Energy scheduling system and energy consumption optimization method for smart quartz processing factory

By collecting and analyzing the energy consumption data of the annealing furnace equipment and dynamically scheduling the annealing temperature, the problem of energy waste during the temperature adjustment process of the quartz processing plant is solved, and energy optimization and production efficiency improvement are achieved.

CN118780413APending Publication Date: 2024-10-15SHANGHAI QIANGHUA IND CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410733769.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Before the quartz processing factory starts every day, it takes a lot of time and energy to heat up the annealing furnace from room temperature to the target processing temperature or adjust between different target processing temperatures, resulting in energy waste and low production efficiency.

Method used

By collecting historical energy consumption data of annealing furnace equipment, the energy consumption rate is calculated, and dynamic scheduling is performed based on the annealing temperature data set to match the temperature requirements of the annealing furnace equipment and quartz devices to optimize energy use.

Benefits of technology

Effectively save energy consumption, reduce energy consumption costs, reduce waiting time, improve production efficiency and equipment utilization, and ensure production progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780413A_ABST
    Figure CN118780413A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of energy consumption monitoring, in particular to an energy scheduling system and an energy consumption optimization method for an intelligent quartz processing factory, and the method specifically comprises the steps: collecting the historical energy consumption data of each annealing furnace device in the factory, and building an annealing temperature data set needed by a quartz device to be processed on that day; matching the target working temperature required to be reached by the first operation of each annealing furnace device on the current day in the annealing temperature data set; dynamically scheduling equipment energy of the annealing furnace according to the energy scheduling strategy; transmitting the annealing furnace equipment information matched with the to-be-processed quartz device to a factory workshop where the to-be-processed quartz device is located, and notifying a quartz device transporter in a factory to transport the to-be-processed quartz device to the matched annealing furnace equipment; the method solves the problem that in the prior art, before a quartz processing factory starts working every day, when the temperature of an annealing furnace rises to the target processing temperature from the room temperature or is adjusted between different target processing temperatures, a large amount of time and energy need to be consumed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy consumption monitoring, and in particular to an energy scheduling system and an energy consumption optimization method for a smart quartz processing factory. Background Art

[0002] A quartz processing factory refers to a factory that specializes in extracting quartz raw materials from quartz ores and making various quartz products through a series of processing techniques; quartz processing usually requires high-temperature melting, drying, annealing or sintering, and these high-temperature processing processes consume a lot of energy.

[0003] The annealing furnace of a quartz processing factory is a device used to heat treat quartz products. Annealing is a heat treatment process that controls the heating time and temperature of the material to ensure that the quartz products achieve the ideal heat treatment effect during the annealing process. After annealing, the quartz products can improve their chemical and physical properties, reduce internal stress, and improve stability and durability. In this processing technology, the annealing furnace plays a very important role in production and is the key to quality control and performance improvement of quartz products. In the existing production and processing, before the quartz processing factory starts work every day, it takes a lot of time and energy to heat the annealing furnace from room temperature to the target processing temperature or adjust between the different target processing temperatures required by different quartz devices. How to optimize the production scheduling strategy and reduce the energy waste generated by the annealing furnace is an important issue that the quartz processing industry needs to solve.

[0004] In the existing disclosed invention technology, for example, Chinese patent No. CN117705827A discloses a method for detecting defects in quartz glass based on multivariable fine-firing energy consumption optimization, including obtaining historical fine-firing data of quartz glass, constructing a fine-firing energy consumption model for quartz glass, and solving specific fine-firing energy consumption model parameters through historical fine-firing data; dividing the fine-firing task of quartz glass into multiple fine-firing batches, substituting the fine-firing task data into the fine-firing energy consumption model, and calculating the fine-firing parameters of the fine-firing task; detecting the quality of each fine-firing batch of quartz glass, constructing a quartz glass appearance defect evaluation index, feedback-adjusting the fine-firing parameters during the fine-firing of quartz glass, and detecting physical property defects of quartz glass.

