Automatic control method and device for energy management
Through the automated control method based on the energy load change prediction model, the problem of low energy management efficiency of energy-using equipment in food production enterprises is solved, precise and efficient control of energy-using equipment is achieved, and energy waste is reduced.
Patent Information
- Application Number
- CN202310346305.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-15
AI Technical Summary
The energy management and control efficiency of energy-consuming equipment in food production enterprises is low, resulting in serious energy waste and unable to meet lean management requirements.
By determining the actual production data to be analyzed, the energy-consuming equipment is analyzed based on the energy load change prediction model, the simulation data of the energy load is generated, and the prediction curve is obtained through calibration to realize automatic control of the energy-consuming equipment.
It improves the operational safety and stability of energy-consuming equipment, achieves precise and efficient control of energy management, and reduces energy waste.
Smart Images

Figure CN118778461A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of energy management technology, and more particularly to an automatic control method and device for energy management, and also to an electronic device and a processor-readable storage medium. Background Art
[0002] The production process of food production enterprises usually involves related energy-consuming equipment such as refrigeration systems, air compressor systems, boiler systems and water treatment systems. As energy costs continue to rise, the extensive control method of energy-consuming equipment leads to serious energy waste, which brings great challenges to the production costs of enterprises. At present, there are many types of energy-consuming equipment related to the production process of food production enterprises. Energy management requires personnel to be on duty on site for a long time, and the control efficiency is low, which cannot meet the lean management requirements of energy consumption. Therefore, how to design a more accurate and efficient energy management automation control scheme to achieve energy-saving control of energy supply system parameters on demand based on relevant operation data monitoring has become an important issue that technicians in this field need to solve urgently. Summary of the invention
[0003] To this end, the present invention provides an automatic control method for energy management to solve the problem that the control scheme for energy management of energy-consuming equipment in the prior art has high limitations, resulting in serious energy waste.
[0004] In a first aspect, the present invention provides an automatic control method for energy management, comprising:
[0005] Determine the actual production data to be analyzed;
[0006] Analyze the actual production data based on the energy load change prediction model to determine the simulated data of the energy load corresponding to the actual production data; the energy load change prediction model is obtained from the historical production data and the historical data of the energy load corresponding to it;
[0007] The simulation data of the energy load is calibrated to obtain an energy load change prediction curve, and the energy-consuming equipment is controlled based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0008] Furthermore, before determining the actual production data to be analyzed, it also includes:
[0009] Obtain historical data on energy consumption power of energy-consuming equipment within a preset time range and historical data on its corresponding energy load;
[0010] Based on the historical data of the energy consumption power and the historical data of the energy load, the energy load change prediction model is obtained.
[0011] Furthermore, the determining of the actual production data to be analyzed specifically includes:
[0012] Acquire the production order information and production scheduling information input by the terminal; wherein the production order information includes the product item information and product output information;
[0013] Determine the production time corresponding to the production order information based on the production scheduling information;
[0014] The product item information, the product output information and the production time are determined as actual production data to be analyzed.
[0015] Furthermore, the actual production data is analyzed based on the energy load change prediction model to determine the simulation data of the energy load corresponding to the actual production data, specifically including: inputting the actual production data into the energy load change prediction model to obtain the real-time data of the energy load of different energy types at each moment;
[0016] Based on the real-time data of energy load of the different energy types at each moment and the production time, the total power consumption data of energy-consuming equipment during the production time is obtained;
[0017] Based on the total energy consumption power data, simulated data of the energy load corresponding to the actual production data is obtained.
[0018] Furthermore, the simulation data of the energy load is calibrated to obtain the energy load change prediction curve, which specifically includes: when the simulation data of the energy load of the energy-consuming equipment is equal to or greater than a first preset energy load value, the simulation data of the energy load is corrected to increase the first preset amount to obtain the energy load change prediction curve; or, when the simulation data of the energy load of the energy-consuming equipment is less than a second preset energy load value, the simulation data of the energy load is corrected to increase the second preset amount to obtain the energy load change prediction curve; wherein, the first preset energy load value is greater than the second preset energy load value, and the first preset amount is greater than the second preset amount.
[0019] Furthermore, after obtaining the energy load change prediction curve, it also includes:
[0020] When the simulated data of the energy load of the energy-consuming equipment reaches or exceeds a preset energy load peak value, an abnormal alarm prompt information is generated.
