Digital intelligent management system for construction progress

By designing a digital intelligent management system for construction progress, the isolation problem caused by data classification management was solved, unified management and real-time monitoring of project progress data were realized, and the efficiency and quality of project management were improved.

CN118780491APending Publication Date: 2024-10-15CHINA CONSTR FIRST BUILDING (GRP) CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410923826.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In existing project progress management methods, data classification management leads to data isolation, making it difficult to achieve seamless integration and affecting the accuracy of real-time monitoring and decision-making.

Method used

Design a digital intelligent management system for construction progress, including an image acquisition module, an image processing module, a project progress monitoring module, a project progress processing module, a control module, a display module, a storage module and a communication module. Data can be processed through image processing and data analysis. Unified management and real-time monitoring.

Benefits of technology

It realizes the unified management of various archive files and progress supervision data of the project, supports remote downloading and viewing, and improves the efficiency and quality of project management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780491A_ABST
    Figure CN118780491A_ABST
Patent Text Reader

Abstract

The invention relates to a construction progress digital intelligent management system which comprises an image acquisition module, an image processing module, a project progress monitoring module, a project progress processing module, a control module, a display module, a storage module, an input module and a communication module. The image acquisition module is electrically connected with the image processing module, and the image processing module is electrically connected with the control module; the project progress monitoring module is electrically connected with the project progress processing module, and the project progress processing module is electrically connected with the control module; the control module is electrically connected with the display module, the storage module, the input module and the communication module; according to the construction progress digital intelligent management system, various archived files of a project and project progress supervision data can be managed in a unified manner, remote downloading and viewing can be carried out at the same time, and monitoring, viewing and management by project managers at any time are facilitated, so that the project management efficiency and quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering progress management, and in particular relates to a digital intelligent management system for construction progress. Background Art

[0002] As construction and engineering projects become increasingly complex, traditional construction management methods are gradually showing their limitations. The need to monitor project progress, quality, and safety has become more urgent. At the same time, the rapid development of digital technology has also provided new possibilities for solving these challenges. Therefore, the comprehensive application of image processing, data analysis, and intelligent management systems has become a research hotspot in the field of construction management.

[0003] In the existing technology, various types of project progress data are generally managed in a classified manner, which is often isolated and difficult to achieve seamless integration. The difficulty in data exchange and sharing between multiple systems affects the accuracy of real-time monitoring and decision-making. Summary of the invention

[0004] The existing project progress management adopts a classified management approach to various types of data and has difficulties in real-time management of project progress.

[0005] The present invention provides a digital intelligent management system for construction progress, comprising an image acquisition module, an image processing module, a project progress monitoring module, a project progress processing module, a control module, a display module, a storage module, an input module, and a communication module; the image acquisition module is electrically connected to the image processing module, and the image processing module is electrically connected to the control module; the project progress monitoring module is electrically connected to the project progress processing module, and the project progress processing module is electrically connected to the control module; the control module is electrically connected to the display module, the control module is electrically connected to the storage module, the control module is electrically connected to the input module, and the control module is electrically connected to the communication module.

[0006] Furthermore, the digital intelligent management system for construction progress also includes a power supply module, which is electrically connected to the image acquisition module, the image processing module, the project progress monitoring module, the project progress processing module, the control module, the display module, and the communication module respectively.

[0007] Furthermore, the image processing module processes the image X acquired by the image acquisition module. i The processing process is: through the input module for image X i Increase the attribute parameters, and then image X i Digitize and store in the storage module.