[0005] The above patent lacks real-time monitoring and adjustment of energy consumption during the quartz processing process, resulting in the inability to timely reflect and adjust energy consumption fluctuations in actual production, which requires a lot of time and energy. Summary of the invention

[0006] The technical problem to be solved by the present invention is that in the prior art, before the quartz processing factory starts work every day, it takes a lot of time and energy to heat the annealing furnace from room temperature to the target processing temperature or adjust between different target processing temperatures. An energy scheduling system and energy consumption optimization method for a smart quartz processing factory are proposed.

[0007] In order to achieve the above-mentioned object, the technical solution of the energy consumption optimization method for a smart quartz processing factory of the present invention comprises the following steps:

[0008] S1: Collect the historical energy consumption data of each annealing furnace equipment in the factory and calculate the energy consumption rate of each annealing furnace equipment;

[0009] S2: extracting the annealing temperature values ​​required for the quartz devices to be processed in the factory on that day, and arranging the annealing temperature values ​​in order from large to small to form an annealing temperature data set required for the quartz devices to be processed on that day;

[0010] S3: According to the energy consumption rate of each annealing furnace equipment, the target operating temperature that needs to be achieved by each annealing furnace equipment in the first operation of the day is matched in the annealing temperature data set;

[0011] S4: When the temperature in the annealing furnace reaches and stably maintains the target operating temperature, the annealing temperature data set required by the quartz device to be processed on that day is matched with the annealing temperature value required by the next quartz device to be processed by the annealing furnace, and the energy of the annealing furnace is dynamically scheduled according to the energy scheduling strategy;

[0012] S5: Transmit the annealing furnace equipment information matched to the quartz device to be processed in S4 to the factory workshop where the quartz device to be processed is located, and notify the quartz device transportation personnel in the factory to transport the quartz device to be processed to the matched annealing furnace equipment.

[0013] Specifically, in S1, the smart quartz processing factory includes S annealing furnace equipment; the historical energy consumption data of each annealing furnace equipment includes: in the previous working day, the annealing furnace equipment is in the heating working stage, and the energy consumed by the furnace temperature increasing by 1 degree is W up , the average time T for the furnace temperature to rise by 1 degree up ;

[0014] The historical energy consumption data of each annealing furnace equipment also includes: in the previous working day, the annealing furnace equipment was in the cooling stage, and the amount of energy consumed when the temperature in the furnace decreased by 1 degree was W down The average time T for the furnace temperature to drop by 1 degree down .

[0015] Specifically, in S1, the energy consumption rate of each annealing furnace equipment includes: a heating energy consumption rate and a cooling energy consumption rate;

[0016] The calculation strategy of the heating energy consumption rate is specifically as follows:

[0017]

[0018] The calculation strategy of the cooling energy consumption rate is specifically as follows:

[0019]

[0020] Among them, θ s,up , θ s,down are respectively the heating energy consumption rate and the cooling energy consumption rate of the s-th annealing furnace equipment; s ≤ S;

[0021] T n , T y are respectively the ambient temperature value at which the annealing furnace equipment works on the current day and the ambient temperature value at which the annealing furnace equipment worked on the previous working day.

[0022] Specifically, S3 includes the following specific steps:

[0023] S31: Extract the heating energy consumption rate and the annealing temperature data set {t1, t2... t d ... t D} of each annealing furnace equipment, and arrange the heating energy consumption rates of each annealing furnace equipment in descending order to form a heating energy consumption rate set {θ 1,up , θ 2,up ... θ s,up ... θ S,up};

[0024] Among them, t d is the annealing temperature value required for the d-th quartz device to be processed; t D is the annealing temperature value required for the D-th quartz device to be processed; D is the number of quartz devices to be processed on the current day, d ≤ D; θ S,up is the heating energy consumption rate of the S-th annealing furnace equipment;