[0021] In a second aspect, the present invention further provides an automatic control device for energy management, comprising:
[0022] A production information acquisition unit, used to determine actual production data to be analyzed;
[0023] An energy load prediction unit, used to analyze the actual production data based on an energy load change prediction model to determine simulation data of energy load corresponding to the actual production data; the energy load change prediction model is obtained from historical production data and historical data of energy load corresponding to the historical production data;
[0024] An energy manufacturing execution unit is used to calibrate the simulation data of the energy load, obtain an energy load change prediction curve, and control energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0025] Furthermore, before determining the actual production data to be analyzed, it also includes:
[0026] The prediction model building unit is used to obtain the historical data of energy consumption power of energy-consuming equipment and the historical data of its corresponding energy load within a preset time range; based on the historical data of energy consumption power and the historical data of energy load, the energy load change prediction model is obtained.
[0027] Furthermore, the production information acquisition unit is specifically used to:
[0028] Acquire the production order information and production scheduling information input by the terminal; wherein the production order information includes the product item information and product output information;
[0029] Determine the production time corresponding to the production order information based on the production scheduling information;
[0030] The product item information, the product output information and the production time are determined as actual production data to be analyzed.
[0031] Furthermore, the energy load prediction unit is specifically used to: input the actual production data into the energy load change prediction model to obtain real-time data of energy load of different energy types at various times; based on the real-time data of energy load of different energy types at various times and the production time, obtain the total energy consumption power data of energy-consuming equipment during the production time; based on the total energy consumption power data, obtain simulation data of the energy load corresponding to the actual production data.
[0032] Furthermore, the energy manufacturing execution unit is specifically used to: when the simulation data of the energy load of the energy-consuming equipment is equal to or greater than a first preset energy load value, correct the simulation data of the energy load to increase the first preset amount to obtain an energy load change prediction curve; or, when the simulation data of the energy load of the energy-consuming equipment is less than a second preset energy load value, correct the simulation data of the energy load to increase the second preset amount to obtain an energy load change prediction curve; wherein the first preset energy load value is greater than the second preset energy load value, and the first preset amount is greater than the second preset amount.
[0033] Furthermore, after obtaining the energy load change prediction curve, it also includes:
[0034] The alarm prompt unit is used to generate abnormal alarm prompt information when the simulation data of the energy load of the energy-consuming equipment reaches or exceeds the preset energy load peak value.
[0035] In a third aspect, the present invention further provides an electronic device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the automatic control method for energy management as described in any one of the above items are implemented.
[0036] In a fourth aspect, the present invention further provides a processor-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the automated control method for energy management as described in any one of the above items are implemented.
[0037] The automatic control method of energy management provided by the present invention determines the actual production data to be analyzed, analyzes the actual production data based on the energy load change prediction model, determines the simulation data of the energy load corresponding to the actual production data, and then calibrates the simulation data of the energy load to obtain the energy load change prediction curve, and controls the energy-consuming equipment based on the energy load change prediction curve. This method can realize the pre-control of the energy-consuming equipment through the energy load change prediction curve, effectively improves the safety and stability of the operation of the energy-consuming equipment, and facilitates the energy management of the production process of the energy-consuming equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 A schematic diagram of a flow chart of an automatic control method for energy management provided by an embodiment of the present invention;
[0040] Figure 2 One of the structural schematic diagrams of the automatic control device for energy management provided by an embodiment of the present invention;
[0041] Figure 3 A second structural diagram of the automatic control device for energy management provided by an embodiment of the present invention;
[0042] Figure 4 A schematic diagram of the physical structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0043] In order to make the purpose, technical scheme and advantages of the embodiment of the present invention clearer, the technical scheme in the embodiment of the present invention will be clearly and completely described in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present invention. It should be noted that the terms "first", "second", etc. in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described here can be implemented in an order other than those illustrated or described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0044] The following is a detailed description of an embodiment of the automatic control method for energy management according to the present invention. Figure 1 FIG. 1 is a flow chart of an automatic control method for energy management provided by an embodiment of the present invention, and the specific implementation process includes the following steps:
[0045] Step 101: Determine actual production data to be analyzed.