[0008] Furthermore, the project progress processing module processes the image Y collected by the project progress monitoring module. iThe processing process is:

[0009] S1. Retrieve the image Y stored in the storage module i-1 , image Y i ;

[0010] S2, respectively for image Y i-1 , image Y i Process the image Y i-1 Divide into target image Y i-1 , Background image Y i-1 , image Y i Divide into target image Y i , Background image Y i ;

[0011] S3, background image Y i-1 With background image Y i For comparison, the background change parameter D is calculated by the following formula;

[0012]

[0013] in, Among them, M is the background image Y i-1 With background image Y i The width of the background image is N. i-1 With background image Y i The height of image Y i-1 With background image Y i The specific width of is in the range of 1 to M; l is the image Y i-1 With background image Y i The specific height of the background image Y is in the range of 1 to N. i-1 With background image Y i The pixel value of

[0014] S4, respectively for the target image Y i-1 , target image Y i Processing is performed to obtain the enhanced target image Yl i-1 , enhance the target image Yl i , the method is as follows:

[0015]

[0016] Where u = mean(Y)*t

[0017]

[0018] Wherein, Yl(x,y) is the gray value of the pixel point of the enhanced image, t is a constant coefficient, and the value range is 1 < t < 2, and Y(x,y) is the gray value of the pixel point of the original target image;

[0019] S5. Respectively divide the enhanced target image Yl i-1 , the enhanced target image Yl i into small images of 5*5 pixels, and respectively record the central pixel value Ylz i-1 of the small images of the enhanced target image Yl i-1 (x z , y z ), and the central pixel value Ylz i of the small images of the enhanced target image Yl i (x z , y z );

[0020] S6. Compare the central pixel value Ylz i-1 of the small images of the enhanced target image Yl i-1 (x z , y z ) with the central pixel value Ylz i of the small images of the enhanced target image Yl i (x z , y z ), and calculate the target change parameter Dm through the following formula;

[0021]

[0022] Among them,

[0023] Among them, Z is the number of centers of the small images of the enhanced target image Yl i-1 or the number of centers of the small images of the enhanced target image Yl i , j is the number of centers of the small images of the enhanced target image Yl i-1 or the specific number of the small images of the enhanced target image Yl i , and the value range is 1 to Z;

[0024] S7. Calculate the project progress parameter H through the following formula, and the value range of H is 0 < H < 1,

[0025]

[0026] Furthermore, the project progress monitoring module is a fixed-position project monitoring device.

[0027] Beneficial effects of the invention: The digital intelligent management system for construction progress provided by the invention can uniformly manage various archived files and project progress supervision data of the project, and can also be downloaded and viewed remotely, making it convenient for project managers to monitor, view and manage at any time, thereby improving the efficiency and quality of project management.

[0028] The present invention will be further described in detail below with reference to the embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 Schematic diagram of the digital intelligent management system for construction progress.

[0030] Figure 2 Determine the engineering progress process diagram for the engineering progress processing module. DETAILED DESCRIPTION

[0031] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose, the specific implementation methods, structural features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and embodiments.

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] In the description of the present invention, it is necessary to understand that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "aligned", "overlap", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0034] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0035] Example 1

[0036] In order to solve the problem that various types of data in the existing project progress management are managed in a classified manner and the real-time management of the project progress is difficult.

[0037] The present invention provides a digital intelligent management system for construction progress, including an image acquisition module, an image processing module, a project progress monitoring module, a project progress processing module, a control module, a display module, a storage module, an input module, and a communication module;

[0038] Image acquisition module, used to scan and input various documents of the corresponding construction project, such as project bidding documents, project contracts, design drawings, material lists, project participant information and other related documents;

[0039] Image processing module, used to add attribute parameters to various files scanned and entered by the image acquisition module, to facilitate management and related personnel to retrieve, review and manage;

[0040] Furthermore, the added attribute parameters refer to parameters such as the time, location, and project affiliation of the image acquisition, so that the image can be retrieved later to check the progress of the project.