[0025] S32: Extract the number D of quartz devices to be processed on the current day;

[0026] When D < S, execute step S33;

[0027] When D ≥ S, execute step S34;

[0028] S33: Input the maximum annealing temperature data matching instruction into the annealing temperature data set required for the quartz devices to be processed on the current day, and match the quartz devices to be processed with the required annealing temperature data of t1 to the maximum heating energy consumption rate of θ 1,upThe annealing furnace equipment of the quartz device to be processed on that day is matched to each annealing furnace equipment in sequence, wherein the required annealing temperature data is t D The quartz device to be processed is matched to the SDth annealing furnace equipment;

[0029] S34: Inputting a segmented annealing temperature search instruction into the annealing temperature data set of the quartz device to be processed on the day, and performing matching processing on the target operating temperature that needs to be achieved by the annealing furnace equipment for the first time on the day; wherein the annealing temperature data set is divided into X segments, is the floor symbol,

[0030] Match the maximum annealing temperature data in each annealing temperature data set to S annealing furnace devices in sequence; wherein the dth quartz device to be processed is matched to the sth annealing furnace device for annealing;

[0031] S35: Calculate the pre-start time required for each annealing furnace device to reach the target operating temperature for the first operation of the day, and perform timed pre-start control on each annealing furnace device before the factory starts working on the day.

[0032] Specifically, in S35, the calculation strategy of the pre-start time required for the annealing furnace equipment to reach the target operating temperature for the first time of operation on the day is as follows:

[0033] μ s,d =|t d -T n |×T up ;

[0034] Among them, μ s,d It is the pre-start time of the sth annealing furnace equipment for the dth quartz device to be processed.

[0035] Specifically, S4 includes the following specific steps:

[0036] S41: When the temperature in the annealing furnace reaches and stably maintains the target operating temperature t d,mb When the annealing temperature data set required by the quartz device to be processed on that day is used, the two annealing temperature values ​​closest to the current target operating temperature of the annealing furnace equipment are matched. in, x1, x2 are both subscripts and x1, x2∈{1, 2...d...D};

[0037] S42: importing the two annealing temperature values ​​obtained by matching into the energy scheduling strategy to calculate the energy scheduling coefficient;

[0038] The energy scheduling coefficient includes: a heating scheduling coefficient and a cooling scheduling coefficient;

[0039] The heating scheduling coefficient r up The calculation strategy is:

[0040] The cooling scheduling coefficient r down The calculation strategy is:

[0041] S43: Dynamically dispatching the energy of the annealing furnace equipment;

[0042] When up ≥r down When the annealing temperature is Annealing the quartz device to be processed;

[0043] When up <r down When the annealing temperature is The quartz device to be processed is annealed.

[0044] In addition, the energy dispatching system for the smart quartz processing factory of the present invention includes the following modules:

[0045] Historical energy consumption data collection module, annealing temperature data set module, first operation temperature determination module, energy dynamic scheduling module, annealing furnace equipment information sharing module;

[0046] The historical energy consumption data collection module is used to collect the historical energy consumption data of each annealing furnace equipment in the factory and calculate the energy consumption rate of each annealing furnace equipment;

[0047] The annealing temperature data set module is used to extract the annealing temperature values ​​required for the quartz devices to be processed on the day in the factory, and to arrange the annealing temperature values ​​in order from large to small to form the annealing temperature data set required for the quartz devices to be processed on the day;

[0048] The first operation temperature determination module matches the target operating temperature that each annealing furnace device needs to reach for the first operation of the day in the annealing temperature data set according to the energy consumption rate of each annealing furnace device;

[0049] The energy dynamic scheduling module is used to match the annealing temperature value required by the next quartz device to be processed by the annealing furnace equipment in the annealing temperature data set required by the quartz device to be processed on that day when the temperature in the annealing furnace equipment reaches and stably maintains the target operating temperature, and dynamically schedule the energy of the annealing furnace equipment according to the energy scheduling strategy;

[0050] The annealing furnace equipment information sharing module is used to transmit the annealing furnace equipment information matched to the quartz device to be processed to the factory workshop where the quartz device to be processed is located, and to notify the quartz device transportation personnel in the factory to transport the quartz device to be processed to the matched annealing furnace equipment.

