint multi-objective optimization problem is established, and intelligent optimization algorithms are used to calculate errors, which solves the problem of power outage assessment in the existing technology and achieves accurate and efficient current transformers. Error assessment reduces the assessment cost and improves the power supply security of the distribution network.
Patent Information
- Application Number
- CN202410748896.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2024-10-15
AI Technical Summary
The current transformer error assessment for the existing distribution network requires power outage, which affects the stability of the operation and is costly. Moreover, the assessment by the digital comparison method is inaccurate.
By collecting the secondary current data and historical data of low-voltage current transformers, a multi-constraint multi-objective optimization problem is established, and intelligent optimization algorithms are used to calculate transformer errors to achieve online error evaluation and avoid power outage operations.
It achieves accurate online evaluation of distribution network current transformer errors, reduces evaluation costs, and improves power supply security.
Smart Images

Figure CN118777964A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of current transformer measurement status evaluation, and in particular to an online operation error evaluation method, system and medium for low-voltage current transformers used in distribution networks. Background Art
[0002] As an important part of the electric energy metering device, the accuracy and reliability of the transformer's metering performance is directly related to the fairness of electric energy trade settlement. The accuracy and stability of low-voltage current transformers are important guarantees for the metering, protection, and monitoring of electric energy in the distribution network system. Due to the complex distribution network environment, current transformers used in distribution networks are prone to failure, resulting in inaccurate metering and even affecting the safety of the distribution network. Therefore, it is urgent to conduct effective and accurate calibration of current transformers.
[0003] At present, for the error evaluation of current transformers used in distribution networks, it is usually necessary to shut down the distribution network and then use an offline evaluation method to compare and detect the transformer to be calibrated. This method requires the distribution network line to be shut down, which is difficult to operate and has a great impact on the operation of the line network. The online evaluation method does not require power outage and is more suitable for the actual operation of the distribution network. Among them, the calibration device of the analog comparison method combines the acquisition device and the clock synchronization device, which is used for the online calibration of the distribution network current transformer. It is affected by time drift and temperature drift and has poor stability. The calibration method based on the digital comparison method converts the secondary signals of the standard circuit and the circuit to be tested into digital signals for synchronous measurement, and then converts them to the primary circuit to calculate the transformer error. However, the digital comparison method has a fixed delay due to factors such as control signal delay and input signal introduction delay, resulting in inaccurate evaluation. This patent directly evaluates the transformer error through data collection analysis, is not affected by the environment, has irreplaceable technical advantages, and has great practical value in improving the power supply safety and reliability of the distribution network. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a method, system and medium for online operation error evaluation of a low-voltage current transformer for a distribution network, which solves the problem that offline evaluation requires power outage and has a significant impact on the operation of the distribution network through online evaluation, thereby reducing the evaluation cost.
[0005] To achieve the above objectives, in a first aspect, an embodiment of the present application provides an online operation error evaluation method for a low-voltage current transformer for a distribution network, comprising the following specific steps:
[0006] The low-voltage current transformers with topological relationship in the regional distribution network are taken as a group, the number of transformers is n, and the secondary current data output by the CT group is collected, the historical data is collected, and the real-time data of the transformer under test is collected, which are used as the data source for online evaluation of distribution network current transformer errors;
[0007] Mathematical modeling of relevant physical quantities;
[0008] The data relationship and physical relationship of the CT group to be tested are the goals and constraints of mathematical solution. The distribution network power data collection value-CT primary side current true value set is transformed into a multi-constraint and multi-objective optimization problem. The multi-objective and multi-constraint problem is solved with the help of intelligent optimization algorithm, and the CT primary side current true value set I is obtained. * ;
[0009] Calculate the error E of n CTs in the tested group, and the final evaluation result e i , 1≤i≤n.
[0010] E=(e1,e2,...,e i ,...e n ), the error of the ith transformer is e i , which is divided into the ratio difference of the real part and the angular difference of the imaginary part
[0011]
[0012] k x is the rated transformation ratio of the xth CT, Real-time measurement of phase for the xth CT secondary side, i sx is the current amplitude of the secondary side current measurement value of the xth CT to be tested.