[0046] In an embodiment of the present invention, the product item information, the product output information and the production time can be determined as the actual production data to be analyzed by obtaining the production order information and the production scheduling information input by the terminal and determining the production time corresponding to the production order information based on the production scheduling information. For example, the production order information for the next day can be obtained by interconnecting with the workshop MES (Manufacturing Execution System) system, and the production order information includes but is not limited to the product item information and product output information. The production scheduling information can be scheduled according to the maintenance plan of the workshop equipment through the MES system, and can provide production time information of the production line.
[0047] Step 102: Analyze the actual production data based on the energy load change prediction model to determine the simulated data of the energy load corresponding to the actual production data. The energy load change prediction model is obtained from the historical production data and the historical data of the energy load corresponding to it.
[0048] During the implementation of this step, the actual production data can be input into the energy load change prediction model to obtain real-time data of energy loads of different energy types at various times; based on the real-time data of energy loads of different energy types at various times and the production time, the total power consumption data of energy-consuming equipment during the production time can be obtained; based on the total power consumption data, the simulated data of energy loads corresponding to the actual production data can be obtained. The energy-consuming equipment can refer to equipment in a production workshop, such as power distribution systems, refrigeration systems, boiler systems, air compressor systems, water treatment systems and other related energy-consuming equipment.
[0049] Since the energy load (i.e., energy load) of the production process is related to the sum of the energy consumption power of the energy-consuming equipment running within a period of time, a model for energy load prediction can be constructed based on this. Specifically, before executing this step to determine the actual production data to be analyzed or analyzing the actual production data based on the energy load change prediction model, it is necessary to obtain in advance the historical data of the energy consumption power of the energy-consuming equipment within a preset time range and the historical data of the corresponding energy load, and construct the energy load change prediction model based on the historical data of the energy consumption power and the historical data of the energy load. The energy load change prediction model can represent the correlation between different production times, different product items and product outputs and the corresponding energy load data.
[0050] For example, when constructing the energy load change prediction model based on the historical data of the energy consumption power and the historical data of the energy load, the energy-consuming equipment can be defined as x, the energy type can be defined as y, the standard energy consumption power of a single energy-consuming equipment can be defined as p, and the production time can be defined as z.
[0051] The energy load algorithm corresponding to the constructed energy load prediction model may include an energy load algorithm and an algorithm for integrating the energy used in a unit interval. The load calculation includes: firstly determining the energy load algorithm at a certain moment as Where n is the number of energy-consuming equipment (i.e., running equipment); y is the energy type, which corresponds to the product item information; and p is the standard energy consumption power of a single energy-consuming equipment for producing a unit product. Taking z as the unit interval, i.e., [z0, z1], the algorithm for integrating the energy consumption of z is (2): For example, the unit interval z0-z1 can be 0-60 seconds; the energy consumption in the unit interval z is used as the data point (i.e., the simulated data of the energy load corresponding to the actual production data), and the initial energy load change prediction curve under different time granularities can be simulated. By substituting the actual production data into the energy load calculation corresponding to the energy load change prediction model, the simulated data of the energy load corresponding to the actual production data can be obtained. The energy load prediction model is Figure 3 prediction model in ).
[0052] Step 103: calibrate the simulation data of the energy load to obtain an energy load change prediction curve, and control the energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0053] In this step, when the simulation data of the energy load is calibrated to obtain the energy load change prediction curve, the simulation data of the energy load can be corrected to increase the first preset amount to obtain the energy load change prediction curve when the simulation data of the energy load of the energy-consuming equipment is equal to or greater than the first preset energy load value; or, when the simulation data of the energy load of the energy-consuming equipment is less than the second preset energy load value, the simulation data of the energy load can be corrected to increase the second preset amount to obtain the energy load change prediction curve; wherein the first preset energy load value is greater than the second preset energy load value, and the first preset amount is greater than the second preset amount. Controlling the energy-consuming equipment based on the energy load change prediction curve specifically includes: pre-generating corresponding equipment control instructions based on the energy load change prediction curve, and by issuing the corresponding equipment control instructions to the energy-consuming equipment, ensuring energy-saving control of energy supply parameters adjusted on demand, and realizing group control of multiple systems, thereby realizing automatic operation control of energy-consuming equipment under unattended conditions. The first preset energy load value may refer to the highest load that hinders the stability of energy supply, and the first preset amount may be an adjustment amount for energy load determined based on historical energy load data or empirical data, such as 5%. The second preset energy load value may refer to the lowest load that hinders the stability of energy supply. Since sudden fluctuations in energy demand during low energy load periods will not cause production downtime, the second preset amount may be an adjustment amount for energy load determined based on historical energy load data or empirical data, such as 2%. The energy load is the simulated data of the energy load.