[0051] The present invention also discloses a storage medium, in which instructions are stored. When a computer reads the instructions, the computer executes the energy consumption optimization method for a smart quartz processing factory.

[0052] The present invention also discloses an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the energy consumption optimization method for a smart quartz processing factory when executing the computer program.

[0053] Compared with the prior art, the technical effects of the present invention are as follows:

[0054] 1. The present invention takes into account the problem that before the quartz processing factory starts work every day, it takes a lot of time and energy to heat the annealing furnace from room temperature to the target processing temperature or adjust between different target processing temperatures. By matching the target operating temperature according to the energy consumption rate of each annealing furnace equipment, dynamic energy scheduling is achieved, which can effectively save energy consumption and reduce energy consumption costs.

[0055] 2. The present invention can effectively reduce waiting time, improve production efficiency and increase production capacity by orderly arranging and dynamically scheduling annealing temperature data sets.

[0056] 3. The present invention matches the demand for quartz devices with the energy consumption rate of the annealing furnace equipment, thereby maximizing equipment utilization, reducing idleness, and improving production efficiency.

[0057] 4. The present invention matches the quartz device to be processed to the corresponding annealing furnace equipment and notifies the transportation personnel to transport it, which can improve the coordination and efficiency of the transportation process, reduce the transportation time, and ensure the production progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.

[0059] in:

[0060] Figure 1 A schematic flow chart of the energy consumption optimization method for a smart quartz processing factory of the present invention;

[0061] Figure 2 It is a structural schematic diagram of the energy dispatching system for a smart quartz processing factory of the present invention. DETAILED DESCRIPTION

[0062] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0063] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0064] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0065] Embodiment 1

[0066] like Figure 1 As shown, the energy consumption optimization method for a smart quartz processing factory according to an embodiment of the present invention includes the following specific steps:

[0067] S1: Collect the historical energy consumption data of each annealing furnace equipment in the factory and calculate the energy consumption rate of each annealing furnace equipment;

[0068] In S1, the smart quartz processing factory includes S annealing furnace equipment.

[0069] In this embodiment, each annealing furnace device performs annealing treatment on a total of E quartz devices to be processed within one working day.

[0070] The historical energy consumption data of each annealing furnace equipment includes: in the previous working day, the annealing furnace equipment was in the heating stage, and the amount of energy consumed when the temperature in the furnace increased by 1 degree was W up , the average time T for the furnace temperature to rise by 1 degree up .

[0071] The historical energy consumption data of each annealing furnace equipment also includes: in the previous working day, the annealing furnace equipment was in the cooling stage, and the amount of energy consumed when the temperature in the furnace decreased by 1 degree was W down , the average time T for the furnace temperature to drop by 1 degree down .

[0072] In S1, the energy consumption rates of the respective annealing furnace devices include: the heating energy consumption rate and the cooling energy consumption rate.

[0073] The calculation strategy for the heating energy consumption rate is specifically as follows:

[0074]

[0075] The calculation strategy for the cooling energy consumption rate is specifically as follows:

[0076]

[0077] where θ s,up , θ s,down are respectively the heating energy consumption rate and the cooling energy consumption rate of the s-th annealing furnace device, and s ≤ S.

[0078] T n , T y are respectively the ambient temperature value at which the annealing furnace device operates on the current day and the ambient temperature value at which the annealing furnace device operated on the previous working day.