[0041] The project progress monitoring module is used to monitor the construction progress of the project in real time and collect image data of the project progress;

[0042] The project progress processing module is used to calculate the project progress data and record the project progress and project quality parameters;

[0043] The control module is the core module of the digital intelligent management system for construction progress. It is used to receive control instructions, output display data of project progress, and control the retrieval and review of project documents;

[0044] Display module, used to display various data of project progress management;

[0045] Storage module, used to store various data of project progress;

[0046] An input module is used to receive control commands from engineering management personnel;

[0047] The communication module is used to complete the remote data storage and remote control interactive instructions of the digital intelligent management system of the construction progress;

[0048] The specific structure of the digital intelligent management system for construction progress is as follows: the image acquisition module is electrically connected to the image processing module, and the image processing module is electrically connected to the control module; the project progress monitoring module is electrically connected to the project progress processing module, and the project progress processing module is electrically connected to the control module; the control module is electrically connected to the display module, the control module is electrically connected to the storage module, the control module is electrically connected to the input module, and the control module is electrically connected to the communication module.

[0049] Furthermore, the digital intelligent management system for construction progress also includes a power supply module, which is electrically connected to the image acquisition module, the image processing module, the project progress monitoring module, the project progress processing module, the control module, the display module, and the communication module respectively.

[0050] Furthermore, the image processing module processes the image X acquired by the image acquisition module. i The processing process is: through the input module for image X i Increase the attribute parameters, and then image X i Digitize and store in the storage module.

[0051] Furthermore, the added attribute parameters refer to the time, location, distance, altitude, ambient temperature, humidity, light conditions, shooting method, project ownership and other parameters when the image was taken, so that the image can be retrieved later to check the progress of the project.

[0052] Further, such as Figure 2 As shown, the engineering progress processing module processes the image Y collected by the engineering progress monitoring module. i The processing process is as follows: S1, retrieve the image Y stored in the storage module i-1 , image Y i ;

[0053] S2, respectively for image Y i-1 , image Y i Process the image Y i-1 Divide into target image Y i-1 , Background image Y i-1 , image Y i Divide into target image Y i , Background image Y i ;

[0054] S3, background image Y i-1 With background image Y i For comparison, the background change parameter D is calculated by the following formula;

[0055]

[0056] in, Among them, M is the background image Y i-1 With background image Y i The width of the background image is N. i-1 With background image Y i The height of image Y i-1 With background image Y i The specific width of is in the range of 1 to M; l is the image Y i-1 With background image Yi The specific height has a value range of 1 to N; (x, y) is the background image Y i-1 and the background image Y i pixel value;

[0057] S4. Respectively process the target image Y i-1 and the target image Y i to obtain the enhanced target image Yl i-1 and the enhanced target image Yl i The method is as follows:

[0058]

[0059] where u = mean(Y) * t

[0060]

[0061] In the formula, Yl(x, y) is the gray value of the pixel point of the enhanced image, t is a constant coefficient with a value range of 1 < t < 2, and Y(x, y) is the gray value of the pixel point of the original target image; in order to improve the contrast of the target image and obtain a more accurate target image, the target image is enhanced first;

[0062] S5. Respectively divide the enhanced target image Yl i-1 and the enhanced target image Yl i into small images of 5 * 5 pixels, and respectively record the central pixel value Ylz i-1 of the small image of the enhanced target image Yl i-1 (x z , y z ), and the central pixel value Ylz i of the small image of the enhanced target image Yl i (x z , y z );

[0063] S6. Compare the central pixel value Ylz i-1 of the small image of the enhanced target image Yl i-1 (x z , y z ) with the central pixel value Ylz i of the small image of the enhanced target image Yl i (x z , y z ) to calculate the target change parameter Dm through the following formula;

[0064]

[0065] Among them,

[0066] Among them, Z is the enhanced target image Yl i-1 The number of centers of the small image or the enhanced target image Yl i The number of centers of the small images, j is the enhanced target image Yl i-1 The number of centers of the small image or the enhanced target image Yl i The specific number of small images, ranging from 1 to Z;

[0067] S7. Calculate the project progress parameter H by the following formula. The value range of H is 0 <H<1,

[0068]

[0069] The closer the project progress parameter H is to 1, the more obvious the project progress is. The closer the project progress parameter H is to 0, the slower the project progress is and the more difficult it is to detect.