[0013] The historical data collected and the real-time data of the transformer under test are collected as the data source for online evaluation of the distribution network current transformer error. Specifically,
[0014] The node current collected in real time by the switch of the distribution network to be tested is recorded as Ir. i r is the true value of the node current amplitude, is the node current phase, and the secondary current data measurement value is recorded as I s , is the secondary current measurement value of the xth CT to be tested, where i sx is the current amplitude, is the current phase, e j is the symbol of the imaginary part,
[0015] Refer to the nameplate of the CT group, record the rated transformation ratio as K, K = (k1, k2, ..., kn), and record the average value of the ratio difference angle measured by the CT in the distribution network in the offline state as f o θ o .
[0016] The mathematical modeling of the relevant physical quantities is specifically as follows:
[0017] I * is the vector true value of the primary current of the group CT,
[0018] is the evaluation result of the xth CT to be tested, i.e., the vector true value of the primary current (1≤x≤n), where is the true value of the current amplitude, is the true value of the current phase,
[0019]
[0020] Among them, the first objective sub-function f1 is based on the principle of minimizing the sum of the ratio difference and angle difference of every two CTs in the distribution network. The second objective sub-function f2 is based on the principle of minimizing the time difference between the individual ratio difference and angle difference of the CT to be measured and the normal metering state. The third objective function f3 is based on Kirchhoff's current law, and the sum of the primary side current of the CT group and the node current difference are minimized.
[0021] According to the first objective sub-function f1, the second objective sub-function f2 and the third objective function f3, the objective function is constructed:
[0022]
[0023] The optimization solution is specifically as follows:
[0024] Set the optimal solution search boundary: Use the historical current data of the distribution network and the primary side true value calculated according to the current distribution network measurement value as the upper and lower bounds, denoted as
[0025]
[0026] The PCDMO dwarf mongoose optimization algorithm is introduced to obtain the optimal solution. The number of CTs in the group n is used as the population size, and the maximum number of iterations MaxIt is set. The solution is I * ,
[0027] Initialize the dwarf mongoose population and select the leader α according to the following formula
[0028]
[0029] Among them, fit i is the fitness value of the ith individual, α is the probability of being selected as the leader,
[0030] Generate a new candidate solution according to the following formula
[0031]
[0032] Among them, I k is a randomly selected solution, I best is the best solution currently obtained, the operator Peep is its correction parameter, and the calculation formula is:
[0033]
[0034] it represents the current number of iterations, MaxIt represents the maximum number of iterations,
[0035] Reinitialize the population, calculate the fitness value, and the new candidate solution, and update the current optimal solution I * , until the maximum number of iterations MaxIt.
[0036] In a second aspect, an embodiment of the present application provides an online operation error evaluation system for a low-voltage current transformer for a distribution network, comprising:
[0037] The data acquisition module takes the low-voltage current transformers with topological relationship in the regional distribution network as a group, with the number of transformers being n, and collects the secondary current data output by the CT group, collects historical data, and collects the real-time data of the transformer under test, which together serve as the data source for online evaluation of the distribution network current transformer error;
[0038] The mathematical modeling module transforms the data relationship and physical relationship of the CT group to be tested into the goal and constraint of mathematical solution, transforms the distribution network power data collection value-CT primary side current true value set into a multi-constraint and multi-objective optimization problem, and solves the multi-objective and multi-constraint problem with the help of intelligent optimization algorithm to obtain the CT primary side current true value set I * ;
[0039] The calculation module is used to calculate the error E of n CTs in the tested group and obtain the final evaluation result e i , 1≤i≤n.
[0040] In a third aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the processor executes the steps of the online operation error evaluation method for a low-voltage current transformer for a distribution network as described above.