[0079] S2: Extract the annealing temperature values required for the quartz devices to be processed in the factory on the current day, and arrange the annealing temperature values in descending order to form a dataset of the annealing temperature values required for the quartz devices to be processed on the current day.

[0080] S3: According to the energy consumption rates of the respective annealing furnace devices, match the target working temperatures that each annealing furnace device needs to reach for the first time operation on the current day in the annealing temperature dataset.

[0081] S31: Extract the heating energy consumption rates of the respective annealing furnace devices and the annealing temperature dataset {t1, t2...t d ...t D}, and arrange the heating energy consumption rates of the respective annealing furnace devices in descending order to form a heating energy consumption rate set {θ 1,up , θ 2,up ...θ s,up ...θ S,up};

[0082] where t d is the annealing temperature value required for the d-th quartz device to be processed; t D is the annealing temperature value required for the D-th quartz device to be processed; D is the number of quartz devices to be processed on the current day, and d ≤ D; θ S,up is the heating energy consumption rate of the S-th annealing furnace device.

[0083] S32: Extract the number D of quartz devices to be processed on the current day;

[0084] When D < S, execute step S33;

[0085] When D≥S, execute step S34.

[0086] S33: Input the maximum annealing temperature data matching instruction in the annealing temperature data set required by the quartz device to be processed on that day, and match the quartz device to be processed with the required annealing temperature data t1 to the maximum heating energy consumption rate θ 1,up The annealing furnace equipment of the quartz device to be processed on that day is matched to each annealing furnace equipment in sequence, wherein the required annealing temperature data is t D The quartz device to be processed is matched to the SD annealing furnace equipment.

[0087] S34: Inputting a segmented annealing temperature search instruction into the annealing temperature data set of the quartz device to be processed on the day, and performing matching processing on the target operating temperature that needs to be achieved by the annealing furnace equipment for the first time on the day; wherein the annealing temperature data set is divided into X segments, is the floor symbol,

[0088] The maximum annealing temperature data in each annealing temperature data set is matched to S annealing furnace devices in sequence; wherein the dth quartz device to be processed is matched to the sth annealing furnace device for annealing treatment.

[0089] S35: Calculate the pre-start time required for each annealing furnace device to reach the target operating temperature for the first operation of the day, and perform timed pre-start control on each annealing furnace device before the factory starts working on the day.

[0090] In S35, the calculation strategy of the pre-start time required for each annealing furnace device to reach the target operating temperature for the first time of operation on the day is as follows:

[0091] μ s,d =|t d -T n |×T up ;

[0092] Among them, μ s,d It is the pre-start time of the sth annealing furnace equipment for the dth quartz device to be processed.

[0093] S4: When the temperature inside the annealing furnace reaches and stably maintains the target operating temperature, continue to match the annealing temperature value required by the next quartz device to be processed by the annealing furnace in the annealing temperature data set required by the quartz device to be processed on that day, and dynamically schedule the energy of the annealing furnace according to the energy scheduling strategy.

[0094] S41: When the temperature in the annealing furnace reaches and stably maintains the target operating temperature td,mb When the annealing temperature data set required by the quartz device to be processed on that day is used, the two annealing temperature values ​​closest to the current target operating temperature of the annealing furnace equipment are matched. in, x1, x2 are both subscripts and x1, x2∈{1, 2...d...D}.

[0095] S42: Import the two annealing temperature values ​​obtained by matching into the energy scheduling strategy to calculate the energy scheduling coefficient.

[0096] The energy scheduling coefficient includes a heating scheduling coefficient and a cooling scheduling coefficient.

[0097] The heating scheduling coefficient r up The calculation strategy is:

[0098] The cooling scheduling coefficient r down The calculation strategy is:

[0099] S43: Dynamically dispatching the energy of the annealing furnace equipment;

[0100] When up ≥r down When the annealing temperature is Annealing treatment of quartz devices processed on behalf of others;

[0101] When up <r down When the annealing temperature is The quartz devices processed by the manufacturer are annealed.