[0054] Specifically, during the high energy load period, that is, when the simulated data of the energy load of the energy-consuming equipment is equal to or greater than the first preset energy load value, in order to ensure the stability of energy supply, the simulated data of the energy load can be corrected by increasing the first preset amount by 5% to avoid insufficient energy supply due to abnormal production fluctuations; during the low energy load period, that is, when the simulated data of the energy load of the energy-consuming equipment is less than the second preset energy load value, the energy demand is low and sudden fluctuations will not cause production downtime, so the simulated data of the energy load is corrected by increasing the second preset amount by 2%. In the actual production process, if the production plan is delayed due to equipment failure or other reasons, the energy demand of the corresponding production line will be delayed in time after receiving the information, and the overall energy load change forecast curve will be recalculated.
[0055] In the embodiment of the present invention, the control of the refrigeration system, air compressor system, and boiler system preferably adopts intelligent control based on the energy supply pressure or temperature. The control method adopts group control technology. According to the energy load change prediction curve, when the energy consumption index is reached, the system controls the equipment to reduce the load and then shut down. When it is lower than the set demand, the equipment is started or loaded. Since there is a situation where the supply exceeds the demand or the energy supply is insufficient when the upper and lower limit value range is large and the energy consumption fluctuates greatly during the specific implementation process, that is, the supply and demand difference fluctuation band, on the basis of the above-mentioned intelligent control, according to the simulated energy load prediction curve, the equipment start-up instruction (that is, the equipment control instruction) is issued in advance in the preset time period (such as the first 10 minutes) before the energy load increases, and energy production and supply are provided on demand; in the time period when the energy load is reduced, the equipment control instruction for reducing the load or shutting down the running equipment is issued, thereby reducing the energy waste caused by the supply exceeding the demand. Based on the overload peak-shaving strategy, according to the equipment configuration of the refrigeration, air compressor, and boiler systems, the maximum energy supply capacity can be calculated and the upper limit value can be set. When the energy load exceeds the maximum energy supply capacity based on the energy load prediction curve, an alarm prompt is issued, and the inspection plan is adjusted to stagger the energy consumption peak.
[0056] In addition, the water treatment system can also realize the whole process of operating parameter monitoring, group control of water treatment system, and monitoring of water supply quality. It can automatically clean according to parameters such as pressure and hardness to improve the water yield rate, realize resin regeneration according to hardness index, reduce material consumption, and realize equipment maintenance according to pressure difference to reduce maintenance costs. The solution to the problem of large load fluctuations in the water treatment system is similar to that of the refrigeration system, air compressor system, and boiler system. The production information acquisition unit and the energy load prediction unit are completed in the same way. The difference is that the water treatment system has storage equipment, and there are differences in the control of the energy manufacturing execution unit: specifically, in the process of narrowing the supply and demand difference fluctuation band control: on the basis of similar control as the refrigeration system, air compressor system, and boiler system, according to the simulated energy load change prediction curve, the storage capacity of the storage equipment is calculated before the time period when the energy load increases. If the storage capacity is greater than the production water consumption, there is no need to send equipment control instructions to control the start-up. If the storage capacity is less than the production water consumption, softened water and pure water are prepared according to the lower limit liquid level as information. In the overload peak-shaving strategy: based on the equipment configuration of the water treatment system, the maximum energy supply capacity is calculated and an upper limit is set. When the predicted water consumption exceeds the sum of the storage capacity + the preparation capacity, an alarm is issued, and the inspection plan is adjusted to stagger the energy consumption peak.