[0041] Compared with the prior art, the beneficial effects of this application are:
[0042] Aiming at the problem that the traditional current transformer error state offline evaluation requires power outage, which has a great impact on the operation of the distribution network, the present invention collects known and measurable power data based on data-driven, analyzes the electrical and physical relationship of the distribution network topology, determines the constraint relationship directly existing in the current transformer group, establishes three target sub-functions, and optimizes and solves them, thereby performing online evaluation of the measurement error state of large-scale current transformers in a group environment. The problem that the offline evaluation requires power outage and has a great impact on the operation of the distribution network is solved through online evaluation, and the evaluation cost is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0044] Figure 1 A flow chart of the method of this application;
[0045] Figure 2 This is the CT ratio difference assessment result diagram;
[0046] Figure 3 This is the CT angle difference evaluation result diagram;
[0047] Figure 4 This is a system block diagram of this application. DETAILED DESCRIPTION
[0048] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0049] The terms "comprises," "comprising," or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.
[0050] The terms "first", "second", etc. are only used to distinguish one entity or operation from another entity or operation, and should not be understood as indicating or implying relative importance, nor should they be understood as requiring or implying any such actual relationship or order between these entities or operations.
[0051] like Figure 1 As shown, a method for evaluating online operation errors of low-voltage current transformers for distribution networks includes the following specific steps:
[0052] Data collection
[0053] The low-voltage current transformers with topological relationship in the regional distribution network are taken as a group (requirement: no less than 8 current transformers), the number of transformers is n, the secondary current data output by the group CT is collected, a large amount of the above historical data is collected, and the above real-time data of the transformer under test is collected, which are used together as the data source for online evaluation of distribution network current transformer errors.
[0054] The node current collected in real time by the switch of the distribution network to be tested is recorded as Ir. i r is the true value of the node current amplitude, is the node current phase. The secondary current data measurement value is recorded as I s . is the secondary current measurement value of the xth CT to be tested, where i sx is the current amplitude, is the current phase, e j is the symbol of the imaginary part.
[0055] Refer to the nameplate of the group CT and record the rated transformation ratio as K, K = (k1, k2, ..., kn). Record the average values of the ratio difference angle measured by the CT in the distribution network in the offline state as f o θ o .
[0056] Modeling
[0057] Mathematically model the relevant physical quantities and define the following symbols
[0058] I * It is the vector true value of the primary current of the group CT.
[0059] is the evaluation result of the xth CT to be tested, i.e., the vector true value of the primary current (1≤x≤n), where is the true value of the current amplitude, is the true value of the current phase.
[0060]
[0061] Among them, the first objective sub-function f1 is based on the principle of minimizing the sum of the ratio difference and angle difference between every two CTs in the distribution network. The second objective sub-function f2 is based on the principle of minimizing the time difference between the individual ratio difference and angle difference of the CT to be measured and the normal metering state. The third objective function f3 is based on Kirchhoff's current law, and it is deduced that the sum of the primary side current of the CT group and the node current difference are minimized.
[0062] According to the above three objective sub-functions, construct the objective function:
[0063]
[0064] Optimization solution
[0065] The data relationship and physical relationship of the CT group to be tested are the goals and constraints of mathematical solution. The "distribution network power data collection value-CT primary side current true value set" is transformed into a multi-constraint and multi-objective optimization problem. The multi-objective and multi-constraint problem is solved with the help of intelligent optimization algorithm, and the CT primary side current true value set I is obtained. * .
[0066] The specific solution process is as follows:
[0067] 1. Set the optimal solution search boundary: Use the historical current data of the distribution network and the primary side true value calculated according to the current distribution network measurement value as the upper and lower bounds, denoted as
[0068]
[0069] 2. PCDMO (dwarf mongoose optimization algorithm) is introduced to find the optimal solution, the number of CTs n in the group is used as the population size, and the maximum number of iterations MaxIt is set. The solution is I * .
[0070] 3. Initialize the dwarf mongoose population and select the leader α according to the following formula
[0071]
[0072] Among them, fit i is the fitness value of the ith individual, and α is the probability of being selected as the leader.