[0102] S5: Transmit the annealing furnace equipment information matched to the quartz device to be processed in S4 to the factory workshop where the quartz device to be processed is located, and notify the quartz device transportation personnel in the factory to transport the quartz device to be processed to the matched annealing furnace equipment.

[0103] Embodiment 2

[0104] like Figure 2 As shown, the energy scheduling system for a smart quartz processing factory according to an embodiment of the present invention includes the following modules:

[0105] Historical energy consumption data collection module, annealing temperature data set module, first operation temperature determination module, energy dynamic scheduling module, and annealing furnace equipment information sharing module.

[0106] The historical energy consumption data collection module is used to collect the historical energy consumption data of each annealing furnace equipment in the factory and calculate the energy consumption rate of each annealing furnace equipment.

[0107] The annealing temperature data set module is used to extract the annealing temperature values ​​required for the quartz devices to be processed in the factory on that day, and to arrange the annealing temperature values ​​in order from large to small to form the annealing temperature data set required for the quartz devices to be processed on that day.

[0108] The first operation temperature determination module matches the target operating temperature that each annealing furnace device needs to reach when it first operates on that day in the annealing temperature data set according to the energy consumption rate of each annealing furnace device.

[0109] The energy dynamic scheduling module is used to match the annealing temperature value required for the next quartz device to be processed by the annealing furnace equipment in the annealing temperature data set required by the quartz device to be processed on that day when the temperature inside the annealing furnace equipment reaches and stably maintains the target operating temperature, and dynamically schedule the energy of the annealing furnace equipment according to the energy scheduling strategy.

[0110] The annealing furnace equipment information sharing module is used to transmit the annealing furnace equipment information matched to the quartz device to be processed to the factory workshop where the quartz device to be processed is located, and to notify the quartz device transportation personnel in the factory to transport the quartz device to be processed to the matched annealing furnace equipment.

[0111] Embodiment 3

[0112] This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor.

[0113] The processor executes the energy consumption optimization method for a smart quartz processing factory by calling a computer program stored in the memory.

[0114] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein the memory stores at least one computer program, which is loaded and executed by the processor to implement the energy consumption optimization method for a smart quartz processing factory provided by the above method embodiment. The electronic device may also include other components for implementing the functions of the device, for example, the electronic device may also have components such as a wired or wireless network interface and an input and output interface to input and output data. This embodiment will not be described in detail here.

[0115] Embodiment 4

[0116] This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;

[0117] When the computer program runs on a computer device, the computer device executes the energy consumption optimization method for a smart quartz processing factory.

[0118] For example, the computer readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.

[0119] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0120] It should be understood that determining B based on A does not mean determining B only based on A. B can also be determined based on A and / or other information.

[0121] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. Computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center through a wired network or / and a wireless network. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0122] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0123] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0124] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only one, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0125] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0126] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0127] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0128] In summary, compared with the prior art, the technical effects of the present invention are as follows:

[0129] 1. The present invention takes into account the problem that before the quartz processing factory starts work every day, it takes a lot of time and energy to heat the annealing furnace from room temperature to the target processing temperature or adjust between different target processing temperatures. By matching the target operating temperature according to the energy consumption rate of each annealing furnace equipment, dynamic energy scheduling is achieved, which can effectively save energy consumption and reduce energy consumption costs.

[0130] 2. The present invention can effectively reduce waiting time, improve production efficiency and increase production capacity by orderly arranging and dynamically scheduling annealing temperature data sets.

[0131] 3. The present invention matches the demand for quartz devices with the energy consumption rate of the annealing furnace equipment, thereby maximizing equipment utilization, reducing idleness, and improving production efficiency.

[0132] 4. The present invention matches the quartz device to be processed to the corresponding annealing furnace equipment and notifies the transportation personnel to transport it, which can improve the coordination and efficiency of the transportation process, reduce the transportation time, and ensure the production progress.