[0057] The automatic control method of energy management provided by the present invention determines the actual production data to be analyzed, analyzes the actual production data based on the energy load change prediction model, determines the simulation data of the energy load corresponding to the actual production data, and then calibrates the simulation data of the energy load to obtain the energy load change prediction curve, and controls the energy-consuming equipment based on the energy load change prediction curve. This method can realize the pre-control of the energy-consuming equipment through the energy load change prediction curve, effectively improves the safety and stability of the operation of the energy-consuming equipment, and facilitates the energy management of the production process of the energy-consuming equipment.
[0058] Corresponding to the above-mentioned automatic control method for energy management, the present invention also provides an automatic control device for energy management. Since the embodiment of the device is similar to the above-mentioned method embodiment, the description is relatively simple. For relevant parts, please refer to the description of the above-mentioned method embodiment. The embodiment of the automatic control device for energy management described below is only illustrative. Please refer to Figure 2 As shown, it is a structural schematic diagram of an automatic control device for energy management provided by an embodiment of the present invention.
[0059] The automatic control device for energy management described in the present invention specifically includes the following parts:
[0060] The production information acquisition unit 201 is used to determine the actual production data to be analyzed;
[0061] The energy load prediction unit 202 is used to analyze the actual production data based on the energy load change prediction model to determine the simulation data of the energy load corresponding to the actual production data; the energy load change prediction model is obtained from the historical production data and the historical data of the energy load corresponding to it;
[0062] The energy manufacturing execution unit 203 is used to calibrate the simulation data of the energy load, obtain the energy load change prediction curve, and control the energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0063] Furthermore, before determining the actual production data to be analyzed, it also includes:
[0064] The prediction model building unit is used to obtain the historical data of energy consumption power of energy-consuming equipment and the historical data of its corresponding energy load within a preset time range; based on the historical data of energy consumption power and the historical data of energy load, the energy load change prediction model is obtained.
[0065] Furthermore, the production information acquisition unit is specifically used to:
[0066] Acquire the production order information and production scheduling information input by the terminal; wherein the production order information includes the product item information and product output information;
[0067] Determine the production time corresponding to the production order information based on the production scheduling information;
[0068] The product item information, the product output information and the production time are determined as actual production data to be analyzed.
[0069] Furthermore, the energy load prediction unit is specifically used to: input the actual production data into the energy load change prediction model to obtain real-time data of energy load of different energy types at various times; based on the real-time data of energy load of different energy types at various times and the production time, obtain the total energy consumption power data of energy-consuming equipment during the production time; based on the total energy consumption power data, obtain simulation data of the energy load corresponding to the actual production data.
[0070] Furthermore, the energy manufacturing execution unit is specifically used to: when the simulation data of the energy load of the energy-consuming equipment is equal to or greater than a first preset energy load value, correct the simulation data of the energy load to increase the first preset amount to obtain an energy load change prediction curve; or, when the simulation data of the energy load of the energy-consuming equipment is less than a second preset energy load value, correct the simulation data of the energy load to increase the second preset amount to obtain an energy load change prediction curve; wherein the first preset energy load value is greater than the second preset energy load value, and the first preset amount is greater than the second preset amount.
[0071] Furthermore, after obtaining the energy load change prediction curve, it also includes:
[0072] The alarm prompt unit is used to generate abnormal alarm prompt information when the simulation data of the energy load of the energy-consuming equipment reaches or exceeds the preset energy load peak value.