[0073] 4. Generate new candidate solutions according to the following formula
[0074]
[0075] Among them, I k is a randomly selected solution, I best is the best solution currently obtained, the operator Peep is its correction parameter, and the calculation formula is:
[0076]
[0077] it represents the current iteration number, and MaxIt represents the maximum iteration number.
[0078] 5. Reinitialize the population, calculate the fitness value, and the new candidate solution, and update the current optimal solution I * , iterate step 3 until the maximum number of iterations MaxIt
[0079] Evaluate
[0080] I* is the true value set of the primary current of the CT. The error E of the n CTs in the group to be tested is calculated according to the following formula: E = (e1, e2, ..., ei, ... en). The error of the ith transformer is ei, which is divided into the ratio error of the real part and the angle difference of the imaginary part.
[0081]
[0082] According to e i as the final evaluation result.
[0083] The distribution network environment is complex, which makes the current transformers used in the distribution network prone to failure, resulting in inaccurate measurement. The present invention designs an online evaluation algorithm for distribution network current transformers to achieve the evaluation of group current transformer measurement errors. The online evaluation does not require the distribution network to be powered off, avoiding the huge cost of evaluating each transformer one by one.
[0084] The CT error evaluation accuracy based on the method of the present invention is tested through actual distribution network application experiments and the results are as follows.
[0085] The group CT in a distribution network area is evaluated for error using the patented method. The number of CTs is 60, and the ratio difference and angle difference evaluation data are obtained. The distribution network is shut down, and the above CT ratio difference and angle difference are evaluated offline using the traditional method. The evaluation results are used as the true value of the error. The results are as follows Figure 2 and Figure 3 shown.
[0086] It can be seen from the figure that the evaluation error result of the present invention is close to the true value of the error, which shows that the evaluation accuracy of the present invention is relatively high.
[0087] like Figure 4 As shown, an embodiment of the present application provides an online operation error evaluation system for a low-voltage current transformer for a distribution network, comprising:
[0088] Data acquisition module 1, taking low-voltage current transformers with topological relationship in the regional distribution network as a group, the number of transformers is n, collecting secondary current data output by the CT group, collecting historical data, and collecting real-time data of the measured transformer, which are jointly used as the data source for online evaluation of distribution network current transformer errors;
[0089] Mathematical modeling module 2 transforms the data relationship and physical relationship of the CT group to be tested into the goal and constraint of mathematical solution, transforms the distribution network power data collection value-CT primary side current true value set into a multi-constraint and multi-objective optimization problem, and solves the multi-objective and multi-constraint problem with the help of intelligent optimization algorithm to obtain the CT primary side current true value set I * ;
[0090] Calculation module 3 is used to calculate the error E of n CTs in the tested group and obtain the final evaluation result e i, 1≤i≤n.
[0091] An embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the processor executes the steps of the online operation error evaluation method for a low-voltage current transformer for a distribution network as described above.
[0092] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0093] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0094] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0095] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0096] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for evaluating online operation error of a low voltage current transformer for a distribution network, characterized in that: The specific steps include: The low-voltage current transformers with topological relationship in the regional distribution network are taken as a group, the number of transformers is n, and the secondary current data output by the CT group is collected, the historical data is collected, and the real-time data of the transformer under test is collected, which are used as the data source for online evaluation of distribution network current transformer errors; Mathematical modeling of relevant physical quantities; The data relationship and physical relationship of the CT group to be tested are the goals and constraints of mathematical solution. The distribution network power data collection value-CT primary side current true value set is transformed into a multi-constraint and multi-objective optimization problem. The multi-objective and multi-constraint problem is solved with the help of intelligent optimization algorithm, and the CT primary side current true value set I is obtained. * ; Calculate the error E of n CTs in the tested group, and the final evaluation result e i , 1≤i≤n.
2. The method for evaluating online operation error of a low-voltage current transformer for a distribution network according to claim 1, characterized in that: E=(e1,e2,...,e i ,...e n ), the error of the ith transformer is e i , which is divided into the ratio difference of the real part and the angular difference of the imaginary part k x is the rated transformation ratio of the xth CT, Real-time measurement of phase for the xth CT secondary side, i sx is the current amplitude of the secondary side current measurement value of the xth CT to be tested.