[0133] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An energy consumption optimization method for a smart quartz processing factory, characterized in that: The method includes the following specific steps: S1: Collect the historical energy consumption data of each annealing furnace device in the factory, and calculate the energy consumption rate of each annealing furnace device; S2: Extract the annealing temperature values required for the quartz devices to be processed in the factory on the current day, and arrange the annealing temperature values in descending order to form a dataset of the annealing temperature values required for the quartz devices to be processed on the current day; S3: According to the energy consumption rate of each annealing furnace device, match the target working temperature that each annealing furnace device needs to reach for the first time on the current day in the annealing temperature dataset; S4: When the temperature inside the annealing furnace device reaches and stably maintains the target working temperature, continue to match the annealing temperature value required for the next quartz device to be processed by the annealing furnace device in the dataset of the annealing temperature values required for the quartz devices to be processed on the current day, and dynamically schedule the energy of the annealing furnace device according to the energy scheduling strategy; S5: Transmit the information of the annealing furnace device matched with the quartz device to be processed in S4 to the factory workshop where the quartz device to be processed is located, and notify the quartz device transportation personnel in the factory to transport the quartz device to be processed to the matched annealing furnace device.

2. The energy consumption optimization method for a smart quartz processing factory according to claim 1, characterized in that: In S1, the smart quartz processing factory includes S annealing furnace equipment; the historical energy consumption data of each annealing furnace equipment includes: in the previous working day, the annealing furnace equipment was in the heating stage, and the amount of energy consumed when the temperature in the furnace increased by 1 degree was W up , the average time T for the furnace temperature to rise by 1 degree up ; The historical energy consumption data of each annealing furnace equipment also includes: in the previous working day, the annealing furnace equipment was in the cooling stage, and the amount of energy consumed when the temperature in the furnace decreased by 1 degree was W down The average time T for the furnace temperature to drop by 1 degree down .

3. The energy consumption optimization method for a smart quartz processing factory according to claim 2, characterized in that: In S1, the energy consumption rate of each annealing furnace device includes: the heating energy consumption rate and the cooling energy consumption rate; The calculation strategy of the heating energy consumption rate is specifically as follows: The calculation strategy of the cooling energy consumption rate is specifically as follows: Among them, θ s,up ,θ s,down are the heating energy consumption rate and cooling energy consumption rate of the sth annealing furnace equipment respectively; s≤S; T n , T y They are respectively the ambient temperature value of the annealing furnace equipment on the current day and the ambient temperature value of the annealing furnace equipment on the previous working day.

4. The energy consumption optimization method for a smart quartz processing factory according to claim 3 is characterized in that: S3 includes the following specific steps: S31: Extract the heating energy consumption rate and annealing temperature data set {t1, t2…t d …t D }, and the heating energy consumption rates of each annealing furnace equipment are arranged in order from large to small to form a heating energy consumption rate set {θ 1,up ,θ 2,up , ..., θ s,up , ..., θ s,up }; Among them, t d is the required annealing temperature value of the dth quartz device to be processed; t D is the required annealing temperature value of the Dth quartz device to be processed; D is the number of quartz devices to be processed on that day, d≤D; θ S,up is the heating energy consumption rate of the sth annealing furnace equipment; S32: Extract the number D of quartz devices to be processed on the current day; When D < S, execute step S33; When D ≥ S, execute step S34; S33: Input the maximum annealing temperature data matching instruction in the annealing temperature data set required by the quartz device to be processed on that day, and match the quartz device to be processed with the required annealing temperature data t1 to the maximum heating energy consumption rate θ 1,up The annealing furnace equipment of the quartz device to be processed on that day is matched to each annealing furnace equipment in sequence, wherein the required annealing temperature data is t D The quartz device to be processed is matched to the SDth annealing furnace equipment; S34: Inputting a segmented annealing temperature search instruction into the annealing temperature data set of the quartz device to be processed on the day, and performing matching processing on the target operating temperature that needs to be achieved by the annealing furnace equipment for the first time on the day; wherein the annealing temperature data set is divided into X segments, is the floor symbol, Match the maximum annealing temperature data in each segment of the annealing temperature dataset to S annealing furnace devices in sequence; among them, the d-th quartz device to be processed is matched to the s-th annealing furnace device for annealing treatment; S35: Calculate the pre-start time required for each annealing furnace device to reach the target working temperature for the first time on the current day, and perform timed pre-start control on each annealing furnace device before the factory starts work on the current day.