[0073] It should be noted that the present invention provides an energy-carbon integrated management system, which may include a centralized control center (i.e., a perception layer and an execution layer) to realize automatic control of equipment in a single workshop, such as power distribution systems, refrigeration systems, boiler systems, air compressor systems, water treatment systems and other energy subsystems, which can automatically operate and control, monitor in real time, automatically protect, collect and process data, and achieve safe and stable operation, energy saving and consumption reduction. At the same time, all equipment of multiple energy and power systems are centrally controlled, and data exchange and real-time communication are carried out with the subsystems through interfaces (authorized users transmit data to the outside). At the same time, users can monitor and query the operation information and equipment status of each system through the centralized control center, and authorized users can also issue equipment control commands to the energy subsystems through the centralized control center, so that unattended automatic operation can be realized. The perception layer may include a production information acquisition unit, and the execution layer may include an energy load forecasting unit and an energy manufacturing execution unit. The energy centralized control center has the following functions: it can simulate a three-dimensional dynamic process flow chart that is consistent with the actual system process flow, can display the complete process flow and online use scene in a panoramic view, and present a dynamic layout chart of the factory's public energy facilities. The values of each monitoring point can be displayed on the host computer and the dynamic change curve can be queried for trend analysis; the host computer parameters can be set to adjust the operating status of the control point; it can realize one-key start of a single energy power system; it can display the operating status of each monitoring point and realize the alarm function by setting a high position; the key areas of the energy workshop can realize the display of the actual scene monitored by the camera after the alarm; it can automatically generate energy and power equipment operation record reports according to fixed periods, and can be It can review and store reports; it can monitor multiple energy power systems at one operation station, and one general interface can display and control the entire energy workshop. It can split the screen to display and control each system separately, and each subsystem has independent local control; it has hierarchical control security authority; the distribution system can monitor the operation of the incoming and outgoing lines and loads of the distribution network, the equipment operation parameters, the power quality, the ambient temperature and humidity, and the temperature of capacitors and main lines; the refrigeration system, air compressor system, and boiler can monitor the operation data of the entire process, realize group control of the system, monitor the quality of energy supply, and realize energy-saving control by adjusting the energy supply parameters on demand; such as Figure 3 The simple schematic diagram shown in the figure adopts the following steps to supply energy on demand in order to solve the problem of large fluctuations in the load of ice water, compressed air and steam consumption; the air conditioning system can monitor the entire process from the generation to the use of clean air, and can automatically control the operating parameters of the unit according to the environmental parameter requirements; the sewage system can monitor the operating parameters of the entire process, and can realize automatic interlocking control of key energy-saving control points; the energy delivery system can dynamically monitor the delivery and distribution of various energy media manufactured in the energy workshop. The automatic control device of energy management corresponds to the centralized control center.
[0074] The energy management automation control device provided by the present invention determines the actual production data to be analyzed, analyzes the actual production data based on the energy load change prediction model, determines the simulation data of the energy load corresponding to the actual production data, and then calibrates the simulation data of the energy load to obtain the energy load change prediction curve, and controls the energy-consuming equipment based on the energy load change prediction curve. This method can realize the pre-control of the energy-consuming equipment through the energy load change prediction curve, effectively improves the safety and stability of the operation of the energy-consuming equipment, and facilitates the energy management of the production process of the energy-consuming equipment.
[0075] Corresponding to the above-mentioned automatic control method for energy management, the present invention also provides an electronic device. Since the embodiment of the electronic device is similar to the above-mentioned method embodiment, the description is relatively simple. For relevant parts, please refer to the description of the above-mentioned method embodiment. The electronic device described below is only exemplary. Figure 4 As shown, it is a schematic diagram of the physical structure of an electronic device disclosed in an embodiment of the present invention. The electronic device may include: a processor 401, a memory 402 and a communication bus 403, wherein the processor 401 and the memory 402 complete mutual communication through the communication bus 403, and communicate with the outside through the communication interface 404. The processor 401 can call the logic instructions in the memory 402 to execute the automatic control method of energy management, the method comprising: determining the actual production data to be analyzed; analyzing the actual production data based on the energy load change prediction model, and determining the simulation data of the energy load corresponding to the actual production data; the energy load change prediction model is obtained by the historical production data and the historical data of the energy load corresponding to it; calibrating the simulation data of the energy load to obtain the energy load change prediction curve, and controlling the energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0076] In addition, the logic instructions in the above-mentioned memory 402 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: a storage chip, a U disk, a mobile hard disk, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), a disk or an optical disk, and other media that can store program codes.
[0077] On the other hand, an embodiment of the present invention further provides a computer program product, which includes a computer program stored on a processor-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer can execute the automatic control method of energy management provided by the above-mentioned method embodiments, and the method includes: determining the actual production data to be analyzed; analyzing the actual production data based on an energy load change prediction model, and determining the simulation data of the energy load corresponding to the actual production data; the energy load change prediction model is obtained from historical production data and its corresponding historical data of energy load; calibrating the simulation data of the energy load to obtain an energy load change prediction curve, and controlling the energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0078] On the other hand, an embodiment of the present invention further provides a processor-readable storage medium, on which a computer program is stored. When the computer program is executed by the processor, it is implemented to execute the automatic control method of energy management provided by the above-mentioned embodiments, the method comprising: determining the actual production data to be analyzed; analyzing the actual production data based on an energy load change prediction model, and determining the simulation data of the energy load corresponding to the actual production data; the energy load change prediction model is obtained from historical production data and its corresponding historical data of energy load; calibrating the simulation data of the energy load to obtain an energy load change prediction curve, and controlling the energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
[0079] The processor-readable storage medium can be any available medium or data storage device that can be accessed by the processor, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NANDFLASH), solid-state drive (SSD)), etc.