[0070] Furthermore, the project progress monitoring module is a fixed-position project monitoring device, so that images with exactly the same length and width can be collected, which is convenient for the project progress processing module to process the images. If a mobile-position project monitoring device is used, it is necessary to pre-process the images collected each time to adjust the image size, contrast, target ratio, etc. The accuracy of the project progress parameters updated by the project progress processing module is often low and needs to be manually corrected.

[0071] To sum up, the digital intelligent management system for construction progress provided in this embodiment can unify the management of various archived files and project progress supervision data of the project, and can also be downloaded and viewed remotely, making it convenient for project managers to monitor, view and manage at any time, thereby improving the efficiency and quality of project management.

[0072] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A digital intelligent management system for construction progress, characterized by: It includes an image acquisition module, an image processing module, a project progress monitoring module, a project progress processing module, a control module, a display module, a storage module, an input module, and a communication module; the image acquisition module is electrically connected to the image processing module, and the image processing module is electrically connected to the control module; the project progress monitoring module is electrically connected to the project progress processing module, and the project progress processing module is electrically connected to the control module; the control module is electrically connected to the display module, the control module is electrically connected to the storage module, the control module is electrically connected to the input module, and the control module is electrically connected to the communication module.

2. A digital intelligent management system for construction progress as claimed in claim 1, characterized in that: It further includes a power supply module, which is respectively electrically connected to the image acquisition module, the image processing module, the project progress monitoring module, the project progress processing module, the control module, the display module, and the communication module.

3. A digital intelligent management system for construction progress as claimed in claim 1, characterized in that: The image processing module processes the image X collected by the image collection module. i The processing process is: through the input module for image X i Increase the attribute parameters, and then image X i Digitize and store in the storage module.

4. A digital intelligent management system for construction progress as claimed in claim 1, characterized in that: The engineering progress processing module processes the image Y collected by the engineering progress monitoring module. i The processing process is: S1. Retrieve the image Y stored in the storage module i-1 , image Y i ; S2, respectively for image Y i-1 , image Y i Process the image Y i-1 Divide into target image Y i-1 , Background image Y i-1 , image Y i Divide into target image Y i , Background image Y i ; S3, background image Y i-1 With background image Y i For comparison, the background change parameter D is calculated by the following formula; in, Among them, M is the background image Y i-1 With background image Y i The width of the background image is N. i-1 With background image Y i The height of image Y i-1 With background image Y i The specific width of is in the range of 1 to M; l is the image Y i-1 With background image Y i The specific height of the background image Y is in the range of 1 to N. i-1 With background image Y i The pixel value of S4, respectively for the target image Y i-1 , target image Y i Processing is performed to obtain the enhanced target image Yl i-1 , enhance the target image Yl i , the method is as follows: Where u = mean(Y) * t In the formula, Yl(x,y) is the gray value of the enhanced image pixel point, t is a constant coefficient, and the value range is 1 < t < 2, and Y(x,y) is the gray value of the original target image pixel point; S5, respectively enhance the target image Y1 i-1 , enhance the target image Yl i Divide into small images of 5*5 pixels, and record the enhanced target image Yl respectively i-1 The central pixel value Ylz of the small image i-1 (x z ,y z ), enhance the target image Yl i The central pixel value Ylz of the small image i (x z ,y z ); S6: Enhance the target image Y1 i-1 The central pixel value Ylz of the small image i-1 (x z ,y z ) and the enhanced target image Yl i The central pixel value Ylz of the small image i (x z ,y z ) are compared, and the target change parameter Dm is calculated by the following formula; in, Among them, Z is the enhanced target image Yl i-1 The number of centers of the small image or the enhanced target image Yl i The number of centers of the small images, j is the enhanced target image Yl i-1 The number of centers of the small image or the enhanced target image Yl i The specific number of small images, ranging from 1 to Z; S7. Calculate the project progress parameter H through the following formula, and the value range of H is 0 < H < 1.

5. A digital intelligent management system for construction progress as claimed in claim 1, characterized in that: The project progress monitoring module is a fixed-position project monitoring device.