5. The energy consumption optimization method for a smart quartz processing factory according to claim 4 is characterized in that: In S35, the calculation strategy of the pre-start time required for each annealing furnace device to reach the target working temperature for the first time on the current day is specifically as follows: μ s,d =|t d -T n |×T up ; Among them, μ s,d It is the pre-start time of the sth annealing furnace equipment for the dth quartz device to be processed.

6. The energy consumption optimization method for a smart quartz processing factory according to claim 5, characterized in that: S4 includes the following specific steps: S41: When the temperature in the annealing furnace reaches and stably maintains the target operating temperature t d,mb When the annealing temperature data set required by the quartz device to be processed on that day is used, the two annealing temperature values ​​closest to the current target operating temperature of the annealing furnace equipment are matched. in, x1, x2 are both subscripts and x1, x2∈{1, 2…d…D}; S42: Matching to obtain two annealing temperature values Import energy scheduling strategy and calculate energy scheduling coefficient; Among them, the energy scheduling coefficient includes: the heating scheduling coefficient and the cooling scheduling coefficient; The heating scheduling coefficient r up The calculation strategy is: The cooling scheduling coefficient r down The calculation strategy is: S43: Dynamically schedule the energy of the annealing furnace device; When up ≥r down When the annealing temperature is Annealing the quartz device to be processed; When up <r down When the annealing temperature is The quartz device to be processed is annealed.

7. An energy dispatching system for a smart quartz processing factory, which is implemented based on the energy consumption optimization method for a smart quartz processing factory as described in any one of claims 1 to 6, characterized in that: The system includes the following modules: Historical energy consumption data acquisition module, annealing temperature dataset module, first-run temperature determination module, energy dynamic scheduling module, annealing furnace device information sharing module; The historical energy consumption data acquisition module is used to collect the historical energy consumption data of each annealing furnace device in the factory, and calculate the energy consumption rate of each annealing furnace device; The annealing temperature dataset module is used to extract the annealing temperature values required for the quartz devices to be processed in the factory on the current day, and arrange the annealing temperature values in descending order to form a dataset of the annealing temperature values required for the quartz devices to be processed on the current day; The first-run temperature determination module matches the target working temperature that each annealing furnace device needs to reach for the first time on the current day in the annealing temperature dataset according to the energy consumption rate of each annealing furnace device; The energy dynamic scheduling module is used to match the annealing temperature value required by the next quartz device to be processed by the annealing furnace equipment in the annealing temperature data set required by the quartz device to be processed on that day when the temperature in the annealing furnace equipment reaches and stably maintains the target operating temperature, and dynamically schedule the energy of the annealing furnace equipment according to the energy scheduling strategy; The annealing furnace equipment information sharing module is used to transmit the annealing furnace equipment information matched to the quartz device to be processed to the factory workshop where the quartz device to be processed is located, and to notify the quartz device transportation personnel in the factory to transport the quartz device to be processed to the matched annealing furnace equipment.

8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the energy consumption optimization method for a smart quartz processing factory as described in any one of claims 1 to 6 is implemented.

9. An electronic device, characterized in that: include: A memory for storing instructions; A processor is used to execute the instructions so that the device performs the steps of the energy consumption optimization method for a smart quartz processing factory as described in any one of claims 1-6.