[0080] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0081] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0082] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An automatic control method for energy management, characterized in that: include: Determine the actual production data to be analyzed; Analyze the actual production data based on the energy load change prediction model to determine the simulated data of the energy load corresponding to the actual production data; the energy load change prediction model is obtained from the historical production data and the historical data of the energy load corresponding to it; The simulation data of the energy load is calibrated to obtain an energy load change prediction curve, and the energy-consuming equipment is controlled based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
2. The automatic control method for energy management according to claim 1, characterized in that: Before determining the actual production data to be analyzed, it also includes: Obtain historical data on energy consumption power of energy-consuming equipment within a preset time range and historical data on its corresponding energy load; Based on the historical data of the energy consumption power and the historical data of the energy load, the energy load change prediction model is obtained.
3. The automatic control method for energy management according to claim 1, characterized in that: The determining of the actual production data to be analyzed specifically includes: Acquire the production order information and production scheduling information input by the terminal; wherein the production order information includes the product item information and product output information; Determine the production time corresponding to the production order information based on the production scheduling information; The product item information, the product output information and the production time are determined as actual production data to be analyzed.
4. The automatic control method for energy management according to claim 1, characterized in that: The analyzing the actual production data based on the energy load change prediction model to determine the simulated data of the energy load corresponding to the actual production data specifically includes: Inputting the actual production data into the energy load change prediction model to obtain real-time data of energy loads of different energy types at various times; Based on the real-time data of energy load of the different energy types at each moment and the production time, the total power consumption data of energy-consuming equipment during the production time is obtained; Based on the total energy consumption power data, simulated data of the energy load corresponding to the actual production data is obtained.
5. The automatic control method for energy management according to claim 1, characterized in that: The calibrating the simulation data of the energy load to obtain the energy load change prediction curve specifically includes: when the simulation data of the energy load of the energy-consuming equipment is equal to or greater than a first preset energy load value, correcting the simulation data of the energy load to increase the first preset amount to obtain the energy load change prediction curve; or, when the simulation data of the energy load of the energy-consuming equipment is less than a second preset energy load value, correcting the simulation data of the energy load to increase the second preset amount to obtain the energy load change prediction curve; wherein the first preset energy load value is greater than the second preset energy load value, and the first preset amount is greater than the second preset amount.
6. The automatic control method for energy management according to claim 1, characterized in that: After obtaining the energy load change prediction curve, it also includes: When the simulated data of the energy load of the energy-consuming equipment reaches or exceeds a preset energy load peak value, an abnormal alarm prompt information is generated.
7. An automatic control device for energy management, characterized in that: include: A production information acquisition unit, used to determine actual production data to be analyzed; An energy load prediction unit, used to analyze the actual production data based on an energy load change prediction model to determine simulation data of energy load corresponding to the actual production data; the energy load change prediction model is obtained from historical production data and historical data of energy load corresponding to the historical production data; An energy manufacturing execution unit is used to calibrate the simulation data of the energy load, obtain an energy load change prediction curve, and control energy-consuming equipment based on the energy load change prediction curve; wherein the energy load change prediction curve is associated with the energy-consuming equipment.
8. The automatic control device for energy management according to claim 7, characterized in that: Before determining the actual production data to be analyzed, it also includes: The prediction model building unit is used to obtain the historical data of energy consumption power of energy-consuming equipment and the historical data of its corresponding energy load within a preset time range; based on the historical data of energy consumption power and the historical data of energy load, the energy load change prediction model is obtained.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the automatic control method for energy management as claimed in any one of claims 1 to 6 are implemented.
10. A processor-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the automatic control method for energy management as claimed in any one of claims 1 to 6 are implemented.
Citation Information
Cited By
Intelligent Orchestration Systems for Energy and Power Management of Edge Networking Devices and Distributed Energy Entities
US20230335998A1