3. The method for evaluating online operation error of a low-voltage current transformer for a distribution network according to claim 1, characterized in that: The historical data collected and the real-time data of the current transformer under test are collected as the data source for online evaluation of the current transformer error of the distribution network. Specifically, The node current collected in real time by the switch of the distribution network to be tested is recorded as Ir. i r is the true value of the node current amplitude, is the node current phase, and the secondary current data measurement value is recorded as I s , is the secondary current measurement value of the xth CT to be tested, where i sx is the current amplitude, is the current phase, e j is the symbol of the imaginary part, Refer to the nameplate of the CT group, record the rated transformation ratio as K, K = (k1, k2, ..., kn), and record the average value of the ratio difference angle measured by the CT in the distribution network in the offline state as f o θ o .
4. The method for evaluating online operation error of a low-voltage current transformer for a distribution network according to claim 1, characterized in that: The mathematical modeling of the relevant physical quantities is specifically as follows: I * is the vector true value of the primary current of the group CT, is the evaluation result of the xth CT to be tested, i.e., the vector true value of the primary current (1≤x≤n), where is the true value of the current amplitude, is the true value of the current phase, Among them, the first objective sub-function f1 is based on the principle of minimizing the sum of the ratio difference and angle difference between every two CTs in the distribution network. The second objective sub-function f2 is based on the principle of minimizing the time difference between the individual ratio difference and angle difference of the CT to be measured and the normal metering state. The third objective function f3 is based on Kirchhoff's current law, and it is deduced that the sum of the primary side current of the CT group and the node current difference are minimized.
5. The method for evaluating online operation error of a low voltage current transformer for a distribution network according to claim 4, characterized in that: According to the first objective sub-function f1, the second objective sub-function f2 and the third objective function f3, the objective function is constructed:
6. The method for evaluating online operation error of a low voltage current transformer for a distribution network according to claim 1, characterized in that: The optimization solution is specifically as follows: Set the optimal solution search boundary: Use the historical current data of the distribution network and the primary side true value calculated according to the current distribution network measurement value as the upper and lower bounds, denoted as The PCDMO dwarf mongoose optimization algorithm is introduced to obtain the optimal solution. The number of CTs in the group n is used as the population size, and the maximum number of iterations MaxIt is set. The solution is I * , Initialize the dwarf mongoose population and select the leader α according to the following formula Among them, fit i is the fitness value of the ith individual, α is the probability of being selected as the leader, Generate a new candidate solution according to the following formula Among them, I k is a randomly selected solution, I best is the best solution currently obtained, the operator Peep is its correction parameter, and the calculation formula is: it represents the current number of iterations, MaxIt represents the maximum number of iterations, Reinitialize the population, calculate the fitness value, and the new candidate solution, and update the current optimal solution I * , until the maximum number of iterations MaxIt.
7. A low voltage current transformer online operation error evaluation system for distribution network, characterized in that: The data acquisition module takes the low-voltage current transformers with topological relationship in the regional distribution network as a group, with the number of transformers being n, and collects the secondary current data output by the CT group, collects historical data, and collects the real-time data of the transformer under test, which together serve as the data source for online evaluation of the distribution network current transformer error; The mathematical modeling module transforms the data relationship and physical relationship of the CT group to be tested into the goal and constraint of mathematical solution, transforms the distribution network power data collection value-CT primary side current true value set into a multi-constraint and multi-objective optimization problem, and solves the multi-objective and multi-constraint problem with the help of intelligent optimization algorithm to obtain the CT primary side current true value set I * ; The calculation module is used to calculate the error E of n CTs in the tested group and obtain the final evaluation result e i , 1≤i≤n.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the processor executes the steps of the method for online operation error evaluation of a low-voltage current transformer for a distribution network as described in any one of claims 1 to 6.